RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LAKE ELMO PROVIDING
PUBLIC COMMENT ON THE STATE OF MINNESOTA'S PROPOSED CONCEPTUAL
DRINKING WATER SUPPLY PLAN FOR THE EAST METRO
WHEREAS, on February 18, 2018, the State of Minnesota settled a lawsuit against 3M Company in return
for a settlement of $ 850 million and,
WHEREAS,; after legal and other expenses are paid, approximately $720 million remained to meet the
priorities of the settlement including providing clean drinking water in sufficient supply to residents and
businesses in the east metro to meet their current and future water needs and,
WHEREAS, the State of Minnesota's 2018 settlement with 3M established a grant for the "3M Water
Quality and Sustainability" appropriation in the Remediation Fund; and,
WHEREAS, under Priority 1 of this settlement agreement, the Minnesota Pollution Control Agency
(MPCA) and the Minnesota Department of Natural Resources (DNR) will use the grant to enhance the
quality, quantity and sustainability of drinking water in the East Metro to ensure clean drinking water in
sufficient supply to residents and businesses in the east metro to meet their current and future water needs;
and,
WHEREAS, the MPCA and DNR as the "Co -Trustee" of these funds established three working groups in
2018 and have been holding public meetings toward the development of a Conceptual Drinking Water
Supply Plan (CDWSP); and,
WHEREAS, on September 10, 2020 the Co -Trustees released their $700 million drinking water protection
plan for the Twin Cities East Metropolitan Area; and,
WHEREAS, the draft CDWSP includes three options to provide safe and sustainable drinking water for
more than 174,000 Minnesotans impacted by PFAS contamination from 3M; and
WHEREAS, the Co -Trustees identified their preferred option as option 1 which provides construction,
operating and maintenance costs for approximately 40 years and private wells for more than 100 years using
granular activated carbon (GAC) filters. It requires drinking water to be treated for PFAS at a health index
value of .5 or greater. The preferred option also includes the largest allocation ($38 million) for future
contingency planning; and
WHEREAS, under both options 1 and 2, Lake Elmo would be supplied with drinking water from
Woodbury and under option 3 Lake Elmo would be connected to St. Paul Regional Water; and
WHEREAS, the public comment period on the draft CDWSP has been extended until December 10, 2020;
NOW THEREFORE, BE IT RESOLVED by the City Council of Lake Elmo, Minnesota that it
provides the following comments on the draft CDWSP:
1. The City of Lake Elmo does not support the final CDWSP as it relates to the Lake Elmo water
system. At the end of this process, a long-term safe and sustainable drinking water supply
source has not been detennined for the City with any firm confidence. The lack of a defined safe
and sustainable drinking water supply source keeps Lake Elmo in a state of uncertainty, which
is impairing the City's ability to manage growth while building a viable, sustainable and
efficient water supply system.
a. The Woodbury interconnect has been presented to the City with the latest revision (1 lth
hour). There was no previous analysis for this option throughout the plan development. It
is being described as a "place holder" with little to no details for the city to review. This
alternative remains incomplete, with incomplete cost infonnation.
b. How does a "placeholder" of interconnecting to Woodbury allow the Lake Elmo staff
and residents the opportunity to comment on what the actual solution will be prior to it
being adopted by the Co -trustees?
c. The Woodbury interconnect plan does not provide for or define a complete solution.
There are no details regarding physical connections, redundancy plan, or distribution
system changes and impacts to ensure a fully integrated and efficient water distribution
system. A distribution system analysis needs to be completed by the City's consultant, to
frilly understand additional distribution system impacts and improvements that may be
required, and the associated additional costs for these improvements
d. Cost estimates are not fully developed, cost estimate assumptions appear flawed, and
overall the costs appear inadequate for the proposed solution: 1) no funds have been
included for costs to purchase water from Woodbury; 2) no costs have been included for
booster stations that may be needed to implement this option; and 3) additional
distribution system improvements and the associated costs are yet to be detennined. To
the extent that any current city infrastructure is rendered obsolete (i.e. $1.4 million
booster station built in 2014) and is no longer used, the City should receive full
compensation for the damages to the lost investment.
e. Woodbury comments submitted to the State in October, 2020 indicate that they are not
prepared to provide an interconnect with Lake Elmo until they are assured that they will
be provided adequate appropriations for the proposed Lake Elmo Interconnect. The City
of Woodbury is requesting approval of all required appropriations to supply Lake Elmo
by interconnect before they will allow the construction of the interconnect. The delay
this assurance may cause does not align with Lake Elmo's need to manage current
growth and development.
f. Both Lake Elmo and Woodbury will require a clear analysis and assessment of specific
water rate impacts and administrative burdens, for each community to be assured that
their respective water customers are not subsidizing the other community, now, or at any
time in the future. This is a very difficult analysis when Lake Elmo will still be owning
and maintaining a city-wide water system and will only need to purchase a "partial"
water supply. Who will have the ability to determine the water rates being charged to
Lake Elmo initially and into the future? How is Lake Elmo assured they will always be
treated fairly?
g. The timing of the proposed interconnect solution is unclear. Improvements take years to
plan and implement, and the city is obligated to grow its water system to meet today's
growth.
2. The "placeholder" plan should include an independent water supply for the City Lake Elmo.
The city may need alternate sources of water to avoid adverse effects on White Bear Lake. If
Lake Elmo will not be allowed to follow the city's adopted water supply plan and place wells in
the northern portion of the city, outside of the impacts of PFAS and TCE, the "placeholder" plan
should include an independent water supply for the city. Under these circumstances, the City of
Lake Elmo supports a plan that includes the abandonment of Well No. 4 (inside of the 5-mile
White Bear Lake radius) and the construction of three new 1,500 gpm water supply wells
outside of the 5-mile radius of White Bear Lake, together with raw watenmains to a centralized
4,500 GPM GAC water treatment facility for the three new wells.
3. The City of Lake Elmo supports the State's plan and commitment to preserve groundwater as
the continued source of drinking water in Lake Elmo.
4. The City of Lake Elmo supports Option 1, in regards to the treatment of wells with an HI > 0.5;
and does not support treatment of wells with thresholds below HI < 0.5; as funding is proving to
be insufficient for all needs.
5. The City of Lake Elmo supports an emphasis on the funding of the first priority goals while
maintaining a minimum funded period of 40 years for O&M costs for new treatment
infrastructure on public water systems, prior to releasing or committing to funding for secondary
goals. Lake Elmo also believes that O&M costs should be included for public water distribution
infrastructure such as booster stations and pressure reduction valves (items with mechanical and
electrical components similar to treatment plants).
6. The City of Lake Elmo supports funding to be set aside to cover O&M costs for private well
treatment for a period of 100 years.
7. The City of Lake Elmo supports the funding of drinking water protection projects to be used for
the remediation of groundwater not related to the actual 3M disposal sites, to help reduce future
treatment needs and improve overall source water quality. In particular, the City supports
potential remediation projects related to the removal of PFAS from sediments and surface
waters in Project 1007 (targeted sediment removal; treating contaminated surface water). Lake
Elmo believes that the funding set aside amount should be established in the same manner as the
community drinking water systems, by defining specific projects and developing costs estimates
for each project.
8. The City of Lake Elmo supports the funding set aside for sustainability and conservation, but
only for those specific projects that can be clearly identified and defined and their impacts to the
long-term quantity and quality of drinking water is known. Lake Elmo is concerned that the
proposed $60 million set aside is too much and may not be supported by a defined need. The
funding set aside amount should be established in the same manner as the community drinking
water systems, by defining specific projects and developing costs estimates for each project.
9. The City of Lake Elmo is requesting compensation in frill for recent water distribution system
infrastructure (less project costs paid by 3M) that the City was required to construct, starting in
2006, in response to the PFAS contamination in the City. In order to respond with safe drinking
water, the city was required to expand the municipal water system outside of its Municipal
Urban Service Area (MUSA) boundaries. By not providing compensation to Lake Elmo for
early response actions to PFAS contamination, Lake Elmo is not being treated equitably to the
other 13 communities.
10. The City of Lake Elmo should receive full funding to abandon Well No. 3 that has been
impacted by PEAS and remains an unused well.
11. The City of Lake Elmo is requesting to be treated fairly in the funding allocation of water
storage. The percentage funding for the next City water tower should be based on the total
number of water customers residing outside of the City MUSA areas, not just the number of
connections from the City's expedited projects and future public watermain connections.
12. The City of Lake Elmo is requesting that the State fully fund a water distribution system review
and analysis by the City's consultant, to fully understand additional distribution system impacts
and improvements that may be required by an alternative water source. The City is requesting
immediate access to the WaterCAD Hydraulic model created by Wood, in the spirit of reducing
the duplication of these costs.
13. Neighborhood Connections. The City of Lake Elmo supports the continuation of connecting
non-MUSA area neighborhoods to the municipal water system, consistent with the current
expedited project implementation process. The city strongly supports comnecting all
neighborhoods located within the Special Well Construction Area. In addition to the current
and recently awarded expedited projects, the City strongly supports the State's position to
include the extension of municipal water in the CDWSP for the Homestead (14th Street N),
Packard Park and Eden Park neighborhoods, and for the properties located along 20th Street
Circle. However, the CDWSP stops short of providing for a complete solution for connecting
neighborhoods.
a. The City of Lake Elmo is concerned that the costs estimates identified in the CDWSP
remain insufficient to complete the scope of improvements that are identified in the plan
for Lake Elmo. The city has a great deal of experience over the past 15 years
implementing street and watermain extension projects throughout the city, mostly in
response to PFAS contamination. We believe that the total project costs are being
underestimated by at least 20-25%. Costs estimates should be reviewed and updated to
reflect past experiences.
b. The City of Lake Elmo strongly supports that all neighborhoods located in the Special
Well Constriction Area should have the option of connecting to municipal water.
Additional neighborhoods that should be included in the plan as frilly funded municipal
water connection projects include Sunfish Ponds (16 properties), the Forest (18
properties), properties along Stillwater Lane (10 properties), properties along Klondike
Avenue (11 properties), and four properties located west of the Tapestry neighborhood.
Strong consideration should also be given to including the Tartan Meadows
neighborhood (39 properties) located directly south of the Homestead neighborhood, and
5 remotely located properties in the Old Village MUSA, just south of the UP Railroad
(3407, 3409, 3411,3413, and 3415 Lake Elmo Avenue).
c. If neighborhood areas identified in the previous paragraph remain excluded from the
CDWSP as areas to be connected to municipal water, the City requests the CDWSP be
updated to comprehensively address how the State intends to fully fund private well
owners that incur additional well ownership costs due to the existence of the Special
Well Construction Area. Comparing the cost of GAC to municipal water connection
fails to recognize the risk and increased cost of drilling a new/replacement well in the
Special Well Construction Area. These property owners should not be incurring
additional costs for their private wells when other large lot neighborhoods in neighboring
communities are connected to municipal systems, or a community with no existing
development is getting an entire water system (well, treatment, tower) funded. The co -
trustees should strive for equity amongst communities while recognizing their different
circumstances, and recognizing the damages incurred simply because properties are
located within the SWCA.
d. The City of Lake Elmo requests that the co -trustees treat all communities consistently
when considering if private wells can be used for irrigation after homes are connected to
a municipal water system.
14. The City of Lake Elmo supports the funding set aside of $41 million for potential additional
neighborhood hookups that could be completed in the future, as additional well testing data
becomes available. Preservation of adequate funding for connecting additional neighborhoods is
very important to address future potential issues that may arise through additional testing and
for homes within the flow path of the PFAS plumes.
15. The City of Lake Elmo supports the establishment of the $38 million contingency fund to
potentially address changes in the HBV/HRL, future plume movement, and cost over -runs.
BE IT FURTHER RESOLVED by the City Council of Lake Elmo, Minnesota that this resolution
be forwarded to the Co -Trustees after adoption along with any additional detailed comments on the
CDWSP identified by staff that are consistent with the themes above.
APPROVED by the Lake Elmo City Council on this I' day of December, 2020.
Byy
M' a Pearson
Mayor
ATTEST: