Loading...
HomeMy WebLinkAbout#13 - Comprehensive Plan Draft STAFF REPORT DATE: 6/5/2018 REGULAR ITEM #: 13 MOTION TO: City Council FROM: Emily Becker, Planning Director AGENDA ITEM: Approval of the 2040 Comprehensive Plan Update to be Submitted for Adjacent Jurisdictional Review REVIEWED BY: Jennifer Haskamp, Swanson Haskamp Consulting BACKGROUND: The Council is being asked to approve submittal of the Draft 2040 Comprehensive Plan Update for adjacent jurisdictional review. ISSUE BEFORE COUNCIL: Should the Draft 2040 Comprehensive Plan Update be submitted for adjacent jurisdictional review? PROPOSAL DETAILS/ANALYSIS: City Review Thus Far. The City has been working with consultant Swanson Haskamp Consulting since February of 2017 on the 2040 Comprehensive Plan Update (Update). There have been a number of community engagement events including 4th of July Parade, Arbor Day, Tri-Lakes Ski Show, Farmers Market; a number of Advisory Panel meetings; and two Open Houses. Review by the Planning Commission occurred on April 23rd, two public hearings were held at the Planning Commission meetings on May 7th and 30th, and two Council Workshops were held on March 13th and May 8th. Extension Requested – Not Yet Granted. As previously explained at the May 15th Council meeting, the City’s 2040 Comprehensive Plan Update (Update) is due to the Metropolitan Council by December 31, 2018. While the City would still like to meet that deadline, an extension request has been made to extend this deadline to February 28, 2019, though this has not yet been approved. Before the City can submit the Update to the Metropolitan Council, it must first submit the Update to adjacent jurisdictions for review. These jurisdictions have up to six months to complete this review, although it may not take this long. After this, a final public hearing is required, and Council must approve with a 4/5 vote that the Update may be officially submitted. In order to try and still meet the December 31st deadline, Staff is recommending that the Council approve the Update to be submitted to jurisdictional review so that the City may keep on track with the final deadline for adoption. City Council Meeting Page 2 Regular Item #13 6/5/2018 Changes Since Last Review. Through direction of the Planning Commission and Council, the Urban Reserve land use designation, which guided land to develop post-2040, has been removed. This has been replaced with various land uses including Village Low Density Residential, Village Medium Density Residential, Low Density Residential, Medium Density Residential, and some High Density Residential. The Housing Chapter was also updated. Additionally, drafts of Chapters 7-10 are provided. Option to Make Changes After Jurisdictional Review. The submittal for adjacent jurisdictional review can be sent in draft form. Therefore, Council can still require minor changes to the submittal after it has been sent out for adjacent jurisdictional review. These changes cannot be significant however, in that they cannot significantly impact adjacent jurisdictions. Changes such as the goals and strategies can still be made. Changes Since the 2030 Comprehensive Plan. The following provides a brief summary of updates made. • Chapter 1: Community & Planning Context (This Chapter has already been provided to Council) o This provides a summary of current demographic and socio-economic trends; current market snapshot (both local and regional) and planning context (regional context requirements by the Metropolitan Council and local context and objectives guiding plan development). The regional context requirements reflect the Metropolitan 2015 Systems statement, which forecast that Lake Elmo will more than double its population and add more than 2.5 times the number of households counted in the last census of 2010, and employment will add another 1,000 jobs, increasing by 125% from now until 2040. The local context and objectives guiding plan development describe the process through which the Update was drafted. It also outlines changes from the 2030 Plan, which explains that the Update is a re- write from the previous Plan, taking in to consideration current market place and expected demand. • Chapter 2: Vision, Goals & Strategies (This Chapter has already been provided to Council) o This chapter is similar to the 2030 Plan’s City-Wide Planning Policy. The former plan’s City-Wide Planning Policy outlined goals that pertained to that planning period, including agricultural preservation, goals for residential and non-residential development, housing, environmental protection, municipal services, transportation, I-94 Freeway Corridor Planning Policy, and Village Area Planning Policy. The 2040 Update provides a Vision Statement and outlines goals and strategies. These goals and strategies were derived from a Strengths, Weaknesses, Opportunities and Threats (SWOT) analysis exercise by the Advisory Panel. These goals and strategies pertain to character and governance; land use; balanced development and growth; and housing; parks, trails and open space; and transportation and infrastructure. • Chapter 3: Land Use City Council Meeting Page 2 Regular Item #13 6/5/2018 o Sewered Development. The previous existing land use plan did not include any developed areas that were in the Metropolitan Urban Services Area (MUSA), and the 2040 Update’s existing land use includes sewered development (Inwood, Savona, Easton Village, etc.). o Density. Densities within the plan have changed as follows:  Density ranges for Medium Density Residential and High Density Residential were shifted from 4.5-7 units per acre (upa) to 4.5-8 upa and 7.5-15 upa to 8-15 upa, respectively, to allow for a better integration of uses and more flexibility to respond to market demands.  Density ranges for Village Low Density Residential and Village Medium Density Residential have hanged from 1.5-2.49 upa to 1.5-3 upa and 2.5- 4.99 upa to 3-7.99 upa, respectively, and a Village High Density Residential Land Use with a density of 8-12 upa in order to provide for an increase in types of housing stock, provide opportunities for a more affordable and lifecycle housing, and bring higher concentration of people living close to Village destinations and amenities. o Mixed Use. Mixed Use south of 10th Street has changed. The 2030 Plan stated that mixed use areas south of 10th Street could be zoned in accordance with either the base or adjacent land use category. This is not actually mixed use. The 2040 Update actually proposes mixed use business and mixed use business park south of 10th Street, which assumes that land will develop with a minimum of 50% residential use. o Business Park. The Business Park land use category specifically exempts residential use, warehousing, manufacturing, distribution, assembly and truck terminals, whereas the 2030 Plan allowed such uses. The aforementioned mixed use business park does, however, allow warehousing, showroom, light manufacturing and residential use. o Commercial. The Commercial category specifies that this land use category is to be used for retail business and not to be used for residential, whereas the 2030 Plan allowed for a broader range of uses, including residential. The mixed use commercial category does allow residential use. o Village.  Greenbelt Buffers. These are not within the 2040 Update. There is still a proposed open space/green network on page 35 of the Parks, Trails, and Open Space Chapter, which will help guide green networks and open space throughout the city when development occurs.  The center of the Village is guided for Commercial, while it was previously designated as Village Mixed Use. Parcels guided for Rural Single Family north of Stillwater Boulevard and in the southeast portion were changed to Village Mixed Use and Low Density Residential. The northeast area of the Village was changed from Low Density Residential and Commercial to Medium Density Residential and Commercial.  There is no longer a Village Plan. Rather, there is reference to creating three districts within the Village: Civic, Elmo Station, and Old Village, which are further described in the Balanced Development & Growth Chapter. o Rural Areas. Residential Estates and Rural Single Family land use designations were combined into one Rural Single Family land use designation, which allows City Council Meeting Page 2 Regular Item #13 6/5/2018 development at a density of 0.1-2 units per acre. Additionally, there is no longer a density requirement for Open Space Preservation developments. The Update simply states that these developments generally average more than one residential unit per 10 acres. o Musa. There is no change to the MUSA except for amendments since the 2030 Plan that have been approved by Council. o Staging Plan. The Staging Plan has changed slightly, and specifies specific development time periods and includes the Village Area. The 2030 Plan designated stages. The 2040 Update still designates the areas south of 10th Street in the same order as the 2030 Plan. • Chapter 4: Balanced Development & Growth (This Chapter has already been provided to Council) o This is a new chapter which describes what types of development patterns exist today, where those patterns are changing and evolving, and where they are likely to stay the same. • Chapter 5: Housing o The housing chapter presents important housing principles that underscore the dynamics behind the role and importance of housing as a key element within the Plan; focuses on existing housing stock, summarizing important information regarding the overall number, types, affordability, and occupants of housing units; projected need for housing during this planning period; and practical implementation tools to help the City achieve its identified housing goals. The 2030 Plan had similar goals, including providing more affordable and a wider variety of housing. • Chapter 6: Parks, Trails, and Open Space (This Chapter has already been provided to Council) o The Parks and Trails chapter focuses on refining and synthesizing information contained within the 2030 Comprehensive Plan and preparing an update that is more concise, clear and direct about the City’s goals and objectives for its future in regards to parks and trails. It now functions at a higher level of detail that will focus and more clearly demonstrate the interconnected quality of the Parks and Trails system. There are wider park search areas, and the trail plan identifies a regional trail search corridor and broader trail search corridors. This Chapter will evolve in to an updated Park System Plan and a Trail System Plan that implements this chapter as part of the implementation process. • Chapter 7: Transportation o The 2030 Plan has been updated to use new numbers within the 2040 Plan and also includes updated road classification and new improvements to be made. • Chapter 8: Surface Water o Information updated. • Chapter 9: Wastewater Facilities o Information from the 2030 Plan was updated significantly, as the 2030 Plan only planned for, and did not include, infrastructure. • Chapter 10: Water Supply o The City submitted a Water Supply Plan as required by the Metropolitan Council and Minnesota Department of Natural Resources (DNR) on December of 2017. City Council Meeting Page 2 Regular Item #13 6/5/2018 This has not yet been approved. An updated draft has been sent to the DNR with updated population projections for review. • Chapter 11: Implementation o Rather than designating implementation within each individual chapter, there is an implementation chapter that describes implementation for each chapter within the 2040 Update. Approval to Submit to Adjacent Jurisdictions Requested. The City’s 2040 Comprehensive Plan Update (Update) is due to the Metropolitan Council by December 31, 2018. While the City would still like to meet that deadline, an extension request has been made to extend this deadline to February 28, 2019. Before the City can submit the Update to the Metropolitan Council, it must first submit the Update to adjacent jurisdictions for review. These jurisdictions have up to six months to complete this review, although it may not take this long. After this, a final public hearing is required, and Council must approve with a 4/5 vote that the Update may be officially submitted. In order to try and still meet the December 31st deadline, Staff is recommending that the Council approve the Update to be submitted to jurisdictional review so that the City may keep on track with the final deadline for adoption. Planning Commission Recommendation. The Planning Commission reviewed the Draft 2040 Comprehensive Plan and held a public hearing at its May 30, 2018 meeting. The Planning Commission had the following comments in regards to the Plan. During the meeting, the following public comments were heard: • Jim Ogren, 11790 Little Bluestem Court had a question about new designations to replace Urban Reserve and had question about how these designations were derived. • Stefany Lorgan, 9918 7th Street North, had concern about the designation of Mixed Use- Business Park east of the Savona Development. It was explained that the previous designation of the parcel that is directly east of the Savona townhomes was previously designated as Mixed Use in the 2030 Comprehensive Plan. • Ann Bucheck, 2301 Legion Avenue, had concern about truck terminals being in the Business Park District; requested that reference language to the Golf Course Community land use designation on page 14 of the Land Use Chapter change to “…likelihood that a golf course can will be maintained on the property;” had population concerns about the sewered population; asked if the Being Healthy section in the land use chapter could also promote farms in present time and encourage that they stay in the community, maintain aquifers, and encourage use of the private sewer system; asked about emphasizing historical districts in the Housing Chapter in order to preserve the houses that are over 40 years old; has concerns about page 11 of the Housing Chapter, stating that there are already a variety of housing types that provide affordable housing; does not agree with TIF districts; has concerns about the Surface Water Chapter, asking that the City adopt stricter water volume than the Valley Branch Watershed District, as they did in the past; asked for clarification on items in the Transportation Chapter including the park and ride City Council Meeting Page 2 Regular Item #13 6/5/2018 and Transit Advisory Committee; and asked for clarification on the Water Supply Plan, asking if the entire City has to have public water. • Jackie McNamara, 10321 10th Street North, thanked the City for changing the Urban Reserve land use designation and asked for clarification about phasing. • David Screaton, 711 Manning Avenue North, asked that the Airport Safety Zones and Runway Protection Zones shown in the Land Use Chapter show both existing and proposed runway locations. The Planning Commission recommended that Council approve submittal of the Draft 2040 Comprehensive Plan for adjacent jurisdictional review with the following amendments: • Chapter 1: Recommended approval with no amendments (7-0) • Chapter 2: Recommended approval with no amendments (7-0) • Chapter 3: o Greenbelt buffer. There was a motion that the greenbelt buffer within the Village should be maintained. It was clarified that there is a proposed open space/green network on page 35 of the Parks, Trails and Open Space Chapter which clarifies greenways and open space that are to be maintained when considering development. It was also added that most of the areas that had the greenbelt buffer are developed (i.e. Legacy at North Star, Easton Village, Village Park Preserve, and Wildflower). Commissioner Hartley added that greenbelt buffers in the Village forces us to increase density elsewhere. Commissioner Weeks stated that the greenbelt buffer has proven confusing to both Staff and Council because it’s unclear how wide it should be. Motion failed 6-1. o Mixed Use-Business Park North of 5th Street. There was a motion to change the land use designation north of 5th Street to the east of Keats Avenue and north of the Commercial area the northeast of the intersection of Hudson Boulevard and Keats Avenue to Medium Density Residential. It was discussed that this is a plan that works, and the City as a whole has to think of what is best for the city. Additionally, there are ordinances that can be drafted to protect these areas so that the residential portions of these mixed use areas are strategically placed so as to not negatively impact adjacent residential development. Motion failed 5-2. o Airport Impact Zones. There was a motion to provide both existing and proposed Airport Impact Zones within the Land Use Chapter. Motion passed 7-0. o Planning Commission recommended approval 6-1 (Commissioner Lundquist dissenting with the desire for the first two proposed amendments to be included). • Chapter 4: Recommended approval with no amendments (7-0) • Chapter 5: Recommended approval with no amendments (7-0) • Chapter 6: Recommended approval with no amendments (7-0) • Chapter 7: Recommended approval with no amendments (7-0) • Chapter 8: Recommended approval with no amendments (7-0) • Chapter 9: Recommended approval with no amendments (7-0) • Chapter 10: Recommended approval with no amendments (7-0) • Chapter 11: Motion that ongoing review of Chapter 150 of the City Code: Illicit Discharge be reviewed in light of recent water contamination. Motion passed 7-0. City Council Meeting Page 2 Regular Item #13 6/5/2018 FISCAL IMPACT: The City has hired a consultant to prepare the 2040 Update, and direction by Council is that the budget cannot exceed $90,000. This number is near being reached, as we are nearing the end of the process. Major changes and delays could cause this budget to be exceeded. OPTIONS: The Council has the following options: 1) Approve the 2040 Update be submitted for adjacent jurisdictional review. 2) Do not approve the 2040 Update be submitted for adjacent jurisdictional review. RECOMMENDATION: Staff and the Planning Commission recommend that Council approve that the 2040 Update be submitted for adjacent jurisdictional review. “Move to approve that the 2040 Update be submitted for adjacent jurisdictional review.” ATTACHMENTS: 1. Draft 2040 Comprehensive Plan Updated Chapters 2. 2030 Land Use Plan and Draft 2040 Land Use Plan (for comparison) Draft Chapter 3: Land Use Existing & Future F Draft 2040 Future Land Use Plan Urban Reserve V-UHD V-MXD V-ULD V-UMD MXD-BP MXD-UHD ULD UM D UH D RAD RE RSF RSFS GC C LB Institutional BP Park/OS ROW PSP MUSA2040 _Revised 2020 - 2030 2020 2020 SO U T H M U S A SO U T H M U S A VI L L A G E MUSA 2020 existing existing existing 2030-2040 post-2040 2030-2040 2020 - 2030 post-2040 post-2040 existing 2020 ex i s t i n g post-2040 existing existing F Draft 2040 Future Land Use Plan Urban Reserve V-UHD V-MXD V-ULD V-UMD MXD-BP MXD-UHD ULD UM D UH D RAD RE RSF RSFS GC C LB Institutional BP Park/OS ROW PSP MUSA2040 _Revised 2020 -20302020 2020 SO U T H M U S A SO U T H M U S A VILLAGE MUSA 2020 existing existing existing 2030-2040 post-2040 2030-2040 2020 - 2030 post-2040 post-2040 existing 2020 ex i s t i n g post-2040existing existing IDEALAVEN 60TH ST N 10TH ST N LAKE ELMO AVE N S TILLWATE R B LV D N 30TH ST N KEATS AVE N OLSONLAKETRLN 50TH ST N MANNINGAVEN47TH ST N34TH ST NLAKE J A N E TRL N 4 5 T H ST N INWOOD AVE N Horseshoe ClearUnnamedDeMontrevilleOlsonJaneBerschen'sPond Elmo Sunfish Friedrich Pond Eagle Point Downs H.J. Brown Pond RoseGoose Goose Armstrong Armstrong Kramer GoetschelKlawitterPondDeerPondCrombiePondHedge'sPond Dirk'sPond Beutel's Pond Legion Pond FDraft Date: Rev. 5.2.2018 Source: Washington County, MNGEO, SHC AP RAD RSF RSFS GC LDR MDR HDR MU-BP MU-C V-LDR V-MDR V-HDR V-MU Institutional BP C Park PSP Reserve Close d Landfill ROW IDEAL AVE N 60TH ST N 10TH ST N LAKE ELMO AVE N STILLWATER BLVD N 30TH ST N KEATS AVE N O L S O N L A K E T R L N 50TH ST N MANNING AVE N 47TH ST N 34TH ST N LAKE JA NE TRL N 4 5TH ST N INWOOD AVE N Horseshoe Clear Unnamed DeMontreville Olson Jane Berschen's Pond Elmo Sunfish Friedrich Pond Eagle Point Downs H.J. Brown Pond RoseGoose Goose Armstrong Armstrong Kramer Goetschel Klawitter Pond Deer Pond Crombie Pond Hedge's Pond Dirk's Pond Beutel's Pond Legion Pond FDraft Date: Rev. 5.2.2018Source: Washington County, MNGEO, SHC Closed Landfill AP ELU RAD RSF LDR MDR V-LDR V-MDRLB BP GB C MXDIndustrial Institutional Golf Course PSP Park/OS Undeveloped ROW Comprehensive Plan 2040 LAND USE - DRAFT 5-25-2018 City of Lake Elmo Comprehensive Plan 2040 2 LAND USE - DRAFT 5-25-2018 City of Lake Elmo Comprehensive Plan 2040 3 INTRODUCTION The City of Lake Elmo is a growing, engaged and dynamic community that has experienced significant change over the past planning period. The City’s proximity to jobs and access to regional amenities means that the City will likely continue to experience external pressures to grow. Consequently, it is essential for the City to develop a thoughtful, well-planned approach to its future land uses and growth strategy. The following chapter will focus first on existing land uses that will provide a baseline from which the Future Land Use Plan (“FLU”) was derived. The FLU guides anticipated densities of new neighborhoods, locations of future mixed-use and employment centers, and guides land for commercial and retail services through 2040. The community understands that while there is significant growth pressure and demand today for certain types of development, that demand is likely to ebb and flow and change over the next several decades as market trends fluctuate. More detail regarding current market trends and development can be found in Chapter 4. Balanced Development & Growth within this Plan; however, the pace of growth is addressed through the Staging Plan that is included in subsequent sections of this chapter. The Staging Plan provides sequential geographic areas available for development and growth during prescribed time periods that methodically allows for contiguous development and cost-effective expansion of municipal services to undeveloped areas of the community. The Future Land Use, Staging and Special Area plans contained within this chapter, if consistently followed and implemented, directly support the goals and objectives contained within Chapter 1: Vision, Goals & Strategies. The intent of this chapter is to demonstrate where land use changes are anticipated, where existing land use patterns are guided to stay the same, and how these land uses patterns will continue to support the identity and character of the community through this planning period. LAND USE - DRAFT 5-25-2018 City of Lake Elmo Comprehensive Plan 2040 4 2040 Land Use Highlights – What’s to Come »The Existing Land Use Patterns in the Rural Residential areas should be protected through this planning period; some new rural residential neighborhoods, including open space developments, are anticipated to develop consistent with the City’s rural tradition. »New Future Land Use designations will allow for a better response to market conditions and will allow a greater options in land use choices. »Integration of more diverse neighborhood patterns and densities will allow for a stronger commitment to the staging plan. »Refinement of staging and infrastructure phasing to promote contiguous, efficient development patterns. LAND USE - DRAFT 5-25-2018 City of Lake Elmo Comprehensive Plan 2040 5 Existing Land Use The existing land use patterns reflect the City’s past commitment to the rural landscape and investment in development of primarily single-family detached housing. Rural residential neighborhoods with conventional rural subdivisions and open space development subdivisions are sprinkled throughout much of the community’s landscape. The many lakes of the City are dotted with smaller residential lots that once were dominated by vacation homes that have now transitioned to full-time residences. The Lake Elmo Regional Park Reserve is centered in the City providing a hub of natural and recreational resources for both City and metro-area residents. The “Old Village” is the historical hub of activity in the City, and a mix of uses is present today including some residential, commercial and office users. Business uses, employment pockets and retail/service users are primarily located in or near the “Old Village”, along the I-94 corridor, or at major intersections and thoroughfares. In Lake Elmo’s 2030 Comprehensive Plan, the City’s existing land uses did not include any areas that were connected to municipal services or located within the Metropolitan Urban Service Area (“MUSA”). Now, in this 2040 Plan, the existing land use patterns include neighborhoods that have been developed or are under construction that were guided in the MUSA in the previous plan. The availability of municipal services has allowed for the addition of new land use patterns that can be found in developing neighborhoods such as Inwood, Savona, and Easton Village. Additionally, the Old Village area has been incrementally served and connected to municipal services over the past decade, which has allowed for existing small-lot residential neighborhoods to be served, as well as new neighborhoods under development. While the developing neighborhoods in the MUSA continue to be dominated by single-family detached uses, some diversification has started to emerge as a few small pockets of medium-density residential uses are under construction and development. LAND USE - DRAFT 5-25-2018 City of Lake Elmo Comprehensive Plan 2040 6 Table 3-1. Existing Land Use Existing Land Uses Residential Density (dwelling units/acre)Acres % Total Acres Agricultural Preserve (AP)0.025 414.70 2.67% Rural Area Development (RAD)0.1 6,103.13 39.36% Rural Estate (RE)0.1 -0.4 815.26 5.26% Rural Single Family (RSF)0.66 - 2.0 1,754.14 11.31% Low Density Residential (LDR)2 - 4 182.06 1.17% Medium Density Residential (MDR)4 - 8 231.41 1.49% Village - Low Density Residential (V-LDR)1 - 4 36.08 0.23% Village - Medium Density Residential (V-MDR)4 - 6 48.18 0.31% Mixed Use (MU)5 - 12 4.93 0.03% Undeveloped (U)Various 392.15 2.53% Limited Business (LB)NA 71.79 0.46% Business Park (BP)NA 88.01 0.57% General Business (GB)NA 70.09 0.45% Commercial (C)NA 50.27 0.32% Institutional (INST)NA 305.40 1.97% Closed Landfill (CL)NA 67.53 0.44% Public/Semi-Public (PSP)NA 123.55 0.80% Golf Course (GC)NA 267.36 1.72% Parks & Open Space (POS)NA 2,531.43 16.32% Right of Way (ROW)NA 594.18 3.83% Open Water NA 1,355.29 8.74% TOTAL 15,506.96 100.00% LAND USE - DRAFT 5-25-2018 City of Lake Elmo Comprehensive Plan 2040 7 Map 3-1: Existing Land Use Map 2018 IDEAL AVE N 60TH ST N 10TH ST N LAKE ELMO AVE N S TILLWATER BLV D N 30TH ST N KEATS AVE N O L S O N L A K E T R L N 50TH ST N MANNING AVE N 47TH ST N 34TH ST N LAKE J A N E TRL N 4 5 T H ST N INWOOD AVE N Horseshoe Clear Unnamed DeMontreville Olson Jane Berschen's Pond Elmo Sunfish Friedrich Pond Eagle Point Downs H.J. Brown Pond RoseGoose Goose Armstrong Armstrong Kramer Goetschel Klawitter Pond Deer Pond Crombie Pond Hedge's Pond Dirk's Pond Beutel's Pond Legion Pond FDraft Date: Rev. 5.2.2018 Source: Washington County, MNGEO, SHC Closed Landfill AP ELU RAD RSF LDR MDR V-LDR V-MDR LB BP GB C MXD Industrial Institutional Golf Course PSP Park/OS Undeveloped ROW Closed Landfill LAND USE - DRAFT 5-25-2018 City of Lake Elmo Comprehensive Plan 2040 8 Existing Land Use Definitions Agricultural Preserve (AP) This land use designation identifies land that is enrolled in the Agricultural Preserves program. Land in this designation is required to be guided for no more than 1 dwelling unit per 40 acres, and is protected from further subdivision during the contract period. Rural Area Development (RAD) This land use designation represents the large areas of rural residential development and agricultural uses within the City. Common uses found in these areas include working farms, alternative agricultural uses as defined by City Code, and rural single family detached residences. Development in these areas requires 10+ acres, or a conditional use permit to authorize a cluster development meeting the City’s Preserved Open Space regulations. Rural Estate (RE) This land use designation defines areas developed specifically for large lot single-family detached housing typically on two or more acres of land, but developed at densities more than one unit per ten acres. Rural Single Family (RSF) This land use designation identifies land that was platted for conventional subdivision prior to 2005, and includes large lots that are primarily serviced by private on-site well and septic system. Low Density Residential (LDR) This land use designation identifies land that has been developed with primarily single-family detached housing with urban services between 2010 and 2018 at densities between 2.5 and 4 dwelling units per acre. This existing land use is only located within the South MUSA. Medium Density Residential (MDR) This land use designation identifies land that has been developed primarily with a mix of attached and detached single-family housing with urban services between 2010 and 2018 at densities between 4.5 and 7 dwelling units per acre, and the manufactured home park that was developed in the 1960s. This existing land use is only located within the South MUSA. LAND USE - DRAFT 5-25-2018 City of Lake Elmo Comprehensive Plan 2040 9 Village - Low Density Residential (V-LDR) This land use designation identifies land that has been developed with primarily single-family detached housing with urban services between 2010 and 2018 at densities between 1.5 and 2.5 dwelling units per acre. This existing land use is only located within the Village Planning MUSA. Village - Medium Density Residential (V-MDR) This land use designation identifies land that has been developed with primarily single-family detached housing with urban services between 2010 and 2018 at densities between 2.5 and 5 dwelling units per acre. This existing land use is only located within the Village Planning MUSA. Mixed Use (MU) This land use designation identifies land developed with a mix of commercial and residential uses and is limited to land within the Village Planning Area. Undeveloped (U) This land use designation identifies land within the South MUSA and Village MUSA that has been approved for future sewered development through a Preliminary Plat or PUD process, but Final Plat has not been completed. Limited Business (LB) This land use designation identifies areas that are developed with commercial users that are not served by urban services. Users in this designation are generally less intense than would be permitted in the planned MUSA designations. Business Park (BP) This land use designation identifies areas used for professional businesses including medical and research facilities, offices and corporate headquarters. Users specifically excluded for existing park areas include warehousing, manufacturing, distribution, assembly and truck terminals. Retail sales of goods and services are allowed by conditional use permit. General Business (GB) This land use designation identifies areas used for general business activities that currently include warehousing, light industrial and manufacturing uses. LAND USE - DRAFT 5-25-2018 City of Lake Elmo Comprehensive Plan 2040 10 Commercial (C) This land use designation identifies areas that are used for retail and service businesses. This land use can be found within the Village MUSA and South MUSA. Institutional (INST) This land use designation identifies lands that are developed with public or semi-public uses including users such as, but not limited to, religious institutions, schools, libraries and other civic buildings. Public/Semi-Public (PSP) This land use designation identifies lands that support adjacent development with stormwater ponds and other utilities and may include ancillary uses such as trails and small open spaces. Golf Course (GC) This land use designation identifies land that is used for a private golf course and ancillary uses that may include, but not be limited to, driving range, clubhouse and other amenity centers. Park & Open Space (POS) This land use designation identifies land that is used for park, recreation, trails, other natural resources preservation. Land within this designation is publicly owned by either the City, county, or other public agency. Closed Landfill Restricted (CL) This land use designation identifies former landfills that are qualified to be under the Closed Landfill Program of the Minnesota Pollution Control Agency (MPCA). The purpose of this category is to limit uses of land within the closed landfill, both actively filled and related lands, to minimal uses in order to protect the land from human activity where response action systems are in place and, at the same time, are protective of human health and safety. Right of Way (ROW) This land use designation includes all publicly dedicated areas that are used for roadways, shoulders, ditches, and other improvements. It should be noted that not all roads in the City are platted, and many are dedicated by easement and therefore this land area is accounted for through the associated land use designation. As a result there is more land dedicated to road use than identified within the acreages identified on the existing land use table. LAND USE - DRAFT 5-25-2018 City of Lake Elmo Comprehensive Plan 2040 11 FUTURE LAND USE The Future Land Use Plan (“FLU”) was developed by building on stated goals and strategies as identified through the planning process and documented in Chapter 1: Vision, Goals & Strategies. The resulting FLU carefully balances the recommendations and considerations of residents, stakeholders, staff, and policy-makers while responding to and incorporating the regulatory requirements of the Metropolitan Council. The FLU is in part shaped by the policy designations the City is required to meet as part of the Metropolitan Council’s Thrive MSP 2040 Land Use Policy as provided within the 2015 Lake Elmo System Statement. Lake Elmo falls into two categories of Community Designation, as described in Chapter 2: Community Context. Each of these designations carries responsibility for the related Community Role in the regional growth of the metropolitan area in relation to future land use. These roles are outlined in the Metropolitan Council’s Thrive 2040 Land Use Policy and include the following land use practices for Lake Elmo: Emerging Suburban Edge • Plan and stage development for forecasted growth through 2040 and beyond at overall average net densities of at least 3-5 dwelling units per acre in the community. Target higher-intensity developments in areas with better access to regional sewer and transportation infrastructure, connections to local commercial activity centers, transit facilities, and recreational amenities. Future land use must therefore plan to accommodate a minimum residential density of 3 du/acre within this designation. • Identify and protect an adequate supply of land to support growth for future development beyond 2040, with regard to agricultural viability and natural and historic resources preservation. • Incorporate best management practices for stormwater management and natural resources conservation and restoration in planning processes. • Plan for local infrastructure needs including those needed to support future growth. LU Goal #1. Wo rk with residents, developers, land owners and other stakeholders through the development process and require development that is consistent with the future Land Use Plan. - Chapter 1: Vision, Goals & Strategies LAND USE - DRAFT 5-25-2018 City of Lake Elmo Comprehensive Plan 2040 12 Rural Residential • Discourage future development of rural residential patterns (unsewered lots of 2.5 acres or less) and where opportunities exist, plan for rural development at densities that are not greater than 1 unit per 10 acres. Future land use must therefore plan to limit development to a maximum residential density of 0.1 du/acre within this designation. • Implement conservation subdivision ordinances, cluster development ordinances, and environmental protection provisions in local land use ordinances, consistent with the Council’s flexible residential development guidelines. • Promote best management practices for stormwater management, habitat restoration, and natural resource conservation in development plans and projects. The two distinctive Community Designations require the City to adopt and implement a FLU that provides a minimum residential density within the areas defined as Emerging Suburban Edge (where MUSA is designated), while implementing a maximum residential density for the areas identified as Rural Residential (areas not included within the MUSA in this planning period). The FLU must also identify appropriate land use designations and guide corresponding acreages that support the forecasted employment growth as identified within the System Statement. Additionally, the FLU must guide adequate land area, at appropriate densities, that may accommodate the City’s allocated number of affordable housing units for the period between 2021 and 2030. The employment and affordable housing requirements will be provided for within the MUSA, and are not expected to be met within the Rural Residential Areas. The Emerging Suburban Areas are generally consistent with the MUSA areas identified in the 2030 Comprehensive Plan with two exceptions; 1) the existing single-family homes on the south side of Olson Lake are now served by MUSA; and 2) the newly designated Golf Course Community located on the east side of the community was incorporated into the MUSA through a Comprehensive Plan Amendment in October 2017. With the exception of these two areas, the MUSA and corresponding Emerging Suburban Area designations are unchanged from the previous planning period, and all projected urbanized growth can be accommodated within the boundaries as shown on Map 3-2. 2018-2040 MUSA. LAND USE - DRAFT 5-25-2018 City of Lake Elmo Comprehensive Plan 2040 13 IDEAL AVE N 60TH ST N 10TH ST N LAKE ELMO AVE N STILLWATE R B LV D N 30TH ST N KEATS AVE N O L S O N L A K E T R L N 50TH ST N MANNING AV E N 47TH ST N 34TH ST N LAKE J A N E TRL N 4 5 T H ST N INWOOD AVE N Horseshoe Clear Unnamed DeMontreville Olson Jane Berschen's Pond Elmo Sunfish Friedrich Pond Eagle Point Downs H.J. Brown Pond RoseGoose Goose Armstrong Armstrong Kramer Goetschel Klawitter Pond Deer Pond Crombie Pond Hedge's Pond Dirk's Pond Beutel's Pond Legion Pond FDraft Date: Rev. 5.2.2018 Source: Washington County, MNGEO, SHC Map 3-2. 2018 – 2040 MUSA VILLAGE PLANNING AREA (MUSA) SOUTH PLANNING AREA (MUSA) LAND USE - DRAFT 5-25-2018 City of Lake Elmo Comprehensive Plan 2040 14 Future Land Use Definitions Agricultural Preserve (AP) This land use designation identifies land that is enrolled in the Agricultural Preserves program. Land in this designation is required to be guided for no more than 1 dwelling unit per 40 acres, and is protected from further subdivision during the contract period. Rural Area Development (RAD) A large percentage of land in Lake Elmo falls within the Rural Area Development designation, including single-family detached homes, working farms and agricultural uses where land is undeveloped, cultivated in crops, or used for livestock. This designation includes open space developments that are developed, or may be developed, with clustered housing and may be served by a community septic system. Open space developments generally average more than 1 residential unit per 10 acres and include a dedicated open space protected through a conservation easement. This designation is inclusive of large-lot rural single family detached residential uses, and future conventional subdivision. Density accross this land use designation is planned to maintain maximum densities of 1 residential dwelling unit per 10 acres. This land use designation is limited to areas not within the MUSA planning areas. Rural Single Family (RSF) This land use designation combines the previous Residential Estate and Rural Single-Family categories into one designation to simplify intended land use guidance. Development with this designation includes single-family detached housing served by private on-site well and septic systems. Some areas with this designation are allowed to have two-family dwellings based on zoning. Rural Single Family Sewered (RSFS) This land use designation identifies existing previously unsewered rural single family land uses located within the Village Planning Area. These properties have either recently been served with municipal sewer and water, or are planned to be served as part of the planned MUSA extensions within the Village Planning Area. Golf Course Community (GC) In recognition that a Golf Course on the land formerly known as Tartan Park is a local and regional amenity the City wishes to maintain, this specialized land use category has been crafted to maximize the likelihood that a golf course can be maintained on the property should a development proposal for the land come forward. LAND USE - DRAFT 5-25-2018 City of Lake Elmo Comprehensive Plan 2040 15 Low Density Residential (LDR) Approximately 20% of the planned land uses in the South Planning Area are guided or developed with low density residential land uses. This category includes development of single-family detached housing and two-family attached dwellings with a density of 2.5 to 4 units per acre (2.5 – 4 du/acre) and are planned to be serviced by public sewer and water. This land use is limited to the part of the City within the South Planning Area. Medium Density Residential (MDR) Approximately 12% of the planned land uses in the South Planning Area are guided for medium density residential uses. This category allows for a variety of housing types including single-family detached, duplexes, townhomes, and small two- and three-story apartment buildings and/or senior living centers. The Medium Density Residential development is intended for a density of 4.01 to 8 units per acre (4.01 – 8 du/acre). This land use is limited to the part of the City within the South Planning Area. High Density Residential (HDR) Approximately 4% of the planned land uses in the South Planning Area are guided for high density residential uses. This land use designation guides land for higher density residential development including townhomes, small apartment buildings, and multi-family dwellings. Residential density ranges between 8.01 and 15 units per acre (8.01 – 15 du/acre) and provides opportunities for affordable housing to be incorporated into future developments. This land use is limited to the part of the City within the South Planning Area. Mixed Use Commercial (MU-C) Approximately 8% of the planned land uses in the South Planning Area are guided as mixed-use commercial. This designation is a new land use designation and identifies where a mix of commercial and residential uses may be integrated to benefit from proximity and adjacencies to each other. Commercial uses in this category include service and retail uses such as, but not limited to, restaurants, shops, convenience stores, salons, studios and dry cleaners. Land with this designation is assumed to develop with a minimum of 50% residential use with a density ranging from 10 to 15 dwelling units per acre (10 – 15 du/acre). LAND USE - DRAFT 5-25-2018 City of Lake Elmo Comprehensive Plan 2040 16 Mixed Use - Business Park (MU-BP) Approximately 8% of the planned land uses in the South Planning Area are guided as mixed-use business park. This land use designation is new and identifies where a mix of general business, business park, and residential uses may benefit or be compatible due to proximity of uses. Business uses in this category include office and service uses such as, but not limited to, offices and agencies, warehouse/showroom, light manufacturing, and live/ work development. Land with this designation is assumed to develop with a minimum of 50% residential use with a density ranging from 6 to 10 dwelling units per acre (6 – 10 du/acre). Village – Low Density Residential (V-LDR) This land use designation is planned for areas within the Village Planning Area and identifies land intended for single-family detached housing development serviced by municipal sewer and water. Density ranges between 1.5 and 3 dwelling units per acres (1.5 – 3 du/acre). This land use already exists, or is developing, in much of the outside edges of the Village Planning Area, transitioning from the village center districts to the rural land use pattern not designated within the MUSA areas. Village – Medium Density Residential (V-MDR) This land use designation identifies proposed land use within the Village Planning Area guided for single-family detached, duplexes, and townhomes/ villa housing types. Residential density ranges between 3.01 and 8 dwelling units per acre (3.01 – 8 du/acre). This land use allows for a greater variety in housing stock and brings more people closer to living within easy access of Village destinations and amenities. Village – High Density Residential (V-HDR) This land use designation is a new planned land use within the Village Planning Area and is guided for apartment buildings and multi-family dwellings with a density between 8.01 and 12 units per acre (8.01 – 12 du/acre). This land use is intended to provide for an increase in types of housing stock, provide opportunities for more affordable and lifecycle housing, and bring a higher concentration of people living closer to Village destinations and amenities. LAND USE - DRAFT 5-25-2018 City of Lake Elmo Comprehensive Plan 2040 17 Village – Mixed Use (V-MU) This land use designation is used in the center of the Village Planning Area to identify an area where a mix of vertically integrated commercial/business and residential uses provide development types that benefit from proximity to each other. More residents in closer proximity to businesses bring greater traffic to the businesses while these same businesses offer convenient and necessary services and amenities to nearby residents. Together, the dynamics of a mixed-use district can establish unique vitality, synergy of activity, and a true community destination. Land with this designation is assumed to redevelop or develop with a minimum of 50% residential use with a density ranging from 5 to 10 dwelling units per acre (5 – 10 du/acre). Limited Business (LB) This land use designation identifies areas that are developed with commercial users that were not served by urban services. Users in this designation are generally less intense than would be permitted in the planned MUSA designations. Commercial (C) The commercial land use includes areas that are used for retail business and are primarily located within MUSA boundaries of the City. Small pockets of commercial land can also be found where retail goods and services are located at transportation intersections. This category excludes any residential use. Business Park (BP) This land use provides for a wide variety of professional businesses such as medical and research facilities, offices and corporate headquarters. Uses specifically excluded from existing business park areas include warehousing, manufacturing, distribution, assembly and truck terminals. Retail sales of goods and services are allowable uses by conditional use permit provided such uses are goods and services for the employees of the permitted business use. This category excludes any residential use. LAND USE - DRAFT 5-25-2018 City of Lake Elmo Comprehensive Plan 2040 18 Institutional (INST) The Institutional land use category identifies land that is used for schools, religious institutions, City hall, municipal buildings, libraries, and other institutional uses. This land use is found throughout the City. Public/Semi-Public (PSP) The Public/Semi-Public land use category identifies land that is generally owned by the City or other agency, whose primary purpose is to support adjacent developments with stormwater management and other utilities. This land use may also include some secondary uses such as public trails or small open spaces. Closed Landfill Restricted (CL) This land use designation identifies former landfills that are qualified to be under the Closed Landfill Program of the Minnesota Pollution Control Agency (MPCA). The purpose of this category is to limit uses of land within the closed landfill, both actively filled and related lands, to minimal uses in order to protect the land from human activity where response action systems are in place and, at the same time, are protective of human health and safety. Park & Open Space (Park) This land use identifies land used for public recreation and protected open space managed for park uses. Most land within this designation is owned by Washington County or the City of Lake Elmo, but also includes land owned by other public and semi-public agencies. LAND USE - DRAFT 5-25-2018 City of Lake Elmo Comprehensive Plan 2040 19 LAND USE - DRAFT 5-25-2018 City of Lake Elmo Comprehensive Plan 2040 20 The following table identifies the total land area within the community and comprehensively includes all existing land uses, not guided for change, and planned land uses. The planned land use designations are generally consistent with the 2030 Land Use Plan, with some exceptions as noted: • The nomenclature regarding sewered residential uses has been changed from “Urban Low Density” to “Low Density Residential, “Urban Medium Density” to “Medium Density Residential” and so forth. This change did not in all cases alter the definition or density ranges but was renamed to better describe the planned land uses. • The density ranges for Medium Density Residential and High Density Residential were shifted to align with the required affordable housing density requirements as noted within the Metropolitan Council’s Housing Policy Plan. • Two mixed use residential land uses were added to areas within the MUSA to allow for a better integration of uses and more flexibility to respond to market demands. These use designations require a minimum residential component as described within the Future Land Use definitions. Table 3-2. Future Land Use Plan and Total Acreage Future Land Use Residential Density (dwelling units/acre)Total Acres % of Total Acres Agricultural Preserve (AP)0.025 414.73 2.67% Rural Area Development (RAD)0.1 4,835.22 31.18% Rural Single Family (RSF)0.1-2.0 2,398.76 15.48% Rural Single Family Sewered (RSFS)0.1-2.0 149.79 0.97% Golf Course Community (GC)1.5-2.49 442.96 2.86% Low Density Residential (LDR)2.5 - 4 477.90 3.08% Medium Density Residential (MDR)4.01 - 8 365.92 2.36% High Density Residential (HDR)8.01 - 15 80.07 0.52% Mixed Use – Commercial (MU-C)10 - 15 138.23 0.89% Mixed Use - Business Park (MU-BP)6 - 10 92.20 0.59% Village – Low Density Residential (V-LDR)1.5 - 3 377.54 2.43% Village – Medium Density Residential (V-MDR)3.01 - 8 157.13 1.01% Village – High Density Residential (V-HDR)8.01 - 12 21.99 0.14% Village – Mixed Use (V-MU)5 - 10 76.74 0.49% Commercial (C)NA 154.92 1.00% Business Park (BP)NA 206.93 1.33% Limited Business (LB)NA 45.76 0.30% Institutional (INST)NA 301.41 1.94% Closed Landfill NA 67.34 0.43% Public/Semi-Public (PSP)NA 206.56 1.33% Park/Open Space (Park)NA 2602.16.79% Open Water NA 1355.29 8.74% Right of Way (ROW) Includes RR ROW NA 534.54 3.45% Total 15,506.97 100.00% LAND USE - DRAFT 5-25-2018 City of Lake Elmo Comprehensive Plan 2040 21 IDEAL AVE N INWOOD AVE N 60TH ST N 10TH ST N LAKE ELMO AVE N STILLWATER B LV D N 30TH ST N KEATS AVE N O L S O N L A K E T R L N 50TH ST N MANNING AVE N 47TH ST N 34TH ST N LAKE J A N E TR L N 4 5 T H ST N Horseshoe Clear Unnamed DeMontreville Olson Jane Berschen's Pond Elmo Sunfish Friedrich Pond Eagle Point Downs H.J. Brown Pond RoseGoose Goose Armstrong Armstrong Kramer Goetschel Klawitter Pond Deer Pond Crombie Pond Hedge's Pond Dirk's Pond Beutel's Pond Legion Pond FDraft Date: Rev. 5.23.2018 Source: Washington County, MNGEO, City of Lake Elmo, SHC AP RAD RSF RSFS GC LDR MDR HDR MU-BP MU-C V-LDR V-MDR V-HDR V-MU Institutional Closed Landfill ROW BP C Park PSP 0 0.3 0.6 0.9 1.20.15 Miles Map 3-3. Future Land Use Map Legend Planned Roadway (Parkway) LAND USE - DRAFT 5-25-2018 City of Lake Elmo Comprehensive Plan 2040 22 Planned Growth Areas Growth within Lake Elmo is expected to primarily occur in areas designated within the MUSA, consistent with the Metropolitan Council’s 2015 System Statement Projections. The City geographically describes their primary growth areas the South Planning Area and the Village Planning Area. Within both of these MUSA boundaries, there is adequate land to serve the projected population, households and employment through 2040. As shown on Map 3-4 and Map 3-5, the areas planned for growth and change in this planning period are identified. Corresponding Table 3-3. Net Developable Acreage of Residential Land Uses provides the calculated density, and expected households, based on the FLU in each of these areas. In addition to the anticipated growth in the areas served within the MUSA, the City also anticipates some growth within the Rural Residential areas consistent with previous lans, and as projected within the 2015 System Statement. Further description regarding the development of the FLU and the growth strategy are provided within Chapter 4: Balanced Development & Growth. Map 3-4. Future Land Use – South Planning Area Planned Growth IDEAL AVE N INWOOD AVE N 60TH ST N 10TH ST N LAKE ELMO AVE N S TIL LWATE R B LV D N 30TH ST N KEATS AVE N O L S O N L A K E T R L N 50TH ST N MA NNING AVE N 47TH ST N 34TH ST N LAKE J A N E TR L N 4 5 T H ST N Horseshoe Clear Unnamed DeMontreville Olson Jane Berschen's Pond Elmo Sunfish Friedrich Pond Eagle Point Downs H.J. Brown Pond RoseGoose Goose Armstrong Armstrong Kramer Goetschel KlawitterPond Deer Pond Crombie Pond Hedge's Pond Dirk's Pond Beutel's Pond Legion Pond FDraft Date: Rev. 5.23.2018 Source: Washington County, MNGEO, City of Lake Elmo, SHC AP RAD RSF RSFS GC LDR MDR HDR MU-BP MU-C V-L DR V-MD R V-HDR V-MU In stitutional Closed Lan dfill ROW BP C Park PSP 0 0.3 0.6 0.9 1.20.15 Miles LU Goal #3. Continue to educate residents, developers, and stakeholders about the guided land uses and where sewered and non-sewered development is guided. - Chapter 1: Vision, Goals & Strategies Elmo Eagle Point Downs Rose Goose Horseshoe Kramer Sunfish Legion Pond Armstrong Friedrich Pond H.J. Brown Pond GooseArmstrong Beutel's Pond FDraft Date: 4.5.2018 Source: Washington County, MNGEO, SHC AP RAD RSF RSFS GC LDR MDR HDR MU-BP MU-C V-LDR V-MDR V-HDR V-MU Institutional BP C Park PSP Reserve Closed Landfill ROW MU S A MUSA Areas Planned for Growth Planned Roadway (Parkway) Legend LAND USE - DRAFT 5-25-2018 City of Lake Elmo Comprehensive Plan 2040 23 Map 3-5. Future Land Use –Village Planning Area Planned Growth IDEAL AVE N 60TH ST N 10TH ST N LAKE ELMO AVE N S TILLWATE R B LVD N 30TH ST N KEATS AVE N O L S O N L A K E T R L N 50TH ST N MANNING AVE N 47TH ST N 34TH ST N LAKE J A N E TRL N 4 5 T H ST N INWOOD AVE N Horseshoe Clear Unnamed DeMontreville Olson Jane Berschen's Pond Elmo Sunfish Friedrich Pond Eagle Point Downs H.J. Brown Pond RoseGoose Goose Armstrong Armstrong Kramer Goetschel Klawitter Pond Deer Pond Crombie Pond Hedge's Pond Dirk's Pond Beutel's Pond Legion Pond FDraft Date: Rev. 5.2.2018 Source: Washington County, MNGEO, SHC AP RAD RSF RSFS GC LDR MDR HDR MU-BP MU-C V-LDR V-MDR V-H DR V-MU Institutional BP C Park PSP Reserve Closed Landfill ROW ID EAL AVE N INWOOD AVE N 60THSTN 10TH ST N LAKE ELMO AVE N S TIL LWATE R B LV D N 30TH ST N KEATS AVE N O L S O N L A K E T R L N 50T H ST N MA NNING AVE N 47T H ST N 34TH ST N LAKEJANETRLN 45THSTN Horseshoe Clea r UnnamedDeMontreville Olson Jane Berschen's Pond Elm o Sunf ish Friedrich Pond Eagle Point Downs H.J. Brown Pond RoseGoose Goose Armstrong Armstrong Krame r Goetschel Klawitt erPond Deer Pond Crombie Pond Hedge's Pond Dirk's Pond Beutel's Pond Legion Pond FDraft Date : Rev. 5.2 3.2018 Source: Washin gton Coun ty, MNGEO, City of Lake Elmo, SHC AP RAD RSF RSFS GC LDR MDR HDR MU-BP MU-C V-LDR V-MDR V-HDR V-MU Institutional Clo se d Lan dfill ROW BP C Park PSP 0 0.3 0.6 0.9 1.20.15 Miles Areas Planned for Growth Planned Roadway (Parkway) MUSA MU S A Legend LAND USE - DRAFT 5-25-2018 City of Lake Elmo Comprehensive Plan 2040 24 Table 3-3. Net Developable Acreage of Residential Land Uses Future Land Use Residential Density (dwelling units/net acre) Total Net Acres Estimated Households Low Density Residential (LDR)2.5 - 4 233.43 584 Medium Density Residential (MDR)4.01 - 8 148.50 596 High Density Residential (HDR)8.01 - 15 79.99 640 Mixed Use – Commercial (MU-C)*10 - 15 62.19 622 Mixed Use - Business Park (MU-B)*6 - 10 46.05 276 Village – Low Density Residential (V-LDR)1.5 - 3 137.60 206 Village – Medium Density Residential (V-MDR)3.01 - 8 70.10 211 Village – High Density Residential (V-HDR)8.01 - 12 19.99 49 Village – Mixed Use (V-MU)*5 - 10 9.84 160 Total 2020-2040 Residential 807.71 3,344 Net Density 2020-2040 4.14 du/acre Residential Plats 2010 - 2020 1,180.75 2,444 Total Sewered Households 2010-2040 1,914.81 5,788 Total Net Density 2010-2040 3.02 du/acre *Only residential acreage included/calculated in table. Land Use designation assumption that a minimum of 50% of total acreage is developed with residential use. Total number of households does not exclude potential park areas as contemplated in Chapter 6: Parks Trails and Open Spaces. Actual acres and resulting households to be adjusted and calculated at time of development (Preliminary and Final Plat). Net density does exclude principal/arterial ROW, wetlands, and lake areas. Density in Sewered Areas by 2040 Consistent with the Metropolitan Council’s policies, the density calculation performed based on Table 3-3. Net Developable Acreage of Planned Residential Land Uses will result in an average net density of approximately 3.0 dwelling units per acre. As required, the household calculation in Table 3-3 was performed based on the minimum units allowable per the density range. As shown on Map 3-4 and Map 3-5, there are three land use designations at sufficient densities to meet the City’s allocation of affordable housing per the Metropolitan Council System Statement. Approximately 112 acres are collectively guided for these three designations between 2021 and 2030, which meets the required allocation in this planning period. (Further detail regarding affordable housing can be found in Chapter 5: Housing). LAND USE - DRAFT 5-25-2018 City of Lake Elmo Comprehensive Plan 2040 25 Revised Population and Household Projections As noted in Table 3-3 the number of households, and thus the corresponding projected population, is greater than the projections identified by the Metropolitan Council in the 2015 System Statement. After much deliberation and discussion, the City concluded that it would be more advantageous to plan for a thoughtful, contiguous land use pattern throughout all MUSA areas rather than limiting the amount of land available for urbanized services within this planning period to match the 2015 System Statement. As denoted in subsequent sections of this chapter and the Sanitary Sewer chapter, the City’s infrastructure may need additional improvements to its infrastructure to serve the entire MUSA area depending on the ultimate commercial and/or business user and density of the residential neighborhoods. Thus capacity of the infrastructure within later staging areas will need to be evaluated, and development approvals contingent on appropriate system upgrades. Regardless, this Plan identifies and guides all land within the MUSA with an urbanized land use designation, and therefore the following table provides the City’s adjusted projections based on the Future Land Use Plan and Staging Plan contained in this chapter. (There are no revisions to the employment forecasts, as those are relatively consistent with the System Statement). Table 3-4. Revised Population & Household Projections 2020 2030 2040 Population Unsewered 6,788 7,140 7,992 Population Sewered 5,032 11,196 15,743 Total Population 11,820 18,335 23,735 Households Unsewered 2,441 2,760 3,379 Households Sewered 1,850 4,116 5,788 Total Households 4,291 6,876 9,167 Source: Lake Elmo System Statement, SHC, City of Lake Elmo LAND USE - DRAFT 5-25-2018 City of Lake Elmo Comprehensive Plan 2040 26 Employment Locations Existing and planned employment locations are generally located within the Village Planning Area and South Planning Area. Land uses served by MUSA, or planned for extension of services, will continue to be the primary locations for employment through the forecasted planning period. There are some existing limited business land uses located outside of MUSA designations that are anticipated to remain in operations through this planning period, but are not accounted for in Table 3-4 because they are existing, and no intensification of the land use is projected in these areas. To determine the intensity of the commercial and business park uses in the guided FLU, the maximum impervious surface coverage was estimated based on information contained in the City’s Zoning Ordinance. The coverage calculation was converted to square feet and the Metropolitan Council Environmental Services Sewer Area Charge (SAC) 2017 Manual was used to determine allocated SAC units based on the designation and potential users. These land uses are identified on Map 3-3: Future Land Use Plan, Map 3-4: Future Land Use Plan – South Planning Area and Map 3-5: Future Land Use Plan – Village Planning Area. Table 3-5. Employment Locations and Intensity (Planned for Development) Growth Area Land Use Planned Acres Intensity (FAR) Estimated Acres (Square Feet) SAC South Planning Area Commercial 110 35%38.5 (1,677,060)559 Business Parkb 100 35%35 (1,524,600)320 Mixed Use - Commerciala 69.12 35%24.19 (1,053,804)351 Mixed Use - Business Parkab 46.1 35%16.14 (702,841)148 Village Planning Area Commercial 14.9 35%5.21 (227,165)76 Mixed Use - Villagea 9.54 50%4.77 (207,781)69 Total SAC/Emp.1,523 aOnly commercial/business component is included in acreage. Approximately 50% of total land use designation used for calculation per land use definition. bBusiness Park Designations calculation assumes office/manufacturing/warehousing mix of general business users. LAND USE - DRAFT 5-25-2018 City of Lake Elmo Comprehensive Plan 2040 27 Airport Impact The Lake Elmo Regional Airport is located adjacent to the City’s eastern boundary in West Lakeland Township. The airport is east of Manning Avenue and between the railroad and 30th Street N. Parts of the airport safety zone and noise impact areas impact a portion of the Village Planning Area in Lake Elmo. A new low density single- family detached residential neighborhood is partially developed with subsequent phases anticipated within this planning period. No development is allowed within the Runway Protection Zone (RPZ). All land designated within the RPZ are designated as Public/ Semi-Public uses and are included within the City’s Greenway Overlay which restrict any future development of land within this designation. The FLU is consistent with allowed land uses within the safety zones for the Lake Elmo Regional Airport and reflects this restriction. The City will continue to work with the Metropolitan Airports Commission and MnDOT Aeronautics Division to update airport zoning regulations that address noise and safety concerns within these zones as required. Map 3-6. Airport Safety and Runway Protection IDEAL AVE N INWOOD AVE N 60THSTN 10TH ST N LAKE ELMO AVE N S TIL LWATE R B LV D N 30TH ST N KEATS AVE N O L S O N L A K E T R L N 50TH ST N MA NNING AVE N 47TH ST N 34TH ST N LAKEJANETRLN 45 T H ST N Horseshoe Clear Unnamed DeMontreville Olson Jane Berschen's Pond Elmo Sunfish Friedrich Pond Eagle Point Downs H.J. Brown Pond RoseGoose Goose Armstrong Armstrong Kramer Goetschel Klawitter Pond Deer Pond Crombie Pond Hedge's Pond Dirk's Pond Beutel's Pond Legion Pond FDraft Date: Rev. 5.23.2018 Source: Washington County, MNGEO, City of Lake Elmo, SHC AP RAD RSF RSFS GC LDR MDR HDR MU-BP MU-C V-LDR V-MDR V-HDR V-MU Institutional Closed Landfill ROW BP C Park PSP 0 0.3 0.6 0.9 1.20.15 Miles *Runway protection zones and safety zones depicted are mos recently available shapefiles. Verification of location of runway improvements and revised RPZ to be completed after EA process. IDEAL AVE N 60TH ST N 10TH ST N LAKE ELMO AVE N STILLWATE R B LV D N 30TH ST N KEATS AVE N O L S O N L A K E T R L N 50TH ST N MANNING AVE N 47TH ST N 34TH ST N LAKE J A N E TRL N 4 5 T H ST N INWOOD AVE N Horseshoe Clear Unnamed DeMontreville Olson Jane Berschen's Pond Elmo Sunfish Friedrich Pond Eagle Point Downs H.J. Brown Pond RoseGoose Goose Armstrong Armstrong Kramer Goetschel Klawitter Pond Deer Pond Crombie Pond Hedge's Pond Dirk's Pond Beutel's Pond Legion Pond FDraft Date: Rev. 5.2.2018 Source: Washington County, MNGEO, SHC 21D Preferred Ultimate Runway Protection Zone 21D Preferred Ultimate Safety Zone A 21D Preferred Ultimate Safety Zone B LAKE ELMO AIRPORT Legend LAND USE - DRAFT 5-25-2018 City of Lake Elmo Comprehensive Plan 2040 28 Phasing and Staged Growth The majority of the City’s growth in households and employment is anticipated to occur within the designated MUSA boundaries; however, there will be some continued development in the rural residential areas of the community consistent with the community’s land use designations. Table 3-6 identifies gross acreages per land use designation, while calculations found in Table 3-3 provide net acreage calculations for each residential land use designation within the designated MUSA as noted. The City’s objective is to plan for phased, contiguous growth to ensure adequate infrastructure and capacity are available to support development. Map 3-7 identifies four staging areas consistent with existing and planned water, wastewater and transportation infrastructure. The last phase is denoted as post-2035 and should be monitored for capacity and potential improvements based on actual development in earlier phasing periods. Map 3-7. MUSA Growth & Phasing Plan IDEAL AVE N 60TH ST N 10TH ST N LAK E ELMO AVE N STILLWATE R B LV D N 30TH ST N K EATS AVE N O L S O N L AK E T R L N 50TH ST N MANNING AVE N 47TH ST N 34TH ST N LAK E J A NE TRL N 4 5 T H ST N INWOOD AVE N Horseshoe Clear Unnamed DeMontreville Olson Jane Berschen's Pond Elmo Sunfish Friedrich Pond Eagle Point Downs H.J. Brown Pond RoseGoose Goose Armstrong Armstrong Kramer Goetschel Klawitter Pond Deer Pond Crombie Pond Hedge's Pond Dirk's Pond Beutel's Pond Legion Pond FDraft Date: Rev. 5.17.2018 Source: Washington County, MNGEO, SHC AP RAD RSF RSFS GC LDR MDR HDR MU-BP MU-C V-LDR V-MDR V-HDR V-MU Institutional Closed Landfill ROW BP C Park PSP Current (2020) 2020 - 2030 2030-2040 2035-2040 + Staging/Phase LAND USE - DRAFT 5-25-2018 City of Lake Elmo Comprehensive Plan 2040 29 Table 3-6. Future Land Use Forecast Gross Acreage per Decade Future Land Use Residential Density (dwelling units/acre)2020 Acres (%)2030 Acres (%)2040 Acres (%) Agricultural Preserve (AP)0.025 414.73 (2.67%)414.73 (2.67%)414.73 (2.67%) Rural Area Development (RAD)0.1 6,118.16 (39.45%)5,490.01 (35.40%)4,837.37 (31.19%) Rural Single Family (RSF)0.5 - 2 2,398.76 (15.47%)2,398.76 (15.47%)2,398.76 (15.47%) Rural Single Family Sewered (RSFS)0.5-2 149.79 (0.97%)149.79 (0.97%)149.79 (0.97%) Golf Course Community 1.5-2.49 221.48 (1.43%)442.96 (2.86%)442.96 (2.86%) Low Density Residential (LDR)2.5 - 4 216.16 (1.39%)256.20 (1.65%)477.90 (3.08%) Medium Density Residential (MDR)4.01 - 8 298.89 (1.93%)365.92 (2.36%)365.92 (2.36%) High Density Residential (HDR)8.01 - 15 12.69 (0.08%)80.07 (0.52%)80.07 (0.52%) Mixed Use - Commercial (MU-C)12 - 15 63.73 (0.41%)63.73 (0.41%)138.23 (0.89%) Mixed Use - Business Park (MU-BP)6 - 10 0 (0%)0 (0%)92.20 (0.59%) Village – Low Density Residential (V-LDR)1.5 - 3 202.78 (1.31%)225.45 (1.45%)377.54 (2.43%) Village – Medium Density Residential (V-MDR)3.01 - 5 78.31 (0.50%)92.71 (0.60%)157.13 (1.01%) Village – High Density Residential (V-HDR)8.01 -12 0 (0%)0 (0%)21.99 (0.14%) Village – Mixed Use (V-MU)5 - 10 76.74 (0.49%)76.74 (0.49%)76.74 (0.49%) Commercial (C)NA 41.16 (0.27%)129.18 (0.83%)154.92 (1.0%) Business Park (BP)NA 99.80 (0.64%)206.93 (1.33%)206.93 (1.33%) Limited Business (LB)NA 45.76 (0.30%)45.76 (0.30%)45.76 (0.30%) Institutional (INST)NA 301.41 (1.94%)301.41 (1.94%)301.41 (1.94%) Public/Semi-Public (PSP)*NA 206.56 (1.33%)206.56 (1.33%)206.56 (1.33%) Closed Landfill NA 67.34 (0.43%)67.34 (0.43%)67.34 (0.43%) Park (Park)*NA 2,602.89 (16.79%)2,602.89 (16.79%)2,602.89 (16.79%) Open Water*NA 1,355.29 (8.75%)1,355.29 (8.75%)1,355.29 (8.75%) ROW / RR ROW*NA 534.54 (3.45%)534.54 (3.45%)534.54 (3.45%) TOTAL NA 15,506.97 (100%)15,506.97 (100%)15,506.97 (100%) LAND USE - DRAFT 5-25-2018 City of Lake Elmo Comprehensive Plan 2040 30 ADDITIONAL OBJECTIVES OF FUTURE LAND USES The City’s FLU acknowledges and plans for continued household and employment growth through 2040, but also includes preservation and continued support of its rural residential landscape and robust parks and open space system. The City of Lake Elmo has always been identified as an exceptional place to live because of its robust parks system, protected high-quality natural resources, and proximity to major employment, healthcare and retail centers. Even though the community is growing, and in some cases transitioning from a primarily rural residential community, there is a desire and an opportunity to weave the most important elements and characteristics into changing areas of the community to ensure that the identity and character of the community continues for generations to come. Equally important to the planned land uses, densities and projections is the commitment to maintain open spaces, natural resources and parks and to promote opportunities to provide healthy, vibrant, resilient neighborhoods. The following sections should be used as an extension to the Future Land Use Plan and should be incorporated or acknowledged in growth areas and in areas planned for protection of existing uses. There is always an opportunity to do better, and the following themes help support the future direction of the City’s land uses and decision-making. Promoting Health with Land Use As part of the 2040 Comprehensive Plan Update process, the City obtained a grant from Washington County Health Services through the State Health and Improvement Program (SHIP) to incorporate living healthy principles into this comprehensive plan. There are many ways that the principles of healthy neighborhoods, communities and environments can be incorporated into existing and future land uses. The following summary identifies some of the ways in which health was considered, and incorporated, into the Future Land Use Plan. LAND USE - DRAFT 5-25-2018 City of Lake Elmo Comprehensive Plan 2040 31 Mixed-Use Land Use Designations to Promote Health The introduction of land uses that will promote a more compact, walkable, development pattern was purposefully integrated throughout the growth areas as identified in previous sections of this chapter. In addition to creating new land use designations, the City discussed opportunities to better connect existing neighborhoods though bikeways, trails and other pedestrian routes to support active residents. This discussion included how public and private trail connections may be used to achieve these objectives, and the City acknowledges the need to better communicate and sign public trails and routes so users are comfortable and informed using the system. In addition to neighborhood pattern, the new mixed-use designations will permit the incorporation of uses such as restaurants, markets, farmers markets, and other events that can be designed to support an active lifestyle for the City’s residents, employees and employers. With the growing popularity of farm-to-table dining and experiences that focus on healthy living, Lake Elmo is well-positioned to capitalize on trends that connect its rich rural and agricultural resources with health-conscious consumers seeking fresh high-quality foods and products. As the community grows and new households are added, it will be important for the City to ensure grocery and fresh foods are sold and provided at locations nearby higher concentrations of residents. Ensuring “Uses” that Support Health are Permitted and Accessible Closely related to the introduction of more compact development patterns, is the need to provide accessible options to purchase healthy and fresh foods and products. This can be accomplished through ensuring that uses that support that objective are permitted within the City’s land use designations and the zoning code. Connection and ease of access are essential components to this objective, so pedestrian, bikeways and other routes to locations with fresh products is important to consider as the City develops and evolves. LAND USE - DRAFT 5-25-2018 City of Lake Elmo Comprehensive Plan 2040 32 Providing an Accessible and Connected Green Network The City is committed to preservation of its existing natural resource and open space network. In addition to the existing network, the City plans to expand the network as growth areas are developed. Part of this planning process included discussion and recommendations regarding better park, trail and open space connections for residents in existing neighborhoods and in new growing neighborhoods. Natural resource protection, identification, preservation and development creates opportunities to create a network of greenways and trails for residents to utilize for recreation, connection with nature, connection between various neighborhoods and destinations in and around Lake Elmo, and to build a more resilient (and green) infrastructure. Trail development is an important way to promote health and activity in the community. The City’s Future Land Use Plan should be implemented to be consistent with Chapter 6: Parks, Trails & Open Space that identifies key trail, natural resource and open space considerations as development occurs within the City’s growth areas. Parks, Open Space and Natural Resources Integration Nearly 18% of the City’s land acreage is publicly protected as Park or Open Space, and an additional 11% of private lands area is protected with a conservation easement. Natural resources, parks, and open spaces protection and enhancement is one of the City’s character defining elements that makes the community a special place to live, work and recreate. The City’s expansive natural resources, including woodland, meadow, lakes and wetlands, and rural scenic amenities are sprinkled throughout the heart of the community are valued assets for all residents. The presence of high quality natural resources is important to the lasting effort of balanced development, enduring biodiversity, and opportunity for recreation and connection for area residents. The effort to preserve and enhance these features as an asset for the community and region is a primary objective and specifically stated in several Goals and Strategies within Chapter 1: Vision, Goals & Strategies. LU Goal #2. Enhance Lake Elmo’s expansive network of trails, open spaces, and natural resources as amenities in developing areas of the community. - Chapter 1: Vision, Goals & Strategies LAND USE - DRAFT 5-25-2018 City of Lake Elmo Comprehensive Plan 2040 33 Decision-making related to incorporation of greenways, natural resources, parks and trails associated within this Future Land Use Plan should be consistent with the information found in Chapter 6: Parks, Trails & Open Space. Access & Transportation A key component of implementing the Future Land Use Plan is to plan for appropriate access and consider diverse modes of transportation. It is likely that as the growth areas change and develop a more diverse demographic will move to the community and their transportation demands may include alternate modes such as bikeways, pedestrian ways and the desire for transit. Incorporated on Map 3-3: Future Land Use Plan are the conceptual main thoroughfares through the growth areas that are planned for within the Chapter 7: Transportation. Identification of the east-west roadway connection in the South MUSA planning boundary on the Future Land Use Plan is deliberate and was used to guide compatible and appropriate land uses. It is the intent of the Future Land Use Plan that development along the east-west corridor would support and plan for adequate right-of-way at time of development that would include a multi-use trail that would promote mode choice and accessibility to adjacent neighborhoods. Likewise, a new roadway connection in the Village MUSA planning boundary is identified and the land use plan was developed to encourage higher-densities near the roadway to improve access. More detail regarding new roadways, and the existing transportation, transit, and bikeways system can be found in Chapter 7: Transportation. LAND USE - DRAFT 5-25-2018 City of Lake Elmo Comprehensive Plan 2040 34 Supporting Resiliency The purpose of creating a Future Land Use Plan that provides a diverse land use pattern is to allow for the City to adapt and change as needed through this planning period. Better integration of land uses allows for the community to be thoughtful about innovation as the environment changes and new technologies are developed, and creates opportunities to adapt and be responsive. The idea of resiliency is woven throughout this Plan, and is specifically discussed as it relates to the Green Network and Resilient Infrastructure in Chapter 6. It is the intent of the City that the idea of a Green Network be used as part of the decision-making process and allow for improvements in neighborhood and development design as the community evolves and changes through 2040. Solar Access The City has incorporated standards into their zoning ordinances regarding siting of structures and buildings to support access to solar resources. Given the City’s dominant residential landscape pattern, options for private property owners including individual homeowners and homeowners associations to capitalize on solar energy are supported by the City’s adopted ordinances and official controls. LAND USE - DRAFT 5-25-2018 City of Lake Elmo Comprehensive Plan 2040 35 Map 3-8: Gross Solar Potential Lake Elmo S T I L L W A T E R B L V D N INWOOD AVE N 34TH ST N 10TH ST N IDEAL AVE N KEATS AVE N D E M O N T R E V I L L E T R L N O L S O N L A K E T R L N 50TH ST N LAKE ELMO AV E N 47TH ST N KIMBRO AVE N L A K E J A NE T R L N JULEP AVE N Gross Solar Potential (Watt-hours per Year) High : 1276008 Low : 900001 Solar Potential under 900,000 watt-hours per year County Boundaries City and Township Boundaries Wetlands and Open Water Features Gross Solar Potential Source: University of Minnesota U-Spatial Statewide Solar Raster. ANOKA DAKOTA HENNEPIN RAMSEY SCOTT WASHINGTON CARVER Extent of Main Map 0 1 2 3 40.5 Miles 12/20/2016 City of Lake Elmo, Washington County LAND USE - DRAFT 5-25-2018 City of Lake Elmo Comprehensive Plan 2040 36 SPECIAL RESOURCE PROTECTION A consideration when developing the Future Land Use Plan was to inventory special or unique resources in the community, and to allow these resources (where applicable) to help guide where and when development would occur. Historical Resources There are no State or Locally registered historical districts or structures in the Lake Elmo. However, the City strongly supports the preservation of the “Old Village” Main Street, where the village first developed. During the 2030 Planning period, the City developed a set of design guidelines which will help protect existing buildings and ensure new construction integrates well with the existing character and building form of the district. During this Plan development process the City studied the Old Village area, and concluded that it would benefit from further refinement based on areas contained within the previous Old Village boundary. The result, is that this Plan creates three distinct Districts that describe the use, activities and desired plans based on location within the City’s core village area. A full description of the Districts, and how they will shape the core of the village are provided in Chapter 4: Balanced Development & Growth. LU Goal #4. Create strong and vibrant Districts in the Village Planning Area that becomes a destination for all residents of the community. LU Goal #5. Identify and Explore opportunities to improve the streetscape in the Old Village District, Elmo Station District and Civic Center District to create a more walkable environment. LU Goal #6. Maintain and Strengthen the small-town charm of the Old Village District. - Chapter 1: Vision, Goals & Strategies LAND USE - DRAFT 5-25-2018 City of Lake Elmo Comprehensive Plan 2040 37 ID EAL AVE N INWOOD AVE N 60THSTN 10TH ST N LAKE ELMO AVE N STIL LWATE R B LV D N 30TH ST N KEATS AVE N O L S O N L A K E T R L N 50T H ST N MA NNING AVE N 47T H ST N 34TH ST N LAKEJANETRLN 45THSTN Horsesho e Clea rUnnamedDeMontreville Olson Jane Berschen's Pond Elm o Sunf ish Friedrich Pond Eagle Point Downs H.J. Brown Pond RoseGoose Goose Armstrong Armstrong Krame r Goe tsche l KlawitterPond Deer Pond Crombie Pond Hedge's Pond Dirk's Pond Beutel's Pond Legion Pond FDraft Date : Rev. 5.2 3.2018 Source: Was hin gton County, MNGEO, City of La ke El mo, SHC AP RAD RSF RSFS GC LDR MDR HDR MU-BP MU-C V-LDR V-MDR V-HDR V-MU Institutional Close d Lan df ill ROW BP C Park PSP 0 0.3 0.6 0.9 1.20.15 Miles District Plan - NEED TO CREATE - Old Village, Civic, Elmo Station Vi l l a g e P l a n n i n g A r e a Civic District Old Village District Village Planning Area Elmo Station District MAP 3-9: District Boundaries in Village Planning Area Elmo Eagle Point Downs Rose Goose Horseshoe Kramer Sunfish Legion Pond Armstrong Friedrich Pond H.J. Brown Pond GooseArmstrong Beutel's Pond FDraft Date: 4.5.2018 Source: Washington County, MNGEO, SHC AP RAD RSF RSFS GC LDR MDR HDR MU-BP MU-C V-LDR V-MDR V-HDR V-MU Institutional BP C Park PSP Reserve Closed Landfill ROW Source: Metropolitan Council,City of Lake Elmo, SHC LAND USE - DRAFT 5-25-2018 City of Lake Elmo Comprehensive Plan 2040 38 Aggregate Resources Per the Metropolitan Council’s 1997 Aggregate Resources information, there are approximately 324 acres of land identified in the City has having aggregate resource value. Today, there are two active aggregate sites, one located in the northwestern quadrant of the community, which is identified on the 1997 Aggregate Resource Inventory. The second active site is located in the South MUSA boundary, near the Keats intersection with 10th Street North. Adjacent to this site, and designated within the City’s post-2035 phasing area, is additional land identified within the 1997 Aggregate Resource map. The existing active sites have been in operation for several decades, and it is the City’s understanding that these sites are nearing their useful life and may be exhausted in this planning period. Beyond the active sites, the 1997 Aggregate Resource map identified areas within exiting neighborhoods that are not likely to experience any demand or opportunity for extraction. As aggregate resources are depleted, the land will likely transition into suburban-style development, consistent with the surrounding district. As mentioned, some of the land identified with potential for aggregate resource extraction that has not been mined, is designated within the City’s post-2035 phasing area, which does not plan for or anticipate urbanized development over the next 15-years due to existing development patterns and infrastructure planning. Agricultural Preserve The City’s agrarian and agricultural past continues to be valued by the City, and landowners and homeowners that express interest in preserving agricultural land through the Agricultural Preserve program will be supported by the City. Currently, there are approximately 414-acres of land protected by an Agricultural Preserve covenant per the Metropolitan Council’s records, and those properties have been identified and guided appropriately on the Existing and Future Land Use Plan contained within this chapter. LAND USE - DRAFT 5-25-2018 City of Lake Elmo Comprehensive Plan 2040 39 Map 3-10. Aggregate Resource Locations IDEAL AVE N INWOOD AVE N 60TH ST N 10TH ST N LAKE ELMO AVE N STILLWATE R B LV D N 30TH ST N KEATS AVE N O L S O N L A K E T R L N 50TH ST N MANNING AVE N 47TH ST N 34TH ST N LAKE J A N E TR L N 4 5 T H ST N Horseshoe Clear Unnamed DeMontreville Olson Jane Berschen's Pond Elmo Sunfish Friedrich Pond Eagle Point Downs H.J. Brown Pond RoseGoose Goose Armstrong Armstrong Kramer Goetschel Klawitter Pond Deer Pond Crombie Pond Hedge's Pond Dirk's Pond Beutel's Pond Legion Pond FDraft Date: Rev. 5.23.2018 Source: Washington County, MNGEO, City of Lake Elmo, SHC Aggregate Resources 1997 MUSA 2040 (Revised) 0 0.3 0.6 0.9 1.20.15 Miles Elmo Jane Olson Downs Rose Eagle Point DeMontreville Sunfish Horseshoe Goose Clear Goetschel Kramer Armstrong Unnamed Legion Pond Friedrich Pond H.J. Brown Pond Goose Deer Pond Armstrong Crombie Pond Klawitter Pond Berschen's Pond Hedge's Pond Dirk's Pond Beutel's Pond FHomesteaded EMV < $238,500 $238,501 - $450,000 $450,001 - $750,000 $750,001+ Draft Date: 4.5.2018 Source: Washington County, MNGEO, SHC Elmo Jane Olson Downs Rose Eagle Point DeMontreville Sunfish Horseshoe Goose Clear Goetschel Kramer Armstrong Unnamed Legion Pond Friedrich Pond H.J. Brown Pond Goose Deer Pond Armstrong Crombie Pond Klawitter Pond Berschen's Pond Hedge's Pond Dirk's Pond Beutel's Pond FHomesteaded EMV < $238,500 $238,501 - $450,000 $450,001 - $750,000 $750,001+ Draft Date: 4.5.2018 Source: Washington County, MNGEO, SHC Chapter 5: Housing Supply, Demand & Allocations Comprehensive Plan 2040 HOUSING - DRAFT 5-24-2018 City of Lake Elmo Comprehensive Plan 2040 2 HOUSING - DRAFT 5-24-2018 City of Lake Elmo Comprehensive Plan 2040 3 INTRODUCTION The City’s housing stock is evolving and is slowly becoming more diverse as new neighborhoods throughout the community are beginning to be developed. Prior to the 2030 Plan, the City was dominated by single-family detached housing in a predominantly rural residential setting. The historical development pattern is fairly homogeneous, with some pockets of slightly smaller and older homes near the Old Village District, and around the Tri-Lakes area that remain a vibrant, vital part of the City’s housing stock. The City’s 2030 Comprehensive Plan was the first to introduce suburban densities into the community, and with that guiding came the opportunity to incorporate more diversity into the housing stock and create a more balanced housing supply that would provide options to a broader demographic. Shortly after the 2030 Plan was put into effect, the housing bust and great recession hit, leaving the residential housing market largely paralyzed, and places like Lake Elmo saw little to no new residential development even though land had been guided to allow new neighborhoods and housing. While the first half the decade very little happened due to the housing bust, by 2015 renewed interest in housing began to emerge. The first signs of recovery in Lake Elmo were consistent with regional and nation trends, which first saw recovery in the single-family detached housing market which is demonstrated in neighborhoods such as Wildflower in the Village Planning Area, and Savona in the South Planning Area. As the single-family residential housing market heated up and prices began to escalate, interest in attached housing and multi-family products has slowly emerged as a more cost-effective alternative. The delay in demand for attached and multi-family products is particularly noticeable in communities like Lake Elmo; however, current regional trends suggest that the housing market is likely to remain strong, and that Lake Elmo will continue to see increasing demand for new, and more diverse housing stock over this planning period. Understanding that there will be demand for a more diverse housing stock, the Future Land Use Plan included in Chapter 3 guides residential land use with a range of densities to allow for development of spectrum of households from rural residential neighborhoods to small apartment complexes. The purpose of this chapter is to evaluate Lake Elmo’s existing housing stock and to plan for future housing needs based on not only the Future Land Use Plan, but the household and population projections as stated within the City’s 2015 System Statement prepared by the Metropolitan Council. Addressing and planning for the City’s housing stock is a critical part of this Comprehensive Plan, because residential uses account for the largest existing and future HOUSING - DRAFT 5-24-2018 City of Lake Elmo Comprehensive Plan 2040 4 2040 Housing Highlights »Greater housing diversity (townhomes and apartments added to mix of housing types, beyond single-family homes) »Intensification of housing in the South Planning Area and Village Area »Protect the rural residential areas and neighborhood patterns. »Staging plan supports diverse housing stock throughout each phasing area. HOUSING - DRAFT 5-24-2018 City of Lake Elmo Comprehensive Plan 2040 5 land use category in Lake Elmo. Moreover, a diverse housing stock with access to open space and essential goods and services is paramount to creating a healthy, sustainable, and resilient community. It protects the community’s tax base against market fluctuations; it helps the community’s economic competitiveness by assisting Lake Elmo businesses with employee attraction and retention; it provides options for existing residents to remain in the community should their life circumstances (e.g., aging-in- place); and it offers future residents access to the same amenities and levels of service that current residents have come to expect and appreciate. The first part of this chapter presents important housing principles that underscore the dynamics behind the role and importance of housing as a key element in this Plan. The second part of the Chapter focuses on the existing housing stock and summarizes important information regarding the overall number of housing units, the type of units, their affordability, and the profile of who lives in those units. The existing housing stock provides a critical baseline of information from which the City can plan and determine what types of housing products may be demanded over the next 10-20 years, which then informed where to appropriately guide land areas suitable to attract that type of development. Finally, the third part of this chapter addresses the projected need for housing during this planning period based on the existing housing and neighborhood conditions and the 2015 System Statement requirements. This section evaluates issues surrounding affordability and the Metropolitan Council’s requirements for quantifying need based on income and provides corresponding description of where and how the City might encourage a broader range of affordability in its new neighborhoods. The final section links projected housing need to practical implementation tools to help the City achieve its identified housing goals. HOUSING - DRAFT 5-24-2018 City of Lake Elmo Comprehensive Plan 2040 6 HOUSING PRINCIPLES The following sections provide context and information about the role housing plays in the community, and how the principles can be supported through thoughtful planning of the City’s future housing stock. Throughout this process, residents, stakeholders and the Advisory Panel discussed the visible changes in the housing stock taking place in the community, particularly within the growth areas. Though new development and growth is planned to continue over the next planning period, the existing housing stock and neighborhoods was also an important part of the discussion. What is clear, is that the City is likely to continue to be dominated by residential uses and land use patterns in both the existing areas of the community and in the areas guided for growth and change. Since housing plays such a critical role in the character of the community, it is important for the City to have a universal understanding of the principles that make good houses, neighborhoods and community. The following are some core principles from which this Housing chapter is developed. Housing Diversity As described in the Balanced Development and Growth Chapter, and within the introduction of this Chapter, the City has been slowly increasing and improving diversity of its housing stock in new neighborhoods but there are still critical gaps in the City’s housing supply. To more effectively describe why diversity is important, understanding what it means to have a diverse housing stock is a critical first step to demonstrating why a diverse housing stock can have long-term positive effects on the City and its residents. A community that has a diverse supply of housing is one that includes different tenures (rental and ownership), types (single family, townhome, and HOUSING - DRAFT 5-24-2018 City of Lake Elmo Comprehensive Plan 2040 7 apartment), price points, sizes and styles. This residential mix can accommodate the needs of a wide variety of households at different life stages, incomes and family types. Furthermore, it provides more options as resident housing needs vary over time due to changes in age, income, housing preference, family structure, or physical abilities. In turn, this enables people to move into a community and remain in it as they experience these life changes while staying close to their established social support networks. For example, a long-term Lake Elmo resident who no longer wishes to care for a large yard will likely choose to move to another housing type within their community with less maintenance needs, if that option is available, before looking at other communities. A diverse supply also provides options for young adults, who grew up in a community, to move out of their parent’s home into an apartment or townhome nearby. In addition to providing improved housing options for residents, a diverse supply of single-family homes, townhomes, and apartments provides local governments with a broad tax base that can withstand changes in economic and housing trends without dramatic impacts on government budgets and services. Age and housing types aside, a diverse supply of housing price points specifically helps to address the needs of current and projected local workers. Oftentimes employees want to live close to where they work. Employers need a diverse housing supply to help attract and hire the best qualified talent at all wage levels with a variety of home preferences. A full range of home options is needed to match the needs of a diverse workforce. Housing Stability For many people, a stable home is a critical component to their quality of life. Quality of life can mean something different to many people, but with respect to housing it is often associated with a feeling that their home feels safe in terms of its surrounding neighborhood and the physical structure, and that they expect to be able to reside there for the near future. This degree of certainty in a home is often the foundation needed to pursue life goals and to fulfill their potential. A central aspect to a stable home is HOUSING - DRAFT 5-24-2018 City of Lake Elmo Comprehensive Plan 2040 8 affordability, and the industry has generally quantified this as defined as paying no more than 30% of gross income toward home expenses. If forced to pay more, a household may forgo health care, food, education, transportation and other expenses in order to pay their mortgage or rent and utilities. In that situation, an essential car repair may mean making the difficult choice between reliable transportation and risking mortgage defaults or evictions. Frequent moves, in an attempt to afford a suitable home, place a lot of stress on households. For families with children, this often results in a change in schools, daily work commutes, and access to supportive friends and family. For seniors, it may impact access to healthcare, transportation, and long established social networks. A community with quality affordable housing helps to ensure the stability of both neighborhoods and communities that greatly benefit its residents and businesses. Workforce Housing The Washington County Community Development Agency (CDA) conducted research that revealed a mismatch between the wages of many who work in Washington County (County) and the cost of housing in the County, this mismatch is particularly pronounced in the City of Lake Elmo. The County has the third highest median household income in the Metro Area and one of the highest costs of living in the state. However, the average weekly wage for the workers employed in the County is 37 percent lower than the Metro Area average. There are two contributing factors: 1) many jobs in the County are low skill and do not pay enough to afford the housing that currently exists in the County; and 2) there is a lack of modestly priced options in the County affordable at that wage level. To be a vibrant and growing community, it is important to have a good mix of jobs across a wide wage range as well as enough housing that is accessible to all income levels so that those that work in the County can also call it home. For the business sector to grow and expand, a reliable labor force is needed to fuel it. Available and financially accessible housing helps to attract a talented workforce to fill these job opportunities so they can live near their place of work. Workers often look for jobs that are located near attractive housing options. This also helps to retain current workers who wish to be at a company for the long term thereby avoiding unnecessary and costly employee turn-overs. HOUSING - DRAFT 5-24-2018 City of Lake Elmo Comprehensive Plan 2040 9 EXISTING HOUSING SUPPLY The previous sections are intended to provide context from which to consider the City’s existing housing stock, and to eventually consider how the City map plan for future needs in the housing stock. This section provides information about the current housing stock in Lake Elmo that is most relevant to consider when planning for the future of the City’s housing. This information is a synthesis of more detailed housing and socio- economic data that is included in Appendix, which was used to inform the remaining content of this chapter. Key Housing Characteristics Total Housing Units & Recent Construction Trends According to data from the Metropolitan Council and the City of Lake Elmo, there are 3,606 housing units in Lake Elmo as of 2017. As seen in Figure 4-1. Housing Construction Permits 2001-2017, a 10-year period of very limited new construction proceeds Lake Elmo’s current strong housing market and rapid growth adding approximately 300 new housing units per year. It is important to keep in mind, though, that the housing sector, like all real estate sectors, is cyclical. Therefore, not every year during the planning period will likely see similar quantities of new housing development. As a result, it will be important to track housing development on an on-going basis to understand how broader market trends are influencing the growth and change of Lake Elmo. Figure 5-1. Housing Construction Permits 2001-2017 (units) Sources: Metropolitan Council; City of Lake Elmo 3,606 Lake Elmo housing units as of December 31, 2017 - Sources: Metropolitan Council: City of Lake Elmo Grand Total 87%Single Family 7%Townhome 7%Multifamily 52%Single Family 23%Townhome 24%Multifamily 42%Single Family 15%Townhome 43%Multifamily Sources: Metropolitan Council; City of Lake Elmo 0 5,000 10,000 15,000 20,000 25,000 20 1 1 20 1 2 20 1 3 20 1 4 20 1 5 20 1 6 Me t r o A r e a H o u s i n g U n i t s COUNTY METRO AREA 140 94 46 13 21 27 25 23 17 26 25 34 36 41 142 339 299 HOUSING - DRAFT 5-24-2018 City of Lake Elmo Comprehensive Plan 2040 10 Year Built Although recent construction in Lake Elmo is adding a lot of new housing units, over 40 percent of the City’s housing stock (1,500 units) is more than 40 years old. Therefore, it will be important to track the condition of these older homes because they are at-risk of deferred maintenance, which can rapidly result in critical structural problems. At the same time, well-maintained older housing can be an important source of entry-housing. Housing Type Lake Elmo’s existing housing stock is dominated by detached, single-family homes as seen in Figure 5-2. Housing Stock by Structure Type. According to data from the Metropolitan Council, 82 percent of the City’s housing stock (2,955 units) consists of single-family homes. Moreover, the remaining housing stock mostly consists of manufactured housing or mobile homes, which account for 12 percent of the housing stock of 428 units. This means only six percent of the housing stock (223 units) is something other than a single-family home or mobile home. More housing choices will help older adults to remain in the community as they age-in-place and younger adults to move into the community. Figure 5-2. Housing Stock by Structure Type (2017) Single-Family82% Mobile Homes 12% All Other Housing Types 6% Owner-Occupied92% Renter-Occupied 8% Sources: Metropolitan Council; City of Lake Elmo Housing Goal #4. Protect and preserve the existing housing stock of established neighborhoods. - Chapter 1: Vision, Goals & Strategies 40% Lake Elmo housing stock more than 40 years old - Sources: US Census; Metropolitan Council; City of Lake Elmo HOUSING - DRAFT 5-24-2018 City of Lake Elmo Comprehensive Plan 2040 11 Although single family homes can be a very flexible type of housing, it does mean that the community has a lack of housing choices. This can have an impact on both existing residents who may desire a different housing type and those who may want to move into the community. This is especially true for older residents who no longer want or are able to maintain a single-family home. Currently, the only option for Lake Elmo residents in need of housing with support services is Arbor Glen Senior Living, which opened in 2017. However, for older adults who do not need support services, but would prefer low maintenance housing, the options are limited to small pockets of new developments such as the villa-style products in Inwood. Key Demographics The issue of being able to adequately house an aging population will only become more important in the coming years. According to data from the US Census, Lake Elmo is already a community with a high proportion of older adults. Illustrated in Figure 5-3. Median Age of the Population, the median age of Lake Elmo residents in 2015 was 44 years, which was almost 8 years older than the Metro Area median age. The Minnesota State Demographer anticipates Lake Elmo’s median age will increase, and by 2020, they expect the City’s median age to be just over 46. Therefore, the housing needs of an older population will become increasingly important in the years to come. Figure 5-3. Median Age of the Population (2015) 37.3 42.4 43.9 46.1 34.2 36.0 36.5 37.7 33 38 43 2000 2010 2015 2020 LAKE ELMO METRO AREA Sources: US Census; Minnesota State Demographer; Perkins+Will HOUSING - DRAFT 5-24-2018 City of Lake Elmo Comprehensive Plan 2040 12 At the same time, Lake Elmo has surprisingly few residents age 25 to 34. Currently, a little over five percent of the City’s population is in this age group. Metro-wide the percentage is three times this amount at just over 15 percent. The lack of young adults is likely the result of few entry-level housing options. Homeownership Level The predominance of single-family homes helps explain why almost all of the housing stock is owner-occupied (92% or 3,402 units) versus renter-occupied (8% or 204 units) as seen in Figure 5-4. Lake Elmo Homeownership. Although homeownership is an important path to building wealth and promoting greater civic involvement, depending on where households are in their lifecycle, homeownership also can be a financial burden. For example, many older adults have health concerns that make maintenance and upkeep of their housing a physical and financial challenge. Younger persons who grow up in a community and want to form their own household often don’t have the savings to enter homeownership. Without rental options, these population groups are forced to leave the community to find housing that will accommodate their circumstances. The only existing rental options are single-family homes or the recently completed Arbor Glen Senior Living residence. Figure 5-4. Lake Elmo Homeownership (2017) Single-Family82% Mobile Homes 12% All Other Housing Types6% Owner-Occupied92% Renter-Occupied 8% Sources: Metropolitan Council; City of Lake Elmo 5 % of Lake Elmo residents are 25-34 years old 1 5% of Metro Area residents are 25-34 years old - Source: US Census HOUSING - DRAFT 5-24-2018 City of Lake Elmo Comprehensive Plan 2040 13 Home Values & Household Income Lake Elmo has high housing values compared to the larger Metro Area. According to the Minneapolis Area Association of Realtors, the 2017 median sales price of homes in Lake Elmo was $432,500, which was $185,000 more than the Metro Area median sales price of $247,900 illustrated in Figure 5-5. Median Home Sales Price. High home prices are attributed to larger homes sizes, newer housing stock, and larger lot sizes as well as the community’s advantageous location within the region given its proximity to numerous open space amenities, retail shopping and services, and major employment centers. Despite the high average home prices, there are areas within the City with less costly housing. In particular, older and smaller homes are concentrated near the Old Village, Tablyn Park, and in the Cimmaron Mobile Home Park. Figure 5-5. Median Home Sales Price (2017) $432,500 $247,900 LAKE ELMO METRO AREA Source: Minneapolis Area Association of Realtors The cost of housing also has a strong influence on who lives in Lake Elmo. The result is a community that is much older and wealthier than the Metro Area. According to the US Census, the 2015 median household income for Lake Elmo was just under $100,000, which was 35 percent higher than the metro area median household income of $69,000 as seen in Figure 5-6. Median Household Income. High household incomes have more to do with few younger households than a concentration of wealth. If the community had more younger households, the median would likely be lower. Figure 5-6. Median Household Income (2015) $99,161 $69,233 LAKE ELMO METRO AREA Source: US Census HOUSING - DRAFT 5-24-2018 City of Lake Elmo Comprehensive Plan 2040 14 MAP 5-1. Assessor Estimated Home Values (2018) Elmo Jane Olson Downs Rose Eagle Point DeMontreville Sunfish Horseshoe Goose Clear Goetschel Kramer Armstrong Unnamed Legion Pond Friedrich Pond H.J. Brown Pond Goose Deer Pond Armstrong Crombie Pond Klawitter Pond Berschen's Pond Hedge's Pond Dirk's Pond Beutel's Pond FHomesteaded EMV < $238,500 $238,501 - $450,000 $450,001 - $750,000 $750,001+ Draft Date: 4.5.2018 Source: Washington County, MNGEO, SHC HOUSING - DRAFT 5-24-2018 City of Lake Elmo Comprehensive Plan 2040 15 HOUSING DEMAND & AFFORDABILITY The existing conditions of the City’s housing stock provide valuable insight and information to assist in planning for what types of housing and price-points may be demanded in the future as the City continues to grow. As described in the previous sections of this chapter, the existing housing stock is relatively homogeneous and expensive. By planning for improved housing diversity, the City will experience a more stable, well-rounded housing supply to meet the demands of a diverse demographic. To assist in that planning effort, this section of the housing plan analyzes the affordability of Lake Elmo’s existing housing stock and compares it to the City’s ability to meet the current and forecasted housing needs. One of the most important factors in analyzing the housing stock is its affordability and marketability. As demonstrated in previous sections of this Chapter, the majority of Lake Elmo’s housing stock is not considered affordable. Some of the conditions that limit affordability are the newer age of the housing stock, the larger size of the homes and lots, and also Lake Elmo’s geographic location in the region. These same factors also contribute to the City’s marketability and housing value. With newer and larger homes, the average market value of the homes is more than that of other communities that may have more typical suburban size lots, more modest homes, and an older housing stock. Definition of Affordability There are several different definitions of affordable housing. The definition of affordable housing most frequently cited and measured in this chapter is that housing is affordable when households do not pay more than 30 percent of their income on housing costs. (Defined by the U.S. Department of Housing and Urban Development or “HUD”). When households have incomes at or below 80 percent of the area median income (AMI) costs associated with market rate housing (whether ownership or rental) becomes a challenge. This household group tends to pay more than 30 percent of their income on housing and has less disposable income to pay for other goods and services such as clothing, food, child care, transportation, and medical expenses. In addition, those residents with lower incomes have significantly fewer housing choices to meet their family needs. As required by 2015 System Statements issued by the Metropolitan Council, cities within the 7-County Metropolitan Area are required to plan for an allocated number affordable housing units based on three levels of affordability. As prescribed by HUD for the Twin Cities region, the three levels are: Extremely Low Income (30% of Area Median Income “AMI” or less); Very Low Income (31-50% of AMI); and Low Income (51-80% of AMI). HOUSING - DRAFT 5-24-2018 City of Lake Elmo Comprehensive Plan 2040 16 Ownership Housing Affordability Table 5-1 identifies the housing costs/prices that meet each of the affordability levels for home ownership in Lake Elmo. The Metropolitan Council determines affordable home prices based on monthly housing costs, assuming a 30-year fixed-rate mortgage at prevailing interest rates, insurance, and utilities. Ta ble 5-1. 2017 Affordable Purchase Price for Owner-Occupied Housing hHousehold Income Level Affordable Home Price 80% AMI ($68,000)$236,000 60% AMI ($54,240)$185,000 50% AMI ($45,200)$151,500 30% AMI ($27,100)$85,000 Source: Metropolitan Council Table 5-2 identifies the monthly rental housing costs that meet each of the affordability levels for rental housing in Lake Elmo. Based on HUD defined parameters, the Metropolitan Council determines affordable rents based on the number of bedrooms assuming that smaller units can and should accommodate smaller households. Table 5-2. 2017 Affordable Rental Rates # of Bedrooms 30% of AMI 50% of AMI 60% of AMI 80% of AMI Studio/Efficiency $474 $791 $949 $1,265 1 Bedroom $508 $848 $1,017 $1,356 2 Bedroom $610 $1,017 $1,220 $1,627 3 Bedroom $705 $1,175 $1,410 $1,880 4 Bedroom $786 $1,311 $1,573 $2,097 Source: Metropolitan Council HOUSING - DRAFT 5-24-2018 City of Lake Elmo Comprehensive Plan 2040 17 Existing Affordable Units Table 5-3 compiles an inventory of the estimated market value of ownership housing and of rental rates to determine what percentage of the City’s housing stock would be considered Affordable based on the levels established by HUD for the region. As shown, 24 percent of the City’s housing stock (865 units) is at or below 80 percent of AMI, with 13 percent of the housing stock (473 units) at or below 50 percent of AMI. A significant proportion of the City’s affordable housing stock is located in the Cimmaron Mobile Home Park, and in the historic neighborhoods surrounding the Old Village District. As suggested by the City’s median home sales price, Lake Elmo’s overall housing stock is not affordable, especially when compared to the Metro Area’s percentage of housing units that are considered affordable. Regionally, 68 percent of the housing stock is affordable at or below 80 percent of AMI and 28 percent is affordable at or below 50 percent of AMI. Table 5-3. Lake Elmo Affordable Housing Stock Lake Elmo Units Pct. of All hHousing uUnits Metro Area Pct. of All Housing Units Units affordable to households with income at or below 30% of AMI 373 10.3%6.5% Units affordable to households with income 31% to 50% of AMI 100 2.8%21.8% Units affordable to households with income 51% to 80% of AMI 392 10.9%39.9% Total Units at or below 80% AMI 865 24.0%68.3% Source: Metropolitan Council staff estimates for 2015 based on 2105 and 2016 MetroGIS Parcel Datasets (ownership units), 2009-2013 Comprehensive Housing Affordability Strategy data from HUD (rental units and household income), and the Council’s 2015 Manufactured Housing Parks Survey (manufactured homes). HOUSING - DRAFT 5-24-2018 City of Lake Elmo Comprehensive Plan 2040 18 Publicly Subsidized Units As of 2017, Lake Elmo does not have any publicly subsidized housing units. Cost Burdened Households Directly correlated to affordability is the metric of cost burden, which is the proportion of household income spent toward housing and utilities. When lower income households spend more than 30 percent of their income toward housing and utilities this burden is considered excessive because it begins to limit the money available for other essentials such as food, clothing, transportation, and healthcare. Table X-4 shows the number and percentage of low-income Lake Elmo households that are cost burdened and compares this against the Metro Area rate of cost burdened low-income households. According to data from the Metropolitan Council, 418 Lake Elmo households have incomes at or below AMI and also spend more than 30 percent of their income on housing costs. This is just under 12 percent of the City’s households. This percentage is less than half the Metro Area rate of 23 percent. The low incidence of cost burdened households is correlated with high proportion of households in their peak earning years (i.e., age 45-64) with higher than average incomes and the existing housing supply. As Lake Elmo’s population ages into retirement, and younger households are needed to support local business expansion, housing that is cost burden to lower income households will increase. Table 5-4. Cost Burdened Households by Income Level Lake Elmo Units Percentage of All Households Metro Area Percentage of All Households Income at or below 30% of AMI 200 5.5%10.0% Income 31% to 50% of AMI 151 4.2%7.4% Income 51% to 80% of AMI 67 1.9%5.8% Total households at or below 80% AMI 418 11.6%23.2% Note: Housing cost burden refers to households whose housing costs are at least 30% of their income. Source: U.S. Department of Housing and Urban Development, 2009-2013 Comprehensive Housing Affordability Strategy (CHAS) data, with counts adjusted to better match Metropolitan Council 2015 household estimates. HOUSING - DRAFT 5-24-2018 City of Lake Elmo Comprehensive Plan 2040 19 Affordable Housing Allocation for Lake Elmo Included within the 2015 System Statement provided by the Metropolitan Council is an allocation of affordable housing need for the City of Lake Elmo. The System Statement requires the City to plan for an additional 508 Affordable Units over the next 20 years (Table 5-5). Because of the limited supply of existing affordable housing, the Metropolitan Council is establishing an allocation of new affordable units to meet both regional goals for housing affordability and to ensure greater housing choice within Lake Elmo as it grows and its housing needs become more diverse. As such, land use designations contained within Chapter 3. Land Use assign appropriate densities to developing or redevelopment areas to meet the Metropolitan Council’s affordable allocation. Table 5-5. Affordable Housing Need Allocation through 2030 % of Area Median Income (AMI)Units At or below 30% AMI 27 31 to 50% AMI 179 51 to 80% AMI 302 Total Units 508 Source: Metropolitan Council 2015 Systems Statement - Lake Elmo HOUSING - DRAFT 5-24-2018 City of Lake Elmo Comprehensive Plan 2040 20 FUTURE HOUSING OPPORTUNITIES Projected Housing Need The Metropolitan Council’s 2015 System Statement forecasts that Lake Elmo will add approximately 3,500 new households through 2040. This amount of household growth will generate need for a more diverse housing stock. As a community that is both aging and growing, it will be important that a much wider selection of housing be made available in order to retain existing residents and attract new ones. Therefore, more housing options besides detached single- family units on large lots and mobile homes will need to be accommodated. This housing plan does not prescribe specific housing products or styles, but it does identify where within the land use plan different housing types, primarily through guided densities, can be accommodated. For example, the 2015 System Statement allocates 508 new affordable housing units in Lake Elmo through 2030. It does not stipulate that these be rental or owner; it does not stipulate that these units be attached or detached; nor does it stipulate that they be publicly subsidized or dependent on market dynamics. However, housing affordability is strongly correlated with the price of land. Therefore, areas that allow higher densities are more likely to accommodate a range of housing types and price points. 3,500 Number of forecasted new households in Lake Elmo through 2040 - Source: Metropolitan Council 508 Number of allocated affordable housing units through 2030 - Source: Metropolitan Council HOUSING - DRAFT 5-24-2018 City of Lake Elmo Comprehensive Plan 2040 21 Future Residential Uses in Planned Growth Areas Higher Density Residential Areas The Land Use Plan outlined in Chapter 3 identifies two planned growth areas both within the Municipal Urban Services Area (MUSA): 1) the South Planning Area; and 2) the Village Planning Area. Both planned growth areas call for new residential land uses at a sufficient density to accommodate a variety of housing types at densities that could support the number of allocated affordable units at the three income levels. Table 5-6 below describes the future land use categories, the allowable density ranges, and the minimum number of supportable future units. According to the guided densities and staging plan, these three high density areas could accommodate, at minimum, a total of approximately 958 dwelling units between 2020 and 2030, which exceeds the required allocated affordable units. Table 5-6. Planned Residential Uses Supportive of Affordable Housing Future Land Use Residential Density (dwelling units/acre)Total Acres Supportable Households/ Dwellings High Density Residential (HDR)8.01-15 79.99 640 Mixed Use Commercial (MU-C)10-15 31.86 318 Total 2020-2030 Higher Density Residential 111.85 958 Net Density 2020-2040 (All Planned Residential Areas)8.6 dwelling units/acre Source: SHC, Perkins+Will, City of Lake Elmo Moreover, the two residential land use categories would be proximate to mixed- use and commercial districts in which essential goods and services, transit, and employment opportunities would be planned to be available. Housing Goal #1. Create land use designations that support various housing types throughout the community. - Chapter 1: Vision, Goals & Strategies HOUSING - DRAFT 5-24-2018 City of Lake Elmo Comprehensive Plan 2040 22 Other Sewered Residential Areas In addition to new residential development envisioned in higher density areas between 2020 and 2030, the housing plan also calls for significant residential development in the planned growth areas at lower densities and in future staging period. According to the land use plan, the growth areas could accommodate approximately 2,386 housing units through 2040. These residential categories range from low density areas to mixed use districts that could support relatively high density development, such as housing above ground floor commercial space, or horizontally integrated uses that are connected with walking trails between job centers and apartments. Rural Residential Areas Lake Elmo has a rich history of supporting innovative conservation developments and other unsewered residential neighborhoods. These residential areas preserve critical open space and contribute to Lake Elmo’s high quality of life. Although this Plan does not plan for significant residential growth in the rural portions of Lake Elmo, some growth in this area of the community is anticipated to occur over this planning period. Like housing in the sewered areas of the community, the City’s Rural Residential housing stock is an important part of the housing supply that must be planned for and considered as the community grows. An important consideration of any future residential developments in these areas should respect past efforts to protect and preserve important open spaces, critical habitats, and water resources. Maintaining Existing Housing & Neighborhoods While the City is projected to more than double its households in this planning period, there remains a significant portion of the housing supply that is aging and may begin to experience deferred maintenance, and structural obsolescence if not maintained. As such, it is critical that the City plan for and consider how existing neighborhoods and structures, particularly as they age, will be maintained. Many of these neighborhoods are constructed with high-end, large homes and lots but there are also areas of the City with smaller houses and lots that are an important piece of the City’s history, as well as a contributor to the small proportion of naturally occurring affordable houses in the community. These neighborhoods, at all price-points, are an important part of the City’s character, and it is important for the community to continue to prioritize these areas for preservation and maintenance as an important part of the City’s housing stock. Housing Goal #3. Endorse and sustain existing neighborhood patterns throughout the rural residential areas of the community. - Chapter 1: Vision, Goals & Strategies HOUSING - DRAFT 5-24-2018 City of Lake Elmo Comprehensive Plan 2040 23 HOUSING RESOURCES, STRATEGIES & TOOLS Table 5-7 outlines a variety of resources and tools to implement Lake Elmo’s identified housing needs and stated housing goals. There is a wealth of resources available to assist communities in meeting their goals. The table below should be considered a starting point. As the City’s housing needs evolve or become more defined, it should expand with options. Table 5-7. Housing Resources and Tools Housing Goal Tool/Resource/Strategy Description Protect and Preserve Housing Stock of Existing Neighborhoods CDBG Work with Washington County CDA to use CDBG funds to help low- and moderate-income homeowners with rehabilitation assistance. Referrals Review and update reference procedures and training for applicable staff, including a plan to maintain our ability to refer our residents to any applicable housing programs outside the scope of our local services. Foreclosure prevention In established neighborhoods, a rash of foreclosures, especially in close proximity to one another, can have a deleterious effect on the surrounding neighborhood. Be aware of foreclosures and be able to direct homeowners at-risk of foreclosure to resources that can help prevent foreclosures (can http://www.foreclosure-response.org/ policy_guide/index.html). Explore ways to integrate lifecycle housing choices throughout the community Washington County Community Development Agency (CDA) Given the limited staff capacity of Lake Elmo, regularly coordinate with the Washington County CDA to best align their resources with the city’s housing needs and goals. The CDA has capacity, funding resources, and expertise to assist smaller communities with their housing needs. Livable Communities Demonstration Account (LCDA) Consider supporting/sponsoring an application to LCDA programs for multi-family rental proposals in areas guided for high density residential and targeted to households of all income levels. Tax Abatement Consider tax abatement for large rental project proposals. Zoning and Subdivision ordinances Review zoning and subdivision ordinances to identify any regulations that inhibit the housing priorities in this document. Expedited application process Streamline the pre-application process in order to minimize unnecessary delay for projects that address our stated housing needs, prior to a formal application submittal. Site Assembly Consider strategies for assembling sites in high-density or mixed-use districts that would increase appeal to developers. Housing Bonds Work with Washington County CDA to raise housing bonds for the development of low-income housing at various targeted income levels. Tax Increment Financing (TIF)To help meet the need for low-income housing, consider establishing a TIF district in an area guided for high density development. Brownfield Clean-Up In potential redevelopment areas in the Old Village or along the I-94 corridor, explore EPA and MN DEED grant programs that provide funding and assistance with planning, assessment, and site clean-up. This page is blank. Chapter 7: Transportation Mode Choice, Safety & Connections Comprehensive Plan 2040 2 TRANSPORTATION ffi DRAFT 5ffi24ffi2018 City of Lake Elmo Comprehensive Plan 2040 3 TRANSPORTATION ffi DRAFT 5ffi24ffi2018 City of Lake Elmo Comprehensive Plan 2040 INTRODUCTION The purpose of the Transportation Chapter is to guide development, maintenance, and improvement of the community’s transportation network. This Chapter incorporates and addresses the City’s future transportation needs based on the planned future land uses, development areas, housing, parks and trail systems. The City’s transportation network is comprised of several systems including roadways, transit services, trails, railroads and aviation that all work together to move people and goods throughout, and within, the City. This Chapter identifies the existing and proposed transportation system, examines potential deficiencies, and sets investment priorities. The following Chapter plans for an integrated transportation system that addresses each of the following topics in separate sections: • Roadway System • Transit • Trails • Rail • Aviation The last section of this Chapter provides a summary and implementation section which addresses each of the components of the system, if any additional action within this planning period is expected. The implementation plan sets the groundwork for investment and improvements to the transportation network consistent with the goals, analyses, and conclusions of this Plan. As discussed in preceding Chapters of this Comprehensive Plan, the Transportation Chapter is intended to be dynamic and responsive to the City’s planned land uses and development patterns. As the City’s conditions change and improvements occur, this Chapter should be reviewed for consistency with the Plan to ensure that the transportation systems support the City’s ultimate vision for the community through this planning period. 4 TRANSPORTATION ffi DRAFT 5ffi24ffi2018 City of Lake Elmo Comprehensive Plan 2040 Transportation System Objectives Through this planning process update, the City’s Advisory Panel, members of the public, staff and policy makers discussed the relationship between planned land uses, development areas and the transportation network. The feedback received from this process included comments about specific intersections, questions about future roadway improvements, and discussion about larger policy statements regarding transit and trail planning. While there was a range of detail received, there were a few common objectives for the system that remained consistent with those stated in the 2030 Plan, which are identified as follows: Creating a Connected System Universally, the City and its constituents identified a safe, efficient, and connected system as critical to the success of the transportation system in the community. Residents and business owners identified the need for personal, accessible transportation systems with multi-modal choice as an important consideration as the City grows and development occurs. Business owners and stakeholders echoed that sentiment, focusing on accessibility to and from their locations to promote a healthy stable business environment. Slightly different than the 2030 Plan, feedback communicated through this planning process focused on the need to improve and create a more connected trail network that would include accommodations for bikeways as an alternate transportation mode choice. Less focus and feedback were received regarding protection of the rural character, and instead there was a distinction made between the types of systems that might be needed in the rural residential areas versus the system improvements that would be needed in the developing areas. Much like the feedback reflected in the Land Use and Balanced Development and Growth Chapters of this Plan, the community’s desire is to create a cohesive transportation system that minimizes disruption to the environmental quality of all areas of the community; is respectful of the rural residential areas of the community; and plans for an efficient and effective system in the developing areas of the community. 5 TRANSPORTATION ffi DRAFT 5ffi24ffi2018 City of Lake Elmo Comprehensive Plan 2040 ROADWAY SYSTEM The roadway system is the City’s primary component of the transportation system and is the component of the transportation system used most frequently by residents and businesses in the City. The roads are used for commutes, deliveries, and other basic travel. This section describes the existing roadway system and provides a guide from which future roadways should be planned as development occurs in the City. Existing Roadway System The existing roadway system can be described with respect to several characteristics including jurisdictional classification, functional classification, physical location and construction. The following sections describe each of these characteristics with respect to the existing roadway system in the community. Roadway Jurisdiction The jurisdiction of a roadway is an important consideration in the planning process because it indicates who the responsible agency or party is for maintenance, management, permitting, and possible future improvements. Turnbacks are typically forced from higher level jurisdictions to lower level jurisdictions. Therefore, it is an important part of the City’s understanding of the existing roadway system, as well as any recommended improvements which are discussed in subsequent sections of this Chapter. The tables that follow describe the existing jurisdiction of roadways serving the community, as well as provide an indication of how the City’s existing system compares to the region. 6 TRANSPORTATION ffi DRAFT 5ffi24ffi2018 City of Lake Elmo Comprehensive Plan 2040 Table 7-1: Roadway Jurisdiction and Names Roadway Jurisdiction Roadway Type Roadway Name Federal Interstate US Highway None None Minnesota Trunk Highway (TH)TH 36 Washington County County State-Aid Highway (CSAH) County Road (CR) Stillwater Blvd (CSAH 6) 10th St (CSAH 10) Ideal Ave/Olson Lake Tr (CSAH 13) Inwood Avenue (CSAH 13) 34th St/Stillwater Blvd/40th St (CSAH 14) Manning Ave (CSAH 15) Lake Elmo Ave (CSAH 17) Keats Ave (CSAH 19) 50th St (CSAH 35) Lake Elmo Ave (CR 17B) City of Lake Elmo Municipal State-Aid (MSA) Municipal/Local Jamaca Ave (MSA 103) Lake Jane Tr/45th St/Julep Ave/47th St/Kimbro Ave/43rd St (MSA 104) Keats Ave (MSA 105) Upper 33rd St/Laverne Ave (MSA 106) 20th St (MSA 107) 30th St (MSA 108) 15th St (MSA 110) 50th St (MSA 111) Eagle Point Blvd (MSA 112) Helmo Ave (MSA 113) 39th St (MSA 114) Manning Tr (MSA 115) Demontreville Tr (MSA 119) Hudson Boulevard (MSA 120) 5th Street North (MSA 121) All remaining roads 7 TRANSPORTATION ffi DRAFT 5ffi24ffi2018 City of Lake Elmo Comprehensive Plan 2040 Table 7-2: Roadway Jurisdiction Type Compared to Region Roadway Jurisdiction & Type Lake Elmo Mileage (%) Washington County Mileage (%) Minnesota Mileage (%) Federal Interstate US Highway 0.0 (0.0%) 0.0 (0.0%) 26.6 (1.4%) 30.2 (1.6%) 913.9 (0.7%) 3,224.7 (2.4%) Minnesota Trunk Highway (36?)0.0 (0.0%) 82.1 (4.4%)7,731.0 (5.7%) Washington County County State-Aid County Road 23.51 (21.5%) 1.0 (0.9%) 215.1 (11.6%) 68.1 (3.7%) 30,506.9 (22.5%) 14,489.5 (10.7%) Municipal Municipal State-Aid Municipal/Local 18.12 (16.6%) 66.57 (61.0%) 181.6 (9.7%) 1,083.1 (58.1%) 3,063.5 (2.3%) 16,006.7 (11.8%) Other Township, Park, etc.0.0 (0.0%)176.1 (9.5%)59,583.3(43.9%) Totals 109.2 (100%)1,862.8 (100%)135,519.4 (100%) ROADWAY FUNCTIONAL CLASSIFICATION The Metropolitan Council has established a functional classification system for classifying roadways serving the Twin Cities Metropolitan Area. This system establishes a hierarchy of roads to collect and distribute traffic from local neighborhood properties to the metropolitan highway system. The functional classification system for roadways is broken down into four categories: Principal Arterials, Minor Arterials, Collectors, and Local Roadways. Principal Arterials Principal arterials, generally interstates and trunk highways, provide high-speed mobility between the Twin Cities and important locations outside the Metropolitan Area. They also connect the central business districts of Minneapolis and Saint Paul with other regional business centers. Principal arterials are generally constructed as limited access freeways in the urban area but may also be constructed as multiple-lane divided highways. Principal arterials are primarily 8 TRANSPORTATION ffi DRAFT 5ffi24ffi2018 City of Lake Elmo Comprehensive Plan 2040 under federal or state jurisdiction. The City’s only principal arterial is TH 36 which runs east- west along the northern border. Two other principal arterials, I-94 and I-694, lie just beyond the City’s borders, but are still considered primary routes. Minor Arterials Minor Arterials also emphasize mobility over property access and connect cities with adjacent communities and the metropolitan highway system. Major business centers and other major traffic generators are often located on Minor Arterial roadways. Minor Arterials are further classified as ‘A’ Minor and, ‘B’ Minor arterials. A-Minor Arterials are roadways that are of regional importance because they relieve, expand, or complement the principal arterial system. Minor Arterials other than A-Minor Arterials are classified as B-Minor Arterials. B-Minor Arterials provide City-wide or inter-city connections and generally serve shorter trips than A- Minor Arterials. Minor Arterials of either type are generally under state or county jurisdiction. 34th Street/Stillwater Boulevard (CSAH 14) and 10th Street (CSAH 10) are examples of A Minor Arterials, while Lake Elmo Avenue (CSAH 17), between 34th Street/Stillwater Boulevard (CSAH 14) and 10th Street (CSAH 10), is an example of a B-Minor Arterial. Collectors Collectors supplement the arterial roadway system by providing access between neighborhoods and to the arterial system. They are designed to carry less traffic than arterials and to provide direct access to some properties. Collectors can be further divided into Major and Minor Collectors. Major Collectors typically provide access and mobility across neighborhoods and would connect to the arterial roadway system. Minor Collectors are typically limited to one or two neighborhoods and may connect only to other Collectors. Major Collectors are typically under county or municipal jurisdiction. Minor Collectors are primarily under local jurisdiction. 50th Street between Lake Elmo Avenue (CSAH 17) /Stillwater Boulevard (CSAH14); Hudson Boulevard and Keats Avenue, TH 36 south to 47th Avenue are examples of a Major Collector within the City. 39th Avenue North (Lake Elmo Avenue (CSAH 17) east to Stillwater Boulevard (CSAH 14)), Eagle Point Boulevard (Inwood Avenue (CSAH 13) east and south to Hudson Boulevard), and 5th Street North are examples of Minor Collectors. Local Roadways Local streets consist of township roads and city streets and are under municipal jurisdiction. Their primary purpose is to provide direct access to local properties within neighborhoods. Local streets are designed for low speeds to discourage through traffic. Figure 7-1 shows the existing functional classification of the roadways within the City. 9 TRANSPORTATION ffi DRAFT 5ffi24ffi2018 City of Lake Elmo Comprehensive Plan 2040 Long Unnamed Unnamed Unnamed Park Nursery Pond Long Klawitter PondUnnamed Unnamed Unnamed DeMontreville Unnamed UnnamedClear Cloverdale Unnamed Unnamed Jane Unnamed (Goetschel)Dirk's Pond UnnamedUnnamed Deer Pond Berschen's PondCrombie Pond Unnamed Sunfish Unnamed Unnamed Friedrich Pond Elmo Unnamed Legion Pond Unnamed Eagle Point DownsUnnamedUnnamed Unnamed Unnamed Unnamed Horseshoe H.J. Brown Pond Armstrong Goose Rose Unnamed Unnamed Kramer Unnamed Markgrafs Olson Unnamed Hedge's Pond Unnamed F00.6 1.2 1.80.3 MilesExisting Functional Classification of Roadways Classification Principal Arterial Other Arterial A-Minor Augmentor A-Minor Connector A-Minor Expander A-Minor Reliever Major Collector Minor Collector Figure 7-1: Existing Functional Classification of Roadways Source: MnGEO, Metropolitan Council, Washington County, City of Lake Elmo, SHC, Focus Engineering Figure 7-1. Existing Functional Classification of Roadways 10 TRANSPORTATION ffi DRAFT 5ffi24ffi2018 City of Lake Elmo Comprehensive Plan 2040 Traffic Operations Figure 7-2 displays the volumes of existing principal and A-Minor Arterial roadways within the City based on the 2015/2016 Mn/DOT Average Annual Daily Traffic (AADT) counts, and also shows projected 2040 Volumes from Washington County (more information regarding forecasts is discussed in subsequent sections of this Chapter). Table 7-3 lists planning-level daily threshold volumes for different roadway design types as referenced in the Washington County Transportation Plan. The average daily traffic volumes were compared to the design threshold capacities shown in the above table to determine the approximate level of congestion for each roadway segment analyzed. Each roadway segment was ranked according to the following categories: • Uncongested: the existing average daily volume is less than 85-percent of the threshold volume, with a low probability of operational problems due to traffic flow. • Approaching congestion: the existing average daily volume is between 85-percent and 100-percent of threshold volumes, with a moderate probability of operational problems due to restricted traffic flow. • Congested: the existing average daily volume exceeds 100-percent of the threshold volume, with a high probability of operational problems due to restricted traffic flow. For purposes of this Chapter and analysis, the City will use the data available from Washington County because all Principal and A-Minor Arterials are either County or State Roads and the County and data available is current and reflects existing conditions in the City. Washington County Comprehensive Plan Draft Chapter 5 states the following regarding the methodology used: “Existing capacity deficiencies were identified by comparing the AADT volumes to the thresholds identified in Table 7-3. The methodology used does not account for traffic conditions that do not fit the average daily traffic criteria (e.g. weekend travel, holiday travel, etc) because they tend to produce atypical congestion and different congestion levels.” “The methodology does not take into account factors such as geometric conditions at the intersection nodes, potential peaking characteristics, or directional flow disparities.” 11 TRANSPORTATION ffi DRAFT 5ffi24ffi2018 City of Lake Elmo Comprehensive Plan 2040 1 8 0 0 1 5 0 0 9500 1 3 0 0 2 2 5 0 11300 17300 18100 1600 1 0 5 0 2000 1100 1 2 1 0 0 19500 14500 4050 44 00 7300 18300 3050 2500 3500 2800 3 0 7 0 0 8000 2000 8000 9200 930 22300 7600 4800 1300 11000 3 6 50 1 0 60 0 176001 2 7 0 0 860 5000 1 3 5 0 1 2 3 0 0 1150 2450 5 4 0 0 10700 80000 3850 1200 36500 94000 12700 580 3650 3800 0 920 7100 16200 5 9 0 0 4 8 0 0 0 22200 4700 13100 5900 8300 950 9900 860 85000 6600 12200 3350 4000 3500 5 0 5 0 15000 4600 1900 2 7 5 0 105000 1 5 0 0 8 1 0 0 0 4550 11 00 0 3 5 0 0 0 650 194001850 4500 1 5 0 0 5000 300 1 0 5 0 8100 4 6 50 370 4750 4 7 5 0 1800 3300 4200 1 1 3 0 0 77000 7 7 0 0 0 0 0 1900 40 00 21000 0 0 0 22000 22000 0 0 0 0 0 22000 75 00 0 18900 3600 6400 22400 0 3 6 0 0 0 0 0 16900 0 6700 0 7100 1 4 9 0 00 1800 8 3 0 0 99000 4500 0 38000 107000 0 200 7800 4550 0 8300 21000 0 5 1 0 0 0 1 9 0 0 31000 5400 19100 96000 1600 16700 21000 95000 0 13800 17900 6800 5300 6 2 0 0 21000 0 126000 3 1 0 0 12200 1300 93000121000 1700 9 5 0 0 0 7000 13 3 0 0 44400 0 0 0 0 0 0 1 6 2 0 0 11200 410000 0 0 0 0 0 0 0 0 5 3 00 0 0 20000 0 0 5600 7300 9700 89000 8 9 0 0 0 17100 Long Unnamed Unnamed Unnamed Park Nursery Pond Long Klawitter PondUnnamed Unnamed Unnamed DeMontreville Unnamed Clear Cloverdale UnnamedUnnamed Jane Unnamed (Goetschel)Dirk's Pond UnnamedUnnamedDeer Pond Berschen's Pond Unnamed Sunfish Unnamed Unnamed Friedrich Pond Elmo Unnamed Legion Pond Unnamed Eagle Point DownsUnnamedUnnamed Unnamed Unnamed Unnamed Horseshoe H.J. Brown Pond Armstrong Goose Unnamed Unnamed Kramer Unnamed Markgrafs Olson Unnamed Unnamed 60TH ST N 10TH ST N S T I L L W A T E R B L V D N 30TH ST N KEATS AV E N 50TH ST N M ANNING AVE N 47TH ST N 34TH ST N L A K E J A N E T R L N 4 5 T H ST N INWOOD AVE N L A K E ELMOAVE N F00.6 1.2 1.80.3 Miles Figure 7-2: Existing 2015 AADT and Projected 2040 AADT Source: MnGEO, Metropolitan Council, Washington County, City of Lake Elmo, SHC, Focus Engineering Legend XXX 2015 AADT XXX 2040 Projected AADT Figure 7-2. Existing 2015 AADT and Projected 2040 AADT 12 TRANSPORTATION ffi DRAFT 5ffi24ffi2018 City of Lake Elmo Comprehensive Plan 2040 As noted within the Washington County Chapter, while there are deficiencies in the methodology that could impact the order of magnitude of the deficiency, this methodology is widely accepted and applicable for transportation planning purposes. Based on Washington County’s analysis and data there are roadway segments that are operating under, near, or over capacity today. As shown on Figure 9 from the Washington County 2040 Comprehensive Plan Chapter 5 several roadway sections currently have AADTs above the planning level thresholds and are experiencing congestion and delays, especially during the peak periods. These segments include: • I-94; approaching congested from Keats Avenue (CSAH 19) to the west (Although not within the City, I-94 is an important regional route for the City and included in this plan). • TH 36; over capacity from Lake Elmo Avenue (CSAH 17) to the east. • Manning Avenue (CSAH 15); over capacity north and south of the Stillwater Boulevard (CSAH 14) intersection. Table 7-3: Planning Level Roadway Capacities by Roadway Type Roadway Type1 Planning Level Daily Capacity2 (AADT) Approaching Capacity (85% AADT) Two-Lane Undivided Urban Undivided Rural Three-lane (two-lane with turn lanes) 10,000 12,000 22,500 8,500 10,200 19,125 Four-Lane Undivided Urban Divided Urban Divided Rural 20,000 32,000 38,000 17,000 27,200 32,300 Freeway Four-Lane Six-Lane 80,000 120,000 68,000 102,000 This chart is intended for use as an approximation for planning purposes. 1.The terms urban and rural describe typical section design (e.g. curb and gutter for urban and ditch drainage for rural), not geographical areas. 2. Turn lanes may be needed for high speeds at 7,000 AADT. Source: Washington County 2040 Comprehensive Plan – Chapter 5 Transportation 13 TRANSPORTATION ffi DRAFT 5ffi24ffi2018 City of Lake Elmo Comprehensive Plan 2040 Number of Lanes The number of lanes of a roadway is directly correlated to the capacity of a roadway. While local roadways are generally two-lanes, the County and State roads are constructed to handle higher volumes of traffic. The following summary of Principal and A-Minor arterial roadways that serve the City are provided in Table 7-4. Table 7-4: 2017 Number of Lanes on Principal and A-Minor Arterial Roadways Roadway Number of Lanes TH36 4 Lanes CSAH 17 2 Lanes CSAH 14 (I-494 to CSAH 6)4 Lanes CSAH 14 (CSAH 6 to CSAH 17)2 Lanes CSAH 14 (CSAH 17 to CSAH 17 South)3 Lanes CSAH 14 (CSAH 17 to CSAH 15)2 Lanes CSAH 10 2 Lanes I-94 6 Lanes Source: Washington County 2040 Comprehensive Plan – Chapter 5 Transportation 14 TRANSPORTATION ffi DRAFT 5ffi24ffi2018 City of Lake Elmo Comprehensive Plan 2040 Safety As noted in previous sections of this Chapter, safety of the transportation system and most importantly the roadways, is a priority of the City particularly as it becomes more developed. While this planning process did not perform a full analysis of crashes within the City, the City can consider and incorporate the findings of Washington County who recently completed a comprehensive system wide analysis for crashes occurring from 2013 to 2015. While the study considered data for the whole County, the findings of the report are still important and valuable to the City of Lake Elmo particularly since many of its residents and business owners frequently travel throughout the region. The findings and conclusions of Washington County’s crash analysis are summarized below. It should be noted that the details of the report, including specific data related to Lake Elmo is available and can be obtained as individual projects or roadways are planned for through this planning period. • A total of 107 fatal and incapacitating injury crashes occurred on all roadways within the county (31 fatal and 76 incapacitating injury crashes). • A total of 28 fatal and incapacitating injury crashes occurred on the Washington County roadway system (6 fatal and 22 incapacitating injury crashes). • The following types of fatal and incapacitating injury crashes occurred most frequently on the county roadway system: »Lane departure crashes including head-on crashes and run off road crashes (particularly on the right side of the roadway) »Intersection-related crashes including right angle crashes »Motorcycle crashes »Crashes involving pedestrians and bicyclists Since much of the City’s developing area is accessed by County and State roads, the findings of Washington County’s crash analysis is relevant and should be considered as new local roadways and intersections are designed. Additionally, the County’s Annual Intersection Control Ranking System (ICRS) Report is an annual report that prioritizes the installation of traffic control improvements on roadways under Washington County’s jurisdiction. 15 TRANSPORTATION ffi DRAFT 5ffi24ffi2018 City of Lake Elmo Comprehensive Plan 2040 Traffic Forecasts An important component of future planning is determining expected traffic volumes. By establishing the projected demand, transportation network deficiencies within the City can be further recognized and potential improvements identified. The following sections provide a summary of the previous 2030 Plan methodology, and how the 2040 Traffic Forecasts were derived. 2030 Transportation Chapter Forecasts and Methodology The City’s 2030 Comprehensive Plan marked a significant change and departure from the City’s typical rural residential development pattern as new areas were identified for urbanization and intensification of development. The planned growth meant that a detailed transportation analysis was essential so that the City could plan for a safe, and efficient roadway system to serve new businesses, retail areas and neighborhoods. That planning effort resulted in the City’s consultants developing a citywide travel demand model that was based on the projected future growth and land development patterns identified in the Future Land Use Plan and staging/phasing plans. The travel demand forecasts developed were based on the modified Twin Cities regional travel demand model, which was released by the Metropolitan Council. The City developed its travel demand model as a subset of the Washington County Transportation Model in coordination with the CSAH 17 Sub-area Study to forecast traffic in 2030 per the requirements of the previous planning period. The results of that effort were compiled and included within the City’s 2030 Comprehensive Plan Transportation Chapter, which were subsequently incorporated into the County and Metropolitan Council’s data after the Plan adoption. 2040 Traffic Forecasts and Methodology Since the 2030 Plan was adopted, the City has experienced development and growth, but the projected increase of population, households and employment was impacted by the great recession of the late 2000s through the early 2010s. By the time the Metropolitan Council issued the City’s 2015 System Statement the projected growth identified in the City’s 2030 16 TRANSPORTATION ffi DRAFT 5ffi24ffi2018 City of Lake Elmo Comprehensive Plan 2040 Plan had been reduced by approximately 25% through 2040. While the projections have been reduced, the City is still expected to experience significant growth in this planning period that may be comparable to the City’s 2030 Plan. The reduced projections slightly impacted the Future Land Use plan, particularly within the urbanizing areas. Methodology As part of Washington County’s 2040 Comprehensive Plan Update, a 2040 Traffic Model was developed and used to project 2040 traffic volumes on principal and A-Minor Arterials in the County. The detailed methodology of their model can be found in Chapter 5 Transportation of Washington County’s 2040 Comprehensive Plan and associated appendices; however, what is most relevant to the City is that the model incorporated known community land use plans and development objectives to project 2040 population, households and employment data for sub- areas of the county called Traffic Analysis Zones (TAZs). Given Washington County’s methodology for projecting 2040 volumes included use of the City’s adopted 2030 Future Land Use plan (which is more intense than the 2040 Future Land Use Plan) the City was confident that the Washington County model could be used to forecast traffic volumes in this 2040 Plan update. To validate this conclusion, the City prepared an updated TAZ analysis based on the Future Land Use Plan contained within Chapter 3 of this 2040 Comprehensive Plan and compared the estimates to those contained within the County’s TAZ projections. The full table with estimated TAZ projections can be found in the Appendix to this Chapter. Summary and Conclusions Figure 7-2 shows the 2040 projected traffic volumes on principal and A-Minor Arterials of Lake Elmo’s roadways based on the Washington County traffic model. Based on the traffic model, Washington County prepared a 2040 Volume/Capacity Analysis that identified principal and A-Minor Arterials that will be approaching capacity or over capacity with the existing roadway system. Washington County performed only a planning-level analysis to identify locations where capacity problems are expected to occur by 2040, and the City should consider this as it plans for future development in areas that may experience deficiencies in the roadway system. This information provides insight into areas that may need additional traffic study and analysis as developments are proposed. The City should require future developers to provide traffic studies and analysis as part of the development review process to ensure proper mitigation and improvements to the system are incorporated as areas of the community develop with a greater intensity of uses. The Washington County 2040 Traffic Model indicates the following potential deficiencies in 17 TRANSPORTATION ffi DRAFT 5ffi24ffi2018 City of Lake Elmo Comprehensive Plan 2040 Figure 7-3. 2040 AADT Forecasts 0 0 4000 0 21000 0 0 0 22000 22000 0 0 0 0 0 22000 5200 75 00 0 18900 3600 6400 22400 0 3 6 0 0 0 0 16900 6700 0 7100 1 4 9 0 00 1800 8 3 0 0 99000 4500 0 38000 107000 0 5800 200 7800 4550 0 8300 21000 5 1 0 0 0 1 9 0 0 31000 5400 19100 96000 1600 16700 21000 95000 0 13800 17900 6800 5300 6900 6 2 0 0 21000 0 126000 3 1 0 0 12200 1300 93000121000 1700 9 5 0 0 0 1330 0 44400 0 0 0 0 1 6 2 0 0 11200 0 0 41000 0 0 0 0 0 0 0 0 0 0 53 00 0 0 20000 0 0 5600 7300 9700 89000 17100 Long Unnamed Unnamed Unnamed Park Nursery Pond Long Klawitter PondUnnamed Unnamed Unnamed DeMontreville Unnamed Clear Cloverdale Unnamed Unnamed Jane Unnamed (Goetschel)Dirk's Pond UnnamedUnnamedDeer Pond Berschen's Pond Unnamed Sunfish Unnamed Unnamed Friedrich Pond Elmo Unnamed Legion Pond Unnamed Eagle Point DownsUnnamedUnnamed Unnamed Unnamed Unnamed Horseshoe H.J. Brown Pond Armstrong Goose Unnamed Unnamed Kramer Unnamed Markgrafs Olson Unnamed Unnamed 60TH ST N 10TH ST N S T I L L W A T E R B L V D N 30TH ST N KEATS AVE N 50TH ST N M ANNING AVE N 47TH ST N 34TH ST N L A K E J A N E T R L N 4 5 T H ST N INWOOD AVE N LAKE ELMO AVE N F2040 Traffic Forecasts 0 0.6 1.2 1.80.3 Miles Figure 7-4: 2040 AADT Forecasts Source: MnGEO, Metropolitan Council, Washington County, City of Lake Elmo, SHC, Focus Engineering DRAFT 18 TRANSPORTATION ffi DRAFT 5ffi24ffi2018 City of Lake Elmo Comprehensive Plan 2040 Lake Elmo given current conditions: • Inwood Avenue is approaching capacity; segment north of 10th Street (CSAH 10) and segment south of CSAH 6 • 10th Street (CSAH 10) is over capacity; segment east of Inwood (CSAH 13) to Lake Elmo Avenue (CSAH 17) • Manning Avenue (CSAH 15) is over capacity from 10th Street (CSAH 10) to Stillwater Boulevard (CSAH 14); and is approaching capacity from CSAH 14 to Highway 36 It should be noted that the Washington County model does not attempt to evaluate if specific improvements would result in a reduction of deficiencies, and instead it only evaluates the Base Model assumptions. For purposes of this Comprehensive Plan Chapter, Lake Elmo will use this information as a guide to help inform how local roadways, and associated improvements, might impact the roadway system as development occurs. Because a city-wide specific model was prepared for the 2030 Plan, some specific roadway improvements were established and will carry forward into this planning period. A summary of those improvements are as follows: • Continuation of 5th Street North (the east-west Minor Collector roadway/parkway) through the South Planning Area. This is intended to alleviate congestion on 10th Street/CSAH 10 as development progresses within this area of the community. • Development of a local roadway/parkway to connect mixed-use and new neighborhoods on north side of CSAH 14 to the south side of CSAH 14 (39th Street/Village Parkway). 19 TRANSPORTATION ffi DRAFT 5ffi24ffi2018 City of Lake Elmo Comprehensive Plan 2040 Regional Initiatives As Lake Elmo and the surrounding area have developed, certain roadways and locations were identified in the City’s previous plan as having strategic importance, to either the City or region. While these areas were studied in and around the time of the 2030 Plan, given the delayed time-line of development in the community, some of these studies and planning efforts remain relevant to this plan. Two such items are identified in this plan as having significant impact on the City’s roadway network, including: • Lake Elmo Village Area Alternative Urban Areawide Review (AUAR) • Minnesota Interregional Corridor System Since the 2030 Plan, an addition study and effort within Washington County has been initiated to improve and expand Manning Avenue (CSAH 15) which runs along the eastern boarder of Lake Elmo. Since this regional project also has the potential to significantly impact the City’s roadway network a summary of this project is also included within the plan. Each of these initiatives is described separately below. Lake Elmo Village Area AUAR In anticipation of development within the Village Planning Area, the City prepared an Alternative Urban Areawide Review (AUAR) that evaluated anticipated development scenarios and identify potential deficiencies and impacts and identify appropriate mitigation that would alleviate those issues. While the AUAR was prepared prior to development, the document continues to be a relevant guide in assessing necessary improvements as development occurs. The scenarios analyzed within the AUAR continue to be fairly consistent with development trends, and therefore many of the transportation improvements and mitigative recommendations condition to be either implemented or planned for within the system. A summary of the mitigation identified within the AUAR is provided as follows: • Signalizing intersections. • Adding left and right turn lanes for capacity and safety. • Upgrading Stillwater Boulevard (TH 5) from its current two lanes to a four-lane facility. 20 TRANSPORTATION ffi DRAFT 5ffi24ffi2018 City of Lake Elmo Comprehensive Plan 2040 In addition to this mitigation, information on other options to improve traffic operations was provided, including: • Access Management; controlling the number of and spacing of private driveways and public roadways that connect to a roadway corridor. • Non-Traditional Intersection Control; using alternatives to traffic signals and stop signs, such as roundabouts, to control turning movements at intersections. • Transit Opportunities; providing regularly scheduled bus or rail service as well as car pool opportunities to provide an option to single-driver vehicles. • Trail Systems; providing a system that allows for non-motorized travel between land uses for recreation or commuting. One notable planned change/improvement within the Village Planning Area that was identified as important within the AUAR is the realignment and design of Stillwater Boulevard (CSAH 14). The design of this realignment is underway, and the City continues to work with Washington County on appropriate upgrades of CSAH 14 through this area. Minnesota Interregional Corridor System (IRC) In January of 2000, Mn/DOT adopted the IRC Study as part of the State Transportation Plan. This study identified key corridors in Minnesota with an emphasis on providing efficient connections between regional trade centers. The goal of the IRC system is to tie the state together and enhance the economic vitality by safe, timely, and efficient movement of goods and people. Lake Elmo is bracketed on the north and south by two roadways identified in the IRC Study as Interregional Corridors: TH 36 and I- 94. Under this identification, Mn/DOT has certain goals and performance targets for each corridor. Mn/DOT is implementing measures to maintain and improve the IRC System through completion of corridor plans, which include management plans on each roadway in cooperation with local units of government. More information regarding the Minnesota IRC System can be found on MnDOT’s website. Trunk Highway (TH) 36 TH 36 has been identified as a Medium Priority Interregional Corridor under the IRC Study. The TH 36 Corridor Management Plan was published in May 2001 detailing the study of TH 36, from I-694 to the Wisconsin border. This includes the segment along the border of Lake Elmo. 21 TRANSPORTATION ffi DRAFT 5ffi24ffi2018 City of Lake Elmo Comprehensive Plan 2040 The key reasoning for this designation includes: • Its connection to the Stillwater area. • Its service as one of the major routes connecting with western Wisconsin. • Its service to the adjacent communities of Stillwater, Oak Park Heights, Grant, Lake Elmo, Mahtomedi, Willernie, Pine Springs, and Oakdale. • Its high volume of commuter traffic and recreational/tourist traffic. • Its expected traffic increases due to continued growth in Stillwater and Oak Park Heights, which serve as the commercial activity center for the St. Croix Valley, and continued growth in western Wisconsin. Lake Elmo did not agree with this designation or the reasoning presented by Mn/DOT. An October 2001 resolution, Resolution 2001-94, declined City acceptance and participation in the TH 36 Corridor Management Plan for, among other reasons, not giving the City the opportunity to respond to the designation and the belief that closing access on TH 36 will prove harmful to the City’s residents and businesses. Despite City objections, planning for TH 36 as a Medium Priority IRC continued. The strategies and goals for TH 36 with this designation included a 55-mph average peak hour operating speed, elimination of traffic signals, and access via interchange or right in/right out only without median breaks. The original TH 36 IRC plan envisioned City access to TH 36 via new Manning Avenue (CSAH 15) interchange or right in/right out access from Keats Avenue and some select private access driveways. Demontreville Trail and Lake Elmo Avenue (CSAH 17) would become overpasses without connection to TH 36. Highlands Trail and most other private access points would be eliminated or reduced to right in/right out access only. As the City has continued to work with the County and Mn/DOT on the future of TH 36, both agencies have been open to changes to the original ICR plan. The City has obtained federal grant assistance and is currently completing the development of a concept plan for a south frontage road system from Demontreville Trail to Lake Elmo Avenue to maintain better access to TH36 for Lake Elmo properties. For instance, the current intersection of TH 36 with Lake Elmo Avenue (CSAH 17) is now being examined as a potential interchange. The City is working in earnest with other agencies to determine the final configuration. The City will need to continue to work with Mn/DOT, the County, and adjacent communities to determine the final 22 TRANSPORTATION ffi DRAFT 5ffi24ffi2018 City of Lake Elmo Comprehensive Plan 2040 configuration of access to TH 36 at this and other locations. In addition, the City will also need to decide how to serve properties adjacent to TH 36 as access is reduced or eliminated. Options for access to and from TH 36 as well as to adjacent property includes creating a frontage road, creating a backage road, using the north frontage road, or a combination of two or more of these methods. There are two primary benefits to the City from the potential improvements to TH 36. The first is reduced commuter traffic on City roadways. As TH 36 is improved with higher average operating speeds, commuters will have less desire to seek other routes. Wisconsin commuters would travel through the City on TH 36 without impact to City residential areas. Without the improvements, travel times on TH 36 will likely be reduced in the future. As observed on other routes in the Metropolitan area, as a major route gets congested, motorists will seek out County and local roads that show at least a perceived improvement in travel time. A comparison of projected 2030 traffic volumes in the previous sections shows this to be the case here. The other potential benefit to the City from the potential improvements to TH 36 is increased safety. Current at-grade intersections with TH 36 represent some of the most dangerous areas of the City in terms of crashes. By consolidating access into interchanges and limited right in/right out access, residential and business traffic to and from the City will be able to more safely enter and exit this corridor. Interstate 94 The I-94 corridor, including the segments adjacent to the southern border of the City, has been designated High Priority IRC. Under this designation, I-94 has a goal 60-mph average peak hour operating speeds with minimal conflicts and interruptions to traffic flow. A corridor management plan has not yet been developed to examine the existing operations and determine future plans to meet those goals. It is expected that such a plan will be developed in the near future. It is also anticipated that Lake Elmo will have the opportunity to participate on some type of advisory panel in conjunction with development of that plan to express the City’s views and opinions on the corridor. The City will work with the Mn/DOT, the County, and adjacent communities on a corridor plan that is effective for all involved. Although an IRC plan has not been developed for I-94, a recent traffic impact study involving the corridor was completed under the direction of the City of Woodbury. The October 2008 Woodbury Northeast Area Traffic Impact Study examined impacts from the development of an approximately 580-acre site between Keats Avenue (CSAH 19) and Manning Avenue 23 TRANSPORTATION ffi DRAFT 5ffi24ffi2018 City of Lake Elmo Comprehensive Plan 2040 Long Unnamed Unnamed Unnamed Park Nursery Pond Long Klawitter PondUnnamed Unnamed Unnamed DeMontreville Unnamed UnnamedClear Cloverdale Unnamed Unnamed Jane Unnamed (Goetschel)Dirk's Pond UnnamedUnnamed Deer Pond Berschen's Pond Unnamed Sunfish Unnamed Unnamed Friedrich Pond Elmo Unnamed Legion Pond Unnamed Eagle Point DownsUnnamedUnnamed Unnamed Unnamed Unnamed Horseshoe H.J. Brown Pond Armstrong Goose Rose Unnamed Unnamed Kramer Unnamed Markgrafs Olson Unnamed Unnamed 60TH ST N 10TH ST N S T I L L W A T E R B L V D N 30TH ST N KEATS AVE N 50TH ST N MANNING AVE N 47TH ST N 34TH ST N L A K E J A N E T R L N 4 5 T H ST N INWOOD AVE N LAKE ELMO AVE N F00.6 1.2 1.80.3 MilesThrive MSP -Transportation Policy Plan Projects Project Type 2019 - 2024 Pavement Figure 7-3: Planned Improvements to Principal and A-Minor Arterials Source: MnGEO, Metropolitan Council, Washington County, City of Lake Elmo, SHC, Focus Engineering Figure 7-4. Thrive MSP - Transportation Policy Plan Projects (TH 95), south of I-94. This development is planned for mixed-use including retail, office, some residential, parkland, and a new park-and-ride facility. Although the report focuses on transportation improvements necessary to accommodate a development not located in Lake Elmo, the potential mitigation options affect the I-94 corridor and potentially Lake Elmo’s transportation network. 2040 Transportation Policy Plan Projects As part of the regional planning initiatives, the Metropolitan Council’s 2040 Transportation Policy Plan identifies projects to regional roadways planned for improvements during this planning period. The Metropolitan Council has identified improvements to CSAH 14 and I-94 as shown on Figure 7-4. 24 TRANSPORTATION ffi DRAFT 5ffi24ffi2018 City of Lake Elmo Comprehensive Plan 2040 System Analysis With the traffic forecasts completed, the City of Lake Elmo’s transportation system elements were re- examined to identify potential issues, recommend potential improvements, and provide guidance for development of the system through 2030. These elements are examined separately below. Functional Classification Changes The functional classification system creates a hierarchy of roads that carries traffic between destinations in a safe and efficient manner, as described earlier. Principal Arterials and Minor Arterials are generally well spaced around the City. Taking into account the 2040 projected volumes, regional initiatives, and proposed roadway improvements, Lake Elmo Avenue (CSAH 17) could change its current designation of a B-Minor Arterial. With the proposed improvements, the 2040 projected volume decreases as regional traffic shifts to Manning Avenue (CSAH 15). This suggests the roadway serves more local than regional traffic and could be designated as a Major Collector. The City’s Collector system is also less than desired and lacking appropriate connections between the arterials. In general, these connections already exist in the form of the State Aid system. Minnesota State-Aid (MSA) routes are designed to accommodate higher levels of traffic and truck traffic, similar to the function of collector roadways. In addition, residents already use these roads as routes to access the arterial roadways and other land uses. Identifying these routes in the functional classification system reinforces their need as MSA routes and better identifies the routes to existing and future residents and businesses. The functional classification system is also related to access management, which can help the City maintain the balance between mobility and access as development occurs. The functional classification can also be used to help determine the appropriate location of intersection improvements and traffic control, such as traffic signals. The following changes and additions are proposed for the City’s functional classification map. Proposed function classification changes: • Lake Elmo Avenue (CSAH 17), Stillwater Boulevard (CSAH) south to 10th Street (CSAH 10), will change from a B-Minor Arterial to a Major Collector. • Lake Jane Trail, 42nd Street north and east to Jamaca Avenue, will change from its current Major Collector designation to a local road. 25 TRANSPORTATION ffi DRAFT 5ffi24ffi2018 City of Lake Elmo Comprehensive Plan 2040 Proposed functional classifications additions: • 42nd Street, Lake Jane Trail east to Jamaca Avenue, will be designated as a Major Collector. • Jamaca Avenue, Stillwater Boulevard (CSAH 14) north to Lake Jane Trail, will be designated as a Major Collector. • A future south frontage road along TH 36 (Demontreville Trail North to Lake Elmo Avenue (CSAH 17)) will be designated as a Major Collector. • Jamaca Avenue North (from Lake Jane Trail North to Stillwater Boulevard (CSAH14)) will be designated as a Major Collector. • Hudson Boulevard, Inwood Avenue (CSAH 13) east to Manning Avenue (CSAH 15), will be designated as a Major Collector. • Kimbro Avenue, 43rd Street north to 47th Street, will be designated as a Minor Collector. • 43rd Street, Kimbro Avenue east to Lake Elmo Avenue (CSAH 17), will be designated as a Minor Collector. • Laverne Avenue, Upper 33rd Street north to 39th Street, will be designated as a Minor Collector. • Upper 33rd Street, Lake Elmo Avenue (CSAH 17) east to Laverne Avenue, will be designated as a Minor Collector. • Village Parkway, connecting the Stillwater Boulevard (CSAH 14)/39th Street intersection to the 30th Street/Lisbon Avenue intersection, will be designated as a Minor Collector. • 31st Street, Stillwater Boulevard (CSAH 6) east to Stillwater Boulevard (TH 5), will be designated as a Minor Collector. • 20th Street, Lake Elmo Avenue (CSAH 17) east to Manning Trail, will be designated as a Minor Collector. • Manning Trail, 20th Street north to the City border, will be designated as a Minor Collector. • 15th Street, the City border east to Inwood Avenue (CSAH 13), will be designated as a Minor Collector. 26 TRANSPORTATION ffi DRAFT 5ffi24ffi2018 City of Lake Elmo Comprehensive Plan 2040 • Kimbro Avenue North (starting at the intersection of 47th Street North), as it turns to 43rd Street North to Lake Elmo Avenue North (CSAH 17), will be designated as a Minor Collector. • Stillwater Way will be designated as a Minor Collector. • Village Parkway will be designated as a Minor Collector. • 20th Street North, from Lake Elmo Avenue (CSAH 17) to Manning Trail North, will be designated as a Minor Collector. • Island Trail North will be designated as a Minor Collector. • Jade Trail North will be designated as a Minor Collector. • A future road, connecting 5th Street North to Hudson Boulevard North to the east of Jade Trail North and South of Keats Avenue North, will be designated as a Minor Collector. This proposed functional classification plan is shown in Figure 7-5. The majority of these changes could occur now as most of the roadways currently exist. As stated, these changes would align the City’s MSA routes with its Functional Classification Map in addition to other benefits. The new roadways will need to be designated and developed as development occurs. This also means the City will plan access and mobility along each roadway according to its classification’s characteristics. As development occurs and travel patterns change, the functional classification map will need to be reviewed to evolve and to continue to serve its function. 27 TRANSPORTATION ffi DRAFT 5ffi24ffi2018 City of Lake Elmo Comprehensive Plan 2040 Figure 7-5. Planned Functional Classification Long Unnamed Unnamed Unnamed Park Nursery Pond Long Klawitter PondUnnamed Unnamed Unnamed DeMontreville Unnamed UnnamedClear Cloverdale Unnamed Unnamed Jane Unnamed (Goetschel)Dirk's Pond UnnamedUnnamed Deer Pond Berschen's PondCrombie Pond Unnamed Sunfish Unnamed Unnamed Friedrich Pond Elmo Unnamed Legion Pond Unnamed Eagle Point DownsUnnamedUnnamed Unnamed Unnamed Unnamed Horseshoe H.J. Brown Pond Armstrong Goose Rose Unnamed Unnamed Kramer Unnamed Markgrafs Olson Unnamed Hedge's Pond Unnamed F00.6 1.2 1.80.3 MilesPlanned Functional Classification of Roadways Principal Arterial A Minor Augmentor A Minor Reliever A Minor Expander A Minor Connector B Minor Major Collector Minor Collector A Minor Expander Major Collector Minor Collector Plan Major Plan Minor Figure 7-5. Planned Functional Classification Source: MnGEO, Metropolitan Council, Washington County, City of Lake Elmo, SHC, Focus Engineering 28 TRANSPORTATION ffi DRAFT 5ffi24ffi2018 City of Lake Elmo Comprehensive Plan 2040 Right-of-way Preservation Many of the changes discussed above are due to existing and planned land uses that will likely warrant future functional classification changes. Currently, the principal and A-Minor Arterials within the city are all Washington County roadways. As part of future planning effort, the City is required to identify the County’s required right-of-way that must be planned for to support the planned functional classification of roadways. The information in this table should be planned for as new development occurs within the City. Table 7-5. Right-of-Way Preservation Functional Classification Right-of-Way Width**Future Facility Type Minor Arterial 220 feet 6-lane divided 180 feet 4-lane divided 150 feet 3-lane undivided 120 feet 2-lane urban Collector 150 feet 3-lane undivided 120 feet 2-lane undivided 100 feet 2-lane undivided, urban * Widths are total width of corridor and assume the road is centered in the corridor. ** Due to particular development conditions, physical features of the site or highway corridor, special traffic control needs, or other conditions, Washington County may require more right-of-way width than shown in these guidelines. Source: Washington County 2040 Comprehensive Plan – Chapter 5 Transportation 29 TRANSPORTATION ffi DRAFT 5ffi24ffi2018 City of Lake Elmo Comprehensive Plan 2040 System Safety Safety of the roadways and intersections for users of the system is a primary goal of the City. Improvement in safety can occur from multiple strategies. As part of the Minnesota Toward Zero Deaths campaign, four major focus areas were identified for communities to reduce traffic injuries and fatalities: Education, Enforcement, Engineering, and Emergency Medical Services. While each area is important in improving safety, their combined use can result in a greater reduction in crashes and severity than one area alone. Using information from that campaign, these areas are examined in consideration of the City’s network. Education Education is about motivating changes in driving habits and behaviors. It goes beyond an understanding of the “rules of the road” to consideration of how driving or a particular safety issue can impact other drivers, pedestrians/bicyclists, and the surrounding land uses. Education is typically coordinated with a targeted enforcement campaign, such as drunk driving. Educational efforts can include posters, news releases, public service announcements, or many other types of public information. The City schools represent an opportunity to influence driver behavior before and after obtaining a license. Education can focus on driving as well as safety on other transportation modes, such as walking or riding a bus. Education directed at students can also influence the parents into better behavior and decisions. The Lake Elmo Elementary School 2008 Safe Routes to School Plan documents some educational ideas for younger students to improve their safety in the transportation network. Opportunities for education also exist outside the classroom and can be targeted at all ages. An example could be a traffic safety page on the City’s website. The City will look for educational opportunities to improve driving behavior. Enforcement Traffic rules and laws set the guidelines for safe operations of the roads. Enforcement of those laws ensures that motorists use the roads as they are intended and do not adversely impact themselves or others. The Toward Zero Deaths website lists existing enforcement campaigns and resources that could be used by the City in cooperation with different enforcement agencies. In addition, the City could address some specific safety issues by targeted enforcement. Currently, policing in the City is provided by the Washington County Sheriff’s Department. Therefore, increased enforcement on a specific issue within the City would need the cooperation of the 30 TRANSPORTATION ffi DRAFT 5ffi24ffi2018 City of Lake Elmo Comprehensive Plan 2040 County. Depending upon the issue, the County may benefit from targeted enforcement at similar sites throughout the County. The City, in cooperation with the County and the Sheriff’s Department, will examine issues and opportunities that may result in targeted or increased enforcement to improve roadway safety. Engineering Any physical modification of the roadways can be designated as engineering. Various methods can be used from complete reconstruction for improved grades to tree-trimming for improved sight distance. Before an engineering change is made, a full evaluation and analysis of existing characteristics and issues is needed. Through an evaluation, the engineering needs can be customized to directly impact the safety issue and improve traffic operations. Two engineering options for roadways within the City have been shown to increase safety: access management and roundabouts. Access Management Access management is the balance between corridor mobility and property access. Increased access to a road leads to more vehicle turning movements as motorists enter and exit properties. This increase in turning movements results in a decrease in mobility on the corridor. Similarly, increasing the mobility corresponds with a decrease in access. The relationship between access and mobility is further defined with the functional classification of roadways. An Interstate Freeway provides the greatest mobility as access is limited to grade-separated interchanges. On the opposite side, a local roadway cul-de- sac provides the greatest access with multiple driveways and limited spacing between those driveways. However, with only one connection to other roadways, the cul-de-sac offers almost no mobility. The Mn/DOT graph below shows this relationship between access and mobility. In terms of safety, as the access to a road increase, whether public or private, the crash rate increases. This relationship has been confirmed by Technical Study No. 4, Toward An Access Classification System and Spacing Guidelines, by the Minnesota Department of Transportation (Mn/DOT) and by the Federal Highway Administration’s (FHWA) Access Research Report No. FHWA-RD-91-0444. 31 TRANSPORTATION ffi DRAFT 5ffi24ffi2018 City of Lake Elmo Comprehensive Plan 2040 Based upon this relationship, the safest transportation network would have no access. Such a network is completely unrealistic, as all roadway users need access for every destination. Thus, access management guidelines were developed to provide that balance between safe, efficient travel and sufficient property access on different types of roadways. When a transportation network provides effective access management, the benefits include: • Reduced congestion and improved safety with fewer crashes. • Improved travel times. • Improved movement between destinations. • Improved economic development. The following Mn/DOT website provides additional information regarding access management: www.oim.dot.state.mn.us/access/index.html Each agency is responsible for the access management of their roadways. In some cases, the State and County will consult with the City as the roadway travels through important land uses or existing access that may be difficult to move or remove. As proper access management provides benefits to all agencies, there are advantages to having consistency across the agencies. Therefore, the City will use the Washington County access spacing guidelines. Table 7.5 shows these guidelines that are based upon the functional classification. The table identifies recommended distances for full access locations. This chart is part of the Washington County Transportation Plan and more information regarding these guidelines can be found in that document. Some existing public and private connections may not currently satisfy these guidelines. In addition, access that does not adhere to these guidelines may need to be granted for special circumstances or specific reasons. Flexibility is required in these and other cases, depending upon the exact situation and conditions. It is important to note that these spacing guidelines are goals and not absolute laws or regulations. The City will work with the State, the County, developers, and its community to improve roadway safety and mobility through these guidelines. 32 TRANSPORTATION ffi DRAFT 5ffi24ffi2018 City of Lake Elmo Comprehensive Plan 2040 Table 7-6: Access Management Guidelines Type of Access Functional Classification of Roadway Principal Arterial Minor Arterial Collector Local> 7,500 AADT < 7,500 AADT A. Private Residential Driveways No Direct Access No Direct Access (3)(3)(3) B. Commercial Driveways or Non-Continuous Commercial Street No Direct Access No Direct Access 1/8 Mile 1/8 Mile (3) C. Non-Continuous Residential Streets No Direct Access 1/8 Mile with No Median Opening 1/8 Mile 1/8 Mile (3) D. Continuous Local Streets and Collector Streets 1/2 Mile 1/4 Mile 1/4 Mile 1/8 Mile 1/8 Mile E. Minor Arterials 1/2 Mile 1/2 Mile 1/2 Mile 1/2 Mile 1/2 Mile (1) See Figure 7-1 and Figure 7-5 for existing and planned functional classification of roadways. (2) Traffic volumes refer to 20 year forecasts. (3) Determination based on other criteria (sight distance, speed, traffic volume, etc.). (4) Distances shown are minimums. (5) “Non-Continuous” streets refer to cul-de-sacs or short length streets (less than 1/2 mile) which do not cross the roadway in question. (6) The type of traffic control, turn lanes and bypass lanes required will be determined based upon the projected traffic volumes on the type of access requested (7) Distances may be increased over these minimums based on other criteria (sight distance, speed, traffic volume, etc.). 33 TRANSPORTATION ffi DRAFT 5ffi24ffi2018 City of Lake Elmo Comprehensive Plan 2040 In addition to working with these spacing guidelines, the City will use best access management practices in its urban, developing, and rural areas. These practices include: • Minimizing new access locations and reducing/consolidating existing access points. • Protecting and improving intersection functional and sight distance areas. • Properly designing of driveway and intersection (grade, lane width, etc.). • Developing turn lanes. • Avoiding offset intersections and driveways. Roundabouts Roundabouts are a type of circular intersection with key features that differentiate it from other types of circular intersections, like traffic circles or rotaries. The key characteristics identifiable in the field are: • Yield at entry. • No pedestrian access to the center island. • No parking. • Counterclockwise traffic circulation around the center island. With a fundamentally different design than tradition intersections with stop signs or signals, roundabout offer many benefits. The primary benefit is fewer crashes and less severe crashes compared to traditional intersections. The roundabout forces lower speeds through the intersection and all vehicles are traveling the same direction around the center island. This combination eliminates several types of crashes, like right angle, and allows more reaction time for drivers to avoid crashes. As a result, crash rates at roundabout intersections have been shown to be significantly lower than those at traditional stop-controlled or signal-controlled intersections. In addition to safety benefits, roundabouts generally result in less vehicular delay at the intersections, less vehicle pollution, and increased landscaping opportunities. A notable use in other sites has been roundabout corridors where roundabouts are used for several intersections in a row. In combination, vehicle speeds in the corridor have been reduced and landscaping opportunities are increased. 34 TRANSPORTATION ffi DRAFT 5ffi24ffi2018 City of Lake Elmo Comprehensive Plan 2040 Roundabouts are not intended for every intersection. Some characteristics, such as steep grades and/or limited right-of-way, may not allow the proper design of a roundabout. Site characteristics should be carefully studied and analyzed to ensure a roundabout is the proper control for a particular situation. The City will consider roundabouts as an option for intersection control, particularly for the Village Area. Although only these two engineering items have been detailed in this section, other engineering solutions are available to improve safety. For instance, providing adequate paved, shoulders on roadways allows motorists to recover from incidents that cause them to leave the drive lane and allows a safe location for disabled vehicles. Access management, roundabouts, and other engineering options will be considered by the City in developing a safe transportation network. Emergency Medical Services Emergency medical services fit into the goals of improving safety by their response to an incident. Fast and effective emergency responses are critical in reducing the severity of a crash. Focus on this response is particularly important in rural areas like within the City, which does not have close medical facilities. In the City, emergency responses are provided by the Washington County Sheriff’s Department and the Lake Elmo Fire Department. As the first responders to a crash, these emergency services workers have firsthand knowledge of safety issues and impacts. Beyond their importance as Emergency Medical Service providers, their knowledge can be used in determining safety issues and solutions as well as in public outreach and education. In most cases, a combination of two or more of these four major focus areas provide for a more complete safety solution to a specific or general safety issue. More specific examples and ideas for use in the City can be found at the Toward Zero Deaths website: www.minnesotatzd.org. As the City works to improve safety, these major focus areas will be considered alone and in combination. Of particular importance to the City, in terms of safety, are the area schools. As mentioned earlier, planning efforts have already begun for improving safety around the Lake Elmo Elementary School through its 2008 Safe Routes to School Plan. While not a City led initiative, the City supports continuing this special effort directed specifically at students. 35 TRANSPORTATION ffi DRAFT 5ffi24ffi2018 City of Lake Elmo Comprehensive Plan 2040 TRANSIT FACILITIES Transit represents a major component of transportation planning. Several factors influence the potential use of transit. However, the primary predictors are density of origination and destination. With consideration of these primary factors, the Metropolitan Council identifies four key conditions to identify transit market areas: • Population density • Employment concentration and job density • Trip volumes and patterns • Transit dependent segments of the population Using these criteria, distinct market areas have been developed recognizing different types and levels of transit service for each market. Lake Elmo is currently within the Metropolitan Transit Taxing District and is designated within Transit Market Area IV and Transit Market Area V as shown on Figure 7-6. Transit within Market Areas IV and V are expected to be served by peak period express service and a public dial-a-ride service. Existing Transit Facilities Lake Elmo has existing transit facilities consistent with its Market Area IV and V designation, which includes limited fixed route express and dial-a-ride service, rideshare program, and park- and-ride lots. Each component of the existing system is discussed below. Transit Service Metro Transit, a division of the Metropolitan Council, provides transit service along one fixed route through the City. Route 294 provides service between downtown Saint Paul and Stillwater via on 34th Street/Stillwater Boulevard (CSAH 14). Route 375 an express route bus route providing access to downtown Minneapolis has a stop just outside the City’s far southwestern corner, but is within walking distance of Lake Elmo’s Inwood neighborhood. The route includes stops in Lake Elmo. While not located in the City of Lake Elmo, the Metro Gold Line, a new Bus Rapid Transit (BRT) line, is planned within the I-94 corridor. The park-and-ride for the BRT route is located less than a mile from the City’s southwestern border and will provide additional transit options to Lake Elmo’s residents. 36 TRANSPORTATION ffi DRAFT 5ffi24ffi2018 City of Lake Elmo Comprehensive Plan 2040 Figure 7-6. Transit Market Areas and Facilities ¬(Å ¬(Å ¬(Å ¬(Ŭ(Ŭ(Å ¬(Å ¬(Å ¬(Å ¬(Å " " ¿¿¿¿¿¿ ¿¿¿¿¿¿¿¿¿¿ ¿ ¿¿¿ ¿ ¿ ¿ ¿¿ ¿ ¿¿ ¿ ¿ ¿ ¿ ¿ ¿¿ ¿¿ ¿¿ ¿ ¿¿ ¿¿ ¿ ¿¿¿ ¿¿ ¿¿ ¿¿ ¿¿ ¿ ¿¿ ¿ ¿ ¿¿ ¿ ¿ ¿¿ ¿ ¿ ¿¿¿¿¿¿ ¿¿ ¿¿¿¿ ¿ ¿ ¿¿ ¿¿ ¿ ¿ ¿¿ ¿ ¿ ¿ ¿¿¿¿ ¿ ¿¿¿¿¿¿¿¿ ¿ ¿ ¿¿ ¿¿¿¿ ¿¿ ¿¿ ¿¿ ¿¿ ¿¿ ¿¿ ¿¿ ¿ ¿¿ ¿¿ ¿¿¿ ¿ ¿¿ ¿¿¿¿ ¿¿¿¿¿¿¿ ¿¿ ¿¿¿¿¿ ¿¿¿ ¿¿ ¿¿ ¿¿ ¿¿¿¿ ¿ ¿¿ ¿¿ ¿ ¿ ¿¿¿¿ ¿ ¿¿ ¿¿¿¿¿ ¿¿ ¿¿¿¿¿ ¿¿ ¿¿ ¿ ¿¿ ¿ k k k k k k k Long Unnamed Unnamed Unnamed Park Nursery Pond Long Klawitter PondUnnamed Unnamed Unnamed DeMontreville Unnamed UnnamedClear Cloverdale Unnamed Unnamed Jane Unnamed (Goetschel)Dirk's Pond UnnamedUnnamed Deer Pond Berschen's Pond Unnamed Sunfish Unnamed Unnamed Friedrich Pond Elmo Unnamed Legion Pond Unnamed Eagle Point DownsUnnamedUnnamed Unnamed Unnamed Unnamed Horseshoe H.J. Brown Pond Armstrong Goose Rose Unnamed Unnamed Kramer Unnamed Markgrafs Olson Unnamed Unnamed 60TH ST N 10TH ST N S T I L L W A T E R B L V D N 30TH ST N KEATS AVE N 50TH S T N M ANNING AVE N 47TH ST N 34TH ST N L A K E J A N E T R L N 4 5 T H ST N INWOOD AVE N LAKE ELMO AVE N 294 2 9 4 2 9 4 375 2 9 4 351351351 3 7 5351 351 294 3 7 5 355 353 294 3 5 1 3 5 1 351 294 375 FkExisting Facility - Park-and-Ride k Park-and-Ride- Future ¿Transit Stops Transit Routes "Planned Transitway Stations ¬(Å Planned Transitway Alignments Transit Market Area Market Area IV Market Area V Figure 7-8: Transit Source: MnGEO, Metropolitan Council, Washington County, City of Lake Elmo, SHC, Focus Engineering DRAFT 37 TRANSPORTATION ffi DRAFT 5ffi24ffi2018 City of Lake Elmo Comprehensive Plan 2040 Demand-response transit service is currently offered by Metro Mobility through the provider HSI Transporter Services. HSI Transporter Services provides door-through-door transit services for adults 59 years or older and persons with disabilities who are residents of Washington County. Door-through-door service means that drivers will help riders through the first set of doors at both their pick-up points and their destinations. The HSI Transporter Service is available Monday through Friday between 7:30 a.m. and 5 p.m. and will take residents anywhere in Washington County. Outside of Washington County, trips are available to specific destinations and medical facilities in St. Paul. In addition, the transporter will take riders to a Metro Transit bus line that allows for increased connections to destinations throughout the Metro Area. Rideshare Rideshare is a Metro Transit program that matches motorists with others traveling in the same direction and time. There are two types of rideshare opportunities available to Lake Elmo residents: carpool matching and trip matching. Carpool matching finds commuters in the same area who travel to and from the same work area. Trip matching helps individuals share rides to concerts, sporting events, business conferences, or other one-time trips. In either case, people register with Metro Transit, who then notifies them when a carpool or trip match opportunity exists. It is up to the individuals to contact each other and follow through on the pool. Park-and-Ride Lots To facilitate use of transit, either using the bus or carpool, parking lots are available across the Twin Cities. Motorists are able to park for free at these lots and then continue to their destination using the bus or carpooling. There are six lots in the adjacent cities that could be used by Lake Elmo commuters, including: • St. Croix Valley Recreation Center in Stillwater. • Guardian Angels Church in Oakdale. • Walton Park in Oakdale. • Woodbury Mall Theater in Woodbury. • Woodbury Lutheran Church in Woodbury. • Christ Episcopal Church Park and Ride next to Woodbury Lutheran Church Park- and-Ride. 38 TRANSPORTATION ffi DRAFT 5ffi24ffi2018 City of Lake Elmo Comprehensive Plan 2040 Separately, there is one park and pool lot available in Grant, near the intersection of TH 36 and Manning Avenue (CSAH 15). Bus service is not provided at this lot, but commuters may still park for free and carpool from this location. In addition to the existing park-and-ride lots located in adjacent communities, there are two additional park-and-rides planned to become available within this planning period. The planned facilities are: • New park-and-ride facility in Lake Elmo located just west of the Manning Avenue and Hudson Road intersection. • New park-and-ride facility located less than 1-mile from the southwestern city border in the City of Lake Elmo to provide access to the Metro Gold Line BRT. Figure 7-6 shows the existing transit facilities, including current bus routes and the existing park-and-ride lot locations in the City, as well as the planned park-and-rides in the City and to serve the Metro Gold Line BRT. Transit Planning Transit alternatives to automobile travel are both encouraged and advocated by the City. According to Metro Transit information, commuter growth is expected in most areas of Lake Elmo. The Village Area in particular represents an opportunity to expand transit within the City. Two other areas of potential transit expansion include the TH 36 corridor on the north border of the City and the I-94 corridor on the south border of the City. Each area is discussed separately below. Village Area Transit service to the Village Area is an important component for the City and in keeping with regional transportation goals. The Village Area is now and will continue to be the largest concentration of commerce and urban scale housing in the City. The relationship of the Village Area to future transit is enhanced by its location adjacent to 34th Street/Stillwater Boulevard (TH 5) and the existing east-west Union Pacific rail corridor. 39 TRANSPORTATION ffi DRAFT 5ffi24ffi2018 City of Lake Elmo Comprehensive Plan 2040 I-94 Transit Corridor The 2040 Transportation Policy Plan contained within Thrive MSP identified a potential alignment of the planned Metro Gold Line BRT through the South Planning Area in the City. However, since the adoption of the 2040 Thrive MSP plan, the Metro Gold Line alignment and planned stops has been established, and the alignment will not occur adjacent to, or within, the City of Lake Elmo. There is an express route bus planned on I-94 that will include a stop at the planned park-and- ride lot at I-94 and Manning Avenue (CSAH 15). Expanding the existing transit corridor on the southern border of Lake Elmo would serve residents with an improved option to driving and could reduce congestion on I-94. Reduced congestion on I-94 would result in fewer commuters using alternative routes through the City on the frontage road. It would also reduce potential congestion from continued development in Woodbury. The City encourages and advocates for the continued improvement of existing transit routes and the development of new transit alternatives, particularly for the Village Area. As regional agencies are often better able to advocate for improved transit in the area, the Metropolitan Council and the County are encouraged to continue examining these potential transit way corridors and associated issues. However, support and assistance from the local governments is needed. The City will work with these and other agencies in pursuit of their common and City- specific transit goals. Participating in a future transit advisory committee, if formed for the area for one of the corridors, is one method that will increase the City’s voice on transit coverage and improvements. Another method for active City participation could include leading or assisting in more detailed studies of proposed transit improvements, such as expansion of the City’s current park-and-ride or providing transit facilities like a shelter. 40 TRANSPORTATION ffi DRAFT 5ffi24ffi2018 City of Lake Elmo Comprehensive Plan 2040 Long Unnamed Unnamed Unnamed Park Nursery Pond Long Klawitter PondUnnamed Unnamed Unnamed DeMontreville Unnamed UnnamedClear Cloverdale Unnamed Unnamed Jane Unnamed (Goetschel)Dirk's Pond UnnamedUnnamed Deer Pond Berschen's Pond Unnamed Sunfish Unnamed Unnamed Friedrich Pond Elmo Unnamed Legion Pond Unnamed Eagle Point DownsUnnamedUnnamed Unnamed Unnamed Unnamed Horseshoe H.J. Brown Pond Armstrong Goose Rose Unnamed Unnamed Kramer Unnamed Markgrafs Olson Unnamed Unnamed 60TH ST N 10TH ST N S T I L L W A T E R B L V D N 30TH ST N KEATS AVE N 50TH S T N M ANNING AVE N 47TH ST N 34TH ST N L A K E J A N E T R L N 4 5 T H ST N INWOOD AVE N LAKEELMO AVE N F00.6 1.2 1.80.3 MilesRBTN Corridors Tier 2 Alignment Trails Classification On Road Striped Shoulder Road Separated Trail Sidewalk Figure 7-6: Regional Bicycle Transportation Network & Local Trail Designations Source: MnGEO, Metropolitan Council, Washington County, City of Lake Elmo, SHC, Focus Engineering Figure 7-7. Regional Bicycle Transportation Network and Local Trail Designation 41 TRANSPORTATION ffi DRAFT 5ffi24ffi2018 City of Lake Elmo Comprehensive Plan 2040 BIKEWAY & TRAIL SYSTEM The City’s bikeway and trail system plays a role in the Parks, Trails, and Open Space system planning as well as contributes to the City’s transportation system. Trails and bikeways have the unique opportunity to do ‘double duty’, that is to say they can provide not only recreational opportunities, but can also serve as a transportation mode choice provided the system is well connected and planned for. This section addresses the City’s bikeway and trail system from a transportation perspective, and while it repeats or restates some of the information contained in Chapter 6, the purpose of this section is to identify how the system will be planned for and contribute to the City’s comprehensive transportation system as the community continues to grow and evolve. As indicated in Chapter 6, the City’s Comprehensive Trail Master Plan was created and adopted in 2005. While many of the components of the Trail Master Plan (hereafter referred to as the Trail System Plan) should be updated to reflect current and projected development trends, some of the principles contained within the plan continue to be relevant. For example, the 2005 Trail System Plan was developed with the objective of providing a connected network of trails that would created increased accessibility to key destinations within the community. That objective continues to be valid but has now expanded to consider how the system could provide connections to local destinations, and also how the system could provide connections to the larger region. The City and the transportation system benefit from a trail network through its currently designated recreation and commuter routes. Recreation trails are generally considered an amenity, positively affect the City’s image, and in some cases provide connections to the regional and city trail network. Commuter routes link destinations and provide an additional mode option to vehicular travel. Recognizing the limitations of seasonality in our climate, these routes provide connections for pedestrians and non-motorized vehicles between parks and open spaces, neighborhoods and developments, adjacent cities, and regional trails. A properly designed trail system will help to reduce reliance on automobiles and the volume of auto traffic on the City roadways provided a complete, and comprehensive, system is developed. 42 TRANSPORTATION ffi DRAFT 5ffi24ffi2018 City of Lake Elmo Comprehensive Plan 2040 Existing Trail Network Currently, on- and off-road trails, dedicated bicycle lanes, and private trails are provided within the City. The City will need to focus on connecting recreational trails and linking specific destinations to create an adequate commuter trail system. Providing designated trail links between the schools, the Village area, and other key residential and business areas will improve safety for pedestrians and bicyclists. Planning for some destinations has already occurred through the Lake Elmo Elementary School 2008 Safe Routes to School Plan. However, today in 2018, the issue of safe pedestrian and bicycle access continues to be a discussion topic since crossing of CSAH 14 continues to be challenging at best. Through this planning process, several residents continued to communicate a desire for improved trail connections and access that would be safer, and easier to navigate. Essentially, the community is interested in developing a complete trail network that is safe and has easy to follow wayfinding within the system. Regional Bicycle Transportation Network, Bikeways and Trails As part of this Comprehensive Plan update, the Metropolitan Council introduced the concept of planning for the Regional Bicycle Transportation Network (RBTN). The plan suggests that communities look at their existing trail and bikeway network and identify interregional opportunities to connect the system and to create transportation mode choice not only for recreational opportunities, but for overall transportation choice. Figure 7-7 identifies the Metropolitan Council’s RBTN planning corridors in the City, and the City’s existing trails – or designated routes – are identified on the figure to demonstrate how existing routes support the plan for RBTN. As shown on the trail figures contained in Chapter 6, the City is interested in the opportunity to convert some of the currently designated ‘on-road shoulder striped’ bikeways to be either dedicated bike lanes or road-separated trails to improve safety and to benefit trail/ bike user wayfinding. These improvements are largely identified on County roadways, which align with the RBTN alignments, so the City will need to work with Washington County when improvements are scheduled or planned to help bring these plans to fruition. 43 TRANSPORTATION ffi DRAFT 5ffi24ffi2018 City of Lake Elmo Comprehensive Plan 2040 As the system continues to grow, and key gaps and links are made, their use will likely increase as residents’ and others’ comfort level with the system improves. Focusing on public pedestrian/ bicycle trail planning and development compliments both the private trail development in several Open Space Development neighborhoods and the ‘central place’ philosophy, policy, and planning of the City regarding the Old Village. Generally, the City has been and will continue to be focused on creating a multi-purpose, connected and comprehensive trail network in the community that provides recreational opportunities as well as transportation mode choice. The City’s Park Commission has established the following vision for the system in the 2005 Trail System Plan, and it continues to be appropriate today: “The City will develop a safe, convenient and integrated system of trails linking neighborhoods, schools, the “Old Village,” and parks that will focus on the natural resources and character of Lake Elmo and help safely meet the recreation, health/fitness, and transportation needs of its residents.” 44 TRANSPORTATION ffi DRAFT 5ffi24ffi2018 City of Lake Elmo Comprehensive Plan 2040 FREIGHT Trucking The movement of goods and services throughout Washington County is conducted through various modes of transportation including commercial trucking. Many of the County’s roads are designated truck routes, that are designed and constructed to accommodate and support the transport of freight by truck. Figure 7-8 identifies 2016 Heavy Commercial AADT on roads adjacent to, or within the City of Lake Elmo. 45 TRANSPORTATION ffi DRAFT 5ffi24ffi2018 City of Lake Elmo Comprehensive Plan 2040 Long Unnamed Unnamed Unnamed Park Nursery Pond Long Klawitter PondUnnamed Unnamed Unnamed DeMontreville Unnamed UnnamedClear Cloverdale Unnamed Unnamed Jane Unnamed (Goetschel)Dirk's Pond UnnamedUnnamed Deer Pond Berschen's Pond Unnamed Sunfish Unnamed Unnamed Friedrich Pond Elmo Unnamed Legion Pond Unnamed Eagle Point DownsUnnamedUnnamed Unnamed Unnamed Unnamed Horseshoe H.J. Brown Pond Armstrong Goose Rose Unnamed Unnamed Kramer Unnamed Markgrafs Olson Unnamed Unnamed 60TH ST N 10TH ST N S T I L L W A T E R B L V D N 30TH ST N KEATS AVE N 50TH ST N M ANNING AVE N 47TH S T N 34TH ST N L A K E J A N E T R L N 4 5 T H ST N INWOOD AVE N LAKE ELMO AVE N 810 550 9 8 0 680 2850 4650 16 50 480 2 0 0 0 690 5000 10000 3 4 0 550 11000 10500 4 8 5 0 6 5 0 0 29 5 1800 F00.6 1.2 1.80.3 Miles2016 HCAADT Figure 7-7: Heavy Commercial/Freight Source: MnGEO, Metropolitan Council, Washington County, City of Lake Elmo, SHC, Focus Engineering DRAFTFigure 7-8. Heavy Commercial / Freight 46 TRANSPORTATION ffi DRAFT 5ffi24ffi2018 City of Lake Elmo Comprehensive Plan 2040 RAIL Existing Characteristics There is one active railway in Lake Elmo, owned by Union Pacific Railroad Company. This east- west rail line travels through the middle of the City, generally adjacent to 34th Street/Stillwater Boulevard (CSAH 14). According to current Mn/DOT records, the track shows an average of four trains per day with a top speed of 40 mph. This is in conflict with information from Union Pacific, which states an average use of five trains per day at 30 mph. Additional information from Union Pacific indicates two of these trains operate at night. There are four public at-grade crossings in the City, located at the crossings of 31st Street, Klondike Avenue, Lake Elmo Avenue (CSAH 17), and Manning Avenue (CSAH 15). The Lake Elmo Avenue (CSAH 17) and Manning Avenue (CSAH 15) crossings have flashing lights and warning bells for oncoming trains. The other two public at- grade crossings are under stop sign control. In addition to these public at- grade crossings, there are several private at-grade crossings. In general, these private crossings are controlled with stop signs. Safety Crossing of the railway should only occur at those marked locations. Crossing at unauthorized locations is illegal and dangerous. A fully loaded train moving at 40 mph can take close to a mile or more to come to a complete stop. When the train engineer sees something on the track, such as a vehicle or pedestrian, it is often too late to stop the train. Because of this and as required by law, all other modes of traffic must yield to trains at the crossing locations, including emergency services, bicycles, and pedestrians. Depending upon the speed and length of the train, stopping for a train can add noticeable delay to a trip. The size of a train also leads to a perception of a slower traveling speed. Combining this perception with the potential delay, motorists or others may attempt to ‘beat’ the train creating a significant safety risk. To date, the risk has not translated into a problem. Mn/DOT crash records did not show any vehicle-train crashes in the years 1998 through 2007. However, the Federal Railroad Administration (FRA) did provide records for one crash at the Lake Elmo Avenue (CSAH 17) crossing. From FRA records, a single vehicle crashed into a train at this location in 2007. The crash caused property damage only with neither the vehicle driver nor train personnel injured. 47 TRANSPORTATION ffi DRAFT 5ffi24ffi2018 City of Lake Elmo Comprehensive Plan 2040 Rail Planning A public at-grade crossing is planned in the Village area, to the east of the Village center. The crossing location, while not yet in place, has been determined by the Easton Village residential housing development which has been preliminary platted, and with this Plat the alignment of Village Parkway has been established from 30th Street to the UPRR. At the time of the crossing construction it is expected that the existing private crossing will be closed. The number of trains may increase on the Union Pacific line whether through a general increase in freight deliveries or a possible commuter rail, as described in the Transit Section. This rail line is part of a primary route between the Twin Cities and Chicago as well as through Milwaukee. The connection of these major cities creates the potential for increased rail traffic at any time. Projected traffic volumes show motorized traffic increasing around the rail corridor. Non- motorized traffic is also expected to increase in the area and at rail crossings. As these volumes increase into the future, potential delays at the crossings will increase and the potential safety issues subsequently increase. Consideration of safety and the crossing locations is particularly important for the higher density expected in the Village Area as well as its planned new public at-grade crossing. To combat the increase in potential risk, the City will work to improve conditions through: • Providing education focused on safe driving, biking, and walking behaviors at crossing locations. • Closing private crossings when feasible and when development or redevelopment occurs. • Upgrading existing crossings to include lights and warning bells, or improve to full lights and guard arms. • Including safety components in any new at-grade crossing. 48 TRANSPORTATION ffi DRAFT 5ffi24ffi2018 City of Lake Elmo Comprehensive Plan 2040 Ultimately, all users of the transportation network may benefit from grade-separated crossings at one or more of the public locations. Grade- separated crossings physically separate the trains from other modes of travel. The City will need to work with the other agencies and the railroad as opportunities arise and traffic volumes increase into the future. When opportunities arise, the City will work with other agencies or organizations to provide rail crossing information and safety tips. Quiet Zones are another option to consider for the railroad crossings. The term “Quiet Zone” pertains to a single highway/railroad at-grade crossing or a consecutive stretch of highway/ railroad at-grade crossings (rail corridor) in which a train engineer, under normal conditions, is ordered not to blow the train horn while approaching the crossing. From the community’s point of view, the result can be improved living conditions as loud train horns are silenced. From the railroad’s perspective, a warning and safety device, the loud train horn, has been silenced. The City will consider the potential safety implications, monetary cost, community benefits, and other factors before implementing a Quiet Zone. The City will also work with other agencies and the railroad in determining the need/desire for a Quiet Zone and/or implementing the Quiet Zone. 49 TRANSPORTATION ffi DRAFT 5ffi24ffi2018 City of Lake Elmo Comprehensive Plan 2040 AVIATION While Lake Elmo does not directly host an airport, the Lake Elmo Airport is located in Baytown Township adjacent to the City’s eastern border. The runways of the airport are oriented such that aviation safety and clear zones extend into the City. With airport approach patterns stretching over Lake Elmo, residents and businesses of the community are impacted by airport operations and the policies and planning of the Metropolitan Airports Commission (MAC). Located on approximately 640 acres of land, this airport first opened in 1951 and is one of seven airports in the region owned and operated by the MAC. During its time in operation, the Lake Elmo Airport has existed as a General Aviation “good neighbor” to the City. To ensure the continuance of this “good neighbor” environment, elected and appointed City officials regularly monitor the activities of the MAC in their efforts to manage and plan for this airport. The most recent long-term comprehensive plan for the Lake Elmo Airport was prepared by the MAC in 2016. A summary of The Lake Elmo Airport 2035 Long-Term Comprehensive Plan (LTCP) information is provided as follows. Some text is taken directly from the LTCP for reference in this Plan chapter. Existing Conditions & Issues The current definition or classification of the Lake Elmo Airport depends upon the agency. Four agencies (MAC, FAA, MnDOT, and Metropolitan Council) each classify this airport in their terms, which are provided below. While differing in language, the common theme for classification is general aviation activity focused on personal or recreational use with minor business use. • The MAC considers the Lake Elmo Airport as a “complimentary reliever,” serving as a recreation use airport. • The Federal Aviation Administration (FAA) National Plan of Integrated Airport Systems (NPIAS) identifies airports that are significant to national air transportation with both a Service Level and Asset Role for each airport. The Service Level describes the type of service the airport currently provides to the community, and the Asset Role is assigned using operational categories developed in the ASSET 1 report. In the 2015-2019 NPIAS, the FAA classifies Lake Elmo Airport as follows: 50 TRANSPORTATION ffi DRAFT 5ffi24ffi2018 City of Lake Elmo Comprehensive Plan 2040 »Service Level: Reliever. The FAA has encouraged the development of high-capacity general aviation airports in major metropolitan areas. These specialized airports, called relievers, provide pilots with attractive alternatives to using congested hub airports. They also provide general aviation access to the surrounding area. To be eligible for reliever designation, these airports must be open to the public, have 100 or more based aircraft, or have 25,000 annual itinerant operations. Lake Elmo Airport qualifies as a reliever on the basis of having over 100 based aircraft. »Asset Role: Local. Local airports supplement communities by providing access primarily to intrastate and some interstate markets. These airports accommodate small businesses, flight training, emergency service, charter passenger service, cargo operations, and personal flying activities. They typically accommodate smaller general aviation aircraft, mostly single-engine and some multi-engine propeller aircraft. The Minnesota Department of Transportation (MnDOT) classifies the Lake Elmo Airport as an Intermediate System Airport, suggesting a paved lighted runway of up to 5,000 feet and capable of accommodating all single engine and most twin engine aircraft as well as some light jet aircraft. According to the latest Minnesota State Aviation System Plan (SASP) published in 2013 by, Lake Elmo Airport is identified by MnDOT as one of the state’s intermediate airports potentially needing a runway extension based on the operational requirements of the airport’s critical aircraft. The Metropolitan Council considers the Lake Elmo Airport a Minor Airport, meaning a primary runway length between 2,500 and 5,000 feet with either precision or non-precision approach and accommodating personal use and recreation aircraft, business general aviation and air taxi traffic, flight training, and military operations. Based on the most recent study in 2014, Lake Elmo Airport has just over 200 based aircraft and accommodates approximately 26,000 total annual aircraft operations. It has two paved runways. The primary runway (Runway 14-32) is 2,849 feet long by 75 feet wide and is lighted with Medium Intensity Runway Edge Lights, end identifier lights, and precision approach path indicators. The crosswind runway (Runway 04-22) is 2,496 feet long by 75 feet wide and is not lighted. It should be noted with regard to aviation outside of Lake Elmo Airport that seaplanes are currently permitted to operate on Lake Elmo within the City and must follow guidelines set forth in Minnesota Rules 8800.2800. 51 TRANSPORTATION ffi DRAFT 5ffi24ffi2018 City of Lake Elmo Comprehensive Plan 2040 Identified Issues Previous reports indicated several deficiencies of the airport, including lack of a weather station. Since then, an automated weather system has been added. Other issues noted included: • The runways are the shortest of the area’s reliever airports • The registered aircraft is almost up to the capacity of the hanger areas. • The airport is currently using wells and septic systems rather than sanitary sewer and water facilities. Runway Protection Zones and State Safety Zones extend into the City. These areas restrict land use off runway ends to help ensure the safety of people and property on the ground. The dimensions of Runway Protection Zones are based upon the aircraft approach category and runway approach visibility minimums. The runways at the Lake Elmo Airport require a Runway Protection Zone in a trapezoid area extending beyond the end of a runway and intended to be clear of structures and places of public assembly in order to enhance safety for those operating at the airport and for people on the ground. The FAA’s updated RPZ guidance, issued in 2012, clarifies and tightens up the policy on what constitutes an incompatible land use in an RPZ, now defined to include public roadways and railroads. The FAA also clarified the process to evaluate proposed land uses that would be introduced into an RPZ based upon a triggering action. A triggering action could be an airfield project, an off-airport development proposal, or an operational change at the airport. Based on FAA guidelines, Mn/DOT has further designated land use safety zones and other Airport Zoning Standards, as established in the Minnesota Rules Chapter 8800.2400. Minimum Standard Zones are; Safety Zone A, Safety Zone B, and Safety Zone C. These zones are intended to restrict land uses that may be hazardous to the operational safety of aircraft using the airport and to protect the safety and property of people on the ground in the area near the airport. Details for restrictions within these zones can be found online at https://www.revisor.mn.gov/ rules/?id=8800.2400. Another restriction to development around airports is noise or Day-Night Average Sound Level (DNL). The FAA requires the DNL noise metric to determine and analyze noise exposure and aid in the determination of aircraft noise and land use compatibility issues. The MAC suggests that the 60 DNL contour be used for planning purposes inside the Metropolitan Urban Service Area (MUSA). Since much of Lake Elmo is not within the MUSA, the planning also includes the 55 DNL. More information regarding the location of the Runway Protection Zones, Safety 52 TRANSPORTATION ffi DRAFT 5ffi24ffi2018 City of Lake Elmo Comprehensive Plan 2040 Zones, and DNL contour impact areas, including graphics, can be found in the MAC’s LTCP for the Lake Elmo Airport. Finally, Federal Regulation Title 14 Part 77 establishes standards and notification requirements for objects affecting navigable airspace. Each sponsor who proposes certain types of construction or alteration, which includes buildings/structures and roadways, shall notify the FAA. This notification allows the FAA to identify potential aeronautical hazards in advance to prevent or minimize adverse impacts to the safe and efficient use of navigable airspace. Once notified, the FAA will conduct an aeronautical study to determine the impact to air navigation. One of three responses is then typically issued: • No Objection - subject construction did not exceed obstruction standards and marking/lighting is not required. • Conditional Determination - proposed construction/alteration would be acceptable contingent upon implementing mitigating measures (Marking & Lighting, etc.). • Objectionable - proposed construction/alteration is determined to be a hazard and is thus objectionable. Source: Federal Aviation Regulations Part 77: Objects Affecting Navigable Airspace The FAA’s Form 7460-1, Notice of Proposed Construction or Alteration, can be found through this link to the FAA’s website: http://forms.faa.gov/forms/faa7460-1.pdf Recent Airport Improvements The following facility improvements have been completed at Lake Elmo Airport since the completion of the previous LTCP in 2006: • Installation of an Automated Weather Observation System (AWOS) by MnDOT in 2008 • Rehabilitation of Runway 14-32 taxiway connectors in 2008 • Reconstruction of the apron/run-up area in front of the MAC Maintenance Building, replacement of the pavement on the main entrance road, and airfield crack repairs in 2009 • Reconstruction of the center 40-feet of Runway 14-32 in 2012 • Rehabilitation of portions of Runway 04-22 and its parallel taxiway in 2013 53 TRANSPORTATION ffi DRAFT 5ffi24ffi2018 City of Lake Elmo Comprehensive Plan 2040 • Reconstruction and widening of portions of Runway 04-22 parallel taxiway and north building area alleyway pavement rehabilitation in 2015 All of the airfield areas at Lake Elmo Airport are asphalt, but they vary in pavement age, thickness, and structural section. Runway 14-32 and the associated taxiways were originally constructed in 1951. Runway 04-22 and its parallel taxiway were built in 1967. The north side taxiway was partially constructed in 1981 and was extended to its current length in 1992. Over time, pavement overlays, rehabilitation, reconstruction and/or crack repair methods have changed the characteristics of the pavement from section to section. The Airport Pavement Management Program for the MAC Relievers has included periodic pavement condition inspections, most recently in 2013. The inspections were completed in accordance with FAA guidelines and utilized the Pavement Condition Index (PCI) Method. Existing landside facilities, including the existing number of aircraft storage hangars, appear to be adequate to support anticipated levels for both based aircraft and total operations. No new hangar development areas are proposed, although areas to accommodate the construction of additional hangars should be preserved in the LTCP. Airport Planning One of the most significant challenges facing airports today is the presence of incompatible land use, either adjacent to the airport or in runway flight paths. Working closely with municipal officials, airport users, developers, and any nearby residents, airports can reduce these types of conflicts through the use of zoning regulations that disallow certain types of nearby development. Lake Elmo Airport is located in Baytown Township with the City of Lake Elmo adjacent and directly west and West Lakeland Township adjacent and directly south of the airport property. All of these areas are located in Washington County. Washington County has adopted an overlay district for Lake Elmo Airport to control the type and extent of land development adjacent to and near the airport. The City of Lake Elmo does not have its own airport overlay district. As the Lake Elmo Airport is not located within the City limits, it is primarily the Runway Protection Zones, Safety Zones, and noise restriction guidelines that affect land use planning within the City. Currently, land use around the airport is used or planned for Agricultural, Open Space, or Single Family Detached. In general, the surrounding 54 TRANSPORTATION ffi DRAFT 5ffi24ffi2018 City of Lake Elmo Comprehensive Plan 2040 land uses are compatible with the airport. New residential development in recent years is getting closer to the airport property. Approximately 320 single-family residential homes at a density of approximately 2 to 2.5 units per acre are built or under construction in the residential developments known as the Easton Village and Village Park Preserve, which include a new north-south minor connector road between 30th Street North and 40th Street North and several stormwater detention ponds. MAC staff reviewed the plans for these developments and provided comments to the City of Lake Elmo emphasizing the potential for aircraft overflights and noise, along with items related to the design of the stormwater ponds and landscaping. Airport Forecasts & Proposed Development Forecasts were completed for airport operations and based aircraft in the LTCP. The base year is 2012 and forecasts were prepared for 2015, 2020, 2025, 2030, and 2035. The forecasts for the airport are unconstrained, except for runway length and assume that the necessary facilities will be in place to accommodate demand. Operations at Lake Elmo Airport are projected to decrease slightly from 26,709 in 2012 to 26,138 in 2035 in the Base Case, an average annual decrease of approximately 0.1 percent. A relocated and longer primary runway is proposed at the Lake Elmo Airport for several reasons: • The existing 2,850-foot primary runway pavement is in need of full reconstruction. • The runway must be lengthened in order to meet FAA criteria for runway length for the type of aircraft using the runway today. • Obstructions on either end of the existing runway make it infeasible to extend the runway in its current location. • The runway must be relocated in order to best achieve FAA-compliant runway protection zones (RPZs). • The FAA has indicated that they will require MAC to purchase the private property within the existing RPZ on the west side of Manning Avenue as a condition of receiving grant funding to reconstruct the existing runway in its current configuration. • The proposed project will achieve the objectives of enhancing safety and improving operational capabilities for the design aircraft family. 55 TRANSPORTATION ffi DRAFT 5ffi24ffi2018 City of Lake Elmo Comprehensive Plan 2040 Four development alternatives were initially evaluated in the Alternatives Analysis developed for the Draft 2035 LTCP. The Final LTCP Preferred Development Alternative plan includes extending the primary runway to 3,600 feet. The plan proposes the following improvements over the next 20-year planning period: • Relocate primary Runway 14-32 by shifting the centerline 615 feet to the northeast and extend it to a length of 3,500 feet, including all necessary grading and clearing • Realign 30th Street N around the new Runway 32 end RPZ and reconnect to the existing intersection with Neal Avenue • Construct a new cross-field taxiway to serve the new Runway 14 end, including taxiway lighting and/or reflectors • Convert existing Runway 14-32 into a partial parallel taxiway and construct additional taxiway infrastructure as needed to support the relocated runway, including taxiway lighting and/or reflectors • Reconstruct existing crosswind Runway 04-22 and extend it to 2,750 feet as recommended in the facility requirements section, including runway lighting, Precision Approach Path Indicator (PAPI) systems, and a new taxiway connector • Pursue the establishment of a new non-precision instrument approach to the Runway 14 end, and upgrade the existing Runway 04 approach to an RNAV (GPS) type • Using the projections for the airport, noting the existing deficiencies, and in consideration of several concepts, costs, benefits, and negative issues, the long-term plan recommended a preferred alternative for future development of the Lake Elmo Airport. Table 11 below provides the summary of the recommendations and the timeline for these changes. 56 TRANSPORTATION ffi DRAFT 5ffi24ffi2018 City of Lake Elmo Comprehensive Plan 2040 One of the goals for the 2035 LTCP is to comply with the FAA’s airport design standards, so achieving RPZ compliance in the recommended future condition is a high priority. With the preferred development concept, all RPZs will be contained on property the MAC already owns and be clear of any non-compliant land uses. The MAC would no longer need to acquire private property, and the County roadway project would not be subject to an FAA runway protection zone evaluation and approval process. In general, the preferred alternative for the Lake Elmo Airport does not change its impact on the City of Lake Elmo. The location of the Runway Protection Zones, Safety Zones, and DNL contour impact areas within the City remain the same. Land use compatibility is therefore expected to remain consistent. For the crosswind runway, areas within the protection and noise contour impact areas are primarily developed. Very limited development, if any, is expected in this area in the future. For the primary runway, the future development impacts will affect a part of the Village Area. Development scenarios for the Village Area maintain a greenbelt/buffer along Manning Avenue (CSAH 15) specifically to provide a buffer to the airport. The development scenarios do include residential uses within the safety zones and noise contour impact areas. These future residential developments located within the safety zones and noise contour impact areas are subject to development restrictions established by state statute and the City. The City will continue to work with a Joint Airport Zoning Board to minimize land use compatibility issues and implement an airport zoning ordinance. 57 TRANSPORTATION ffi DRAFT 5ffi24ffi2018 City of Lake Elmo Comprehensive Plan 2040 Amphibian and Float-Equipped Plane Operations Seaplanes are allowed to operate on several lakes within the metro area. When lakes are frozen, aircraft equipped with either wheels or skis may operate on the lakes if such operations can be conducted in a safe and reasonable manner relative to lake traffic and use. These types of aircraft are under multiple Minnesota State Statutes to guide their operation and promote safety. These Statutes include: • Minnesota Rules 8800.2600, Compliance with Marine Traffic Rules: All seaplanes must comply with marine traffic rules to the extent that such rules do not interfere with the safe operation of aircraft. • Minnesota Rules 8800.2700, Approaches and Takeoffs: All approaches to and takeoffs from the water area shall be made in such a manner as to clear all structures on the lane by at least 100 feet, and wherever the area of body of water will permit, such landing and takeoffs shall be made at a distance of not less than 300 feet, both laterally and vertically, from any boat or person on the surface of the water, or as near to 300 feet as the area of water will permit. • Minnesota Rules 8800.2800; Seaplanes operations are permitted only on the following public waters within Washington County - Big Carnelian Lake, Big Marine Lake, Clear Lake, Forest Lake, Lake Elmo, Mississippi River, Oneka Lake, and St. Croix River. Seaplane operations are prohibited on all other public waters within Washington County. In addition, the Minnesota Department of Natural Resources and the Federal Government have restrictions and guidelines on seaplanes that may affect their operations within the City of Lake Elmo. The Mn/DOT Office of Aeronautics and Aviation should be consulted for more details on the rules and guidelines regarding these types of aircraft. Information regarding this type of plane activity on the allowed lakes is not available. As such, projections of usage on the lakes for these types of aircraft are not available either. In any case, the City is committed to safe and lawful plane activity on its lakes. 58 TRANSPORTATION ffi DRAFT 5ffi24ffi2018 City of Lake Elmo Comprehensive Plan 2040 TRANSPORTATION IMPLEMENTATION PROGRAM The following program will be implemented in order to ensure that the City’s Transportation goals and policies are met. • The City will continue to advocate for a transportation network that coincides with the overall goals of the City; safety, multi-modal, and preserving the rural character. • The City will continue to work with surrounding Cities, Washington County, the Minnesota Department of Transportation, and other government agencies in development of a transportation network consistent with the goals and policies of this plan. • The City will work with developers for improvements to the transportation network that will serve its goals and strategies. A specific example is the creation of a Minor Collector road between 10th Street (CSAH 10) and Hudson Boulevard (I-94 frontage road). This new roadway would reduce traffic volumes on 10th Street (CSAH 10) and Hudson Boulevard (I-94 frontage road), eliminating the need for four-lane facilities. • The City will participate in coalitions and multi-jurisdictional efforts for improvements to the transportation network that coincide with the overall goals of the City. This could include corridor studies/groups, transit oversight panels, and/or construction projects. • The City will continue to improve the transportation network to reflect all modes of travel. • The City is supportive of the four major focus areas in pursuit of safety improvements: Education, Enforcement, Engineering, and Emergency Medical Services. Combination of these focus areas result in better solutions to targeted or general safety issues. Of particular concern are the areas around schools and keeping students safe. Applying these major focus areas towards the school areas is encouraged and expected. • The City will continue to pursue a TH 36 access and connectivity plan to provide a safe and adequate service to residents of Lake Elmo while minimizing traffic by-passing through the city. The City will work with the County and the State on the ultimate plan for TH 36, including its connections to the City. 59 TRANSPORTATION ffi DRAFT 5ffi24ffi2018 City of Lake Elmo Comprehensive Plan 2040 • The City supports improvements that will eliminate the need for a four-lane facility on Stillwater Boulevard (CSAH 14). Examples of improvements could include one or more of the following: upgrade TH 36 to “freeway” status, upgrade of Manning Avenue (CSAH 15) to a four-lane facility, reconfiguration of the Stillwater Boulevard (CSAH 14)/Manning Avenue (CSAH 15) intersection with the 40th Street (CSAH 14)/Manning Avenue (CSAH 15) intersection to create a single four-legged intersection, access management, alternative intersection control, expanded transit opportunities, and expanded trail system. These options could allow for more extensive landscaping and streetscaping on Stillwater Boulevard (CSAH 14), consistent with its expected redevelopment. • The City will continue to support improvements that will maintain the rural character of Lake Elmo Avenue, in particular along the eastern shoreline of Lake Elmo. • The City will update and refine their Capital Improvement Plan to be consistent with the goals and strategies described in this plan. Capital Improvement Plan The Capital Improvements Plan (CIP) is the financial planning mechanism used by communities to plan for long-term major expenditures. Lake Elmo adopts a 5-year CIP annually. Each year is it reviewed and revised as priorities change. The upcoming year of the CIP is used to aid in the annual budgeting process. Each year the City adopts an annual budget. Expenditures are made in accordance with this budget for the following year. The Comprehensive Plan sets forth overall direction for the City; the 5-year CIP and annual budget implements the goals and policies contained within it. Each year, every item in the CIP should be evaluated in relation to the goals, policies, and general direction of the Comprehensive Plan. This allows spending decisions to be made within the overall context and future plan for the City. It is important that the financial tools implement the intent of the Comprehensive Plan. 60 TRANSPORTATION ffi DRAFT 5ffi24ffi2018 City of Lake Elmo Comprehensive Plan 2040 TRANSPORTATION APPENDIX : 2040 TAZ 62 TRANSPORTATION ffi DRAFT 5ffi24ffi2018 City of Lake Elmo Comprehensive Plan 2040 63 TRANSPORTATION ffi DRAFT 5ffi24ffi2018 City of Lake Elmo Comprehensive Plan 2040 Re g i o n a l Mo d e l Wa s h . C o . Mo d e l 20 2 0 2 0 3 0 ( a ) N E W 2 0 4 0 20 2 0 2 0 3 0 ( a ) N E W 2 0 4 0 20 2 0 2 0 3 0 ( a ) N E W 2 0 4 0 20 2 0 2 0 3 0 ( a ) N E W 2 0 4 0 20 2 0 2 0 3 0 ( a ) N E W 2 0 4 0 23 4 9 1 5 7 4 2 3 4 2 3 4 2 3 1 7 3 1 8 0 1 9 2 00 0 0 0 1 2 0 0 1 2 23 5 0 1 5 8 6 4 1 5 6 3 5 6 3 2 5 6 2 5 6 2 5 6 00 0 3 0 6 1 3 0 6 1 23 5 0 1 5 9 8 2 0 7 5 0 6 6 4 2 5 3 2 7 7 3 0 2 0 0 0 1 7 0 5 5 0 1 7 0 5 5 0 23 5 1 1 6 0 5 9 6 4 7 5 4 4 0 1 9 8 2 0 0 2 0 3 00 0 0 0 0 0 0 0 23 5 2 1 6 1 5 8 0 3 9 8 3 0 8 1 9 3 1 9 3 1 9 3 0 0 0 1 9 0 0 1 9 0 0 23 5 2 1 6 2 25 5 2 5 8 4 7 1 2 1 6 7 3 2 1 00 0 0 0 0 0 0 0 23 5 3 1 6 3 1 5 2 1 3 5 1 1 8 5 1 5 2 5 4 0 0 0 1 4 9 9 3 1 4 9 9 3 23 5 4 1 6 4 8 4 3 1 , 0 0 0 1 , 1 3 5 1 5 4 4 0 0 4 2 3 7 1 2 0 0 2 2 3 3 4 9 3 1 7 3 0 0 4 2 0 5 1 7 5 2 3 23 5 4 1 6 5 58 6 0 6 6 1 6 3 0 3 0 0 0 0 1 0 0 0 1 0 0 0 23 5 5 1 6 6 4 0 6 6 2 0 8 2 5 1 0 9 1 4 2 1 5 0 00 0 0 0 0 0 0 0 23 5 5 1 6 7 46 5 0 6 4 1 2 3 0 2 9 00 0 0 0 0 0 0 0 23 5 5 1 6 9 3 5 6 3 0 6 2 5 6 8 5 1 0 0 1 1 6 0 0 0 0 5 1 9 6 0 5 1 9 6 23 8 7 2 3 7 51 4 4 7 8 4 3 2 4 2 0 0 3 1 2 6 2 6 5 6 9 8 4 8 4 8 4 1 4 6 1 4 9 1 5 3 23 8 7 2 3 8 1 7 2 2 6 4 3 5 6 6 7 9 9 1 3 2 0 0 0 1 9 0 0 1 9 0 0 23 8 7 2 3 9 5 6 4 5 0 0 4 4 0 1 9 9 1 9 9 1 9 9 00 0 4 0 0 4 0 0 23 8 7 2 4 0 4 2 0 0 6 2 0 3 7 4 2 3 0 0 8 9 9 2 1 3 0 0 1 3 8 9 9 2 23 8 7 2 4 1 0 4 2 5 5 8 2 0 2 1 4 2 1 4 00 0 0 0 0 0 0 0 23 8 8 2 4 2 20 0 1 0 0 0 0 0 5 2 0 5 2 0 23 8 8 2 4 3 1 8 1 2 5 3 3 2 5 8 9 1 0 0 1 1 5 1 3 5 1 1 5 1 0 0 9 4 8 0 0 2 2 9 1 9 5 1 0 0 23 8 9 2 4 4 53 6 2 7 1 1 8 2 0 2 2 0 0 0 1 6 4 1 6 4 1 6 4 1 6 4 1 6 4 1 6 4 23 8 9 2 4 5 4 1 4 3 7 5 3 4 2 1 5 7 1 5 7 1 5 7 00 0 0 0 0 0 0 0 24 0 1 2 5 7 8 1 7 2 3 4 1 0 1 0 00 0 3 1 0 3 1 0 24 0 1 2 5 8 2 3 2 1 6 2 1 7 3 7 0 7 4 7 8 00 0 0 0 0 0 0 0 24 0 2 2 5 9 2 7 6 1 6 7 1 6 7 7 6 7 6 7 6 0 0 0 3 1 1 5 0 3 1 1 5 0 24 0 2 2 6 0 1 2 1 2 8 2 8 4 7 1 3 1 3 00 0 2 1 0 2 1 0 24 0 3 2 6 1 1 7 8 3 6 3 8 2 4 1 0 0 3 5 2 3 4 9 00 0 0 1 0 0 0 1 0 0 24 1 0 2 7 4 0 3 0 4 2 , 7 9 5 0 2 2 7 1 , 1 1 8 0 1 3 3 3 1 1 5 1 1 6 1 1 6 5 2 4 9 4 2 7 24 1 0 2 7 5 1 2 0 6 1 7 2 , 3 4 1 3 7 2 8 7 8 6 1 0 0 0 5 3 0 3 2 5 3 0 3 2 24 1 0 2 7 6 5 1 0 2 , 5 0 0 2 , 0 4 0 4 4 5 6 2 5 7 5 0 0 2 4 6 8 1 , 7 7 2 1 2 8 6 8 1 , 7 7 4 1 3 3 24 1 0 2 7 7 0 1 , 3 1 4 1 , 3 1 4 0 4 8 6 4 8 7 3 7 9 1 5 1 2 3 3 , 1 9 3 3 2 9 2 6 3 , 2 7 2 4 8 0 24 1 1 2 7 8 5 6 8 5 6 8 5 6 8 0 2 0 9 2 0 9 0 1 3 4 8 8 5 1 8 0 5 1 5 2 8 8 24 1 1 2 7 9 0 1 , 3 0 0 1 , 3 8 5 2 6 5 0 0 5 7 9 1 5 1 1 0 0 5 0 5 0 4 5 0 4 5 0 4 6 5 5 6 0 4 5 5 4 24 1 1 2 8 0 1 5 6 1 , 7 0 0 1 , 7 0 0 3 7 6 7 0 6 7 0 0 0 0 1 5 3 0 0 1 5 3 0 0 24 1 1 2 8 1 0 1 , 2 0 0 1, 3 1 0 0 5 5 4 8 5 2 4 4 2 1 2 5 3 1 7 2 5 8 0 0 19 6 1, 0 0 1 25 3 TO T A L S 8, 5 5 5 1 8 , 0 7 1 2 3 , 9 5 7 2 , 9 1 2 6 , 6 7 4 9 , 3 3 6 4 4 6 1 , 3 3 8 1 , 3 4 2 1 , 7 5 3 6 , 9 8 7 2 , 46 9 2 , 1 9 9 8 , 3 2 5 3 , 8 1 1 (a ) 2 0 3 0 c a l c u l a t i o n s p e r c u r r e n t T A Z b o u n d a r i e s a r e e s t i m a t e d ba s e d o n s t a g i n g p l a n . (b ) 2 0 3 0 c a l u c l a t i o n s h a v e b e e n a d j u s t e d b a s e d o n t h e r e v i s e d p op u l a t i o n s p r o j e c t i o n s a n d f u t u r e l a n d u s e p l a n c o n t a i n e d i n C h ap t e r 3 To t a l E m p l o y m e n t Tr a n s p o r t a t i o n A n a l y s i s Zo n e s Po p u l a t i o n Ho u s e h o l d s Re t a i l E m p l o y m e n t N o n - r e t a i l E m p l o y m e n t Transportation Analysis Zone Population, Household & Employment Projections DRAFT Chapter 8: Surface Water Management Protect, Preserve & Conserve Comprehensive Plan 2040 SURFACE WATER MANAGEMENT - DRAFT 5-25-2018 City of Lake Elmo Comprehensive Plan 2040 2 SURFACE WATER MANAGEMENT - DRAFT 5-25-2018 City of Lake Elmo Comprehensive Plan 2040 3 INTRODUCTION AND PURPOSE T he purpose of this chapter of the Lake Elmo 2040 Comprehensive Plan and the Lake Elmo Local Surface Water Management Plan (LSWMP) is to guide the City of Lake Elmo in conserving, protecting, and maintaining the quality of its surface waters, ground water, and natural resources. The City is generally positioned to follow water management strategies and regulations set forth by the governing watershed districts. According to the Metropolitan Surface Water Management Act of 1982, local units of government in the seven-county metro area prepare and implement comprehensive surface water management plans through membership in a watershed management organization (WMO) or a watershed district (WD). The primary goals of the Metropolitan Surface Water Management Act are to: • Protect, preserve, and use natural surface and groundwater storage and retention systems; • Minimize public capital expenditures needed to correct flooding and water quality problems; • Identify and plan for means to effectively protect and improve surface and groundwater quality; • Establish more uniform local policies and official controls for surface and groundwater management; • Prevent erosion of soil into surface water systems; • Promote groundwater recharge; • Protect and enhance fish and wildlife habitat and water recreational facilities; and • Secure the other benefits associated with the proper management of surface and groundwater. (Source MN Board of Water and Soil Resources, www.bwsr.mn.us) SURFACE WATER MANAGEMENT - DRAFT 5-25-2018 City of Lake Elmo Comprehensive Plan 2040 4 2040 Surface Water – What’s to Come »The City primarily partners with the local watershed management organizations to regulate and manage surface water resources in Lake Elmo. »Surface water management best practices will continue to be critical for maintaining and improving water quality for City residents. This Plan chapter therefore recognizes that the responsibility of water resource management is in the hands of numerous agencies and organizations each tasked with monitoring and planning for water resource management and environmental protection. It intends to meet the provisions of Minnesota Statutes §473.157 and §103B.235, Minnesota Rules 8410, and standards and requirements of the three watershed districts intersecting Lake Elmo municipal boundaries: Valley Branch, South Washington, and Brown’s Creek Watershed Districts. Lake Elmo’s LSWMP avoids duplicating efforts of others by adopting or referencing the standards and policies of the Brown’s Creek Watershed District (BCWD), Valley Branch Watershed District (VBWD), South Washington Watershed District (SWWD), Washington County, the Metropolitan Council, State of Minnesota Agencies such as the Minnesota Pollution Control Agency (MPCA), the Minnesota Department of Natural Resources (MnDNR), the Minnesota Department of Health (MDH), and the Board of Soil and Water Resources (BWSR), plus Federal Agencies, most notably the Environmental Protection Agency (EPA) where applicable. SURFACE WATER MANAGEMENT - DRAFT 5-25-2018 City of Lake Elmo Comprehensive Plan 2040 5 CITY OF LAKE ELMO LOCAL SURFACE WATER MANAGEMENT PLAN Plan Summary The City of Lake Elmo’s Local Surface Water Management Plan (LSWMP) together through its MS4 Permit implementation helps guide the protection and management of surface waters, ground water, and related natural resources in the City of Lake Elmo. The existing LSWMP was adopted in 2009 for a ten-year period and developed as a part of the City’s 2030 Comprehensive Plan to meet the requirements of the applicable State Statutes, the Metropolitan Council, and local Watershed Districts. The LSWMP will be updated as part of the implementation of the Lake Elmo 2040 Comprehensive Plan Update and to comply with current regulations and requirements of these organizations. While the City’s fully adopted LSWMP will be updated as an implementation step to this planning effort, where available, the relevant sections of this Chapter have been updated to reflect revised data and information available from the applicable agencies. Lake Elmo’s adopted LSWMP is divided into eight sections: 1. Purpose and Scope 2. Physical Setting 3. Regulatory Setting 4. Related Studies, Plans and Reports 5. Goals and Policies The City has land area that falls within three Watershed Districts - the Valley Branch Watershed District, South Washington Watershed District, and Brown’s Creek Watershed District. (See Map 8-1: Lake Elmo Watershed Districts.) The City concurs with the watershed management plans and standards adopted by these Districts. The current plans of these organizations were used to develop several sections of this Chapter, and updated information will be incorporated into the City’s revised LSWMP to include goals, policies, and implementation actions that address issues identified by the City and others. Approximately 10 percent of the City is covered by lakes and wetlands, and the City also possesses several creeks. Goals and policies indicate the Watershed Districts will continue to take the primary regulatory role in surface water management of these water features within Lake Elmo. Lake Elmo works collaboratively with the watershed districts for permitting development and redevelopment projects. The Watersheds will review project applications to ensure district storm water management requirements are being met with regards to rate control and volume control rules. Lake Elmo reviews the development and redevelopment projects to ensure quality infrastructure and that the storm water BMPs constructed to meet permit requirements, are 6. Assessment of Problems and Corrective Actions 7. Implementation 8. Administration SURFACE WATER MANAGEMENT - DRAFT 5-25-2018 City of Lake Elmo Comprehensive Plan 2040 6 constructed in accordance with the City Engineering Design Standards. Both the City and Watershed oversee development and redevelopment projects as they relate to erosion control site management. In addition, the City will continue to implement its adopted MS4 Permit and SWPPP to manage and maintain the surface waters and infrastructure in the City and educate its residents about the importance of protecting surface and ground water resources. The goals, policies, and implementation of the LSWMP note that the City will enforce its zoning and subdivision ordinances to assist in maintaining or improving the quality of surface and ground waters within Lake Elmo. More detail of the goals and policies are included later in this Chapter. The City will update its applicable codes to ensure they meet the requirements of the Metropolitan Council, are consistent with the Watershed Management Plans and standards, and conform with the Washington County Groundwater Plan. The City will continue to cooperate with local Watershed Districts, the Washington Conservation District, Washington County, its residents, and others to protect and enhance surface water, ground water, and related natural resources for current and future generations. 60TH ST N 10TH ST N LAKE ELMO AVE N INWOOD AVE N 50TH ST N S T I L L W A T E R B L V D N 34TH ST N L A K E JAN E TR L N MANNING AVE N KEATS AVE N 47TH ST N 30TH ST N 4 5 T H S T N IDEAL AVE N STILLWATER BLVD N 60TH ST N MANNING AVE N LAKE ELMO AVE N S T I L LW A T E R B L V D N 0 2,900 5,800 8,7001,450 Feet Date: 4/24/2017 Source: Metropolitan Council, MnGEO Prepared by: SHC [Watershed Management Organizations BROWNS CREEK SOUTH WASHINGTON COUNTY VALLEY BRANCH Map 8-1. Watershed Boundary Map SURFACE WATER MANAGEMENT - DRAFT 5-25-2018 City of Lake Elmo Comprehensive Plan 2040 7 Local Water Management Responsibilities and Related Agreements Each of the three watershed districts that intersect the city boundaries of Lake Elmo regulates potential development impacts to water resources within their respective district by managing permitting and providing comments on development proposals and other permit applications. The City of Lake Elmo also adopts the water management plans, rules, and standards of all three watershed districts by reference within its LSWMP and reaffirms it within this Plan chapter. The majority of the City is contained within the Valley Branch Watershed District (VBWD), and the VBWD serves as the local governmental unit (LGU) for the Wetland Conservation Act (WCA) for the City of Lake Elmo. The City is the LGU for the WCA within the Brown’s Creek Watershed District (BCWD) and the South Washington Watershed District (SWWD) areas, and portions of the City within the BCWD and SWWD are mostly developed. The City utilizes the services of the Washington Conservation District (WCD) in carrying out its responsibilities under WCA in BCWD and SWWD. The WCD provides services to administer WCA, including wetland determinations, review of wetland delineations and impact applications, recommendations to the City, preparation of notices of application or decisions, and other administrative tasks. The City of Lake Elmo also has an approved Municipal Stormwater (MS4) Permit from MPCA and storm water pollution preparation plan (SWPPP), for which it implements SWPPP requirements. Copies of these documents are included in the Appendix of the LSWMP. The City is otherwise responsible for construction and maintenance of all municipal storm water management infrastructure associated with City roads and rights- of-way. The City of Oakdale, the City of Lake Elmo, and the VBWD entered into a joint powers agreement for storm water management for the 3M property on the east and west sides of Ideal Avenue (in Lake Elmo and Oakdale, respectively). Discharge rates must be compliant with this agreement for any future development of this area. A copy of the agreement is included in the Appendix of the LSWMP. Plan Revisions and Amendment Procedures To keep current with local practices and policies and address unintended issues, the City may need to revise and update the adopted LSWMP. Written petitions from residents or business owners for LSWMP amendments must be submitted to the City Administrator stating the reason for the requested amendment and providing supporting information for the request. SURFACE WATER MANAGEMENT - DRAFT 5-25-2018 City of Lake Elmo Comprehensive Plan 2040 8 The City may reject the petition, delay action on the petition until the next full LSWMP revision/update, or accept the petition as an urgent issue that requires immediate LSWMP amendment. The City of Lake Elmo may also amend the LSWMP in response to City-identified needs. Any amendments made to the LSWMP must be submitted to the three Watershed Districts for review and approval before adoption by the City. The current LSWMP was adopted in 2009 and is intended to be in effect for 10 years. The City’s LSWMP was scheduled to be updated in 2019 as stated within the adopted LSWMP, and therefore is identified as an implementation step in this 2040 Comprehensive Plan. Much of the information contained within the adopted 2009 LSWMP will continue to be relevant and accurate since the City has adopted and incorporated by reference all three Watershed District’s rules and regulations, and the updates to the LSWMP are generally anticipated to include any additional information available from the Watershed Districts that was not available in the last planning period. SURFACE WATER MANAGEMENT - DRAFT 5-25-2018 City of Lake Elmo Comprehensive Plan 2040 9 PHYSICAL ENVIRONMENT AND LAND USE Existing Land Use and Physical Environment The City of Lake Elmo was established in 1969. Located in central Washington County on the east side of the seven-county metro area, land use in Lake Elmo reflects the City’s past commitment to the rural landscape and investment in development of primarily single-family detached housing. It now possesses a mix of low-density residential, parks and open space, pockets of agriculture, and scattered commercial uses. (See Map 3-1: Existing Land Use Map 2018) Between 1970 and 1980, Lake Elmo experienced a significant increase in the number of households (84%). Development slowed during the 1980s and 1990s (17 - 19% increases in households). Population was expected to grow significantly between 2010 and 2020, however, the great recession slowed the rate of development, and the expected population growth was less than forecasted in the City’s 2030 Comprehensive Plan. The physical environment of Lake Elmo is primarily a scenic rural landscape and the recreational lifestyle makes the community highly desirable to residents. Gently rolling land, wooded lots, and a series of lakes offer an appealing setting to residents. The City is home to four “priority lakes”, varying in size from 87 to 257 acres. Expanses of the natural landscape are protected in park lands, and pockets of property are protected for agricultural use through the agricultural preserve program. Many areas developed for residential land use are lower density or utilize conservation easements to protect the natural features that provide value to the area. Much of the City’s high quality natural areas and rare species are found within the Lake Elmo Regional Park Reserve. Topography and Geology Topography influences the direction and rate of runoff as it flows over land. Like most of Washington County, the topography of Lake Elmo was established during the late Wisconsinan glaciation when the glacier retreated leaving behind topographic lows and bedrock surface. The melting glacier ice left many depressions that became lakes and wetlands visible today, as well as hills and steep slopes. Some steep slopes can be found throughout the City’s landscape as well. The City’s topography and topographical features are illustrated in Map 8-3: Topography to follow. In addition, the Valley Branch Watershed District has compiled topographic mapping to determine the steepness of land and the elevations of features throughout the watershed. More information can be found in the VBWD watershed management plan. SURFACE WATER MANAGEMENT - DRAFT 5-25-2018 City of Lake Elmo Comprehensive Plan 2040 10 Climate and Precipitation The climate in the seven-county metro area is described as a humid continental climate with moderate precipitation, wide daily temperature variations, warm humid summers and cold winters. The diverse nature of the air masses impacting Minnesota’s climate also leads to seasonal temperature extremes. The total average annual precipitation in this area is approximately 31 inches, and annual snowfall averages around 54 inches (equivalent to approximately 5.4 inches of water). The amount, rate, and type of precipitation a watershed receives have a direct effect on its water resources. Average precipitation amounts can vary locally across the region, and precipitation amounts can vary widely across a watershed during individual storm events. Despite wide variations in climate conditions, climatologists are studying four significant climate trends in the recently determined in the Upper Midwest (Minnesota Weather Almanac, Seeley, 2006): 1. Warmer winters 2. Higher minimum temperatures 3. Higher dew points 4. Changes in precipitation trends – more rainfall is coming from heavy thunderstorm events and increased snowfall According to the Soil and Water Conservation Society’s (SWCS) 2003 report, total precipitation amounts in the United States (and in the Great Lakes region) are trending upward, as are storm intensities. More information about climate and its impacts on water resources can be found in the Valley Branch Watershed District’s Watershed Management Plan, 2015. Soils The Soil Conservation Service (SCS), now the Natural Resources Conservation Service (NRCS), published the Soil Survey of Washington and Ramsey Counties in 1980. The publication provides soil location maps and information on the physical properties of soils found in Washington County. Within the City of Lake Elmo, the NRCS has identified three soil associations (soil patterns), as generally described here: SURFACE WATER MANAGEMENT - DRAFT 5-25-2018 City of Lake Elmo Comprehensive Plan 2040 11 1. Antigo-Chetek-Mahtomedi Association – These soils are formed dominantly in outwash. They are described as nearly level to steep, well drained to excessively drained, medium textured to coarse textured soils; mostly on outwash plains. These soil types are located in the north central and south eastern areas of the City as well as a small portion in the southwestern area of the City. 2. Santiago Kingsley Association – These soils formed dominantly in glacial till. They are described as undulating to steep, well drained, medium textured and moderately course textured soils, and are found on uplands. These soils are found generally in the south western portion of the City reaching north easterly through the central area of the City. 3. Antigo-Comstock Association – These soils are formed dominantly in silty mantle and the underlying sandy outwash and in silty lacustrine sediments. They are described as level to moderately sloping, well drained and somewhat poorly drained, medium textured soils on outwash plains and glacial lake plains. These soils are found in the south eastern corner of the City as well as the east central border of the City. A small area in the north central area also has these soil characteristics. The nature of soils comprising the top layer of unconsolidated material in a watershed is important because soil properties are a primary factor in determining the volume of runoff associated with a given rainfall event. The NRCS Soil Survey assigns soil types to a hydrologic group depending on the soils ability to infiltrate water during long-duration storms. The four hydrologic soil group classifications are described below. Hydrologic soil group types indicate the level of infiltration and compatibility with development for each type of soil. More information about the location of these soil groups in Lake Elmo can be found in the Appendix of the LSWMP. Group A soils have low runoff potential and high infiltration rates even when thoroughly wetted. These consist of deep, well-drained sands or gravels. Group B soils have moderate infiltration rates and the potential for runoff. They consist of moderately-deep to deep, and moderate to well-drained soils. Group C soils have low infiltration rates and generally impede the downward movement of water. These soils have more moderately-fine to fine textures and provide greater amounts of runoff volumes when thoroughly wetted. Group D soils have very low infiltration rates and very high runoff potential. These soils are associated with clays with high swelling potential and soils with a high permanent water table. SURFACE WATER MANAGEMENT - DRAFT 5-25-2018 City of Lake Elmo Comprehensive Plan 2040 12 NATURAL RESOURCES The landscape of Lake Elmo comprises a wealth of natural resources, including many lakes and intermittent wetlands. The location of these features, and efforts to preserve and protect them, should contribute to decisions about the development of new parks, trails, and other recreational facilities. In past planning efforts, the Parks Commission utilized natural resource mapping resources to identify features to include in future park sites. For example, bodies of water and wetlands were characterized with high importance and informed recommendations on future park locations. Locations included forested shoreland on Lake Elmo, shoreland on Goose Lake, shoreland on Clear Lake, shoreland on Kramer Lake, and steep shoreland north of 50th Street. A forested area off of the northern portion of Lake Elmo Avenue was also highlighted. Other land features and prioritized for different purposes. For instance, relatively flat parcels of land were identified as possible locations for athletic fields. Maps 8-2 through 8-4 identify Lake Elmo’s natural resources including wetlands, topography, and significant natural features according to the Minnesota Department of Natural Resources. This mapping will inform decisions when refining locations of future park, trail, and open space uses. Wetlands Wetlands provide a rich habitat for wildlife, including birds, mammals, fish, and amphibians, and contribute as well to maintaining the quality of the City’s water. Wetlands within parks can be a focal point for nature observation and wildlife watching. Map 6-7 includes wetlands indexed by the National Wetlands Inventory which categorizes wetlands based on quality and significance for habitat, as well as outlines the 100 year floodplain. Horseshoe Clear Unnamed DeMontreville Olson Jane Berschen's Pond Elmo Sunfish Friedrich Pond Eagle Point Downs H.J. Brown Pond RoseGoose Goose Armstrong Armstrong Kramer Goetschel Klawitter Pond Deer Pond Crombie Pond Hedge's Pond Dirk's Pond Beutel's Pond Legion Pond FNational Wetlands Inventory 100-YR FEMA Floodplain Source: MNGEO, Washington County, City of Lake Elmo Draft 3.26.2018 Legend MAP 8-2. WETLANDS AND FLOODPLAIN SURFACE WATER MANAGEMENT - DRAFT 5-25-2018 City of Lake Elmo Comprehensive Plan 2040 13 Horseshoe Clear Unnamed DeMontreville Olson Jane Berschen'sPond Elmo Sunfish FriedrichPond Eagle Point Downs H.J.BrownPond RoseGoose Goose Armstrong Armstrong Kramer Goetschel Klawitter Pond Deer Pond Crombie Pond Hedge's Pond Dirk's Pond Beutel's Pond Legion Pond FMLCCS Regionally Significant Ecological Areas 2008 Ecological Score 1 (Low) 2 (Moderate) 3 (High) 2040 FLU Closed Landfill Institutional PSP Park GC Source: MNGEO, Washington County, City of Lake Elmo Draft 3.26.2018 Legend Topography Contour lines describe slopes and flat lands, indicating views and drainage ways. Naturally flat areas are conducive to formal or informal play fields and gardens. High points within parks are opportunities for benches or picnic tables overlooking views below. Slopes may provide opportunities for sledding or natural amphitheaters. Undulating terrain or drainage ways create interest for trails. Playgrounds nestled into a lower area create a sense of safety and separation from nearby streets or homes. Map 8-3 includes contour lines at ten-foot intervals to illustrate topography. Biologically Significant Ecological Areas Land cover refers to vegetation, water, rock, and human-made surfaces on the land. Examples of common land cover in Lake Elmo are agricultural crops, short grass (lawns), forests, woods, and water. Some land cover is identified to special and unique values that make it regionally significant to the quality of natural resources and ecological healthy of the landscape. These lands are important for inclusion in a high-quality PTOS system. Map 8-4 describes significant ecological areas in Lake Elmo. MAP 8-3. TOPOGRAPHY MAP 8-4. SIGNIFICANT ECOLOGICAL AREAS Horseshoe Clear Unnamed DeMontreville Olson Jane Berschen's Pond Elmo Sunfish Friedrich Pond Eagle Point Downs H.J. BrownPond RoseGoose Goose Armstrong Armstrong Kramer Goetschel Klawitter Pond Deer Pond Crombie Pond Hedge's Pond Dirk's Pond Beutel's Pond Legion Pond FSteep Slope Areas 10-FT Contours Source: MNGEO, Washington County, City of Lake Elmo Draft 3.26.2018 Legend SURFACE WATER MANAGEMENT - DRAFT 5-25-2018 City of Lake Elmo Comprehensive Plan 2040 14 Proposed Physical Environment and Future Land Use Land use data is an important factor for estimating surface water runoff. The hard or impervious surface areas associated with each land use greatly affect the amount of runoff generated from an area. Future land use projections indicate those areas that may be available for water resource enhancement and where improvements should be a priority. Significant changes or intensification of land use can increase runoff due to added impervious surfaces. The City of Lake Elmo is designated as both an Emerging Suburban Community and a Rural Residential Community meaning that future land use will maintain a mix of rural uses and rural residential densities, as well as suburban-style development. All of the areas potentially available for suburban development are located within the identified MUSA boundaries described as the Village Planning Area and the South Planning Area in this Plan. Forecasts contained within Chapter 3 of this Plan, indicate that approximately 2,200 additional households will be added to the MUSA planning area in addition to the households already planned for between 2010 and 2020. In addition the additional households within the MUSA, there will likely be some growth within the Rural Residential areas with conventional subdivisions and open space developments. Utilities Portions of Lake Elmo are within the Metropolitan Urban Service Area (MUSA), providing sanitary sewer and water service to included properties. A large portion of the City remains outside these boundaries through 2040 and is generally served by private well and septic systems (individual and community). Due to groundwater contamination in the Lake Elmo area, the municipal water system extends beyond the designated MUSA boundaries. The sanitary sewer system in Lake Elmo is of relatively new construction, most of which has been constructed only since 2013. The sanitary sewer system consists of approximately 23 miles of sewer mains managed by 6 lift stations. The portions of the City’s wastewater handled by the public sewer is managed on a metropolitan level and is split between Metro Wastewater Treatment Plant located in St. Paul Minnesota and the Cottage Grove Metropolitan Wastewater Treatment Plant.. Other parts of Lake Elmo utilize Subsurface Sewage Treatment Systems (SSTS) for wastewater management including 8 community treatment systems owned and operated by the City. The City storm water conveyance system consists largely of rural ditches and swales and the runoff is typically treated and retained near the point of rainfall through a series or lowlands or storm water basins. In the urbanized areas curb and gutter, along with storm sewers are SURFACE WATER MANAGEMENT - DRAFT 5-25-2018 City of Lake Elmo Comprehensive Plan 2040 15 utilized to convey runoff to the storm water treatment basins consisting of pretreatment basins, retention basins and infiltration basins. The City’s storm sewer and sub watersheds are mapped and included in the City’s MS4 Permit attached in the Appendix. Future street maintenance and redevelopment will likely dictate the extension or reconstruction of the storm drainage system. Mapping of stormwater utilities will be updated as improvements of the system are completed to stay in compliance with MS4 inventory and mapping requirements. SURFACE WATERS AND DRAINAGE Watersheds and Sub-Watersheds As mentioned, three watersheds districts are located within the City of Lake Elmo, however, the Valley Branch Watershed District covers the majority (approximately 90-95%) of the City’s waterways and drainage areas. A small portion in the northeast falls within the Brown’s Creek Watershed District, and a small portion in the southwest of the City falls within the South Washington Watershed District as shown on Map 8-1. Subwatersheds within the broader Watersheds District areas identify the more localized drainage and flows with the City of Lake Elmo. The Valley Branch Watershed District developed a management plan for each of the subwatersheds which illustrates boundaries, drainage flows, and elevations within the sub watershed mapping. This Plan chapter refers to these subwatershed management plans for drainage flow and runoff details, which can be found online at http://www.vbwd.org/watershed_management_plan_2015-2025/index.php. There are 21 total subwatersheds of the Valley Branch Watershed District in Lake Elmo: Lake Demontreville Lake Olson Friedrich’s Pond Long Lake Beutel Pond Raleigh Creek Klawitter Pond Sunfish Lake Eagle Point Lake Goetchel Pond Cloverdale Goose Lake Clear Lake Legion Pond Rose Lake Lake Jane Lake Elmo Horseshoe Lake Kramer Pond Rest Area Pond SURFACE WATER MANAGEMENT - DRAFT 5-25-2018 City of Lake Elmo Comprehensive Plan 2040 16 Public Waters Approximately ten percent (10%) of the City of Lake Elmo is occupied by wetlands and open water features. These water features and watercourses defined as public waters are under regulatory control by the MnDNR. Map 8-5 and the table below identify the major public waters located in the City of Lake Elmo. Table 8-1. Public Waters, Lakes, and Wetlands Name DNR Public Waters No. Surface Area (Acres) Maximum Depth (ft) DeMontreville (Lake)82-101 P 158 24 Eagle Point (Lake)82-109 P 154 6 Elmo (Lake)82-106 P 297 140 Horseshoe (Lake)82-74 P 76 11 Jane (Lake)82-104 P 154 39 Olson (Lake)82-103 P 87 15 Sunfish (Lake) 82-107 P 73 Not determined Armstrong 82-116 W 6 - Berschen’s Pond 82-105 W 6 - Beutel’s Pond 82-399 W 3 Not determined Clear 82-99 W 25 10 Crombie Pond 82-386 W 7 - Deer Pond 82-385 W 6 - Dirk’s Pond 82-389 W 3 - Downs 82-110 W 38 7 Friedrich Pond 82-108 W 17 Not determined Goetschel 82-313 W 22 14 Goose 82-113 W 42 5-7 H.J. Brown Pond 82-111 W 21 - Hedge’s Pond 82-387 W 5 - Klawitter Pond 82-368 W 5 Not determined Kramer 82-117 W 28 Not determined Legion Pond 82-462 W 18 Not determined Rose 82-112 W 26 Not determined Unnamed Wetlands 82-316; 82-366; 82-367; 82-369; 82-370; 82-371; 82-384; 82-388; 82-390; 82- 100; 82-314; 82-315; 198 Sources: MnDNR, VBWD, City of Lake Elmo SURFACE WATER MANAGEMENT - DRAFT 5-25-2018 City of Lake Elmo Comprehensive Plan 2040 17 ¬«36 §¨¦94 Pine Springs Grant Stillwater Oak Park Heights Baytown Twp. West Lakeland Twp. AftonWoodbury Oakdale Armstrong Kramer Horseshoe Rose Goose H.J. Brown Pond Eagle Point Elmo Downs Legion Pond Friedrich's Pond Sunfish Berschen's Pond Dirk's Pond Goetschel C Clear Jane Olson DeMontreville Klawitter Pond Hedge's Pond Crombie Pond R alei g h C re e k Fa r ne y C re e kNorthFarneyCreek Eden Park Pond Margaret BeutelPond Hedge's Bog Deer Pond LakeElmoOutlet LIMITATION OF LIABILITYThis document is not a legally recorded map or survey and is not intended to be used as one. This map is a compilation of records and information from various state, county, and city offices, and other sources. 00.510.25 Miles K:\gis\LAKEELMO\PROJECTS\2009 SWMP\Maps\Figure 10-PublicWatersInventory Map.mxd 2030 Comprehensive Plan City of Lake Elmo, Minnesota /Legend City Boundary Streams Network Public Waters Local Roads Major Highways Map date: February 2009 Prepared by: Surface Water Management Plan Sources: MnDNR, TKDA FIGURE 10: PUBLIC WATER INVENTORY Map 8-5. Lake Elmo Public Waters Source: City of Lake Elmo, MnDNR ¬«36 §¨¦94 Pine Springs Grant Stillwater Oak Park Heights Baytown Twp. West Lakeland Twp. AftonWoodbury Oakdale Armstrong Kramer Horseshoe Rose Goose H.J. Brown Pond Eagle Point Elmo Downs Legion Pond Friedrich's Pond Sunfish Berschen's Pond Dirk's Pond Goetschel C Clear Jane Olson DeMontreville Klawitter Pond Hedge's Pond Crombie Pond R alei g h C re e k FarneyCreekNorthFarneyCreek Eden Park Pond Margaret Beutel Pond Hedge's Bog Deer Pond LakeElmoOutlet LIMITATION OF LIABILITYThis document is not a legally recorded map or survey and is not intended to be used as one. This map is a compilation of records and information from various state, county, and city offices, and other sources. 00.510.25 Miles K:\gis\LAKEELMO\PROJECTS\2009 SWMP\Maps\Figure 10-PublicWatersInventory Map.mxd 2030 Comprehensive Plan City of Lake Elmo, Minnesota /Legend City Boundary Streams Network Public Waters Local Roads Major Highways Map date: February 2009 Prepared by: Surface Water Management Plan Sources: MnDNR, TKDA FIGURE 10: PUBLIC WATER INVENTORY ¬«36 §¨¦94 Pine Springs Grant Stillwater Oak Park Heights Baytown Twp. West Lakeland Twp. AftonWoodbury Oakdale Armstrong Kramer Horseshoe Rose Goose H.J. Brown Pond Eagle Point Elmo Downs Legion Pond Friedrich's Pond Sunfish Berschen's Pond Dirk's Pond Goetschel C Clear Jane Olson DeMontreville Klawitter Pond Hedge's Pond Crombie Pond R alei g h C re e k Fa r ne y C re e kNorthFarneyCreek Eden Park Pond Margaret Beutel Pond Hedge's Bog Deer Pond LakeElmoOutlet LIMITATION OF LIABILITYThis document is not a legally recorded map or survey and is not intended to be used as one. This map is a compilation of records and information from various state, county, and city offices, and other sources. 00.510.25 Miles K:\gis\LAKEELMO\PROJECTS\2009 SWMP\Maps\Figure 10-PublicWatersInventory Map.mxd 2030 Comprehensive Plan City of Lake Elmo, Minnesota /Legend City Boundary Streams Network Public Waters Local Roads Major Highways Map date: February 2009 Prepared by: Surface Water Management Plan Sources: MnDNR, TKDA FIGURE 10: PUBLIC WATER INVENTORY SURFACE WATER MANAGEMENT - DRAFT 5-25-2018 City of Lake Elmo Comprehensive Plan 2040 18 Lakes There are 7 lakes included in the inventory of public waters in Lake Elmo. Size and depth of these water bodies is also included in the table above where available from the MnDNR. Lake Information Reports for the seven named lakes in the City are included within the LSWMP. These reports are a summary of MnDNR data and describe available public access information, lake characteristics, water level histories, and water quality information. Additional information on these lakes is available from the VBWD Watershed Management Plan. The Metropolitan Council has identified four priority lakes in Lake Elmo: DeMontreville, Olson, Jane, and Elmo. The “priority lake” designation is used to focus the Council’s limited resources and to identify lakes that will require completion of a nutrient budget analysis during environmental review processes. Wetlands The relatively flat topography and wet soil conditions in Lake Elmo result in extensive wetland areas. Wetland community types within the City include a full range of wetlands, from emergent wetland habitats, to scrub and shrub wetland habitats, as well as forested wetland habitats. However, the primary wetland features in the City include deep water and shallow water habitats due to the extensive lake network within the City. The wetland areas within the City are illustrated in Map 8-2 Wetlands and Floodplain. Wetland areas are valuable resources that provide many benefits to the City and surrounding areas. Some of these benefits include ground water recharge, filtration of sediments and nutrients, flood control, wildlife habitat, and scenic value. The three Watershed Districts have adopted standards for wetland management in each of their Watershed Management Plans. Rivers & Streams Raleigh Creek is the dominant stream that flows through the City of Lake Elmo and is a major sub watershed within the VBWD. Its course as an intermittent stream begins in the City of Oakdale, west of I-694 and south of TH 5. Water flows easterly as it enters the City of Lake Elmo and crosses Stillwater Boulevard near its intersection with 31st Street North east of Tablyn Park. A tributary enters Raleigh Creek from south of Stillwater Boulevard and east of the Ideal Avenue intersection. In addition, the discharge from Beutel Pond also enters Raleigh Creek near Stillwater Boulevard. From near Tablyn Park and Stillwater Boulevard, Raleigh Creek flows southerly to Lake Elmo Park Reserve and the northernmost bay of Eagle Point Lake. VBWD has completed a Watershed Management Plan for Raleigh Creek and extensive information about this sub watershed can be found in the VBWD’s Watershed Management Plan. SURFACE WATER MANAGEMENT - DRAFT 5-25-2018 City of Lake Elmo Comprehensive Plan 2040 19 Farney Creek and North Farney Creek are located within the Eagle Point Lake sub watershed within the VBWD. These creeks are located south of Raleigh Creek in the City of Lake Elmo and drain into Eagle Point Lake. Farney Creek is an intermittent stream that enters the lake’s west side. Additional details can also be found in the VBWD’s Watershed Management Plan for Eagle Point Lake. Groundwater The City of Lake Elmo follows regulations and standards for groundwater protection, preservation, and use from various state and local agencies charged with monitoring and regulating water quality and consumption. These agencies include: The MPCA, which monitors water quality and enforces laws relating to water pollution. The Minnesota Geological Survey which complies a state inventory of groundwater resources. The MnDNR which regulates the usage rate and volume of drinking water. Domestic water use is regulated with permits. Use in excess of 25 people or use that exceeds 10,000 gallons per day or 1,000,000 gallons per year must obtain a water appropriation permit from the MnDNR. The Minnesota Department of Health (MDH) is responsible for environmental groundwater quality protection and facilitates well abandonment and installation of new wells. Local Watershed Districts are generally responsible for groundwater protection and use, but their role is limited to cooperating and assisting state agencies in their groundwater protection efforts. Washington County developed the Washington County Groundwater Plan that provides a county-wide structure for preserving and protecting the county’s groundwater supply. The groundwater plan can be found online at https://www.co.washington.mn.us/DocumentCenter/View/794. SURFACE WATER MANAGEMENT - DRAFT 5-25-2018 City of Lake Elmo Comprehensive Plan 2040 20 EXISTING AND POTENTIAL WATER RESOURCE-RELATED PROBLEMS Existing Water Resource Problems The City of Lake Elmo’s existing LSWMP contains a list of known water resource problems within the City. They are listed by the Watershed where the issue is located. Corrective actions are identified in the current LSWMP and have been updated in the following section. Valley Branch Watershed District Area The VBWD Watershed Management Plan identifies the following problems in the City of Lake Elmo that is within the Watershed District. The City and VBWD have discussed these problems, and the City proposes the following actions to address the problems: > Village Area Flooding Potential flooding in the Lake Elmo Village Area and the potential water quality and quantity impacts of storm water runoff from proposed future development, particularly on Down’s Lake. Assessment of Problem: The Lake Elmo Old Village Area was urbanized decades ago within areas of very flat terrain and with the lack of adequate stormwater management or conveyance systems in place to either store or infiltrate the water or to convey the water efficiently through the downtown area. Persistent and regular flooding has caused problems ranging from nuisance flooding of properties and roadways to more significant flooding of homes and commercial structures. In addition, Downs Lake is relatively small, with a large tributary area. The lake has a history of wide fluctuations in water levels, from potential for flooding in some years to very low water levels during drought years. Two homes are within the 100-year floodplain of Down’s Lake and connecting waterbodies. • The Watershed District and the City have studied conditions on the lake and in its watershed several times. A proposal by VBWD for a more detailed study and flood-relief project were opposed by Washington County, the DNR, Washington SWCD, MPCA, the City and some residents. • The Lake Elmo Old Village Area AUAR analyzed the proposed development scenarios for this area, which drains to Down’s Lake. The AUAR analyzed the potential impacts to the lake and other water bodies, and recommended strategies to avoid, minimize or mitigate for impacts. SURFACE WATER MANAGEMENT - DRAFT 5-25-2018 City of Lake Elmo Comprehensive Plan 2040 21 Proposed Corrective Actions: A Regional Stormwater Management Study was completed by SEH, in May 2015, to develop a regional drainage strategy and approach for managing stormwater to reduce the flooding in the Village Center Area and to identify opportunities for water quality treatment in the Downs Lake subwatershed. An important aspect of this approach was to consider future development / redevelopment in the watershed and to explore the potential for amenities such as water features or the potential for green infrastructure. The study identified a regional strategy that includes the following recommendations, with the first two recommendations already completed: • A regional infiltration basin was constructed in 2015 directly downstream from the Old Village Center together with the construction of a new large diameter storm sewer system along Lake Elmo Avenue, Laverne Avenue, 36th Street, and Upper 33rd Street. • Goetschel Pond Stormwater Diversion. As part of multiple development projects, storm water was diverted from 2 large new subdivisions from draining to the Down’s Lake subwatershed to the Goetschel Pond subwatershed, effectively diverting 50+ acres of drainage area from entering the Old Village center, and ultimately Down’s Lake. • Continue to construct stormwater retention ponds upstream of the Village Center as new development occurs. By enforcing VBWD and City storm water management practices, the rate and volume of storm water runoff will be reduced with any development project. • Complete further evaluation and consider implementation of the Sunfish Lake Diversion plan. • Continue to improve storm water conveyance through the Village Center to further reduce flooding and incorporate small scale green infrastructure with future Village Center projects as opportunities become available. • Complete the ongoing maintenance of proposed and existing storm water facilities > Flooding near Friedrich’s Pond Assessment of the Problem: The VBWD noted from the late 1970s to the mid 1980s Friedrich’s Pond experienced high water levels resulting from above average precipitation and decreased ground water seepage from Friedrich’s Pond, which resulted in basement flooding to the adjacent homes. There have been no further reports of high water levels until recently in 2016 and 2017 from one property owner having a driveway inundated and reporting high groundwater levels near the home. Land uses are proposed to remain the same in the area in the City’s 2040 Comprehensive Plan. SURFACE WATER MANAGEMENT - DRAFT 5-25-2018 City of Lake Elmo Comprehensive Plan 2040 22 Proposed Corrective Actions: The VBWD has identified the following mitigation options to address the high water level in Friedrich’s Pond: Installation of a controlled gravity outlet and drainage routes, utilizing a pumped outlet structure, flood proofing the affected homes, flood insurance, and a do nothing approach. The City and VBWD have not proposed any specific solution and have not yet identified a public purpose for making improvements since the potential high water risks are very limited and exist on private property. Any permit applications for this area will be reviewed per the City of Lake Elmo Flood Plain Ordinance. > Flooding near Legion Pond Assessment of Problem: In the 1980’s the VBWD reported high water levels in the Legion Pond/ Eden Park area which threatened the nearby homes. Several proposals were developed to mitigate the flooding, including overflow pumping to Lake Elmo. The residents located in the floodplain rejected the pumping proposals, objecting to the high cost and lack of a permanent solution to the problem as reasons. The high water levels were later relieved by a onetime overflow pumping of the pond to Lake Elmo, and later by the drought of 1987-1988. Residents have bermed around their homes to help protect against future high water levels. Proposed Corrective Action: The VBWD proposed three feasible mitigation plans to the Legion Pond’s high water problem: the first option involves constructing a pumped outlet to Lake Elmo. This option would incur annual operation and maintenance costs. The second option is to construct a gravity outlet from Legion Pond to Lake Elmo. The third option is to provide only emergency pumping relief. • Beginning in 1984, the City constructed a community wastewater facility as part of the 201 System and hooked up 2764, 2778, 2790, and 2814 Legion Avenue North. This addressed the location of the individual septic systems on these lots. If future flood mitigation is pursued, it could focus on the remaining septic systems not connected to the 201 System and the walk out elevations of all homes in the affected area. • The second option (constructing a gravity outlet to Lake Elmo) now becomes a more feasible option with the availability of the 201 System. The City would consider all options provided in the VBWD Plan - the preferred corrective action will depend on the timing, urgency, public comment, agency comment, and available funding. However, due to the current trend of low water levels and the Project 1007 flood-relief improvements, the City does not find any immediate need to address flooding issues in this area. • The City will work directly with the VBWD to continue to monitor the situation. Any permit applications for this area will be reviewed per the City of Lake Elmo Flood Plain Ordinance. This ordinance is included in the Appendix of this Report. SURFACE WATER MANAGEMENT - DRAFT 5-25-2018 City of Lake Elmo Comprehensive Plan 2040 23 > Low Water Levels on Sunfish Lake Assessment of Problem: Residents have expressed concerns related to low water levels on Sunfish Lake. Proposed Corrective Actions: The City and VBWD have discussed the problem and agreed that there is little that the City can do to address this issue. > Minimum Building Elevations to prevent flooding The City will continue to enforce the VBWD standard that minimum floor elevations of buildings be 2’ or more above the 100- year flood plain and will continue to enforce the standard on development that is not reviewed by the Watershed District. The District requires the minimum floor elevations of structures to be at least two feet higher than the adjacent water body’s critical 100-year flood level. The VBWD rule applies to all water bodies, whether they are mapped as floodplains on FEMA flood insurance rate maps or not. Proposed Corrective Action: The City has adopted the Watershed District standard in its Engineering Standards and reviews development plans and building permits accordingly. South Washington Watershed District Area The SWWD Water Management Plan has identified the following problems in the area of Lake Elmo that is within the Watershed District. The City and SWWD discussed these problems, and the City is proposing the following actions to address the problems: > Wilmes Lake Flooding Issues Assessment of Problem: The SWWD has completed studies of Wilmes Lake and potential flooding issues. Areas in the Wilmes Lake sub watershed within Lake Elmo contribute to the lake’s drainage area but are not the cause of the flooding concern. No structures are currently below the 100-year flood elevation. The Watershed District and City of Woodbury have established and funded a program to provide protection to homes on the east side of the lake. Proposed Corrective Action:. The City concurs with and adopts the SWWD volume control standard in this LSWMP and will continue to implement its ordinances requiring volume control. SURFACE WATER MANAGEMENT - DRAFT 5-25-2018 City of Lake Elmo Comprehensive Plan 2040 24 > Wilmes Lake Water Quality Issue Assessment of Problem: Wilmes Lake has been classified as an impaired water for nutrients. The SWWD has not completed a TMDL study for the lake but is likely to complete a study and develop recommendations to address the nutrient problems in the future. Proposed Corrective Action: The City will support the District’s TMDL study for Wilmes Lake, and work with the District to implement its recommendations. The City has, and will continue to enforce volume control requirements for new development within the subwatershed to benefit water quality in Wilmes Lake. The City adopts the District’s standards for volume control and allowable phosphorus loading to Wilmes Lake, and will address these requirements as it manages land use and development within the Wilmes Lake Subwatershed area. Brown’s Creek Watershed District > Impaired Waters Issues Assessment of Problem: The BCWD area within Lake Elmo includes wetland areas and some areas that may still be developed. The area drains to Long Lake, Brown’s Creek, and the St. Croix River. All of these water bodies are impaired waters. The BCWD is currently completing TMDL studies for Long Lake and Brown Creek. The St. Croix Basin Team has set a goal to reduce nutrient loading to the St. Croix basin by 20 percent. Proposed Corrective Action: The City will participate in the District’s TMDL studies of Long Lake and Brown’s Creek and will work with the District to implement the recommendations of these studies. The City will implement its land use plan and ordinances to assist with the protection of surface waters in this area. Groundwater Resource Problems > Sustainable Water Supply for Drinking Water Assessment of Problem: Groundwater contamination has been present within the Lake Elmo area since discovery of PFCs in early 2004. Ongoing investigation, mitigation, and management of the contamination continues to take place and is primarily managed through the Minnesota Department of Health, Minnesota Pollution Control Agency and Minnesota Department of Natural Resources. The City has contamination in Well #3, which was never placed into service, and more recently has discontinued use of Well #1 after receiving a well advisory from the MDH in April 2018. These wells will require the construction and implementation of high cost treatment facilities if these wells are ever placed into service again. SURFACE WATER MANAGEMENT - DRAFT 5-25-2018 City of Lake Elmo Comprehensive Plan 2040 25 The City’s two remaining water supply wells (Well #2 and Well #4) are located in the northeast part of the City, located in areas free from groundwater contamination. However, these wells are Jordan Aquifer Wells and are located near or within the jurisdiction of the White Bear Lake Court Order (5 mile radius) and have become subjected to appropriation restrictions and limitations. As the City continues to grow, the City will require 2 to 3 additional water supply wells, however there is a severe limitation on groundwater use. A moratorium has been placed on appropriation permits impacting White Bear Lake. Currently, no new drinking wells can be located within 5 miles of White Bear Lake, which affects approximately the northern half of the City of Lake Elmo. The southern parts of Lake Elmo overlay the PFC groundwater contamination plume. Proposed Corrective Action: The City will work with the MDH, MPCAs, MnDNR, and neighboring municipalities to identify appropriate water supply sources and water supply well locations. > Drinking Lake Elmo Water Quality Assessment of Problem: Lake Elmo is a ground water discharge waterbody. Impacts to ground water resources may impact lake quality. Proposed Action: City will implement its land use plan and ordinances to protect ground water recharge areas. > Jordan Aquifer Impacts Assessment of Problem: The City of Lake Elmo has two municipal wells located in the northeast quadrant of Lake Elmo. These wells are cased to the Jordan aquifer, which is the same aquifer that feeds Lake Elmo. The City, the DNR, Washington County, and the VBWD have not performed any calculations to determine the long-term sustainability of the Jordan aquifer in this area and if the pumping is or will impact the water levels of the lake. Nor has any agency determined if there will be conflict between the drinking water well and the lake. More recently, court action has prevented new wells from being located within 5 miles of White Bear Lake. [ADD MORE] Proposed Action: The City will work cooperatively with the VBWD, the MnDNR, Washington County, and other entities as this issue is further studied. SURFACE WATER MANAGEMENT - DRAFT 5-25-2018 City of Lake Elmo Comprehensive Plan 2040 26 > Special Well Construction Areas (SWCA) Assessment of Problem: Portions of the City in both VBWD and SWWD were designated by the Minnesota Department of Health as a Special Well Construction Area (SWCA) in 1988 and 2007. This designation applies to the construction repair, modification, and sealing of wells and borings. The primary purpose of SWCAs is to protect public health and ground water quality by ensuring wells and borings are constructed to obtain ground water from a protected aquifer(s) and to help prevent spread of contamination. Storm water related activities in these areas, such as geotechnical evaluations for a pond or infiltration feature, should reflect appropriate compliance with requirements set forth by the Department of Health given the criteria for environmental bore holes. Nonstructural methods for controlling storm water runoff volumes should generally be given priority over structural methods. Proposed Action: The City will cooperate with the MPCA, MDH, and the Watershed Districts to address ground water quality issues and enforce its Zoning and Subdivision ordinances to protect ground water quality. > The SWWD Groundwater Management Assessment of Problem: The SWWD’s ground water management initiative consists of monitoring and data analysis. The objective is to compile baseline data to characterize dynamics between storm water and ground water. Outcomes of the ground water management include setting or adjusting thresholds or standards to best address storm water management and ground water protection and identifying potential ground water resources trends in the context of storm water management efforts. Proposed Action: The City will support these efforts as they relate to the area within the SWWD in Lake Elmo. > Washington County Groundwater Management Assessment of Problems: Reduced ground water recharge resulting from urbanization. Degraded quality of ground water as a result of increased non-point source pollution. Reduced ground water flows to surface waters, lowered lake levels, and well interference resulting from overuse of ground water. Need for citizens and public officials to understand ground water-related issues. Proposed Actions: The County Ground water Plan identifies the following actions to implement: Provide education to citizens and public officials on the interaction of surface and ground water quality and quantity; the value of and need to protect ground water recharge areas. SURFACE WATER MANAGEMENT - DRAFT 5-25-2018 City of Lake Elmo Comprehensive Plan 2040 27 Impaired Waters The Minnesota Pollution Control Agency (MPCA) compiles water quality data for water bodies in the state. The impaired waters within Lake Elmo’s drainage are listed in Table 8-2, and Map 8-6 shows locations of impaired waters in Lake Elmo. More information about water quality data and monitoring can be found at https://www.pca.state.mn.us/water/water-quality-data. Table 8-1: 2018 Impaired Waters List Water body name Water body type Year added to List Affected designated use Pollutant or stressor TMDL target completion year EPA category Mercury TMDL region Year TMDL plan approved Approved TMDL EPA ID# Downs Lake 2012 Aquatic Recreation Nutrient/eutrophi- cation biological indicators 2024 5 Elmo Lake 1998 Aquatic Consumption Mercury in fish tissue 4A SW 2007 32414 Elmo Lake 2008 Aquatic Consumption Perfluorooctane Sulfonate (PFOS) in fish tissue 2025 5 Goose (South)Lake 2012 Aquatic Recreation Nutrient/eutrophi- cation biological indicators 2024 5 Jane Lake 2006 Aquatic Consumption Mercury in fish tissue 2021 5 SW Sunfish Lake 2008 Aquatic Recreation Nutrient/eutrophi- cation biological indicators 4A 2016 66249 Source: MPCA Total Maximum Daily Load (TMDL) Studies As with nearly all of the east metro communities, Lake Elmo is upstream of Lake Pepin and therefore is required to implement TMDL plans for this impaired water body. The St. Croix Basin Team has set a goal to reduce nutrient loading to the St. Croix basin by 20%, to protect this Outstanding Resource Value Water (ORVW). The City adopted a BMP in its MS4 Permit to cooperate with the Watershed Districts to create a process to identify all discharges from the City’s MS4 system to the St. Croix and determine if discharges to the ORVW can be eliminated, or to identify and adopt BMP’s that allow the existing high quality of the St. Croix River to be maintained. If modifications are needed, the City will modify its SWPPP and submit the modifications to the MPCA. The City will work with the Watershed Districts and other organizations as they complete TMDL studies and enforce its ordinances to assist in protection and improvement of these resources. SURFACE WATER MANAGEMENT - DRAFT 5-25-2018 City of Lake Elmo Comprehensive Plan 2040 28 Potential Water Resource Problems > Maintaining and updating Municipal Stormwater Infrastructure The City of Lake Elmo is responsible for maintenance of its storm sewer system in conformance with the MS4 Permit Program. This system includes pipes, constructed ponds, lakes, wetlands, ditches, swales, and other infiltration features and drainageways and provides needed flood management and water quality mitigation. The City’s current SWPPP can be found in the Appendix of the LSWMP. Other units of government are responsible for maintaining the stormwater systems under their control: • MnDOT is responsible for maintaining the ditch and infiltration areas along Trunk Highway 36 and Interstate 94. • Washington County is responsible for maintaining storm sewer catch basins and leads in the county roads. Private stormwater facilities must also be maintained in compliance with original performance design standards. Owners are responsible for removing and properly disposing of all settled materials, including solids, from ponds, sumps, grit chambers, and other devices. The City and/or local Watershed Districts may inspect private stormwater facilities and work with owners to bring cleaning and maintenance up to date. SURFACE WATER MANAGEMENT - DRAFT 5-25-2018 City of Lake Elmo Comprehensive Plan 2040 29 Map 8-6. Lake Elmo Impaired Waters 60TH ST N 10TH ST N LAKE ELMO AVE N INWOOD AVE N 50TH ST N S T I L L W A T E R B L V D N 34TH ST N L A K E JA N E T R L N MANNING AVE N KEATS AVE N 47TH ST N 30TH ST N 4 5 T H S T N IDEAL AVE N STILLWATER BLVD N 60TH ST N MANNING AVE N LAKE ELMO AVE N S T I L L W A T E R B L V D N Elmo Jane O l s o n E a g l e P o i n t S u nfis h Rose DeMontreville Horseshoe Downs Goose Clear Goetschel Kramer Unnamed Armstrong Legion Pond H.J. Brown Pond Friedrich Pond Deer Pond Crombie Pond Klawitter Pond Hedge's Pond Berschen's Pond Dirk's Pond Beutel's Pond 0 2,900 5,800 8,7001,450 Feet Date: 4/24/2017 Source: Metropolitan Council, MnGEO Prepared by: SHC [Impaired Waterbodies (2014 Draft) Impaired Streams Impaired Lakes SURFACE WATER MANAGEMENT - DRAFT 5-25-2018 City of Lake Elmo Comprehensive Plan 2040 30 GOALS AND POLICIES General The goals in Lake Elmo’s Local Surface Water Management Plan are consistent with the goals of the Brown’s Creek Watershed, Valley Branch Watershed District, and South Washington Watershed District while addressing the more specific and changing needs of the City. The goals are also established in accordance with Minnesota Statutes 103B and Minnesota Rules 8410. The policies of Brown’s Creek Watershed District, Valley Branch Watershed District, and South Washington Watershed District have been adopted by reference for the portions of the watershed districts within the City, as shown in Map 8-1. The City of Lake Elmo recognizes that BCWD, VBWD, and SWWD will continue to have permitting authority for areas within each district. The most recent rules and regulations for each district can be found at the relative locations online: • Brown’s Creek Watershed District (BCWD) www.bcwd.org • Valley Branch Watershed District (VBWD) www.vbwd.org • South Washington Watershed District (SWWD) www.swwdmn.org Local surface water goals will continue to be implemented through annual review and updates of the City’s Storm Water Pollution Prevention Plan (SWPPP), as well as compliance with the NPDES MS4 Permit. Additional goals and policies of the City are contained as follows. LSWMP Goals and Policies The following goals and policies are part of the City of Lake Elmo’s adopted Local Surface Water Management Plan: 1. The City of Lake Elmo is committed to a goal of no adverse impacts to ground and surface water resources in the area. Policies: • The City will work cooperatively with local water management organizations, state agencies, and landowners to protect local wetlands, lakes, streams, and ground water to preserve the values of these resources for future generations. • The City concurs with and adopts the Valley Branch, South Washington and Brown’s Creek Watershed Districts’ Watershed Management Plans, rules and standards by reference through this LSWMP. The Watershed Districts will continue to enforce SURFACE WATER MANAGEMENT - DRAFT 5-25-2018 City of Lake Elmo Comprehensive Plan 2040 31 surface water regulations and permitting within the City within the boundaries of their districts. The City will coordinate its review of development proposals with the Watershed Organizations, by providing review comments to the districts. • The City will manage land use to support protection of surface and ground waters through the following elements of its Zoning and Subdivision Ordinance: Chapter 53 Stormwater Management Utility Chapter 91 Forests and Trees Chapter 152 Flood Plain Management Chapter 153 Subdivision Regulations Chapter 154 Zoning Code • The City will implement its ordinances and standards and cooperate with the County, MPCA and the Watershed Organizations in managing land use to protect ground water resources. Additional goals and policies for ground water protection are included in the Water Supply element of the City’s Comprehensive Plan. • The City encourages the use of best management practices for agricultural land uses to minimize erosion and to protect the quality of surface and ground water resources. • The City supports and will encourage developers and landowners to use storm water practices that promote infiltration/filtration and decrease impervious areas through site design and use of Low Impact Development (LID) techniques and Green Design. • The City supports inspection of on-site individual sewage treatment systems by an MPCA certified inspector at the time of property sale or transfer and requirements that these systems meet state standards. GOAL 2. The City will work with local Watershed Districts to collaborate in the plan review and permitting new development and redevelopment projects to meet ordinances and design standards thereby implementing rate and volume control practices, Policies: • The City will continue to review and implement the recommendations of the Village Regional Stormwater Study to further mitigate water quantity and quality concerns in the Old Village center and Down’s Lake Watershed. • Review developments and require they meet SWWD permit requirements. SURFACE WATER MANAGEMENT - DRAFT 5-25-2018 City of Lake Elmo Comprehensive Plan 2040 32 GOAL 3. Protect the quality of local lakes by supporting the Watershed Districts’ goals and plans for managing lakes in the City. Policies: • The City will update and implement its land use plan, zoning and subdivision ordinances to protect shoreland areas and lake water quality, and work with the Watershed Districts to achieve the lake management goals identified in the Watershed’s Water Management Plans. • The City will participate in the Watershed Districts’ Total Maximum Daily Load (TMDL) studies and implementation plans to address impaired water bodies within the City and areas downstream. GOAL 4. Protect and enhance the quality of wetland resources. Policies: • The City will cooperate with the Valley Branch Watershed District as they serve as the LGU for the WCA within its watershed area. • The City will serve as the LGU for the WCA within the BCWD and SWWD areas of the City. The City will utilize the technical assistance provided by the Washington Conservation District in this role. • The City will support and help to implement Watershed District requirements for wetland management, including District water quality standards, buffer requirements, and pretreatment of storm water prior to discharge into all wetlands. • Wetlands that have not been inventoried by the Watershed Districts will be required to complete a functions and values assessment as a part of the development application. Watershed rules regarding wetland management will be applied based on the results of the assessment and the wetland classification. GOAL 5. Protect and enhance the quality of natural resources. Policies: • The City will work with state agencies, Washington County, local watershed districts and residents and landowners to protect and enhance natural communities and natural resources in Lake Elmo. • The City will encourage developers and landowners to retain native vegetation and undisturbed areas to protect habitat and manage storm water. SURFACE WATER MANAGEMENT - DRAFT 5-25-2018 City of Lake Elmo Comprehensive Plan 2040 33 • The City will require subdivision design that preserves natural drainage systems and protects and restores wetlands and wetland buffers. • The City will work with other organizations and landowners to protect the greenway corridors and habitat connections identified in Lake Elmo. • The City will work with other organizations and support efforts to control the spread of invasive exotic species. GOAL 6. Protect ground water quality and quantity. Policies: • The City will cooperate with the Minnesota Pollution Control Agency, Minnesota Department of Health, Washington County, and local watershed districts to address ground water quality and quantity issues. The City will enforce its Zoning and Subdivision ordinances to protect ground water quality, ground water quantity, and to manage ground water recharge areas. • The City will coordinate with other LGUs for ground water sensitive areas, wellhead protection areas, water use contingency, and allocation plans, and other ground water issues where the plans may affect other jurisdictions. • The City has completed a Wellhead Protection Plan (included in the Appendix) and will continue to evaluate and monitor implementation of the objectives and plans of actions identified in this Plan. • The City will consider requiring a ground water monitoring plan or ground water protection plan as part of a permit application for businesses that store, use, or transport hazardous materials and for properties formerly used as a waste disposal site or waste transfer facility. TRIN Goal #1. Provide improved infrastructure, including sewer, water, and facilities, to serve new residents in the developing areas of the community. - Chapter 1: Vision, Goals & Strategies SURFACE WATER MANAGEMENT - DRAFT 5-25-2018 City of Lake Elmo Comprehensive Plan 2040 34 IMPLEMENTATION PLAN City Role and Responsibilities The City will complete the following specific implementation actions to implement the Surface Water chapter of this Plan: 1. The City adopts and incorporates by reference the Watershed Management Plans of the three Watershed Districts with presence in Lake Elmo, including the standards and rules, into this Comprehensive Plan and as a part of the City’s permitting and development review process. The Watershed Districts will continue to enforce surface water regulations and permitting within the City and within their geographic areas. The City will coordinate its review of development proposals with the Watershed Districts and will manage land use to support protection of surface and ground waters through its Zoning and Subdivision Ordinance. 2. The City will update its Local Surface Water Management Plan (LSWMP) by the end of 2019 consistent with the timeline adopted in the 2009 LSWMP. The City understands that its LSWMP must be consistent with each Watershed District’s Watershed Management Plans. a) The City understands that the Valley Branch Watershed District, Brown’s Creek Watershed District and South Washington Watershed District have prepared models for portions of the City, but not all modeling work is complete. The City will rely on each watershed district completing this work and will update its LSWMP as information and data become available. b) The City will update its LSWMP and submit a copy to each of the Watershed Districts for review, comment, and approval once complete. SURFACE WATER MANAGEMENT - DRAFT 5-25-2018 City of Lake Elmo Comprehensive Plan 2040 35 3. City Process for Proposed Development. The City of Lake Elmo reviews proposed development per its Subdivision Ordinance. Design must be in compliance with Engineering Design Standards. An approved Watershed District permit is required prior to final plat acceptance. WCD approval of any wetland impact must be provided if located in BCWD or SWWD. Any impacts to public waters must be reviewed by the MnDNR. An NPDES Permit must be received from the MPCA when applicable. An approved SWPPP must be provided for all subdivisions. No building permit will be issued until the following has been completed: The City will support the Watershed Districts’ implementation of their standards for management of water quantity and quality, including control of peak runoff, volume control, infiltration and filtration, wetland quality, and best management practices to control Total Suspended Solids (TSS), Total Phosphorus (TP), and runoff from development or redevelopment within the City. 4. The Watershed Districts will continue to play the primary role in reviewing storm water plans for development applications within the City, and the City will condition any development approvals on demonstrated compliance with Watershed District Rules. The City will direct applicants to submit completed permit applications of any development proposals at time of application and will work cooperatively with the Watershed Districts through the review and approval process. 5. The City will continue to work with each Watershed District on refinement of coordination of permit and development application review processes and timelines. 6. The City will update its ordinances to be consistent with Watershed Management Plans, standards and rules, and with NPDES construction storm water permit requirements for erosion and sediment control if necessary. SURFACE WATER MANAGEMENT - DRAFT 5-25-2018 City of Lake Elmo Comprehensive Plan 2040 36 7. The City will cooperate with the Watershed Districts to address concerns related to impaired waters and, as the Watershed Districts complete TMDL studies, will manage land use to avoid impacts to water resources within the City. 8. Continue to implement the City’s MS4 Permit and SWPPP requirements. 9. Funding Mechanisms. The City will continue to use general fund revenues and storm water utility funds to fund improvements when needed to address water quality and quantity concerns and maintain City-owned storm water management facilities. The City’s commitments to system maintenance are described in detail in its MS4 permit and SWPPP. The City requires that developers finance the improvements that are required with new development and redevelopment to ensure that private developments meet City and watershed requirements. 10. Capital Improvement Plan (CIP). The City’s CIP will incorporate specific implementation strategies for surface water management as part of the budgeting process. 11. The City’s inspection and maintenance program and pollution prevention/good housekeeping is completed under the MS4 Permit and documented per the SWPPP. 12. The City will continue to implement the strategies and recommendations as needed from the Old Village Area Regional Stormwater Management Study that was completed by SEH, in May 2015, to continue to address and mitigate the Old Village Area flooding problems and to protect resources in the Down’s Lake Watershed and downstream. City Ordinances. The City’s adopted ordinances that provide standards and regulations to manage water resources include the following: • Chapter 53 Stormwater Management Utility • Chapter 91 Forests and Trees • Chapter 150 Illicit Discharge and Connection • Chapter 152 Flood Plain Management • Chapter 153 Subdivision Regulations • Chapter 154 Zoning Code SURFACE WATER MANAGEMENT - DRAFT 5-25-2018 City of Lake Elmo Comprehensive Plan 2040 37 NPDES Phase II The City of Lake Elmo is required to have a Municipal Separate Storm Sewer System (MS4) permit through the MPCA’s National Pollutant Discharge Elimination System (NPDES) Phase II Program of the Minnesota Pollution Control Agency (MPCA). MS4 Permits are required for communities with urban development and populations over 10,000 or with urban development and populations over 5,000 that have potential to discharge to valuable or polluted waters. In accordance with an MS4 Permit, the City of Lake Elmo is required at a minimum to implement six control measures: 1. Public Education and Outreach 2. Public Participation/Involvement 3. Illicit Discharge Detection and Elimination 4. Construction Site Stormwater Runoff Control 5. Post-Construction Stormwater Management 6. Pollution Prevention/Good Housekeeping for Municipal Operations For more information on the MS4 Permit requirements, see the MPCA’s rules online at www.pca. state.mn.us. Official Controls The City of lake Elmo maintains official controls for the purposes of water management and environment protection within their Municipal Code. Stormwater Management Utility Lake Elmo maintains a stormwater management utility as outlined in ordinance Chapter 53 of the Municipal Code. The code states that “The municipal surface water system shall be operated as a public utility, pursuant to M.S. § 444.075, …from which revenues will be derived subject to the provisions of this chapter and Minnesota Statutes. In general, revenue from the surface water utility shall be used for preparation of a Surface Water Management Plan, maintenance of existing ditches, culverts, pond, and storm sewers, capital improvement in developed areas, equipment, planning, inventories, and water quality improvements, including weed control.” SURFACE WATER MANAGEMENT - DRAFT 5-25-2018 City of Lake Elmo Comprehensive Plan 2040 38 Wetland Protection and Preservation Overlay District (WPP) (Chapter 150, Section 215) The purpose of the Wetland Protection and Preservation Overlay District is to “provide for the protection, preservation, proper maintenance, and use of the city’s wetlands, to minimize the disturbance to them and to prevent damage from excessive sedimentation, eutrophication, or pollution, to prevent loss of fish or other beneficial aquatic organisms, and/or loss of wildlife and vegetation or the habitants of the same; to provide for the protection of the city’s probable fresh water supplies from the dangers of drought, overdraft, pollution, or mismanagement; to secure safety from floods; to reduce the financial burdens imposed upon the communities through rescue and relief efforts occasioned by the occupancy or use of areas subject to periodic flooding to prevent loss of life, property damage, and the losses and risks associated with flood conditions; to preserve the location, character, and extent of natural drainage courses.” Shoreland District and Standards (Chapter 150, Section 250) The Shoreland District is identified to protect water features from potential development and land use impacts. Generally, the ordinance outlines standards that “apply to all shorelands of the protected waters. Where the requirements of the underlying zoning district as shown on the official zoning map are more restrictive than those set forth in §§ 150.250et seq., the more restrictive standards shall apply. Only land above the ordinary high water level of public waters can be used to meet lot area standards, and lot width standards must be met at both the ordinary high water level and at the building line.” Storm Water and Erosion and Sediment Control (Chapter 150, Section 270) As part of the Land Usage chapter (Chapter 150), the municipal code also regulates maintenance of storm water facilities, both public and privately-owned. It also requires that all site construction undergo regular monitoring and inspections for compliance with appropriate NPDES permit requirements. Illicit Discharge and Connection (Chapter 150, Section 300) This Chapter of the Municipal Code regulates discharge and watercourse protection, and directly supports requirements in the MS4 Permit. It states “No person shall throw, drain, or otherwise discharge, cause, or allow others under its control to throw, drain, or otherwise SURFACE WATER MANAGEMENT - DRAFT 5-25-2018 City of Lake Elmo Comprehensive Plan 2040 39 discharge into the MS4 any pollutants or waters containing any pollutants, other than storm water.” For privately-owned land along a public watercourse, the ordinance also states “Every person owning property through which a watercourse passes, or such person’s lessee, shall keep and maintain that part of the watercourse within the property free of trash, debris, yard waste, excessive vegetation, and other obstacles that would pollute, contaminate, or significantly retard the flow of water through the watercourse. In addition, the owner or lessee shall maintain existing privately owned structures within or adjacent to a watercourse, so that such structures will not become a hazard to the use, function, or physical integrity of the watercourse.” Floodplain Management Lake Elmo maintains a floodplain management ordinance in Chapter 152 of the Municipal Code. The ordinance generally regulates development and construction within floodways and floodplains. The purpose of the ordinance is to promote the public health, safety, and general welfare and to minimize those losses” applicable “to all lands within the jurisdiction of Lake Elmo shown on the official zoning map and/or the attachments thereto as being located within the boundaries of the Floodway, Flood Fringe, or General Flood Plain Districts. Others Other rules part of the official controls contribute to the goals and policies for surface water management and are contained within the Municipal Code. These chapters include Chapter 91, Forests and Trees; Chapter 153 Subdivision Regulations; and Chapter 154 Zoning. There are no major changes identified at this time to the City’s Official Controls as they relate to the management of surface water in the City. As the Lake Elmo 2040 Comprehensive Plan Update is adopted, Zoning Codes will be updated to match the Future Land Use Plan. These Zoning Codes may incorporate additional standards that support implementation of best practices in surface water management as development occurs. The added standards may help achieve City goals for improved groundwater recharge, reduction of runoff, and increased water quality. Education Program As part of Lake Elmo’s commitment to education, and an important component of the MS4 Permit compliance, the City will continue to organize education programs for increased public awareness and participation in local surface water management. Lake Elmo is a member of SURFACE WATER MANAGEMENT - DRAFT 5-25-2018 City of Lake Elmo Comprehensive Plan 2040 40 the East Metro Water Resource Education Program (EMWREP) to assist in establishing and facilitating education programs for water management. More information about EMWREP can be found online at www.mnwcd.org/emwrep. Other opportunities will continue to be presented for residents, business owners, developers, and others to help improve strategies and implementation for increasing water quality and reducing runoff in all areas of Lake Elmo. Appropriate advertising of events and programs will be facilitated accordingly. Example programs may include: • Wetland buffer delineation and management • Best management practices for storm water infiltration • Best management practices for storm water runoff reduction and control • Invasive species control • Conservation easements • Sustainable groundwater recharge Collaboration with Agencies & Organizations There are a number of local, state, and federal agencies that have rules and regulations related to local water management. The City recognizes the roles of these other agencies and will cooperate, coordinate, and when possible partner with these agencies. This Plan chapter recognizes the many agencies and organization involved with regulating surface water management. It is the intention of the City of Lake Elmo to cooperate, collaborate, and coordinate efforts with these agencies to achieve successful water management within the City. Each of these organizations hosts various resources, plans, data, rules, and regulations for water management at the related website: Federal • Environmental Protection Agency www.epa.gov • US Army Corps of Engineers www.mvp.usace.army.mi • US Fish and Wildlife Service www.fws.gov State • Minnesota Environmental Quality Board www.eqb.state.mn.us • Minnesota Department of Natural Resources www.dnr.state.mn.us SURFACE WATER MANAGEMENT - DRAFT 5-25-2018 City of Lake Elmo Comprehensive Plan 2040 41 • Minnesota Pollution Control Agency www.pca.state.mn.us • Minnesota Department of Health www.health.state.mn.us • Board of Water and Soil Resources www.bwsr.state.mn.us • Minnesota Department of Agriculture www.mda.state.mn.us County • Washington County http://www.co.washington.mn.us/ • Washington Conservation District http://www.mnwcd.org/ Regional • South Washington Watershed District www.swwdmn.org • Valley Branch Watershed District http://vbwd.org/ • Brown’s Creek Watershed District http://bcwd.org/ • Metropolitan Council www.metrocouncil.org TRIN Goal #2. Maintain the level of city services to existing neighborhoods and plan through appropriate capital expenditures for necessary improvements. - Chapter 1: Vision, Goals & Strategies SURFACE WATER MANAGEMENT - DRAFT 5-25-2018 City of Lake Elmo Comprehensive Plan 2040 42 Table 8-3. Local Water Management Implementation Plan DR A F T T A B L E 8 - 3 . L O C A L S U R F A C E W A T E R M A N A G E M E N T I M P L E M E N T A T I O N P L A N Pr o j e c t De s c r i p t i o n MS4 Permit Requirement Initial 12 Mo. Requirement Annual Requirement Projects, Programs & Studies 10 Year Cost Estimate Possible Funding Sources Pr o p o s e d C o s t B y Y e a r 20 1 8 20 1 9 20 2 0 20 2 1 20 2 2 20 2 3 20 2 4 20 2 5 20 2 6 20 2 7 Co m m e n t s Up d a t e L S W M P X X $1 0 , 0 0 0 $4 0 , 0 0 0 Th e c u r r e n t L S W M P e x p i r e s i n 20 1 9 ; t h e u p d a t e w i l l b e c o m p l e t e an d a d o p t e d p r i o r t o t h i s d a t e ; a n d bu d g e t e d f o r i n 2 0 1 8 – 2 0 2 2 C I P Ed u c a t i o n A c t i v - it y I m p l e m e n t a - ti o n P l a n X X X $2 , 5 0 0 $2 , 5 0 0 $2 , 5 0 0 $2 , 5 0 0 $2 , 5 0 0 $2 , 5 0 0 $2 , 5 0 0 $2 , 5 0 0 $2 , 5 0 0 $2 , 5 0 0 An n u a l S W P P P As s e s s m e n t & A n n u a l R e - po r t i n g X X $2 , 5 0 0 $2 , 5 0 0 $2 , 5 0 0 $2 , 5 0 0 $2 , 5 0 0 $2 , 5 0 0 $2 , 5 0 0 $2 , 5 0 0 $2 , 5 0 0 $2 , 5 0 0 An n u a l P u b l i c Me e t i n g / E v e n t X X $1 , 0 0 0 $1 , 0 0 0 $1 , 0 0 0 $1 , 0 0 0 $1 , 0 0 0 $1 , 0 0 0 $1 , 0 0 0 $1 , 0 0 0 $1 , 0 0 0 $1 , 0 0 0 On l i n e Av a i l a b i l i t y o f th e S W P P P X X X $2 5 0 $2 5 0 $2 5 0 $2 5 0 $2 5 0 $2 5 0 $2 5 0 $2 5 0 $2 5 0 $2 5 0 ID D E I n s p e c - ti o n s X X X $3 , 0 0 0 $3 , 0 0 0 $3 , 0 0 0 $3 , 0 0 0 $3 , 0 0 0 $3 , 0 0 0 $3 , 0 0 0 $3 , 0 0 0 $3 , 0 0 0 $3 , 0 0 0 Ph a s e 2 R e - gi o n a l D r a i n a g e Im p r o v e m e n t s $1 , 2 0 0 , 0 0 0 $8 0 0 , 0 0 0 As s h o w n i n C i t y a d o p t e d 2 0 1 8 - 20 2 2 C I P Ph a s e 3 R e - gi o n a l D r a i n a g e Im p r o v e m e n t s $5 0 0 , 0 0 0 As s h o w n i n C i t y a d o p t e d 2 0 1 8 - 20 2 2 C I P Kr a m e r L a k e Fl o o d p l a i n st u d y $6 0 , 0 0 0 As s h o w n i n C i t y a d o p t e d 2 0 1 8 - 20 2 2 C I P ; c o n t i n g e n t o n g r a n t f r o m wa t e r s h e d d i s t r i c t Re n e w M S 4 Pe r m i t $1 0 , 0 0 0 Pa r t o f t h e n e x t 5 - y e a r u p d a t e t o th e S W P P P St o r m w a t e r Co n v e y a n c e Sy s t e m R e p a i r an d R e p l a c e - me n t $4 0 , 0 0 0 $4 0 , 0 0 0 $4 0 , 0 0 0 $4 0 , 0 0 0 $4 0 , 0 0 0 $4 0 , 0 0 0 $4 0 , 0 0 0 $4 0 , 0 0 0 $4 0 , 0 0 0 $4 0 , 0 0 0 WASTEWATER FACILITIES – DRAFT – 5-23-2018 | City of Lake Elmo Comprehensive Plan 2040 DRAFT Chapter 9: Wastewater Services 1 WASTEWATER FACILITIES – DRAFT – 5-23-2018 | City of Lake Elmo Comprehensive Plan 2040 INTRODUCTION The City of Lake Elmo is located within Washington County and is bordered by the City of Oak Park Heights, Baytown Township, and West Lakeland Township to its east; City of Woodbury to its south; the City of Oakdale to its west; and the City of Grant to its north. A large portion of Lake Elmo is designated as Rural Residential, to which there are no plans to provide urban infrastructure, such as a centralized sanitary sewer collection. Two areas are designated as Emerging Suburban Edge and are in the Metropolitan Urban Service Area (MUSA), the Old Village MUSA Area and South Planning MUSA Area. In addition, there is a small MUSA area along the west side of Lake Olson where lake home properties connect to the City of Oakdale Sanitary Sewer system. The Comprehensive Wastewater Management Plan will focus heavily on the needs and future plans for the City sanitary sewer system needed to serve the Old Village and South Planning MUSA Areas. The purpose of the Wastewater Management Chapter is to describe the existing wastewater management systems within the City and to outline timing and sequence of future improvements, allowing the City to build and improve a sanitary sewer collection system for the defined 2040 MUSA in the most efficient and cost-effective manner. The City of Lake Elmo’s Sanitary Sewer Plan was developed to conform to the Metropolitan Council’s Thrive 2040 Water Resources Policy Plan, which outlines goals for the wastewater system, including environmental sustainability. Additionally, the Thrive 2040 Plan includes population, household, and employment projections alongside projected wastewater flows. Wastewater flows are anticipated to increase significantly through 2040 as a result of projected population increases and land use changes within Lake Elmo. The Sanitary Sewer Plan serves as a guiding document for City infrastructure improvements and expansion. 1 WASTEWATER FACILITIES – DRAFT – 5-23-2018 | City of Lake Elmo Comprehensive Plan 2040 CITY SANITARY SEWER SYSTEM AND URBAN SERVICES AREAS Typically, municipal wastewater management systems consist of two elements: sanitary sewer collection and wastewater treatment. Collection systems include sewer services, trunk sewer pipe, lateral sewer pipe, manholes, lift stations, and forcemains which collect the sewer flows from private residential, commercial, and industrial properties within the city. Treatment systems include the biological or chemical treatment to remove targeted contaminants from the wastewater. The City’s sanitary sewer system is defined by four primary sanitary sewer service areas as follows: 1) the Old Village MUSA, 2) the Southeast Planning MUSA (Keats Avenue – Manning Avenue), and 3) the Southwest Planning MUSA (Inwood Avenue – Keats Avenue), and 4) Lake Olson MUSA. Old Village MUSA In 2013, the City constructed a lift station-forcemain system to convey wastewater from the Village Planning Area. The lift station-forcemain system was designed to serve the planned 1,100 new housing units and approximately 400 existing housing units with additional reserve capacity for future needs. The lift station was located near Reid Park at 30th Street and Lisbon Avenue, at the southern boundary of the Village Planning area. Two gravity trunk mains were extended north from the lift station, an 18-inch trunk main was extended on the Village east side through the new development growth areas, then along 39th Street from CSAH 14 to Lake Elmo Avenue. A 15-inch trunk main was extended west from the lift station along 30th Street, then north along Lake Elmo Avenue to serve existing residential properties. 8-inch lateral mains are being installed through a 7 Phase “Old Village Capital Improvement Plan” to replace aging and failed onsite wastewater systems, including two of the four community 201 wastewater systems. All Village wastewater is pumped through a 16-inch forcemain running approximately 3 miles and discharging to a 24-inch trunk main at Lake Elmo Avenue and 5th Street North. Southeast Planning MUSA (Keats Avenue – Manning Avenue) Sanitary sewer service was also initiated in 2013 to serve portions of the Southeast Planning MUSA beginning at the intersection of Lake Elmo Avenue and 5th Street. A 24-inch trunk main was extended north from the MCES Cottage Grove Ravine Meter Station in Lake Elmo and 8-inch lateral mains were extended to serve two new residential developments. As identified above, the 24- inch trunk main was designed to receive the Old Village MUSA wastewater and convey it to the MCES Cottage Grove Ravine Meter Station, located along Hudson Boulevard near Lake Elmo Avenue. In 2017, following a Comprehensive Plan Amendment, sanitary sewer was extended to the Tartan Park area, just north of the Southeast Planning MUSA to serve the Royal Golf Club (RGC) residential development. The RGC sanitary sewer system consists of lateral gravity sanitary sewer mains within three separate lift station service areas. The multiple lift stations were needed to convey wastewater through a highly variable topography. The largest of the lift stations is located along 10th Street (the southern RGC boundary) and receives all wastewater generated from the development and pumps it to the existing 16-inch forcemain along Lake Elmo Avenue. The construction for two of the lift stations will be completed in 2018 with the third lift station to be phased in with the future build-out of the development. 2 WASTEWATER FACILITIES – DRAFT – 5-23-2018 | City of Lake Elmo Comprehensive Plan 2040 The 2020 Staging Plan includes the extension of a second trunk sewer from the MCES Cottage Grove Ravine Meter Station to serve the portions of the Southeast Planning MUSA from Lake Elmo Avenue to Manning Avenue. In addition to serving new development in this area, service will be extended to the existing Cimarron manufactured home park consisting of approximately 510 units. Cimarron owns and operates a private sewer collection and wastewater treatment system. A new lift station will likely be required to connect to the City sanitary sewer system. This service area also includes the future connection to the existing Oakland Junior High School to replace an existing on-site wastewater treatment facility. These flows are included in the forecasts. The 2030 Staging Plan includes the extension of two additional trunk sewer mains west of Lake Elmo Avenue, one from the MCES Cottage Grove Ravine Meter Station along Hudson Boulevard running west across Lake Elmo Avenue to serve new development south of the Forest Addition, and the second extending west from the intersection of Lake Elmo Avenue and 5th Street N. to serve the areas north and west of the Forest Addition. Both trunk sewer mains will discharge to a new lift station to be located on the west side of the Lake Elmo Avenue that will pumped across Lake Elmo Avenue to the adjacent gravity trunk mains. Southwest Planning MUSA (Inwood Avenue – Keats Avenue) The Eagle Point Business Park, located in the southeast 1/4 of Section 33, was platted and developed beginning in year 2000. The area was brought into the Metropolitan Urban Service Area (MUSA) and gravity sanitary sewer was constructed to serve the business park. Wastewater is conveyed to the I-94 lift station located on north side of Hudson Boulevard, about 1/3 mile east of Inwood Avenue (CSAH 13). Through agreement with the City of Oakdale, the I-94 lift station discharges to a City of Oakdale sanitary sewer main in Hudson Boulevard. From there it enters the WONE interceptor. Under the agreement with the City of Oakdale, Lake Elmo is limited to the amount it can discharge. In 2014, significant residential development was initiated in the remaining Southwest Planning MUSA area, first to the east of the Eagle Point Business Park and later to the north. A sanitary sewer conveyance system was developed to serve the entire MUSA area consisting mostly of gravity sanitary sewer. A 12-inch trunk main was extended along Hudson Boulevard approximately 4,200 feet to the east of the I-94 lift station. At Jade Trail, another 12-inch trunk main is extended north into the Inwood development (north of the Eagle Point Business Park) which later transitions down to a 10-inch main at 10th Street and Island Trail. A lift station (Keats Avenue Lift Station) was needed to capture wastewater flows from the lower topographic area adjacent to Keats Avenue and Goose Lake. The forcemain from this lift station runs south along Keats Avenue, then west along Hudson Boulevard and discharging back to the 12-inch trunk main on Hudson Boulevard. The current staging areas (up to 2020) have been platted for the most part and the sanitary sewer system installed, although some areas have not been fully built-out. The commercial areas remain unbuilt along Inwood Avenue and just north of the Eagle Point Business Park. The 2020 Staging Plan consists of about 125 aces located between the Eagle Point Business Park and Keats Avenue, and south of 5th Street North. The existing sanitary sewer system is in place and readily available to serve this area. 3 WASTEWATER FACILITIES – DRAFT – 5-23-2018 | City of Lake Elmo Comprehensive Plan 2040 Lake Olson MUSA In 2013, the City of Lake Elmo and City of Oakdale entered into a cooperative agreement, which is included in this Chapter as Appendix D, to jointly install sanitary sewer along Olson Lake Trail in the Tri-Lakes area, a border street with Lake Elmo properties on the east side and Oakdale properties on the west side. The sanitary sewer extension provides public sewer service to 21 Lake Elmo properties but connects to an Oakdale owned and operated sanitary sewer system. Five properties were connected to sewer in 2013 and the remaining properties were connected in 2017. No future extensions are anticipated for this MUSA area at this time. 4 WASTEWATER FACILITIES – DRAFT – 5-23-2018 | City of Lake Elmo Comprehensive Plan 2040 METROPOLITAN COUNCIL ENVIRONMENTAL SERVICES For the City of Lake Elmo, the Metropolitan Council Environmental Services (MCES) provides wastewater treatment for Lake Elmo’s sanitary sewer flows. Therefore, the City’s sanitary sewer system consists of only a collection system which connects and discharge to MCES interceptors. MCES owns and operates a system of sewer interceptors that convey wastewater across City boundaries to regional treatment facilities. Wastewater flows from Lake Elmo enter the MCES Interceptor system at two locations. The western portion of the South Planning MUSA, between Inwood Avenue and Keats Avenue, are conveyed to the MCES Metropolitan Wastewater Treatment Plant (WWTP) located in the City of St. Paul, directly adjacent to the Mississippi River. This area connects to the MCES system through a 10-inch gravity sewer extending across eastern Oakdale and connecting to the MCES 15-inch 1-WO-500 (WONE) interceptor sewer that crosses under I-94 into Woodbury. The Old Village MUSA and eastern portion of the South Planning MUSA, between Keats Avenue and Manning Avenue, are conveyed to the MCES Eagle Point Plant in Cottage Grove which serves southern Washington County. This area connects to the MCES system at a meter station/interceptor that also crosses under I-94 into Woodbury. The connection point is located along Hudson Boulevard approximately 1,000 feet east of Lake Elmo Avenue. The MCES plans to extend a new sewer connection for the City of Lake Elmo to replace the connection through Oakdale for the western portion of the South Planning MUSA, more specifically the east 1/2 of Section 33 and all of Section 34. The new WONE connection point will be near the City's existing I-94 lift station and will greatly reduce that lift station’s forcemain length. The I-94 lift station will continue to be active and maintained by the City. The existing units in the Cimarron manufactured home park will be served by regional sewer between 2030 and 2040 unless environmental threats require a more immediate connection. The remaining homes and businesses not currently served by sewer within the Village Planning Area are assumed to be served by regional sewer between 2018 and 2030. Lift Stations The City’s current system includes 5 lift stations, as summarized in Table 9-1. TABLE 9-1 LIFT STATIONS No. Lift Station Year Constructed Pumping Capacity (gpm) 1 I-94 (along Hudson Blvd.) 2018 (rebuilt) 825 2 Reid Park 2013 1,200 3 Keats Avenue 2014 390 4 RGC 1st Addition 2018 100 5 10th Street 2018 325 5 WASTEWATER FACILITIES – DRAFT – 5-23-2018 | City of Lake Elmo Comprehensive Plan 2040 FORECASTS Population The Metropolitan Council projects and publishes population and sewer usage forecasts for each City in the Metropolitan Area. This allocation is used in projecting future wastewater flows and system capacity to plan for additional infrastructure needs. Table 9-2 shows such forecasts for Lake Elmo. TABLE 9-2 POPULATION FORECASTS FOR LAKE ELMO Forecast Year Forecast Component Population Households Employment 2010 MCES Sewered 0 0 623 2010 Unsewered 8,061 2,776 1,318 2020 MCES Sewered 3,712 1,359 2,338 2020 Unsewered 6,788 2,441 562 2030 MCES Sewered 6,960 2,540 2,788 2030 Unsewered 7,140 2,760 562 2040 MCES Sewered 10,208 3,721 3,238 2040 Unsewered 7,992 3,379 562 Community Forecast for Areas Served by Regional Sewer Service Wastewater flow projections were generated for each MUSA area and regional interceptor for the 2020, 2030 and 2040 planning periods based on the anticipated land uses. Table 9-3 summarizes these projections by sewer REC units, average day wastewater flows and peak day wastewater flows. TABLE 9-3 PROJECTIONS BY SEWER REC UNITS Current (2020) Wastewater Flows by Interceptor MCES WONE Interceptor/Oakdale MCES Cottage Grove Ravine Interceptor REC Units Average Day Projected Flow (MGD) Peak Day Projected Flow (MGD) REC Units Average Day Projected Flow (MGD) Peak Day Projected Flow (MGD) Old Village MUSA 1,542 0.42 1.48 Southeast Planning MUSA 170 0.05 0.19 Southwest Planning MUSA 1,682 0.46 1.61 TOTALS 1,682 0.46 1.61 1,712 0.47 1.67 6 WASTEWATER FACILITIES – DRAFT – 5-23-2018 | City of Lake Elmo Comprehensive Plan 2040 2020-2030 Wastewater Flows MCES WONE Interceptor/Oakdale MCES Cottage Grove Ravine Interceptor REC Units Average Day Projected Flow (MGD) Peak Day Projected Flow (MGD) REC Units Average Day Projected Flow (MGD) Peak Day Projected Flow (MGD) Old Village MUSA 1,823 0.50 1.70 Southeast Planning MUSA 3,001 0.82 2.63 Southwest Planning MUSA 2,613 0.72 2.36 TOTALS 2,613 0.72 2.36 4,824 1.32 4.33 2030-2040 Wastewater Flows by Interceptor MCES WONE Interceptor/Oakdale MCES Cottage Grove Ravine Interceptor REC Units Average Day Projected Flow (MGD) Peak Day Projected Flow (MGD) REC Units Average Day Projected Flow (MGD) Peak Day Projected Flow (MGD) Old Village MUSA 2,537 0.70 2.29 Southeast Planning MUSA 5,344 1.46 4.39 Southwest Planning MUSA 2,613 0.72 2.36 TOTALS 2,613 0.72 2.36 7,881 2.16 6.69 Sanitary Sewer Plan Map The Sewer Staging Plan Map (Map 9-1) [to be inserted at a later date - see land use chapter] shows sewer service staging in four phases in accordance with the Land Use Plan. The Sewer Services Area – Tri Lakes Map (Map 9-2) shows the sewer service area for existing homes to be provided with service along Lake Olson. 7 Lake DeMontreville Lake Olson OL S O N L A K E T R L N H I L L T R L N 50TH ST N HIDDEN BAY T R L N H I L L T O P A V E N HI G H L A N D S T R L N DEER POND TRL N JA C K P I N E T R L N WINDBREAK TRL N 53RD ST N HILL TRAIL CT N Sewer Service Area - Tri Lakes Lake Elmo Comprehensive Plan Update E 0 250 500 750 1,000125Feet Public Sewer Service Area Map 9-2 8 WASTEWATER FACILITIES – DRAFT – 5-23-2018 | City of Lake Elmo Comprehensive Plan 2040 Projected Flows for Each MCES Interceptor Service Area (MGD) TABLE 9-4 PROJECTED FLOWS FOR EACH MCES INTERCEPTOR SERVICE AREA (MGD) Average Day Projected Wastewater Flows by Interceptor (MGD) Year WONE Cottage Grove TOTAL 2020 0.46 0.47 0.93 2030 0.72 1.32 2.04 2040 0.72 2.16 2.88 Peak Day Projected Wastewater Flows by Interceptor (MGD) Year WONE Cottage Grove TOTAL 2020 1.61 1.67 3.28 2030 2.36 4.33 6.69 2040 2.36 6.69 9.05 Land Use Plan Map The general plan for providing sanitary sewer to the planned service area is outlined in Map 9-3. 9 La k e E l m o Lake JaneOlson Lake L a k e D e M o n t r e v i l l e # # # # ### #* #* # ## ")") # #* #* #* # # ## # # Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS,USDA, USGS, AeroGRID, IGN, and the GIS User Community Future Land Use - Sewer Plan- DRAFT (needs edits and land use inserted) Map 9-3 K 0 10.5 Miles WONE Interceptor Cottage Grove Ravine Interceptor 456713 456710 456719 456717 456715 456717 456714456713 #* ") Oakdale Gravity Service #Flow Direction MCES Interceptor Lift Station Gravity SewerForcemain SewerMunicipal Boundary Data Source: Washington County, MN Planning MUSA South West Planning MUSA South East Planning MUSA Old Village Planning MUSA Lake Olson MUSA ") 10 WASTEWATER FACILITIES – DRAFT – 5-23-2018 | City of Lake Elmo Comprehensive Plan 2040 INFILTRATION AND INFLOW (I/I) Inflow is water, typically stormwater, which enters the sewer system through broken manhole covers, sewer cleanouts, sump pumps, foundation drains, and rain leaders. Infiltration is water, typically groundwater, which leaks into the sewer system through cracks in the sewer mains, laterals, joints, and manholes. Water from inflow and infiltration (I/I) can consume available capacity in the wastewater collection system and increase the flow into treatment facilities. As a sewer system ages, I/I can become an increasing burden on a City’s system and consume otherwise available capacity. Therefore, it is imperative that I/I be reduced whenever it is cost effective to do so. In February 2006, the MCES began an Ongoing I/I Program which requires communities within their service area to eliminate excessive I/I. The City of Lake Elmo’s sanitary sewer system is very new, primarily installed since 2013. Therefore, Lake Elmo currently does not have excessive I/I concerns. The City of Lake Elmo’s goal is to have no inflow or infiltration into its sewer system, and to attain the goal of preventing and reducing excessive infiltration and inflow as the sewer system ages. To meet that goal the City will observe the following procedures: •All sewer mains will be air tested in accordance with the Minnesota City Engineers Association Standards for Utility Construction. •All new sewer mains will be televised. •Homes and businesses will be checked for sump pump discharge into the sewer system prior to issuance of a Certificate of Occupancy. •The City will monitor actual sewer flows during storm events to see if there is an increase in sewer discharge. •The City will develop a schedule to inspect and clean all sewers. Additionally, City Code Section 150.300 prohibits discharge from and requires disconnection of existing sump pumps, foundation drains, and/or rain leaders to the sanitary sewer system, a copy of which is attached as in Appendix A. 11 WASTEWATER FACILITIES – DRAFT – 5-23-2018 | City of Lake Elmo Comprehensive Plan 2040 AREAS NOT SERVED BY THE REGIONAL SYSTEM Description of the City’s Current Management Program The City has adopted Chapter 4: Subsurface Sewage Treatment System Regulations of the Washington County Development Code by reference. A copy of the City's Ordinance and a description of the SSTS monitoring system are included as Appendix B. Washington County currently monitors SSTS installations and administers the code for the City. Cimarron Manufactured Home Park operates and maintains a packaged treatment plant with a capacity of 0.15 MGD. There is a State permit for this facility. Information, including location, of non-conforming systems or systems with known problems may be obtained from the Washington County Comprehensive Plan 2040. Conditions Under Which Septic Systems Are Allowed Septic Systems are allowed for all land uses within the City outside of the planned sewer service areas in accordance with Chapter 4: Subsurface Sewage Treatment System Regulations of the Washington County Development code as adopted by reference by the City of Lake Elmo. Private Community Wastewater Treatment Systems Map 9-4 and Table 9-5 Private Community Wastewater Treatment Systems shows the privately owned sewage treatment systems that have been constructed in the City. These community wastewater collection and treatment systems were installed in accordance with Minnesota Rules 7080 to serve open space developments including Carriage Station, Discover Crossing, Farms of Lake Elmo, Fields of St. Croix, Hamlet on Sunfish Lake, Hidden Meadows, St. Croix’s Sanctuary, Tamarack Farm Estates, Tana Ridge, Tapestry at Charlotte’s Grove, Whistling Valley, and Wildflower Shores. These systems have all been constructed since 1998. The homeowners within these new subdivisions are responsible for ownership, operation and maintenance. The Private Community Wastewater Treatment Systems consist of “wetland treatment systems” or “community drainfield systems”. Systems over 10,000 gallons per day have a State Disposal Permit. The City's Agreement with Washington County is included as Appendix C. 12 WASTEWATER FACILITIES – DRAFT – 5-23-2018 | City of Lake Elmo Comprehensive Plan 2040 TABLE 9-5 PRIVATE COMMUNITY WASTEWATER TREATMENT SYSTEMS Private Community Wastewater Treatment Systems Subdivision Number of Homes Design Flow (GPD) State Permit Carriage Station 111 44,875 Yes Discover Crossing 28 9,045 No Farms of Lake Elmo 33 12,375 Yes Fields of St. Croix 135 35,589 Yes Hamlet on Sunfish Lake 41 8,200 Pending Hidden Meadows 25 and church 13,375 Yes St. Croix’s Sanctuary 62 20,000 Yes Tamarack Farm Estates 20 4,000 No Tana Ridge 20 5,841 Yes Tapestry at Charlotte’s Grove 67 25,125 Yes Whistling Valley 46 20,000 Yes Wildflower Shores 25 3,600 No Private Treatment Systems There are currently 1,981 known individual sewage treatment systems (ISTSs or septic systems) within the City of Lake Elmo, as shown in Map 9-5. City-Owned Community Wastewater Treatment Systems (201 Systems) In the late 1980’s, the City of Lake Elmo participated in the Federal 201 program which provided grant funds to help communities build shared wastewater treatment systems. The City of Lake Elmo designed and constructed eight (8) 201 shared wastewater treatment systems under this program to replace failing septic systems on private property. The systems provided individual septic tanks for private properties with shared wastewater drain fields and were constructed in the Old Village and Tri-Lakes areas. Two of the four Old Village 201 systems were replaced in 2015 and 2016 through the extension of City sanitary sewer, including Old Village Remote B and D. There are also four 201 systems located in the Tri-Lakes area. Map 9-6 Existing 201 Shared Wastewater Treatment Systems shows the location of these systems, which includes the following facilities, as shown in Table 9-6: TABLE 9-6 SHARED WASTEWATER TREATMENT SYSTEMS City-Owned 201 Wastewater Treatment Systems Old Village Remote A 6 3,750 Old Village Remote B REPLACED 0 Old Village Remote C 8 1,500 Old Village Remote D REPLACED 0 Tri-Lakes Remote A 1 450 Tri-Lakes Remote B 3 1,500 Tri-Lakes Remote C 2 600 Tri-Lakes Remote D 3 1,350 13 Map 9-4 Discover Crossing .. St. Croix's Santurary.Hidden Meadows 14 !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !(!( !( !( !( !( !( !(!( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !(!( !( !( !(!( !( !(!( !(!( !(!( !( !( !(!(!( !( !(!( !( !(!(!( !( !(!( !( !(!( !( !( !( !( !( !( !( !( !( !(!( !(!( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !(!(!( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !(!( !(!(!( !( !(!( !( !( !(!( !(!( !(!( !(!( !(!( !( !( !( !( !(!( !( !( !( !(!(!( !( !( !( !(!(!( !(!( !(!( !( !( !( !( !( !( !( !( !( !(!( !( !( !( !( !( !(!( !( !(!(!( !( !(!( !( !( !( !( !(!( !(!( !( !( !( !( !( !( !( !( !( !( !(!(!(!(!( !( !(!( !( !( !( !( !( !( !(!( !( !( !( !( !(!(!( !(!( !( !( !( !( !( !( !( !(!( !( !( !(!( !(!( !( !(!( !( !( !( !( !( !(!( !( !( !(!(!( !( !( !( !( !(!( !( !(!(!( !( !( !( !( !( !( !( !( !(!( !( !( !( !( !( !( !( !( !( !( !(!(!(!(!( !(!( !( !( !( !( !( !( !(!(!(!(!( !(!( !( !( !(!( !( !( !( !(!(!( !( !( !( !( !( !(!( !( !( !( !( !( !( !( !( !( !(!( !( !( !(!( !( !( !( !(!(!( !( !( !(!(!( !(!(!( !( !( !( !(!(!(!( !( !( !( !(!(!( !( !( !( !( !( !(!(!( !( !( !(!( !( !( !( !(!( !(!( !(!(!(!( !(!( !(!( !(!( !( !( !( !(!(!(!( !( !( !(!(!( !( !( !(!( !( !(!( !( !(!(!(!( !(!( !( !(!( !(!( !( !( !( !( !( !( !(!(!(!( !(!(!( !( !(!( !( !( !( !( !( !( !( !( !( !(!( !( !( !( !( !( !( !(!( !(!( !( !( !( !( !( !( !( !( !(!(!(!(!( !(!(!( !( !( !( !( !(!(!( !(!(!( !( !(!( !( !( !(!( !( !( !( !(!(!( !(!( !( !(!(!( !( !( !(!( !( !( !(!( !( !( !( !( !( !( !(!( !(!(!( !( !(!(!( !(!( !( !( !( !( !(!( !( !( !( !( !( !( !(!(!(!(!( !( !( !(!( !(!( !(!( !( !(!( !( !( !(!( !(!( !( !(!(!(!( !( !(!( !( !( !( !( !( !(!(!( !( !( !( !( !( !( !(!( !( !( !(!( !( !( !( !( !( !( !( !( !( !( !( !(!( !( !(!( !( !(!(!( !( !(!(!( !( !(!(!(!( !(!( !(!( !( !( !( !( !( !( !( !(!( !(!(!(!( !( !( !( !( !(!(!(!( !( !( !( !(!(!( !( !( !( !(!( !( !( !( !( !( !(!( !( !( !(!( !( !(!( !( !(!( !( !( !(!( !( !( !( !( !( !( !( !( !(!( !( !(!(!( !( !(!( !( !( !(!(!( !( !(!(!(!( !(!( !( !( !( !( !( !(!( !( !( !( !( !(!( !(!( !( !( !( !( !( !(!( !( !( !(!( !( !( !(!( !( !( !(!( !( !( !( !( !( !( !(!( !( !( !( !( !( !( !( !( !( !( !(!( !( !( !( !( !( !(!( !( !( !( !( !( !( !( !( !( !( !( !(!(!( !(!( !( !(!( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !(!(!( !( !( !( !(!( !( !(!( !( !(!( !( !( !(!( !( !( !( !( !( !( !( !( !( !(!( !( !( !( !( !(!( !(!( !( !( !( !( !( !(!( !( !(!( !( !( !( !( !( !(!( !( !( !( !( !(!(!( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !(!( !( !( !( !(!( !( !( !( !(!( !( !( !( !( !(!( !( !( !( !( !( !(!( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !(!(!( !( !( !( !( !( !(!( !( !( !( !( !( !(!( !( !( !( !( !( !( !( !( !( !( !( !( !(!( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !(!(!( !( !( !( !( !(!(!( !( !(!( !( !( !(!( !( !( !(!( !( !( !(!( !( !( !( !( !( !( !( !( !(!( !(!( !( !( !(!( !(!(!(!( !( !( !( !(!( !(!(!(!(!( !(!(!( !(!(!(!(!( !(!( !( !(!( !( !(!(!(!( !( !( !( !(!( !( !( !( !(!(!( !( !(!(!( !( !( !(!(!( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !(!( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !(!( !( !( !( !( !( !( !(!( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !(!( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !(!( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !(!( !( !( !( !( !( !( !(!( !( !( !( !( !( !(!( !( !( !( !(!( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !(!( !( !( !( !( !( !( !( !(!( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !(!( !( !( !( !( !( !( !( !( !( !( !( !( !(!( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !(!( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !(!( !( !( !( !( !( !( !( !( !( !(!( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !(!(!( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !(!( !( !( !( !( !( !( !(!( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !(!( !( !( !( !( !( !( !( !( !( !( !( !( !(!( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !(!( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !(!( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !(!( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !(!( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !(!( !( !( !( !(!( !( !( !( !( !( !( !( !( !( !( !( !(!( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !(!( !(!( !(!( !( !( !( !( !( !( !( !( !( !( !( !( !( !(!( !( !(!( !( !(!( !( !(!( !( !( !(!( !(!(!( !( !( !( !( !( !(!( !( !(!(!( !( !( !(!( !( !( !( !( !( !( !( !(!( !( !( !( !( !( !( !(!( !( !( !( !( !( !( !( !( !(!( !( !( !( !( !( !( !( !( !( !( !( !( !( !(!( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !(!( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !(!( !( !(!(!(!( !(!( !(!(!(!( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !(!(!( !( !( !(!( !( !( !( !( !( !( !(!( !( !( !(!( !( !( !(!( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !(!( !( !(!( !( !( !( !( ") ") ") ") ") ") ") ") ") ") ") ") ") ") 80631080 6 3 2 0 80 5 5 - 3 B 80 5 5 - 3 A 8 0 6 3 1-WO-500 ®!(Individual Sewer Treatment Systems (ISTS) (Approx. 1,982 Systems) ")Private Wastewater Treatment (Approx. 12 Systems) Gravity Interceptor Forcemain Interceptor City & Township Boundaries Individual Sewer Treatment Systems (ISTS)City of Lake Elmo 0 4,0002,000 Feet Source Data: SSTS, (ISTS) Washington County (June 2017), NCompass Technologies and MCES. Map created by MCES. 15 Map 9-6 System A [REPLACED] [REPLACED] 16 5/24/2018 CHAPTER 150: GENERAL PROVISIONS xx http://library.amlegal.com/alpscripts/get-content.aspx 1/6 Print Lake Elmo, MN Code of Ordinances ILLICIT DISCHARGE AND CONNECTION § 150.300 PURPOSE. The general purpose of this subchapter is to provide for the health, safety, and general welfare of the public through the regulation of non-storm water discharges to the storm drainage system to the maximum extent practicable as required by federal and state law. This subchapter establishes methods for controlling the introduction of pollutants into the municipal separate storm sewer system (MS4) in order to comply with requirements of the MS4 permit issued to the City of Lake Elmo by the Minnesota Pollution control Agency (MPCA) under the National Pollutant Discharge Elimination System (NPDES) permit process. The objections of this subchapter are: (A) To regulate the contribution of pollutants to the MS4 by storm water discharges by any user; (B) To prohibit illicit connections and discharges to the MS4; (C) To establish legal authority to carry out all inspection, surveillance, monitoring, and enforcement procedures necessary to ensure compliance with this subchapter. (Ord. 2012-59, passed 6-5-2012) § 150.301 APPLICABILITY. This subchapter shall apply to all water entering the storm drainage system generated on any developed and undeveloped lands unless explicitly exempted by § 150.306(A)(1) through (A)(4) of this subchapter. (Ord. 2012-59, passed 6-5-2012) § 150.302 DEFINITIONS. For the purposes of this subchapter, all terms, phrases, words, and their derivatives shall have the meanings as stated in Chapter 11 of the City Code. (Ord. 2012-59, passed 6-5-2012) § 150.303 RESPONSIBILITY FOR ADMINISTRATION. The City of Lake Elmo shall administer, implement, and enforce the provisions of this subchapter. Any powers granted or duties imposed upon the City of Lake Elmo maybe delegated in writing by the City Administrator to persons or entities acting in the beneficial interest of or in the employ of the city. (Ord. 2012-59, passed 6-5-2012) § 150.304 COMPATIBILITY WITH OTHER REGULATIONS. Appendix A: Illicit Discharge Connection Ordinance 17 5/24/2018 CHAPTER 150: GENERAL PROVISIONS xx http://library.amlegal.com/alpscripts/get-content.aspx 2/6 This subchapter is not intended to modify or repeal any other ordinance, rule, regulation, or other provision of law. The requirements of this subchapter are in addition to the requirements of any other ordinance, rule, regulation, or other provision of law, and where any provision of this subchapter imposes restrictions different from those imposed by any other ordinance, rule, regulation, or other provision of law, whichever provision is more restrictive or imposes higher protective standards for human health or the environment shall control. (Ord. 2012-59, passed 6-5-2012) § 150.305 ULTIMATE RESPONSIBILITY. The standards set forth herein and promulgated pursuant to this subchapter are minimum standards; therefore this subchapter does not intend or imply that compliance by any person will ensue that there will be no contamination, pollution, or unauthorized discharge of pollutants. (Ord. 2012-59, passed 6-5-2012) § 150.306 DISCHARGE PROHIBITIONS. (A)Prohibition of illegal discharges. No person shall throw, drain, or otherwise discharge, cause, or allow others under its control to throw, drain, or otherwise discharge into the MS4 any pollutants or waters containing any pollutants, other than storm water. The commencement, conduct or continuance of any illegal discharge to the storm drain system is prohibited except as described as follows: (1) The following discharges are exempt from discharge prohibitions established by this subchapter: water line flushing, landscape irrigation, diverted stream flows, rising groundwater, uncontaminated groundwater infiltration, uncontaminated pumped groundwater, discharges from potable water sources, foundation drains, air conditioning condensation, irrigation water, springs, water from crawl space pumps, footing drains, lawn watering, individual residential car washing, flows from riparian habitats and wetlands, street wash water, dechlorinated swimming pool water, and any other water source not containing a pollutant. (a) For swimming pool discharges, water shall sit seven days without the addition of chlorine to allow for chlorine to evaporate before discharge. (b) Discharge of swimming pools, crawl spaces, sump pumps, footing drains and other sources that may be determined to contain sediment or other forms or pollutants may NOT be discharged directly to a gutter or storm sewer. This discharge must be allowed to flow over a vegetated area to allow filtering of pollutants, evaporation of chemicals and infiltration of water consistent with the storm water requirements of the City of Lake Elmo. (2) Discharges or flow from firefighting, and other discharges specified in writing by the City of Lake Elmo as being necessary to protect public health and safety. (3) Discharges associated with dye testing, however this activity requires a written notification to the City of Lake Elmo prior to the time of the test. (4) The prohibition shall not apply to any non-storm water discharge permitted under an NPDES permit, waiver, or waste discharge order issued to the discharger and administered under the authority of the MPCA, provided that the discharger is in foil compliance with all requirements of the permit, waiver, or order and other applicable laws and regulations, and provided that written approval has been granted for any discharge to the storm drain system. (B)Prohibition of illicit connections. 18 5/24/2018 CHAPTER 150: GENERAL PROVISIONS xx http://library.amlegal.com/alpscripts/get-content.aspx 3/6 (1) The construction, use, maintenance or continued existence of illicit connections to the storm drain system is prohibited. (2) This prohibition expressly includes, without limitation, illicit connections made in the past, regardless of whether the connection was permissible under law or practices applicable or prevailing at the time of connection. (3) A person is considered to be in violation of this subchapter if the person connects a line conveying sewage to the MS4, or allows such a connection to continue. (4) Improper connections in violation of this subchapter must be disconnected and redirected, if necessary, to an approved onsite wastewater management system or the sanitary sewer system upon approval of the City of Lake Elmo. (5) Any drain or conveyance that has not been documented in plans, maps or equivalent, and which may be connected to the storm sewer system, shall be located by the owner or occupant of that property upon receipt of written notice of violation from the City of Lake Elmo requiring that such locating be completed. Such notice will specify a reasonable time period within which the location of the drain or conveyance is to be determined, that the drain or conveyance be identified as storm sewer, sanitary sewer or other, and that the outfall location or point of connection to the storm sewer system, sanitary sewer system or other discharge point be identified. Results of these investigations are to be documented and provided to the City of Lake Elmo. (C)Additional discharge prohibitions. Any owner or occupant of property within the City of Lake Elmo shall comply with the following requirements: (1) Subsurface sewage treatment systems shall be maintained to prevent failure. (2) Recreational vehicle sewage shall be disposed of to a proper sanitary waste facility. (3) Mobile washing companies (carpet cleaning, mobile vehicle washing, and the like) shall dispose of wastewater to the sanitary sewer. (4) All motor vehicle parking lots and private streets shall be swept, at a minimum, once a year in the spring to remove debris. Such debris shall be collected and properly disposed. (5) Fuel, chemical residue, household hazardous waste or other types of potentially harmful material shall be disposed of properly. (6) Objects, such as motor vehicle parts, containing grease, oil or other hazardous substances, and unsealed receptacles containing hazardous materials, shall not be stored in areas susceptible to runoff. (7) Any machinery or equipment that is to be repaired or maintained in areas susceptible to runoff shall be placed in a confined area to contain leaks, spills or discharges. (Ord. 2012-59, passed 6-5-2012) § 150.307 WATERCOURSE PROTECTION. Every person owning property through which a watercourse passes, or such person’s lessee, shall keep and maintain that part of the watercourse within the property free of trash, debris, yard waste, excessive vegetation, and other obstacles that would pollute, contaminate, or significantly retard the flow of water through the watercourse. In addition, the owner or lessee shall maintain existing privately owned structures within or adjacent to a watercourse, so that such structures will not become a hazard to the use, function, or physical integrity of the watercourse. (Ord. 2012-59, passed 6-5-2012) 19 5/24/2018 CHAPTER 150: GENERAL PROVISIONS xx http://library.amlegal.com/alpscripts/get-content.aspx 4/6 § 150.308 INDUSTRIAL OR CONSTRUCTION ACTIVITY DISCHARGES. Submission of Notice of Intent (NOI) to the City of Lake Elmo. (A) Any person subject to an industrial or construction activity NPDES storm water discharge permit shall comply with all provisions of such permit. Proof of compliance with said permit is required in a form acceptable to the City of Lake Elmo prior to the allowing of discharges to the MS4. (1) Industrial activity includes activities subject to NPDES Industrial Storm Water Permits as defined in 40 CFR, Section 122.26 (b)(14). (2) Construction activity includes activities subject to NPDES Construction Permits. These include construction projects resulting in land disturbance of one acre or more. Such activities include but are not limited to clearing and grubbing, grading, excavating, and demolition. (B) The operator of a facility, including construction sites, required to have an NPDES permit to discharge storm water associated with industrial activity shall submit a copy of the NOI to the City of Lake Elmo at the same time the operator submits the original NOI to the EPA as applicable. (C) The copy of the NOI must be delivered to the City of Lake Elmo either in person or by mailing it to: Notice of Intent to Discharge Storm Water City of Lake Elmo 3800 Laverne Avenue S. Lake Elmo, MN 55042 (D) A person commits an offense if the person operates a facility that is discharging storm water associated with industrial activity without having submitted a copy of the NOI to do so to the City of Lake Elmo. (Ord. 2012-59, passed 6-5-2012) § 150.309 REQUIREMENT TO PREVENT, CONTROL, AND REDUCE STORM WATER POLLUTANTS BY THE USE OF BEST MANAGEMENT PRACTICES. The City of Lake Elmo will adopt requirements identifying best management practices for any activity, operation, or facility which may cause or contribute to pollution or contamination of storm water, the storm drain system, or waters of the United States. The owner or operator of such activity, operation, or facility shall provide, at their own expense, reasonable protection from accidental discharge of prohibited materials or other wastes into the municipal storm drain system or watercourses through the use of these structural and non-structural BMPs. Further, any person responsible for a property or premise that is, or may be, the source of an illicit discharge, may be required to implement, at said person's expense, additional structural and non-structural BMPs to prevent the further discharge of pollutants to the MS4. Compliance with all terms and conditions of a valid NPDES permit authorizing the discharge of storm water associated with industrial activity, to the extent practicable, shall be deemed compliance with the provisions of this subchapter. These BMPs shall be part of a storm water management plan (SWMP) as necessary for compliance with requirements of the NPDES permit. (Ord. 2012-59, passed 6-5-2012) § 150.310 NOTIFICATION OF SPILLS. Notwithstanding other requirements of law, as soon as any person responsible for a facility or operation, or responsible for emergency response for a facility or operation has information of any known or suspected release of materials which are resulting or may result in illegal discharges or pollutants discharging into 20 5/24/2018 CHAPTER 150: GENERAL PROVISIONS xx http://library.amlegal.com/alpscripts/get-content.aspx 5/6 storm water, the storm drain system, or waters of the United States, said person shall take all necessary steps to ensure the discovery, containment, and cleanup of such release. In the event of such a release of hazardous materials said person shall immediately notify emergency response agencies of the occurrence via emergency dispatch services. In the event of a release of non-hazardous materials, said person shall notify the City of Lake Elmo in person or by phone no later than the next business day. If the discharge of prohibited materials emanates from a commercial or industrial establishment, the owner or operator of such establishment shall also retain an on-site written record of the discharge and the actions taken to prevent its recurrence. Failure to provide notification of a release as provided above is a violation of this subchapter. (Ord. 2012-59, passed 6-5-2012) § 150.311 RIGHT OF ENTRY. The City of Lake Elmo shall be permitted to enter and inspect facilities subject to regulation under this subchapter as often as may be necessary to determine compliance with this subchapter, including the right to set up, or require facilities owner to set up devices necessary to conduct monitoring and/or sampling of the facilities storm water discharge. (Ord. 2012-59, passed 6-5-2012) § 150.312 ENFORCEMENT. (A)Enforcement. The City of Lake Elmo shall be responsible for enforcing this subchapter. (B)Penalties. Any person, firm or corporation failing to comply with or violating any of the provisions of this subchapter, shall be deemed guilty of a misdemeanor, and each day during which any violation of any of the provisions of this subchapter is committed, continued or permitted, shall constitute a separate offense. All land use and building permits shall be suspended until the applicant has corrected any and all violations. (C)Emergency cease and desist orders. When the City of Lake Elmo finds that any person has violated, or continues to violate, any provision of this subchapter, or any order issued hereunder, or that the person’s past violations are likely to recur, and that the person’s violation(s) has (have) caused or contributed to an actual or threatened discharge to the MS4 or waters of the state which reasonably appears to present an imminent or substantial endangerment to the health or welfare of persons or to the environment, the City of Lake Elmo may issue an order to the violator directing it immediately to cease and desist all such violations. (D)Suspension due to the detection of illicit discharge. Any person discharging to the MS4 in violation of this subchapter may have their MS4 access terminated if such termination would abate or reduce an illicit discharge. Such suspension may also be imposed if it is necessary to stop an actual or threatened discharge which presents or may present imminent and substantial danger. (E)Violations deemed a public nuisance. In addition to the enforcement processes and penalties provided, any condition caused or permitted to exist in violation of any of the provisions of this subchapter is a threat to public health, safety, and welfare, and is declared and deemed a nuisance, and may be summarily abated or restored at the violator’s expense; and/or a civil action to abate, enjoin, or otherwise compel the cessation of such nuisance may be taken. (Ord. 2012-59, passed 6-5-2012) § 150.313 SEVERABILITY. 21 5/24/2018 CHAPTER 150: GENERAL PROVISIONS xx http://library.amlegal.com/alpscripts/get-content.aspx 6/6 The provisions of this subchapter are severable. If any provision of this subchapter or the application of any provision of this subchapter to any circumstance is held invalid, such invalidity shall not affect other provisions or applications of this subchapter, which can be given effect without the invalid provision or application. (Ord. 2012-59, passed 6-5-2012) § 150.314 AUTHORITY. This subchapter shall become effective upon its passage and publication in accordance with the law. (Ord. 2012-59, passed 6-5-2012) 22 5/24/2018 CHAPTER 51: WASTE WATER TREATMENT SYSTEMS xx http://library.amlegal.com/alpscripts/get-content.aspx 1/16 Print Lake Elmo, MN Code of Ordinances CHAPTER 51: WASTE WATER TREATMENT SYSTEMS Section Subsurface Sewage Treatment Systems 51.001 Intent and purpose 51.002 Regulations adopted by reference 51.003 Exceptions to county regulations 51.004 Generally 51.005 Administration Municipal Sanitary Sewer System 51.020 General operation 51.021 Definitions 51.022 Connections with sewer required 51.023 Supervision of sewer connections 51.024 Permits 51.025 Connection charge 51.026 Types of wastes prohibited 51.027 Pretreatment, control, and refusal of extraordinary wastes 51.028 Tampering with municipal sanitary sewer system prohibited 51.029 Entry upon private property 51.030 Maintenance of municipal sanitary sewer connections 51.031 Rates and charges 51.032 Establishment of strength charges Community Sewage Treatment System Service Charge 51.045 Intent and purpose 51.046 Regulations 51.047 Determination of community sewage treatment system service charge 51.048 Delinquent accounts; revocation 51.049 Community Sewage Treatment System Service Fund Appendix B: Wastewater Treatment Systems Ordinance 23 5/24/2018 CHAPTER 51: WASTE WATER TREATMENT SYSTEMS xx http://library.amlegal.com/alpscripts/get-content.aspx 2/16 Alternative Waste Disposal Systems; Wetland Treatment Systems 51.065 Intent and purpose 51.066 Rules SUBSURFACE SEWAGE TREATMENT SYSTEMS § 51.001 INTENT AND PURPOSE. This subchapter is adopted for the purpose of protecting the health, safety and welfare of the residents of the city through regulating the location, design, installation, use and maintenance of individual sewage treatment systems so as to prevent contamination of surface waters and groundwater. (1997 Code, § 700.02) (Am. Ord. 08-029, passed 9-21-2010; Am. Ord. 08-159, passed 12-6-2016) § 51.002 REGULATIONS ADOPTED BY REFERENCE. Chapter 4 of the Washington County Development Code entitled Subsurface Sewage Treatment Systems Regulations, Ordinance # 196 (the “County Regulations”), with the exception of Sections 3.1, 3.3, 3.4, 22.10, 23, 26.3, 28.1, and 29.1 is hereby adopted by reference and made part of this chapter. Whenever the term “Department” appears in the County Regulations, it shall mean the “Lake Elmo Planning Department.” Whenever the word “County” appears in the County Regulations, it shall mean the “City of Lake Elmo” except as used in Section 3.14 of the County Regulations. Whenever the term “local unit of government” appears in the County Regulations, it shall mean the “City of Lake Elmo.” (Ord. 08-029, passed 9-21-2010; Am. Ord. 08-159, passed 12-6-2016) § 51.003 EXCEPTIONS TO COUNTY REGULATIONS. (A) The following provisions are adopted in addition to the County Regulations and are more restrictive than the County Regulations: Mound systems are not allowed for new collector systems in the OP Open Space Preservation District except to replace existing non-compliant systems. (Ord. 08-029, passed 9-21-2010; Am. Ord. 08-159, passed 12-6-2016) § 51.004 GENERALLY. General requirements - community sewage treatment systems. (A) (1) Lawful connections to community sewage treatment systems will be allowed, with a city permit. (2) When an existing individual sewage treatment system is failing and the property in question is near the community sewage treatment system provided capacity is available in all components of the community sewage treatment system. (3) A new connection to a community sewage treatment system will not be permitted for new construction, unless the previous structure in which the new construction occurs was previously connected 24 5/24/2018 CHAPTER 51: WASTE WATER TREATMENT SYSTEMS xx http://library.amlegal.com/alpscripts/get-content.aspx 3/16 to the existing community sewage treatment system. In that event, a city permit is required. (Am. Ord. 97-105, passed 4-2-2002) (B) The fee for new connections will be determined by the city. The new user will be responsible for paying all costs to connect to the system, plus a charge to pay for previously built drainfield areas. (C) No person(s) shall uncover, make any connections with or opening into, use, alter, or disturb any community sewage treatment system or appurtenance of the system without first obtaining a written permit from the city. This provision shall not apply to certified qualified employees performing tasks within their area of certification for which a permit is not required. The definition of a CERTIFIED QUALIFIED EMPLOYEE shall be as set forth in the County Regulations. (1997 Code, § 700.04) (Am. Ord. 08-029, passed 9-21-2010; Am. Ord. 08-159, passed 12-6-2016) Penalty, see § 10.99 § 51.005 ADMINISTRATION. (A) Board of Adjustment and Appeals. (1) Administrative appeals. (a) An aggrieved party may appeal a decision by the permitting authority regarding the interpretation or application of the provisions of §§ 51.001et seq. (b) Appeals shall be reviewed and determined by the city’s Board of Adjustment and Appeals. (2) Variance procedures. (a) Request for variances to the provisions of §§ 51.001et seq. shall be reviewed pursuant to the procedures and standards contained in the zoning code. (b) No variances with respect to Sections 4.1, 4.7, 4.8, 4.9, and Sections 16.2(1) through 16.2(4) of the County Regulations will be considered or granted by the city. The city may grant a variance with respect to Section 4.8(4)(A) of the County Regulations for replacement MSTS serving existing dwellings or other establishments. (Am. Ord. 97-124, passed 11-18-2003; Am. Ord. 08-029, passed 9-21-2010; Am. Ord. 08-159, passed 12- 6-2016) MUNICIPAL SANITARY SEWER SYSTEM § 51.020 GENERAL OPERATION. The municipal sanitary sewer system shall be operated as a public utility and convenience from which revenues will be derived, subject to the provisions of this chapter. (1997 Code, § 705.01) § 51.021 DEFINITIONS. Unless specifically defined within §§ 51.020et seq., common definitions, words, and phrases used in §§ 51.020 et seq. shall be interpreted so as to give them the same meaning throughout this code, and are found 25 5/24/2018 CHAPTER 51: WASTE WATER TREATMENT SYSTEMS xx http://library.amlegal.com/alpscripts/get-content.aspx 4/16 in § 11.01. (1997 Code, § 705.02) § 51.022 CONNECTIONS WITH SEWER REQUIRED. (A) Any building used for human habitation or in which a toilet or other plumbing facility for the disposal of human waste is installed and located on property adjacent to a sewer main, or in a platted block through which the system extends, shall be connected to the municipal sanitary sewer system within 2 years from the date on which a connection is available to the building. (B) All buildings subsequently constructed within the city on property adjacent to a sewer main or in a platted block through which the municipal sanitary sewer system extends, shall be provided with a connection to the sewer system for the disposal of all human waste. (1997 Code, § 705.03) (Am. Ord. 08-139, passed 6-21-2016) Penalty, see § 10.99 § 51.023 SUPERVISION OF SEWER CONNECTIONS. (A) The Building Official shall supervise all sewer connections made to the municipal sanitary sewer system and excavations for installing or repairing the connections. (B) All sewer installers shall verify the location and elevation of a sewer connection stub by securing a written statement from the City Engineer before proceeding with the installation of the sewer house connection. (C) The City Engineer shall not deviate from the planned location without written permission from the Council. (1997 Code, § 705.04) Penalty, see § 10.99 § 51.024 PERMITS. (A) Persons desiring a connection to the municipal sanitary sewer system shall apply to the city for a permit. The application shall be made on forms furnished by the Administrator and shall be accompanied by plans, specifications, and other information required by the Building Official, together with a permit fee as set forth from time to time by resolution of the Council. When reinspection is necessary, a fee as set forth from time to time by resolution of the Council for the reinspection shall be paid. All costs and expenses incident to the installation and connection shall be borne by the owner, and the owner shall indemnify the city for any loss or damage that may, directly or indirectly, be occasioned by the installation of the sewer connection, including restoring streets and street surfaces. (B) Permits for connections will be issued only to the property owner or to a person duly licensed to make the connection under the provisions of this chapter. (1997 Code, § 705.05) Penalty, see § 10.99 § 51.025 CONNECTION CHARGE. (A) A connection charge as determined by resolution of the Council and the permit fee as set forth from time to time by resolution of the Council shall be paid at the time of making application for a connection to the municipal sanitary sewer system. 26 5/24/2018 CHAPTER 51: WASTE WATER TREATMENT SYSTEMS xx http://library.amlegal.com/alpscripts/get-content.aspx 5/16 (B) Before a permit shall be issued, the following conditions shall be complied with. (1) Permit requirements. No permit shall be issued to connect any lot or tract of land with the municipal sanitary sewer system of the city, either directly or indirectly, unless it shall be determined that: (a) The lot or tract of land to be served by the connection has been assessed for the cost of construction of the sanitary sewer main with which the connection is made; (b) If no assessment has been levied for the construction cost, the proceedings for levying the assessment have been or will be commenced and completed in due course; or (c) If no assessment has been levied, and no assessment proceedings will be completed in due course, a sum equal to the portion of cost of construction of the sanitary sewer main which would be assessable against the lot or tract has been paid to the city. (2) Additional connection fee. (a) If none of the above conditions are met, no permit to connect to any sanitary sewer main shall be issued unless the applicant shall pay an additional connection fee which shall be equal to the portion of the cost of construction of the sanitary sewer main which would be assessable against the lot or tract to be served by the connection. (b) The assessable cost is to be determined by the Administrator upon the same basis as any assessment previously levied against other property for the main. (c) If no assessment has been levied, the assessable cost will be determined upon the basis of the uniform charge which may have been or which shall be charged for similar connection with the sanitary sewer main, determined on the basis of the total assessable cost of the main, allocated on a frontage basis, acreage basis, or both. (1997 Code, § 705.06) Penalty, see § 10.99 § 51.026 TYPES OF WASTES PROHIBITED. (A) Unlawful discharges. It is unlawful to discharge any of the following described waters or wastes into the municipal sanitary sewer system: (1) Any liquid or vapor having a temperature higher than 150°F; (2) Any water or waste containing more than 100 parts per million by weight of fat, oil, or grease; (3) Any liquids, solids, or gases which by reason of their nature or quantity are, or may be, sufficient either alone or by interaction with other substances to cause fire or explosion or be injurious in any other way to the waste water disposal system or to the operation of the system. Prohibited materials include, but are not limited to, gasoline, kerosene, naphtha, benzene, toluene, xylene, ethers, alcohols, ketones, aldehydes, peroxides, chlorates, perchlorates, bromates, carbides, hydrides, and sulfides; (4) Any waste water having a pH of less than 5.0 or greater than 9.5 or having any other corrosive property capable of causing damage or hazard to structures, equipment, and personnel of the waste water disposal system; (5) Any waste water containing toxic pollutants, including pesticides and herbicides, in sufficient quantity, either single or by interaction with other pollutants, to inhibit or disrupt any waste water treatment process, constitute a hazard to humans or animals, or create a toxic effect in the receiving waters of the waste water disposal system. A toxic pollutant shall include but not be limited to any pollutant identified pursuant to § 307(a) of the Clean Water Act of 1977, as amended; (6) Any garbage that has not been properly shredded; 27 5/24/2018 CHAPTER 51: WASTE WATER TREATMENT SYSTEMS xx http://library.amlegal.com/alpscripts/get-content.aspx 6/16 (7) Any ashes, cinders, sand, mud, straw, shavings, metal, glass, rags, feathers, plastics, wood, manure, or any other solid or viscous substances capable of causing obstruction to the flow in sewers or other interference with the proper operation of the sewage system; (8) Any waters or wastes containing suspended solids of a character and quantity that unusual attention or expense is required to handle the materials at the sewage treatment plant; (9) Any noxious or malodorous gas or substance capable of creating a public nuisance; and/or (10) Grease, oil, and sand interceptors shall be provided when, in the opinion of the Building Official, they are necessary for the proper handling of liquid wastes containing grease in excessive amounts, or any inflammable wastes, sand, or other harmful ingredients; except that the interceptors shall not be required for private dwelling units which discharge only normal wastes. Grease and oil interceptors shall be of substantial construction, watertight, and equipped with easily removable covers, which, when bolted in place, shall be gastight and watertight. All grease, oil, and sand interceptors shall be maintained by the owner, at owner's expense, and in continuously efficient operation at all times. (B) Substances prohibited. (1) No person shall discharge or cause to be discharged directly or indirectly the following described substances to any public sewers unless, in the opinion of the city, the discharge will not harm the municipal sanitary sewer system facilities, nor cause obstruction to free flow in sewers, nor otherwise endanger life, limb, or public property, nor constitute a nuisance. In forming its opinion as to the acceptability of the wastes, the city may give consideration to the factors as the materials or construction of the sewers, nature of the sewage treatment process, capacity of the municipal sanitary sewer system facilities, the city's S.D.S./N.P.D.E.S. permit and other pertinent factors. City may make the determination either on a general basis or as a discharges from individual users or specific discharges, and may prohibit certain discharges from individual users because of unusual concentrations or combinations which may occur. (2) The substances prohibited are: (a) Any water or wastes containing strong acid, iron and pickling wastes, or concentrated plating solutions, whether neutralized or not; (b) Any water or wastes containing phenols or other taste or odor-producing substances which constitute a nuisance or hazard to the structures, equipment, or personnel of the sewage works, or which interfere with the treatment required to meet the requirements of the state or federal government, or any other public agency with proper authority to regulate the discharge from the sewage treatment plant; and (c) Any radioactive wastes or isotopes of the half-life or concentration that they are not in compliance with regulations issued by the appropriate authority having control over their use or may cause damage or hazards to the treatment works or personnel operating it. (C) Water runoff discharge prohibited. It shall be unlawful to discharge or cause to be discharged into the municipal sanitary sewer system, either directly or indirectly, any roof, storm, surface or ground water of any type or kind, or water discharged from any air conditioning unit or system. (1997 Code, § 705.08) Penalty, see § 10.99 § 51.027 PRETREATMENT, CONTROL, AND REFUSAL OF EXTRAORDINARY WASTES. (A) Generally. (1) If any water or wastes are discharged, or are proposed to be discharged directly or indirectly to the public sewers, which water or wastes do not meet the standards set out in or promulgated under this section, or which in the judgment of the city may have a deleterious effect upon the treatment facilities, processes, 28 5/24/2018 CHAPTER 51: WASTE WATER TREATMENT SYSTEMS xx http://library.amlegal.com/alpscripts/get-content.aspx 7/16 equipment, and soil, vegetation, and ground water or which otherwise create a hazard to life, or constitute a public nuisance, the city may take all or any of the following steps: (a) Refuse to accept the discharges; (b) Require control over the quantities and rates of discharge; (c) Require pretreatment to an acceptable condition for the discharge to the public sewers; and/or (d) Require payment to cover the added cost of handling or treating the wastes. (2) The design and installation of plant or equipment for pretreatment or equalization of flows shall be subject to the review and approval of the city, and subject to the requirements of 40 C.F.R. § 403, as it may be amended from time to time, entitled "Pretreatment Standards," and the Minnesota Pollution Control Agency. (B) Operation and maintenance; preliminary treatment. Where preliminary treatment, flow equalization, or interceptors are required for any water or waste, they shall be effectively operated and maintained continuously in satisfactory and effective condition by the owner at owner's expense and shall be available for inspection by the city at all reasonable times. (C) Control; observation devices. (1) When required by the city, the owner of any property services by a building sewer carrying industrial wastes shall install a suitable control structure together with the necessary meters and other appurtenances in the building sewer to facilitate observation, sampling, and measurement of the wastes. (2) The structure and equipment, when required, shall be constructed at the owner's expense in accordance with plans approved by the city and shall be maintained by the owner so as to be safe and accessible at all times. (D) Sampling. All measurements, tests, and analysis of the characteristics of water and waste to which reference is made in this section shall be determined in accordance with 40 C.F.R. § 136, as it may be amended from time to time, "Guidelines Establishing Test Procedures for the Analysis of Pollutants"; the latest edition of Standard Methods for the Examination of Water and Waste Water and shall be determined at the control structure provided, or upon suitable samples taken at the control structure. If no special structure has been required, the control structure shall be considered to be the nearest downstream manhole in the public sewer from the point at which the building sewer is connected. Sampling shall be carried out by customarily accepted methods to reflect the effluent constituents and their effect upon the treatment works and to determine the existence of hazards to life, health, and property. Sampling methods location, times, durations, and frequencies are to be determined on an individual basis subject to approval by the city. (E) Proof of compliance. The owner of any property serviced by a building sewer carrying industrial wastes shall, at the discretion of the city, be required to provide laboratory measurements, tests, and analysis of waters or wastes to illustrate compliance with §§ 51.020et seq. and any special condition for discharge established by the city or regulatory agencies having jurisdiction over the discharge. The number, type, and frequency of sampling and laboratory analysis to be performed by the owner shall be as stipulated by the city. The industry must supply a complete analysis of the constituents of the waste water discharge to assure that compliance with the federal, state, and local standards are being met. The owner shall bear the expense of all measurements, analysis, and reporting required by the city. At the times as deemed necessary, the city reserves the right to take measurements and samples for analysis by an outside laboratory. (F) New connections; sufficient capacity. New connections to the sanitary sewer system shall be prohibited unless sufficient flow capacity is available in all downstream facilities. (G) Special considerations. No statement contained in §§ 51.020et seq. shall be construed as preventing any special agreement or arrangement between the city and any industrial concern where an industrial 29 5/24/2018 CHAPTER 51: WASTE WATER TREATMENT SYSTEMS xx http://library.amlegal.com/alpscripts/get-content.aspx 8/16 waste of unusual strength or character may be accepted by the city for treatment, subject to payment for the special agreement/arrangement by the industrial concern, providing that National Categorical Pretreatment Standards and the city's N.P.D.E.S. and/or state disposal system permit limitations are not violated. (1997 Code, § 705.09) Penalty, see § 10.99 § 51.028 TAMPERING WITH MUNICIPAL SANITARY SEWER SYSTEM PROHIBITED. No person shall maliciously, willfully, or negligently damage, destroy, uncover, deface, or tamper with any part of the municipal sewer system. (1997 Code, § 705.10) Penalty, see § 10.99 § 51.029 ENTRY UPON PRIVATE PROPERTY. The Building Official, bearing proper credentials and identification, shall at reasonable times be permitted to enter upon all properties connected to the municipal sanitary sewer system for the purpose of inspection, observation, measurement, sampling, and testing in connection with the operation of the municipal sanitary sewer system. (1997 Code, § 705.11) § 51.030 MAINTENANCE OF MUNICIPAL SANITARY SEWER CONNECTIONS. Each property owner shall be responsible at all times for the maintenance of owner's sewer connection to the municipal sanitary sewer system, and shall have the obligation to keep the connection in good repair, to the end that there shall be no interference or obstruction to the sewer system as a whole, nor shall there be any violation of this chapter, and the laws of the state. The Building Official is authorized to make the inspections of the sewer connections as the Building Official may deem necessary to accomplish this purpose, and the property owner shall be responsible for carrying out the instructions as the Building Official deems necessary to accomplish this purpose. (1997 Code, § 705.12) Penalty, see § 10.99 § 51.031 RATES AND CHARGES. Except as provided in §§ 51.020et seq., the Council shall prescribe by resolution the rates to be charged for sewer service and the method of billing and payments. Delinquent accounts may be assessed against the respective property served. (1997 Code, § 705.13) § 51.032 ESTABLISHMENT OF STRENGTH CHARGES. (A) The Metropolitan Waste Control Commission, a metropolitan commission organized and existing under the laws of the State of Minnesota (the "Commission"), in order to receive and retain grants in compliance with the Federal Water Pollution Control Act Amendments of 1972 (the "Acts"), as amended from time to time, and the regulations under the Act, has determined to impose an industrial user sewer strength charge upon users of the Metropolitan Disposal System (as defined in M.S. § 473.121, Subd. 24, as it may be amended from time to time) to recover operation and maintenance costs of treatment works 30 5/24/2018 CHAPTER 51: WASTE WATER TREATMENT SYSTEMS xx http://library.amlegal.com/alpscripts/get-content.aspx 9/16 attributable to the strength of the discharge of industrial waste, the sewer strength charge being in addition to the charge based upon the volume of discharge. In order for the city to pay the costs based upon strength of industrial discharge and allocated to it each year by the Commission, it is found, determined, and declared to be necessary to establish sewer strength charges and a formula for the computation of the charges for all industrial users receiving waste treatment services within or served by the city. Furthermore, M.S. § 444.075, Subd. 3, as it may be amended from time to time, empowers the city to make the sewer charge a charge against the owner, lessee, occupant, or all of them and certify unpaid charges to the county auditor as a tax lien against the property served. (B) For the purpose of paying the costs allocated to the city each year by the Metropolitan Waste Control Commission that are based on the strength of discharge of all industrial users receiving waste treatment service within or served by the city, in addition to sewer charge based on volume of discharge, a sewer charge upon each person, company, or corporation receiving waste treatment services within or served by the city, based upon strength of industrial waste discharged into the sewer system of the city, the charges referred to as "strength charge." (1) Establishment of strength charge formula. For the purpose of computation of the strength charge established by this section, there is established, approved, and adopted the same strength charge formula designated in Resolution No. 76-172 adopted by the Metropolitan Waste Control Commission on 6-15- 1976, a formula based upon pollution qualities and difficulty of disposal of the sewage produced through an evaluation of pollution qualities and quantities in excess of an annual average base and the proportionate costs of operation and maintenance of waste treatment service provided by the commission. (2) Strength charge payment. The strength charge established by this section shall be paid by each industrial user receiving waste treatment services and subject to the charge before the twentieth day next succeeding the date of billing of the charge to the user by or on behalf of the city. The payment of the charge shall be deemed to be delinquent if not paid to the billing entity before the date. If the payment is not paid before the date an industrial user shall pay interest compounded monthly at the rate of 2/3 of 1% per month on the unpaid balance due. (3) Establishment of tax lien. (a) As provided by M.S. § 444.075, Subd. 3, as it may be amended from time to time, if payment of the strength charge established by this section is not paid before the sixtieth day next succeeding the date of billing of the charge to the industrial user by or on behalf of the city, the delinquent sewer strength charge, plus accrued interest, shall be deemed to be a charge against the property served, and the city or its agent shall certify the unpaid delinquent balance to the collection as other taxes are collected. (b) The certification shall not preclude the city or its agent from recovery of the delinquent sewer strength charge and interest on the charge under any other available remedy. (1997 Code, § 705.14) COMMUNITY SEWAGE TREATMENT SYSTEM SERVICE CHARGE § 51.045 INTENT AND PURPOSE. Sections 51.045et seq. is adopted for the purpose of: (A) Setting forth the requirements for accruing revenues to enable the city to comply with the state and federal laws and to provide sufficient revenues to financially balance expenditures for the administration of those waste water systems within the city constructed with federal and state grant funds; and 31 5/24/2018 CHAPTER 51: WASTE WATER TREATMENT SYSTEMS xx http://library.amlegal.com/alpscripts/get-content.aspx 10/16 (B) Charging those users of the waste water utilities within the city, which are constructed with federal and state grant funds, for the operation, maintenance, and replacement costs in proportion to use. (1997 Code, § 710.02) § 51.046 REGULATIONS. (A) The city has established a waste water service charge system whereby revenues collected from users of the waste water treatment facilities will be used to offset all expenditures incurred for administration, annual operation and maintenance, and equipment replacement. (B) (1) A passive maintenance program shall be required of all those properties utilizing individual onsite sewage treatment systems while all properties connected to community collection and treatment systems, cluster system, or individual off-site treatment systems shall be on the active maintenance program. (2) For those properties on the passive maintenance program, the property owner shall be responsible for the cost of operating, maintaining, and replacing owner's system. This will include arranging for all repairs and maintenance to septic tanks, pipes, pumps, controls, drain fields, as well as septic tank pumping. The property owner shall report all problems and the steps taken to alleviate the problems to the City Administrator. The city will supply inspection cards to the pumpers within the city. When a septic tank is pumped, the tank will also be inspected by the pumper and the signed inspection card returned to the city. The city shall, at regular intervals, and at least biennially, determine which septic tanks have not been inspected and/or pumped. If owners on passive maintenance fail to pump their septic tanks or to return the inspection card, the city will, at its option, inspect the system and perform the required maintenance. All costs of the inspection and maintenance shall be charged to the property owner. (3) For those properties on the active maintenance program, the city shall be responsible for operating, maintaining, and replacing the collection and final treatment and disposal system. The city shall arrange for all repairs and maintenance on sewers, lift stations, controls, and drain fields. The property owner shall be responsible for all repairs and maintenance to septic tanks, including septic tank pumping, and to all individual pump stations and sewer pipes up to the collector sewer or final treatment and disposal system. Unless otherwise prescribed, city ownership and the city's responsibility for conducting operation, maintenance, and replacement shall begin at the property line. (4) If owners on active maintenance fail to pump their septic tanks or to return the inspection card, the city will, at its option, inspect the system and perform the required maintenance. All costs of the inspection and maintenance shall be charged to the property owner. Property owners shall report all problems to the City Administrator who will determine responsibility for their correction. Damages caused by the abuse of the system by the property owner will be repaired by the city and assessed against the property owner. (5) When it has been determined that maintenance and replacement is necessary on an individual or community sewage treatment system (apart from septic tank pumping addressed above), the maintenance and replacement shall be accomplished in a manner acceptable to the city. Replacement parts, equipment, and appurtenances shall be of a design and quality acceptable to the city and shall be installed in a manner acceptable to the city and in conformance with requirements of State of Minnesota Rule 7080, "Individual Sewage Treatment Systems," as it may be amended from time to time. In the absence of code provisions or in the amplification of code provisions, materials and procedures shall be as set forth in appropriate specifications of the A.S.T.M., and W.P.C.F. Manual of Practice No. 9. Replacement effected on individual systems shall be reported to the sewer authority. (C) Community sewage treatment system service charges will be established based on equivalent residential units (E.R.U.). One E.R.U. is defined as a unit of waste water volume of 250 gallons per day with a theoretical waste strength of 250 mg/l of B.O.D. and 300 mg/l of total suspended solids. The 32 5/24/2018 CHAPTER 51: WASTE WATER TREATMENT SYSTEMS xx http://library.amlegal.com/alpscripts/get-content.aspx 11/16 assignment of E.R.U.s will be made by the City Administrator in accordance with Tables I and II of Appendix A. (D) In accordance with federal and state requirements, each user will be notified annually at the beginning of each calendar year of the user charge rates attributable to waste water treatment services. (E) In accordance with federal and state requirements, the city will be responsible for maintaining all records necessary to document compliance with the waste water service charge system adopted. (1997 Code, § 710.05) Penalty, see § 10.99 § 51.047 DETERMINATION OF COMMUNITY SEWAGE TREATMENT SYSTEM SERVICE CHARGE. (A) Intent. (1) It is the intent of §§ 51.045et seq. that the user charges shall cover the costs of operating and maintaining the waste water systems, and that costs are recovered from all users in a proportionate manner. The City Administrator shall maintain a proper system of accounts suitable for determining the operation and maintenance, equipment replacement, and debt retirement costs of the collection and treatment facilities. (2) These costs shall be reviewed at regular annual intervals. The city shall determine whether or not sufficient revenue is being generated for the effective operation and maintenance and management of the waste water system, and that user charges are being distributed proportionately to all users. Any inequities and/or shortages shall be corrected by adjusting the rates accordingly by Council resolution. (3) The annual user charge per equivalent residential unit is described as follows. (a) User charge rate per equivalent residential unit: (b) Where: 1. Uc = Annual User Charge; 2. Comr = Total Annual OM&R Costs; 3. ERU = Equivalent Residential Unit; and 4. Total ERUs = The total number of ERUs connected to community sewage treatment systems. (B) Use formula. All users shall be charged in accordance with the methodology described below. (1) (a) Individual off-site or clustered sewage treatment units: (b) Where: 1. SCC = Sewer Service Charge; 2. Uc = User charge for operation, maintenance, and replacement; 3. Ac = Administration charge; and 33 5/24/2018 CHAPTER 51: WASTE WATER TREATMENT SYSTEMS xx http://library.amlegal.com/alpscripts/get-content.aspx 12/16 4. #ERU = Number of ERUs assigned to a particular connection. (2) (a) Individual on-site sewage treatment units: (b) Where: 1. SCC = Sewer service charge; and 2. Ac = Administration charge. (C) Basis for annual user charge. All users of the waste water treatment facilities shall be charged annually for sewer service based on the number of equivalent residential units assigned to each and based on whether the unit is seasonal or year-round. (D) Additional requirements. (1) If a user discharges toxic pollutants or wastes of unusual strength of character to the treatment facilities which cause or increase the operation and maintenance costs, the user shall be ordered either to install pretreatment facilities or pay for the extra costs of treating the wastes. (2) This decision will be made by the City Administrator at the time the user begins to discharge extra strength wastes. (1997 Code, § 710.06) § 51.048 DELINQUENT ACCOUNTS; REVOCATION. (A) Delinquent accounts. Any bill not paid for 4 weeks after date of billing shall be declared delinquent and a past-due notice shall be issued to the billed party. The past-due notice shall contain an additional charge to cover the costs of the rebilling. Additional delinquent notices including their respective charges shall be sent at 8 and 12 weeks after the billing date. Should a bill still be delinquent after 120 days, the city may elect to take the following actions. (1) Tax. Whenever waste water service charge bills become delinquent, the amount due shall be certified to the City Auditor for inclusion with the following year's tax statement. (2) Lien. Whenever waste water treatment bills become delinquent, the same shall become and constitute a lien upon the real estate to which the sewer service is supplied. Statements rendered for the charge shall be deemed notice to all parties, whether or not the person charged with the statement is the owner of the property served. The claim for lien shall be made in the form of a sworn statement setting forth: (a) A description of the real estate, sufficient for the identification of the real estate, upon or for which the sewage service was supplied; (b) The amount of money due for the sewage service; and (c) The date or dates when the amount or amounts became delinquent. If all amounts shown due remain unpaid after recording as provided by state statutes, the city may foreclose the lien in the same manner and with the same effect as in the foreclosure of mortgages on real estate. (3) Civil action. (a) In the alternative of levying a lien, the city may, at its discretion, file suit in a civil action to collect the amounts as are delinquent and due against the occupant or user of the real estate and shall collect, as well, all attorney's fees incurred by the city in filing the civil action. 34 5/24/2018 CHAPTER 51: WASTE WATER TREATMENT SYSTEMS xx http://library.amlegal.com/alpscripts/get-content.aspx 13/16 (b) The attorney's fees shall be fixed by order of the court. (B) Delinquent account penalties. In addition to all penalties and costs attributable and chargeable to recording notices of the lien or filing a civil action, the owner or user of the real estate being served by the treatment works shall be liable for interest upon all unpaid balances at the rate of 12% per annum. (C) Revocation. The city reserves the right to revoke discharge permits and to disconnect service to any user whenever waste water treatment becomes delinquent. (1997 Code, § 710.07) § 51.049 COMMUNITY SEWAGE TREATMENT SYSTEM SERVICE FUND. (A) Purpose. (1) The city, by §§ 51.045et seq., establishes a "Sewer Service Fund" as an income fund to receive all revenues generated by the sewer service charge system, and all other income dedicated to the operation, maintenance, replacement, and construction of the waste water treatment works, including taxes, special charges, fees, and assessments intended to retire construction debt. (2) The city also establishes the following accounts as income and expenditure accounts within the Sewer Service Fund: (a) Operation and Maintenance Account; (b) Equipment Replacement Account; and (c) Debt Retirement Account. (B) Management of funds. (1) All revenue generated by the sewer service charge system, and all other income pertinent to the treatment system, including taxes and special assessments dedicated to retire construction debt, shall be held by the Clerk separate and apart from all other funds of the city. (2) Funds received by the Sewer Service Fund shall be transferred to the Operation and Maintenance Account, the Equipment Replacement Account, and the Debt Retirement Account in accordance with state and federal regulations and the provisions of §§ 51.045et seq. (C) Replacement. Revenue generated by the sewer service charge system sufficient to ensure adequate replacement throughout the design of useful life, whichever is longer, of the waste water facility shall be held separate and apart in the Equipment Replacement Account and dedicated to effecting replacement costs. Interest income generated by the Equipment Replacement Account shall remain in the Equipment Replacement Account. (D) Operation and maintenance. Revenue generated by the sewer service charge system sufficient for operation and maintenance shall be held separate and apart in the Operation and Maintenance Account. (1997 Code, § 710.08) ALTERNATIVE WASTE DISPOSAL SYSTEMS; WETLAND TREATMENT SYSTEMS § 51.065 INTENT AND PURPOSE. 35 5/24/2018 CHAPTER 51: WASTE WATER TREATMENT SYSTEMS xx http://library.amlegal.com/alpscripts/get-content.aspx 14/16 (A) Health, safety, and welfare. The purpose of §§ 51.065et seq. is to protect the health, safety, and welfare of the residents of the community, present and future. (B) Contamination of surface/ground water. The purpose of §§ 51.065et seq. is to regulate the location, design, installation, use, and maintenance of alternative waste disposal systems so as to prevent the contamination of the surface and ground water within the community. (C) Contamination of private water supply wells. The intent of §§ 51.065et seq. is to protect the individual water supply wells of the community from contamination by inadequate, improperly designed, located, installed, or maintained individual and community sewage treatment systems. (D) Open space development. The intent of §§ 51.065et seq. is to allow subsurface flow "wetland treatment" systems to be an allowed alternative system within cluster developments. (1997 Code, § 720.02) § 51.066 RULES. (A) Specifications which apply. Lake Elmo Municipal Code §§ 51.001et seq. shall apply, except as provided below: § 51.003(B)(1). Each dwelling shall have its own sewage tank and a stilling tank shall be installed before the first cell. (B) Location of systems. (1) Setbacks. (a) All components of a wetland treatment system within a new residential or commercial development, including stilling tanks, pump stations, and treatment cells, shall be located a minimum of 100 feet from any property line, and 200 feet from any existing or proposed home. Stilling tanks may however be located 50 feet from a street right-of-way. (b) Wetland treatment systems used to replace failed septic systems shall have setbacks considered reasonable for the site and the neighboring properties. (2) Ground water. Treatment cells shall have a minimum of 3 feet between the bottom of the cell and the ground water table. Drain tile or French drains shall not be used to artificially lower the ground water table. (C) System design. (1) Designer. Wetland treatment systems shall be designed by a registered professional engineer with experience and specific training in the design of these types of systems. (2) Design flow. Wetland treatment systems shall be sized based on a minimum of 50 gallons per day per person. (3) Level of treatment. (a) Wetland treatment systems shall be designed to remove total suspended solids (T.S.S.), phosphorous (P.), total nitrogen (T.N.), and fecal coliforms (F.C.), and reduce the 5-day carbonaceous biochemical oxygen demand (C.B.O.D.5). Calculations showing the design level of treatment shall be submitted. (b) Prior to discharge into the infiltration cell, the following discharge limits shall be met: 1. C.B.O.D.5 - 50 mg/l; 2. T.S.S. - 20 mg/l; 36 5/24/2018 CHAPTER 51: WASTE WATER TREATMENT SYSTEMS xx http://library.amlegal.com/alpscripts/get-content.aspx 15/16 3. T.N. - 15 mg/l; 4. N.H.4 - 10 mg/l; 5. T.P. - 5 mg/l; and 6. F.C. - 200 mg/l. (c) One foot below the infiltration cell, the following discharge limits shall be met: 1. C.B.O.D.5 - 0 mg/l; 2. T.S.S. - 0 mg/l; 3. T.N. - 5 mg/l; 4. N.H.4 - 1 mg/l; 5. T.P. - 1 mg/l; and 6. F.C. - 10 mg/l. (4)Inspection points. Inspection and monitoring ports shall be located within the system so that the water level can be determined, and a water sample can be easily taken in each treatment cell, and 1 foot below the infiltration cell. (5)Operating plan. An operating plan shall be developed by the designer. This plan shall include standard operating procedures and maintenance of the system. (6)Monitoring plan. (a) Systems designed for greater than 1,500 gallons per day shall have a monitoring plan developed by the designer. It shall include monitoring of sludge and scum levels in the septic tanks and pumping stations, effluent flow into the system. Water quality exiting the first treatment cell shall be monitored to ensure that it meets the design level of treatment. Monitoring 1 foot below the second treatment cell shall be done to ensure that it meets the design level of treatment. Monitoring shall be conducted annually. (b) The city shall be sent a copy of all test results. (7)Mitigation plan. The system designer shall develop a plan to follow in case expansion or abandonment of the system is necessary. (8)City review. The city shall review and approve all parts of the system design and associated plans prior to any construction taking place. Once approval of the system is given, a permit shall be issued by the city. (D)Construction. (1)Sanitary sewers. All sanitary sewers shall be constructed and tested in accordance with the City Engineers Association of Minnesota Standards for Utility Construction. (2)Treatment cells; testing. (a) Liners of treatment cells shall be visually inspected for tears, holes, or poor seams prior to placing rock. A leak test shall be performed after the rock is in placed. The liner shall be uncovered, repaired, and the test rerun if any leaks show up during this testing. (b) A city representative shall be present for all treatment cell testing. (3)Turf establishment; plant growth. 37 5/24/2018 CHAPTER 51: WASTE WATER TREATMENT SYSTEMS xx http://library.amlegal.com/alpscripts/get-content.aspx 16/16 (a) The designer shall prepare a vegetation plan to establish a wetland community over the treatment cells. (b) Prior to final acceptance, wetland plants shall display vigorous growth, and turf shall be established outside of the treatment cell area. (c) No erosion shall be present on the site. (4)Certification. The system designer shall certify in writing to the city that the treatment system has been constructed in accordance with the approved plans and specifications, and that all test requirements have been met. This certification must be received before start-up of the system. (1997 Code, § 720.03) Penalty, see § 10.99 38 Appendix C Agreement with Lake Olson for Subsurface Sewage Treatment System 39 40 41 42 43 44 Appendix D Lake Elmo Oakdale Sanitary Sewer Service Agreement 45 46 47 1 Draft Chapter 10: Water Supply Plan Local Water Supply Plan Template Third Generation for 2016 -2018 Revised April 10, 2017 Formerly called Water Emergency & Water Conservation Plan 2 Cover photo by Molly Shodeen For more information on this Water Supply Plan Template, please contact the DNR Division of Ecological and Water Resources at (651) 259-5034 or (651) 259-5100. Copyright 2015 State of Minnesota, Department of Natural Resources This information is available in an alternative format upon request. Equal opportunity to participate in and benefit from programs of the Minnesota Department of Natural Resources is available to all individuals regardless of race, color, creed, religion, national origin, sex, marital status, public assistance status, age, sexual orientation, disability or activity on behalf of a local human rights commission. Discrimination inquiries should be sent to Minnesota DNR, 500 Lafayette Road, St. Paul, MN 55155-4049; or the Equal Opportunity Office, Department of the Interior, Washington, DC 20240. 3 Table of contents INTRODUCTION TO WATER SUPPLY PLANS (WSP) ............................................................. 6 Who needs to complete a Water Supply Plan ......................................................................... 6 Groundwater Management Areas (GWMA) ............................................................................ 6 Benefits of completing a WSP ................................................................................................ 6 WSP Approval Process .......................................................................................................... 7 PART 1. WATER SUPPLY SYSTEM DESCRIPTION AND EVALUATION ................................ 9 A. Analysis of Water Demand .............................................................................................. 9 B. Treatment and Storage Capacity ....................................................................................11 Treatment and storage capacity versus demand ........................................................................... 12 C. Water Sources ................................................................................................................12 Limits on Emergency Interconnections .......................................................................................... 12 D. Future Demand Projections – Key Metropolitan Council Benchmark ..............................13 Water Use Trends ........................................................................................................................... 13 Projection Method .......................................................................................................................... 14 E. Resource Sustainability ..................................................................................................14 Monitoring – Key DNR Benchmark ................................................................................................. 14 Water Level Data ............................................................................................................................ 15 Potential Water Supply Issues & Natural Resource Impacts – Key DNR & Metropolitan Council Benchmark ...................................................................................................................................... 15 Wellhead Protection (WHP) and Source Water Protection (SWP) Plans ....................................... 21 F. Capital Improvement Plan (CIP) .....................................................................................22 Adequacy of Water Supply System ................................................................................................. 22 Proposed Future Water Sources ..................................................................................................... 23 Water Source Alternatives - Key Metropolitan Council Benchmark .............................................. 23 PART 2. EMERGENCY PREPAREDNESS PROCEDURES .....................................................24 A. Emergency Response Plan ............................................................................................24 B. Operational Contingency Plan ........................................................................................24 C. Emergency Response Procedures .................................................................................24 4 Emergency Telephone List .............................................................................................................. 25 Current Water Sources and Service Area ....................................................................................... 25 Procedure for Augmenting Water Supplies .................................................................................... 25 Allocation and Demand Reduction Procedures .............................................................................. 26 Notification Procedures .................................................................................................................. 28 Enforcement ................................................................................................................................... 29 PART 3. WATER CONSERVATION PLAN ...............................................................................30 Progress since 2006 ..............................................................................................................30 A. Triggers for Allocation and Demand Reduction Actions ..................................................31 B. Conservation Objectives and Strategies – Key benchmark for DNR ...............................32 Objective 1: Reduce Unaccounted (Non-Revenue) Water loss to Less than 10% .......................... 32 Objective 2: Achieve Less than 75 Residential Gallons per Capita Demand (GPCD) ...................... 34 Objective 3: Achieve at least 1.5% annual reduction in non-residential per capita water use ...... 35 Objective 4: Achieve a Decreasing Trend in Total Per Capita Demand .......................................... 36 Objective 5: Reduce Ratio of Maximum day to the Average Day Demand to Less Than 2.6 ......... 36 Objective 6: Implement Demand Reduction Measures ................................................................. 37 Objective 7: Additional strategies to Reduce Water Use and Support Wellhead Protection Planning .......................................................................................................................................... 39 Objective 8: Tracking Success: How will you track or measure success through the next ten years? .............................................................................................................................................. 39 C. Regulation ......................................................................................................................40 D. Retrofitting Programs ......................................................................................................41 Retrofitting Programs ..................................................................................................................... 41 E. Education and Information Programs .............................................................................42 Proposed Education Programs ....................................................................................................... 42 PART 4. ITEMS FOR METROPOLITAN AREA COMMUNITIES ..............................................45 A. Water Demand Projections through 2040 .......................................................................45 B. Potential Water Supply Issues ........................................................................................45 5 C. Proposed Alternative Approaches to Meet Extended Water Demand Projections ...........45 D. Value-Added Water Supply Planning Efforts (Optional) ..................................................46 Source Water Protection Strategies ............................................................................................... 46 Technical assistance........................................................................................................................ 46 GLOSSARY ..............................................................................................................................47 Acronyms and Initialisms .......................................................................................................49 APPENDICES TO BE SUBMITTED BY THE WATER SUPPLIER ............................................49 Appendix 1: Well records and maintenance summaries .......................................................49 Appendix 2: Water level monitoring plan ...............................................................................49 Appendix 3: Water level graphs for each water supply well ...................................................49 Appendix 4: Capital Improvement Plan ..................................................................................49 Appendix 5: Emergency Telephone List ...............................................................................49 Appendix 6: Cooperative Agreements for Emergency Services ............................................49 Appendix 7: Municipal Critical Water Deficiency Ordinance ...................................................49 Appendix 8: Graph of Ten Years of Annual Per Capita Water Demand for Each Customer Category ................................................................................................................................49 Appendix 9: Water Rate Structure ........................................................................................49 Appendix 10: Ordinances or Regulations Related to Water Use ............................................49 Appendix 11: Implementation Checklist ................................................................................49 Appendix 12: Sources of Information for Table 10 ................................................................49 6 DEPARTMENT OF NATURAL RESOURCES – DIVISION OF ECOLOGICAL AND WATER RESOURCES AND METROPOLITAN COUNCIL INTRODUCTION TO WATER SUPPLY PLANS (WSP) Who needs to complete a Water Supply Plan Public water suppliers serving more than 1,000 people, large private water suppliers in designated Groundwater Management Areas, and all water suppliers in the Twin Cities metropolitan area are required to prepare and submit a water supply plan. The goal of the WSP is to help water suppliers: 1) implement long term water sustainability and conservation measures; and 2) develop critical emergency preparedness measures. Your community needs to know what measures will be implemented in case of a water crisis. A lot of emergencies can be avoided or mitigated if long term sustainability measures are implemented. Groundwater Management Areas (GWMA) The DNR has designated three areas of the state as Groundwater Management Areas (GWMAs) to focus groundwater management efforts in specific geographies where there is an added risk of overuse or water quality degradation. A plan directing the DNRs actions within each GWMA has been prepared. Although there are no specific additional requirements with respect to the water supply planning for communities within designated GWMAs, communities should be aware of the issues and actions planned if they are within the boundary of one of the GWMAs. The three GWMAs are the North and East Metro GWMA (Twin Cities Metro), the Bonanza Valley GWMA and the Straight River GWMA (near Park Rapids). Additional information and maps are included in the DNR Groundwater Management Areas webpage. Benefits of completing a WSP Completing a WSP using this template, fulfills a water supplier’s statutory obligations under M.S. M.S.103G.291 to complete a water supply plan. For water suppliers in the metropolitan area, the WSP will help local governmental units to fulfill their requirements under M.S. 473.859 to complete a local comprehensive plan. Additional benefits of completing WSP template:  The standardized format allows for quicker and easier review and approval  Help water suppliers prepare for droughts and water emergencies.  Create eligibility for funding requests to the Minnesota Department of Health (MDH) for the Drinking Water Revolving Fund.  Allow water suppliers to submit requests for new wells or expanded capacity of existing wells.  Simplify the development of county comprehensive water plans and watershed plans.  Fulfill the contingency plan provisions required in the MDH wellhead protection and surface water protection plans.  Fulfill the demand reduction requirements of Minnesota Statutes, section 103G.291 subd 3 and 4. 7  Upon implementation, contribute to maintaining aquifer levels, reducing potential well interference and water use conflicts, and reducing the need to drill new wells or expand system capacity.  Enable DNR to compile and analyze water use and conservation data to help guide decisions.  Conserve Minnesota’s water resources If your community needs assistance completing the Water Supply Plan, assistance is available from your area hydrologist or groundwater specialist, the MN Rural Waters Association circuit rider program, or in the metropolitan area from Metropolitan Council staff. Many private consultants are also available. WSP Approval Process 10 Basic Steps for completing a 10-Year Water Supply Plan 1. Download the DNR/Metropolitan Council Water Supply Plan Template from the DNR Water Supply Plan webpage. 2. Save the document with a file name with this naming convention: WSP_cityname_permitnumber_date.doc. 3. The template is a form that should be completed electronically. 4. Compile the required water use data (Part 1) and emergency procedures information (Part 2) 5. The Water Conservation section (Part 3) may need discussion with the water department, council, or planning commission, if your community does not already have an active water conservation program. 6. Communities in the seven-county Twin Cities metropolitan area should complete all the information discussed in Part 4. The Metropolitan Council has additional guidance information on their Water Supply webpage. All out-state water suppliers do not need to complete the content addressed in Part 4. 7. Use the Plan instructions and Checklist document from the DNR Water Supply Plan webpage to insure all data is complete and attachments are included. This will allow for a quicker approval process. 8. Plans should be submitted electronically using the MPARS website – no paper documents are required. 9. DNR hydrologist will review plans (in cooperation with Metropolitan Council in Metro area) and approve the plan or make recommendations. 10. Once approved, communities should complete a Certification of Adoption form, and send a copy to the DNR. 8 Complete Table 1 with information about the public water supply system covered by this WSP. Table 1. General information regarding this WSP Requested Information Description DNR Water Appropriation Permit Number(s) 611031 Ownership ☒ Public or ☐ Private Metropolitan Council Area ☒ Yes or ☐ No (and county name) Washington Street Address 3800 Laverne Ave. N City, State, Zip Lake Elmo, MN 55042 Contact Person Name Rob Weldon Title Public Works Director Phone Number 651-747-3941 MDH Supplier Classification Municipal, Non-municipal transient, non-municipal non-transient, etc. 9 PART 1. WATER SUPPLY SYSTEM DESCRIPTION AND EVALUATION The first step in any water supply analysis is to assess the current status of demand and availability. Information summarized in Part 1 can be used to develop Emergency Preparedness Procedures (Part 2) and the Water Conservation Plan (Part 3). This data is also needed to track progress for water efficiency measures. A. Analysis of Water Demand Complete Table 2 showing the past 10 years of water demand data.  Some of this information may be in your Wellhead Protection Plan.  If you do not have this information, do your best, call your engineer for assistance or if necessary leave blank. If your customer categories are different than the ones listed in Table 2, please describe the differences below: 10 Table 2. Historic water demand (see definitions in the glossary after Part 4 of this template) Year Pop. Served Total Connections Residential Water Delivered (MG) C/I/I Water Delivered (MG) Water used for Non- essential Wholesale Deliveries (MG) Total Water Delivered (MG) Total Water Pumped (MG) Water Supplier Services Percent Unmetered/ Unaccounted Average Daily Demand (MGD) Max. Daily Demand (MGD) Date of Max. Demand Residential Per Capita Demand (GPCD) Total per capita Demand (GPCD) 2005 2077 495 46 6 .106 52 56 1 .142 .660 7/17 60 68 2006 2919 651 70 6 .139 76 82 1 .208 .813 7/13 66 71 2007 2980 671 108 9 .756 117 142 1 .321 1 7/26 99 108 2008 3400 868 109 8 .120 117 129 1 .321 1 7/3 89 94 2009 2551 905 103 8 3 114 130 1 .312 .970 7/17 110 122 2010 3153 911 81 7 5 94 103 1 .256 .736 8/29 70 82 2011 3212 932 93 7 3 103 112 1 .282 .876 6/30 79 88 2012 165 2013 3200 1050 94 31 4 125 129 1 .342 1 8/25 80 107 2014 3200 1069 89 22 .635 111 112 1 .304 76 95 2015 3600 1152 84 22 .759 106 110 1 .290 .831 8/3 64 81 Avg. 2010- 2015 3273 1029 88 18 2.68 108 122 1 .295 .861 74 91 MG – Million Gallons MGD – Million Gallons per Day GPCD – Gallons per Capita per Day See Glossary for definitions. A list of Acronyms and Initialisms can be found after the Glossary. 11 Complete Table 3 by listing the top 10 water users by volume, from largest to smallest. For each user, include information about the category of use (residential, commercial, industrial, institutional, or wholesale), the amount of water used in gallons per year, the percent of total water delivered, and the status of water conservation measures. Table 3. Large volume users Customer Use Category (Residential, Industrial, Commercial, Institutional, Wholesale) Amount Used (Gallons per Year) Percent of Total Annual Water Delivered Implementing Water Conservation Measures? (Yes/No/Unknown) 1. HOLIDAY INN COMMERCIAL 3,124,000 2.45 UNKNOWN 2. MACHINE SHED COMMERCIAL 1,681,600 1.32 UNKNOWN 3. HIGH POINTE COMMERCIAL 1,193,000 0.94 UNKNOWN 4. LAKE ELMO INN COMMERCIAL 999,998 0.79 UNKNOWN 5. BREMER BANK COMMERCIAL 992,000 0.78 UNKNOWN 6. ROCKPOINT COMMERCIAL 588,000 0.46 UNKNOWN 7. MI HOMES RESIDENTIAL 527,000 0.41 UNKNOWN 8. BARTHELEMY RESIDENTIAL 477,000 0.37 UNKNOWN 9. LAKE ELMO ELEM COMMERCIAL 467,000 0.37 UNKNOWN 10. ELMO INN ENT COMMERCIAL 450,000 0.35 UNKNOWN B. Treatment and Storage Capacity Complete Table 4 with a description of where water is treated, the year treatment facilities were constructed, water treatment capacity, the treatment methods (i.e. chemical addition, reverse osmosis, coagulation, sedimentation, etc.) and treatment types used (i.e. fluoridation, softening, chlorination, Fe/MN removal, coagulation, etc.). Also describe the annual amount and method of disposal of treatment residuals. Add rows to the table as needed. Table 4. Water treatment capacity and treatment processes Treatment Site ID (Plant Name or Well ID) Year Constructed Treatment Capacity (GPD) Treatment Method Treatment Type Annual Volume of Residuals Disposal Process for Residuals Do You Reclaim Filter Backwash Water? Insert Facility ID here Add rows as needed Total NA NA NA NA Complete Table 5 with information about storage structures. Describe the type (i.e. elevated, ground, etc.), the storage capacity of each type of structure, the year each structure was constructed, and the primary material for each structure. Add rows to the table as needed. 12 Table 5. Storage capacity, as of the end of the last calendar year Structure Name Type of Storage Structure Year Constructed Primary Material Storage Capacity (Gallons) Water Tower #1 Elevated storage 1962 Steel 75,000 Water Tower #2 Elevated storage 2006 Composite 750,000 Add rows as needed Other - Total NA NA NA 825,000 Treatment and storage capacity versus demand It is recommended that total storage equal or exceed the average daily demand. Discuss the difference between current storage and treatment capacity versus the water supplier’s projected average water demand over the next 10 years (see Table 7 for projected water demand): C. Water Sources Complete Table 6 by listing all types of water sources that supply water to the system, including groundwater, surface water, interconnections with other water suppliers, or others. Provide the name of each source (aquifer name, river or lake name, name of interconnecting water supplier) and the Minnesota unique well number or intake ID, as appropriate. Report the year the source was installed or established and the current capacity. Provide information about the depth of all wells. Describe the status of the source (active, inactive, emergency only, retail/wholesale interconnection) and if the source facilities have a dedicated emergency power source. Add rows to the table as needed for each installation. Include copies of well records and maintenance summary for each well that has occurred since your last approved plan in Appendix 1. Table 6. Water sources and status Resource Type (Groundwater, Surface water, Interconnection) Resource Name MN Unique Well # or Intake ID Year Installed Capacity (Gallons per Minute) Well Depth (Feet) Status of Normal and Emergency Operations (active, inactive, emergency only, retail/wholesale interconnection)) Does this Source have a Dedicated Emergency Power Source? (Yes or No) Ground Water Well #1 208448 1962 500 808 Active No Ground Water Well #2 603085 2001 1000 285 Active No Ground Water Well #3 655910 1000 Inactive N/A Ground Water Well #4 767874 2015 1250 290 Active Yes Interconnect City of Oakdale Hudson Blvd. 1996 607 Retail N/A Interconnect City of Oakdale Ideal Ave. 1400 Residential/Inactive Limits on Emergency Interconnections 13 Discuss any limitations on the use of the water sources (e.g. not to be operated simultaneously, limitations due to blending, aquifer recovery issues etc.) and the use of interconnections, including capacity limits or timing constraints (i.e. only 200 gallons per minute are available from the City of Prior Lake, and it is estimated to take 6 hours to establish the emergency connection). If there are no limitations, list none. Interconnects with City of Oakdale Hudson Blvd = 12” Ideal Ave = 6” D. Future Demand Projections – Key Metropolitan Council Benchmark Water Use Trends Use the data in Table 2 to describe trends in 1) population served; 2) total per capita water demand; 3) average daily demand; 4) maximum daily demand. Then explain the causes for upward or downward trends. For example, over the ten years has the average daily demand trended up or down? Why is this occurring? Demand and population have increased and will continue to increase due to growth and development. Use the water use trend information discussed above to complete Table 7 with projected annual demand for the next ten years. Communities in the seven-county Twin Cities metropolitan area must also include projections for 2030 and 2040 as part of their local comprehensive planning. Projected demand should be consistent with trends evident in the historical data in Table 2, as discussed above. Projected demand should also reflect state demographer population projections and/or other planning projections. Table 7. Projected annual water demand [Table to be updated with new projected numbers. TBU=to be updated] Year Projected Total Population Projected Population Served Projected Total Per Capita Water Demand (GPCD) Projected Average Daily Demand (MGD) Projected Maximum Daily Demand (MGD) 2016 8,122 3,960 84 .333 .999 2017 8,872 4,830 74 .359 1 2018 9,622 5,580 74 .414 1.2 2019 10,372 6,330 74 .469 1.4 2020 11,122 7,080 74 .523 1.6 2021 11,872 7,830 74 .580 1.7 2022 12,622 8,580 74 .635 1.9 2023 13,372 9,330 74 .690 2 2024 14,122 10,080 74 .745 2.2 2025 14,452 10,410 74 .770 2.3 2030 18,000 13,860 74 1.045 3.135 2040 23,735 20,649 74 1.595 4.785 GPCD – Gallons per Capita per Day MGD – Million Gallons per Day 14 Projection Method Describe the method used to project water demand, including assumptions for population and business growth and how water conservation and efficiency programs affect projected water demand: Population and peak day water use. Percentage of population served increases by 1% each year. Projected Total Per Capita Water Demand changed from 2016 to 2017 and remained consistent each year. Projected Average Daily demand increased from 2017 incrementally by 0.055, and projected Maximum Daily Demand is Projected Average Daily Demand multiplied by three. E. Resource Sustainability Monitoring – Key DNR Benchmark Complete Table 8 by inserting information about source water quality and quantity monitoring efforts. The list should include all production wells, observation wells, and source water intakes or reservoirs. Groundwater level data for DNR’s statewide network of observation wells are available online through the DNR’s Cooperative Groundwater Monitoring (CGM) webpage. Table 8. Information about source water quality and quantity monitoring MN Unique Well # or Surface Water ID Type of monitoring point Monitoring program Frequency of monitoring Monitoring Method Well #1 208448 ☒ production well ☐ observation well ☐ source water intake ☐ source water reservoir ☐ routine MDH sampling ☒ routine water utility sampling ☐ other ☐ continuous ☐ hourly ☒ daily ☐ monthly ☐ quarterly ☐ annually ☐ SCADA ☐ grab sampling ☒ steel tape ☐ stream gauge Well #2 603085 ☒ production well ☐ observation well ☐ source water intake ☐ source water reservoir ☐ routine MDH sampling ☒ routine water utility sampling ☐ other ☐ continuous ☐ hourly ☒ daily ☐ monthly ☐ quarterly ☐ annually ☒ SCADA ☐ grab sampling ☐ steel tape ☐ stream gauge Well #4 ☒ production well ☐ observation well ☐ source water intake ☐ source water reservoir ☐ routine MDH sampling ☒ routine water utility sampling ☐ other ☐ continuous ☐ hourly ☒ daily ☐ monthly ☐ quarterly ☐ annually ☒ SCADA ☐ grab sampling ☐ steel tape ☐ stream gauge Add rows to the table as needed ☐ production well ☐ observation well ☐ source water intake ☐ source water reservoir ☐ routine MDH sampling ☐ routine water utility sampling ☐ other ☐ continuous ☐ hourly ☐ daily ☐ monthly ☐ quarterly ☐ annually ☐ SCADA ☐ grab sampling ☐ steel tape ☐ stream gauge 15 Water Level Data A water level monitoring plan that includes monitoring locations and a schedule for water level readings must be submitted as Appendix 2. If one does not already exist, it needs to be prepared and submitted with the WSP. Ideally, all production and observation wells are monitored at least monthly. Complete Table 9 to summarize water level data for each well being monitored. Provide the name of the aquifer and a brief description of how much water levels vary over the season (the difference between the highest and lowest water levels measured during the year) and the long-term trends for each well. If water levels are not measured and recorded on a routine basis, then provide the static water level when each well was constructed and the most recent water level measured during the same season the well was constructed. Also include all water level data taken during any well and pump maintenance. Add rows to the table as needed. Groundwater hydrographs illustrate the historical record of aquifer water levels measured within a well and can indicate water level trends over time. For each well in your system, provide a hydrograph for the life of the well, or for as many years as water levels have been measured. Include the hydrographs in Appendix 3. An example of a hydrograph can be found on the DNR’s Groundwater Hydrograph webpage. Hydrographs for DNR Observation wells can be found in the CGM discussed above. Table 9. Water level data Unique Well Number or Well ID Aquifer Name Seasonal Variation (Feet) Long-term Trend in water level data Water level measured during well/pumping maintenance Well #1 208448 Jordan Sandstone Mt. Simon ☐ Falling ☐ Stable ☐ Rising MM/DD/YY:____ MM/DD/YY:____ MM/DD/YY:____ Well #2 603085 Prairie du Chien Jordan ☐ Falling ☐ Stable ☐ Rising MM/DD/YY:____ MM/DD/YY:____ MM/DD/YY:____ Well #4 767874 Prairie du Chien Jordan ☐ Falling ☐ Stable ☐ Rising MM/DD/YY:____ MM/DD/YY:____ MM/DD/YY:____ ☐ Falling ☐ Stable ☐ Rising MM/DD/YY:____ MM/DD/YY:____ MM/DD/YY:____ Potential Water Supply Issues & Natural Resource Impacts – Key DNR & Metropolitan Council Benchmark Complete Table 10 by listing the types of natural resources that are or could potentially be impacted by permitted water withdrawals in the future. You do not need to identify every single water resource in your entire community. The goal is to help you triage the most important water resources and/or the water resources that may be impacted by your water supply system – perhaps during a drought or when the population has grown significantly in ten years. This is emerging science, so do the best you can with available data. For identified resources, provide the name of specific resources that may be impacted. 16 Identify what the greatest risks to the resource are and how the risks are being assessed. Identify any resource protection thresholds – formal or informal – that have been established to identify when actions should be taken to mitigate impacts. Provide information about the potential mitigation actions that may be taken, if a resource protection threshold is crossed. Add additional rows to the table as needed. See the glossary at the end of the template for definitions. Some of this baseline data should have been in your earlier water supply plans or county comprehensive water plans. When filling out this table, think of what are the water supply risks, identify the resources, determine the threshold and then determine what your community will do to mitigate the impacts. Your DNR area hydrologist is available to assist with this table. For communities in the seven-county Twin Cities metropolitan area, the Master Water Supply Plan Appendix 1 (Water Supply Profiles), provides information about potential water supply issues and natural resource impacts for your community. Steps for completing Table 10 1. Identify the potential for natural resource impacts/issues within the community First, review available information to identify resources that may be impacted by the operation of your water supply system (such as pumping). Potential Sources of Information:  County Geologic Atlas  Local studies  Metropolitan Council System Statement (for metro communities)  Metropolitan Council Master Water Supply Plan (for metro communities) ACTION: Check the resource type(s) that may be impacted in the column “Resource Type” 2. Identify where your water supply system is most likely to impact those resources (and vice versa). Potential Sources of Information:  Drinking Water Supply Management Areas  Geologic Atlas - Sensitivity  If no WHPA or other information exists, consider rivers, lakes, wetlands and significant within 1.5 miles of wells; and calcareous fens and trout streams within 5 miles of wells ACTION: Focus the rest of your work in these areas. 3. Within focus areas, identify specific features of value to the community You know your community best. What resources are important to pay attention to? It may be useful to check in with your community’s planning and zoning staff and others. Potential Sources of Information:  Park plans  Local studies 17  Natural resource inventories  Tourist attractions/recreational areas/valued community resource ACTION: Identify specific features that the community prioritizes in the “Resource Name” column (for example: North Lake, Long River, Brook Trout Stream, or Green Fen). If, based on a review of available information, no features are likely to be at risk, note “None”. 4. Identify what impact(s) the resource is at risk for Potential Sources of Information:  Wellhead Protection Plan  Water Appropriation Permit  County Geologic Atlas  MDH or PCA reports of the area  Metropolitan Council System Statement (for metro communities)  Metropolitan Council Master Water Supply Plan (for metro communities) ACTION: Check the risk type in the column “Risk”. If, based on a review of available information, no risk is identified, note “None anticipated”. 5. Describe how the risk was assessed Potential Sources of Information:  Local studies  Monitoring data (community, WMO, DNR, etc.)  Aquifer testing  County Geologic Atlas or other hydrogeologic studies  Regional or state studies, such as DNR’s report ‘Definitions and Thresholds for Negative Impacts to Surface Waters’  Well boring logs ACTION: Identify the method(s) used to identify the risk to the resource in the “Risk Assessed Through” column 6. Describe protection threshold/goals What is the goal, if any, for protecting these resources? For example, is there a lower limit on acceptable flow in a river or stream? Water quality outside of an accepted range? A lower limit on acceptable aquifer level decline at one or more monitoring wells? Withdrawals that exceed some percent of the total amount available from a source? Or a lower limit on acceptable changes to a protected habitat? Potential Sources of Information:  County Comprehensive Water Plans  Watershed Plans or One Watershed/One Plan  Groundwater or Aquifer Plans  Metropolitan Master Plans  DNR Thresholds study  Community parks, open space, and natural resource plans 18 ACTION: Describe resource protection goals in the “Describe Resource Protection Threshold” column or reference an existing plan/document/webpage 7. If a goal/threshold should trigger action, describe the plan that will be implemented. Identify specific action, mitigation measures or management plan that the water supplier will implement, or refer to a partner’s plan that includes actions to be taken. Potential Sources of Information:  County Comprehensive Water Plans  Watershed Plans or One Watershed/One Plan  Groundwater or Aquifer Plans  Metropolitan Master Plans  Studies such as DNR Thresholds study ACTION: Describe the mitigation measure or management plan in the “Mitigation Measure or Management Plan” column. 8. Describe work to evaluate these risks going forward. For example, what is the plan to regularly check in to stay current on plans or new data? Identify specific action that the water supplier will take to identify the creation of or change to goals/thresholds, or refer to a partner’s plan that includes actions to be taken. Potential Sources of Information:  County Comprehensive Water Plans  Watershed Plans or One Watershed/One Plan  Groundwater or Aquifer Plans  Metropolitan Master Plans  Studies such as DNR Thresholds study ACTION: Describe what will be done to evaluate risks going forward, including any changes to goals or protection thresholds in the “Describe how Changes to Goals are monitored” column. 19 Table 10. Natural resource impacts (*List specific resources in Appendix 12) Resource Type Resource Name Risk Risk Assessed Through * Describe Resource Protection Threshold or Goal * Mitigation Measures or Management Plan Describe How Thresholds or Goals are Monitored ☐ River or stream ☒ None anticipated ☐ Flow/water level decline ☐ Degrading water quality trends ☐ Impacts on endangered, threatened, or special concern species habitat ☐ Other: ___________ ☐ Geologic atlas or other mapping ☐ Modeling ☐ Modeling ☐ Monitoring ☐ Aquifer testing ☐WRAPS or other watershed report ☐Proximity (<1.5 miles) ☐ Other: ___________ ☐ Not applicable ☐ Additional data is needed to establish ☐ See report: ___________ ☐ No data available ☐ Other: ___________ ☐Not applicable ☐ Change groundwater pumping ☐ Increase conservation ☐ Other: ___________ ☐Not applicable ☐ Newly collected data will be analyzed ☐ Regular check-in with these partners: ___________ _ ☐ Other: ___________ ☐ Calcareous fen ☒ None anticipated ☐ Flow/water level decline ☐ Degrading water quality trends ☐ Impacts on endangered, threatened, or special concern species habitat ☐ Other: ___________ ☐ Geologic atlas or other mapping ☐ Modeling ☐ Modeling ☐ Monitoring ☐ Aquifer testing ☐WRAPS or other watershed Report ☐Proximity (<5 miles) ☐ Other: _________ ☐ Other: ___ ☐ Not applicable ☐ Additional data is needed to establish ☐ See report: ___________ ☐ Other: ___________ ☐Not applicable ☐ Change groundwater pumping ☐ Increase conservation ☐ Other: ___________ ☐Not applicable ☐ Newly collected data will be analyzed ☐ Regular check-in with these partners: ___________ ☐ Other: ___________ 20 Resource Type Resource Name Risk Risk Assessed Through * Describe Resource Protection Threshold or Goal * Mitigation Measures or Management Plan Describe How Thresholds or Goals are Monitored ☒ Lake White Bear Lake ☐ None anticipated ☒ Flow/water level decline ☐ Degrading water quality trends ☐ Impacts on endangered, threatened, or special concern species habitat ☐ Other: ___________ ☒ Geologic atlas or other mapping ☐ Modeling ☒ Modeling ☐ Monitoring ☐ Aquifer testing ☐WRAPS or other watershed report ☐Proximity (<1.5 miles) ☐ Other: _________ ☐ Other: ___ ☐ Not applicable ☐ Additional data is needed to establish ☐ See report: ___________ ☐ Other: ___________ ☐Not applicable ☒ Change groundwater pumping ☐ Increase conservation ☐ Other: ___________ ☐Not applicable ☒ Newly collected data will be analyzed ☐ Regular check-in with these partners: ___________ ☐ Other: ___________ ☐ Wetland ☒ None anticipated ☐ Flow/water level decline ☐ Degrading water quality trends ☐ Impacts on endangered, threatened, or special concern species habitat ☐ Other: ___________ ☐ Geologic atlas or other mapping ☐ Modeling ☐ Modeling ☐ Monitoring ☐ Aquifer testing ☐WRAPS or other watershed report ☐Proximity (<1.5 miles) ☐ Other: _________ ☐ Not applicable ☐ Additional data is needed to establish ☐ See report: ___________ ☐ Other: ___________ ☐Not applicable ☐ Change groundwater pumping ☐ Increase conservation ☐ Other: ___________ ☐Not applicable ☐ Newly collected data will be analyzed ☐ Regular check-in with these partners: ___________ _ ☐ Other: ___________ 21 Resource Type Resource Name Risk Risk Assessed Through * Describe Resource Protection Threshold or Goal * Mitigation Measures or Management Plan Describe How Thresholds or Goals are Monitored ☐ Trout stream ☒ None anticipated ☐ Flow/water level decline ☐ Degrading water quality trends ☐ Impacts on endangered, threatened, or special concern species habitat ☐ Other: ___________ ☐ Geologic atlas or other mapping ☐ Modeling ☐ Monitoring ☐ Aquifer testing ☐WRAPS or other watershed report ☐Proximity (< 5 miles) ☐ Other: ___________ ☐ Not applicable ☐ Additional data is needed to establish ☐ See report: ___________ ☐ Other: ___________ ☐Not applicable ☐ Change groundwater pumping ☐ Increase conservation ☐ Other: ___________ ☐Not applicable ☐ Newly collected data will be analyzed ☐ Regular check-in with these partners: ___________ ☐ Other: ___________ ☐ Aquifer ☒ None anticipated ☐ Flow/water level decline ☐ Degrading water quality trends ☐ Impacts on endangered, threatened, or special concern species habitat ☐ Other: ___________ ☐ Geologic atlas or other mapping ☐ Modeling ☐ Monitoring ☐ Aquifer testing ☐Proximity (obwell < 5 miles) ☐ Other: ___________ ☐ Not applicable ☐ Additional data is needed to establish ☐ See report: ___________ ☐ Other: ___________ ☐Not applicable ☐ Change groundwater pumping ☐ Increase conservation ☐ Other: ___________ ☐Not applicable ☐ Newly collected data will be analyzed ☐ Regular check-in with these partners: ___________ ☐ Other: ___________ Wellhead Protection (WHP) and Source Water Protection (SWP) Plans Complete Table 11 to provide status information about WHP and SWP plans. The emergency procedures in this plan are intended to comply with the contingency plan provisions required in the Minnesota Department of Health’s (MDH) Wellhead Protection (WHP) Plan and Surface Water Protection (SWP) Plan. 22 Table 11. Status of Wellhead Protection and Source Water Protection Plans Plan Type Status Date Adopted Date for Update WHP ☒ In Process ☐ Completed ☐ Not Applicable SWP ☐ In Process ☐ Completed ☒ Not Applicable WHP – Wellhead Protection Plan SWP – Source Water Protection Plan F. Capital Improvement Plan (CIP) Please note that any wells that received approval under a ten-year permit, but that were not built, are now expired and must submit a water appropriations permit. Adequacy of Water Supply System Complete Table 12 with information about the adequacy of wells and/or intakes, storage facilities, treatment facilities, and distribution systems to sustain current and projected demands. List planned capital improvements for any system components, in chronological order. Communities in the seven- county Twin Cities metropolitan area should also include information about plans through 2040. The assessment can be the general status by category; it is not necessary to identify every single well, storage facility, treatment facility, lift station, and mile of pipe. Please attach your latest Capital Improvement Plan as Appendix 4. Table 12. Adequacy of Water Supply System System Component Planned action Anticipated Construction Year Notes Wells/Intakes Have 4 wells (3 active) 2 additional wells are in CIP ☐ No action planned - adequate ☐ Repair/replacement ☒ Expansion/addition Water Storage Facilities Have 2 2 additional are in CIP ☐ No action planned - adequate ☐ Repair/replacement ☒ Expansion/addition 2017 & 2025 Water Treatment Facilities ☒ No action planned - adequate ☐ Repair/replacement ☐ Expansion/addition Distribution Systems (Pipes, valves, etc.) Old Village Water and Sewer Upgrades Inwood Ave waterma ☐ No action planned - adequate ☒ Repair/replacement ☒ Expansion/addition 2017 Pressure Zones Inwood Booster Station ☐ No action planned - adequate ☐ Repair/replacement ☒ Expansion/addition 2017 23 System Component Planned action Anticipated Construction Year Notes Other: ☐ No action planned - adequate ☐ Repair/replacement ☐ Expansion/addition Proposed Future Water Sources Complete Table 13 to identify new water source installation planned over the next ten years. Add rows to the table as needed. Table 13. Proposed future installations/sources Source Installation Location (approximate) Resource Name Proposed Pumping Capacity (gpm) Planned Installation Year Planned Partnerships Groundwater Surface Water Interconnection to another supplier Water Source Alternatives - Key Metropolitan Council Benchmark Do you anticipate the need for alternative water sources in the next 10 years? Yes ☐ No ☒ For metro communities, will you need alternative water sources by the year 2040? Yes ☐ No ☒ If you answered yes for either question, then complete table 14. If no, insert NA. Complete Table 14 by checking the box next to alternative approaches that your community is considering, including approximate locations (if known), the estimated amount of future demand that could be met through the approach, the estimated timeframe to implement the approach, potential partnerships, and the major benefits and challenges of the approach. Add rows to the table as needed. For communities in the seven-county Twin Cities metropolitan area, these alternatives should include approaches the community is considering to meet projected 2040 water demand. Table 14. Alternative water sources Alternative Source Considered Source and/or Installation Location (approximate) Estimated Amount of Future Demand (%) Timeframe to Implement (YYYY) Potential Partners Benefits Challenges ☐ Groundwater ☐ Surface Water ☐ Reclaimed stormwater ☐ Reclaimed wastewater ☐ Interconnection to another supplier 24 PART 2. EMERGENCY PREPAREDNESS PROCEDURES The emergency preparedness procedures outlined in this plan are intended to comply with the contingency plan provisions required by MDH in the WHP and SWP. Water emergencies can occur as a result of vandalism, sabotage, accidental contamination, mechanical problems, power failings, drought, flooding, and other natural disasters. The purpose of emergency planning is to develop emergency response procedures and to identify actions needed to improve emergency preparedness. In the case of a municipality, these procedures should be in support of, and part of, an all-hazard emergency operations plan. Municipalities that already have written procedures dealing with water emergencies should review the following information and update existing procedures to address these water supply protection measures. A. Emergency Response Plan Section 1433(b) of the Safe Drinking Water Act, (Public Law 107-188, Title IV- Drinking Water Security and Safety) requires community water suppliers serving over 3,300 people to prepare an Emergency Response Plan. MDH recommends that Emergency Response Plans are updated annually. Do you have an Emergency Response Plan? Yes ☐ No ☒ Have you updated the Emergency Response Plan in the last year? Yes ☐ No ☒ When did you last update your Emergency Response Plan? ____________________ Complete Table 15 by inserting the noted information regarding your completed Emergency Response Plan. Table 15. Emergency Response Plan contact information Emergency Response Plan Role Contact Person Contact Phone Number Contact Email Emergency Response Lead Alternate Emergency Response Lead B. Operational Contingency Plan All utilities should have a written operational contingency plan that describes measures to be taken for water supply mainline breaks and other common system failures as well as routine maintenance. Do you have a written operational contingency plan? Yes ☐ No ☒ At a minimum, a water supplier should prepare and maintain an emergency contact list of contractors and suppliers. C. Emergency Response Procedures Water suppliers must meet the requirements of MN Rules 4720.5280. Accordingly, the Minnesota Department of Natural Resources (DNR) requires public water suppliers serving more than 1,000 people to submit Emergency and Conservation Plans. Water emergency and conservation plans that have been 25 approved by the DNR, under provisions of Minnesota Statute 186 and Minnesota Rules, part 6115.0770, will be considered equivalent to an approved WHP contingency plan. Emergency Telephone List Prepare and attach a list of emergency contacts, including the MN Duty Officer (1-800-422-0798), as Appendix 5. An Emergency Contact List template is available at the MnDNR Water Supply Plans webpage. The list should include key utility and community personnel, contacts in adjacent water suppliers, and appropriate local, state and federal emergency contacts. Please be sure to verify and update the contacts on the emergency telephone list and date it. Thereafter, update on a regular basis (once a year is recommended). In the case of a municipality, this information should be contained in a notification and warning standard operating procedure maintained by the Emergency Manager for that community. Responsibilities and services for each contact should be defined. Current Water Sources and Service Area Quick access to concise and detailed information on water sources, water treatment, and the distribution system may be needed in an emergency. System operation and maintenance records should be maintained in secured central and back-up locations so that the records are accessible for emergency purposes. A detailed map of the system showing the treatment plants, water sources, storage facilities, supply lines, interconnections, and other information that would be useful in an emergency should also be readily available. It is critical that public water supplier representatives and emergency response personnel communicate about the response procedures and be able to easily obtain this kind of information both in electronic and hard copy formats (in case of a power outage). Do records and maps exist? Yes ☒ No ☐ Can staff access records and maps from a central secured location in the event of an emergency? Yes ☒ No ☐ Does the appropriate staff know where the materials are located? Yes ☒ No ☐ Procedure for Augmenting Water Supplies Complete Tables 16 – 17 by listing all available sources of water that can be used to augment or replace existing sources in an emergency. Add rows to the tables as needed. In the case of a municipality, this information should be contained in a notification and warning standard operating procedure maintained by the warning point for that community. Municipalities are encouraged to execute cooperative agreements for potential emergency water services and copies should be included in Appendix 6. Outstate Communities may consider using nearby high capacity wells (industry, golf course) as emergency water sources. 26 WSP should include information on any physical or chemical problems that may limit interconnections to other sources of water. Approvals from the MDH are required for interconnections or the reuse of water. Table 16. Interconnections with other water supply systems to supply water in an emergency Other Water Supply System Owner Capacity (GPM & MGD) Note Any Limitations On Use List of services, equipment, supplies available to respond City of Oakdale (Hudson Blvd) 1400 GPM City of Oakdale (Ideal Ave.) 607 GPM GPM – Gallons per minute MGD – million gallons per day Table 17. Utilizing surface water as an alternative source Surface Water Source Name Capacity (GPM) Capacity (MGD) Treatment Needs Note Any Limitations On Use Insert name of surface water source here Add rows as needed If not covered above, describe additional emergency measures for providing water (obtaining bottled water, or steps to obtain National Guard services, etc.) Allocation and Demand Reduction Procedures Complete Table 18 by adding information about how decisions will be made to allocate water and reduce demand during an emergency. Provide information for each customer category, including its priority ranking, average day demand, and demand reduction potential for each customer category. Modify the customer categories as needed, and add additional lines if necessary. Water use categories should be prioritized in a way that is consistent with Minnesota Statutes 103G.261 (#1 is highest priority) as follows: 1. Water use for human needs such as cooking, cleaning, drinking, washing and waste disposal; use for on-farm livestock watering; and use for power production that meets contingency requirements. 2. Water use involving consumption of less than 10,000 gallons per day (usually from private wells or surface water intakes) 3. Water use for agricultural irrigation and processing of agricultural products involving consumption of more than 10,000 gallons per day (usually from private high-capacity wells or surface water intakes) 27 4. Water use for power production above the use provided for in the contingency plan. 5. All other water use involving consumption of more than 10,000 gallons per day. 6. Nonessential uses – car washes, golf courses, etc. Water used for human needs at hospitals, nursing homes and similar types of facilities should be designated as a high priority to be maintained in an emergency. Lower priority uses will need to address water used for human needs at other types of facilities such as hotels, office buildings, and manufacturing plants. The volume of water and other types of water uses at these facilities must be carefully considered. After reviewing the data, common sense should dictate local allocation priorities to protect domestic requirements over certain types of economic needs. Water use for lawn sprinkling, vehicle washing, golf courses, and recreation are legislatively considered non-essential. Table 18. Water use priorities Customer Category Allocation Priority Average Daily Demand (GDP) Short-Term Emergency Demand Reduction Potential (GPD) Residential 1 217,968 Institutional 2 1,279 Commercial 3 161,640 Industrial N/A 0 Irrigation 4 32,074 32,074 Wholesale 5 0 Non-Essential 6 0 TOTAL NA NA GPD – Gallons per Day Tip: Calculating Emergency Demand Reduction Potential The emergency demand reduction potential for all uses will typically equal the difference between maximum use (summer demand) and base use (winter demand). In extreme emergency situations, lower priority water uses must be restricted or eliminated to protect priority domestic water requirements. Emergency demand reduction potential should be based on average day demands for customer categories within each priority class. Use the tables in Part 3 on water conservation to help you determine strategies. Complete Table 19 by selecting the triggers and actions during water supply disruption conditions. 28 Table 19. Emergency demand reduction conditions, triggers and actions (Select all that may apply and describe) Emergency Triggers Short-term Actions Long-term Actions ☒ Contamination ☒ Loss of production ☒ Infrastructure failure ☐ Executive order by Governor ☐ Other: _____________ ☒ Supply augmentation through distribution valve configuration or City of Oakdale. ☒ Adopt (if not already) and enforce a critical water deficiency ordinance to penalize lawn watering, vehicle washing, golf course and park irrigation & other nonessential uses. ☐ Water allocation through____ ☒ Meet with large water users to discuss their contingency plan. ☒ Supply augmentation through distribution valve configuration or City of Oakdale. ☒ Adopt (if not already) and enforce a critical water deficiency ordinance to penalize lawn watering, vehicle washing, golf course and park irrigation & other nonessential uses. ☐ Water allocation through____ ☒ Meet with large water users to discuss their contingency plan. Notification Procedures Complete Table 20 by selecting trigger for informing customers regarding conservation requests, water use restrictions, and suspensions; notification frequencies; and partners that may assist in the notification process. Add rows to the table as needed. Table 20. Plan to inform customers regarding conservation requests, water use restrictions, and suspensions Notification Trigger(s) Methods (select all that apply) Update Frequency Partners ☒ Short-term demand reduction declared (< 1 year) ☒ Website ☐ Email list serve ☒ Social media (e.g. Twitter, Facebook) ☒ Direct customer mailing, ☒ Press release (TV, radio, newspaper), ☐ Meeting with large water users (> 10% of total city use) ☐ Other: ________ ☒ Daily ☐ Weekly ☐ Monthly ☐ Annually ☒ Long-term Ongoing demand reduction declared ☒ Website ☐ Email list serve ☒ Social media (e.g. Twitter, Facebook) ☒ Direct customer mailing, ☒ Press release (TV, radio, newspaper), ☐ Meeting with large water users (> 10% of total city use) ☐ Other: ________ ☐ Daily ☐ Weekly ☒ Monthly ☐ Annually ☐ Governor’s critical water deficiency declared ☐ Website ☐ Email list serve ☐ Social media (e.g. Twitter, Facebook) ☐ Daily ☐ Weekly ☐ Monthly ☐ Annually 29 Notification Trigger(s) Methods (select all that apply) Update Frequency Partners ☐ Direct customer mailing, ☐ Press release (TV, radio, newspaper), ☐ Meeting with large water users (> 10% of total city use) ☐ Other: ________ Enforcement Prior to a water emergency, municipal water suppliers must adopt regulations that restrict water use and outline the enforcement response plan. The enforcement response plan must outline how conditions will be monitored to know when enforcement actions are triggered, what enforcement tools will be used, who will be responsible for enforcement, and what timelines for corrective actions will be expected. Affected operations, communications, and enforcement staff must then be trained to rapidly implement those provisions during emergency conditions. Important Note: Disregard of critical water deficiency orders, even though total appropriation remains less than permitted, is adequate grounds for immediate modification of a public water supply authority’s water use permit (2013 MN Statutes 103G.291) Does the city have a critical water deficiency restriction/official control in place that includes provisions to restrict water use and enforce the restrictions? (This restriction may be an ordinance, rule, regulation, policy under a council directive, or other official control) Yes ☒ No ☐ If yes, attach the official control document to this WSP as Appendix 7. If no, the municipality must adopt such an official control within 6 months of submitting this WSP and submit it to the DNR as an amendment to this WSP. Irrespective of whether a critical water deficiency control is in place, does the public water supply utility, city manager, mayor, or emergency manager have standing authority to implement water restrictions? Yes ☒ No ☐ If yes, cite the regulatory authority reference: ________________________. If no, who has authority to implement water use restrictions in an emergency? 30 PART 3. WATER CONSERVATION PLAN Minnesotans have historically benefited from the state’s abundant water supplies, reducing the need for conservation. There are however, limits to the available supplies of water and increasing threats to the quality of our drinking water. Causes of water supply limitation may include: population increases, economic trends, uneven statewide availability of groundwater, climatic changes, and degraded water quality. Examples of threats to drinking water quality include: the presence of contaminant plumes from past land use activities, exceedances of water quality standards from natural and human sources, contaminants of emerging concern, and increasing pollutant trends from nonpoint sources. There are many incentives for conserving water; conservation:  reduces the potential for pumping-induced transfer of contaminants into the deeper aquifers, which can add treatment costs  reduces the need for capital projects to expand system capacity  reduces the likelihood of water use conflicts, like well interference, aquatic habitat loss, and declining lake levels  conserves energy, because less energy is needed to extract, treat and distribute water (and less energy production also conserves water since water is used to produce energy)  maintains water supplies that can then be available during times of drought It is therefore imperative that water suppliers implement water conservation plans. The first step in water conservation is identifying opportunities for behavioral or engineering changes that could be made to reduce water use by conducting a thorough analysis of:  Water use by customer  Extraction, treatment, distribution and irrigation system efficiencies  Industrial processing system efficiencies  Regulatory and barriers to conservation  Cultural barriers to conservation  Water reuse opportunities Once accurate data is compiled, water suppliers can set achievable goals for reducing water use. A successful water conservation plan follows a logical sequence of events. The plan should address both conservation on the supply side (leak detection and repairs, metering), as well as on the demand side (reductions in usage). Implementation should be conducted in phases, starting with the most obvious and lowest-cost options. In some cases, one of the early steps will be reviewing regulatory constraints to water conservation, such as lawn irrigation requirements. Outside funding and grants may be available for implementation of projects. Engage water system operators and maintenance staff and customers in brainstorming opportunities to reduce water use. Ask the question: “How can I help save water?” Progress since 2006 Is this your community’s first Water Supply Plan? Yes ☒ No ☐ Priority 1: Significant water reduction; low cost Priority 2: Slight water reduction, low costs (low hanging fruit) Priority 2: Significant water reduction; significant costs Priority 3: Slight water reduction, significant costs (do only if necessary) 31 If yes, describe conservation practices that you are already implementing, such as: pricing, system improvements, education, regulation, appliance retrofitting, enforcement, etc. Tiered billing. If no, complete Table 21 to summarize conservation actions taken since the adoption of the 2006 water supply plan. Table 21. Implementation of previous ten-year Conservation Plan 2006 Plan Commitments Action Taken? Change water rates structure to provide conservation pricing ☒ Yes ☐ No Water supply system improvements (e.g. leak repairs, valve replacements, etc.) ☒ Yes ☐ No Educational efforts ☐ Yes ☒ No New water conservation ordinances ☒ Yes ☐ No Rebate or retrofitting Program (e.g. for toilet, faucets, appliances, showerheads, dish washers, washing machines, irrigation systems, rain barrels, water softeners, etc. ☐ Yes ☒ No Enforcement ☐ Yes ☐ No Describe other ☐ Yes ☐ No What are the results you have seen from the actions in Table 21 and how were results measured? Results are unobtainable due to increased growth of city and expansion of the water system. A. Triggers for Allocation and Demand Reduction Actions Complete table 22 by checking each trigger below, as appropriate, and the actions to be taken at various levels or stages of severity. Add in additional rows to the table as needed. Table 22. Short and long-term demand reduction conditions, triggers and actions Objective Triggers Actions Protect surface water flows ☐ Low stream flow conditions ☐ Increase promotion of conservation measures 32 Objective Triggers Actions ☐ Reports of declining wetland and lake levels ☐ Other: ______________ ☐ Other: ____________ Short-term demand reduction (less than 1 year ☐ Extremely high seasonal water demand (more than double winter demand) ☐ Loss of treatment capacity ☐ Lack of water in storage ☐ State drought plan ☐ Well interference ☐ Other: ___________________ ☐ Adopt (if not already) and enforce the critical water deficiency ordinance to restrict or prohibit lawn watering, vehicle washing, golf course and park irrigation & other nonessential uses. ☐ Supply augmentation through ____ ☐ Water allocation through____ ☐ Meet with large water users to discuss user’s contingency plan. Long-term demand reduction (>1 year) ☐ Per capita demand increasing ☐ Total demand increase (higher population or more industry). Water level in well(s) below elevation of _____ ☐ Other: _____________ ☐ Develop a critical water deficiency ordinance that is or can be quickly adopted to penalize lawn watering, vehicle washing, golf course and park irrigation & other nonessential uses. ☐ Enact a water waste ordinance that targets overwatering (causing water to flow off the landscape into streets, parking lots, or similar), watering impervious surfaces (streets, driveways or other hardscape areas), and negligence of known leaks, breaks, or malfunctions. ☐ Meet with large water users to discuss user’s contingency plan. ☐ Enhanced monitoring and reporting: audits, meters, billing, etc. Governor’s “Critical Water Deficiency Order” declared ☐ Describe ☐ Describe B. Conservation Objectives and Strategies – Key benchmark for DNR This section establishes water conservation objectives and strategies for eight major areas of water use. Objective 1: Reduce Unaccounted (Non-Revenue) Water loss to Less than 10% The Minnesota Rural Water Association, the Metropolitan Council and the Department of Natural Resources recommend that all water uses be metered. Metering can help identify high use locations and times, along with leaks within buildings that have multiple meters. It is difficult to quantify specific unmetered water use such as that associated with firefighting and system flushing or system leaks. Typically, water suppliers subtract metered water use from total water pumped to calculate unaccounted or non-revenue water loss. Is your five-year average (2005-2014) unaccounted Water Use in Table 2 higher than 10%? Yes ☐ No ☒ What is your leak detection monitoring schedule? (e.g. Monitor 1/3rd of the city lines per year) 33 Do leak detection on areas of the city that are scheduled for street reconstruction 2 years prior to construction beginning. Create a plan to ¼ of the city every year. Water Audits - are designed to help quantify and track water losses associated with water distribution systems and identify areas for improved efficiency and cost recovery. The American Water Works Association (AWWA) has a recommended water audit methodology which is presented in AWWA’s M36 Manual of Water Supply Practices: Water Audits and Loss Control Programs. AWWA also provides a free spreadsheet-based water audit tool that water suppliers can use to conduct their own water audits. This free water audit tool can be found on AWWA’s Water Loss Control webpage. Another resource for water audit and water loss control information is Minnesota Rural Water Association. What is the date of your most recent water audit? N/A Frequency of water audits: ☐ yearly ☐ other (specify frequency) ________ Leak detection and survey: ☒ every year ☐ every other year ☐ periodic as needed Year last leak detection survey completed: 2017 If Table 2 shows annual water losses over 10% or an increasing trend over time, describe what actions will be taken to reach the <10% loss objective and within what timeframe Metering -AWWA recommends that every water supplier install meters to account for all water taken into its system, along with all water distributed from its system at each customer’s point of service. An effective metering program relies upon periodic performance testing, repair, maintenance or replacement of all meters. Drinking Water Revolving Loan Funds are available for purchase of new meters when new plants are built. AWWA also recommends that water suppliers conduct regular water audits to account for unmetered unbilled consumption, metered unbilled consumption and source water and customer metering inaccuracies. Some cities install separate meters for interior and exterior water use, but some research suggests that this may not result in water conservation. Complete Table 23 by adding the requested information regarding the number, types, testing and maintenance of customer meters. Table 23. Information about customer meters Customer Category Number of Customers Number of Metered Connections Number of Automated Meter Readers Meter testing intervals (years) Average age/meter replacement schedule (years Residential 1610 1610 1610 When needed 20 years Irrigation meters 24 24 24 When needed 20 years Institutional 1 1 1 When needed 20 years Commercial 112 112 112 When needed 20 years 34 Customer Category Number of Customers Number of Metered Connections Number of Automated Meter Readers Meter testing intervals (years) Average age/meter replacement schedule (years Industrial 0 0 0 NA 0 Public facilities 7 0 0 When needed 20 years Other 0 0 0 NA 0 TOTALS 1754 1754 1754 NA NA For unmetered systems, describe any plans to install meters or replace current meters with advanced technology meters. Provide an estimate of the cost to implement the plan and the projected water savings from implementing the plan. Table 24. Water source meters Number of Meters Meter testing schedule (years) Number of Automated Meter Readers Average age/meter replacement schedule (years Wells 3 10 years 3 ___ / ___ Interconnects 2 unknown 2 ___ / ___ Objective 2: Achieve Less than 75 Residential Gallons per Capita Demand (GPCD) The 2002 average residential per capita demand in the Twin Cities Metropolitan area was 75 gallons per capita per day. Is your average 2010-2015 residential per capita water demand in Table 2 more than 75? Yes ☐ No ☒ What was your 2010 – 2015 five-year average residential per capita water demand? 74 g/person/day Describe the water use trend over that timeframe: Varies, no consistent trend. Complete Table 25 by checking which strategies you will use to continue reducing residential per capita demand and project a likely timeframe for completing each checked strategy (Select all that apply and add rows for additional strategies): Table 25. Strategies and timeframe to reduce residential per capita demand Strategy to reduce residential per capita demand Timeframe for completing work ☒ Revise city ordinances/codes to encourage or require water efficient landscaping. Continuous, No water credit will be given for new sod starting in 2018 ☐ Revise city ordinance/codes to permit water reuse options, especially for non-potable purposes like irrigation, 35 Strategy to reduce residential per capita demand Timeframe for completing work groundwater recharge, and industrial use. Check with plumbing authority to see if internal buildings reuse is permitted ☒ Revise ordinances to limit irrigation. Describe the restricted irrigation plan: Reviewed annually ☐ Revise outdoor irrigation installations codes to require high efficiency systems (e.g. those with soil moisture sensors or programmable watering areas) in new installations or system replacements. ☒ Make water system infrastructure improvements continuous ☐ Offer free or reduced cost water use audits) for residential customers. ☐ Implement a notification system to inform customers when water availability conditions change. ☐ Provide rebates or incentives for installing water efficient appliances and/or fixtures indoors (e.g., low flow toilets, high efficiency dish washers and washing machines, showerhead and faucet aerators, water softeners, etc.) ☐ Provide rebates or incentives to reduce outdoor water use (e.g., turf replacement/reduction, rain gardens, rain barrels, smart irrigation, outdoor water use meters, etc.) ☐ Identify supplemental Water Resources ☐ Conduct audience-appropriate water conservation education and outreach. ☐ Describe other plans Objective 3: Achieve at least 1.5% annual reduction in non-residential per capita water use (For each of the next ten years, or a 15% total reduction over ten years.) This includes commercial, institutional, industrial and agricultural water users. Complete Table 26 by checking which strategies you will used to continue reducing non-residential customer use demand and project a likely timeframe for completing each checked strategy (add rows for additional strategies). Where possible, substitute recycled water used in one process for reuse in another. (For example, spent rinse water can often be reused in a cooling tower.) Keep in mind the true cost of water is the amount on the water bill PLUS the expenses to heat, cool, treat, pump, and dispose of/discharge the water. Don’t just calculate the initial investment. Many conservation retrofits that appear to be prohibitively expensive are actually very cost-effective when amortized over the life of the equipment. Often reducing water use also saves electrical and other utility costs. Note: as of 2015, water reuse, and is not allowed by the state plumbing code, M.R. 4715 (a variance is needed). However, several state agencies are addressing this issue. Table 26. Strategies and timeframe to reduce institutional, commercial industrial, and agricultural and non-revenue use demand Strategy to reduce total business, industry, agricultural demand Timeframe for completing work ☐ Conduct a facility water use audit for both indoor and outdoor use, including system components 36 Strategy to reduce total business, industry, agricultural demand Timeframe for completing work ☒ Install enhanced meters capable of automated readings to detect spikes in consumption In process, completion expected in 5 years ☐ Compare facility water use to related industry benchmarks, if available (e.g., meat processing, dairy, fruit and vegetable, beverage, textiles, paper/pulp, metals, technology, petroleum refining etc.) ☐ Install water conservation fixtures and appliances or change processes to conserve water ☒ Repair leaking system components (e.g., pipes, valves) continuous ☐ Investigate the reuse of reclaimed water (e.g., stormwater, wastewater effluent, process wastewater, etc.) ☒ Reduce outdoor water use (e.g., turf replacement/reduction, rain gardens, rain barrels, smart irrigation, outdoor water use meters, etc.) continuous ☒ Train employees how to conserve water continuous ☒ Implement a notification system to inform non-residential customers when water availability conditions change. CodeRed call system ☐ Nonpotable rainwater catchment systems intended to supply uses such as water closets, urinals, trap primers for floor drains and floor sinks, industrial processes, water features, vehicle washing facilities, cooling tower makeup, and similar uses shall be approved by the commissioner. Plumbing code 4714.1702, Published October 31, 2016 ☐ Describe other plans: Objective 4: Achieve a Decreasing Trend in Total Per Capita Demand Include as Appendix 8 one graph showing total per capita water demand for each customer category (i.e., residential, institutional, commercial, industrial) from 2005-2014 and add the calculated/estimated linear trend for the next 10 years. Describe the trend for each customer category; explain the reason(s) for the trends, and where trends are increasing. Objective 5: Reduce Ratio of Maximum day (peak day) to the Average Day Demand to Less Than 2.6 Is the ratio of average 2005-2014 maximum day demand to average 2005-2014 average day demand reported in Table 2 more than 2.6? Yes ☐ No ☒ Calculate a ten-year average (2005 – 2014) of the ratio of maximum day demand to average day demand: 3:1 37 The position of the DNR has been that a peak day/average day ratio that is above 2.6 for in summer indicates that the water being used for irrigation by the residents in a community is too large and that efforts should be made to reduce the peak day use by the community. It should be noted that by reducing the peak day use, communities can also reduce the amount of infrastructure that is required to meet the peak day use. This infrastructure includes new wells, new water towers which can be costly items. Objective 6: Implement Demand Reduction Measures Water Conservation Program Municipal water suppliers serving over 1,000 people are required to adopt demand reduction measures that include a conservation rate structure, or a uniform rate structure with a conservation program that achieves demand reduction. These measures must achieve demand reduction in ways that reduce water demand, water losses, peak water demands, and nonessential water uses. These measures must be approved before a community may request well construction approval from the Department of Health or before requesting an increase in water appropriations permit volume (Minnesota Statutes, section 103G.291, subd. 3 and 4). Rates should be adjusted on a regular basis to ensure that revenue of the system is adequate under reduced demand scenarios. If a municipal water supplier intends to use a Uniform Rate Structure, a community-wide Water Conservation Program that will achieve demand reduction must be provided. Current Water Rates Include a copy of the actual rate structure in Appendix 9 or list current water rates including base/service fees and volume charges below. Volume included in base rate or service charge: __0___ gallons or ____ cubic feet ___ other Frequency of billing: ☐ Monthly ☐ Bimonthly ☒ Quarterly ☐ Other: _________________ Water Rate Evaluation Frequency: ☒ every year ☐ every ___ years ☐ no schedule Date of last rate change: 4/1/17 Table 27. Rate structures for each customer category (Select all that apply and add additional rows as needed) Customer Category Conservation Billing Strategies in Use * Conservation Neutral Billing Strategies in Use ** Non-Conserving Billing Strategies in Use *** Residential ☐ Monthly billing ☒ Increasing block rates (volume tiered rates) ☐ Seasonal rates ☐ Time of use rates ☒ Water bills reported in gallons ☐ Individualized goal rates ☐ Excess use rates ☐ Uniform ☒ Odd/even day watering ☐ Service charge based on water volume ☐ Declining block ☐ Flat ☐ Other (describe) 38 Customer Category Conservation Billing Strategies in Use * Conservation Neutral Billing Strategies in Use ** Non-Conserving Billing Strategies in Use *** ☐ Drought surcharge ☐ Use water bill to provide comparisons ☒ Service charge not based on water volume ☐ Other (describe) Commercial/ Industrial/ Institutional ☐ Monthly billing ☒ Increasing block rates (volume tiered rates) ☐ Seasonal rates ☐ Time of use rates ☒ Water bills reported in gallons ☐ Individualized goal rates ☐ Excess use rates ☐ Drought surcharge ☐ Use water bill to provide comparisons ☒ Service charge not based on water volume ☐ Other (describe) ☐ Uniform ☐ Service charge based on water volume ☐ Declining block ☐ Flat ☐ Other (describe) ☐ Other * Rate Structures components that may promote water conservation:  Monthly billing: is encouraged to help people see their water usage so they can consider changing behavior.  Increasing block rates (also known as a tiered residential rate structure): Typically, these have at least three tiers: should have at least three tiers. o The first tier is for the winter average water use. o The second tier is the year-round average use, which is lower than typical summer use. This rate should be set to cover the full cost of service. o The third tier should be above the average annual use and should be priced high enough to encourage conservation, as should any higher tiers. For this to be effective, the difference in block rates should be significant.  Seasonal rate: higher rates in summer to reduce peak demands  Time of Use rates: lower rates for off peak water use  Bill water use in gallons: this allows customers to compare their use to average rates  Individualized goal rates: typically used for industry, business or other large water users to promote water conservation if they keep within agreed upon goals. Excess Use rates: if water use goes above an agreed upon amount this higher rate is charged  Drought surcharge: an extra fee is charged for guaranteed water use during drought  Use water bill to provide comparisons: simple graphics comparing individual use over time or compare individual use to others.  Service charge or base fee that does not include a water volume – a base charge or fee to cover universal city expenses that are not customer dependent and/or to provide minimal water at a lower rate (e.g., an amount less than the average residential per capita demand for the water supplier for the last 5 years)  Emergency rates -A community may have a separate conservation rate that only goes into effect when the community or governor declares a drought emergency. These higher rates can help to protect the city budgets during times of significantly less water usage. 39 **Conservation Neutral**  Uniform rate: rate per unit used is the same regardless of the volume used  Odd/even day watering –This approach reduces peak demand on a daily basis for system operation, but it does not reduce overall water use. *** Non-Conserving ***  Service charge or base fee with water volume: an amount of water larger than the average residential per capita demand for the water supplier for the last 5 years  Declining block rate: the rate per unit used decreases as water use increases.  Flat rate: one fee regardless of how much water is used (usually unmetered). Provide justification for any conservation neutral or non-conserving rate structures. If intending to adopt a conservation rate structure, include the timeframe to do so: Objective 7: Additional strategies to Reduce Water Use and Support Wellhead Protection Planning Development and redevelopment projects can provide additional water conservation opportunities, such as the actions listed below. If a Uniform Rate Structure is in place, the water supplier must provide a Water Conservation Program that includes at least two of the actions listed below. Check those actions that you intent to implement within the next 10 years. Table 28. Additional strategies to Reduce Water Use & Support Wellhead Protection ☒ Participate in the GreenStep Cities Program, including implementation of at least one of the 20 “Best Practices” for water ☒ Prepare a master plan for smart growth (compact urban growth that avoids sprawl) ☒ Prepare a comprehensive open space plan (areas for parks, green spaces, natural areas) ☒ Adopt a water use restriction ordinance (lawn irrigation, car washing, pools, etc.) ☒ Adopt an outdoor lawn irrigation ordinance ☐ Adopt a private well ordinance (private wells in a city must comply with water restrictions) ☒ Implement a stormwater management program ☐ Adopt non-zoning wetlands ordinance (can further protect wetlands beyond state/federal laws- for vernal pools, buffer areas, restrictions on filling or alterations) ☐ Adopt a water offset program (primarily for new development or expansion) ☐ Implement a water conservation outreach program ☐ Hire a water conservation coordinator (part-time) ☐ Implement a rebate program for water efficient appliances, fixtures, or outdoor water management ☐ Other Objective 8: Tracking Success: How will you track or measure success through the next ten years? Documentation. This will be difficult to achieve due to planned growth of the city and infrastructure. 40 Tip: The process to monitor demand reduction and/or a rate structure includes: a) The DNR Hydrologist will call or visit the community the first 1-3 years after the water supply plan is completed. b) They will discuss what activities the community is doing to conserve water and if they feel their actions are successful. The Water Supply Plan, Part 3 tables and responses will guide the discussion. For example, they will discuss efforts to reduce unaccounted for water loss if that is a problem, or go through Tables 33, 34 and 35 to discuss new initiatives. c) The city representative and the hydrologist will discuss total per capita water use, residential per capita water use, and business/industry use. They will note trends. d) They will also discuss options for improvement and/or collect case studies of success stories to share with other communities. One option may be to change the rate structure, but there are many other paths to successful water conservation. e) If appropriate, they will cooperatively develop a simple work plan for the next few years, targeting a couple areas where the city might focus efforts. C. Regulation Complete Table 29 by selecting which regulations are used to reduce demand and improve water efficiencies. Add additional rows as needed. Copies of adopted regulations or proposed restrictions or should be included in Appendix 10 (a list with hyperlinks is acceptable). Table 29. Regulations for short-term reductions in demand and long-term improvements in water efficiencies Regulations Utilized When is it applied (in effect)? ☒ Rainfall sensors required on landscape irrigation systems ☒ Ongoing ☐ Seasonal ☐ Only during declared Emergencies ☒ Water efficient plumbing fixtures required ☒ New development ☐ Replacement ☐ Rebate Programs ☐ Critical/Emergency Water Deficiency ordinance ☐ Only during declared Emergencies ☒ Watering restriction requirements (time of day, allowable days, etc.) ☒ Odd/even ☐ 2 days/week ☐ Only during declared Emergencies ☐ Water waste prohibited (for example, having a fine for irrigators spraying on the street) ☐ Ongoing ☐ Seasonal ☐ Only during declared Emergencies ☒ Limitations on turf areas (requiring lots to have 10% - 25% of the space in natural areas) ☒ New development ☒ Shoreland/zoning ☐ Other ☐ Soil preparation requirement s (after construction, requiring topsoil to be applied to promote good root growth) ☐ New Development ☐ Construction Projects ☐ Other ☒ Tree ratios (requiring a certain number of trees per square foot of lawn) ☒ New development ☒ Shoreland/zoning ☐ Other 41 Regulations Utilized When is it applied (in effect)? ☐ Permit to fill swimming pool and/or requiring pools to be covered (to prevent evaporation) ☐ Ongoing ☐ Seasonal ☐ Only during declared Emergencies ☐ Ordinances that permit stormwater irrigation, reuse of water, or other alternative water use (Note: be sure to check current plumbing codes for updates) ☐ Describe D. Retrofitting Programs Education and incentive programs aimed at replacing inefficient plumbing fixtures and appliances can help reduce per capita water use, as well as energy costs. It is recommended that municipal water suppliers develop a long-term plan to retrofit public buildings with water efficient plumbing fixtures and appliances. Some water suppliers have developed partnerships with organizations having similar conservation goals, such as electric or gas suppliers, to develop cooperative rebate and retrofit programs. A study by the AWWA Research Foundation (Residential End Uses of Water, 1999) found that the average indoor water use for a non-conserving home is 69.3 gallons per capita per day (gpcd). The average indoor water use in a conserving home is 45.2 gpcd and most of the decrease in water use is related to water efficient plumbing fixtures and appliances that can reduce water, sewer and energy costs. In Minnesota, certain electric and gas providers are required (Minnesota Statute 216B.241) to fund programs that will conserve energy resources and some utilities have distributed water efficient showerheads to customers to help reduce energy demands required to supply hot water. Retrofitting Programs Complete Table 30 by checking which water uses are targeted, the outreach methods used, the measures used to identify success, and any participating partners. Table 30. Retrofitting programs (Select all that apply) Water Use Targets Outreach Methods Partners ☐ Low flush toilets, ☐ Toilet leak tablets, ☐ Low flow showerheads, ☐ Faucet aerators; ☐ Education about ☐ Free distribution of ☐ Rebate for ☐ Other ☐ Gas company ☐ Electric company ☐ Watershed organization ☐ Water conserving washing machines, ☐ Dish washers, ☐ Water softeners; ☐ Education about ☐ Free distribution of ☐ Rebate for ☐ Other ☐ Gas company ☐ Electric company ☐ Watershed organization ☐ Rain gardens, ☐ Rain barrels, ☐ Native/drought tolerant landscaping, etc. ☐ Education about ☐ Free distribution of ☐ Rebate for ☐ Other ☐ Gas company ☐ Electric company ☐ Watershed organization Briefly discuss measures of success from the above table (e.g. number of items distributed, dollar value of rebates, gallons of water conserved, etc.): 42 E. Education and Information Programs Customer education should take place in three different circumstances. First, customers should be provided information on how to conserve water and improve water use efficiencies. Second, information should be provided at appropriate times to address peak demands. Third, emergency notices and educational materials about how to reduce water use should be available for quick distribution during an emergency. Proposed Education Programs Complete Table 31 by selecting which methods are used to provide water conservation and information, including the frequency of program components. Select all that apply and add additional lines as needed. Table 31. Current and Proposed Education Programs Education Methods General summary of topics #/Year Frequency Billing inserts or tips printed on the actual bill ☐ Ongoing ☐ Seasonal ☐ Only during declared emergencies Consumer Confidence Reports 1 ☒ Ongoing ☐ Seasonal ☐ Only during declared emergencies Press releases to traditional local news outlets (e.g., newspapers, radio and TV) ☐ Ongoing ☐ Seasonal ☐ Only during declared emergencies Social media distribution (e.g., emails, Facebook, Twitter) Facebook is used to help spread time sensitive materials that have not reached the emergency level. ☒ Ongoing ☐ Seasonal ☐ Only during declared emergencies Paid advertisements (e.g., billboards, print media, TV, radio, web sites, etc.) ☐ Ongoing ☐ Seasonal ☐ Only during declared emergencies Presentations to community groups ☐ Ongoing ☐ Seasonal ☐ Only during declared emergencies Staff training MN Dept of Health Operator Certification Program for PW Staff ☒ Ongoing ☐ Seasonal ☐ Only during declared emergencies 43 Education Methods General summary of topics #/Year Frequency Facility tours ☐ Ongoing ☐ Seasonal ☐ Only during declared emergencies Displays and exhibits ☐ Ongoing ☐ Seasonal ☐ Only during declared emergencies Marketing rebate programs (e.g., indoor fixtures & appliances and outdoor practices) ☐ Ongoing ☐ Seasonal ☐ Only during declared emergencies Community news letters Article related to water conservation will be included in bi-annual newsletters 2 ☐ Ongoing ☒ Seasonal ☐ Only during declared emergencies Direct mailings (water audit/retrofit kits, showerheads, brochures) ☐ Ongoing ☐ Seasonal ☐ Only during declared emergencies Information kiosk at utility and public buildings ☐ Ongoing ☐ Seasonal ☐ Only during declared emergencies Public service announcements ☐ Ongoing ☐ Seasonal ☐ Only during declared emergencies Cable TV Programs ☐ Ongoing ☐ Seasonal ☐ Only during declared emergencies Demonstration projects (landscaping or plumbing) ☐ Ongoing ☐ Seasonal ☐ Only during declared emergencies K-12 education programs (Project Wet, Drinking Water Institute, presentations) ☐ Ongoing ☐ Seasonal ☐ Only during declared emergencies Community events (children’s water festivals, environmental fairs) ☐ Ongoing ☐ Seasonal ☐ Only during declared emergencies 44 Education Methods General summary of topics #/Year Frequency Community education classes ☐ Ongoing ☐ Seasonal ☐ Only during declared emergencies Water week promotions ☐ Ongoing ☐ Seasonal ☐ Only during declared emergencies Website (include address: ) ☐ Ongoing ☐ Seasonal ☐ Only during declared emergencies Targeted efforts (large volume users, users with large increases) ☐ Ongoing ☐ Seasonal ☐ Only during declared emergencies Notices of ordinances ☐ Ongoing ☐ Seasonal ☐ Only during declared emergencies Emergency conservation notices ☐ Ongoing ☐ Seasonal ☐ Only during declared emergencies Other: ☐ Ongoing ☐ Seasonal ☐ Only during declared emergencies Briefly discuss what future education and information activities your community is considering in the future: Utilize new created Social Media pages, Weekly e-mail updates and Quarterly Newsletter 45 PART 4. ITEMS FOR METROPOLITAN AREA COMMUNITIES Minnesota Statute 473.859 requires WSPs to be completed for all local units of government in the seven-county Metropolitan Area as part of the local comprehensive planning process. Much of the information in Parts 1-3 addresses water demand for the next 10 years. However, additional information is needed to address water demand through 2040, which will make the WSP consistent with the Metropolitan Land Use Planning Act, upon which the local comprehensive plans are based. This Part 4 provides guidance to complete the WSP in a way that addresses plans for water supply through 2040. A. Water Demand Projections through 2040 Complete Table 7 in Part 1D by filling in information about long-term water demand projections through 2040. Total Community Population projections should be consistent with the community’s system statement, which can be found on the Metropolitan Council’s website and which was sent to the community in September 2015. Projected Average Day, Maximum Day, and Annual Water Demands may either be calculated using the method outlined in Appendix 2 of the 2015 Master Water Supply Plan or by a method developed by the individual water supplier. B. Potential Water Supply Issues Complete Table 10 in Part 1E by providing information about the potential water supply issues in your community, including those that might occur due to 2040 projected water use. The Master Water Supply Plan provides information about potential issues for your community in Appendix 1 (Water Supply Profiles). This resource may be useful in completing Table 10. You may document results of local work done to evaluate impact of planned uses by attaching a feasibility assessment or providing a citation and link to where the plan is available electronically. C. Proposed Alternative Approaches to Meet Extended Water Demand Projections Complete Table 12 in Part 1F with information about potential water supply infrastructure impacts (such as replacements, expansions or additions to wells/intakes, water storage and treatment capacity, distribution systems, and emergency interconnections) of extended plans for development and redevelopment, in 10-year increments through 2040. It may be useful to refer to information in the community’s local Land Use Plan, if available. Complete Table 14 in Part 1F by checking each approach your community is considering to meet future demand. For each approach your community is considering, provide information about the amount of 46 future water demand to be met using that approach, the timeframe to implement the approach, potential partners, and current understanding of the key benefits and challenges of the approach. As challenges are being discussed, consider the need for: evaluation of geologic conditions (mapping, aquifer tests, modeling), identification of areas where domestic wells could be impacted, measurement and analysis of water levels & pumping rates, triggers & associated actions to protect water levels, etc. D. Value-Added Water Supply Planning Efforts (Optional) The following information is not required to be completed as part of the local water supply plan, but completing this can help strengthen source water protection throughout the region and help Metropolitan Council and partners in the region to better support local efforts. Source Water Protection Strategies Does a Drinking Water Supply Management Area for a neighboring public water supplier overlap your community? Yes ☒ No ☐ If you answered no, skip this section. If you answered yes, please complete Table 32 with information about new water demand or land use planning-related local controls that are being considered to provide additional protection in this area. Table 32. Local controls and schedule to protect Drinking Water Supply Management Areas Local Control Schedule to Implement Potential Partners ☐ None at this time ☐ Comprehensive planning that guides development in vulnerable drinking water supply management areas ☐ Zoning overlay ☒ Other: 2018 Well Head Protection Plan 2018 Mn Rural Water Technical assistance From your community’s perspective, what are the most important topics for the Metropolitan Council to address, guided by the region’s Metropolitan Area Water Supply Advisory Committee and Technical Advisory Committee, as part of its ongoing water supply planning role? ☒ Coordination of state, regional and local water supply planning roles ☒ Regional water use goals ☐ Water use reporting standards ☐ Regional and sub-regional partnership opportunities ☐ Identifying and prioritizing data gaps and input for regional and sub-regional analyses ☐ Others: ___________________________________________________________________ 47 GLOSSARY Agricultural/Irrigation Water Use - Water used for crop and non-crop irrigation, livestock watering, chemigation, golf course irrigation, landscape and athletic field irrigation. Average Daily Demand - The total water pumped during the year divided by 365 days. Calcareous Fen - Calcareous fens are rare and distinctive wetlands dependent on a constant supply of cold groundwater. Because they are dependent on groundwater and are one of the rarest natural communities in the United States, they are a protected resource in MN. Approximately 200 have been located in Minnesota. They may not be filled, drained or otherwise degraded. Commercial/Institutional Water Use - Water used by motels, hotels, restaurants, office buildings, commercial facilities and institutions (both civilian and military). Consider maintaining separate institutional water use records for emergency planning and allocation purposes. Water used by multi-family dwellings, apartment buildings, senior housing complexes, and mobile home parks should be reported as Residential Water Use. Commercial/Institutional/Industrial (C/I/I) Water Sold - The sum of water delivered for commercial/institutional or industrial purposes. Conservation Rate Structure - A rate structure that encourages conservation and may include increasing block rates, seasonal rates, time of use rates, individualized goal rates, or excess use rates. If a conservation ra te is applied to multifamily dwellings, the rate structure must consider each residential unit as an individual user. A community may have a separate conservation rate that only goes into effect when the community or governor declares a drought emergency. These higher rates can help to protect the city budgets during times of significantly less water usage. Date of Maximum Daily Demand - The date of the maximum (highest) water demand. Typically this is a day in July or August. Declining Rate Structure - Under a declining block rate structure, a consumer pays less per additional unit of water as usage increases. This rate structure does not promote water conservation. Distribution System - Water distribution systems consist of an interconnected series of pipes, valves, storage facilities (water tanks, water towers, reservoirs), water purification facilities, pumping stations, flushing hydrants, and components that convey drinking water and meeting fire protection needs for cities, homes, schools, hospitals, businesses, industries and other facilities. Flat Rate Structure - Flat fee rates do not vary by customer characteristics or water usage. This rate structure does not promote water conservation. Industrial Water Use - Water used for thermonuclear power (electric utility generation) and other industrial use such as steel, chemical and allied products, paper and allied products, mining, and petroleum refining. Low Flow Fixtures/Appliances - Plumbing fixtures and appliances that significantly reduce the amount of water released per use are labeled “low flow”. These fixtures and appliances use just enough water to be effective, saving excess, clean drinking water that usually goes down the drain. Maximum Daily Demand - The maximum (highest) amount of water used in one day. Metered Residential Connections - The number of residential connections to the water system that have meters. For multifamily dwellings, report each residential unit as an individual user. Percent Unmetered/Unaccounted For - Unaccounted for water use is the volume of water withdrawn from all sources minus the volume of water delivered. This value represents water “lost” by miscalculated water use due to inaccurate meters, water lost through leaks, or water that is used but unmetered or otherwi se undocumented. Water used for public services such as hydrant flushing, ice skating rinks, and public swimming pools should be reported under the category “Water Supplier Services”. 48 Population Served - The number of people who are served by the community ’s public water supply system. This includes the number of people in the community who are connected to the public water supply system, as well as people in neighboring communities who use water supplied by the community’s public water supply system. It should not include residents in the community who have private wells or get their water from neighboring water supply. Residential Connections - The total number of residential connections to the water system. For multifamily dwellings, report each residential unit as an individual user. Residential Per Capita Demand - The total residential water delivered during the year divided by the population served divided by 365 days. Residential Water Use - Water used for normal household purposes such as drinking, food preparation, bathing, washing clothes and dishes, flushing toilets, and watering lawns and gardens. Should include all water delivered to single family private residences, multi-family dwellings, apartment buildings, senior housing complexes, mobile home parks, etc. Smart Meter - Smart meters can be used by municipalities or by individual homeowners. Smart metering generally indicates the presence of one or more of the following:  Smart irrigation water meters are controllers that look at factors such as weather, soil, slope, etc. and adjust watering time up or down based on data. Smart controllers in a typical summer will reduce water use by 30%-50%. Just changing the spray nozzle to new efficient models can reduce water use by 40%.  Smart Meters on customer premises that measure consumption during specific time periods and communicate it to the utility, often on a daily basis.  A communication channel that permits the utility, at a minimum, to obtain meter reads on demand, to ascertain whether water has recently been flowing through the meter and onto the premises, and to issue commands to the meter to perform specific tasks such as disconnecting or restricting water flow. Total Connections - The number of connections to the public water supply system. Total Per Capita Demand - The total amount of water withdrawn from all water supply sources during the year divided by the population served divided by 365 days. Total Water Pumped - The cumulative amount of water withdrawn from all water supply sou rces during the year. Total Water Delivered - The sum of residential, commercial, industrial, institutional, water supplier services, wholesale and other water delivered. Ultimate (Full Build-Out) - Time period representing the community’s estimated total amount and location of potential development, or when the community is fully built out at the final planned density. Unaccounted (Non-revenue) Loss - See definitions for “percent unmetered/unaccounted for loss”. Uniform Rate Structure - A uniform rate structure charges the same price-per-unit for water usage beyond the fixed customer charge, which covers some fixed costs. The rate sends a price signal to the customer because the water bill will vary by usage. Uniform rates by class charge the same price-per-unit for all customers within a customer class (e.g. residential or non-residential). This price structure is generally considered less effective in encouraging water conservation. Water Supplier Services - Water used for public services such as hydrant flushing, ice skating rinks, public swimming pools, city park irrigation, back-flushing at water treatment facilities, and/or other uses. Water Used for Nonessential Purposes - Water used for lawn irrigation, golf course and park irrigation, car washes, ornamental fountains, and other non-essential uses. Wholesale Deliveries - The amount of water delivered in bulk to other public water suppliers. 49 Acronyms and Initialisms AWWA – American Water Works Association C/I/I – Commercial/Institutional/Industrial CIP – Capital Improvement Plan GIS – Geographic Information System GPCD – Gallons per capita per day GWMA – Groundwater Management Area – North and East Metro, Straight River, Bonanza, MDH – Minnesota Department of Health MGD – Million gallons per day MG – Million gallons MGL – Maximum Contaminant Level MnTAP – Minnesota Technical Assistance Program (University of Minnesota) MPARS – MN/DNR Permitting and Reporting System (new electronic permitting system) MRWA – Minnesota Rural Waters Association SWP – Source Water Protection WHP – Wellhead Protection APPENDICES TO BE SUBMITTED BY THE WATER SUPPLIER Appendix 1: Well records and maintenance summaries Go to Part 1C for information on what to include in appendix Appendix 2: Water level monitoring plan Go to Part 1E for information on what to include in appendix Appendix 3: Water level graphs for each water supply well Go to Part 1E for information on what to include in appendix Appendix 4: Capital Improvement Plan Go to Part 1E for information on what to include in appendix Appendix 5: Emergency Telephone List Go to Part 2C for information on what to include in appendix Appendix 6: Cooperative Agreements for Emergency Services Go to Part 2C for information on what to include in appendix Appendix 7: Municipal Critical Water Deficiency Ordinance Go to Part 2C for information on what to include in appendix Appendix 8: Graph of Ten Years of Annual Per Capita Water Demand for Each Customer Category Go to Objective 4 in Part 3B for information on what to include in appendix Appendix 9: Water Rate Structure Go to Objective 6 in Part 3B for information on what to include in appendix Appendix 10: Ordinances or Regulations Related to Water Use Go to Objective 7 in Part 3B for information on what to include in appendix Appendix 11: Implementation Checklist Provide a table that summarizes all the actions that the public water supplier is doing, or proposes to do, with estimated implementation dates. Appendix 12: Sources of Information for Table 10 Provide links or references to the information used to complete Table 10. If the file size is reasonable, provide source information as attachments to the plan. DRAFT Chapter 11: Implementation Bringing the Plan to Fruition IDEALAVEN INWOOD AVE N 60TH ST N 10TH ST N LAKE ELMO AVE N STILLWATE R B LV D N 30TH ST N KEATS AVE N OLSONLAKETRLN 50TH ST N MANNINGAVEN47TH ST N34TH ST NLAKE J A N E TRL N 4 5 T H ST N Horseshoe ClearUnnamedDeMontrevilleOlsonJaneBerschen'sPond Elmo Sunfish Friedrich Pond Eagle Point Downs H.J. Brown Pond RoseGoose Goose Armstrong Armstrong Kramer GoetschelKlawitterPondDeerPondCrombiePondHedge'sPond Dirk'sPond Beutel's Pond Legion Pond FDraft Date: Rev. 5.23.2018 Source: Washington County, MNGEO, City of Lake Elmo, SHC AP RAD RSF RSFS GC LDR MDR HDR MU-BP MU-C V-LDR V-MD R V-H DR V-MU Institutional Closed Landfill ROW BP C Park PSP 0 0.3 0.6 0.9 1.20.15 Miles Comprehensive Plan 2040 IMPLEMENTATION - DRAFT 5-24-2018 City of Lake Elmo Comprehensive Plan 2040 2 IMPLEMENTATION - DRAFT 5-24-2018 City of Lake Elmo Comprehensive Plan 2040 3 INTRODUCTION An important component of this Comprehensive Plan Update process is to identify implementation strategies and priorities that will work towards bringing this Plan to fruition. This chapter provides a set of implementation strategies that are specific to the chapters, goals and strategies of each component contained within this Plan. One of the last major public engagement efforts of this planning process was a city-wide Open House to present the draft Plan, and to solicit feedback specific to implementation chapter development. Over 150 residents and stakeholders attended the event and nearly 100 people responded to the Implementation Survey at the Open House or online. Once tabulated, trends regarding implementation priorities were identified, and were then used to help inform the implementation strategies contained within this chapter. A summary of the most agreed to, and highest priority implementation strategies as identified within the survey include: • General Comprehensive Plan Statement: Overwhelmingly people responded that they rely on the Comprehensive Plan to understand what is happening in the City and that the City should follow its Plan. Further respondents felt that the City should put the work and financial resources into developing appropriate ordinances and policies to implement the Plan. Ordinances should be clear, easy to understand, and reliable. • Land Use: The majority of respondents prioritized the development of zoning districts that support new Future Land Use designations contained within this Plan as the most important implementation step, and identified the top priority as creating zoning that supports the new mixed-use areas. With respect to the character of commercial areas, respondents were fairly consistent in their desire to promote low-intensity users that keep traffic calm. Further, respondents were uninterested in developing a regional destination for commercial and business park users, and instead prioritized creating opportunities for businesses and users that would support existing Lake Elmo neighborhoods and residents. From a residential perspective, respondents were focused on creating policies and ordinances that would support the protection, restoration and integration of existing natural resources into new neighborhoods and developing areas in the community. IMPLEMENTATION - DRAFT 5-24-2018 City of Lake Elmo Comprehensive Plan 2040 4 • Balanced Development and Growth: Respondents were split as to whether the City should take a more proactive approach to economic development in the community. Many felt that the City’s leaders and staff should be proactive to identify the types of growth and development it wants and may even go as far as supporting that effort with financial resources. Financial commitments aside, overwhelmingly people felt that the City should at a minimum be prepared to respond to development pressure through establishing appropriate zoning, design guideline and policies that support the desired development and growth patterns in the community. Additionally, respondents felt like it was important to create a more streamlined, easy to understand development review process, and to make sure details such as architecture/design standards, setbacks and landscape requirements were established within ordinances to reduce ambiguity. • Housing: Opinions on the top priorities related to housing were more distributed than any other question, and there was less consensus on who and what types of housing would be most needed through this planning period. Generally, people continue to see the owner-occupied single-family detached housing type as important to the future of the community. However, a significant number of people also identified the need for owner-occupied town homes and condominiums in the City. With respect to demographic trends, people felt that the future needs in the community would continue to be households with young children, and empty-nesters looking to downsize but also recognized that there may be other demographics that may lack options within the community. • Parks, Trails and Open Space (PTOS): Respondents generally agreed on their top priorities for the PTOS system; they prioritized the desire to create more local trail connections into Lake Elmo Regional Park (north and west), to improve and restore the quality of natural resources (lakes, wetland, woodlands, etc.) in the community, and finally identified the desire to make sure new developments (residential and commercial) are required to incorporate a public trail or sidewalk in development plans that provide connections to the larger city-wide planned trail network. • Transportation: People generally rely on the City’s existing roadway network as the primary mode of transportation and identified their top priority as maintenance and management of the existing roadway system. Ranked closely behind, respondents were interested in creating more dedicated bike lanes and pedestrian safety improvements on local roadways. IMPLEMENTATION - DRAFT 5-24-2018 City of Lake Elmo Comprehensive Plan 2040 5 In addition to the top priorities identified through the Implementation Survey, the Advisory Panel has also discussed priorities for implementing this Comprehensive Plan throughout this planning process. A summary of the top priorities that have been discussed by the Advisory Panel over the last year include the following: • Create zoning districts that support a balanced land use plan and provide opportunities for housing diversity including single-family, townhome and multi-family products within the developing areas of the community. • Create opportunities for young people to come back to the community in their early adult years. This likely will include some market rate renter-occupied product (apartment, townhome, etc.), that could not only provide options for young professionals but seniors looking to downsize. • Allow enough flexibility within this Plan and supporting implementation ordinances and policies to have the latitude to respond to market fluctuations and demands. • Integrate and weave parks, trails, open spaces and natural resources into every development – rural or urbanizing. Create a green network that is an amenity, and accessible, to all residents. • Create bikeways and pedestrian connections on major roadways to create a more hospitable network. • Work with the County to see if there is an opportunity to provide non-motorized trail access/connections into the Lake Elmo Park Reserve, particularly from the north and west sides of the park. Guided by the priorities identified from the Advisory Panel, and the Implementation Survey the following implementation chapter was developed. This chapter is not intended to identify every planning or policy effort needed to implement this Comprehensive Plan, but instead is intended to provide a road-map of major initiatives that may require time, resources, and additional study to make sure the City prioritizes certain efforts at it continues to grow and evolve. IMPLEMENTATION - DRAFT 5-24-2018 City of Lake Elmo Comprehensive Plan 2040 6 IMPLEMENTATION STRATEGIES The following strategies are organized by Plan chapter. In some cases some of the implementation strategies will perform ‘double-duty’ that is to say, there may be an implementation strategy identified that would assist with implementation of the goals and strategies of the Land Use chapter and the Housing Chapter. In those cases, the implementation strategy is listed with the Plan chapter that the implementation strategy most directly supports. Chapter 3: Land Use The following implementation steps and strategies are identified to support the City’s Future Land Use Plan and the corresponding goals and strategies identified within Chapter 2 of this Plan. 1. Create two new zoning designations that support the Mixed-Use Business Park and Mixed- Use Commercial land use designations. The process to prepare the new zoning districts will be led by the Planning Commission and may involve a subcommittee to develop the ordinances. This process should be initiated immediately upon adoption of this Comprehensive Plan and should be completed within nine (9) months. Each zoning district may address and include standards such as: • Massing and architecture • Setbacks • Height restrictions • Site design/landscape standards • Permitted, conditionally permitted, and not permitted uses • Mix of uses • PUD process 2. Establish whether each parcel is required to be planned for mix of uses, or if a master planned approach with ghost platting and tracking/monitoring is more desirable 3. Establish a staff and policymaker process and/or create and adopt a formal policy that defines how mixed-use development projects will be tracked for compliance with this Plan. The process must identify how the City will track the mix of land uses and provide a minimum of 50-percent of the land area within the designations for residential uses at densities that meet minimum thresholds as identified within this Plan. Tracking may include, but is not limited to, the following examples: IMPLEMENTATION - DRAFT 5-24-2018 City of Lake Elmo Comprehensive Plan 2040 7 • Require developers to ‘ghost’ plat and file the concept plan as an official document to establish land use mix consistent with this Plan. Create a database or inventory (e.g. Excel) to track residential units and associated density, and acreages associated with each use. This inventory should be considered and used during the development review process. • Create a ordinance and process reference sheet for developers and land owners that describes the mix of uses and process (PUD or otherwise) to ensure compliance with the ordinance. 4. The City may consider using a consultant to assist with developing a master plan for the Mixed-Use Commercial and Mixed-Use Business Park designations that can be used to inform the development of the zoning district requirements and the process to track development within these designations. 5. Create a new zoning district to support the Village High Density Residential (V-HDR) land use designation. This zoning district should be based on other Village residential zoning districts but will be refined and updated to reflect the increased density range identified within this Plan. 7. The City will review and revise, as necessary, current zoning district regulations for consistency with the residential density ranges contained within this document. The review, and any changes, will be completed within nine (9) months of adoption of this Plan. IMPLEMENTATION - DRAFT 5-24-2018 City of Lake Elmo Comprehensive Plan 2040 8 Chapter 4: Balanced Development and Growth The following implementation steps and strategies are identified to support the City’s Balanced Development and Growth Chapter and the corresponding goals and strategies identified within Chapter 2 of this Plan. 1. This City will prioritize and establish a cost for each of the zoning ordinance updates and budget appropriately to complete these updates within their next Capital Improvement Plan process. Some of these initiatives will likely be staff-led to be cost-effective while others may involve a focus group and/or consultant involvement. The City acknowledges that to effectively manage growth and development, the creation of clear, concise and easy to understand ordinances is integral to the implementation of this Plan. 2. The City will create three Overlay Districts for the Village Planning Area to support this Plan. The Overlay Districts will provide additional detail regarding the vision, plan, and specific standards that are unique and tailored to the specific overlay district. For example, the Old Village District overlay will focus on preservation of the integrity of Main Street and existing building patterns and uses within the District. This is unique to the Old Village Overlay District. The process will determine what characteristics and qualities are unique to each Overlay District, and a specific Zoning Overlay District will be added to the Zoning Ordinance and identified on the City’s official Zoning Map. This process will include the Planning Commission and may include a subcommittee to prepare the criteria for each Overlay District. The Overlay Districts will be established and created within nine (9) months of adoption of this Plan. 3. The City will review and update its Open Space Development ordinance to focus on building the greenway network through connected conservation areas, public trails, and other natural resources. 4. The City will explore options to be cautiously proactive about the types of economic development it would like to see in its growth areas. To determine the appropriate level of involvement or engagement by policy makers, a task force, subcommittee, or staff review process may be initiated to establish an economic development and/or competitiveness plan. 5. The Phasing and/or Staging Plan identified within the Land Use chapter, will serve as the foundation for development review and the approval process so that municipal utilities and infrastructure are contiguous and cost-effective. 6. The City will continue to prioritize identification of a solution to the current water supply issues related to the 3M contamination, and current freeze on water appropriation permits from the MnDNR. The City acknowledges that part of implementing a balanced growth plan is the ability to provide municipal services, and at this time there are obstacles that extend well beyond the City’s borders and in some cases, beyond its control. IMPLEMENTATION - DRAFT 5-24-2018 City of Lake Elmo Comprehensive Plan 2040 9 Chapter 5: Housing The City’s implementation program for the Housing chapter is contained within Chapter 5 as required by the Metropolitan Council. Chapter 6: Parks, Trails and Open Space The following implementation steps and strategies are identified to support the City’s Parks, Trails, and Open Space Chapter and the corresponding goals and strategies identified within Chapter 2 of this Plan. 1. The City will continue discussions with Washington County Parks to identify opportunities for improved trail connections into the Lake Elmo Regional Park Reserve, particularly from the north and west side. 2. The City is open to participating on a task force or working group with the County to plan for future connections into the Lake Elmo Regional Park Reserve. 3. The City will continue to require park dedication as established within the City’s Ordinance, and will focus its priority on improving trail (bikeway and pedestrian) connections and providing open space/park access to new neighborhoods. 4. The Park Commission will be involved in initial stages of any development review and process and will provide recommendations regarding planned public trails, parks or other open spaces as identified within this Plan. The Park Commission will provide a written recommendation to the Planning Commission detailing how a proposed development plan is consistent, or inconsistent with this Plan and detailing what modifications are recommended, if any, for a project to be consistent with this Plan. 5. An update to the City’s Park System Plan originally adopted in 2008 and incorporated as part of the 2030 Comprehensive Plan should be completed to reflect recent changes due to development, and to incorporate the Goals and Strategies of this Plan. 6. The City will prepare an update to the City’s Trail System Plan originally adopted in 2005 and incorporated as part of the 2030 Comprehensive Plan, to reflect recent changes due to development, and to incorporate the Goals and Strategies of this Comprehensive Plan. The Trail System Plan should also include maps that identify existing trails, ownership (private or public), as well as planned trail routes and connections throughout existing and new developments. 7. The City will explore opportunities, either by ordinance, or through the development review process to support and enhance the Green Network through the continued enforcement of the park dedication ordinance. IMPLEMENTATION - DRAFT 5-24-2018 City of Lake Elmo Comprehensive Plan 2040 10 8. The City will review existing ordinances and policies to identify opportunities to include standards that support the objectives of the Green Network and Resilient Infrastructure as described within this Plan. Chapter 7: Transportation The following implementation steps and strategies are identified to support the City’s Transportation Chapter and the corresponding goals and strategies identified within Chapter 2 of this Plan. 1. The City will continue to work cooperatively with surrounding Cities, Washington County, the Minnesota Department of Transportation, and other government agencies in development of a transportation network consistent with the goals and strategies of this Plan. 2. The City will require developers to provide roadways, trails, and appropriate right-of-way consistent with the goals and strategies of this Plan. For example, the City has identified the continuation of the Minor Collector roadway (5th Street) to extend eastward to Manning Avenue as development progresses. 3. The City will participate in coalitions and multi-jurisdictional efforts for improvements to the transportation network that coincide with the overall goals of the City. This could include corridor studies/groups, transit oversight panels, and/or construction projects. 4. The City will continue to improve the transportation network to reflect all modes of travel, and will identify opportunities as development occurs to complete the bikeway and trail systems identified within this Plan or through future planning efforts. 5. The City will continue to work with MnDOT and Washington County on the TH 36 South Frontage Road Study to plan to provide safe and adequate access and connectivity to TH 36 for Lake Elmo residents, while minimizing traffic by-passing through the City. 6. The City will continue to support improvements that will maintain the rural character of Lake Elmo Avenue, in particular along the eastern shoreline of Lake Elmo. 7. The City will continue to incorporate the goals and strategies contained within this Plan into the Capital Improvement Plan process. 8. Capital Improvement Plan (CIP). The CIP is the financial planning mechanism used by the City to plan for long-term expenditures. Each year the CIP is revised and updated to reflect the City’s priorities, and the CIP is used to aid in the annual budgeting process. Expenditures are made in accordance with the annual established and adopted budget for the following year. The transportation improvements will continue to be a priority within the CIP, and projects will be identified to implement and support this Comprehensive Plan. IMPLEMENTATION - DRAFT 5-24-2018 City of Lake Elmo Comprehensive Plan 2040 11 Chapter 8: Surface Water The following implementation steps and strategies are identified to support the City’s Surface Water Chapter and the corresponding infrastructure goals and strategies identified within Chapter 2 of this Plan. 1. The City adopts and incorporates by reference the Watershed District’s Water Management Plans, standards, and rules into this Plan and as a part of the City’s permitting and development review process. The Watershed Districts will continue to enforce surface water regulations and permitting within the City within their geographic areas. The City will coordinate its review of development proposals with the Watershed Districts and will manage land use to support protection of surface and ground waters through its Zoning and Subdivision Ordinance. 2. The City will update its Local Surface Water Management Plan (LSWMP) by the end of 2019 consistent with the timeline adopted in the 2009 LSWMP. The City understands that its LSWMP must be consistent with each Watershed District’s Water Management Plans. • The City understands that the Valley Branch Watershed District, Browns Creek Watershed District and South Washington Watershed District have prepared drainage models for portions of the City that indicate path and low direction, but not all modeling work has been complete. The City will rely on each watershed district completing this work and will update its LSWMP as information and data become available. • The City will prepare its LSWMP update and submit a copy of it to each of the Watershed Districts for review, comment and approval once complete. 3. City Process. The City of Lake Elmo reviews proposed development per its Subdivision Ordinance. Design must be in compliance with Engineering Design Standards. An approved Watershed District permit is required prior to final plat acceptance. WCA approval of any wetland impact must be provided by the designated LGU for the Watershed District. Any impacts to public waters must be reviewed by the DNR. An NPDES Permit must be received from the MPCA when applicable. An approved SWPPP must be provided for all subdivisions. No building permit is issued until the following has been completed: • The City will support the Watershed Districts’ implementation of their standards for management of water quantity and quality, including control of peak runoff, volume control, infiltration and filtration, wetland quality, and best management practices to control Total Suspended Solids (TSS), Total Phosphorus (TP), and runoff from development or redevelopment within the City. 4. The Watershed Districts will continue to play the primary role in reviewing storm water plans for development applications within the City, and the City will condition any development approvals on demonstrated compliance with the Watershed District Rules. The IMPLEMENTATION - DRAFT 5-24-2018 City of Lake Elmo Comprehensive Plan 2040 12 City will direct applicants to submit completed permit applications of any development proposals at time of City application, and will work cooperatively with the Watershed Districts through the review and approval process. 5. The City will continue to work with each Watershed District on refinement of coordination of permit and development application review processes and timelines. 6. The City will update its ordinances to be consistent Watershed plans, standards and rules, and with NPDES construction storm water permit requirements for erosion and sediment control if necessary. 7. The City will cooperate with the Watershed Districts to address concerns related to impaired waters and, as the Watershed Districts complete TMDL studies, will manage land use to avoid impacts to water resources within the City. 8. The City will continue to implement the City’s MS4 Permit and SWPPP requirements. 9. Funding Mechanisms. The City will continue to use general fund revenues and storm water utility funds to fund improvements when needed to address water quality and quantity concerns and maintain City-owned storm water management facilities. The City’s commitments to system maintenance are described in detail in its MS4 permit and SWPPP. The City requires that developers finance the improvements that are required with new development and redevelopment to ensure that private developments meet City and watershed requirements. 10. Capital Improvement Plan (CIP). The City’s CIP will incorporate specific implementation strategies for surface water management as part of the budgeting process. 11. The City’s inspection and maintenance program and pollution prevention/good housekeeping is completed under the MS4 Permit and documented per the SWPPP. 12. The City will continue to implement the strategies and recommendations as needed from the Old Village Area Regional Stormwater Management Study that was completed by SEH, in May 2015, to continue to address and mitigate the Old Village Area flooding problems and to protect resources in the Down’s Lake Watershed and downstream. IMPLEMENTATION - DRAFT 5-24-2018 City of Lake Elmo Comprehensive Plan 2040 13 13. City Ordinances. The City’s adopted ordinances that provide standards and regulations to manage water resources include the following: a. Chapter 53 Storm water Management Utility b. Chapter 91 Forests and Trees c. Chapter 150 Illicit Discharge and Connection d. Chapter 152 Flood Plain Management e. Chapter 153 Subdivision Regulations f. Chapter 154 Zoning Code Chapter 9: Wastewater Services The following implementation steps and strategies are identified to support the City’s Wastewater Services Chapter and the corresponding goals and strategies identified within Chapter 2 of this Plan. 1. The City will review and update its Comprehensive Sanitary Sewer System Plan based on the Land Use and Zoning adopted in this Plan to ensure system capacity is available for each service area, including an updated Sanitary Sewer Capital Improvement Plan. 2. The City will work with the Metropolitan Council Environmental Services (MCES) to further understand the downstream capacity limitations and planned improvements required for the City’s Oakdale interceptor connection and/or WONE interceptor connection; and will coordinate planned improvements with MCES. 3. The City will provide new sanitary sewer extensions consistent with the sanitary sewer staging plan and within the general time frames established as part of this Plan, when possible, and as market conditions warrant. 4. The City will continue to operate and maintain the City-owned 201 Community wastewater systems and will develop a system replacement plan. 5. The City will continue to support the MPCA and County’s oversight, monitoring, permitting and enforcement of their respective ISTS rules and regulations within the City. IMPLEMENTATION - DRAFT 5-24-2018 City of Lake Elmo Comprehensive Plan 2040 14 Chapter 10: Water Supply The following implementation steps and strategies are identified to support the City’s Water Supply System needs and the corresponding goals and strategies identified within Chapter 2 of this Plan. 1. The City will work expeditiously with the MDH, MnDNR and other agencies with regulatory authority of the City’s Municipal Water Supply to identify a solution to the closure and decommissioning of Water Supply Well #1 and to implement a new water supply well to meet the existing and growing water customer base. 2. The City will work to implement a new water storage facility to serve the growing water system demands int he low pressure zone (Village area south of the UPRR and southeastern parts of the City) and to replace the aging Water Tower No.1. 3. The City will review and update its Comprehensive Water System plan based on the Land Use adopted by this Plan to ensure system capacity is available for each service area, including an updated Water System Capital Improvement Plan. 4. The City will continue to work with the MDH to monitor the groundwater contamination plumes and contamination impacts to Lake Elmo properties and will develop a mitigation plan for extending the City’s water supply to replace private wells whenever feasible. 5. The City will work to identify appropriate funding resources, including the recent 3M Settlement Fund and Closed Landfill Fund, to implement City water supply extensions to replace private wells, and to address short and long-term public water supply system improvements. 6. Continue to monitor the potential future use of Well No. 3 and Well No. 1 by providing water treatment, but plan for the abandonment of these wells when they are deemed no longer needed. Abandonment is important to protect against groundwater contamination at the well locations. 7. Negotiate a long-term Agreement with the City of Oakdale for a water system interconnect between the two Cities for standby emergency water supply use. 8. Maintain the City’s Water Supply Plan consistent with the MnDNR water supply plan template and continue to provide necessary reporting through the MnDNR Permit and Reporting System (MPARS). Continue to incrementally review the Water Supply Plan to ensure it is consistent with continuing development activities and demands. 9. Implement water conservation measures as identified in the City’s Water Supply Plan. blank page. Sources: Washington County & Metro GIS7-12-2016 5 Lake Elmo Comprehensive Plan 2030 Map 3-3 Village Open Space OverlayMunicipal Boundary White hatching denotes possible mixed use areas Planned Land Use Planned Land UsesBusiness ParkCommercial Golf Course Community Limited Business Public/ParkResidential EstateRural Area Development Rural Single Family Sewered Urban High Density Urban Low DensityUrban Medium Density Village Urban Low DensityVillage Mixed Use Village Urban Medium Density Rural single Family LAND USE - DRAFT 5-25-2018 City of Lake Elmo Comprehensive Plan 2040 21 IDEAL AVE N INWOOD AVE N 60TH ST N 10TH ST N LAKE ELMO AVE N STILLWATER B LV D N 30TH ST N KEATS AVE N O L S O N L A K E T R L N 50TH ST N MANNING AVE N 47TH ST N 34TH ST N LAKE J A N E TR L N 4 5 T H ST N Horseshoe Clear Unnamed DeMontreville Olson Jane Berschen's Pond Elmo Sunfish Friedrich Pond Eagle Point Downs H.J. Brown Pond RoseGoose Goose Armstrong Armstrong Kramer Goetschel Klawitter Pond Deer Pond Crombie Pond Hedge's Pond Dirk's Pond Beutel's Pond Legion Pond FDraft Date: Rev. 5.23.2018 Source: Washington County, MNGEO, City of Lake Elmo, SHC AP RAD RSF RSFS GC LDR MDR HDR MU-BP MU-C V-LDR V-MDR V-HDR V-MU Institutional Closed Landfill ROW BP C Park PSP 0 0.3 0.6 0.9 1.20.15 Miles Map 3-3. Future Land Use Map Legend Planned Roadway (Parkway)