HomeMy WebLinkAbout#18 - Four Corners 2nd Addition PUD1
STAFF REPORT
DATE: 7/17/2018
REGULAR
ITEM #: 18
TO: City Council
FROM: Emily Becker, Planning Director
AGENDA ITEM: Four Corners 2nd Addition General Planned Unit Development (PUD)
Concept Plan
REVIEWED BY: Jack Griffin, City Engineer
BACKGROUND:
The City has received a request from Terry Emerson for a General Planned Unit Development (PUD)
Concept Plan for a 15.77 acre commercial development which includes a park and ride and commercial
development in the southeast corner of 11530 Hudson Boulevard North.
ISSUE BEFORE COUNCIL:
The Council is being asked to hold a public hearing, review and make recommendation on the above-
mentioned request.
PROPOSAL DETAILS/ANALYSIS:
General Information.
• Property Owner: Terry Emerson, 2204 Legion Lane Circle North, Lake Elmo, MN 55042
• Location: North of I-94/Hudson Boulevard and West of Manning Avenue North, Southeast
Corner of 11530 Hudson Boulevard North
• Current Site Area: 70.21 acres
• Land Use Guidance: The 2030 Comprehensive Plan guides the eastern portion of the site as
Mixed-Use Commercial and Commercial, and the western portion is guided as Business Park.
• Current Zoning: Rural Development Transitional
• Proposed Zoning: Commercial and Convenience Commercial
• Current Surrounding Land Use Guidance: Vacant land to the north (Rural Development
Transitional); I-94 to the south (Woodbury); vacant land to the west (Rural Development
Transitional); Manning Avenue to the east (West Lakeland).
• History: The property has been used as rural vacant land.
• Application Timeline: Application received: 5/18/18. 60-day Review: 7/17/18. No extension sent.
Request Details/Reason for PUD. The applicant is proposing to construct a park-and-ride facility on
Outlot C along with a commercial development to the north on Outlot B. Currently, the Zoning Code
states that transit-related park-and-ride lots are allowed in the Convenience Commercial zoning district
within the written Purpose and District Descriptions of Article XIV: Commercial Districts, but it does not
specifically designate park-and-ride facilities as an allowed use within Table 12-1: Permitted, Conditional
and Interim Uses, Commercial Districts. Because of this, the applicant has submitted a Planned Unit
2
Development Application, which allows the applicant to propose a number of uses which then become
permitted uses within the development. Staff believes this is more appropriate than requesting a Zoning
Text Amendment in order to avoid allowing park-and-rides within every commercial area of the City.
Additionally, the site plan proposes more than one principal building and use on a platted lot, which is
only allowed within a PUD.
Zoning. As per the Comprehensive Plan, the eastern portion of the site is guided for Commercial. With
the Preliminary Plat and PUD application, Outlots B and D should be rezoned to Commercial, and Outlot
C should be rezoned to Convenience Commercial, as the Zoning Code alludes that park-and-rides are an
appropriate use within this zoning district. Outlot A would be rezoned at a later time when a development
application is received for that parcel.
Allowed Uses. As previously mentioned, the applicant is requesting park-and-ride as an allowed use
within this development. The commercial development also proposes to include a gas station/convenience
store (conditional use in Commercial zoning district), financial institution (permitted), restaurant
(permitted), and daycare (conditional). Additionally, all other allowed uses within the Commercial zoning
district would be allowed within Outlots B and D. Because the applicant has not secured prospective
tenants at this time, the applicant is requesting the following uses be allowed (marked as either
conditional, permitted, or not allowed within the Commercial zoning district):
• Commercial kennel (conditional)
• Apartments (conditional)
• Automotive service center (conditional)
• Drinking and entertainment (permitted)
• Indoor recreation (conditional)
• Post Office (not allowed)
• Personal Services (permitted)
• Carwash (conditional)
• Financial institution (permitted)
• Offices (permitted)
• Restaurant (permitted)
• Retail (permitted)
• Lodging (permitted)
• Schools (permitted)
• Convent (not allowed)
• Day care center (conditional)
• Drive-through restaurant (conditional)
• Farm equipment sales (not allowed)
• Funeral home (permitted)
• Sales and storage lots (conditional)
• Bus/truck service station or garage (not allowed)
• Veterinary Services (permitted)
• Wholesales (permitted)
The purpose of allowing conditional uses to become permitted with a PUD is that the City has a chance to
review site plans. Because of the lack of any plans to accompany the requested uses listed in bullet points
above, Staff would recommend that this request be denied and recommends that a condition of approval
be that uses other than gas station/convenience store, daycare, and any permitted use within the
Commercial zoning district be allowed require a conditional use permit unless the preliminary and final
plans detail alternative uses with an approved site plan.
3
Consistency with the Comprehensive Plan. The City’s Planned Land Use Map indicates that this area is
guided for Commercial. This area is intended to accommodate a wide range and scale of commercial uses
(such as retail, service, entertainment, and office) throughout the City’s planned urban centers.
Commercial uses can range from small neighborhood convenience nodes, to community retail areas along
maj or roadways, to large shopping centers, to auto-related commercial uses along freeways. The Draft
2040 Comprehensive Plan also designates this area as Commercial but states that commercial land uses
are for retail business solely.
While a park and ride is not a commercial use, there is potential benefit of the draw for other businesses
near the Park and Ride. Additionally, the City wide planning policy in regards to transportation of the
2030 Comprehensive Plan encourages, supports, and advocates public transit service to the City at
appropriate geographic locations as determined by the City. Also, public transportation has less of a
negative impact on the environment than taking a car, and financial savings result from eliminating
parking fees, not needing to pay for gas for individual vehicles and the personal time saved when
bypassing slow traffic. According to the US Census Bureau, in 2016 approximately 85% of Lake Elmo
residents commute to work, and approximately 1.8% of those who commute to work utilize public
transportation. It is not known whether or not a park and ride would encourage increased use of public
transportation. A deterrent of a park and ride is that if the purchase of the land is by a public entity for use
as a park and ride (or any other public use), the City would not collect any property taxes on the site.
Site Plan. The proposed site plan includes one 6,800 square foot building financial building, 5,600 square
foot restaurant, a 20,200 square foot gas station/convenience store, and a 10,400 square foot daycare
along with 154 parking spaces, including 6 handicap parking spaces, within Outlot B. Outlot C includes a
park and ride that will provide approximately 550 parking spaces, including 12 handicap parking spaces;
electric charging stations; bike racks with overhead canopy; two 6’X13’ bus shelters; 10.5’X12’ restroom
building. There is no current proposal for Outlot D. Outlot A will remain an outlot.
Park and Ride. A park and ride facility is a parking lot or structure located along a public transit route
designed to encourage transfer from private automobile to mass transit or to encourage carpooling for
purposes of commuting, or for access to recreation uses. The City does not currently have a park and ride.
The Draft 2040 Comprehensive Plan designates the proposed area as a park and ride. The park and ride
has been in discussion with the City since at least 2011, when the Planning Commission’s Work Plan
included an item to discuss on potential rezoning on two sites for a park and ride along I-94. The corner
of Hudson Boulevard and Manning Avenue was one of these sites. The Council adopted an ordinance on
May 4, 2011, which allowed park and rides as a conditional use within the Rural Residential Limited
Business Holding District (HD-RR-LB), which is no longer a zoning district within the City.
According to a slide show presentation to the Metropolitan Council in 2015, a location was previously
considered in Woodbury, but that has moved to the northwest quadrant. Seven locations were reviewed,
but many were not possible due to various reasons. The park and ride will serve a new express bus service
to downtown Minneapolis. Five daily trips are anticipated for express bus service.
Current and Future Park and Rides. There currently are six lots in adjacent cities that could be used by
Lake Elmo commuters. The figure below shows existing and proposed park and ride facilities near the
proposed facility. Additionally, there is a new park and ride facility planned less than 1 mile from the
southwestern city border to provide access to the Metro Gold Line Bus Rapid Transit (BRT). The
numbers and percentages indicate the 2017 capacity of each park and ride. This information was derived
from the 2017 Annual Regional Park and Ride System Report.
• St. Croix Valley Recreation Center in Stillwater.
• Guardian Angels Church in Oakdale (415 spaces, 81% utilized in 2017).
• Walton Park in Oakdale (58 spaces, 50% utilized in 2017).
• Woodbury Mall Theater in Woodbury (550 spaces, 79% utilized in 2017).
4
• Woodbury Lutheran Church in Woodbury (90 spaces, 97% utilized in 2017).
• Christ Episcopal Church Park and Ride next to Woodbury Lutheran Church Park-and-Ride.
• There is also a park and pool lot available in Grant near the intersection of TH 36 and Manning
Avenue (CSAH 15). Bus service is not provided at this lot, but commuters may still park for free
and carpool from this location (15 spaces, 7% utilized in 2017).
I-94 Impact. I-94 is identified as a High Priority on the Minnesota Interregional Corridor System (IRC)
2000 plan as part of the State Transportation Plan. Under this designation, I-94 has a goal 60-mph average
peak hour operating speeds with minimal conflicts and interruptions to traffic flow. A corridor
management plan has not yet been developed to examine the existing operations and determine future
plans to meet those goals. It is expected that such a plan will be developed in the near future. It is also
anticipated that Lake Elmo will have the opportunity to participate on some type of advisory panel in
conjunction with development of that plan to express the City’s views and opinions on the corridor. The
City will work with the Minnesota Department of Transportation (Mn/DOT), the County, and adjacent
communities on a corridor plan that is effective for all involved.
Urban Services Required. Because the property is within the MUSA, any development of the
property would require that the property be hooked up to city services. Therefore, utility and other
applicable construction plans will need to be submitted as part of the approval process.
Proposed Design. The applicant has not yet provided architectural renderings of the buildings. It
is a recommended condition of approval that the applicant submit architectural renderings of the
proposed buildings so that Staff and the City may further review their compliance with the City’s
Zoning Code and Lake Elmo Design Guidelines and Standards.
Parking. Because the applicant is currently unsure of the exact tenants that will occupy Outlot
B, Staff has not conducted a thorough analysis to determine whether or not adequate parking will
be provided for tenants of Outlot B.
Parking Lot Screening.
• Interior Parking Lot Landscaping. At least 5% of the interior area of parking lots with
more than 30 spaces is required to be devoted to landscape planting areas, which may
consist of islands or corner beds. It is unclear from the site plan what percentage is
devoted to this on both Outlots B and C. Additionally, a minimum of 1 shade tree per 15
5
spaces within parking lots that total 101 spaces or more are required to be located within
these corner islands or beds. With the proposed 550 parking spaces of the park and ride
(Outlot C) a minimum of 37 shade trees are required to be provided within these corner
beds or islands. The 154 parking spaces within Outlot B would require a minimum of 11
shade trees.
• Perimeter Parking Lot Landscaping. A landscaped frontage strip of at least eight feet in
width is required, as the parking area contains over 100 spaces. Screening is required
consisting of a masonry wall, fence, berm, or hedge or combination that forms a screen a
minimum of three and a half and maximum of four feet in height and not less than 50%
opaque on a year-round basis and a minimum of one deciduous tree per 50 linear feet.
It is a recommended condition of approval that the Preliminary Plat and PUD Plans submittal
provide required interior and perimeter parking lot landscaping as required by the Zoning Code.
Off-Street Loading. Off-street loading space is required for all districts for any nonresidential
use which will involve the receipt or distribution of materials or merchandise by trucks or similar
vehicles and has a gross floor area of 5,000 square feet or more. For facilities with 20,000 square
feet gross floor area or greater, one off-street loading berth shall be provided every 30,000 square
feet or fraction thereof. Depending on the final uses that are proposed with the Preliminary Plat
and PUD Plans for this development, it should be evaluated whether or not an off-street loading
berth should be provided.
Consistency with Commercial and Convenience Commercial Zoning Districts. The proposed
development will require a Zoning Map Amendment to rezone the property to Commercial and
Convenience Commercial. The standards for this district are shown below. The applicant has not provided
sufficient information to complete a detailed review of the proposal against these standards, though it is
obvious that the maximum impervious surface of the Convenience Commercial zoning district is
exceeded. It is a recommended condition of approval that the applicant outline all requested PUD
flexibility with the Preliminary Plat and PUD application or meet required standards.
Standard Commercial Convenience
Commercial
Impervious Surface Maximum 75% 60%
Minimum Lot Area 20,000 square feet 12,000 square feet
Minimum Lot Width 60 feet 75 feet
Building Front Yard Setback 30 feet 30 feet
Building Interior Side Yard
Setback
10 feet 10 feet
Building Corner Side Yard
Setback
10 feet 10 feet
Building Rear Yard Setback 30 feet 30 feet
Building Residential Zones 50 feet 50 feet
Parking Front Yard Setback 15 feet 15 feet
Parking Interior Yard Setback 10 feet 10 feet
Parking Corner Side Yard
Setback
15 feet 15 feet
Parking Rear Yard Setback 10 feet 10 feet
Parking Residential Zones 35 feet 35 feet
Maximum Building Height 45 feet 35 feet
6
Consistency with Planned Unit Development Regulations. Staff has reviewed the proposed
plan for its consistency with requirements of Article XVII: Planned Unit Development (PUD)
Regulations and has found the following:
• Intent. The intent of a PUD is to provide for flexibility in the use of land and the
placement and size of buildings in order to better utilize site features and obtain a higher
quality of development. A PUD is required for the proposed development, as a park and
ride is not specifically an allowed use within the Convenience Commercial zoning
district, and a zoning text amendment to allow it any area that was guided for the
Commercial land use designation would likely not be appropriate. Additionally, there is
more than one principal building and use proposed on one parcel. It is a recommended
condition of approval that the applicant submit specific requests for flexibility from the
Zoning Code with the Preliminary Plat and PUD application.
• Identified Objectives. When reviewing requests for PUDs, the City is to consider
whether one or more objectives as outlined in Section 154.751: Identified Objectives of
the Zoning Code will be served or is achieved. Staff has found that the following
objectives are being met with the proposed development.
B. Promotion of integrated land uses, allowing for a mixture of residential, commercial
and public facilities.
• The proposed development is mixed use and includes a mixture of buildings and
uses on one parcel. The uses have not yet been specifically identified yet, but it is
a recommended condition of approval that the uses be identified on the parcel
with the Preliminary Plat and PUD application.
I. Allowing the development to operate in concert with a redevelopment plan in certain
areas of the City and to ensure the redevelopment goals and objectives will be achieved.
• While this isn’t necessarily a redevelopment, the proposed development will bring
city utilities to this area of the City and assist with the realignment of Hudson
Boulevard.
Minimum Requirements. PUDs must meet the following minimum requirements:
A. Lot Area. A PUD must include a minimum of 5 acres for undeveloped land or 2 acres for
developed land within the approved development.
• The proposed development exceeds this requirement with a proposed 15.77 acre
development.
B. Open Space: For all PUDs, at least 20% of the project area not within street rights-of-
way to be preserved as protected open space. Other public or site amenities may be
approved as an alternative to this requirement. Any required open space must be
available to the residents, tenants, or customers of the PUD for recreational purposes or
similar benefit. Land reserved for storm water detention facilities and other required
site improvements may be applied to this requirement. Open space shall be designed to
meet the needs of residents of the PUD and the surrounding neighborhoods, to the
extent practicable, for parks, playgrounds, playing fields and other recreational
facilities.
• The applicant has not provided sufficient information to determine if this is true. It
is a recommended condition of approval that the applicant either provide the
required 20% open space within the development or specify with the Preliminary
7
Plat and PUD application what the proposed public or site amenity the development
will provide that the City may consider an alternative to the open space requirement.
C. Street Layout… In newly developing areas, streets shall be designed to maximize
connectivity in each cardinal direction, except where environmental or physical constraints
make this infeasible. All streets shall terminate at other streets, at public land, or at a park
or other community facility, except that local streets may terminate in stub streets when
those will be connected to other streets in future phases of the development or adjacent
developments.
• The proposed realignment of Hudson Boulevard meets this requirement. The
Preliminary Plat and PUD Plans will need to provide detailed plans that meet all
engineering standards. It is a recommended condition of approval that all comments
outlined in the Engineering memo dated June 14, 2018 be addressed.
Proposed Amenities. The City’s PUD ordinance provides that amenities may be provided for
increased density. In this case, the applicant is not requesting additional density, as this is a
commercial development. However, a PUD should still offer the City amenities in exchange for
the flexibility of allowing more than one building and principal use on a parcel as well as
flexibility from any other standard that is requested as part of the preliminary phase of the
planned development. Staff finds that no amenities as designated in Table 16-2: Site Amenities
are provided in the proposed site plan.
• Site Amenities Not Listed? Additionally, the City may also consider the allotment of
amenity “points” for site amenities that are not otherwise specified within the ordinance
as part of the preliminary phase of the planned development.
Parkland Dedication. Commercial development is required to provide fees in lieu of park land
dedication. These fees will be required prior to recording the plat of each phase of the development.
Because the proposed development will consist of 15.77 acres, a parkland dedication fee of $70,965.00
(15.77 acres X $4500 commercial park dedication fee per acre) will be required.
Engineering Comments. The City Engineer has provided a review memo regarding the
proposed General Concept PUD. This memo is attached for reference. Staff would like to
highlight the following comments in summary:
• Streets and Transportation
o Hudson Boulevard Realignment. Hudson Boulevard must be realigned to move
the existing Hudson Boulevard/Manning Avenue intersection north approximately
470 feet to align with the existing Holiday gas station, which the Concept Plan
shows. This realignment must be designed meeting Municipal State Aid Design
Standards for urban section roadways with a 45-mph design speed. Additional
design details and geometrics are required for City review and changes to this
realignment are likely needed.
o Traffic Signal/Turn Lane Improvements. These will be needed at the new CSAH
15 and Hudson Boulevard intersection, and the concept plan shows this. A
financial contribution to the intersection improvements should be considered.
o Hudson Boulevard Improvements. This must be improved per the City design
standards to an urban section on the north side of the street, a 4-foot shoulder
(curb reaction), a 9-foot boulevard, and 10-foot shared bituminous trail with 2-
foot clear zone. It is further recommended that the south side of the street include
8
an urban section across Outlots B, C, and D. A rural section is permitted along the
south boulevard once the road passes Outlot D.
o Hudson Boulevard Right-of-Way/Easement Dedication. Significant right-of-way
dedication is required to facilitate the Hudson Boulevard realignment and
improvements necessary for this development. Additional right-of-way should
also be granted to facilitate access to the new Hudson Boulevard access to the
property to the north via the first intersection east of Manning Avenue to the north
property line.
o Off-Site Permissions/Right-of-Way. A ROW easement will be required from the
property to the north to allow for the Hudson Boulevard realignment at Manning
Avenue.
o Access. There are three access points proposed along Hudson Boulevard, two of
which meet spacing guidelines. The access to be shared by outlots B and C can
only be permitted right-in/right-out, and a center median will be required.
o Turn Lanes. The addition of turn lanes will need to be evaluated as determined by
the City, which may require additional right-of-way.
• Stormwater Management
o A stormwater management plan meeting all applicable jurisdictions should be
submitted with preliminary plans and meeting all applicable standards.
o Stormwater facilities should remain privately owned, a stormwater maintenance
agreement will be required.
• Municipal Sanitary Sewer
o Provisions to connect to municipal sanitary sewer must be included in the
preliminary plans. Sewer would discharge to the MCES Cottage Grove Ravine
Interceptor.
o Applicant will be responsible to connect to City sanitary sewer at the applicant’s
sole cost and will need to stub sanitary sewer mains to adjacent properties.
o Preliminary plans must include a description of the sanitary sewer capacity
demands including the number of residential equivalency units (RECs) based on
Met Council SAC determination charge.
o Any extension will require utility easements 15 feet on each side centered from
the pipe from off-site properties.
• Municipal Water Supply
o Provisions to connect to municipal water supply must be included in preliminary
plat application.
o Applicant will be responsible to extend municipal water at the applicant’s sole
cost and will need to stub water mains to adjacent properties.
o Preliminary plans must include a description of the water capacity demands
including average day use, peak day uses, and fire suppression demands. This
information is required for staff evaluation of the water improvements needed to
support the development and to determine water availability charges.
o Water is available from Hunter’s Crossing but will require easements across
adjacent properties.
o The site is in the water system’s low-pressure zone which has limited capacity
until a new water tower is constructed to serve the area.
o The applicant is required to place hydrants throughout the property at the
direction of the Fire Department, and the hydrants shall be owned and maintained
by the City.
o Watermain lines and hydrants will require easements.
9
Building Official and Fire Chief Review. The Building Official and Fire Chief have reviewed the
proposed plan and have no comments. They will be consulted during the Preliminary and Final phases of
the PUD in order to ensure that adequate essential services are being provided.
County Review. The application has been sent to the County requesting review. The County had the
following outlined comments in regards to this review:
• The proposed park and ride will be a great amenity for Lake Elmo as development continues to
grow along CSAH 15 and within the City. The proposed site is an ideal location, as it is on the
inbound side for commuting traffic along I-94 and will serve as a reliever for the Guardian
Angels park-and-ride location in Oakdale, which is at capacity.
• Bicycle and pedestrian connectivity are encouraged, and the proposed building and parking lot
orientation are not conducive with walkability and livability principles.
• The Draft Washington County 2040 Comprehensive Plan future right-of-way requirements for
“A” Minor Arterial roadways (classification of CSAH 15) requires a 180 feet (90 feet from center
of roadway) right-of-way, and there appears to be adequate right-of-way today, though more may
be necessary if an expanded interchange is constructed.
• The realigned access to Hudson Boulevard is acceptable as shown. A soutbound righ-turn lane
and a northbound center left-turn lane will be constructed as part of this realignment. A plan
section will need to be prepared and approved by the County Traffic Engineer, and a Washington
County right-of-way will be required for any turn lane improvements.
• No traffic study was submitted to the County as part of the application, and so it cannot be
determined at this time if the new intersection will warrant a new traffic signal. The City will
need to participate in 25% cost share of this signal.
• A trail is needed on the south side of Hudson Boulevard to connect these facility to CSAH and
the trail towards Hudson, Wisconsin.
• Left turn lanes are needed in to the site access to prevent queuing back to CSAH 15.
Planning Commission Review. The Planning Commission held a public hearing and considered the
General PUD Concept Plan at its June 18, 2018 meeting. No one spoke at the public hearing, and no
written comments were received prior to the public hearing. The Planning Commission had the following
comments in regards to the proposed PUD Concept Plan:
• That the applicant should propose contributing the City’s 25% cost share to the signal as an
amenity.
• There was the general consensus that the development of this area would prompt development in
this area of the City and that the park and ride would be a good amenity for the City, as the
Guardian Angels lot is nearing capacity.
The Planning Commission recommended approval of the proposed PUD Concept Plan with Staff-
recommended conditions of approval with a vote of 4-0.
Recommended Findings. Staff and the Planning Commission recommends approval of the Concept PUD
Plan based on the following findings:
1. That the Applicant has submitted all application requirements outlined in Section 154.759:
Application Requirements for General PUD Concept Plan.
2. That the PUD Concept Plan is consistent with the intent of the Lake Elmo Comprehensive
Plan and the Future Land Use Map for this area.
3. That the PUD Concept Plan complies with the general intent of the Commercial zoning
districts with PUD modifications.
4. That the PUD Concept Plan generally complies with the City’s Subdivision regulations.
5. That the PUD Concept Plan is generally consistent with the City’s engineering standards with
exceptions as noted in the City Engineer’s memorandum dated June 14, 2018.
6. The PUD Concept Plan meets the minimum requirement for a PUD including minimum lot area
and street layout. It is not known whether the minimum requirement for open space is met.
10
7. The PUD Concept Plan meets at least one of the required PUD objectives identified in Section
154.751.
Recommended Conditions of Approval. Staff recommends the Planning Commission recommend
approval of the Concept PUD with the following conditions:
1. The future Preliminary Plat and PUD Plans include a portion of PID# 34.029.21.43.0003.
2. The future Preliminary Plat and PUD Plans shall identify proposed land uses, and those land uses
shall accompany a detailed site plan to be approved by the City. Any use that is not designated
on the Preliminary Plat and PUD Plans and is not designated as a permitted use within the
Commercial zoning district shall require a conditional use permit.
3. The future Preliminary Plat and PUD Plans shall provide the required 20% open space within
the development or specify what the proposed public or site amenity the development will
provide that the City may consider as an alternative to the open space requirement.
4. The future Preliminary Plat and PUD Plans should detail proposed amenities in exchange for
flexibility from standards of the Zoning Code.
5. The future Preliminary Plat and PUD Plans shall comply with comments outlined in the City
Engineer Review Memo named Four Corners 2nd Addition Concept Plan dated June 14, 2018.
6. The future Preliminary Plat and PUD Plans shall include provisions for City sanitary sewer
and municipal water as well as sanitary sewer and water capacity demands. The Applicant
shall be responsible to extend City sanitary sewer and municipal water to the site at the
applicant’s cost. Sanitary sewer and water main stubs will be required to all adjacent
properties.
7. The future Preliminary Plat and PUD Plans shall include right-of-way and easement from the
adjacent property to the north to allow for the Hudson Boulevard realignment at Manning
Avenue.
8. The future Preliminary Plat and PUD Plans shall include a stormwater management plan
including a summary report describing the overall management plan and performance criteria
for all required storm events.
9. The Applicant shall obtain all necessary permits including but not limited to all applicable
city permits (building, grading, sign, etc.), NPDES/SWPPP permits and Valley Branch
Watershed District approval.
10. Stormwater facilities shall be privately owned and maintained. A maintenance agreement in a
form acceptable to the City should be executed and recorded.
11. The future Preliminary Plat and PUD Plans shall include tree preservation and landscape plans to
be approved by the City’s Landscape Architect.
12. The future Preliminary Plant and PUD Plans shall include architectural renderings.
13. The Applicant shall submit a photometric plan, and all lighting must meet requirements of
Sections 150.035-150.038 of the City Code.
14. That fees in lieu of park land dedication be provided as required by 153.15 of the City Code
with future final plat.
15. The Applicant shall adhere to all requirements as outlined in the Washington County review
memo dated June 13, 2018.
Possible Findings for Denial. The City has legislative authority to rezone a parcel and may not wish to
rezone Outlot C to Convenience Commercial. While the Convenience Commercial zoning district
describes park and ride as an allowed use within the Convenience Commercial zoning district, it is not an
outlined use within the Commercial-guided areas of the Comprehensive Plan. The Planned Unit
11
Development ordinance states that uses within the PUD may include only those uses generally considered
associated with the general land use category shown for the area on the official Comprehensive Land Use
Plan. A park and ride is not generally a commercial use if owned by a public entity, and so the Council
may wish to deny the proposed Concept PUD Plan based on this. If the Council wishes to deny the
proposed General PUD Concept Plan, Staff would recommend the following findings:
1. That the City’s Planned Unit Development (PUD) ordinance states that uses within a PUD may
include only those uses generally considered associated with the general land use category shown
for the area on the City’s official Comprehensive Land Use Plan. The area in which the Concept
PUD Plan is located is guided by the Comprehensive Land Use Plan as Commercial. A park and
ride facility is not considered a commercial use because it would be owned by a public entity and
therefore would not generate property taxes like a commercial use.
2. That the Comprehensive Land Use Plan does not specifically designate park-and-ride facilities or
any other similar type facilities as an allowed, conditional, or interim use for the Commercial
Zoning District.
3. That while park and ride facilities are considered an allowed use within the City’s Convenience
Commercial Zoning District, the City does not believe that the Convenience Commercial zoning
district is appropriate for the area in which the Concept PUD Plan is being proposed as there is
not a need for a park and ride facility in the City. There currently are six park and ride facilities
in adjacent cities that may be used by Lake Elmo commuters. Additionally, there is a new park
and ride facility being planned for less than one mile from the southwestern Lake Elmo border to
provide access to the Metro Gold Line Bus Rapid Transit.
4. The Applicant has also requested that other uses that are either not currently permitted or are
conditional uses be designated as permitted uses within the PUD. The Applicant has not
submitted any plans to accompany the uses that he is requesting be changed to permitted uses and
therefore, due to the lack of information, this is an unreasonable request.
5. The City’s PUD regulations require that applicants offer the City amenities in exchange for any
requests for flexibility from the City standards. The Applicant is requesting flexibility from the
City standards, including, but not limited to, exceeding the City’s impervious surface
requirements, but yet he has not offered the City any amenities in exchange for the flexibility
being requested.
FISCAL IMPACT:
There would be no fiscal impact to the City at this time, as the developer would be required to pay for any
amendments needed to accommodate the development. Concept Plan approval does not afford the applicant
development rights. When the property develops, it will have urban services and will pay sewer and water
connection charges, building permit fees and the like.
OPTIONS:
The Council may:
• Adopt Resolution 2018-080 approving the Four Corners 2nd Addition Concept PUD with Staff-
recommended conditions of approval and findings.
• Amend Staff and Planning Commission-recommended conditions of approval and findings and
adopt Resolution 2018-080 as amended.
• Adopt Resolution 2018-080 denying the Four Corners 2nd Addition Concept PUD with Staff-
recommended findings.
• Amend Staff-recommended findings for denial and adopt Resolution 2018- as amended.
RECOMMENDATION:
Staff and the Planning Commission recommend approval of the proposed PUD Concept Plan with the
recommended conditions of approval.
12
“Motion to adopt Resolution 2018-080 approving the Four Corners 2nd Addition PUD Concept Plan as
requested by Terry Emerson for the southwest corner of 11530 Hudson Boulevard with recommended
conditions of approval.”
If the Council wishes to deny the proposed PUD Concept Plan, the following motion may be made:
“Motion to adopt Resolution 2018-080 denying the Four Corners 2nd Addition PUD Concept Plan as
requested by Terry Emerson for the southwest corner 11530 Hudson Boulevard with recommended
findings for denial.”
ATTACHMENTS:
• Application materials
• Engineer review memo dated June 14, 2018
• Washington County review memo dated June 13, 2018
• Resolution 2018-080 approving the PUD Concept Plan
• Resolution 2018-080 denying the PUD Concept Plan
PAGE 1 of 3
MEMORANDUM
Date: June 14, 2018
To: Emily Becker, Planner Director Re: Four Corners 2nd Addition Concept Plan
(Commercial Site / Metro Transit Park & Ride)
Cc: Chad Isakson, Assistant City Engineer
From: Jack Griffin, P.E., City Engineer
An engineering review has been completed for the Four Corners 2nd Addition Concept Plan which includes a
Commercial Site and Metro Transit Park & Ride. A Concept Plan was received on May 21, 2018. The submittal
consisted of the following documentation:
Four Corners 2nd Addition Concept Plan, dated May 18, 2018, prepared by Folz Freeman Surveying LLC.
Engineering has the following review comments:
STREETS AND TRANSPORTATION
Hudson Boulevard Realignment. As part of the development, Hudson Boulevard must be realigned to
move the existing Hudson Boulevard/Manning Avenue intersection north approximately 470 feet to align
with the existing Holiday Station driveway. The concept plan shows this realignment as proposed. The
realignment of Hudson Boulevard must be designed meeting Municipal State Aid Design Standards for
urban section roadways with a 45‐mph design speed. Additional design details and geometrics are
required for City review and changes to this realignment are very likely needed.
Traffic Signal/Turn Lane Improvements. A traffic signal and turn lanes will be required at the new CSAH 15
and Hudson Boulevard intersection. A financial contribution to traffic signal/turn lane improvements
should be considered. The concept plan shows turn lanes at this new intersection.
Hudson Boulevard Improvements. In addition, Hudson Boulevard must be improved per the City design
standards to an urban section on the north side of the street, a 4‐foot shoulder (curb reaction), a 9‐foot
boulevard, and 10‐foot shared use bituminous trail with 2‐foot clear zone. It is further recommended that
the south side of the street include an urban section across Outlots B, C and D. A rural section is permitted
along the south boulevard once the road passes Outlot D.
Hudson Boulevard Right‐of‐Way/Easement Dedication. Significant right‐of‐way dedication is required to
facilitate the Hudson Boulevard realignment and improvements necessary for this development. Right‐of‐
way requirements will need to be reviewed carefully as the development plans evolve and all right‐of‐way
dedicated to the City as part of the project. Additional right‐of‐way dedication should also be granted to
facilitate access to the new Hudson Boulevard roadway for the adjacent property to the north. This access
should be provided from the first intersection east of Manning Avenue to the north property line.
Off‐site permissions/right‐of‐way. Right‐of‐way and easement is required from the adjacent property to
the north to allow for the Hudson Boulevard realignment at Manning Avenue.
A 10‐foot utility corridor easement for small utilities must be dedicated to the City along both sides of the
Hudson Boulevard right‐of‐way.
FOCUS ENGINEERING, inc.
Cara Geheren, P.E. 651.300.4261
Jack Griffin, P.E. 651.300.4264
Ryan Stempski, P.E. 651.300.4267
Chad Isakson, P.E. 651.300.4285
PAGE 2 of 3
Site Access. The concept plan proposes three access points along Hudson Boulevard. One full access to
Outlot B is approximately 660 feet from the CSAH 15/Hudson Boulevard intersection thereby meeting the
City’s access spacing requirement. One full access to Outlot C is approximately 700 feet from the Outlot B
access, also meeting the City’s access spacing requirement. A third access is proposed to be shared by
Outlots B/C with access spacing at approximately 350+/‐ feet. This third access can only be permitted as
right‐in/right‐out. A center median will be required as part of the Hudson Boulevard improvements to
enable the proposed right‐in/right‐out access.
Turn Lanes. The addition of turn lanes at each proposed access point will need to be evaluated and added
to the plans as determined by the City which may require additional right‐of‐way at these locations.
STORMWATER MANAGEMENT
A State and Valley Branch Watershed District (VBWD) permit will be required. The site plan is subject to a
storm water management plan meeting State, VBWD and City rules and regulations. No storm water
management plan was provided as part of the Plan submittal and is not required for concept plan review,
however storm water management can impact site design requiring significant plan revisions. The
concept plan shows one storm water pond that is likely two small to accommodate the entire
development as proposed. Additional storm water facilities are likely needed.
A storm water management plan must be submitted with preliminary plans detailing the storm water
management calculations to support any proposed improvements to meet agency requirements including
the HydroCAD model in electronic format. The storm water management plan must include a summary
report describing the overall management plan and performance criteria for all required storm events.
Storm water facilities proposed for meeting State and VBWD permitting requirements must be designed
and constructed in accordance with the City Engineering Design Standards Manual available on the City
website, dated March 2017.
The storm water facilities constructed for this development should remain privately owned and
maintained. The applicant will be required to execute and record a Storm Water Maintenance and
Easement Agreement in the City’s standard form of agreement.
Even as privately owned and maintain facilities, maintenance access roads meeting the City engineering
design standards must be provided for all storm water facilities.
The storm water facility 100‐year HWL must be fully contained within the subject property or easements
must be acquired to protect the 100‐year HWL flood area.
City design standards, details and plan notes must be used for erosion control.
MUNICIPAL SANITARY SEWER
The proposed site is guided in the City’s Comprehensive Plan for 2020‐2030 Regional Sewer Staging Plan
and would discharge to the MCES Cottage Grove Ravine Interceptor. Therefore, provisions for connecting
to the municipal sanitary sewer service must be included with any preliminary plan application.
The applicant will be responsible to connect to the City sanitary sewer system and extend sanitary sewer
into the property at applicant’s sole cost. In addition, the applicant will be required to stub sanitary sewer
mains to adjacent properties so that these parcels maintain sewer access. Sanitary sewer is available
along Hudson Blvd near the MCES Meter Station. The sanitary sewer trunk size will need to be determined
based on the 2040 Comprehensive Plan.
The Preliminary Plan application must include a description of the sanitary sewer capacity demands
including the number of residential equivalent units (REC) based on the Met Council SAC determination
policy. Demands must account for all planned uses and connections to the sewer system. This information
is required for staff evaluation of the sewer system improvements needed to support the development
and to determine the applicable sewer availability charges.
Utility Easements. Any extension of sanitary sewer to the subject property will require utility easements
from off‐site properties. The Preliminary Plans must identify the necessary easements to implement the
proposed improvements and must be a minimum 15‐feet each side centered from the pipe.
PAGE 3 of 3
MUNICIPAL WATER SUPPLY
The proposed facility resides within the Planned MUSA, therefore provisions for connecting to the
municipal water supply must be included with any preliminary paln application.
The applicant will be responsible to extend municipal water to the property at the applicant’s cost.
Watermain stubs will be required to all adjacent properties so that these parcels maintain access to water
service. Water is available to be extended to the property from the Hunter’s Crossing development but
will require easements across adjacent properties. The watermain extension to the site will likely be a 12‐
inch trunk watermain.
The Preliminary Plan application should include a description of the water capacity demands including
average day use, peak day use, and fire suppression demands. This information is required for staff
evaluation of the water improvements needed to support the development and to determine the water
availability charges.
The proposed site is in the water system’s low‐pressure zone which has limited capacity until a new water
tower is constructed to serve the area.
The applicant will be responsible to place hydrants throughout the property at the direction of the Fire
Department. All fire hydrants shall be owned and maintained by the City.
Any watermain lines and hydrants placed within the development will require minimum 30‐foot
easements centered over the pipe. Easements must be dedicated to the City and be provided in the City’s
standard form of easement agreement.
11660 Myeron Road North, Stillwater, Minnesota 55082-9573
Phone: 651-430-4300 • Fax: 651-430-4350 • TTY: 651-430-6246
www.co.washington.mn.us
Equal Employment Opportunity / Affirmative Action
Public Works Department
Donald J. Theisen, P.E.
Director
Wayne H. Sandberg, P.E.
Deputy Director/County Engineer
June 13, 2017
Emily Becker
Community Development Director
City of Lake Elmo
3600 Laverne Avenue North
Lake Elmo, MN 55042
RE: Washington County comments on Four Corners Second Addition, Proposed Concept
Plan
Dear Emily,
Thank you for providing Washington County with the Four Corners Second Addition, Proposed
Concept Plan in the City of Lake Elmo. The project consists of an express park-and-ride lot, a
gas/convenience store, daycare, financial institution and restaurant. The property is located on the
northwest corner of Interstate 94 (I-94) and County State Aid Highway (CSAH) 15/Manning
Avenue. Our comments are as follows:
• The proposed park-and-ride will be a great amenity for Lake Elmo as development
continues to grow along CSAH 15 and within the city. The proposed site is an ideal
location, as it is on the in-bound side for commuting traffic along I-94. The
proposed park-and-ride would serve as a reliever for the Guardian Angels park-
and-ride located in Oakdale, which is currently experiencing constrained capacity.
• Washington County encourages the City to consider bicycle and pedestrian
connectivity within the site. The proposed building and parking lot orientation is not
conducive with walkability and livability principles. These considerations align with
CG Goal 3, LU Goal 2, PTOS Goal 2, and TRIN Goal 4 as stated in the City of
Lake Elmo’s draft 2040 Comprehensive Plan. The aesthetics and desirability of the
commercial sites could be much improved with trail connectivity, intentional
building orientation and implementation of green space elements.
• The Functional Classification of CSAH 15/ Lake Elmo Avenue is an “A” Minor
Arterial Roadway, expander category. The Draft Washington County
Comprehensive Plan 2040 future right-of-way requirement is 180 feet (90 feet from
the center of the roadway). There appears to be adequate right-of-way today;
however, if an expanded interchange were to be constructed in the future, more
right-of-way may be necessary.
• The 2016 Washington County traffic volume count for this section of CSAH15 is
15,700 Annual Average Daily Trips (AADT). The Draft Washington County
Comprehensive Plan 2040 has estimated that traffic will increase to 21,000
Vehicles per Day (VPD) by 2040.
June 13, 2018
Four Corners Addition
Page 2 of 3
• The realigned access location of Hudson Boulevard, which aligns with the access
road to the Holiday Gas station in West Lakeland Township at CSAH 15, is
acceptable to the County as shown. Turn lanes on CSAH 15, including a
southbound right-turn lane and northbound center left-turn lane, will need to be
constructed as part of the Hudson Boulevard realignment. A plan section will need
to be prepared and approved by the county traffic engineer, and a Washington
County Right of Way Permit will be required for any turn lane improvements.
• Since no traffic study has been submitted to Washington County as part of the
concept plan, it can’t be determined at this time if the new intersection will meet
warrants for a traffic signal. If a traffic signal is warranted, the City of Lake Elmo
would have a 25% cost share.
• A trail is needed on the south side of Hudson Blvd to connect these facilities to
CSAH 15 and the trail towards Hudson, Wisconsin.
• Lane configuration at the intersection as shown is acceptable to the County.
• Left turn lanes are needed into the site accesses to prevent queuing back to CSAH
15.
• The developer or the city must submit the drainage report and calculations to our
office for review of any downstream impacts to the county drainage system. Along
with the drainage calculations, we will request written conclusions that the volume
and rate of stormwater run-off into the county right-of way will not increase as part of
the project.
• Access control should be dedicated to Washington County along the CSAH 15
frontage, except for the opening corresponding to Hudson Boulevard North.
• Washington County's policy is to assist local governments in promoting
compatibility between land use and highways. Residential uses located adjacent
to highways often result in complaints about traffic noise. Traffic noise from this
highway could exceed noise standards established by the Minnesota Pollution
Control Agency (MPCA), the U.S. Department of Housing and Urban Development,
and the U.S. Department of Transportation. Minnesota Rule 7030.0030 states that
municipalities are responsible for taking all reasonable measures to prevent land
use activities listed in the MPCA's Noise Area Classification (NAC) where the
establishment of the land use would result in violations of established noise
standards. Minnesota Statute 116.07, Subpart 2a exempts County Roads and
County State Aid Highways from noise thresholds. County policy regarding
development adjacent to existing highways prohibits the expenditure of highway
funds for noise mitigation measures in such areas. The developer should assess
the noise situation and take any action outside of County right of way deemed
necessary to minimize the impact of any highway noise.
June 13, 2018
Four Corners Addition
Page 3 of 3
• A Right-of-Way Permit will be required for any work in the CSAH 15 right-of-way as
it relates to the development. A plan set is required with the application and must
include any grading, installation of culverts, installation of water and sewer
services, left and right turn lanes on CSAH 15, parallel trail grading, signage and
any landscaping and other improvements within County right-of-way.
• All utility connections for the development require Washington County Right-of-
Way Permits. Typically, these are the responsibility of the utility companies.
Thank you for the opportunity to comment on this preliminary plat. If you have any questions,
please contact me at 651-430-4316 or jan.lucke@co.washington.mn.us. For permit applications,
please contact Carol Hanson at Carol.hanson@co.washington.mn.us.
Regards,
Jan Lucke
Public Works Planning Director
C: Carol Hanson, Office Specialist
1
Resolution 2018-080
CITY OF LAKE ELMO
WASHINGTON COUNTY
STATE OF MINNESOTA
RESOLUTION NO. 2018-080
RESOLUTION APPROVING THE CONCEPT PLANNED UNIT DEVELOPMENT PLAN AS
PROPOSED BY TERRY EMERSON FOR A PORTION OF 11530 HUDSON BOULEVARD N
WHEREAS, the City of Lake Elmo is a municipal corporation organized and existing
under the laws of the State of Minnesota; and
WHEREAS, Terry Emerson, 2204 Legion Lane Circle N, Lake Elmo, MN 55042 (the
“Applicant”) has submitted an application to the City of Lake Elmo (City) for a Concept PUD
Plan for a mixed use commercial development including commercial uses and a park and ride on
a 15.77 acre portion of 11530 Hudson Boulevard N, a copy of which is on file in the City of
Lake Elmo Planning and Zoning Department; and
WHEREAS, notice has been published, mailed and posted pursuant to the Lake Elmo
Zoning Ordinance, Section 154.102; and
WHEREAS, the Lake Elmo Planning Commission held a public hearing on June 18,
2018 to consider the Concept PUD approval request; and
WHEREAS, the Lake Elmo Planning Commission adopted a motion recommending
approval of the Concept PUD Plan; and
WHEREAS, the Lake Elmo Planning Commission has submitted its report and
recommendation concerning the Concept PUD as part of a memorandum to the City Council
from the Planning Director for the July 17, 2018 Council Meeting; and
WHEREAS, the City Council reviewed the application at its meeting held on July 17,
2018 and made the following findings:
1. That the Applicant has submitted all application requirements outlined in Section 154.759:
Application Requirements for General PUD Concept Plan.
2. That the PUD Concept Plan is consistent with the intent of the Lake Elmo Comprehensive
Plan and the Future Land Use Map for this area.
3. That the PUD Concept Plan complies with the general intent of the Commercial zoning
districts with PUD modifications.
4. That the PUD Concept Plan generally complies with the City’s Subdivision regulations.
5. That the PUD Concept Plan is generally consistent with the City’s engineering standards with
exceptions as noted in the City Engineer’s memorandum dated June 14, 2018.
6. The PUD Concept Plan meets the minimum requirement for a PUD including minimum
lot area and street layout. It is not known whether the minimum requirement for open space
is met.
2
Resolution 2018-080
7. The PUD Concept Plan meets at least one of the required PUD objectives identified in
Section 154.751.
NOW, THEREFORE, BE IT RESOLVED THAT the City Council does hereby
approve the Concept PUD Plans as proposed by Terry Emerson subject to the following
conditions:
1. The future Preliminary Plat and PUD Plans include a portion of PID# 34.029.21.43.0003.
2. The future Preliminary Plat and PUD Plans shall identify proposed land uses, and those
land uses shall accompany a detailed site plan to be approved by the City. Any use that is
not designated on the Preliminary Plat and PUD Plans and is not designated as a
permitted use within the Commercial zoning district shall require a conditional use
permit.
3. The future Preliminary Plat and PUD Plans shall provide the required 20% open space
within the development or specify what the proposed public or site amenity the development
will provide that the City may consider as an alternative to the open space requirement.
4. The future Preliminary Plat and PUD Plans should detail proposed amenities in exchange for
flexibility from standards of the Zoning Code.
5. The future Preliminary Plat and PUD Plans shall comply with comments outlined in the City
Engineer Review Memo named Four Corners 2nd Addition Concept Plan dated June 14, 2018.
6. The future Preliminary Plat and PUD Plans shall include provisions for City sanitary sewer
and municipal water as well as sanitary sewer and water capacity demands. The Applicant
shall be responsible to extend City sanitary sewer and municipal water to the site at the
applicant’s cost. Sanitary sewer and water main stubs will be required to all adjacent
properties.
7. The future Preliminary Plat and PUD Plans shall include right-of-way and easement from the
adjacent property to the north to allow for the Hudson Boulevard realignment at Manning
Avenue.
8. The future Preliminary Plat and PUD Plans shall include a stormwater management plan
including a summary report describing the overall management plan and performance criteria
for all required storm events.
9. The Applicant shall obtain all necessary permits including but not limited to all applicable
city permits (building, grading, sign, etc.), NPDES/SWPPP permits and Valley Branch
Watershed District approval.
10. Stormwater facilities shall be privately owned and maintained. A maintenance agreement
in a form acceptable to the City should be executed and recorded.
11. The future Preliminary Plat and PUD Plans shall include tree preservation and landscape
plans to be approved by the City’s Landscape Architect.
12. The future Preliminary Plant and PUD Plans shall include architectural renderings.
13. The Applicant shall submit a photometric plan, and all lighting must meet requirements of
Sections 150.035-150.038 of the City Code.
14. That fees in lieu of park land dedication be provided as required by 153.15 of the City Code
with future final plat.
3
Resolution 2018-080
15. The Applicant shall adhere to all requirements as outlined in the Washington County review
memo dated June 13, 2018.
Passed and duly adopted this 17th day of July, 2018 by the City Council of the City of Lake
Elmo, Minnesota.
___________________________________
Mike Pearson, Mayor
ATTEST:
____________________________________
Julie Johnson, City Clerk
1
Resolution 2018-080
529352v2 SJS LA515-1
CITY OF LAKE ELMO
WASHINGTON COUNTY
STATE OF MINNESOTA
RESOLUTION NO. 2018-080
RESOLUTION DENYING THE CONCEPT PLANNED UNIT DEVELOPMENT PLAN AS
PROPOSED BY TERRY EMERSON FOR A PORTION OF 11530 HUDSON BOULEVARD N
WHEREAS, the City of Lake Elmo is a municipal corporation organized and existing
under the laws of the State of Minnesota; and
WHEREAS, Terry Emerson, 2204 Legion Lane Circle N, Lake Elmo, MN 55042 (the
“Applicant”) has submitted an application to the City of Lake Elmo (City) for a Concept PUD
Plan for a mixed use development including commercial uses and a park and ride on a 15.77 acre
portion on the southeast portion of 11530 Hudson Boulevard N, a copy of which is on file in the
City of Lake Elmo Planning and Zoning Department (the “Concept PUD Plan”); and
WHEREAS, notice has been published, mailed and posted pursuant to the Lake Elmo
Zoning Ordinance, Section 154.102; and
WHEREAS, the Lake Elmo Planning Commission held a public hearing on June 18,
2018 to consider the Concept PUD Plan application; and
WHEREAS, the Lake Elmo Planning Commission has submitted its report and
recommendation concerning the Concept PUD Plan as part of a memorandum to the City
Council from the Planning Director for the July 17, 2018 Council Meeting; and
WHEREAS, the City Council reviewed the application at its meeting held on July 17,
2018 and made the following findings:
1. That the City’s Planned Unit Development (PUD) ordinance states that uses within a
PUD may include only those uses generally considered associated with the general land
use category shown for the area on the City’s official Comprehensive Land Use Plan.
The area in which the Concept PUD Plan is located is guided by the Comprehensive
Land Use Plan as Commercial. A park and ride facility is not considered a commercial
use because it would be owned by a public entity and therefore would not generate
property taxes like a commercial use.
2. That the Comprehensive Land Use Plan does not specifically designate park-and-ride
facilities or any other similar type facilities as an allowed, conditional, or interim use for
the Commercial Zoning District.
3. That while park and ride facilities are considered an allowed use within the City’s
Convenience Commercial Zoning District, the City does not believe that the Convenience
Commercial zoning district is appropriate for the area in which the Concept PUD Plan is
being proposed as there is not a need for a park and ride facility in the City. There
currently are six park and ride facilities in adjacent cities that may be used by Lake Elmo
2
Resolution 2018-080
529352v2 SJS LA515-1
commuters. Additionally, there is a new park and ride facility being planned for less than
one mile from the southwestern Lake Elmo border to provide access to the Metro Gold
Line Bus Rapid Transit.
4. The Applicant has also requested that other uses that are either not currently permitted or
are conditional uses be designated as permitted uses within the PUD. The Applicant has
not submitted any plans to accompany the uses that he is requesting be changed to
permitted uses and therefore, due to the lack of information, this is an unreasonable
request.
5. The City’s PUD regulations require that applicants offer the City amenities in exchange
for any requests for flexibility from the City standards. The Applicant is requesting
flexibility from the City standards, including, but not limited to, exceeding the City’s
impervious surface requirements, but yet he has not offered the City any amenities in
exchange for the flexibility being requested.
NOW, THEREFORE, BE IT RESOLVED THAT the City Council does hereby deny
the Concept PUD Plan as proposed by Terry Emerson.
Passed and duly adopted this 17th day of July, 2018 by the City Council of the City of Lake
Elmo, Minnesota.
___________________________________
Mike Pearson, Mayor
ATTEST:
____________________________________
Julie Johnson, City Clerk