REA SOLUTION NO. 2019-078
A RESOLUTION DENYING A PETITION FOR PREPARATION OFAN
ENVIRONMENTAL ASSESSMENT WORKSHEET FOR THE PROPOSED MOUNTAIN
BIKING TRAIL PROJECT IN SUNFISH LAKE PARK
WHEREAS, on October 7, 2019, the City of Lake Elmo (the "City") received from the
Environmental Quality Board (EQB), a petition requesting that the City Council require an
environmental assessment worksheet (EAW) for the potential mountain bike trail project which
has been proposed to be located at Sunfish Lake Park in the City (the "Project"); and
WHEREAS, the EQB has designated the City as the responsible governmental unit (RGU)
for the Project; and
WHEREAS, the City Council considered the request for the EAW at its meeting on
October 15, 2019 and the petitioners and their representatives were provided the opportunity to
present information; and
WHEREAS, the City Council considered all of the information presented at its October
15, 2019 meeting along with the staff report and its supporting documentation; and
WHEREAS, the EQB rules (Minnesota Rules Part 4410.1100, subpart 6) require the City
to determine whether, because of the nature or location of the Project, the Project may have the
potential for significant environmental effects; and
WHEREAS, the EQB rules (Minnesota Rules Part 4410.1700, subpart 7) further require
the City to consider the following factors:
a. Type, extent, and reversibility of environmental effects;
b. Cumulative potential effects: whether the cumulative potential effect is significant;
whether the contribution from the project is significant when viewed in connection
with other contributions to the cumulative potential effect; the degree to which the
project complies with approved mitigation measures specifically designed to
address the -.cumulative potential effect; and the efforts of the proposer to minimize
the contributions from the project;
C. The extent to which the environmental effects are subject to mitigation by ongoing
public regulatory authority;
Resolution 2019-078
d. The extent to which environmental effects can be anticipated and controlled as a
result of other available environmental studies undertaken by public agencies or the
project proposer, including other ElSs.
NOW, THEREFORE, BE IT RESOLVED THAT that based on all of the evidence
presented and the findings below, the City Council determines that the Project does not present the
potential for significant environmental effects:
1. The Project involves construction of approximately 4.20 miles of single-track
mountain bike trails within Sunfish Lake Park.
2. Multi -use single-track trails are unpaved and average 18-24" in width. Single-track
trails have been shown to have minimal impact on the environment, resist erosion
through proper design, construction, and maintenance, co -exist with the natural
environment, and blend with the surrounding area.
3. All trails --whether improved or unimproved or for use by pedestrians, bicycles or
mountain bikes --have some environmental impacts. The evidence demonstrates that
the Project is not likely to have significant environmental impacts, which is required
by Minnesota Rules Part 44 10.1100, subpart 6.
4. Studies have shown that the environmental impacts from properly designed mountain
bike trails are similar to those of hiking trails. The City has hiking trails throughout
wooded areas of the City, including within Sunfish Lake Park and the City has not
found those trails to have caused significant environmental impacts to those areas.
5. The petitioners assert that the Project will have significant environmental effects in the
following ways. Each of these assertions is addressed in the findings below:
a. Negative effects !f
ffiects on the fragile environment o this specific area, The City has not
found any evidence that the Project will have a negative effect on the environment
in Sunfish Lake Park and the petitioners have not provided any evidence to that
effect. Furthermore, the Minnesota Land Trust holds a conservation easement over
the area in Sunfish Lake Park and the purpose of the conservation easement is to
protect habitat for wildlife and native plant communities. The Minnesota Land
Trust has consented to the Project. It would not have consented to the Project if it
had found that the Project had a negative effect on the environment as protecting
the environment is the purpose of the conservation easement.
Resolution 2019-078
b. Erosion concerns —soils are erodible throughout the terrain of the park Trails in
this area will inevitable erode, requiring ongoing maintenance as well as present
possible hazards. There is no evidence that the soils in Sunfish Lake Park are any
more erodible than soils in other areas of the City. As stated above, any erosion
caused by the mountain bike trails would be similar to those of hiking trails, which
also are present in Sunfish Lake Park. Furthermore, the mountain bike trails will
be designed, constructed, and maintained so they resist erosion. Mountain bike
trails will follow existing contours that will minimize erosion potential. There has
been no evidence presented by the petitioners that these techniques or plans will be
insufficient to prevent a significant environmental impact.
c. Habitat destruction and the changing nature of the park that the trails would
present. Potential habitat loss due to the Project is minimal (approximately one
acre of ground disturbance) and represents a small fraction of the habitat within the
268-acre park. Additionally, the mountain bike trails will be unpaved and
construction of the trail system will result in minimal tree removal, so there will be
very little disturbance to the nature of Sunfish Lake Park or its habitat. Trails will
be designed to go around mature trees to avoid their removal.
d. That habitat loss would be significant. As noted above, potential habitat loss due
to the Project is minimal.
e. Wildlife and sensitive species would be lost. There is no evidence that the Project
will negatively impact any wildlife or any sensitive species.
f. Protected areas would be forever changed. The Minnesota Land Trust holds a
conservation easement over the area within the Park. It has consented to the
Project. The Minnesota Land Trust would not have consented to the Project if it
had found that the Project was going to change the conservation easement area as
the purpose of the conservation easement is to preserve the land in its natural state,
g. Incompatible uses and promises were made when the park was established, not all
parks are appropriate for all uses. Mountain bike trails provide opportunities for
bikers to observe and appreciate natural surroundings in the same manner as
existing trails through Sunfish Lake Park. The mountain bike trails are being
designed in order to avoid trail cross -over conflicts with other trails in the park and
are predominately located in areas which do not have an established use, thus not
now actively used. When trail crossings occur, they will be established in a way
that will require mountain bikers to slow down to a speed that allows them to safely
cross the other trails.
Resolution 2019-078
6. Minnesota Rules Part 4410.1700, subpart 7 also requires the following factors to
be considered when determining whether the Project has the potential for
significant environmental effects. Each of these factors is considered by the City
Council in the findings below:
a. Type, extent, and reversibility of environmental effects. Type, extent and
reversibility of environmental effects.
The City recognizes that adding mountain bike trails to Sunfish Lake Park will
have some environmental effects with the minimal grading, tree removal, loss
of habitat and trail construction. None of these activities will be significant
and if needed, their minimal effects could be reversed with restoration if the
City was to close the mountain bike trails.
b. Cumulative potential effects, The RGU shall consider the following factors.
whether the cumulative potential effect is significant; whether the contribution
from the project is significant when viewed in connection with other
contributions to the cumulative potential effect, the degree to which the
project complies with approved mitigation measures specifically designed to
address the cumulative potential effect; and the efforts of the proposer to
minimize the contributions from the project:
There is nothing in the design of the mountain bike trails or in the EAW
petition showing any si nificant environmental effects from the construction
of the mountain bike trails. In fact, the City has designed the proposed trails to
minimize their potential environmental effects by taking into account the
slopes and the waterbodies in the trail design. As discussed above, single-
track mountain bike trails have minimal impact on the environment and their
effects are on par with a hiking trail.
c. The extent to which the environmental effects are subject to mitigation by
ongoing public regulatory authority. The RGUmay rely only on mitigation
measures that are specific and that can be reasonably expected to effectively
mitigate the identified environmental impacts of the project; and
The City may need to mitigate the environmental effects of the trail as they
are used - especially in regard to erosion. This is a responsibility the City
acknowledges and accepts as part of the Project.
d. The extent to which environmental effects can be anticipated and controlled
as a result of other environmental studies undertaken by public agencies or
the project proposer, including other EISs. "
Resolution 2019-078
There are no other projects or environmental studies in this area in the City of
Lake Elmo at this time.
NOW THEREFORE BE IT FUR THE R RESOLVED THAT THE CITY COUNCIL
OF THE CITY OF LAKEELMO FINDS THAT:
I The petition to require preparation of an EAW is hereby denied because the
evidence presented has failed to demonstrate that the Project may have the potential
for significant environmental effects.
This resolution was adopted by the City Council of the City of Lake Elmo on this 15'h day of
October, 2019.
Mike"Fe-arson, Mayor
Resolution 2019-078