Loading...
HomeMy WebLinkAbout#04 - Wildflower 1st Addition Security Release STAFF REPORT DATE: November 7, 2018 CONSENT ITEM #: 4 AGENDA ITEM: Wildflower 1st Addition – Approve Release of Warranty Security for Public Sanitary Sewer and Watermain SUBMITTED BY: Jack Griffin, City Engineer REVIEWED BY: Kristina Handt, City Administrator Ben Prchal, City Planner Rob Weldon, Public Works Director ISSUE BEFORE COUNCIL: Should the City Council approve release of warranty security for public sanitary sewer and watermain for the Wildflower 1st Addition development? PROPOSAL DETAILS/ANALYSIS: Staff has received and processed a request to reduce the development security in accordance with the development agreement for the Wildflower at Lake Elmo 1st Addition. The public sanitary sewer and watermain in Wildflower 1st Addition development was completed and accepted by the City on February 16, 2016 and the 2-year warranty period was initiated. Twenty-five percent (25%) of the original security, or $268,418, was retained through the 2-year warranty period for watermain and sanitary sewer. A warranty walk-through was completed by City staff in December 2017 and all warranty punch list items have since been addressed by the Developer. With the release of the 2- year warranty security for sanitary sewer and watermain the overall development security may be reduced as follows: Current Security Amount Proposed Security Amount 1. Wildflower 1st Addition: $1,047,708 $779,290 FISCAL IMPACT: Release of the warranty security brings the public sanitary sewer and watermain portion of the project to a close. The operation and maintenance of the sanitary sewer and watermain becomes the responsibility of the City going forward. RECOMMENDATION: Staff is recommending that the City Council, as part of the Consent Agenda, approve the release of warranty security for public sanitary sewer and watermain in the Wildflower 1st Addition development resulting in a reduction in overall security as detailed in the respective worksheet. If removed from the consent agenda, the recommended motion for the action is as follows: “Move to approve the security reduction for the Wildflower at Lake Elmo 1st Addition development as detailed in the respective Security Reduction Worksheet”. ATTACHMENTS: 1. Security Reduction Worksheet – Wildflower 1st Addition. WILDFLOWER AT LAKE ELMO 1ST ADDITION Time of Performance:  November 30, 2016 DEVELOPMENT AGREEMENT AMOUNTS CATEGORY CONSTRUCTION 125% REMARKS #1 #2 #3 #4 #5 #6 Grading $116,000 NA Covered by Site Grading Agreement $116,000 Sanitary Sewer $386,885 $483,606 100%$241,803 $120,902 $120,902 Watermain $472,052 $590,065 100%$295,033 $147,516 $147,516 Streets $916,819 $1,146,024 75%$274,539 $584,978 Surface Water Facilities $509,946 $637,433 75%$318,716 $159,358 Erosion Control NA NA Covered by Site Grading Agreement Sidewalks/Trails $220,838 $276,048 75%$207,036 Street Lighting NA NA By Xcel Energy Street Signs and Traffic Control Signs $9,950 $12,438 75%$9,328 Landscaping $200,000 $250,000 Tree Preservation and Restoration $23,675 $29,594 75%$22,195 Wetland Mitigation and Buffers NA NA LOC Through VBWD Monuments $6,000 $7,500 75%$5,625 Miscellaneous Facilities NA NA Record Drawings $6,500 $8,125 75%$6,094 TOTALS $2,752,665 $3,440,831 RELEASED AMOUNTS:$116,000 $1,130,091 $268,418 $744,337 $250,278 $268,418 CUMMULATIVE AMOUNTS:$116,000 $1,246,091 $1,514,509 $2,258,846 $2,509,123 $2,777,541 SECURITY AMOUNT REMAINING:$3,440,831 $2,310,740 $2,042,322 $1,297,986 $1,047,708 $779,290 DATE:10/29/2015 12/15/2015 2/16/2016 9/7/2016 12/5/2017 11/7/2018 REDUCTIONS