HomeMy WebLinkAbout#07 - 2017 Street Imp - Change Order 3 STAFF REPORT DATE: March 20, 2018 CONSENT ITEM # 7 AGENDA ITEM: 2017 Street Improvements - Change Order No. 3 SUBMITTED BY: Jack Griffin, City Engineer REVIEWED BY: Kristina Handt, City Administrator Chad Isakson, Project Engineer ISSUE BEFORE COUNCIL: Should the City Council approve Change Order No. 3 for the 2017 Street Improvements? BACKGROUND: Hardrives, Inc. was awarded a construction contract to complete the 2017 Street Improvements on May 16, 2017. At this time the work has been completed. Engineering is working with the contractor to close out the project. PROPOSAL DETAILS/ANALYSIS: Hardrives, Inc. has submitted a change order to address five changes requested by the City as follows: 1. Adjust manhole 307-4 to align with the new concrete curb and gutter. 2. Sawcut, excavate, and correct roadway settlements due to failed subgrades. 3. Install special castings on two storm sewer structures to match curb type installed. 4. Drainage corrections at 9455 55th Street to adjust landscaped area with new street grades. 5. Sawcut driveways for expanded driveway transitions. FISCAL IMPACT: This change order will increase the contract in the amount of $12,774.61 bringing the revised construction contract to $1,078,892.96. With this change order the project remains within the authorized project budget and contingencies. RECOMMENDATION: Staff is recommending that the City Council approve, as part of the Consent Agenda, Change Order No. 3 for the 2017 Street Improvements. If removed from the consent agenda, the recommended motion for the action is as follows: “Move to approve Change Order No. 3 for the 2017 Street Improvements, thereby increasing the contract amount by $12,774.61”. ATTACHMENTS: 1. Change Order No. 3. CHANGE ORDER NO. 3 2017 STREET IMPROVEMENTS CITY OF LAKE ELMO, MINNESOTA PROJECT NO. 2016.135 QUANTITY UNIT PRICE AMOUNT CO3‐1 LS 1.0 $4,226.75 $4,226.75 CO3‐2 LS 1.0 $5,658.50 $5,658.50 CO3‐3 EA 2.0 $312.55 $625.10 CO3‐4 LS 1.0 $1,542.51 $1,542.51 CO3‐5 LS 1.0 $721.75 $721.75 TOTALS ‐ CHANGE ORDER NO. 3 $12,774.61 Adjust manhole 307‐4 to align with new curb. Sawcut, excavate, and correct roadway settlements due to failed  subgrades. Special order castings to accommodate curb and gutter type. Drainage corrections at 9455 55th Street to adjust landscaped area with  new street grades. Driveway sawcuts for expanded driveway transistions. MODIFY STORM SEWER STRUCTURE EXCAVATE AND REPAIR ROADWAY SETTLEMENTS FURNISH AND INSTALL SPECIAL STORM SEWER CASTINGS REMOVE AND REPLACE ROCK TO RAISE BOULEVARD GRADES MOBILIZE AND SAWCUT DRIVEWAYS DESCRIPTION / JUSTIFICATIONITEM DESCRIPTION OF PAY ITEM UNIT CHANGE ORDER