HomeMy WebLinkAbout#10 - Old Village Phase 4 Improvements STAFF REPORT DATE: June 5, 2018 REGULAR ITEM #: 10 AGENDA ITEM: Old Village Phase 4 Street, Drainage, and Utility Improvements – Resolution Adopting the Final Assessment Roll and Resolution Accepting Bids and Awarding a Contract SUBMITTED BY: Jack Griffin, City Engineer REVIEWED BY: Kristina Handt, City Administrator Sue Iverson, Finance Director Sarah Sonsalla, City Attorney Rob Weldon, Public Works Director Chad Isakson, Project Engineer ISSUE BEFORE COUNCIL: Should the City Council adopt the Final Assessment Roll and award a Contract for the Old Village Phase 4 Street, Drainage, and Utility Improvements? BACKGROUND: On February 20, 2018 the City Council ordered the preparation of the plans and specifications for the Old Village Phase 4 Street, Drainage and Utility Improvements. The improvements include the extension of lateral sanitary sewer mains along 32nd Street North, east of Lake Elmo Avenue, and along 36th Street North/Layton Avenue North. The improvements include the reconstruction of the existing streets with concrete curb and gutter, the addition of storm sewer improvements to improve drainage to the extent possible within the project limits and right-of-way, the replacement of the aged watermain, and a sanitary sewer service stub extended to the property line for each benefitting property. The project also consists of the installation of a regional storm sewer outfall pipe as another extension of the City’s regional downtown storm sewer system and considers the addition of a trail extension along 36th Street North to connect Lion’s Park to the VFW Park. The scope of improvements remains consistent with the preliminary plans that were presented to the City Council on February 20th, 2018. Park improvements were added to the scope of improvements based on staff direction and as part of the project restoration. An informational meeting for members of the community affected by the proposed assessments was held on April 25, 2018. PROPOSAL DETAILS/ANALYSIS: On May 15, 2018, the Lake Elmo City Council conducted the improvement hearing and final assessment hearing for the Old Village Phase 4 Street, Drainage, and Utility Improvements and subsequently ordered the improvements. The City received objections to the assessments from two property owners. The adoption of the final assessment roll and award of contract were tabled until the June 5 City Council meeting. The Feasibility Report was completed and adopted by the City Council defining the scope of the proposed improvements together with the estimated project costs and the preliminary assessment roll consisting, in part, of 100% of the street and drainage improvements being assessed to commercial properties. Staff has now revised this recommendation to assess only 60% of the street and drainage improvements for commercial properties and has updated the Final Assessment Roll accordingly. In addition, staff has obtained signed assessment agreements from each of the properties that filed objections, that withdraws their objection to the assessment and waives its right to appeal. At council direction at the May 15 meeting, Change Order No. 1 has been prepared to add a storm sewer extension to be stubbed to the alley between Laverne Avenue and Layton Avenue to accommodate alley drainage when the alley is improved in the future. The following summarizes the REVISIONS to the report findings, assessments, and recommendations: • A regional drainage area storm sewer outfall pipe will be extended through Lions Park from 36th Street to Upper 33rd Street connecting to the existing storm sewer system and discharging to the regional drainage basin. Drainage and Utility Easements necessary for this storm sewer outfall pipe have been acquired from CHEEE properties. • 12 residential properties on 32nd Street will be assessed on a per unit basis at 30% of the total city cost share for these improvements. The street and drainage assessment for each parcel on this project is being reduced from $8,300 to $7,800 after receiving favorable bids for the project. • Commercial properties on 36th Street and Layton Avenue North will be assessed on a per linear foot basis at a reduced rate of 60% of the total project costs for these improvements. The street, and drainage assessment for each parcel on this project is now $132 per linear foot. Detail for each parcel is provided on the assessment roll. The assessment will be levied over 15 years. • A storm sewer has been extended and stubbed into the ally between Laverne and Layton Avenue to accommodate alley drainage when the alley is improved in the future. This addition to the project is presented as Change Order No. 1. Bids were received, publicly opened, and read aloud on Thursday, May 10, 2018. The City’s design consultant has prepared and attached a summary of bids received and a letter of recommendation for the award of the contract. The City received 3 bids for this project, with A-1 Excavating, Inc. providing the lowest base bid in the amount of $1,698,744.21. In addition, staff has prepared Change Order No. 1 to include the alley storm sewer stub to the scope of improvements per Council direction on May 15, 2018. Change Order No. 1 increases the contract in the estimated amount of $24,518.00 for a total contact amount of $1,723,262.21. As a part of this award Staff is requesting Council to provide the City Administrator authorization to purchase individual grinder stations from a supplier in the not-to-exceed amount of $50,000 and enter into a material testing contract in the not-to-exceed amount of $20,000. Additionally, staff is recommending that the City Council approve a task order to provide construction observation services in an amount not to exceed $130,000. Each of these items are budgeted in the total estimated project costs. Finally, staff is asking the City Council to approve the Assessment Agreement dated May 30, 2018 with C.A. Gerbitz Co., Inc.; the Assessment Agreement dated May 30, 2018 with Elmo Inn Enterprises, Inc.; and the purchase of the Drainage and Utility Easement Agreement with CHEEE LLC in the amount of $24,800. The City Council approved the Plans and Specifications for the Old Village Phase 4 Street, Drainage, and Utility Improvements on April 17, 2018 and authorized staff to advertise the Project for bids. The Project was advertised on QuestCDN.com and in the Oakdale-Lake Elmo Review in accordance with the Minnesota Competitive Bidding requirements. FISCAL IMPACT: Approval of this resolution commits the council to enter into a construction contract for the project. The estimated total cost for the Old Village Phase 4 improvements is $2,313,000 with the street and drainage improvements estimated at $1,235,500; the sanitary sewer improvements estimated at $418,500; the watermain improvements estimated at $372,500; and the park and trail improvements at $286,500. The street, drainage, and sanitary improvements are proposed to be assessed against the benefitting properties consistent with the City’s Special Assessment Policy and the Old Village Sewer Assessment Policy. RECOMMENDATION: Staff is recommending that the City Council approve a resolution adopting the final assessment roll, and approve a resolution accepting bids and awarding a contract for the Old Village Phase 4 Street, Drainage and Utility Improvements, including Change Order No. 1. Staff is also recommending that the City Council authorize the City Administrator to purchase individual grinder stations from a supplier in the not-to-exceed amount of $50,000, enter into a material testing contract in the not-to-exceed amount of $20,000, and authorize a task order to provide construction observation services in an amount not to exceed $130,000. The recommended motions for these actions are as follows: “Move to adopt Resolution No. 2018-060 Adopting the Final Assessment Roll for the Old Village Phase 4 Street, Drainage, and Utility Improvements.” and “Move to approve Resolution No. 2018–061, accepting bids and awarding a contract to the lowest responsible bidder, A-1 Excavating, Inc., for the base bid amount of $1,698,744.21, and approve Change Order No. 1 increasing the contract amount by $24,518.00 for a total contract amount of $1,1,723,262.21.” and “Move to authorize the City Administrator to purchase individual grinder stations from a supplier in the not-to-exceed amount of $50,000; to enter into a material testing contract in the not-to-exceed amount of $20,000; and to approve a task order to provide construction observation services in an amount not to exceed $130,000.” and “Move to approve the Assessment Agreement dated May 30, 2018 with C.A. Gerbitz Co., Inc.; the Assessment Agreement dated May 30, 2018 with Elmo Inn Enterprises, Inc.; and the purchase of the Drainage and Utility Easement Agreement with CHEEE LLC in the amount of $24,800.” ATTACHMENTS: 1. Resolution Adopting the Final Assessment Roll for the Old Village Phase 4 Street, Drainage, and Utility Improvements. 2. Resolution Accepting Bids and Awarding a Contract for the Old Village Phase 4 Street, Drainage, and Utility Improvements. 3. Final Assessment Roll. 4. Engineer’s Summary of Bids Received and Recommendation for Award of Contract. 5. Change Order No. 1. 6. Project Schedule. 7. Assessment Agreement dated May 30, 2018 with C.A. Gerbitz Co., Inc. 8. Assessment Agreement dated May 30, 2018 with Elmo Inn Enterprises, Inc. 9. Drainage and Utility Easement Agreement with CHEEE LLC. CITY OF LAKE ELMO WASHINGTON COUNTY STATE OF MINNESOTA RESOLUTION NO. 2018-060 A RESOLUTION ADOPTING THE FINAL ASSESSMENT ROLL FOR THE OLD VILLAGE PHASE 4 STREET, DRAINAGE, AND UTILITY IMPROVEMENTS WHEREAS, pursuant to proper notice duly given as required by law, the Council has met and heard and passed upon all objections to the proposed assessment for the Old Village Phase 4 Street, Drainage, and Utility Improvements including street, drainage, and sanitary sewer improvements along 32nd Street North, 36th Street North, and Layton Avenue North. NOW, THEREFORE, BE IT RESOLVED, 1. Such proposed assessment, a copy of which is attached hereto and made a part hereof, is hereby accepted and shall constitute the special assessment against the lands named therein, and each tract of land therein included is hereby found to be benefited by the proposed improvement in the amount of the assessment levied against it. 2. Such assessment shall be payable in equal annual installments extending over 15 years for street and drainage improvements and 20 years for sanitary sewer improvements, the first of the installments to be payable on or before the first Monday in January, 2019 and shall bear interest at the rate of 4.5% percent per annum from the adoption date of this assessment resolution. To the first installment shall be added interest on the entire assessment from July 5, 2018 until December 31, 2018. To each subsequent installment, when due, shall be added interest for one year on all unpaid installments. 3. The owner of any property so assessed may, at any time prior to the certification of the assessment to the county auditor, pay the whole of the assessment on such property, with the interest accrued to the date of payment, to the City Clerk, except that no interest shall be charged if the entire assessment is paid within 30 days from the adoption of this resolution; and he/she may, at any time thereafter, pay to the City Clerk the entire amount of the assessment remaining unpaid, with interest accrued to December 31 of the year in which such payment is made. Such payment must be made before October 31 or interest will be charged through December 31 of the next succeeding year. 4. The City Clerk shall forthwith transmit a certified duplicate of this assessment to the County Auditor to be extended on the property tax lists of the county. Such assessments shall be collected and paid over in the same manner as other municipal taxes. ADOPTED BY THE LAKE ELMO CITY COUNCIL ON THE FIFTH DAY OF JUNE, 2018. CITY OF LAKE ELMO By: __________________________ Mike Pearson (Seal) Mayor ATTEST: ________________________________ Julie Johnson City Clerk CITY OF LAKE ELMO WASHINGTON COUNTY STATE OF MINNESOTA RESOLUTION NO. 2018-061 A RESOLUTION ACCEPTING BIDS AND AWARDING A CONTRACT FOR THE OLD VILLAGE PHASE 4 STREET, DRAINAGE, AND UTILITY IMPROVEMENTS WHEREAS, pursuant to an advertisement for bids for the Old Village Phase 4: Street, Drainage, and Utility Improvements, bids were received, opened, and tabulated according to law, and bids were received complying with the advertisement; and WHEREAS, bids were tabulated, checked and summarized to verify that all requirements of the submittal were met; and WHEREAS, the project engineer reviewed the bids and has provided a letter recommending the award of the contract to the lowest responsible bidder, A-1 Excavating, Inc., for the base bid amount of $1,698,744.21; and WHEREAS, Change Order No. 1 was prepared to revise the scope of improvements to include additional storm sewer pipe to be installed in the amount of $24,518.00 thereby revising the total contract amount to $1,723,262.21. NOW, THEREFORE, BE IT RESOLVED, 1. That the Mayor and City Clerk are hereby authorized and directed to enter into a Contract in the accordance with the above ordered Project, in the amount of the Contractor’s lowest responsible bid and including Change Order No. 1, and according to the plans and specifications thereof approved by the City Council. 2. The City Clerk is hereby authorized and directed to return forthwith to all bidders the deposits made with their bids, except that the deposits of the successful bidder and the next two lowest bidders shall be retained until a contract has been signed. ADOPTED BY THE LAKE ELMO CITY COUNCIL ON THE FIFTH DAY OF JUNE, 2018. CITY OF LAKE ELMO By: __________________________ Mike Pearson (Seal) Mayor ATTEST: ________________________________ Julie Johnson City Clerk CITY OF LAKE ELMO, MN. MAY 2018 OLD VILLAGE PHASE 4: STREET AND UTILITY IMPROVEMENTS 32ND STREET NEIGHBORHOOD FINAL ASSESSMENT ROLL STREET AND SANITARY SEWER IMPROVEMENTS PAGE 1 of 1 NO. NAME PID TOTAL  ASSESSMENT  AMOUNT STREET AND  DRAINAGE  ASSESSMENT  AMOUNT SANITARY  SEWER  ASSESSMENT  AMOUNT SAC 1 STUDE ROBERT H & CAROL W 3263 LAKE ELMO AVE N 3263 LAKE ELMO AVE N LAKE ELMO MN 55042 1302921320040 $19,400.00 $7,800.00 $11,600.00 1 2 PROKOSCH SUSAN L 11240 32ND ST N 11240 32ND ST N LAKE ELMO MN 55042 1302921310013 $19,400.00 $7,800.00 $11,600.00 1 3 FERGUSON BRIAN T & KIM M 11258 32ND ST N 11258 32ND ST N LAKE ELMO MN 55042 1302921310011 $19,400.00 $7,800.00 $11,600.00 1 4 MEIER JAMES A TRS 11284 32ND ST N PO BOX 217 LAKE ELMO MN 55042 1302921310012 $19,400.00 $7,800.00 $11,600.00 1 5 WENDT MYRON & BEVERLY 11306 32ND ST N 11306 32ND ST N LAKE ELMO MN 55042 1302921310015 $19,400.00 $7,800.00 $11,600.00 1 6 WENDT EDNA C 11328 32ND ST N 11328 32ND ST N LAKE ELMO MN 55042 1302921310014 $19,400.00 $7,800.00 $11,600.00 1 7 ANDREWS JOHN R & CHERL L 11295 32ND ST N 11295 32ND ST N LAKE ELMO MN 55042 1302921340003 $19,400.00 $7,800.00 $11,600.00 1 8 RUBBERT KENNETH O & DOREEN N 11279 32ND ST N 11279 32ND ST N LAKE ELMO MN 55042 1302921340002 $19,400.00 $7,800.00 $11,600.00 1 9 SANCHEZ OCTAVIO & MICHELLE 11267 32ND ST N 11267 32ND ST N LAKE ELMO MN 55042 1302921340004 $19,400.00 $7,800.00 $11,600.00 1 10 REYNOLDS ROCKY P & KAREN K 11247 32ND ST N 11247 32ND ST N LAKE ELMO MN 55042 1302921340005 $19,400.00 $7,800.00 $11,600.00 1 11 PROKOSCH SUSAN L 11223 32ND ST N 11240 32ND ST N LAKE ELMO MN 55042 1302921330005 $31,000.00 $7,800.00 $23,200.00 2 12 BEERS MARY ANNE 3235 LAKE ELMO AVE N PO BOX 64 LAKE ELMO MN 55042 1302921330008 $19,400.00 $7,800.00 $11,600.00 1 TOTAL $244,400.00 $93,600.00 $150,800.00 13 ADDRESS MAILING ADDRESS CITY OF LAKE ELMO, MN. MAY 2018 OLD VILLAGE PHASE 4: STREET AND UTILITY IMPROVEMENTS 36TH STREET LAYTON AVENUE FINAL ASSESSMENT ROLL (NON-RESIDENTIAL STREET AT 60%) STREET AND SANITARY SEWER IMPROVEMENTS PAGE 1 of 1 NO. NAME PID TOTAL  ASSESSMENT  AMOUNT STREET AND  DRAINAGE  ASSESSMENT  AMOUNT STREET  FRONT  FOOTAGE SANITARY  SEWER  ASSESSMENT  AMOUNT SAC 1 CHRISTINE L SCHILTZ TRS 3686 LAYTON AVE N 721 10TH AVE N SOUTH ST. PAUL MN 55075 1302921240026 $20,000.00 $8,400 100 11,600.00$       1 2 WOLDSNES JON 3664 LAYTON AVE N 3664 LAYTON AVE N LAKE ELMO MN 55042 1302921240027 $20,000.00 $8,400 100 11,600.00$       1 3 TOLLARD GAYL J 3646 LAYTON AVE N 3646 LAYTON AVE N LAKE ELMO MN 55042 1302921240006 $20,000.00 $8,400 100 11,600.00$       1 4 DITTMANN MELANIE A & MELVIN J 3624 LAYTON AVE N 3624 LAYTON AVE N LAKE ELMO MN 55042 1302921240005 $20,000.00 $8,400 100 11,600.00$       1 5 ZEIPELT BETH N 3604 LAYTON AVE N 3604 LAYTON AVE N LAKE ELMO MN 55042 1302921240003 $20,000.00 $8,400 250 11,600.00$       1 6 WACKER WILLIAM G & SALLYANN 3603 LAVERNE AVE N PO BOX 167 LAKE ELMO MN 55042 1302921230017 $8,400.00 $8,400 120 ‐$                   7 CITY OF LAKE ELMO 3585 LAVERNE AVE N 3880 LAVERNE AVE N LAKE ELMO MN 55042 1302921230029 $25,200.00 $25,200 350 ‐$                   8 CITY OF LAKE ELMO 3800 LAVERNE AVE N LAKE ELMO MN 55042 1302921240018 $25,200.00 $25,200 397 ‐$                   9 CHEEE LLC 11320 UPPER 33RD ST N 7250 HUDSON BOULEVARD N OAKDALE MN 55128 1302921240022 $7,920.00 $7,920 60 ‐$                   10 CHEEE LLC 7250 HUDSON BOULEVARD N OAKDALE MN 55128 1302921240019 $13,332.00 $13,332 101 ‐$                   11 C A GERBITZ CO INC 11299 STILLWATER BLVD N 11299 STILLWATER BLVD N LAKE ELMO MN 55042 1302921240017 $87,468.00 $52,668 399 34,800.00$       3 12 ELMO INN ENTERPRISES INC 3712 LAYTON AVE N PO BOX 182 LAKE ELMO MN 55042 1302921240025 $134,132.00 $52,932 401 81,200.00$       7 13 WILLIAM C HAGBERG TRS & PATRICIA H  HAGBERG TRS 11325 STILLWATER BLVD N 3060 LAKE ELMO AVE N LAKE ELMO MN 55042 1302921240016 $34,800.00 $0 0 34,800.00$       3 TOTAL $436,452.00 $227,652 2478 208,800.00$    18 ASSESSABLE PROPERTY ADDRESS MAILING ADDRESS *Properties in Red represent Commercial properties. **Properties in Black represent Residential properties. Engineers | Architects | Planners | Scientists Short Elliott Hendrickson Inc., 3535 Vadnais Center Drive, St. Paul, MN 55110-5196 SEH is 100% employee-owned | sehinc.com | 651.490.2000 | 800.325.2055 | 888.908.8166 fax May 14, 2018 RE: Lake Elmo, MN Old Village Phase 4: Street, Drainage and Utility Improvements City Project No. 2017.157 SEH No. LAKMO 145378 Mr. Jack Griffin City Engineer City of Lake Elmo 3880 Laverne Ave. N. Lake Elmo, MN 55042 On Thursday, May 10, 2018 at, three (3) bids were received for the above-referenced project. The bids ranged from a high of $1,935,716.65 to a low of $1,698,744.21. The low bid was submitted by A-1 Excavating Inc. of Bloomer, WI in the amount of $1,698,744.21. Contractor Total Bid 1 A-1 Excavating Inc. $1,698,744.21 ** 2 RL Larson Excavating, Inc. $1,863,944.90 3 Geislinger & Sons, Inc. $1,935,716.65 Engineer's Estimate $1,630,091.10 ** Denotes corrected figure In reliance on our experience with A-1 Excavating Inc. and/or materials and information provided by the contractor, we have determined that according to their bonding agent, they presently have the financial ability to complete the project bid. SEH makes no representation or warranty as to the actual financial viability of the contractor or its ability to complete its work. A-1 Excavating Inc. has completed similar work in Lake Elmo and surrounding communities in the past. SEH engineers can conclude that A-1 Excavating Inc. has the experience and ability to complete a project of this size and scope. Accordingly we recommend the project be awarded to A-1 Excavating Inc. in the amount of $1,698,744.21. Please contact me if you need any additional information or wish to discuss further. I can be reached at 651.490.2055, or via email at shaupt@sehinc.com. Sincerely, Scott Haupt, PE Project Manager ah s:\ko\l\lakmo\145378\6-bid-const\bidding docs\ov 4 recommendation of award.docx CONTRACT CHANGE ORDER FORM CHANGE ORDER NO. DATE: TO: UNIT LF EA EA EA Amount of Original Contract $ Sum of Additions/Deductions approved to date (CO Nos.         )$ Contract Amount to date $ Amount of this Change Order   (ADD)   (DEDUCT)   (NO CHANGE)$ Revised Contract Amount $ The Contract Period for Completion will be   (UNCHANGED)  (INCREASED)  (DECREASED)days APPROVED BY ENGINEER:  FOCUS ENGINEERING APPROVED BY CONTRACTOR DATE DATE APPROVED BY OWNER:  CITY OF LAKE ELMO, MINNESOTA DATE DATE 0 This Document will become a supplement to the Contract and all provisions will apply hereto. The Contract Documents are  modified as follows upon execution of this Change Order.  BYENGINEER 1,698,744.21 0.00 1,698,744.21 24,518.00 1,723,262.21 INCREASE/(DECREASE) A‐1 Excavating, Inc, 408 26th Avenue PO Box 90, Bloomer, WI 54724 OLD VILLAGE PHASE 4 IMPROVEMENTS PROJECT NO. 2017.157 1 May 31, 2018 ITEM $15,458.00 $4,980.00CO1‐2 Construct Drainage Struct Des. CC‐48" (w/ Casting) 2 $2,490.00 262 $59.00 $3,780.00 $300.00 CO1‐3 Construct Drainage Struct Des. CC‐72" (w/ Casting) 1 $3,780.00 CO1‐4 Storm Sewer Drain Inlet Protection 2 $150.00 NET CONTRACT CHANGE $24,518.00 CITY OF LAKE ELMO, MINNESOTA BYBY CHANGE ORDER DESCRIPTION / JUSTIFICATION: This change order addresses a design change requested by the City. 1) Add storm sewer infrastructure along 36th Street to  accommodate alley drainage when the alley is improved in the future. Attachments  (list documents supporting change):Plan Sheets 3, 30, and 32 Revised for Change Order No. 1 DESCRIPTION OF PAY ITEM QTY UNIT PRICE CO1‐1 18" RC Pipe Sewer, Des 3006 CL V 5/31/2018 FOCUS Engineering, inc.CHANGE ORDER FORM SANITARY SEWER STRUCTURE SCHEDULE MH NO.STREET STATION LOCATION EXISTING TOP OF CASTING CASTING ASSEMBLY R-1642-B (SAN) PROPOSED TOP OF CASTING ELEV. LOW INV ELEV.MH DIAM. MH BUILD (LIN. FT) STD. MH (10') (EACH) DRAINS TO % GRADE 8" PVC SDR 26 (LIN.FT) Connect to Ex. Main (Each) REMARKS EX1 32ND STREET N 0+60.00 4.1 RT 913.38 913.38 892.62 2 32ND STREET N 2+50.00 3.2 RT -X 903.07 893.38 4.00 9.69 X EX1 0.40 134 X CONNECT TO EXIST. 8" STUB EX3 36TH STREET N 10+69.44 1.6 RT 926.44 926.44 911.53 4 36TH STREET N 14+07.37 26.3 RT X 923.20 913.20 4.00 10.00 X EX3 0.40 316 X CONNECT TO EXIST. 8" STUB -36TH STREET N 14+18.71 48.0 RT 913.41 4 0.40 28 28' STUB TO EAST (PLUG IN BELL END IS INCIDENTAL) 5 LAYTON AVENUE N 16+39.21 0.00 RT X 923.15 914.28 4.00 8.87 X 4 0.40 245 6 LAYTON AVENUE N 19+00.00 0.00 RT X 924.46 915.42 4.00 9.04 X 5 0.40 261 7 LAYTON AVENUE N 22+61.93 0.00 RT X 926.28 916.97 4.00 9.31 X 6 0.40 362 8 LAYTON AVENUE N 18+99.56 150.0 RT X 923.24 916.12 4.00 7.12 X 6 0.40 150 TOTAL 6 6 1496 2 STORM SCHEDULE STRUCTURE SCHEDULE STRUCTURE NO. LOCATION DESIGN TOP OF CASTING OUTLET ELEVATION DRAINS TO 12" RCP 15" RCP 18" RCP 42" RCP 36" SPAN RCP 44" SPAN RCP REMARKS STREET/ALIGNMENT STATION CONST. C/L STRUCTURE TYPE CASTING TYPE NO % GRADE INLET ELEV. CL V CL V CL III CL III CL II CL II LT RT 27"2'x3'48"60"72"84"96"120"LIN FT LIN FT LIN FT LIN FT LIN FT LIN FT 100 36TH/LAYTON STORM 100+00.00 0.00 STMH R-1642-B 14.65 931.88 917.23 EX CONSTRUCT OVER EXIST. STORM PIPE (60" RCP) 101 36TH/LAYTON STORM 101+23.27 0.00 STMH R-1642-B 10.66 928.00 917.34 100 0.09 917.23 123 102 36TH/LAYTON STORM 101+92.30 0.00 STMH R-1642-B 10.23 927.63 917.40 101 0.09 917.34 69 103 36TH/LAYTON STORM 103+77.05 0.00 STMH R-1642-B 8.11 925.68 917.57 102 0.09 917.40 185 104 36TH/LAYTON STORM 105+74.59 0.00 STMH R-1642-B 6.19 923.93 917.74 103 0.09 917.58 198 105 36TH/LAYTON STORM 106+19.49 0.00 STMH R-4342 4.37 922.20 917.83 104 0.20 917.74 45 105A 36TH/LAYTON STORM 106+40.70 0.00 STMH R-1642-B 5.12 923.00 917.88 105A 0.25 917.83 21 105B LAYTON AVE N 12+28.53 12.00 CBMH R-3067-V 4.34 924.10 919.76 105A 0.73 917.83 206 -LAYTON AVE N 12+28.53 28.00 -919.94 105B 0.50 919.86 16 105C LAYTON AVE N 12+28.53 12.00 CBMH R-3067-V 4.00 924.10 920.10 105B 1.00 919.86 24 -LAYTON AVE N 12+28.53 28.00 -920.28 105C 0.50 920.20 16 106 LAYTON AVE N 15+00.00 12.00 CBMH R-3067-V 4.03 922.15 918.12 105A 0.25 917.88 95 107 LAYTON AVE N 15+00.00 12.00 CB R-3067-V 3.60 922.15 918.55 106 1.00 918.31 24 108 LAYTON AVE N 18+71.44 12.00 CBMH R-3067-V 4.18 924.00 919.82 106 0.45 918.15 371 109 LAYTON AVE N 18+71.44 12.00 CB R-3067-V 3.60 924.00 920.40 106 2.00 919.92 24 110 36TH/LAYTON STORM 103+77.05 51.48 CB R-2501-C 4.00 926.50 922.50 103 2.00 921.47 51 200 32ND STREET N 6+00.41 22.15 FES 897.00 201 4.08 895.39 37 15" RC PIPE APRON W/ TRASH GUARD 201 32ND STREET N 6+20.43 9.00 CBMH R-3067-V 4.26 899.65 895.39 202 4.20 888.59 162 202 32ND STREET N 7+82.13 9.00 CBMH R-3067-V 4.60 893.09 888.49 203 2.70 886.60 70 203 32ND STREET N 8+37.68 32.00 CBMH R-3067-V 8.06 891.04 886.98 204 0.60 886.88 17 4' SUMP AND SAFL BAFFLE 204 32ND STREET N 8+52.14 41.11 FES 886.88 18" RC PIPE APRON W/ TRASH GUARD TOTALS 1 2 6 1 4 1 1 1 51 293 674 575 116 45 3603 3604 3624 3585 11320 UPPER 33RD 36 0 4 36 2 4 PROJECT SCHEDULE  CITY OF LAKE ELMO        OLD VILLAGE PHASE 4: STREET AND UTILITY IMPROVEMENTS  PROJECT NO. 2017.157 MAY 2018 FOCUS ENGINEERING, inc.  Cara Geheren, P.E.   651.300.4261  Jack Griffin, P.E.                651.300.4264  Ryan Stempski, P.E.  651.300.4267  Chad Isakson, P.E.  651.300.4283                SEPTEMBER 5, 2017  Council authorizes preliminary design and preparation of the Feasibility Report.       FEBRUARY 20, 2018  Council orders the preparation of Plans and Specifications.       APRIL 17, 2018  Presentation of Feasibility Report. Council accepts Report and calls Improvement  Hearing and Assessment Hearing.Approve Plans and Specifications and Order  Advertisement for Bids.      MAY 10, 2018  Receive Contractor Bids.      MAY 15, 2018  Public Improvement Hearing and Final Assessment Hearing. Council Orders the  Improvement (requires 4/5th vote).      JUNE 5, 2018  Adopt Final Assessment Roll. Accepts Bids and Award Contract.      JUNE 26, 2018  Conduct Pre‐Construction Meeting and issue Notice to Proceed.    •OCTOBER 27, 2018  Substantial Completion.    •JUNE 21, 2019    Final Completion.