Loading...
HomeMy WebLinkAbout#14 - 2017 Street Improvements Pay Request 6 STAFF REPORT DATE: April 17, 2018 CONSENT ITEM #: 14 AGENDA ITEM: 2017 Street Improvements – Accept Improvements and Approve Pay Request No. 6 (Final) SUBMITTED BY: Jack Griffin, City Engineer REVIEWED BY: Kristina Handt, City Administrator Rob Weldon, Public Works Director Chad Isakson, Project Engineer ISSUE BEFORE COUNCIL: Should the City Council accept the 2017 Street Improvements and approve Pay Request No. 6 (Final) to Hardrives, Inc.? BACKGROUND: Hardrives, Inc. was awarded a construction contract on May 16, 2017 to complete the 2017 Street Improvements project. The contractor has completed the work in accordance with the contract. The Project Engineer has prepared a Certificate of Completion indicating that all work is completed including all punch list items and is recommending acceptance of the improvements and release of final retainage. Project acceptance will initiate the one-year warranty period for the improvements. The one-year warranty will begin on April 17, 2018 and will extend through April 17, 2019. PROPOSAL DETAILS/ANALYSIS: Hardrives, Inc. has submitted Pay Request No. 6 (Final) in the amount of $63,114.77. The work has been reviewed by the Engineer and is fully completed in accordance with the Contract, Specifications, and Change Orders. The City Council is respectfully requested to consider accepting the improvements and approving Pay Request No. 6 (Final) for the 2017 Street Improvements. FISCAL IMPACT: The final total construction cost for the project is $1,019,577.81, which is 1.8% under the original contract award amount of $1,038,206.14. A breakdown of the total project costs compared with the approved project budget is shown below. 2017 Street Improvements – Final Project Cost Summary Final Project Costs Authorized Project Costs TOTAL PROJECT COSTS: $1,215,000 $1,301,000 Breakdown: Construction: $1,020,000 $1,038,000 Contingency: $0 $50,000 Total Engineering (Report, Design, Construction, Right of Way Services) $161,500 $169,000 Geotechnical Engineering: $18,500 $14,000 Legal, Fiscal, and Administration: $15,000 $30,000 RECOMMENDATION: Staff is recommending that the City Council consider, as part of the consent agenda, accepting the 2017 Street Improvements and approving Pay Request #6 (Final) in the amount of $63,114.77. If removed from the consent agenda, the recommended motion for the action is as follows: “Move to accept the improvements and approve Pay Request No. 6 (Final) to Hardrives, Inc. in the amount of $63,114.77 for the 2017 Street Improvements.” ATTACHMENTS: 1. Pay Estimate #6 (Final). 2. Certificate of Completion. PARTIAL PAY ESTIMATE NO. 6 (FINAL) 2017 STREET IMPROVEMENTS CITY OF LAKE ELMO, MINNESOTA PROJECT NO. 2016.135 QUANTITY UNIT PRICE AMOUNT QUANTITY AMOUNT QUANTITY AMOUNT 1 LS 1 $4,226.26 $4,226.26 0.00 $0.00 1.00 $4,226.26 2 LS 1 $1,890.12 $1,890.12 0.00 $0.00 1.00 $1,890.12 3 LF 180 $2.63 $473.40 0.00 $0.00 220.00 $578.60 4 EA 39 $90.00 $3,510.00 0.00 $0.00 60.00 $5,400.00 5 EA 11 $231.01 $2,541.11 0.00 $0.00 15.00 $3,465.15 6 EA 11 $126.01 $1,386.11 0.00 $0.00 15.00 $1,890.15 7 CY 2,080 $10.00 $20,800.00 0.00 $0.00 1,170.00 $11,700.00 8 SY 10,330 $4.40 $45,452.00 0.00 $0.00 7,175.00 $31,570.00 9 SY 2,140 $1.95 $4,173.00 0.00 $0.00 2,851.00 $5,559.45 10 EA 10 $472.53 $4,725.30 0.00 $0.00 0.00 $0.00 $89,177.30 $0.00 $66,279.73 1 LF 281 $5.25 $1,475.25 0.00 $0.00 273.00 $1,433.25 2 EA 12 $420.02 $5,040.24 0.00 $0.00 13.00 $5,460.26 3 EA 1 $420.02 $420.02 0.00 $0.00 1.00 $420.02 4 EA 13 $159.82 $2,077.66 0.00 $0.00 13.00 $2,077.66 5 EA 13 $659.11 $8,568.43 0.00 $0.00 13.00 $8,568.43 6 LF 66 $31.50 $2,079.00 0.00 $0.00 98.00 $3,087.00 7 LF 1,773 $32.55 $57,711.15 0.00 $0.00 1,772.00 $57,678.60 8 LF 20 $60.90 $1,218.00 0.00 $0.00 16.00 $974.40 9 EA 5 $945.06 $4,725.30 0.00 $0.00 4.00 $3,780.24 10 EA 1 $2,205.12 $2,205.12 0.00 $0.00 1.00 $2,205.12 11 EA 4 $1,732.60 $6,930.40 0.00 $0.00 6.00 $10,395.60 12 EA 17 $2,058.11 $34,987.87 0.00 $0.00 18.00 $37,045.98 13 CY 39 $89.25 $3,480.75 0.00 $0.00 38.30 $3,418.28 14 LF 220 $17.85 $3,927.00 0.00 $0.00 335.00 $5,979.75 $134,846.19 $0.00 $142,524.59 1 LF 310 $1.00 $310.00 0.00 $0.00 310.00 $310.00 2 LF 130 $1.65 $214.50 0.00 $0.00 161.00 $265.65 3 SY 680 $4.12 $2,801.60 0.00 $0.00 650.00 $2,678.00 4 SY 220 $7.49 $1,647.80 0.00 $0.00 196.00 $1,468.04 5 SY 41,776 $1.35 $56,397.60 0.00 $0.00 41,776.00 $56,397.60 6 CY 4,062 $9.47 $38,467.14 0.00 $0.00 3,721.00 $35,237.87 7 LF 3,174 $1.01 $3,205.74 0.00 $0.00 3,174.00 $3,205.74 8 CY 370 $0.01 $3.70 0.00 $0.00 349.00 $3.49 9 RS 121 $250.00 $30,250.00 0.00 $0.00 121.00 $30,250.00 10 SY 893 $18.00 $16,074.00 0.00 $0.00 760.00 $13,680.00 11 TN 4,380 $48.75 $213,525.00 0.00 $0.00 4,172.56 $203,412.30 12 TN 3,290 $51.45 $169,270.50 0.00 $0.00 2,837.39 $145,983.72 13 GAL 2,020 $1.25 $2,525.00 0.00 $0.00 200.00 $250.00 14 LF 9,560 $2.60 $24,856.00 0.00 $0.00 9,560.00 $24,856.00 15 LF 20,997 $10.25 $215,219.25 0.00 $0.00 20,939.00 $214,624.75 16 EA 3 $523.98 $1,571.94 0.00 $0.00 3.00 $1,571.94 17 SY 220 $50.61 $11,134.20 0.00 $0.00 222.78 $11,274.90 18 LF 2,000 $9.60 $19,200.00 0.00 $0.00 1,830.00 $17,568.00 19 EA 20 $230.00 $4,600.00 0.00 $0.00 18.00 $4,140.00 20 EA 2 $1,454.34 $2,908.68 0.00 $0.00 2.00 $2,908.68 $814,182.65 $0.00 $770,086.67 TOTALS ‐ BASE CONTRACT $1,038,206.14 $0.00 $978,890.99 CHANGE ORDER NO. 1 CO1‐1 LS 1.0 $2,400.00 $2,400.00 0.00 $0.00 1.0 $2,400.00 CO1‐2 LF 54.0 $5.25 $283.50 0.00 $0.00 54.0 $283.50 CO1‐3 LF 54.0 $60.90 $3,288.60 0.00 $0.00 54.0 $3,288.60 CO1‐4 EA 1.0 $2,205.15 $2,205.15 0.00 $0.00 1.0 $2,205.15 CO1‐5 EA 1.0 $700.00 $700.00 0.00 $0.00 1.0 $700.00 CO1‐6 LS 1.0 $3,150.00 $3,150.00 0.00 $0.00 1.0 $3,150.00 CO1‐7 LS 1.0 $3,715.00 $3,715.00 0.00 $0.00 1.0 $3,715.00 GRADE TO DRAIN BITUMINOUS MATERIAL FOR TACK COAT REMOVE & DISPOSE OF EXISTING CONCRETE CURB AND GUTTER, ALL TYPES REMOVE & DISPOSE OF EXISTING BITUMINOUS PAVEMENT (DRIVEWAY) SUBTOTAL ‐ DIVISION 2 REMOVE & DISPOSE OF EXISTING CONCRETE PAVEMENT (DRIVEWAY) RECLAIM EXISTING BITUMINOUS AND BASE MATERIALS (8" DEPTH INCL. BIT. CURB) (P) DIVISION 3 ‐ STREET IMPROVEMENTS SAWCUT BITUMINOUS OR CONCRETE HAUL OUT EXCESS RECLAIMED MATERIAL (LV) 2' AGGREGATE SHOULDERING 15" FLARED END SECTION 18" FLARED END SECTION CATCH BASIN TYPE 404 CATCH BASIN/MANHOLE TYPE 406 RIP RAP INCL. GEOTEXTILE SUBTOTAL ‐ DIVISION 1 DIVISION 1 ‐ GENERAL MOBILIZATION REMOVE & DISPOSE OF ENERGY DISSIPATION STRUCTURE REMOVE CATCH BASIN CASTING ITEM DESCRIPTION OF PAY ITEM UNIT CONTRACT THIS PERIOD TOTAL TO DATE 12" RCP STORM SEWER PIPE 15" RCP STORM SEWER PIPE 18" RCP STORM SEWER PIPE TRAFFIC CONTROL SILT FENCE INLET PROTECTION CLEAR TREE GRUB TREE IMPORT AND PLACE TOPSOIL BORROW SODDING SEED, MULCH, & FERTILIZER REINSTALL PROPERTY CORNER DIVISION 2 ‐ STORM SEWER IMPROVEMENTS REMOVE & DISPOSE OF EXISTING STORM SEWER (ALL SIZES AND TYPES, INCL. END SECT REMOVE & DISPOSE OF EXISTING STORM SEWER STRUCTURE R‐3067 CATCH BASIN CASTING SUBTOTAL ‐ DIVISION 3 SUBGRADE CORRECTION SUBGRADE PREPARATION OF RECLAIMED SURFACE (P) BITUMINOUS DRIVEWAY PAVEMENT MANHOLE UPPER SECTION REHABILITATION SAW AND SEAL STREET (40' INTERVALS) BITUMINOUS NON‐WEARING COURSE BITUMINOUS WEARING COURSE CONCRETE CURB AND GUTTER, ALL TYPES 6" CONCRETE FLUME (ALL TYPES) 6" CONCRETE DIRVEWAY PAVEMENT 4" PERFORATED PVC EDGE DRAIN DRAINTILE CLEANOUT MOBILIZATION REMOVE STORM SEWER 18‐INCH RCP STORM SEWER 18‐INCH FES W/ TRASHGUARD CONNECT TO EXISTING STRUCTURE CULVERT 305‐1 EXTENSION CULVERT 306‐1 EXTENSION QUANTITY UNIT PRICE AMOUNT QUANTITY AMOUNT QUANTITY AMOUNT ITEM DESCRIPTION OF PAY ITEM UNIT CONTRACT THIS PERIOD TOTAL TO DATE TOTALS ‐ CHANGE ORDER NO. 1 $15,742.25 $0.00 $15,742.25 CHANGE ORDER NO. 2 CO2‐1 HR 64.0 $90.64 $5,800.96 0.00 $0.00 64.0 $5,800.96 CO2‐2 SF 300.0 $6.88 $2,064.00 0.00 $0.00 300.0 $2,064.00 CO2‐3 HR 20.5 $210.00 $4,305.00 0.00 $0.00 20.5 $4,305.00 TOTALS ‐ CHANGE ORDER NO. 2 $12,169.96 $0.00 $12,169.96 CHANGE ORDER NO. 3 CO3‐1 LS 1.0 $4,226.75 $4,226.75 1.00 $4,226.75 1.0 $4,226.75 CO3‐2 LS 1.0 $5,658.50 $5,658.50 1.00 $5,658.50 1.0 $5,658.50 CO3‐3 EA 2.0 $312.55 $625.10 2.00 $625.10 2.0 $625.10 CO3‐4 LS 1.0 $1,542.51 $1,542.51 1.00 $1,542.51 1.0 $1,542.51 CO3‐5 LS 1.0 $721.75 $721.75 1.00 $721.75 1.0 $721.75 TOTALS ‐ CHANGE ORDER NO. 3 $12,774.61 $12,774.61 $12,774.61 COMPENSATING CHANGE ORDER NO. 4 CO4‐1 LS 1.0 ‐$59,315.15 ‐$59,315.15 0.00 $0.00 0.0 $0.00 TOTALS ‐ CHANGE ORDER NO. 4 ‐$59,315.15 $0.00 $0.00 TOTALS ‐ REVISED CONTRACT $1,019,577.81 $12,774.61 $1,019,577.81 MOBILIZE AND SAWCUT DRIVEWAYS FURNISH AND INSTALL SPECIAL STORM SEWER CASTINGS COMPENSATING CHANGE ORDER REMOVE AND REPLACE ROCK TO CORRECT PONDING AREA CONCRETE CURB STRING LINE ADJUSTMENTS CONCRETE VALLEY GUTTER STOCKPILE EXCESS RECLAIM AT PUBLIC WORKS MODIFY STORM SEWER STRUCTURE EXCAVATE AND REPAIR ROADWAY SETTLEMENTS