HomeMy WebLinkAbout#21 - OV Phase 4 Plans & Specs STAFF REPORT DATE: April 17, 2018 REGULAR ITEM #: 21 AGENDA ITEM: Old Village Phase 4 Street and Utility Improvements – Resolution Approving Plans and Specifications and Ordering Advertisement for Bids SUBMITTED BY: Jack Griffin, City Engineer REVIEWED BY: Kristina Handt, City Administrator Rob Weldon, Public Works Director Chad Isakson, Project Engineer ISSUE BEFORE COUNCIL: Should the City Council approve the plans and specifications and order advertisement for bids for the Old Village Phase 4 Street and Utility Improvements? BACKGROUND: On February 20, 2018 the City Council ordered the preparation of the plans and specifications for the Old Village Phase 4 Street and Utility Improvements. The improvements include the extension of lateral sanitary sewer mains along 32nd Street North, east of Lake Elmo Avenue, and along 36th Street North/Layton Avenue North. The improvements include the reconstruction of the existing streets with concrete curb and gutter, the addition of storm sewer improvements to improve drainage to the extent possible within the project limits and right-of-way, the replacement of the aged watermain, and a sanitary sewer service stub extended to the property line for each benefitting property. The project also consists of the installation of a regional storm sewer outfall pipe as another extension of the City’s regional downtown storm sewer system and considers the addition of a trail extension along 36th Street North to connect Lion’s Park to the VFW Park. The scope of improvements remains consistent with the preliminary plans that were presented to the City Council on February 20th, 2018. Park improvements were added to the scope of improvements based on staff direction and as part of the project restoration. PROPOSAL DETAILS/ANALYSIS: The plans and specifications have been completed for the improvements and are ready to be advertised for contractor bids. A bid date has been scheduled for May 10, 2018. Once received, bids will be reviewed by staff and with recommendations to be presented to council on May 15, 2018 to award a contract. FISCAL IMPACT: The estimated total cost for the Old Village Phase 4 Street and Utility Improvements is $2,152,000. The improvements are proposed to be partially assessed against the benefitting properties consistent with the City’s Special Assessment Policy. The project is funded through the issuance of general obligation bonds and special assessments. Approval of this motion does not commit the council to the project costs. Once contractor bids are received, the actual construction costs will be known and the council will be asked to consider entering into a contract to complete the work. RECOMMENDATION: Staff is recommending that the City Council approve Resolution 2018-045 approving the plans and specifications and ordering the advertisement for bids for the Old Village Phase 4 Street and Utility Improvements. The recommended motion for the action is as follows: “Move to approve Resolution No. 2018–045, approving the plans and specifications and ordering the advertisement for bids for the Old Village Phase 4 Street and Utility Improvements.” ATTACHMENTS: 1. Resolution approving the plans and specifications and ordering the advertisement for bids for the Old Village Phase 4 Street and Utility Improvements. 2. Location Map. 3. Project Schedule. 4. Project Plans and Specifications available for review at City Hall. CITY OF LAKE ELMO WASHINGTON COUNTY STATE OF MINNESOTA RESOLUTION NO. 2018-045 A RESOLUTION APPROVING PLANS AND SPECIFICATIONS AND ORDERING ADVERTISEMENT FOR BIDS FOR THE OLD VILLAGE PHASE 4 STREET AND UTILITY IMPROVEMENTS WHEREAS, pursuant to a resolution passed by the City Council on the 20th day of February 2018, the City Engineer, together with SEH, Inc., has prepared plans and specifications for the Old Village Phase 4 Street and Utility Improvements and has presented such plans and specifications to the Council for approval. NOW, THEREFORE, BE IT RESOLVED, 1. Such plans and specifications, a copy of which is on file at Lake Elmo City Hall, and made a part hereof, are hereby approved. 2. The City Clerk shall prepare and cause to be inserted in the official paper and posted online with Quest Construction Data Network (QuestCDN.com) an advertisement for bids upon the making of such improvements under such approved plans and specifications. The advertisement shall be published for at least 21 days, shall specify the work to be done, and shall state that sealed bids provided to the City Clerk prior to the specified bid date and time and accompanied by a bid bond or cashier’s check made payable to the City of Lake Elmo in an amount not less than 5% of the amount of such bid will be considered. ADOPTED BY THE LAKE ELMO CITY COUNCIL ON THE SEVENTEENTH DAY OF APRIL, 2018. CITY OF LAKE ELMO By: __________________________ Mike Pearson (Seal) Mayor ATTEST: ________________________________ Julie Johnson City Clerk Old Village Capital Improvement Plan Phasing Plan; Schedule and Assessment Methodology SEPTEMBER 6, 2016 FOCUS ENGINEERING, inc. OLD VILLAGE CIP – PHASING PLAN PHASE 3 PHASE 4 PHASE 5 PHASE 7 PHASE6 PHASE 6 PHASE 4 PHASE 3 NOT INCLUDED NOT INCLUDEDNOT INCLUDED NOT INCLUDED PROJECT SCHEDULE  CITY OF LAKE ELMO        OLD VILLAGE PHASE 4: STREET AND UTILITY IMPROVEMENTS  PROJECT NO. 2017.157 DECEMBER 2017 FOCUS ENGINEERING, inc.  Cara Geheren, P.E.   651.300.4261  Jack Griffin, P.E.                651.300.4264  Ryan Stempski, P.E.  651.300.4267  Chad Isakson, P.E.  651.300.4283                SEPTEMBER 5, 2017  Council authorizes preliminary design and preparation of the Feasibility Report.       FEBRUARY 20, 2018  Council orders the preparation of Plans and Specifications.       APRIL 17, 2018  Presentation of Feasibility Report. Council accepts Report and calls Improvement  Hearing and Assessment Hearing.Approve Plans and Specifications and Order  Advertisement for Bids.      MAY 10, 2018  Receive Contractor Bids.      MAY 15, 2018  Public Improvement Hearing and Final Assessment Hearing. Council Orders the  Improvement (requires 4/5th vote); Adopts the Final Assessments. Council accepts  Bids and awards Contract.      JUNE 5, 2018  Conduct Pre‐Construction Meeting and issue Notice to Proceed.    •OCTOBER 27, 2018  Substantial Completion.    •JUNE 21, 2019    Final Completion.