HomeMy WebLinkAbout#08 - OV Phase 3 Change Order 4 STAFF REPORT DATE: February 7, 2018 CONSENT #8 AGENDA ITEM: Old Village Phase 3 Street, Drainage, and Utility Improvements - Change Order No. 4 SUBMITTED BY: Jack Griffin, City Engineer REVIEWED BY: Kristina Handt, City Administrator Rob Weldon, Public Works Director Chad Isakson, Project Engineer ISSUE BEFORE COUNCIL: Should the City Council approve Change Order No. 4 for the Old Village Phase 3 Street, Drainage, and Utility Improvements? BACKGROUND: Douglas-Kerr Underground, LLC was awarded a construction contract to complete the Old Village Phase 3 Street, Drainage, and Utility Improvements on May 16, 2017. PROPOSAL DETAILS/ANALYSIS: Douglas-Kerr Underground, LLC has submitted a change order to address additional work completed for the following items: 1. Revise storm sewer pipe size on 31st Street. Increased pipe capacity is required as part of the stormwater treatment basin elimination, per the Valley Branch Watershed District permit. 2. Remove and dispose of a concrete pillar monument from 3200 Lake Elmo Avenue as ordered by Washington County for work related to the Old Village Phase 2 project. Washington County will reimburse Lake Elmo for the work through a credit on the Phase 2 project invoice. 3. Raise a City owned sanitary sewer manhole on Lake Elmo Elementary School property by adding a barrel section to match the elevation with the final grading in the playground area. FISCAL IMPACT: This change order will increase the contract in the amount of $5,386.40 bringing the revised construction contract to $1,583,940.42. With this change order the project remains within the authorized project budget and contingencies. RECOMMENDATION: Staff is recommending that the City Council approve, as part of the Consent Agenda, Change Order No. 4 for the Old Village Phase 3 Street, Drainage, and Utility Improvements. If removed from the consent agenda, the recommended motion for the action is as follows: “Move to approve Change Order No. 4 for the Old Village Phase 3 Street, Drainage, and Utility Improvements, thereby increasing the contract amount by $5,386.40”. ATTACHMENTS: 1. Change Order No. 4. CHANGE ORDER NO. 4 OLD VILLAGE PHASE 3 IMPROVEMENTS CITY OF LAKE ELMO, MINNESOTA PROJECT NO. 2016.133 QUANTITY UNIT PRICE AMOUNT CO4‐1 LF 112.0 $43.35 $4,855.20 CO4‐2 EACH 1.0 $1,740.05 $1,740.05 CO4‐3 LF ‐61.0 $37.85 ‐$2,308.85 CO4‐4 EACH ‐1.0 $1,470.00 ‐$1,470.00 CO4‐5 EACH 1.0 $450.00 $450.00 CO4‐6 LS 1.0 $2,120.00 $2,120.00 TOTALS ‐ CHANGE ORDER NO. 4 $5,386.40 THE CITY SANITARY SEWER MANHOLE ON LAKE ELMO ELEMENTARY  SCHOOL NEEDED TO BE RAISED AFTER FINAL GRADING WAS  COMPLETED. ITEM DESCRIPTION OF PAY ITEM UNIT CHANGE ORDER 24" RC PIPE DESCRIPTION / JUSTIFICATION 24" RC PIPE APRON W/ TRASH GUARD DISPOSE OF CONCRETE PILLAR MONUMENT ADD BARREL SECTION TO SANITARY SEWER MANHOLE REMOVE 21" RC PIPE SEWER, DES, 3006 CL III REMOVE 21" RC PIPE APRON W/TRASH GUARD ELIMATION OF THE STORMWATER TREATMENT BASIN ON 31ST STREET  RESULTED PIPE SIZE CHANGES TO BE IN COMPLIANCE WITH VALLEY  BRANCH WATERSHED DISTRICT PERMIT REQUIREMENTS. REMOVE EXISTING PILLAR AT REQUEST OF WASHINGTON COUNTY.  COUNTY COMPENSATED FOR WORK ON OLD VILLAGE PHASE 2  INVOICING