RESOLUTION 2019-059
WHEREAS, the City of Lake Elmo is a municipal corporation organized and existing under the
laws of the State of Minnesota; and
WHEREAS, the Carmelite Hermitage (Rev. John Burns), 8249 Demontreville Trail, Lake
Elmo, MN 55082 (the "Applicant"} has submitted an application to the City of Lake Elmo (the "City") for
a Conditional Use Permit to add a chapel or place of worship for a portion of the property located at 8249
Demontreville Trail (PID4 09.029.21.12.0002) (the "Property"); and
WHEREAS, notice has been published, mailed and posted pursuant to the Lake Elmo Zoning
Ordinance, Section 154.102; and
WHEREAS, the Lake Elmo Planning Commission held a public hearing on said matter on June
24,2019;and
WHEREAS, the Lake Elmo Planning Commission has submitted its report and
recommendation to the City Council as part of a Staff Memorandum dated August 20, 2019, and
WHEREAS, the City Council considered said matter at its August 20, 2019 meeting; and
NOW, THEREFORE, based on the testimony elicited and information received, the City
Council makes the following:
FINDINGS
1) That the procedures for obtaining said Conditional Use Permit are found in the Lake Elmo
Zoning Ordinance, Section 154.106.
2) That all the submission requirements of said Section 154,106 have been met by the Applicant.
3) That the proposed Conditional Use Permit includes the following components:
a) A Conditional Use Permit for a place of worship or a chapel for a portion of the property
located at 8249 Demontreville trail, Lake Elmo
4) That the Conditional Use Permit for a Carmelites including the proposed chapel will be for the
Property legally described as follows:
Legal Description of the Property
All of Government Lot 4 in Section 9, Township 29 north, Range 21 west, City of Lake
Elmo, Washington County, Minnesota, according to government survey containing 59.4 acres of
land. Also the south 30.6 acres of Government Lot 4 in Section 4, and of the southwest quarter of
the southeast quarter of said Section 4, all in Township 29 North, Range 21 West, according to
government survey, being the south 688 feet thereof.
5) That the Variance application about direct access to a collector or arterial street for the chapel that
was proposed by the Applicant would allow the applicant to use the existing driveway to their
property as access for the proposed chapel.
6) That the City approved the Applicant's request for a Variance about direct access to a collector or
arterial street for the chapel by allowing the Applicant to use the existing driveway to their
property as access for the proposed chapel,
7) Findings
1. The proposed use will not be detrimental to or endanger the public health, safety, comfort,
convenience or general welfare of the neighborhood or the city. The use of the property for
religious facilities, including the proposed chapel, will not be detrimental or in any way
endanger thepublic health, safety, comfort, convenience or welfare of the neighborhood or
the City.
2. The use or development conforms to the City of Lake Elmo Comprehensive Plan. The
property is guided for PubliclPark in the 2030 Comprehensive Plan and Institutional in the
proposed 2040 Comprehensive Plan. A place of worship is a conditional use in these land
use designations.
3. The use or development is compatible with the existing neighborhood. The use is compatible
with the existing neighborhood. The religious facilities in this area were established in the
1950's and Hermitage has been on this site since the 1980's.
4. The proposed use meets all specific development standards for such use listed in Article 7 of
this Chapter. The existing and proposed uses meet all specific development standards for
such use as listed in Section 154.600 Public and Quasi Public Open Space.
5. If the proposed use is in a flood plain management or shoreland area, the proposed use meets
all the specific standards for such use listed in Chapter 150, § 150.250 through 150.257
(Shoreland Regulations) and Chapter 152 (Flood Plain Management). The existing
structures and the proposed chapel would be located outside the 0.2% annual chance
floodplain and meets shoreland setback requirements.
6. The proposed use will be designed, constructed, operated and maintained so as to be
compatible in appearance with the existing or intended character of the general vicinity and
will not change the essential character of that area. The proposed chapel is compatible in
appearance with the existing and intended character of the general vicinity and will not
change the essential character of the area.
7. The proposed use will not be hazardous or create a nuisance as defined under this Chapter to
existing or future neighboring structures. The existing religious facilities and the proposed
chapel are not nor will they will he hazardous or create a nuisance.
S. The proposed use will be served adequately by essential public facilities and services,
including streets, police and fire protection, drainage structures, refuse disposal, water and
sewer systems and schools or will be served adequately by such facilities and services
provided by the persons or agencies responsible for the establishment of the proposed use.
The existing facilities and the proposed chapel are and will be adequately served by
essential public facilities and services, including streets, police andfire protection,
drainage structures, refuse disposal, water and sewer systems and schools.
9. The proposed use will not create excessive additional requirements at public cost for public
facilities and services and will not be detrimental to the economic welfare of the community.
The existing facilities and the proposed chapel do not and will not create excessive
additional requirements at public cost nor will the existing or proposed facilities on the
properly be detrimental to the economic welfare of the community.
10. The proposed use will not involve uses, activities, processes, materials, equipment and
conditions of operation that will be detrimental to any persons, property or the general
welfare because of excessive production of traffic, noise, smoke, fumes, glare or odors. The
existing and proposed uses will not excessively produce traffic, noise, smoke, fumes, glare
or odors.
11. Vehicular approaches to the property, where present, will not create traffic congestion or
interfere with traffic on surrounding public thoroughfares. Vehicular approaches to the
property do not and will not create and have not created traffic congestion or interfere with
traffic. The number of additional vehicles expected on the property because of the new
chapel is minimal and will be limited to certain times and days of the weeks.
12. The proposed use will not result in the destruction, loss or damage of a natural or scenic
feature of major importance. N/A
NOW, THE RE, F ORE, BE IT FURTHER RESOLVED, that the Lake Ehno City Council hereby
approves the request by Rev. John Burns of the Carmelite Hermitage for a Conditional Use Pen -nit for a
chapel or place of worship on the property located at 8249 Demontreville Trail with the following
conditions of approval:
1 ) The City Council must approve the Variance request to allow the Applicant to use the existing
driveway to Dcrnontreville Trail as the access for the proposed chapel.
2) The applicant must obtain all other necessary City, State, and other governing body permits and
approvals before the commencement of any construction activity on the site. These include, but
not limited to, a Valley Branch Watershed District permit, approval of revised plans by the City
Engineer, a building pen -nit and an on -site wastewater (septic) pen -nit,
3) All items and changes outlined by the City Engineer in the memorandum addressing the
Carmelite Chapel Conditional Use Pen -nit and Site Improvements dated June 17, 2019 shall be
incorporated into the project plans.
4) All items outlined by the Fire Chief in his memo dated June 5, 2019, shall be incorporated into
the project plans and before the City issues a building permit for the project.
5) The applicant must provide written documentation demonstrating adequate wastewater
management facilities exist or are proposed to serve the proposed chapel. This should include either
a Washington County inspection compliance report for the existing on -site wastewater system or a
wastewater management plan and permit approved by Washington County to serve the proposed
chapel.
6 The applicant or owner receive a building permit from the City for chapelwithin 12 months of City
Council approval of the conditional use permit.
7 f the applicant or owner has not taken action toward starting the chapel or if substantial
construction of the chapel has not taken place within 12 months of the City's approval of
conditional use permit, the CLIP approval shall become void. The applicant or owner may request
City Council approval of a time extension to start or:implement the conditional use permit.
Massed and duly adopted this 2011 day of august 2019 by the City Council of the City of Lake Elmo;
Minnesota.
hike I eafrson, aycr
ATTEST
4JuIiJon, Clerk