HomeMy WebLinkAbout#20 - OV Phase 4 Street & Utility ImprovementsSTAFF REPORT
DATE: April 17, 2018
Regular Agenda
ITEM #: 20
AGENDA ITEM: Old Village Phase 4 Street and Utility Improvements – Receive Report, Call for
Improvement Hearing, Declare Cost to be Assessed, and Call for Hearing on
Proposed Assessment
SUBMITTED BY: Jack Griffin, City Engineer
REVIEWED BY: Kristina Handt, City Administrator
Brian Swanson, Finance Director
Sarah Sonsalla, City Attorney
Rob Weldon, Public Works Director
Chad Isakson, Project Engineer
ISSUE BEFORE COUNCIL: Should the City Council accept the Feasibility Report for the Old Village
Phase 4 Street and Utility Improvements and call for a Public Improvement Hearing to be held on May 15,
2018? And should the City Council declare the cost to be assessed and call the Final Assessment Hearing
to also be held on May 15, 2018?
BACKGROUND: The City of Lake Elmo is extending sanitary sewer to serve the existing properties in
the Old Village area to replace the use of private on-site sewage treatment systems. The projects also include
regional drainage improvements to address historic flooding issues in the Downtown area, the replacement
of aged watermain pipes and reconstructing the public streets that are disturbed during the work. The
Improvements are being constructed in phases and through separate projects. Phase 1 was constructed in
2015, Phase 2 was constructed in 2016, and Phase 3 was constructed in 2017. The Old Village Phase 4
Improvements are consistent with the Old Village Capital Improvement Plan (CIP) as presented to the City
Council on September 6, 2016.
At the September 5, 2017 council meeting, the council authorized the Old Village Phase 4 Street and Utility
Improvements feasibility report and preliminary design. The Phase 4 Improvements includes two project
areas consisting of the 32nd Street North neighborhood, east of Lake Elmo Avenue, and the 36th
Street/Layton Avenue area. The feasibility report is needed to meet state statutory requirements if any
portion of the project is to be assessed to benefitting properties.
PROPOSAL DETAILS/ANALYSIS: The feasibility report has been completed and outlines the
improvements necessary to extend sanitary sewer to these two project areas, including the reconstruction
of the existing streets with concrete curb and gutter and ribbon curb, installation of a new storm sewer
drainage system, the replacement of the aged watermain, and a sanitary sewer service stub extended to the
property line for each benefitting property. The improvements also include a boulevard trail along 36th
Street and Layton Avenue consistent with previous downtown street projects. Park improvements have
been incorporated to restore areas of Lion’s Park that will be disturbed by the construction of a new storm
sewer outfall pipe. The report provides estimated total project costs as provided by the City’s design
consultant, SEH, Inc. In addition, the report states that the improvements are necessary, cost effective, and
feasible, and provides a preliminary assessment roll for each of the benefitting properties.
The following summarizes the report findings and recommendations:
Sanitary Sewer:
•The project will extend municipal sanitary sewer service to 20 properties that are currently served by
on-site wastewater treatment systems.
•The estimated one-time unit assessment for sanitary sewer will be levied over 20 years. The base
assessment value is $11,600 per residential equivalent connection (REC).
•Additional connection costs, in the estimated combined amount of $6,500, would be collected from
property owners at the time of connection to sewer. This amount is comprised of various permitting
and connection fees by the City and Met Council. If the property owner connects within one year of the
sewer being made available, the City’s incentive program applies, and the estimated combined fees
would be reduced to $4,500.
•Properties will also be directly responsible to pay a private plumbing contractor to make the service
connection for their property, from the right-of-way to their home. This cost is property specific and
includes the installation of the grinder station if required.
•Ten properties on 32nd Street will be served by individual grinder stations with a small diameter low
pressure sewer. The grinder stations would be furnished by the City as part of the project and installed
and maintained by each property.
•Lake Elmo ordinance requires properties to connect to sanitary sewer service within 2 years.
Street and Drainage Improvements:
•The improvements have been developed based on preliminary design work previously presented to the
City Council.
•A new small-diameter cul-de-sac is proposed at the end of 32nd Street, but the cul-de-sac is subject to
obtaining an easement from the impacted property owner. If the easement negotiations are not
successful, the street will be replaced as it exists today.
•A regional drainage area storm sewer outfall pipe will be extended through Lions from 36th Street to
Upper 33rd Street connecting to the existing storm sewer system and discharging to the regional
drainage basin. This pipe system is considered a regional benefit and therefore the costs are not being
assessed to the project properties. The location of this storm sewer pipe is also subject to obtaining an
easement from the existing impacted properties. The estimated total costs are $211,000 for the regional
storm sewer outfall pipe.
•Residential properties on 32nd Street will be assessed on a per unit basis at 30% of the total city cost
share for these improvements. The street, and drainage assessment for each parcel on this project is
$8,300 for 12 residential properties. The assessment will be levied over 15 years.
•Residential properties on 36th Street and Layton Avenue North will be assessed on a per unit basis at
30% of the total city cost share for these improvements. The street, and drainage assessment for each
parcel on this project is $8,400 for 6 residential properties. The two city parks have been assessed 6
residential equivalent units. The assessment will be levied over 15 years.
•Commercial properties on 36th Street and Layton Avenue North will be assessed on a per linear foot
basis at 100% of the total project costs for these improvements. The street, and drainage assessment for
each parcel on this project is $220 per linear foot. Detail for each parcel is provided on the assessment
roll. The assessment will be levied over 15 years.
Watermain Improvements:
•The existing watermain infrastructure will be replaced as part of this project. These improvements are
not assessed for properties that are existing water service customers. The estimated total costs are
$374,000 for water system improvements.
Trail and Park Improvements:
•A bituminous trail is proposed to be extended along the south side of 36th Street and the east side of
Layton Avenue. The estimated total costs are $39,500 for the bituminous trail.
•A regional drainage area storm sewer outfall pipe will be extended through the east side of Lions Park
and will disturb the existing tennis court, volleyball court, and playground. Therefore, with certain park
amenities being partially disturbed by the project, additional park improvements were incorporated into
this project.
•Park improvements being incorporated with the project include the replacement of the tennis courts
with a pickleball court/skating rink area, restoring the volleyball courts with a new sand surface, and
installed a new concrete curb edging around the playground. Park improvement costs are estimated to
be $192,500.
FISCAL IMPACT: The estimated total project cost is $2,152,000 with the City cost share estimated to
be $1,380,580, including $674,180 for the street and drainage improvements and $100,400 for the sanitary
sewer improvements. The remaining costs are proposed to be assessed against the benefitting properties
consistent with the City’s Special Assessment Policy including proposed assessments in the amount of
$411,820 for the street and drainage improvements and $359,600 for the sanitary sewer improvements.
Watermain improvements will be funded through the water enterprise fund and the trail and park
improvements will be funded through the Park Funds.
RECOMMENDATION: Staff is recommending that the City Council approve a Resolution receiving the
Feasibility Report and calling for the Public Improvement Hearing to be held on May 15th, 2018. Staff is
also recommending that the City Council approve a Resolution declaring the costs to be assessed and calling
a Hearing on the Proposed Assessment to also be held on May 15, 2018. The suggested motions to approve
these actions are as follows:
“Move to adopt Resolution No. 2018-043 Receiving the Feasibility Report for the Old Village Phase 4
Street and Utility Improvements and Calling Hearing on Improvement
to be held on May 15, 2018.”
and
“Move to adopt Resolution No. 2018-044 Declaring Cost to be Assessed and Calling Hearing on
Proposed Assessment for the Old Village Phase 4 Street and Utility Improvements
to be held on May 15, 2018.”
ATTACHMENTS:
1.A Resolution Receiving the feasibility report for the Old Village Phase 4 Street and Utility
Improvements and calling a hearing on improvements.
2. Notice of Hearing on Improvement.
3.A Resolution Declaring costs to be assessed and calling hearing on proposed assessments for the
Old Village Phase 4 Improvements.
4.Notice of Hearing on Proposed Assessment.
5.Project Location Map.
6.Project Schedule.
7.Assessment Rolls.
**Old Village Phase 4 Street and Utility Improvements Feasibility Report available for review at City
Hall.
1
CITY OF LAKE ELMO
WASHINGTON COUNTY
STATE OF MINNESOTA
RESOLUTION NO. 2018-043
A RESOLUTION RECEIVING FEASIBILITY REPORT FOR OLD
VILLAGE PHASE 4 STREET AND UTILITY IMPROVEMENTS AND
CALLING HEARING ON IMPROVEMENT
WHEREAS, pursuant to City Council authorization, adopted on September 5, 2017, a
feasibility report has been prepared for the Old Village Phase 4 Street and Utility Improvements,
and
WHEREAS, the feasibility report recommends that benefitting properties be assessed all
or a portion of the cost of the improvements pursuant to the city’s Special Assessment Policy and
Minnesota Statutes, Chapter 429; and
WHEREAS, the feasibility report provides information regarding whether the proposed
improvement is necessary, cost-effective, and feasible; whether it should best be made as
proposed or in connection with some other improvement; the estimated cost of the improvements
as recommended; and a description of the methodology used to calculate individual assessments
for affected parcels.
NOW, THEREFORE, BE IT RESOLVED,
1.That the City Council will consider the improvements in accordance with the report and
the assessments of the abutting properties for all or a portion of the cost of the
improvements pursuant to Minnesota Statues, Chapter 429 at an estimated total project
cost of $2,152,000; consisting of street, drainage, and storm sewer improvements at
$1,086,000, sanitary sewer improvements at $460,000, water system improvements at
$374,000, and trail and parking improvements at $232,000.
2.A public hearing shall be held on such proposed improvements on the 15th day of May,
2018, in the council chambers of the City Hall at or approximately after 7:00 P.M. and
the clerk shall give mailed and published notice of such hearing and improvement as
required by law.
ADOPTED BY THE LAKE ELMO CITY COUNCIL ON THE SEVENTEENTH DAY OF APRIL,
2018.
CITY OF LAKE ELMO
By: _ _________________________
Mike Pearson
(Seal) Mayor
ATTEST:
________________________________
Julie Johnson
City Clerk
CITY OF LAKE ELMO
NOTICE OF HEARING ON IMPROVEMENT
OLD VILLAGE PHASE 4 STREET AND UTILITY IMPROVEMENTS
Notice is hereby given that the City Council of Lake Elmo will meet in the council
chambers of the city hall at or approximately after 7:00 P.M. on Tuesday, May 15, 2018,
to consider the making of the following improvements, pursuant to Minnesota Statutes,
Sections 429.011 to 429.111;
The improvements consist of the extension of sanitary sewer along 32nd Street North,
east of Lake Elmo Avenue, and along 36th Street North and Layton Avenue North,
including the reconstruction of the existing streets with concrete curb and gutter,
installation of storm sewer, replacement of existing watermain, construction of an off-
road bituminous trail along 36th Street North and Layton Avenue North, and park
improvements in Lions Park.
Sanitary sewer assessments are proposed for those properties that abut the improvements
and receive a service stub as part of the project including 3235 and 3263 Lake Elmo
Avenue North; 11223, 11240, 11247, 11258, 11267, 11279, 11284, 11295, 11306, and
11328 32nd Street North; 3604, 3624, 3646, 3664, 3686, and 3712 Layton Avenue North;
and 11299 and 11325 Stillwater Boulevard North. The area proposed to be assessed for
the street and drainage improvements include the properties directly abutting and
accessing the proposed streets along 32nd Street North east of Lake Elmo Avenue North,
along 36th Street North east of Laverne Avenue North, and along Layton Avenue North
between 36th Street North and Stillwater Boulevard North.
The estimated total cost for the project is $2,152,000 with the street and drainage
improvements estimated at $1,086,000, the sanitary sewer improvements estimated at
$460,000, the water system improvements at $374,000, and the trail and park
improvements at $232,000. A reasonable estimate of the impact of the assessment will be
available at the hearing. Such persons as desiring to be heard with reference to the
proposed improvements will be heard at this meeting.
DATED: April 17, 2018
BY ORDER OF THE LAKE ELMO CITY COUNCIL
Mike Pearson, Mayor
(Published in the Oakdale-Lake Elmo Review on April 25 and May 2, 2018)
CITY OF LAKE ELMO
WASHINGTON COUNTY
STATE OF MINNESOTA
RESOLUTION NO. 2018-044
A RESOLUTION DECLARING COST TO BE ASSESSED AND CALLING
HEARING ON PROPOSED ASSESSMENT FOR OLD VILLAGE PHASE 4
STREET AND UTILITY IMPROVEMENTS
WHEREAS, estimated project costs have been calculated for the Old Village Phase 4
Street and Utility Improvements including street, drainage, trail, watermain, and sanitary sewer
improvements along 32nd Street North, 36th Street North, and Layton Avenue North; and
WHEREAS, the estimated total cost of the improvements is $2,152,000.
WHEREAS, the City Clerk and City Engineer have prepared the proposed assessment roll
and will maintain said assessment roll on file in the City offices for public inspection.
NOW, THEREFORE, BE IT RESOLVED,
1. The portion of the cost of such street and drainage improvements to be paid by the City is
hereby declared to be $674,180, and the portion of the cost to be assessed against
benefited property owners is declared to be $411,820.
2.The portion of the cost of such sanitary sewer improvements to be paid by the City is hereby
declared to be $100,400, and the portion of the cost to be assessed against benefited
property owners is declared to be $359,600.
3.The City Clerk, with the assistance of the City Engineer, has calculated the proper amount
to be specially assessed for such improvements against every assessable lot, piece or parcel
of land to be benefited by the improvements, and the Clerk has filed a copy of such
proposed assessment in the City offices for public inspection.
4. Assessments shall be payable in equal annual installments extending over 15 years for
street and drainage improvements, and 20 years for sanitary sewer improvements, the
first of the installments to be payable on or before the first Monday in January, 2019 and
shall bear interest at the rate of 4.50 percent per annum from the date of the adoption of
the assessment resolution.
5. A public hearing shall be held on the 15th day of May, 2018, in the Council Chambers of
the City Hall at or approximately after 7:00 P.M. to pass upon such proposed assessment.
All persons owning property affected by such improvement will be given an opportunity
to be heard with reference to such assessment.
6.The City Clerk is hereby directed to cause a notice of the hearing on the proposed
assessment to be published once in the official newspaper at least two weeks prior to the
hearing, and she shall state in the notice the total cost of the improvement. She shall also
cause mailed notice to be given to the owner of each parcel described in the assessment
roll not less than two weeks prior to the hearings.
7.The owner of any property so assessed may, at any time prior to certification of the
assessment to the county auditor, pay the entire assessment on such property, with interest
accrued to the date of payment, to the City Clerk. No interest shall be charged if the entire
assessment is paid before June 15, 2018. A property owner may at any time thereafter, pay
to the City Clerk the entire amount of the assessment remaining unpaid, with interest
accrued to December 31 of the year in which such payment is made. Such payment must
be made before October 31 or interest will be charged through December 31 of the
succeeding year.
ADOPTED BY THE LAKE ELMO CITY COUNCIL ON THE SEVENTEENTH DAY OF APRIL,
2018.
CITY OF LAKE ELMO
By: __________________________
Mike Pearson
(Seal) Mayor
ATTEST:
________________________________
Julie Johnson
City Clerk
CITY OF LAKE ELMO
NOTICE OF HEARING ON PROPOSED ASSESSMENT
OLD VILLAGE PHASE 4 STREET AND UTILITY IMPROVEMENTS
Notice is hereby given that the City Council of Lake Elmo will meet in the Council
Chambers of the City Hall at or approximately after 7:00 P.M. on Tuesday, May 15,
2018, to consider, and possibly adopt, the proposed assessment against abutting property
for the Old Village Phase 4 Street and Utility Improvements. Adoption by the Council of
the proposed assessment may occur at the hearing. The following describes the area
proposed to be assessed:
• Street and drainage improvements along 32nd Street North east of Lake Elmo
Avenue North, 36th Street North east of Laverne Avenue North, and Layton
Avenue North between 36th Street North and Stillwater Boulevard North.
• Sanitary sewer improvements along 32nd Street east of Lake Elmo Avenue North,
36th Street North east of Laverne Avenue North, and Layton Avenue North
between 36th Street North and Stillwater Boulevard North. Properties include 3235
and 3263 Lake Elmo Avenue North; 11223, 11240, 11247, 11258, 11267, 11279,
11284, 11295, 11306, and 11328 32nd Street North; 3604, 3624, 3646, 3664, 3686,
and 3712 Layton Avenue North; and 11299 and 11325 Stillwater Boulevard North.
You may at any time prior to certification of the assessment to the county auditor on
November 15, 2018, pay the entire assessment on such property to the City Clerk with
interest accrued to the date of payment. No interest shall be charged if the entire
assessment is paid to the City Clerk prior to June 15, 2018. You may at any time
thereafter, pay to the City Clerk the entire amount of the assessment remaining unpaid,
with interest accrued to December 31 of the year in which such payment is made. Such
payment must be made before October 31 (date assessment certified to County Auditor)
or interest will be charged through December 31 of the succeeding year. If you decide not
to prepay the assessment before the date given above the rate of interest that will apply is
4.50 percent per year.
Once assessments are certified to the County, the assessments are payable in equal annual
installments extending over a period of 15 years for street and drainage improvements
and 20 years for sanitary sewer improvements, the first of the installments to be payable
on or before the first Monday in January 2019 and will bear interest at the rate of 4.50
percent per annum from the date of adoption of the assessment resolution. To the first
installment shall be added interest on the entire assessment from the date of the
assessment resolution until December 31, 2018. To each subsequent installment when
due shall be added interest for one year on all unpaid installments.
The proposed assessment roll is on file for public inspection at the City Clerk’s office.
The total amount of the proposed street improvement assessment is $411,820. The total
amount of the proposed sanitary sewer improvement assessment is $359,600. The City
contribution for the overall improvement project is $1,380,580. Written or oral objections
will be considered at the meeting. No appeal may be taken as to the amount of an
assessment unless a written objection signed by the affected property owner is filed with
the municipal clerk prior to the assessment hearing or presented to the presiding officer at
the hearing. The Council may upon such notice consider any objection to the amount of a
proposed individual assessment at an adjourned meeting upon such further notice to the
affected property owners as it deems advisable.
An owner may appeal an assessment to district court pursuant to Minnesota Statutes,
Section 429.081 by serving notice of the appeal upon the Mayor or Clerk within 30 days
after the adoption of the assessment and filing such notice with the district court within
ten days after service upon the Mayor or Clerk.
The City Council is authorized in its discretion to defer the payment of an assessment for
any homestead property owned by a person for whom it would be a hardship to make
payment if the owner is 65 years of age or older and/or the owner is a person retired by
virtue of a permanent and total disability or by a person who is a member of the
Minnesota National Guard or other military reserves who is ordered into active military
service, as defined in section 190.05 subdivision 5b or 5c, as stated in the person’s
military orders, for whom it would be a hardship to make the payments. The owner must
request a deferment of the assessment at or before the public hearing at which the
assessment is adopted and make application on forms prescribed by the City Clerk within
30 days after the adoption.
Notwithstanding the standards and guidelines established by the City for determining a
hardship, a deferment of an assessment may be obtained pursuant to Minnesota Statutes
Section 435.193.
DATED: April 17, 2018
BY ORDER OF THE LAKE ELMO CITY COUNCIL
Mike Pearson, Mayor
(Published in the Oakdale-Lake Elmo Review on April 25, 2018)
Old Village Capital Improvement Plan
Phasing Plan; Schedule and
Assessment Methodology
SEPTEMBER 6, 2016 FOCUS ENGINEERING, inc.
OLD VILLAGE CIP – PHASING PLAN
PHASE 3
PHASE 4
PHASE 5
PHASE 7
PHASE6
PHASE 6
PHASE 4
PHASE 3
NOT
INCLUDED
NOT
INCLUDEDNOT INCLUDED
NOT
INCLUDED
PROJECT SCHEDULE
CITY OF LAKE ELMO
OLD VILLAGE PHASE 4: STREET AND UTILITY IMPROVEMENTS
PROJECT NO. 2017.157
DECEMBER 2017
FOCUS ENGINEERING, inc.
Cara Geheren, P.E. 651.300.4261
Jack Griffin, P.E. 651.300.4264
Ryan Stempski, P.E. 651.300.4267
Chad Isakson, P.E. 651.300.4283
SEPTEMBER 5, 2017 Council authorizes preliminary design and preparation of the Feasibility Report.
FEBRUARY 20, 2018 Council orders the preparation of Plans and Specifications.
APRIL 17, 2018 Presentation of Feasibility Report. Council accepts Report and calls Improvement
Hearing and Assessment Hearing.Approve Plans and Specifications and Order
Advertisement for Bids.
MAY 10, 2018 Receive Contractor Bids.
MAY 15, 2018 Public Improvement Hearing and Final Assessment Hearing. Council Orders the
Improvement (requires 4/5th vote); Adopts the Final Assessments. Council accepts
Bids and awards Contract.
JUNE 5, 2018 Conduct Pre‐Construction Meeting and issue Notice to Proceed.
•OCTOBER 27, 2018 Substantial Completion.
•JUNE 21, 2019 Final Completion.
CITY OF LAKE ELMO, MN.
APRIL 2018
OLD VILLAGE PHASE 4: STREET AND UTILITY IMPROVEMENTS
32ND STREET NEIGHBORHOOD
PRELIMINARY ASSESSMENT ROLL
STREET AND SANITARY SEWER IMPROVEMENTS
PAGE 1 of 1
NO. NAME PID
TOTAL
ASSESSMENT
AMOUNT
STREET AND
DRAINAGE
ASSESSMENT
AMOUNT
SANITARY
SEWER
ASSESSMENT
AMOUNT SAC
1 STUDE ROBERT H & CAROL W 3263 LAKE ELMO AVE N 3263 LAKE ELMO AVE N LAKE ELMO MN 55042 1302921320040 $19,900.00 $8,300.00 $11,600.00 1
2 PROKOSCH SUSAN L 11240 32ND ST N 11240 32ND ST N LAKE ELMO MN 55042 1302921310013 $19,900.00 $8,300.00 $11,600.00 1
3 FERGUSON BRIAN T & KIM M 11258 32ND ST N 11258 32ND ST N LAKE ELMO MN 55042 1302921310011 $19,900.00 $8,300.00 $11,600.00 1
4 MEIER JAMES A TRS 11284 32ND ST N PO BOX 217 LAKE ELMO MN 55042 1302921310012 $19,900.00 $8,300.00 $11,600.00 1
5 WENDT MYRON & BEVERLY 11306 32ND ST N 11306 32ND ST N LAKE ELMO MN 55042 1302921310015 $19,900.00 $8,300.00 $11,600.00 1
6 WENDT EDNA C 11328 32ND ST N 11328 32ND ST N LAKE ELMO MN 55042 1302921310014 $19,900.00 $8,300.00 $11,600.00 1
7 ANDREWS JOHN R & CHERL L 11295 32ND ST N 11295 32ND ST N LAKE ELMO MN 55042 1302921340003 $19,900.00 $8,300.00 $11,600.00 1
8 RUBBERT KENNETH O & DOREEN N 11279 32ND ST N 11279 32ND ST N LAKE ELMO MN 55042 1302921340002 $19,900.00 $8,300.00 $11,600.00 1
9 SANCHEZ OCTAVIO & MICHELLE 11267 32ND ST N 11267 32ND ST N LAKE ELMO MN 55042 1302921340004 $19,900.00 $8,300.00 $11,600.00 1
10 REYNOLDS ROCKY P & KAREN K 11247 32ND ST N 11247 32ND ST N LAKE ELMO MN 55042 1302921340005 $19,900.00 $8,300.00 $11,600.00 1
11 PROKOSCH SUSAN L 11223 32ND ST N 11240 32ND ST N LAKE ELMO MN 55042 1302921330005 $31,500.00 $8,300.00 $23,200.00 2
12 BEERS MARY ANNE 3235 LAKE ELMO AVE N PO BOX 64 LAKE ELMO MN 55042 1302921330008 $19,900.00 $8,300.00 $11,600.00 1
TOTAL $250,400.00 $99,600.00 $150,800.00 13
ADDRESS MAILING ADDRESS
CITY OF LAKE ELMO, MN.
APRIL 2018
OLD VILLAGE PHASE 4: STREET AND UTILITY IMPROVEMENTS
36TH STREET LAYTON AVENUE
PRELIMINARY ASSESSMENT ROLL
STREET AND SANITARY SEWER IMPROVEMENTS
PAGE 1 of 1
NO. NAME PID
TOTAL
ASSESSMENT
AMOUNT
STREET AND
DRAINAGE
ASSESSMENT
AMOUNT
STREET
FRONT
FOOTAGE
SANITARY
SEWER
ASSESSMENT
AMOUNT SAC
1 CHRISTINE L SCHILTZ TRS 3686 LAYTON AVE N 721 10TH AVE N SOUTH ST. PAUL MN 55075 1302921240026 $20,000.00 $8,400 100 11,600.00$ 1
2 WOLDSNES JON 3664 LAYTON AVE N 3664 LAYTON AVE N LAKE ELMO MN 55042 1302921240027 $20,000.00 $8,400 100 11,600.00$ 1
3 TOLLARD GAYL J 3646 LAYTON AVE N 3646 LAYTON AVE N LAKE ELMO MN 55042 1302921240006 $20,000.00 $8,400 100 11,600.00$ 1
4 DITTMANN MELANIE A & MELVIN J 3624 LAYTON AVE N 3624 LAYTON AVE N LAKE ELMO MN 55042 1302921240005 $20,000.00 $8,400 100 11,600.00$ 1
5 ZEIPELT BETH N 3604 LAYTON AVE N 3604 LAYTON AVE N LAKE ELMO MN 55042 1302921240003 $20,000.00 $8,400 250 11,600.00$ 1
6 WACKER WILLIAM G & SALLYANN 3603 LAVERNE AVE N PO BOX 167 LAKE ELMO MN 55042 1302921230017 $8,400.00 $8,400 120 ‐$
7 CITY OF LAKE ELMO 3585 LAVERNE AVE N 3880 LAVERNE AVE N LAKE ELMO MN 55042 1302921230029 $25,200.00 $25,200 350 ‐$
8 CITY OF LAKE ELMO 3800 LAVERNE AVE N LAKE ELMO MN 55042 1302921240018 $25,200.00 $25,200 397 ‐$
9 CHEEE LLC 11320 UPPER 33RD ST N 7250 HUDSON BOULEVARD N OAKDALE MN 55128 1302921240022 $13,200.00 $13,200 60 ‐$
10 CHEEE LLC 7250 HUDSON BOULEVARD N OAKDALE MN 55128 1302921240019 $22,220.00 $22,220 101 ‐$
11 C A GERBITZ CO INC 11299 STILLWATER BLVD N 11299 STILLWATER BLVD N LAKE ELMO MN 55042 1302921240017 $122,580.00 $87,780 399 34,800.00$ 3
12 ELMO INN ENTERPRISES INC 3712 LAYTON AVE N PO BOX 182 LAKE ELMO MN 55042 1302921240025 $169,420.00 $88,220 401 81,200.00$ 7
13 WILLIAM C HAGBERG TRS & PATRICIA H
HAGBERG TRS 11325 STILLWATER BLVD N 3060 LAKE ELMO AVE N LAKE ELMO MN 55042 1302921240016 $34,800.00 $0 0 34,800.00$ 3
TOTAL $521,020.00 $312,220 2478 208,800.00$ 18
ASSESSABLE PROPERTY ADDRESS MAILING ADDRESS
*Properties in Red represent Commercial properties.
**Properties in Black represent Residential properties.