Loading...
HomeMy WebLinkAboutcc2 4 08schoolsafety City Council Date: February 4, 2008 REGULAR Item: Motion ITEM: Receive an update on the options for promoting school safety for Lake Elmo Elementary School and approve funds for the installation of one Dynamic Speed Monitoring Display sign on TH 5, near Lake Elmo Avenue. REQUESTED BY: The Lake Elmo Elementary Traffic Safety Working Group SUBMITTED BY: Susan Hoyt, City Administrator REVIEWED BY: Susan Hoyt, City Administrator Jack Griffin, City Engineer Ted Schoenecker, Washington County SUMMARY AND ACTION REQUESTED: The city council is being asked to receive a presentation regarding school safety for Lake Elmo Elementary School by Ted Shoenecker, Washington County Traffic Engineer, and to approve funds for the installation of a Dynamic Speed Monitoring Display sign. Mr. Schoenecker will provide an update on the results from the Traffic Safety Working Group that was created to identify and address safety concerns around the Lake Elmo Elementary School near the intersection of TH 5 and CSAH 17 (Lake Elmo Avenue). The Traffic Working Group got underway this fall with Jennifer Pelletier, PTA/Parent, Andy Fields, Principal, Nick Thompson and MnDOT staff, Ted Schoenecker and Washington County staff, Marv Stutz, Commander, Washington County Sheriff, Susan Hoyt, City Administrator and Jack Griffin, City Engineer. For an immediate improvement, the City of Lake Elmo is recommending the installation of Dynamic Speed Monitoring Display (DSMD) sign. This is an electronic sign that reports a vehicle’s speed as the driver approaches the sign. These signs have been shown to be an effective tool to increase awareness and to manage speed on roadways. There are already two existing signs found within the City of Lake Elmo. One is on northbound CSAH 13 (Inwood Avenue North), just south of 27th Street North and the other is on northbound CSAH 17 (Lake Elmo Avenue) between 24th Street North and 30th Street North. The City of Lake Elmo will work with the Minnesota Department of Transportation to locate the sign on eastbound TH 5 near the speed limit transition zone approaching Lake Elmo Elementary School. The sign will be located along TH 5, which is MnDOT Right-of-Way. The sign, valued at $6,100, is being donated by 3M. The cost of installing the sign is estimated at $3,100 and the electrical service at $2,000 for a capital investment by the city of $ 5,500 from the city’s capital equipment fund. The city would also cover the operating cost of approximately $ 120 per year out of the public works lighting budget. (The budget can cover this cost). ADDITIONAL INFORMATION: 3M will provide the sign at no cost to the City of Lake Elmo. These signs are typically $6,100 each. Staff will work through Washington County to contract the City of St. Paul to install the signs. The City of St. Paul has an ongoing contract with Washington County to perform electrical maintenance work due to the size of the department, the cost is very reasonable. Their maintenance staff has experience in installing these signs successfully throughout Washington County. The anticipated costs for the City of Lake Elmo would be the labor and parts to install the sign ($3,500), the extension of electric service to the sign (approximately $2,000), and the monthly electrical cost ($10 per month). City staff will work with Xcel Energy to obtain an exact cost and schedule to install the electrical service to the sign. Once electricity is available, the installation of the sign typically takes one day and final completion will depend on the availability of the City of St. Paul staff to install the sign. RECOMMENDATION: The school safety working group along with the city staff recommends the approval of the sign installation and related costs. The safety working group will meet with the working group over the coming months on an as needed basis. Staff recommends providing a funding maximum slightly higher than the estimated cost in case it is higher than estimated so that the project is not delayed. SUGGESTED MOTION FOR CONSIDERATION: Move to approve funds not to exceed $6,000 to install a Dynamic Speed Monitoring Display (DSMD) sign out of the capital equipment fund and to authorize paying for the electrical costs associated with operating the sign from the general fund. ORDER OF BUSINESS: • Introduction Susan Hoyt, City Administrator • Presentation Ted Schoenecker, Transportation Engineer, Washington County Others in attendance: Marv Stutz, Commander, Washington County Sheriff Jennifer Pelletier, PTA / Parent Andy Fields, Principal, Lake Elmo Elementary School Jack Griffin, City Engineer • Questions from city council members to the presenter Mayor and council members The mayor will facilitate this by asking each individual council member for one question allowing for a response to the individual question then move onto the next council member in the sequence until all questions are completed. No council member shall take more than 3 minutes to ask a question. (Also called round robin.) (For example, C.1 asks question 1 and gets answer - C.2 asks question 2 and gets answer and so on.) • Questions/comments from the public to the city council (a maximum of three minutes per question/statement) Mayor facilitates • Call for a motion This is to get a motion on the table for discussion and is actually required under Roberts Rules of Order. This action is not an indication that the motion on the table is the motion that will be approved in the current form. It is purely for discussion purposes. • Discussion among city council members (See round robin process above) Mayor and council members • Action by the city council City council