City Council
Date: June 17, 2008
REGULAR
Item:
MOTION
ITEM: Receive comments from the park commission on the possible lift station locations in Reid
Park for the I-94 to 30th Street Infrastructure Project, and select a preferred lift
station site.
SUBMITTED BY: Jack Griffin, City Engineer
REVIEWED BY: Susan Hoyt, City Administrator
Mike Bouthilet, Public Works Superintendent
Carol Kriegler, Project Assistant
Ryan Stempski, Assistant City Engineer
SUMMARY AND ACTION REQUESTED: The city council is being asked to receive park
commission comments on the possible lift station locations in Reid Park, Site No. 1 and Site No.
2. Staff is further requesting that the city council select a preferred lift station location for
the project, among three sites, Site No. 1, Site No. 2, and Site No. 3, which will allow the
design work on the project to be finalized.
On May 6, 2008, the city council received a detailed presentation in regards to three alternate
lift station locations best suited for a cost effective sanitary sewer system, with two of the
proposed sites located in Reid Park. The city council directed staff to share the presentation
with the park commission and request written park commission comments for the two proposed
sites in Reid Park (Site No. 1 and Site No. 2).
At the end of a presentation on the three lift station options ,, the city council directed the
staff to ask the park commission for comments about the proposed locations, specifically those in
Reid Park. On May 19, 2008, staff made the presentation to the parks commission. The chair
of the park commission was asked to consolidate the commission’s comments, to be included as a
report to the city council. Please refer to the attached report dated June 9 from the park
commission . The commissions The park commission comments were consolidated by the chair and
are provided in Attachment 1XX).The commission’s comments demonstrate a preference for Site
No. 3 to avoid the use of park land for non-park purpose, both for this project and to avoid
precedence for future projects.
Site No. 2 is the most desirable of the three sites from an engineering/public works perspective.
2
ADDITIONAL INFORMATION:
Preliminary engineering work has identified three potential lift station locations in the vicinity of
Reid Park. These locations were presented to the city council on May 6, 2008, and to the
park commission on May 19, 2008. The locations selected and reviewed at this time provide a
cost effective sanitary sewer system for both the initial capital costs and on-going operational
costs; and provide the most functional and flexible trunk sewer system for servicing both new
development and existing homes and businesses in the Village area.
The alternative sites were selected after reviewing the general topography of the sewer service
area as defined in the Lake Elmo Comprehensive Plan; generally locating the lift stations in the
lowest topographic region to maximize the lift station service area. The area around the
southern part of Reid Park provides the lowest topography, is City-owned, and is adjacent to
the project corridor. The three sites identified for consideration were presented to both the
city council and park commission:
• Site Alternative No. 1: In the southwest corner of Reid Park; access from 30th Street,
• Site Alternative No. 2: In the southeast corner of Reid Park: access from 30th Street,
and
• Site Alternative No. 3: In a City-owned parcel adjacent to the southeast corner of Reid
Park. This site would require easement acquisition to accommodate the sewer pipe and
the access driveway. Also, soil borings, a wetland delineation, and additional engineering
work will be required to verify the feasibility of this site.
RECOMMENDATION
ASSESSMENT OF THE SITES
All three sites are being presented for consideration and are potentially feasible options.
Site No. 1 is the lowest initial cost option and provides the most functional sanitary sewer
system.
3
Site No. 2 is very similar to Site No. 1 in functionality at slightly higher costs. Site No. 2 has
protected screening and provides easy acccess and is away from the active recreation area.
Site. No. 3 requires the city to obtain a fairly significant road and utility easement and will add
another $175,000 to the project construction costs. This represents a 40% cost increase for
the lift station facility. and presents will cost approximately $ XXXX, which is X % of the
total project cost. It is easier to get equipment in and out of the site. Additional cost must
also be expended for the easement negotiations and additional engineering site assessment work.
Site No. 3 may require condemnation proceedings if the necessary easement cannot be
successfully negotiated. In additThe site provides additional access and maintenance challenges for
public works ion,From the information provided, the public works superintendent recommended
Site No. 2. The public work perspective was focused on two primary concerns: 1) daily access to
each site with the equipment necessary to maintain a lift station and 2) the proximity to the
recreational facilities within Reid Park. Based on these items, the public works department
recommended Site No. 2 over Site No. 1 to keep the facility in a location with natural
vegetative screening and further away from the active park facilities. Site No. 2 is preferred
over Site No. 3 to keep the access road shorter to enhance access (snow plowing, entrance
road maintenanceeven during snow events, etc.). and reduce both initial cost and maintenance
costs. With Site No. 3, the “grassed” access road would not be a feasible option. Site No. 3
does not use city park land for a non-park use facility.
From an engineering perspective, Site No. 2 is also the preferred option. All three sites are
being presented for consideration and are potentially feasible options. Site No. 1 is the lowest
initial cost option and provides the most functional sanitary sewer system. Site No. 2 is very
similar to Site No. 1 in functionality at slightly higher costs. Site No. 2 is preferred over Site
No. 1 for reasons expressed by the public works superintendent. Site No. 2 is preferred over
Site. No. 3 due to the requirement to obtain a fairly significant road and utility easement, and
lower initial and future project costs. Site No. 3 may require condemnation proceedings for the
easement acquisition if the necessary easements cannot be successfully negotiated.
The parks commission recommends Site No. 3 to avoid the use of park land for non-park
purpose, both for this project and to avoid precedence for future projects (see attached park
commission comments).
Motion for consideration:
RECOMMENDATION
Motion for consideration:
Site #2 is the most desirable of the three sites from an engineering/public works perspective.
Formatted: Font: Not Italic
4
Move to select Site No. 2, or Site No. 3 for the location of the I-94 to 30th Street
Infrastructure Project lift station.
SUGGESTED ORDER OF BUSINESS:
Introduction
Susan Hoyt, City Administrator
Report by staff or other presenter
Jack Griffin, City Engineer
Questions from city council members to the presenter
Mayor and council members
The mayor will facilitate this by asking each individual councilmember for one question allowing for a response
to the individual question then move onto the next council member in the sequence until all questions are
completed. No council member shall take more than 3 minutes to ask a question. (Also called round robin.)
(For example, C.1 asks question 1 and gets answer - C.2 asks question 2 and gets answer and so on.)
Questions/comments from the public to the city council
(a maximum of three minutes per question/statement)
Mayor facilitates
Call for a motion Mayor and Councilmembers
Call for a motion
This is to get a motion on the table for discussion and is actually required under Roberts Rules of Order.
This action is not an indication that the motion on the table is the motion that will be approved in the
current form. It is purely for discussion purposes.
Discussion among city council members
(See round robin process above)
Mayor and council members
Action by the city council City council
ATTACHMENTS:
1. 1. Park Commission Report dated June 9, 2008