Loading...
HomeMy WebLinkAbout7-17-18 meeting packet items 1-19 NOTICE OF MEETING City Council Meeting Tuesday, July 17, 2018 7:00 P.M. City of Lake Elmo | 3800 Laverne Avenue North AGENDA A. Call to Order/Pledge of Allegiance B. Approval of Agenda C. Accept Minutes 1. June 19, 2018; July 3, 2018 D. Public Comments/Inquires E. Presentations F. Consent Agenda 2. Approve Payment of Disbursements and Payroll 3. Accept Building Department June 2018 Report 4. Accept Fire Department June 2018 Report 5. Accept Public Works June 2018 Report 6. Approve Engineering Task Order- MnDOT Bridge Inspection and Enrollment Program 7. Approve Private Development Security Reduction – Boulder Ponds 5th Street. 8. Approve Parking Restriction Changes on Lake Elmo Ave - Resolution No. 2018-072 9. Approve Disposal of Public Works Surplus Equipment 10. Approve Appointment of Election Judges for 2018 Primary and General Elections – Resolution 2017-073 11. Accept Part Time Firefighter Resignation 12. Authorize Membership in the 4M Fund – Resolution 2018-071 G. Regular Agenda 13. Wyndam Village Preliminary Plat and Zoning Map Amendment – Ordinance 08-212; Resolution 2018- 066 14. Wildflower PUD Amendment-Public Hearing – Resolution 2018-074 15. Eagle Point Blvd Street Improvements – Assessment Hearing; Adopt Final Assessment Roll – Resolution 2018-075 16. Wellhead Protection Plan Phase 2 – Public Hearing 17. School Bus Terminal-Zoning Text Amendment, Preliminary and Final Plat, Zoning Map Amendment and Conditional Use Permit at 11530 Hudson Blvd N – Ordinance 08-214, 08-215; Resolution 2018-076, 2018-077, 2018-078, 2018-079 18. Four Corners 2nd Addition General PUD at 11530 Hudson Blvd N – Resolution 2018-080 19. CSAH15/CSAH14 Realignment Additional Work to Realign City Watermain 20. Northport 2nd Addition Final Plat – Resolution 2018-081 21. Northport 2nd Addition Development Agreement – Resolution 2018-082 22. Verizon Monopole-Conditional Use Permit and Variance at 11351 Upper 33rd St. 23. Verizon Leases 24. Demontreville Park Improvements 25. Comp Plan Change Order 26. Water Meter Change Out H. Council Reports I. Staff Reports and Announcements J. Adjourn Our Mission is to Provide Quality Public Services in a Fiscally Responsible Manner While Preserving the City’s Open Space Character CITY OF LAKE ELMO CITY COUNCIL MINUTES JULY 3, 2018 CALL TO ORDER/PLEDGE OF ALLEGIANCE Mayor Pearson called the meeting to order at 7:00 pm. PRESENT: Mayor Mike Pearson and Councilmembers Justin Bloyer, Jill Lundgren and Christine Nelson. ABSENT: Councilmember Julie Fliflet. Staff present: Administrator Handt, City Attorney Sonsalla, City Engineer Griffin, Planning Director Becker, and City Clerk Johnson. APPROVAL OF AGENDA Items 3, 5 and 6 were moved to the Regular Agenda. Councilmember Nelson, seconded by Mayor Pearson, moved TO APPROVE THE AGENDA AS AMENDED. Motion passed 4 – 0. PUBLIC COMMENTS/INQUIRIES None PRESENTATIONS None CONSENT AGENDA 2. Approve Payment of Disbursements and Payroll 3. Approve Lake Elmo Jaycees Special Event Permit and Temporary Liquor License for Huff n Puff Days 4. Approve Extension of Comcast Cable Franchise Agreement 5. Approve Lake Jane Lake Association Improvement Matching Grant 6. Approve Removal of Self Storage Facilities from Zoning Code-Ordinance 08-213 7. Authorize Advertising for Public Works Operator 8. Accept Resignation of Part-Time Firefighter 9. Approve Royal Golf 2nd Addition Final Plat Amendment – Resolution 2018-063 10. Approve Royal Golf 2nd Addition Development Agreement – Resolution 2018-064 11. Approve Disposition of Surplus Fire Department Equipment Councilmember Bloyer, seconded by Councilmember Nelson, moved TO APPROVE THE CONSENT AGENDA AS PRESENTED. Motion passed 4 - 0. LAKE ELMO CITY COUNCIL MINUTES JULY 3, 2018 Page 2 of 4 ITEM 3: Approve Lake Elmo Jaycees Special Event Permit and Temporary Liquor License for Huff n Puff Days Mike Slobodnik, Lake Elmo Jaycees Interim President and Brian Oliverius, Event Chair, asked for assistance recruiting new members. Mayor Pearson, seconded by Councilmember Lundgren, moved TO APPROVE A SPECIAL EVENT PERMIT AND TEMPORARY ON-SALE LIQUOR LICENSE ISSUED TO THE LAKE ELMO JAYCEES FOR THEIR HUFF N’ PUFF DAYS EVENT HELD AUGUST 9 THROUGH 12, 2018, SUBJECT TO APPROVAL OF THE DIRECTOR OF MN ALCOHOL AND GAMBLING ENFORCEMENT DIVISION, AND WAIVE THE LIQUOR LICENSE FEE, SPECIAL EVENT PERMIT FEE AND THE FEE FOR LION’S PARK BALL FIELD LIGHTING AND WITH THE CITY PAYING FOR THE COST OF SECURITY DURING THE EVENT. Motion passed 3 – 1. (Bloyer – nay) ITEM 5: Approve Lake Jane Lake Association Improvement Matching Grant City Adm inistrator Handt stated that this is the second year matching grants have been available for the recreational lakes. John Hamerly spoke on behalf of the Lake Jane Lake Association and presented additional information on costs incurred by the association for treatment of invasive plants. Councilmember Bloyer, seconded by Councilmember Nelson, MOVED TO APPROVE THE LAKE JANE LAKE ASSOCIATION LAKE IMPROVEMENT GRANT REQUEST OF $4,506.17. Motion passed 3 – 1. (Pearson – nay) ITEM 6: Approve Removal of Self Storage Facilities from Zoning Code Planning Director Becker reviewed the proposed zoning code amendment to remove self-service storage as a use within the Commercial and Business Park zoning districts. Councilmember Nelson, seconded by Councilmember Bloyer, moved TO ADOPT ORD. 08- 213 WHICH REMOVES SELF-SERVICE STORAGE FACILITIES AS AN ALLOWED USE WITHIN THE BUSINESS PARK AND COMMERCIAL ZONING DISTRICTS. Motion passed 4 – 0. ITEM 12: Wyndham Village Preliminary Plat and Zoning Map Amendment Planning Director Becker presented the proposed plat and reviewed recommendations from the Planning Commission and City Engineer. Kevin Schroepfer, 11520 30th Street, stated that he would like to see a tree buffer between his property and the proposed development. LAKE ELMO CITY COUNCIL MINUTES JULY 3, 2018 Page 3 of 4 Councilmember Nelson, seconded by Mayor Pearson, moved TO ADOPT ORD. 08-212 APPROVING THE PROPOSED ZONING MAP AMENDMENT TO REZONE 11580 30TH STREET NORTH FROM RURAL SINGLE FAMILY TO VILLAGE URBAN LOW DENSITY RESIDENTIAL AND TO ADOPT RESOLUTION 2018-066 APPROVING THE WYNDHAM VILLAGE PRELIMINARY PLAT SUBJECT TO RECOMMENDED FINDINGS AND CONDITIONS OF APPROVAL. Motion failed 2 – 1 – 1. (Bloyer – nay; Lundgren – present/not voting) Councilmember Bloyer, seconded by Councilmember Nelson, moved TO POSTPONE THE CURRENT ITEM TO THE NEXT COUNCIL MEETING. Motion passed 4 – 0. ITEM 13: Fire Rescue Engine & Equipment Purchase City Administrator Handt provided a brief overview of the request for purchase of a new fire rescue engine and equipment. Lisa McGinn, 8756 Upper 7th Place, stated that she is a member of the Public Safety Committee and reported that the committee worked to keep costs under control wherever possible. Councilmember Nelson, seconded by Councilmember Lundgren, moved TO APPROVE PURHCASE OF A RESCUE ENGINE AND EQUIPMENT WITH A TOTAL COST NOT TO EXCEED $700,000. Motion passed 4 – 0. ITEM 14: Online/Credit Card Payment Charges Finance Director Iverson presented options for a policy for payment of processing fees for credit card payments. Councilmember Bloyer, seconded by Councilmember Lundgren, moved TO HAVE CREDIT CARD PROCESSING FEES PAID BY THE CITY. Motion passed 4 – 0. COUNCIL REPORTS Mayor Pearson: Encouraged the public to consider membership in the Lake Elmo Jaycees. Councilmember Nelson: No report Councilmember Lundgren: Noted that the farmers market had a great opening week and thanked local businesses for donating items for the weekly drawings. Councilmember Bloyer: No report LAKE ELMO CITY COUNCIL MINUTES JULY 3, 2018 Page 4 of 4 STAFF REPORTS AND ANNOUNCEMENTS None Meeting adjourned at 7:46 pm. LAKE ELMO CITY COUNCIL ATTEST: ______________________________ Mike Pearson, Mayor _______________________________ Julie Johnson, City Clerk STAFF REPORT -- page 1 -- DATE: July 17, 2018 CONSENT TO: Mayor and City Council FROM: Amy La Belle, Accountant AGENDA ITEM: Payments & Disbursements REVIEWED BY: Kristina Handt, City Administrator BACKGROUND INFORMATION/STAFF REPORT: The City of Lake Elmo has the fiduciary responsibility to conduct normal business operations. Below is a summary of current claims to be disbursed and paid in accordance with State law and City policies and procedures. FISCAL IMPACT: Claim # Amount Description ACH $ 51,638.77 Payroll 07/05/18 47634 - 47679 $ 294,146.25 Accounts Payable 07/19/18 TOTAL $ 345,785.02 RECOMMENDATION: If removed from the consent agenda, the recommended motion is as follows: “Motion to approve the aforementioned disbursements in the amount of $345,785.02” ATTACHMENTS: 1. Accounts Payable – proof list(s) Tl IE CITY OF U\KEELMO TO: City Council STAFF REPORT DATE: 7-17-18 REGULAR #3 MOTION FROM: Michael Bent, Building Official AGENDA ITEM: REVIEWED BY: Approve Monthly Building Department Report for June 2018 Kristina Handt, City Administrator BACKGROUND: ISSUE BEFORE COUNCIL: As part of its Consent Agenda, the City Council is asked to accept the monthly Building Department report. No specific motion is needed, as this is recommended to be part of the overall approval of the Consent Agenda. PROPOSAL DETAILS/ANALYSIS: Below is a snapshot of the monthly statistics for June 2018. Comparison data is also include from p1ior years for June new home single family construction and total permitting activity for the month. Attached are the system summary reports breaking out this information further, including the statistics related to the inspection activity. New Homes Total Valuation Average Home Value Total Permit Valuation YTD Total Residential Units YTD FISCAL IMP ACT: None OPTIONS: RECOMMENDATION: 2018 32 $10,883,343 $340,104 $63,212,232 156 2017 16 $5,431,100 $339,443 $57,101,617 128 Motion to accept the June 2018 monthly building permit report as presented. ATTACHMENTS: 1.Valuation Report 2.Permits Issued & Fees Report 3.Inspection statistic report for June 2018 4.YTD Building Department Revenue Report 2016 14 $4,961,000 $354,357 $49,902,370 112 STAFF REPORT DATE: July 17, 2018 CONSENT ITEM #: 4 TO: City Council FROM: Greg Malmquist, Fire Chief AGENDA ITEM: Month End Fire Department Update for June 2018 REVIEWED BY: Kristina Handt, City Administrator ISSUE BEFORE COUNCIL: Review month end activity update from fire department. Advise on any additional information requested. PROPOSAL DETAILS/ANALYSIS: We had 36 calls in June: 3 Fire Alarms 2 Structure fires 2 Cancelled en route 19 Medicals 3 Gas leak 4 Car accidents with injuries 1 Vehicle fire 1 Downed power lines 1 House flooding 36 Total A Command vehicle did not respond on 5 calls for a response rate of 86%. Our average response time was 8.8 minutes from alarm to arrival. 15 calls had 3 or less responders minus the Duty Officer with 5 calls having only 1 personnel on the first due apparatus. 6 calls this month had only shift personnel for responders and 2 of those only had the Chief as a responder. Drills for the Month: #1 - CEU: Driving Apparatus #2 - Drafting Operations and Pumping #3 - Water Rescue Points of Interest: -Staffing continues to be of concern. Two new PT personnel were hired and have been training and acclimating to Lake Elmo Fire equipment and guidelines. -Personnel were invited and participated in assisting Bayport fire on a training house burn. -One part time fire fighter transitioned to a Substitute capacity as they can no longer meet the requirements of being scheduled part time due to a new job. -Another part time fire fighter gave notice that in July, they intend to resign from the part time capacity due to a new job of their own. Part Timer Accomplishments: Completed two follow up inspections and closed out inspection for one business. Conducted ability test and orientation for new Personnel. Completed and facilitated multiple station and equipment repairs. Conducted in depth inspection of all SCBA packs finding one needing technical repair. Assisted in set up and clean up for training drills. General cleaning and upkeep for both stations and apparatus. General training for two new Part Time Firefighters. MAYOR AND COUNCIL COMMUNICATION DATE: 7/17/2018 CONSENT ITEM #: 5 AGENDA ITEM: Public Works Director Report SUBMITTED BY: Rob Weldon, Public Works Director REVIEWED BY: Kristina Handt, City Administrator ISSUE BEFORE COUNCIL: City Council is asked to review and accept, as part of Consent Agenda, a brief description of activities that have taken place in the Public Works Department in the month of June 2018. PROPOSAL DETAILS/ANALYSIS: • Irrigation turn-ons • Sealcoat Pre-con Mtg • Submitted Cross Country Ski Trail Grant Request for 2019 • Obtain quotes for street patches from water main breaks • Obtain striping quotes • Discover Crossing Bridge Mtg w/ FOCUS • Quotes for Demotreville park ball field grading • 2018 Street Improvement Pre-Con Mtg. • Finalize 3 year street maint. plan w/ FOCUS • Stormwater steering Committee mtg w/ Washington Conservation District • Hammes 2nd Utility walk through inspection • Obtain quotes for tipped backstop extension at Lions Park • Old Village Phase 4 Pre-con Mtg • 2nd Quarter water meter reading • Royal Golf Lift Station Start-up • Submit annual Consumer Confidence Water Report • Savona Park Grading and Mulch Installation • Install Public Parking Signs on L.E. Ave • Street Sealcoating begins • Sod Repairs • Pothole patching • Ditch mowing • Mow Sunfish Lake Park Trails • Water main break on Lampert Ave. N RECOMMENDATION: Base on the activities listed above, City Council is respectfully asked to accept the June 2018 Public Works Report. STAFF REPORT DATE: July 17, 2018 CONSENT ITEM # 6 AGENDA ITEM: MnDOT Bridge Inspection & Enrollment Program – Approve Engineering Task Order SUBMITTED BY: Jack Griffin, City Engineer REVIEWED BY: Kristina Handt, City Administrator Rob Weldon, Public Works Director Chad Isakson, Assistant City Engineer ISSUE BEFORE COUNCIL: Should the City Council authorize engineering services to perform initial inspections and complete professional services necessary to enroll the City’s three bridge structures into the Minnesota Department of Transportation’s Bridge Management Program? BACKGROUND: In accordance with Minnesota State Statute 165.03, all public structures classified as bridges must be enrolled in the Minnesota Department of Transportation’s Bridge Management Program. The City of Lake Elmo has three structures, one along 57th Street North located in the Discover Crossing development, and two along Eagle Point Blvd in the Eagle Point Business Park. Following initial enrollment, annual inspections are required. PROPOSAL DETAILS/ANALYSIS: Work for this project would include initial bridge inventory and inspections, summary report of the bridge inspection findings, and completion of load ratings of all three bridge structures located within the City of Lake Elmo. The Consultant would fill the role of Program Administrator for the City and would review and certify the completed reports. A Request for Proposal was solicited from three (3) MnDOT Certified Bridge inspection engineers including Collins Engineers, Erickson Engineering, and TKDA. Based on a review of the submitted proposals, staff is recommending selection of Erickson Engineering to complete the work based on project team qualifications, experience, and overall fees (see attached Proposal Fee Summary worksheet). FISCAL IMPACT: The services will be funded through Street Maintenance Fund 3100. RECOMMENDATION: Staff is recommending that the City Council approve, as part of the Consent Agenda, engineering services to inspect, rate, and summarize bridge inspection findings of the City’s three bridges. If removed from the consent agenda, the recommended motion for the action is as follows: “Move to authorize Erickson Engineering to complete engineering services to inspect, rate, and summarize bridge inspection findings of the City’s three bridges in an amount not to exceed $4,910.00.” ATTACHMENTS: 1. Proposal Fee Summary Worksheet. 2. Erickson Engineering Task Order #1 – Bridge Management Program. 3. Professional Services Agreement – Erickson Engineering. CITY OF LAKE ELMO, MINNESOTA BRIDGE MANAGEMENT PROGRAM DATE RECEIVED:  JUNE 29, 2018 Consulting Firm Total Engineering PM/PA BRIDGE INSPECTIONS/REPORTS LOAD RATING EXPENSES COLLINS ENGINEERS $9,613 $1,824 $5,596 $1,664 $529 ERICKSON ENGINEERS $4,910 $330 $3,820 $760 Included TKDA, Inc.$8,500 $1,742 $5,808 $746 $204 PROPOSAL FEE SUMMARY     TASK ORDER No. 1 – BRIDGE MANAGEMENT PROGRAM           Page 1 of 2                                             TASK ORDER                 No. 1  CITY OF LAKE ELMO, MINNESOTA – ERICKSON ENGINEERING CO., LLC  PROFESSIONAL ENGINEERING SERVICES AGREEMENT    In accordance with ARTICLE 1 of the Master AGREEMENT between the City of Lake Elmo (“CITY”) and  Erickson Engineering Co., LLC (“ENGINEER”), dated JULY 17, 2018 (“AGREEMENT”), the ENGINEER  agrees to provide Professional Engineering Support Services as follows:      BRIDGE MANAGEMENT PROGRAM    PROJECT OVERVIEW:  According to State Law, all public structures classified as bridges must be  enrolled in the Minnesota Department of Transportation’s Bridge Management Program.  The City of  Lake Elmo has three structures, one along 57th Street North and two along Eagle Point Blvd, that fall  under this classification that are not currently enrolled. Any and all necessary data should be collected  and processed as part of this Task Order so the City’s bridges are formally enrolled in MnDOT’s  Program.  Work includes initial inspections, summary reports of the bridge inspection findings, and  complete load ratings of all three bridge structures located within the City of Lake Elmo.    SERVICES TO BE PROVIDED BY ENGINEER: Erickson Engineering Co., LLC shall provide the following  Professional Engineering Services:     1. Project Management throughout the course of the work.    2. Program Administrator (PA) – The Consultant shall provide a qualified individual to serve as the  City’s PA for bridge inspections.      3. Bridge Inspection Services   Perform initial inspections on the three bridge structures located within the  C ity  of L ake  Elmo.  Inspections shall be completed by a MnDOT Certified Team Leader for Bridge  Inspections.  All required information shall be collected to complete the initial MnDOT  Bridge Inspection Report and MnDOT Structure Inventory Reports.  Initial inspection  data shall be entered into MnDOT Structure Inventory Management Software (SIMS).     Prepare a summary report of the bridge inspection findings and submit to the City. The  summary report shall contain unique maintenance recommendations f or  e ach  structure   evaluated.   Complete load ratings for each structure.  It is assumed that each bridge will be classified  as a culvert and ratings may be completed using MnDOT Form 90. Each rating shall be  signed by an Engineer licensed in the State of Minnesota.  DELIVERABLES:   Completed Bridge Inspection Reports and Structure Inventory Reports.   Certified load rating reports.      TASK ORDER No. 1 – BRIDGE MANAGEMENT PROGRAM           Page 2 of 2                                              Development and approval of the SIMS reports for each of the bridges.    CITY’S REPRESENTATIVE AND CONTRACT ADMINISTRATION:  The CITY’s representative with respect  to services  rendered  by ENGINEER  under  this TASK ORDER  shall be the City Engineer.  Project  correspondence must be addressed to:  Jack Griffin, P.E., City Engineer   City of Lake Elmo   3800 Laverne Avenue North  Lake Elmo, MN 55042  651.300.4264  Email: Jack.griffin@focusengineeringinc.com    COMPENSATION:  Compensation to ENGINEER shall be on an hourly rate basis using the hourly billing  rates and assigned personnel in a not to exceed amount of $4,910.00.  Payment for Services shall be in accordance with ARTICLE 3.2 of the Master AGREEMENT.  Invoices  should be sent to the attention of the City Engineer.  ATTACHMENTS:  The following documents are incorporated by reference: None.    APPROVAL  AND ACCEPTANCE: Approval and  Acceptance of  this Task  Order, including the  attachment(s) listed above, shall incorporate this document as part of the AGREEMENT. ENGINEER is  authorized to begin performance of services upon receipt of a copy of this Task Order signed by CITY.    The Effective Date of this Task Order is JULY 17, 2018.      ERICKSON ENGINEERING CO., LLC    CITY OF LAKE ELMO, MINNESOTA      By _________________________________  By  _________________________________   (Authorized Principal of the Firm) City Administrator          CITY OF LAKE ELMO – Erickson Engineering‐Professional Services Agreement            Page 1 of 6    CITY OF LAKE ELMO, MINNESOTA  CLIENT‐PROFESSIONAL SERVICES AGREEMENT  This AGREEMENT is made effective on July 17, 2018, (“Effective Date”) between the CITY OF LAKE ELMO,  MINNESOTA,  a  Minnesota Municipal corporation (hereinafter  referred to as the  “CITY”),  and  Erickson  Engineering Co., LLC, a corporation (hereinafter referred to as “CONSULTANT”).     From time to time the CITY intends to engage CONSULTANT to provide Professional Services. This AGREEMENT  sets forth the general terms and conditions which shall govern the relationship and performance of the CITY and  CONSULTANT.      In consideration of the foregoing recitals and following terms and conditions contained herein, the CITY and  CONSULTANT agree as follows:    ARTICLE 1: SERVICES OF THE CONSULTANT    1.1 Scope of Services:     A. The services to be provided by CONSULTANT shall be set forth in a written communication or “Task  Order” that is authorized by the City prior to the start of work.    B. Professional Services will, in general, include studies and reports, design, preparation of working  drawings and specifications; construction administration and construction observations; mapping,  preparation of cost estimates; and other related tasks of a type  normally associated with  infrastructure improvements.    C. This AGREEMENT is not a commitment by the CITY to CONSULTANT to request services or to issue  any Task Orders.    1.2 Task Order Procedure    A. CONSULTANT shall provide the CITY with a “Task Order” for specific services or projects when  requested by the CITY.  Each Task Order will indicate the specific task, scope of services, time for  performance, deliverables to be provided, and the basis of compensation.    B. Individual “Task Orders” or written communications authorizing services by the CONSULTANT shall  be mutually approved by the CITY and CONSULTANT.  Each duly executed Task Order shall be  incorporated and made a part of this AGREEMENT and the General Considerations thereof.    ARTICLE 2: PERIOD OF SERVICE AND TIMES FOR RENDERING SERVICES    2.1  Term:  This AGREEMENT shall be effective and applicable to each “Task Order” issued hereunder and  shall apply to any service provided by CONSULTANT whether retained under a formal ““Task Order” or  other written action or approval by the CITY, subject, however, to termination by either party in  accordance with ARTICLE 5.9.          CITY OF LAKE ELMO – Erickson Engineering‐Professional Services Agreement            Page 2 of 6    2.2 The times for performing services or providing deliverables shall be as stated in each Task Order or  written communication authorizing the service or deliverable.     2.3  The term of the AGREEMENT may be extended by written instrument executed by both parties.    ARTICLE 3: COMPENSATION    3.1    Basis for Compensation:  Compensation to CONSULTANT shall be as set forth in each Task Order. When  services are requested by the CITY and a Task Order is not executed, the services shall be provided on  an hourly rate basis in accordance with the hourly rate sheet on file at the CITY, or as mutually agreed  to in written form.      3.2  Payments for Services    A. Preparation and Submittal of Invoices:  CONSULTANT shall prepare and submit invoices to the CITY on  a monthly basis, unless otherwise mutually agreed.  Invoices are due and payable within 45 days of  receipt.      B. Unpaid Invoices:  All accounts unpaid after 45 days from the date of original invoice shall be subject to  a service charge of 1.0% per month, with interest beginning to accrue 45 days after the date of receipt  of the invoice. Payment will be credited first to any interest and then to principal.      C.  Disputed Invoices:  If the CITY contests an invoice, the CITY shall advise CONSULTANT of the specific  basis for doing so, may withhold only that portion so contested, and must pay  the undisputed portion.     ARTICLE 4:   CITY’S RESPONSIBILITIES      4.1  The CITY shall designate a person to act as the CITY’s representative with respect to services to be  rendered under this AGREEMENT. Unless otherwise designated in writing, the CITY’s representative shall  be the CITY ENGINEER. Such persons shall have authority to transmit instructions, receive instructions,  receive information, interpret and define CITY’s policies with respect to CONSULTANT’s services, and  render decisions relative to a specific project.     4.2 Provide Access:  The CITY shall provide access to, and make provisions for, CONSULTANT to enter upon  public or private property as required to perform their work.    4.3  Provide supporting documentation and Services:  The CITY shall provide all necessary information  regarding its requirements as necessary for orderly progress of the work, including records, data,  instructions, and requirements for completeness.  The CITY shall also provide services in regards to  accounting, fiscal and bond counseling services, insurance, and legal services as may be required for the  project.    4.4  The CITY shall be responsible for, and CONSULTANT may rely upon, the accuracy and completeness of  all requirements, programs, instructions, reports, data, and other information furnished by the CITY to  CONSULTANT pursuant to this AGREEMENT.  CONSULTANT may use such requirements, programs,  instructions, reports, data, and information in performing or furnishing services under this AGREEMENT.        CITY OF LAKE ELMO – Erickson Engineering‐Professional Services Agreement            Page 3 of 6    4.5  Provide prompt Notice and Review:  The CITY shall promptly review and examine all correspondence,  reports, sketches, drawings, specifications and other documents and communications prepared and  presented by CONSULTANT and render decisions pertaining thereto within a reasonable time so as not  to delay the services of CONSULTANT. The CITY shall also give prompt notice to CONSULTANT whenever  CITY observes or otherwise becomes aware of any development that affects the scope or timing of  CONSULTANT’s services or any defect in the work.    4.6 The CITY shall act as liaison with other agencies or involved parties to carry out necessary coordination  and negotiations; obtain permits; and to obtain approvals and consents from others as may be necessary  for completion of the project.    ARTICLE 5:  GENERAL CONSIDERATIONS    5.1  Standards and Parameters of Performance      A. Standard of Care: The standard of care for all professional services performed or furnished by  CONSULTANT under this AGREEMENT will be the care and skill ordinarily used by members of the  subject profession practicing under like circumstances.    B. Technical Accuracy: CONSULTANT shall be responsible for the technical accuracy of its services and  documents resulting therefrom, and CITY shall not be responsible for  discovering deficiencies  therein. CONSULTANT shall correct such deficiencies without additional compensation except to the  extent such action is directly attributable to deficiencies in CITY‐furnished information.    C. Subconsultants:  CONSULTANT may employ such Subconsultants as CONSULTANT deems necessary  to assist in  the performance  or furnishing  of the services, subject to  reasonable,  timely,  and  substantive objections by Owner.      D. Compliance with Laws and Regulations, and Policies and Procedures:  CONSULTANT and CITY shall  comply with applicable Laws and Regulations and CITY mandated standards.    E. CONSULTANT shall not at any time supervise, direct, control, or have authority over any contractor  work, nor shall CONSULTANT have authority over the means, methods, techniques, sequences, or  procedures of construction selected or used  by any contractor, or the safety precautions and  programs incident thereto, for security or safety at the Site, nor for any failure of a contractor to  comply with Laws and Regulations applicable to such contractor’s furnishing and performing its  work.    F. CONSULTANT neither guarantees the performance of any Contractor nor assumes responsibility for  any  Contractor’s failure to  furnish  and  perform  the  Work in accordance with the Contract  Documents, or for the acts or omissions of any Contractor, Subcontractor, or Supplier.    5.2 Independent Contractor:  CONSULTANT is an independent contractor.  T he  manner  in  w hich  t he  s ervices   are performed shall be controlled by CONSULTANT; however, the nature of the services and the results  to be achieved shall be specified by the CITY.  All services pr ovided by the CONSULTANT pursuant to this  AGREEMENT  shall  be provided  by the CONSULTANT  as an independent contractor and  not  as an  employee of the CITY for any purpose, including but not limited to: income tax withholding, workers’  compensation, unemployment compensation, FICA taxes, and eligibility for employee benefits.      CITY OF LAKE ELMO – Erickson Engineering‐Professional Services Agreement            Page 4 of 6      5.3  Insurance    A. CONSULTANT shall procure and maintain insurance for protection from claims against it under  worker’s compensation acts (statutory limits), claims for damages because of bodily injury including  personal injury, and from claims against it for damages because of injury to or destruction of  property including loss of use resulting therefrom.    B. CONSULTANT shall also procure and maintain professional and commercial  general liability  insurance, and auto and excess insurance, for all damages arising out  of  the performance  of services   caused by an error, omission or negligent act for which CONSULTANT is legally liable.    C. For any specific Task Order, the CITY may request that CONSULTANT provide additional insurance  coverage, increased limits, or revised deductibles.       Certificates of insurance will be provided to the CITY upon execution of the contract and thereafter  upon request by the CITY.  The CITY shall be listed as an additional insured.    5.4  Data Practices Act Compliance:  Data provided by CONSULTANT or created under this AGREEMENT  shall be administered in accordance with the Minnesota Government Data Practices Act, Minnesota  Statutes, Chapter 13.    5.5  Use of Documents    A. All Documents prepared and submitted by CONSULTANT are instruments of service, except for CITY‐ furnished data. CONSULTANT shall retain an ownership and property interest therein (including the  right  of  r euse  a t  the  discretion  o f  the  CONSULTANT) whether  or  not the Project or Service is completed.    B. At the time of completion or termination of this AGREEMENT or for each “Task Order,” CONSULTANT  shall make available to the CITY, upon request, copies of all deliverables, maps, reports,  and  correspondence, pertaining to the  work or  Project.    All  such documents  are  not  intended or  represented to be suitable for reuse by the CITY for any other project.  Any reuse without written  verification or adaptation by CONSULTANT for the specific purpose intended will be at the CITY’s sole  risk.    C.  In the event electronic copies of documents are made available to the CITY, the CONSULTANT makes  no representations as to long‐term compatibility of such documents resulting from the use of software  application packages, operating systems, or computer hardware differing from those used by the  documents’ creator.    5.6  Conflict of Interest:  The CONSULTANT shall use best efforts in the performance of its services and  professional obligations to avoid conflicts of interest and appearances of impropriety in representation  of the CITY.  In the event of a conflict, the CONSULTANT, with the consent of the CITY, shall arrange for  suitable alternative engineering representation.  It is the intent of the CONSULTANT to refrain from  handling engineering matters for any other person or entity that may pose a conflict of interest or may  not be in the best interests of the CITY.        CITY OF LAKE ELMO – Erickson Engineering‐Professional Services Agreement            Page 5 of 6    5.7 Termination     A. Either party may terminate this AGREEMENT upon thirty (30) days written notice.    B. Either party has the right to terminate any “Task Order” upon ten (10) days’ written notice unless  otherwise stated in the Task Oder.  In addition, the CITY may at any time, reduce the scope of a “Task  Order”.  Such reduction in scope of a Task Order shall be set forth in a written notice from the CITY  to the CONSULTANT.    C. In the event of a reduction in scope of a “Task Order,” CONSULTANT shall be paid for the work  performed and expenses incurred on the Task Order thus reduced and for any completed and  abandoned work for which payment has not been made.    D. In the event of termination of an “Task Order,” copies of all documents prepared by CONSULTANT  under the Task Order shall be made available by CONSULTANT to the CITY, pursuant to ARTICLE 5.6,  and there shall be no further obligation of the CITY to CONSULTANT under the Task Order, except  for payment of amounts due and owing for work performed and expenses incurred to the date and  time of termination.    E. In like manner, if the entire AGREEMENT is terminated, copies of all remaining documents on file  with the CONSULTANT shall also, upon request, be made available to the CITY pursuant to ARTICLE  5.6 upon receipt of payment of amounts due and owing CONSULTANT for any authorized work.    5.8  Controlling Law:  This AGREEMENT is to be governed by the laws of the State of Minnesota.    5.9  Successors, Assigns, and Beneficiaries    A. The CITY and CONSULTANT are hereby bound and the successors, executors, administrators, assigns,  and legal representatives of the CITY and CONSULTANT are hereby bound to the other party to this  AGREEMENT and to the successors, executors, administrators, assigns and legal representatives of  such other party, in respect of all covenants, agreements, and obligations of this AGREEMENT.    B. Neither the CITY nor CONSULTANT may assign, sublet, or transfer any rights under or interest in this  AGREEMENT, or  any  portion thereof, without the written consent of the other party. Nothing  contained  in this paragraph shall prevent CONSULTANT from employing such independent  professional associates and consultants as CONSULTANT may deem appropriate  to assist in the  performance of services hereunder.    C. Nothing under this AGREEMENT shall be construed to give any rights or benefits in this AGREEMENT  to anyone other than the CITY and CONSULTANT.    5.10  Dispute Resolution    A. The CITY and CONSULTANT agree to negotiate all disputes between them in good faith for a period of  thirty (30) days from the date of notice prior to invoking other provisions of this AGREEMENT, or  exercising their rights under law.          CITY OF LAKE ELMO – Erickson Engineering‐Professional Services Agreement            Page 6 of 6    5.11 Notices:  Any notice required under this AGREEMENT will be in writing, addressed to the appropriate party  at its address on the signature page and given personally, by registered or certified mail postage prepaid,  or by a commercial courier service.  All notices shall be effective upon the date of receipt.    5.12  Survival, Severability, Waiver    A. Survival:  All express representations, waivers, indemnifications, and limitations of liability included in  this AGREEMENT will survive its completion or termination for any reason.    B. Severability:  Any provision or part of the AGREEMENT held to be void or unenforceable under any  Laws or Regulations shall be deemed stricken, and all remaining provisions shall continue to be valid  and binding upon the CITY and CONSULTANT.    C. Waiver:  A party’s non‐enforcement of any provision shall not constitute a waiver of that provision,  nor shall it affect the enforceability of that provision or of the remainder of this AGREEMENT.    IN  WITNESS  WHEREOF, the parties hereto have executed this AGREEMENT as of the date first above written.    Erickson Engineering Co., LLC   CITY OF LAKE ELMO, MINNESOTA        By _____________________________________  By  ___________________________________ __   Mayor           By ___________________________________       City Clerk       STAFF REPORT DATE: July 17, 2018 CONSENT ITEM #: 7 AGENDA ITEM: Private Development Projects – Approve Security Reductions for Boulder Ponds 1st Addition and Boulder Ponds 5th Street Improvements SUBMITTED BY: Jack Griffin, City Engineer REVIEWED BY: Kristina Handt, City Administrator Emily Becker, Planning Director Chad Isakson, Assistance City Engineer ISSUE BEFORE COUNCIL: Should the City Council approve security reductions for the Boulder Ponds 1st Addition and Boulder Ponds 5th Street Improvements? PROPOSAL DETAILS/ANALYSIS: Staff has received and processed requests to reduce the development security in accordance with the various development projects. These requests have been reviewed and the following reductions are being recommended for approval: Current Security Amount Proposed Security Amount 1. Boulder Ponds 1st Addition: $945,215 $ 60,719 2. Boulder Ponds 5th Street: $384,066 $213,173 Work within each of these developments have progressed in accordance with the respective development agreement and to the extent necessary to support a reduction in the security as detailed in this report. In addition, the City is holding $3,125 until 5 additional trees are planted following construction of the home on each property, and $1,000 for some minor plantings needed along the 5th Street median. FISCAL IMPACT: It is the City’s goal to retain at all times during the subdivision improvements a security amount that is adequate to ensure completion of all elements of the improvements as protection to the City tax payers against the potential of developer default. With this reduction, the remaining security amount held by the City remains sufficient to complete the remaining improvements. RECOMMENDATION: Staff is recommending that the City Council approve, as part of the Consent Agenda, the security reductions for the Boulder Ponds 1st Addition and Boulder Ponds 5th Street Improvements as detailed in this report and supporting documentation. If removed from the consent agenda, the recommended motion for the action is as follows: “Move to approve security reductions for the Boulder Ponds 1st Addition and Boulder Ponds 5th Street Improvements as detailed in the attached Security Reduction Worksheets.” ATTACHMENTS: 1. Security Reduction Worksheet – Boulder Ponds 1st Addition. 2. Security Reduction Worksheet – Boulder Ponds 5th Street Improvements. BOULDER PONDS 1ST ADDITION Time of Performance:  October 31, 2016 DEVELOPMENT AGREEMENT AMOUNTS CATEGORY CONSTRUCTION 125% REMARKS #1 #2 #3 #4 #5 #6 Grading $116,600 $116,600 100%$116,600 Grading $68,194 $85,243 100%$42,621 $42,621 Sanitary Sewer $405,451 $506,813 75%$380,110 Watermain $349,674 $437,092 75%$327,819 Streets $1,084,327 $1,355,409 75%$677,704 $338,852 Surface Water Facilities $721,027 $901,284 75%$450,642 $225,321 Erosion Control $48,406 $60,508 75%$45,381 Sidewalks/Trails Included in Streets Included in Streets Street Lighting NA NA By Xcel Energy Street Signs and Traffic Control Signs Included in Streets Included in Streets Landscaping $204,302 $255,378 50%$127,689 $60,719 $3,125 Tree Preservation and Restoration NA NA Wetland Mitigation and Buffers NA NA LOC Through VBWD Monuments $4,700 $5,875 75%$4,406 Miscellaneous Facilities NA NA Record Drawings $2,500 $3,125 75%$2,344 TOTALS $2,888,581 $3,727,326 RELEASED AMOUNTS:$1,995,497 $606,794 $179,819 $60,719 $881,371 CUMMULATIVE AMOUNTS:$1,995,497 $2,602,291 $2,782,111 $2,842,830 SECURITY AMOUNT REMAINING:$1,731,829 $1,125,035 $945,215 $884,496 DATE:12/15/2015 8/2/2016 12/20/2016 7/17/2018 REDUCTIONS Holding for 5 trees  to be planted with Lots BOULDER PONDS 5TH STREET NORTH Time of Performance:  October 31, 2017 DEVELOPMENT AGREEMENT AMOUNTS CATEGORY CONSTRUCTION 125% REMARKS #1 #2 #3 #4 #5 #6 Grading NA NA Included in Boulder Ponds 1st Addition Sanitary Sewer $46,600 $58,250 $43,688 Watermain $64,000 $80,000 $60,000 Storm Sewer (w/pond structures)$97,300 $121,625 $91,219 Streets $287,700 $359,625 $269,719 Sidewalks/Trails $71,000 $88,750 $66,563 Surface Water Facilities NA NA Street Lighting NA NA Street Signs and Traffic Control Signs $11,600 $14,500 $10,875 Private Utilities (electricity, natural gas, telephone, and cable)NA Landscaping $100,753 $125,941 $93,456 $1,000 Tree Preservation and Restoration NA NA Wetland Mitigation and Buffers NA NA Monuments NA NA Erosion Control NA NA Miscellaneous Facilities NA NA Record Drawings NA NA TOTALS $678,953 $848,691 RELEASED AMOUNTS:$103,688 $360,938 $170,893 $212,173 CUMMULATIVE AMOUNTS:$103,688 $464,625 $635,518 SECURITY AMOUNT REMAINING:$745,004 $384,066 $213,173 DATE:2/21/2017 9/5/2017 7/17/2018 REDUCTIONS Holding for 5th Street  median plantings STAFF REPORT DATE: July 17, 2018 CONSENT #8 AGENDA ITEM: Lake Elmo Ave Parking SUBMITTED BY: Kristina Handt, City Administrator BACKGROUND: At the June 12, 2018 work session, Council discussed the parking issues downtown. Staff had suggested one of the changes could be to switch the 60 minute limit areas to 90 minutes. ISSUE BEFORE COUNCIL: Does the Council support changing the 60 minute parking spots to 90 minutes? PROPOSAL DETAILS/ANALYSIS: Since Lake Elmo Ave is a County road, Washington County has the authority to change the parking restrictions. Their practice has been to ask for a resolution from the City Council before approving any changes. A resolution is included in your packet. This change will impact 11 parking spaces; 3 near the post office and 8 north of 34th St. OPTIONS: 1) Approve the resolution 2) Amend and then approve the resolution 3) Do not approve the resolution RECOMMENDATION: If removed from the consent agenda: Motion to approve Resolution No 2018-072 ATTACHMENTS: • Resolution No 2018-072 CITY OF LAKE ELMO WASHINGTON COUNTY STATE OF MINNESOTA RESOLUTION NO. 2018-072 A RESOLUTION RELATING TO PARKING RESTRICTIONS ON THE EAST SIDE OF (CSAH) NO. 17 (LAKE ELMO AVENUE) FROM UPPER 33rd STREET NORTH TO 36TH STREET NORTH WHEREAS, parking restrictions on Lake Elmo Avenue (CSAH 17) are determined by Washington County since it is a county road; and WHEREAS, Washington County requires a City resolution before considering any changes in parking restrictions; and WHEREAS, the City would like to improve parking options downtown on Lake Elmo Ave; and WHEREAS, converting the 60 minute time limits to 90 minutes will reduce sign pollution along Lake Elmo Ave; NOW, THEREFORE, BE IT RESOLVED, by the City Council that all current 60 minute parking restrictions be changed to 90 minutes on the east side of Lake Elmo Avenue (CSAH 17) from Upper 33rd Street North to 36th Street North in the City of Lake Elmo. BE IT FURTHER RESOLVED, that the City of Lake Elmo requests that Washington County change the signage so that all 60 minute parking spots are now limited to 90 minutes. ADOPTED BY THE LAKE ELMO CITY COUNCIL ON THE 17th DAY OF JULY 2018. CITY OF LAKE ELMO By: __________________________ Mike Pearson Mayor (Seal) ATTEST: ________________________________ Julie Johnson City Clerk STAFF REPORT DATE: 7/17/2018 CONSENT ITEM #: 9 MOTION TO: City Council FROM: Rob Weldon, Public Works Director AGENDA ITEM: Sale of Excess and Retired Equipment REVIEWED BY: Kristina Handt, City Administrator BACKGROUND: With the acquisition of new equipment and other equipment that has reached the end of its useful life, Public Works has a surplus of equipment that is no longer operational and needed to conduct city services. ISSUE BEFORE COUNCIL: Should the City Council authorize staff to publicly advertise and sell excess and retired city equipment consistent with the City’s Purchasing Policy? FISCAL IMPACT: Revenue generated by the sale of this equipment will be added to the Equipment Replacement Fund. Below is a list of surplus equipment and the anticipated sale price. Conveyor $2,000 Hopper Box $100 (scrap) Street Light X-Mas Decorations $250 2000 Chevy S-10 Pickup $500 Dodge Pickup $250 (scrap) 1998 Chevy Pickup w/plow $2,000 Chevy Colorado Pickup (Bldg. Dept) $1,000 Hydrant Buddy wrench $100 Dump Truck bumpers (x2) $150 each Power Vent for PW Bldg. (wrong size from construction) $500 Manure Spreader $600 V-Box Spreader $1,500 3-point back blade $200 OPTIONS: • Approve sale of Excess and Retired Equipment • Deny sale of Excess and Retired Equipment • Discuss and amend the sale of Excess and Retired Equipment RECOMMENDATION: “Motion to approve the sale of Excess and Retired Equipment as detailed in the City’s Purchasing Policy” MAYOR & COUNCIL COMMUNICATION -- page 1 -- DATE: 07/17/2018 CONSENT ITEM # 10 AGENDA ITEM: Appointing 2018 Election Judges SUBMITTED BY: Julie Johnson, City Clerk BACKGROUND: Pursuant to Section 204B.21 of the Minnesota Election Laws, election judges shall be appointed by the municipality. The appointments shall be made at least 25 days before the election at which the judges will serve. The election judges are required to receive compensation equal to at least the prevailing Minnesota minimum wage for each hour spent carrying out duties at the polling place and attending training. Staff is requesting the individuals listed on the attached Election Judges List be appointed to serve as election judges for the August 14, 2018 Primary Election and November 6, 2018 General and City Election at the hourly rate of $10.00 for election judges and $11.00 for head election judges. The attached list of Election Judges is not conclusive and may be amended as needed by the City Clerk up to 25 days prior to the Primary and General elections. FISCAL IMPACT: There will be a cost for paying election judges, $10.00 per hour for election judges and $11.00 per hour for head judges. These expenses are included in the 2018 Budget. RECOMMENDATION: As part of its consent agenda, no specific motion is required. If removed from the consent agenda, the recommended motion is as follows: “Move to approve Resolution No. 2018-072, Appointing 2018 Election Judges.” ATTACHMENTS: 1. Resolution No. 2018-072 2. List of 2018 Election Judges CITY OF LAKE ELMO WASHINGTON COUNTY STATE OF MINNESOTA RESOLUTION NO. 2018-072 A RESOLUTION APPOINTING ELECTION JUDGES FOR THE 2018 PRIMARY AND GENERAL ELECTION WHEREAS, pursuant to Section 2014B.21 of the Minnesota Election Laws, Election judges shall be appointed by the municipality; and WHEREAS, the appointments shall be made at least 25 days before the election at which the judges will serve; and WHEREAS, election judges and election judge trainees shall receive at least the prevailing Minnesota minimum wage for each hour spent carrying out duties at the polling place and attending training. WHEREAS, the City of Lake Elmo is dependent upon and appreciative of citizen assistance for its election process and, WHEREAS, the Lake Elmo 2018 Primary and General Election Judge appointments consist of individuals recommended by the City Clerk with the approval by majority of the City Council and, WHEREAS, the list of Election Judges may be amended by the City Clerk as needed. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Lake Elmo that the individuals listed on the attached Election Judges List are appointed to serve as election judges for the August 14, 2018 Primary Election and the November 6, 2018 General and City Election at the hourly rate of $10.00 for election judges and $11.00 for head election judges. ADOPTED BY THE CITY COUNCIL OF THE CITY OF LAKE ELMO THIS 17th DAY OF JULY, 2018. By: _________________________________ Mike Pearson Mayor ATTEST: ____________________________________ Julie Johnson, City Clerk (SEAL) 2018 Election Judges Armando Menendez Barb Kiesling Barbra Bjorkman Bill Wacker Dan O'Connor Diane Allen Donald Slinger Ella Menendez Gail M Olson Jackie Pierre James Roth Jan Kiefner Jan Krueger Janet Carlson Janice Roth Jean Olinger Jim Allen Jim Carlson JoAnne Meyer Linda Wagner Lisa Quinn Mary Ellen Best Patricia O'Donnell Phyllis Paulson Robert Schumacher Sallyann Wacker Sharon Simpson Shirley Durand Tom O'Donnell Wendy Tait Loos Mary Grundeen STAFF REPORT DATE: July 17, 2018 CONSENT ITEM #: 11 TO: Mayor and Council AGENDA ITEM: Accept resignation of Firefighter Dominic Jara SUBMITTED BY: Jake Foster, Assistant City Administrator BACKGROUND: Firefighter Dominic Jara submitted his resignation effective July 21st. Mr. Jara will be staying on as a Paid-on-Call and Substitute Firefighter ISSUE BEFORE COUNCIL: Should the Council accept Dominic Jara’s resignation? PROPOSAL: Staff recommends accepting Dominic Jara’s resignation. RECOMMENDATION: If removed from the consent agenda: “Move to accept Dominic Jara’s resignation.” ATTACHMENTS: None STAFF REPORT DATE: July 17, 2018 CONSENT ITEM # 12 TO: Honorable Mayor and City Council FROM: Sue Iverson – Finance Director AGENDA ITEM: Authorizing Membership in the 4M Fund – Resolution 2018-071 REVIEWED BY: Kristina Handt– City Administrator BACKGROUND: Based upon current and likely future needs, it is recommended that the City of Lake Elmo enter into membership in the Minnesota Municipal Money Market Fund (4M Fund). The 4M Fund was formed in 1987 by a Joint Powers Act and in accordance with Minnesota Investment Statutes by the adoption of a joint powers agreement in the form of a Declaration of Trust which is attached for you review. Staff would like to utilize this to maximize interest earnings along with our other depositories. QUESTION BEFORE THE CITY COUNCIL: 1) Does the City Council desire to approve the resolution as attached? FISCAL IMPACT: Membership in the 4M Fund enhances the investment opportunities available to the City of Lake Elmo and increase investment earnings. RECOMMENDATIONS: 1) Motion to Adopt Resolution No. 2018-071; Authorizing Membership in the 4M Fund. ATTACHMENTS: 1) Declaration of Trust for the Minnesota Municipal Investment Money Market Fund (4M Fund) CITY OF LAKE ELMO WASHINGTON COUNTY, MINNESOTA RESOLUTION 2018 – 071 RESOLUTION AUTHORIZING MEMBERSHIP IN THE 4M FUND WHEREAS, Minnesota Statutes (the Joint Powers Act) provides that governmental units may jointly exercise any power common to the contracting parties; and WHEREAS, the Minnesota Municipal Money Market Fund (the 4M Fund) was formed in 1987, pursuant to the Joint Powers Act and in accordance with Minnesota Investment Statutes, by the adoption of a joint powers agreement in the form of a Declaration of Trust; and WHEREAS, the Declaration of Trust, which has been presented to this Council, authorizes municipalities of the State of Minnesota to become Participants of the Fund and make use from time to time including the 4M Liquid Asset Fund, the 4M Plus Fund, the Term Series, the Fixed Rate Programs, and other Fund services offered by the Fund; and WHEREAS, this Council deems it to be in the best interest for the municipality to make use of, from time to time, the approved services provided by the 4M Fund’s service providers including the Investment Advisor (Prudent Man Advisors, Inc.) or Sub-Advisor (RBC Global Asset Management (U.S.) Inc.), the Administrator (PMA Financial Network, Inc.), the Distributor (PMA Securities, Inc.) or the Fixed Rate Program Providers, PMA Financial Network, Inc. and PMA Securities, Inc., and the Custodian, U.S. Bank National Association, (“Service Providers”) and/or their successors. WHEREAS, this Council deems it advisable for this municipality to enter into the Declaration of Trust and become a Participant of the Fund for the purpose of joint investment with other municipalities so as to enhance the investment earnings accruing to each; now, therefore BE IT RESOLVED AS FOLLOWS: Section 1. This municipality shall become a Participant of the Fund and adopt and enter into the Declaration of Trust, a copy of which shall be filed in the minutes of this meeting. The appropriate officials are hereby authorized to execute those documents necessary to effectuate entry into the Declaration of Trust and the participation of all Fund programs. Section 2. This municipality is authorized to invest monies from time to time and to withdraw such monies from time to time in accordance with the provisions of the Declaration of Trust. The following officers of the municipality or their successors are designated as “Authorized Officials” with authority to effectuate investments and withdrawals in accordance with the Declaration of Trust: Susan K. Iverson Finance Director ____________________________________________ Signature Kristina Handt City Administrator ____________________________________________ Signature (Additional names may be added on a separate list. The treasurer shall advise the Fund of any changes in Authorized Officials in accordance with Fund procedures.) Section 3. The Trustees of the Fund are designated as having official custody of those monies invested in accordance with the Declaration of Trust. Section 4. That the municipality may open depository and other accounts, enter into wire transfer agreements, safekeeping agreements, third party surety agreements securing deposits, collateral agreements, letters of credit, lockbox agreements, or other applicable or related documents with institutions participating in Fund programs including U.S. Bank National Association, or its successor, or programs of PMA Financial Network, Inc. or PMA Securities, Inc. for the purpose of transaction clearing and safekeeping, or the purchase of certificates of 2 deposit (“CDs”) or other deposit products and that these institutions shall be deemed eligible depositories for the municipality. PMA Financial Network, Inc. and PMA Securities, Inc. and their successors are authorized to act on behalf of this municipality as its agent with respect to such accounts and agreements. Monies of this entity may be deposited in such depositories, from time to time in the discretion of the Authorized Officials, pursuant to the Fund’s Programs available through its Services Providers. It is hereby certified that the Council of the City of Lake Elmo adopted this Resolution at a duly convened meeting of the Council held on the 17th day of July, 2018, and that such Resolution is in full force and effect on this date, and that such Resolution has not been modified, amended, or rescinded since its adoption. _____________________________________ Mike Pearson, Mayor ATTEST: _____________________________ Julie Johnson, City Clerk Dated: July 17, 2018 STAFF REPORT DATE: 7/17/18 REGULAR AGENDA ITEM: #13 TO: Council FROM: Emily Becker, Planning Director ITEM: Wyndham Village Preliminary Plat and Zoning Map Amendment REVIEWED BY: Jack Griffin, City Engineer BACKGROUND: The City has received a request from JP Bush Homes for a Preliminary Plat for a ten unit single family detached home development to be called Wyndham Village as well as a Zoning Map Amendment to rezone the property from Rural Single Family Residential to Urban Low Density Residential. REVIEW/ANALYSIS: Applicant: JP Bush Homes, 1980 Quasar Ave S, Lakeland, MN 55043 Property Owners: James McLeod, 11580 30th St N, Lake Elmo, MN 55042 Location: Part of the southwest quarter of the southeast quarter of Section 13, Township 29 North, Range 21West PID: 13-029-21-43-0001 Request: Preliminary Plat and Zoning Map Amendment Existing Land Use: Single Family Detached Residential Home Existing Zoning: RS – Rural Single Family Surrounding Area: North – Northport (Urban Low Density Residential); East – Northport (Urban Low Density Residential); West – Rural Single Family Residential; South – the Homestead (Open Space Preservation Development) Comprehensive Plan: Village Urban Low Density Residential (1.5-2.49 units per acre) Proposed Zoning: V-LDR – Village Urban Low Density Residential (1.5 – 2.49 units per acre) History: The property has long been used as a single family detached dwelling unit. A Comprehensive Plan Amendment to re-guide the property from Rural Single Family to Village Urban Low Density as well as Sketch Plan Review was approved by the City on February 7, 2018 and by Metropolitan Council on March 14, 2018. 2 Deadline for Action: Application Complete – 5/7/2018 60 Day Timeline – 7/6/2018 Extension Sent – N/A Applicable Regulations: Article XII – Urban Residential Districts (LDR) Chapter 153: Subdivision Regulations Usable Backyard Issue. The developer has revised the proposed sketch plan that was previously submitted to the city. The initial sketch plan did not provide backyards that the City had felt were usable, as a 66 foot wide Northern Natural Gas Easement ran along the majority of the backyards of the lots to the west of Liberty Court North. The proposed preliminary plat reduces the number of proposed lots from 13 to 10, as approved by Council, reducing the proposed density from 2.17 units per acre to 1.67 units per acre. Additionally, the developer had provided an exhibit which shows proposed building pad locations that show a 20 foot rear yard principal building setback from the Northern Natural Gas Easement. This exhibit shows that a pool and play set could reasonably fit within these backyards. The standard rear yard setback for properties located within the Village Low Density Residential Zoning District is 20 feet, and so Staff believes that so long as the lots in which the Northern Natural Gas Easement is located maintain a 20 foot principal building rear yard setback from the easement that these proposed lots will provide a sufficient rear yard. This has been added as a recommended condition of approval. Density. The total site acreage is 5.97 acres, and the proposed number of homes is 10. Because none of the area within the proposed preliminary plat can be netted out (i.e. none of it is arterial right-of- way or parkland), the proposed density is 1.67 units per acre. This is within the required density of the Village Urban Low Density (1.5-2.49 units per acre). Greenbelt Buffer. The updated sketch plan increases the greenbelt buffer to the south of the development. Since the initially-proposed sketch plan, the applicant has increased the buffer to approximately 80 feet, which is approximately equal to the buffer provided by the development to the east, Northport. The lot on to which the single family home shall be relocated (Lot 7) does not match this buffer, as the Outlot A does not buffer it from 30th Street. The Village Low Density Residential zoning district designates that residential lots are not to encroach on the Village Open Space Overlay District unless berming or screening protected by a landscape easement is provided as an alternative approved by Council. It is a recommended condition of approval that the applicant provide a detailed site plan for this lot showing the proposed house location and screening/buffering to be approved by Council and protected by a landscape easement. Landscape Plans. The City’s landscape architect has reviewed the landscape plans, but due to insufficient information provided by the applicant has not yet completed review. Approval is contingent upon approved landscape and tree preservation plans being approved by the City’s Landscape Architect. Park Dedication. The proposed development is to the east of Reid Park. With recording of the Northport plat, the City received approximately an additional 12.5 acres of parkland for an extension of Reid Park. The Neighborhood Park Search Area map of the Comprehensive Plan’s Parks and Recreation Plan does not identify this area for a neighborhood park. Therefore, Staff would not recommend that parkland be dedicated within this development and that the City accept fees in lieu of parkland dedication. Per the City’s Subdivision Ordinance, 10% of the fair market value of the 3 land will need to be paid as the parkland dedication fee. The fair market value of the land is determined by current market data, if available, or by obtaining an appraisal from a licensed real estate appraiser, and the subdivider is required to pay for the appraisal. In this case, if the owner of the property will be selling the land to the Applicant to be developed, there will be current market data available. If the owner is not selling the land, an appraisal to determine the fair market value will likely be required in order to determine the amount of parkland dedication the City will receive. The Parks Commission reviewed the proposed sketch plan at its November 2017 meeting and recommended that there be a fee paid lieu of park land and that a trail connection connecting the cul- de-sac to 30th Street would not be desirable because pedestrian crossings are preferred at controlled intersections and that there is a hill at the location of the cul-de-sac, which would create a safety hazard. Trails. No trails are being proposed within the development, only a sidewalk on the west side of Liberty Court North. There is already a trail along the south of 30th Street, and the developers of Northport will be constructing a segment of a trail from the southern edge of that development off Liberty Court North. This trail segment will not connect to the existing trails in Reid Park, however, as approved by Council. The City may extend this trail through to the existing trails in Reid Park in the future. The City’s trail plan indicates a trail along 30th Street North, which already exists on the south side of the street. 4 Access. Access to the proposed lots will be provided from Lower 31st Street North to the north of the subject property (part of the Northport development). Access to this parcel was pre-planned with the adjacent subdivision in order to preserve the proper access management along 30th Street North. The existing driveway will be eliminated as suggested by Staff. Access to the new Lot 7 is proposed to be provided off the cul-de-sac of Liberty Court North. Streets. The proposed streets appear to be meeting the City’s minimum standards: • Liberty Court is proposed to be 28-feet wide within a 60-foot right-of-way; • A 60 foot cul-de-sac right-of-way width is provided with a 45 foot pavement radius; • The cul-de-sac length is proposed to be 510 feet long; • There is a proposed sidewalk to the west of this street. The residential maximum longitudinal grade is 6% with a sidewalk which appears to be feasible. Potential connections to this sidewalk should be considered moving forward. • Surmountable concrete curb and gutter needs to be installed in single family areas with future driveways. Street Naming. The proposed name of Liberty Court is consistent with the City’s Street Naming Policy in that it starts with Li-, which is appropriate within the grid system. There are existing Li- streets both west and far east of this development on the grid pattern, and so it does not necessarily make sense to use an existing street’s name, as it is not specifically in line with an existing street on the grid. Additionally, Northport Final Plat has already been recorded providing a street stub in to this development with the name of Liberty Court N. Utilities – Municipal Water Supply and Municipal Sanitary Sewer. Public water and sanitary sewer service will be extended to the site with the development of Northport. The preliminary plans will need to include detailed utility construction plans that meet City engineering standards. Existing Trail 5 Environmental Review. The proposed development is within the Village Alternative Urban Area Wide Review (AUAR), which was completed in order to address the expected cumulative environmental impacts associated with the anticipated growth and development within the Village. City Engineer Review. The City Engineer’s review comments are found as part of the attachments. Items of note are as follows. These are included as recommended conditions of approval. • Preliminary plat and plans should be revised to dedicate additional right-of-way along 30th Street and/or to expand the storm water to the 100-year High Water Level (HWL) flood area. • Written easement owner permission must be obtained, and copies provided to the City, for work to be completed within the Northern Natural Gas easement. The City must receive copies of the written permission prior to approval of the final plat. • Written landowner permission must be submitted as part of the final plat development applications for any off-site grading work and storm water discharges to adjacent properties. • There were a number of other amendments required to the plan for approval, which can be reviewed in the memo. It is a recommended condition of approval that all of these comments be addressed on the plans prior to submission of final plat for approval. Fire Chief and Building Official Review. The Fire Chief and Building Official worked with Engineering to address any issues with this plat and provided no further comment. Airport. The proposed development is not within the Lake Elmo Airport Existing Runway Protection Zones; however, the Metropolitan Airports Commission was given the opportunity to review the proposed development with the Preliminary Plat application and has provided a review memo, attached. From this review memo, it is a recommended condition of approval that the applicant be required to submit a disclosure statement (similar to that required of homes within Easton Village) that alerts prospective buyers about the proximity of the development to the airport and encourages appropriate noise attenuation construct practices for residential structures. Lot Dimensions and Bulk Requirements. The proposed sketch plan appears to the meet the lot dimensions and bulk requirements for the Village Urban Low Density Residential zoning district, except for Lot 1. This is the only lot that does not meet the required lot width at the setback line. It is a recommended condition of approval that this lot width be increased to 70 feet. Standard Required Proposed Minimum Lot Area 9,000 square feet 9,185 square feet – 41,980 square feet (average of 16,423 square feet) Minimum Lot Width 70 feet 65-229.30 feet Maximum Impervious Surface 35% Unknown Minimum Front Yard Setback 25 feet Grading plan indicates this can be met Minimum Interior Sideyard Setback (principal buildings) 10 feet Grading plan indicates this can be met 6 Minimum Interior Sideyard Setback (accessory structures) 5 feet N/A Minimum Corner Sideyard Setback 15 feet N/A Minimum Rear Yard Setback 20 feet All required rear yard setbacks appear to be met, including from the Northern Natural Gas Easement Outlot A. Outlot A will be City-owned for ponding purposes. This development will also utilize Outlot H of Northport, which contains an infiltration basin. Lot Easements. Lot easements (front, rear and side yard) need to be shown on the plan meeting City requirements. Zoning Map Amendment. Zoning Map Amendments are typically processed during preliminary plat. As such, the applicant has requested a Zoning Map Amendment to rezone the property from Rural Single Family to Urban Low Density Residential. The properties to the north and east of the subject parcel are guided for Village Urban Low Density (V-LDR) and have been re-zoned to Urban Low Density Residential. This was because when these properties received Preliminary Plat approval, there did not exist a Village Urban Low Density zoning district. The V-LDR ordinance was created on 5/26/17. While it would be preferable that the property be rezoned the Urban Low Density in order to align with the zoning of surrounding parcels, the Zoning Code states that densities within the Urban Low Density Zoning District shall range from two 2 to 4 units per acre. Because the proposed density of the development is not within the 2-4 units per acre range, it is not appropriate to re-zone Urban Low Density Residential as the adjacent parcels are zoned. As such, Staff would recommend that the property be re-zoned V-LDR. This is consistent with the Comprehensive Plan in that the parcel is now guided for Village Urban Low Density Residential, as approved by the City Council on February 7, 2018 and the Metropolitan Council on March 14, 2018. Planning Commission Review. The Planning Commission held a public hearing and considered the proposed Preliminary Plat and Zoning Map Amendment at its June 4, 2018 meeting. At the public hearing, there was concern brought up about the density and the greenbelt buffer encroaching on Lot 7. It was clarified that the zoning is Village Low Density Residential, which is not the same as Low Density Residential, and that the Village Low Density Residential zoning district requires that buffering/screening be provided on residential lots that encroach the Village Open Space Overlay District. As such, there was an added aforementioned condition of approval that the applicant provide a detailed site plan that showed the proposed house location along with screening and buffering to be approved by Council and protected by a landscape easement. There was also an adjacent property owner who questioned if he would be able to develop similarly to this parcel, as his property also has the Northern Easement running through it. It was clarified that the Draft 2040 Comprehensive Plan also guides his parcel as Village Low Density Residential, and so as long as he came up with a plan that worked and went through the required application processes and the development adhered to all City Code requirements and standards, then the property could develop. 7 Recommended Findings. Staff recommends the following findings in regards to the proposed Preliminary Plat: 1) That the Wyndham Village preliminary plat is consistent with the Lake Elmo Comprehensive Plan and the Future Land Use Map for this area. 2) That the Wyndham Village preliminary plat complies with the City’s Village Urban Low Density Residential zoning districts with required condition of approval. 3) That the Wyndham Village preliminary plat complies with all other applicable zoning requirements, including the City’s landscaping, storm water, sediment and erosion control and other ordinances, and is consistent with the City’s engineering design standards with corrections as noted by the City Engineer Review Memo dated May 30, 2018. 4) That the Wyndham Village preliminary plat complies with the City’s subdivision ordinance. Recommended Conditions of Approval. Staff recommends the following conditions of approval: 1. That the City approve a Zoning Map Amendment to rezone the property from Rural Single Family to Village Low Density Residential 2. Homes within lots in which the Northern Natural Gas Company Easement (Document 384029) (“Northern Easement”) is located shall maintain a 20 foot principal building rear yard setback from the Northern Easement. 3. All required modifications to the plans as requested by the City Engineer in a review letter dated May 30, 2018 shall be incorporated into the plans, and plans shall be approved prior to consideration of a final plat. 4. Preliminary plat and plans should be revised to dedicate additional right-of-way along 30th Street and/or to expand the storm water to the 100-year High Water Level (HWL) flood area. 5. Written easement owner permission must be obtained, and copies provided to the City, for work to be completed within the Northern Easement. The City must receive copies of the written permission prior to approval of the final plat. 6. Written landowner permission must be submitted as part of the final plat development applications for any off-site grading work and storm water discharges to adjacent properties. 7. The developer shall pay a cash contribution in lieu of land for park dedication equal to 10% of the fair market value of the entire parcel. 8. The developer shall obtain all required permits from Northern Natural Gas to perform construction work over the gas line that runs from north to south across this site. 9. The preliminary landscape plan shall be approved by the City prior to recording of the final plat. 10. The lot width of Lot 1 shall be increased to 70 feet, and all other lot dimension and bulk requirements of the Village Urban Low Density zoning district must be met. 11. The applicant shall provide a disclosure statement to all first homeowners in the development advising of the airport and associated over-flights as well as its proximity to the railroad and associated noise and vibration. 8 12. All builders shall be encouraged to incorporate interior noise reduction measures into single family residential structures within the subdivision based on the Metropolitan Council’s Builder Guide. 13. All easements as requested by the City Engineer and Public Works Department shall be documented on the Final Plat prior to the execution of the final plat by City Officials. 14. Prior to recording the Final Plat, the Developer shall enter into a Developers Agreement acceptable to the City Attorney that delineates who is responsible for the design, construction, and payment of public improvements. 15. The Applicant shall provide a detailed site plan for Lot 7 showing the proposed house location and screening/buffering to be approved by Council and protected by a landscape easement. FISCAL IMPACT: There would be no fiscal impact to the City at this time, as the developer would be required to pay for any amendments needed to accommodate the increase in REC units. When the property develops, it will have urban services and will pay sewer and water connection charges, building permit fees and the like. OPTIONS: • Approve the proposed preliminary plat and zoning map amendment with recommended findings and conditions of approval. • Amend Staff and Planning Commission-recommended findings and conditions of approval and approve the proposed preliminary plat and zoning map amendment. • Do not approve the proposed preliminary plat and zoning map amendment, directing Staff to draft findings for denial and bring back to a future meeting. RECOMMENDATION: Staff and the Planning Commission recommend approval of the Wyndham Village Preliminary Plat and Zoning Map Amendment. “Move to adopt Ord. 08-212 approving the proposed Zoning Map Amendment to rezone 11580 30th Street North from Rural Single Family to Village Urban Low Density Residential” “Move to adopt Resolution 2018-066 approving the Wyndham Village Preliminary Plat subject to recommended findings and conditions of approval.” ATTACHMENTS: 1. Application and Narrative 2. Preliminary Plat 3. Preliminary Landscape Plans 4. Engineer Review Memo 5. Metropolitan Airports Commission Review Memo 6. Resolution 2018-066 approving Preliminary Plat 7. Ord. 08-212 approving the Zoning Map Amendment   PAGE 1 of 4  MEMORANDUM         Date:  May 30, 2018      To: Emily Becker, Planning Director Re: Wyndham Village Preliminary Plan Review  Cc:  Rob Weldon, Public Works Director  Chad Isakson, Assistant City Engineer     From: Jack Griffin, P.E., City Engineer          An engineering review has been completed for Wyndham Village. Preliminary Plat/Plans were received on May 8,  2018. The submittal consisted of the following documentation:     Wyndham Village Preliminary Plat, dated May 4, prepared by Landmark Surveying, Inc.   Wyndham Village Preliminary Plans, Sheets C1.1‐C5.2, dated May 4, 2018, prepared by Plowe Engineering.   Stormwater Management Plan, dated May 8, 2018, prepared by Plowe Engineering.   Landscape Plans, Sheets L1‐L5, dated May 7, 2018, prepared by CalYX Design Group.   Preliminary Plan Narrative, dated May 4, 2018, prepared by J.P.Bush Homes.      STATUS/FINDINGS:  Engineering has prepared the following review comments:      PRELIMINARY PLAT   Preliminary plat approval should be contingent upon all public improvements that support the development  being designed and constructed in accordance with the City Engineering Design Standards Manual dated  March 2017 and as identified within this plan review memorandum.   Preliminary plat approval should also be contingent upon the preliminary plans being revised and approved  by the City prior to the City accepting an application or plans for final plat.   Right‐of‐way/Easement Dedication. The Preliminary Plat and all preliminary plan sheets must be revised to  dedicate additional right‐of‐way along 30th Street North to ensure a minimum 30th Street boulevard of 16  ft. along the entire length of the plat. The current plans show a varied boulevard width from 11‐25 feet. In  addition, a 10 ft. utility corridor must be reserved (at boulevard grades) for small utilities. The proposed  storm water facilities (including the 100‐year HWL) must be revised further north to prevent encroachment  onto the 10 ft. utility corridor.   Outlot A must be dedicated to the City for storm water maintenance. Outlot A has been shown as City‐ owned on the preliminary plat and plans as required. Outlot A may need to be revised to accommodate  additional right‐of‐way along 30th Street and/or to expand the storm water 100‐year HWL flood area.    Drainage and utility easements are required over all storm sewer, sanitary sewer and watermain not located  on City Outlots and right‐of‐way, minimum 30‐feet in width centered on the pipe/structure. Easements  must be shown on the Preliminary Plat, Utility Plans and Grading Plans.    Additional easement is required over the storm sewer outfall pipe between Lots 5 and 6.   Additional easement is required for the proposed Lot 7 driveway culvert.  FOCUS ENGINEERING, inc.  Cara Geheren, P.E.  651.300.4261  Jack Griffin, P.E.               651.300.4264  Ryan Stempski, P.E. 651.300.4267  Chad Isakson, P.E. 651.300.4283    PAGE 2 of 4   Additional easement is required over Lot 6 for the sanitary sewer pipe from MH‐2 to MH‐3, or this pipe  must be realigned to the center of the Lot 7 driveway.   All emergency overflow elevations must be fully protected by drainage easement.   Written easement owner permission must be obtained, and copies provided to the City, for work to be  completed within the gas main easement. The City must receive copies of the written permission prior to  the approval of final plat.   Written  landowner  p ermission m ust  be  s ubmitted  as part  o f  the  f inal plat development applications for any  off‐site grading work and storm water discharges to adjacent properties.    Access Management. The Preliminary Plans shows access to the plat from the Northport subdivision along  Liberty Court. This access was pre‐planned with the adjacent subdivision and preserves the proper access  management along 30th Street North.     STORMWATER MANAGEMENT   The site plan is subject to a storm water management plan meeting State, VBWD and City rules. Additional  City review is necessary for plan changes made to meet these requirements.   Storm water facilities proposed as part of the site plan to meet State and VBWD permitting requirements  must be constructed in accordance with the City Engineering Design Standards Manual.   The storm water management must be revised to demonstrate rate control for each discharge location  rather than a combined discharge. The model must also be revised to correct the pre and post drainage  areas based on existing contours rather than property lines.    The model must evaluate the HWL changes to the Northport Infiltration basin due to areas of direct  discharge and plan revisions must be made to ensure the HWL does not increase.   The model must be revised to include the 10‐day 100‐year snowmelt condition.   The storm water management plan must demonstrate volume control requirements being met.   The storm water management plan executive summary must identify the rate control for each discharge  point and summarize the BMP normal water and resulting high water levels for each basin.     GRADING, DRAINAGE AND EROSION CONTROL   Add north arrow and plan scale.   Add Grading and Erosion Control City Standard Plan Notes dated March 2017 (Details 600A, 600B, 600C, and  600D) to the plan.   Add all lot corner elevations.   The grading plans must be updated to provide all existing conditions along 30th Street including right‐of‐way  widths, street widths from centerline, lane configurations, signs, and all other physical features.    The plans must show all existing and proposed normal water level (NWL) and high water level (100‐year  HWL) for all water bodies within and adjacent to the property, including Northport infiltration basin. Add  100‐year HWL contour for all ponds and verify that the 100‐year HWL is fully contained within the Outlot.  This information is incomplete and must be revised for further review.   The plans must be updated to show the pond maintenance access roads to the facilities and must be a  minimum of 20 ft. wide and at grades that do not exceed 10%.   The plans must show a 10:1 aquatic bench and 10:1 maintenance bench around the storm water pond.   The Stormwater Facility Outlots must fully incorporate the 100‐year HWL, 10‐foot maintenance bench and  all maintenance access roads.   Add Outlet Control structure meeting City standards to replace the 15‐ft. wide pond overflow as the primary  outlet. The overflow should remain as an emergency overflow.     RESIDENTIAL STREETS     Public street standards. Liberty Court must be designed to meet the City’s Engineering Design Standards. A  60 ft. right‐of‐way width with 28 ft. wide street has been shown as required; and a 60 ft. cul‐de‐sac R/W  radius with 45 ft. cul‐de‐sac pavement radius has been shown as required.    PAGE 3 of 4   Liberty Court will result in a 510 ft. long cul‐de‐sac, meeting City standards.    Surmountable concrete curb and gutter shall be installed in single family residential areas with future  driveways.    Pedestrian facilities: A 6 ft. wide sidewalk has been shown along Liberty Court as required. The City should  review any potential connections to this sidewalk.   Ten (10) foot utility easements are required on either side of all right‐of‐ways.    STREET AND STROM SEWER PLANS   Correct plan view scale.   Label street and right‐of‐way width, and label cul‐de‐sac pavement and right‐of‐way radius.   Label concrete sidewalk width on the plan.   Add pedestrian ramp (call‐out in plan view) where sidewalk terminates at cul‐de‐sac.   Add City standard Typical Section per City detail 805 on the street plans. All information shown in the City  details must be shown on the typical section including cross‐slopes, boulevard tree setbacks, sidewalk  location and 10‐ft. small utility corridors on each side of right‐of‐way.   Add City standard detail 801 on the street plans to detail the minimum project pavement section.   Add City Standard Sidewalks and Trails Plan Notes dated March 2017 (Detail 500A).   Add City Standard Storm Sewer Plan Notes dated March 2017 (Detail 400A).   Revise street profile to meet City standards for vertical crest curve K= 19 minimum.   Label all storm sewer structures including FES.   The storm sewer system shall be designed to maintain the City standard minimum pipe cover of 3.0 feet.  Revise storm sewer from CBMH to FES to maintain minimum 3‐ft. pipe cover.   Per City requirements all storm sewer pipe easements must be a minimum 30‐feet in width. Additional  easement is required over Lots 5 and 6 to provide a minimum 30‐ft easement centered over the pipe.   Add profile for proposed driveway culvert and verify 30 ft. easement over pipe and structures.   Add storm sewer structure table showing casting type and build.   Call‐out sump manhole in plan view.    Drain tile is required as part of the City standard street section at all localized low points in the street.  Coordinate with Northport to extend drain tile per City standards, minimum 100 ft. on each side of road,  from existing catch basins in Northport development, south along Liberty Court. End each drain tile with a  clean‐out.    MUNICIPAL WATER SUPPLY   Municipal water supply is available immediately adjacent to the proposed development along Liberty Court.  The applicant is responsible to extend the municipal water into the development site at developer’s cost.   No trunk watermain oversizing applies.    MUNICIPAL SANITARY SEWER   Municipal sanitary sewer is available immediately adjacent to the proposed development along Liberty  Court. The applicant is responsible to extend sanitary sewer into the development site at developer’s cost.   No trunk sewer oversizing applies.    SANITARY SEWER AND WATERMAIN PLANS   Add plan scale and north arrow.   Add City Standard Watermain Plan Notes dated March 2017 (Detail 200A) to the utility plan.   Add City Standard Sanitary Sewer Plan Notes dated March 2017 (Detail 300A) to the utility plan.   Add existing gas main(s) and show pipe size, material and location (dimensions from easement edge). Gas  main depths must be field verified and placed on the plans at water/sewer service crossing.   Add and clearly show gas main easement area and contact information.    PAGE 4 of 4   Extend water and sewer service for Lot 7 completely across gas main easement as part of the development  improvements. Show extensions on the utility plan.   Revise 6” PVC sewer pipe with City minimum 8” PVC sewer main.     Realign the sewer pipe to the centerline of the Lot 7 drainage and utility easement. The pipe requires a  minimum 30‐ft easement centered over the pipe.   Relocate MH‐3 to remain a minimum 15‐ft outside of the gas main easement.   Add water and sewer service stubs to each lot including sewer stub invert.   All water/sewer stubs must be perpendicular to the street. Watermain and sewer main realignment will  be necessary in the cul‐de‐sac to meet this requirement.    Sanitary sewer service pipe to be called‐out as Schedule 40 and stubbed 10ft. beyond the right‐of‐way.   All curb stops to be located 10 ft. beyond the right‐of‐way.   Water/sewer stubs cannot terminate within a paved driveway surface.   Add sewer manhole to realign watermain/sewer main to remain under bituminous paved surface.    SIGNING/PAVEMENT MARKING/LIGHTING PLAN   Add signing, pavement marking and lighting plan per City standard plan format. Update sheet index.   Add Signing/Pavement Markings/Lighting Plan Notes dated March 2017 (Detail 900A).   Add one City standard light pole at the end of the cul‐de‐sac.   Add Street Light Note to indicate “Residential street lights shall be Xcel Energy 100W HPS California Acorn  (Black in Color) with a 15 ft. Aluminum Pole (Black in Color)”.   Add three (3) “No Parking” signs for no parking around cul‐de‐sac. No parking signs to be MnMUTCD R8‐3,  18”x18”.    DETAILS   Sheets C4.1‐C4.3. Add City details 210, 419, 420, 507A‐E, 508, 511, 514, 805, 901, 902, and 903.    SPECIFICATIONS   Submit Project Specifications for Wyndham Village for staff review using the City Standard Specifications  dated March 2017.   If supplementary specifications are also submitted, the following statement must be placed as the first clause  of the supplementary provisions, “The City Standard Specifications for Public Infrastructure, dated March  2017, shall apply to the work performed under this contract. Any supplemental specifications are intended to  supplement  the  City  Standard  Specifications,  however  they  do  NOT  supersede  the  City  Standard  Specifications, Details, Design Standards, or ordinances unless specific written approval has been provided  by the City.”    LANDSCAPE PLAN:   This review does not cover the Landscape Plan or Irrigation Plan. Plan review to be completed by other City  representatives.   The Landscape Plans must be revised to accommodate maintenance access  to a ll storm water BMPs. Grades  along pond access cannot exceeded 10% and must be a minimum of 20 feet in width. Maintenance access  from public right‐of‐ways must be shown on the Landscape Plans.             CITY OF LAKE ELMO WASHINGTON COUNTY, MINNESOTA RESOLUTION NO. 2018-066 A RESOLUTION APPROVING A PRELIMINARY PLAT FOR WYNDHAM VILLAGE WHEREAS, the City of Lake Elmo is a municipal corporation organized and existing under the laws of the State of Minnesota; and WHEREAS, the Lake Elmo Planning Commission reviewed a proposed Sketch Plan and Comprehensive Plan Amendment Request for Wyndham Village on November 13, 2017; and WHEREAS, the Lake Elmo City Council reviewed a proposed Sketch Plan and approved a Comprehensive Plan Amendment Request for Wyndham Village on February 20, 2018; and WHEREAS, the Metropolitan Council approved a Comprehensive Plan Amendment to re-guide the land use of Wyndham Village from Rural Single Family to Village Low Density Residential on March 14, 2018; and WHEREAS, JP Bush, 11580 30th St N, Lakeland, MN 55043 has submitted an application to the City of Lake Elmo (City) for a Preliminary Plat for Wyndham Village, a copy of which is on file in the City of Lake Elmo Planning and Zoning Department; and WHEREAS, the Lake Elmo Planning Commission held public hearing on June 4, 2018 to consider the Preliminary Plat request; and WHEREAS, the Lake Elmo Planning Commission has submitted its report and recommendation concerning the Preliminary Plat as part of a memorandum to the City Council from for the July 3, 2018 Council Meeting; and WHEREAS, the Lake Elmo Planning Commission adopted a motion recommending approval of the Preliminary Plat; and WHEREAS, the City Council reviewed the Preliminary Plat at its meeting held on June 19, 2018 and made the following findings of fact: 1) That the Wyndham Village preliminary plat is consistent with the Lake Elmo Comprehensive Plan and the Future Land Use Map for this area. 2) That the Wyndham Village preliminary plat complies with the City’s Village Urban Low Density Residential zoning districts with required condition of approval. 3) That the Wyndham Village preliminary plat complies with all other applicable zoning requirements, including the City’s landscaping, storm water, sediment and erosion control and other ordinances, and is consistent with the City’s engineering design standards with corrections as noted by the City Engineer Review Memo dated May 30, 2018. 4) That the Wyndham Village preliminary plat complies with the City’s subdivision ordinance. NOW, THEREFORE, BE IT RESOLVED THAT the City Council does hereby approve the preliminary plat for Wyndham Village subject to the following conditions: 1) That the City approve a Zoning Map Amendment to rezone the property from Rural Single Family to Village Low Density Residential 2) Homes within lots in which the Northern Natural Gas Company Easement (Document 384029) (“Northern Easement”) is located shall maintain a 20 foot principal building rear yard setback from the Northern Easement. 3) All required modifications to the plans as requested by the City Engineer in a review letter dated May 30, 2018 shall be incorporated into the plans, and plans shall be approved prior to consideration of a final plat. 4) Preliminary plat and plans should be revised to dedicate additional right-of-way along 30th Street and/or to expand the storm water to the 100-year High Water Level (HWL) flood area. 5) Written easement owner permission must be obtained, and copies provided to the City, for work to be completed within the Northern Easement. The City must receive copies of the written permission prior to approval of the final plat. 6) Written landowner permission must be submitted as part of the final plat development applications for any off-site grading work and storm water discharges to adjacent properties. 7) The developer shall pay a cash contribution in lieu of land for park dedication equal to 10% of the fair market value of the entire parcel. 8) The developer shall obtain all required permits from Northern Natural Gas to perform construction work over the gas line that runs from north to south across this site. 9) The preliminary landscape plan shall be approved by the City prior to recording of the final plat. 10) The lot width of Lot 1 shall be increased to 70 feet, and all other lot dimension and bulk requirements of the Village Urban Low Density zoning district must be met. 11) The applicant shall provide a disclosure statement to all first homeowners in the development advising of the airport and associated over-flights as well as its proximity to the railroad and associated noise and vibration. 12) All builders shall be encouraged to incorporate interior noise reduction measures into single family residential structures within the subdivision based on the Metropolitan Council’s Builder Guide. 13) All easements as requested by the City Engineer and Public Works Department shall be documented on the Final Plat prior to the execution of the final plat by City Officials. 14) Prior to recording the Final Plat, the Developer shall enter into a Developers Agreement acceptable to the City Attorney that delineates who is responsible for the design, construction, and payment of public improvements. 15) The Applicant shall provide a detailed site plan for Lot 7 showing the proposed house location and screening/buffering to be approved by Council and protected by a landscape easement. Passed and duly adopted this 3rd day of July 2018 by the City Council of the City of Lake Elmo, Minnesota. ___________________________________ Mike Pearson, Mayor ATTEST: ____________________________________ Julie Johnson, City Clerk 1 CITY OF LAKE ELMO COUNTY OF WASHINGTON STATE OF MINNESOTA ORDINANCE NO. 08-212 AN ORDINANCE AMENDING THE LAKE ELMO CITY CODE OF ORDINANCES BY AMENDING THE OFFICIAL ZONING MAP OF THE CITY OF LAKE ELMO SECTION 1. The City Council of the City of Lake Elmo hereby ordains the following properties to be rezoned from RS – Rural Single Family to V-LDR Village Low Density Residential: Section 13 Twp 029 Range 021. The east 460.50 feet of the west 1273.00 feet of the south 498.60 feet, and also the east 139.50 feet of the west 812.50 feet of the south 219.30 feet of the SW ¼ of Section 13, Township 29, Range 21. PID# 13.029.21.43.0001. SECTION 2. The City Council of the City of Lake Elmo also hereby ordains that the Zoning Administrator shall make the applicable changes to the official Zoning Map of the City of Lake Elmo. SECTION 3. Effective Date. This ordinance shall become effective immediately upon adoption and publication in the official newspaper of the City of Lake Elmo. SECTION 4. Adoption Date. This Ordinance 08-212 was adopted on this __ day of _____, 2018, by a vote of ___ Ayes and ___ Nays. LAKE ELMO CITY COUNCIL ___________________________________ Mike Pearson, Mayor ATTEST: __________________________________ Julie Johnson, City Clerk This Ordinance 08- was published on the ____ day of ___________________, 2018. STAFF REPORT DATE: 7/17/18 REGULAR ITEM #: 14 TO: City Council FROM: Emily Becker, Planning Director AGENDA ITEM: Reconsideration of Wildflower at Lake Elmo Planned Unit Development (PUD) Amendment REVIEWED BY: Kristina Handt, City Administrator BACKGROUND: Council has requested to reconsider the PUD Amendment that was approved on June 6, 2017. The PUD amendment afforded the following flexibilities for the development, in addition to the flexibilities already allowed per the resolution approving the Preliminary PUD: • Conservation and Prairie Lots will have setbacks consistent with the LDR zoning. • Reduced rear yard setback on Lots 17 and 18, Block 3, Wildflower 1st Addition shall be 15 feet. • Driveway locations will be flexible on Lots 12, 13 and Lot 17, Block 3, Wildflower 1st Addition; and the highlighted lots in phase 3 shown on Exhibit A • Up to 6% impervious coverage is allowed beyond the 50% impervious coverage maximum for the courtyard lots if the additional impervious utilizes pervious paving. • A single 400 sq. ft. storage structure shall be allowed on Outlot A, Wildflower 2nd Addition subject to a 10’ setback from public R/W and an additional 200 sq. ft. covered trellis area attached to the garage. The focus of the requested amendment is on the requirement that 6% increase in impervious coverage utilize pervious paving. The original PUD did not address impervious surface, and so the base zoning district regulations (maximum 50% impervious surface) apply. The reason for the request was because a builder within the development had requested a building permit that provided a survey that did not meet that maximum impervious surface requirements. Subsequent to the PUD amendment approval, that builder had submitted for a building permit application which proposed impervious surface coverage of 52.4%. The builder had agreed and indicated on the building permit application to install permeable pavers for the driveways. While Staff suggested that the builder instead amend the layout of the site to decrease impervious surface to 50% in order to avoid having City Council Meeting 7/17/2018 Page 2 to install the pervious pavers, as the 2.4% increase only requires removal of 163 square feet of impervious surface, but the builder was not open to this idea. Recently, that same builder has come back to the City asking for an alternative solution because of the cost of these pavers. ISSUE BEFORE COUNCIL: The issue before Council is whether to approve or deny an amendment to the Resolution approving a PUD Amendments previously requested by Engstrom Companies for the Wildflower at Lake Elmo PUD. PROPOSAL DETAILS/ANALYSIS: Stormwater. Staff had contacted the Valley Branch Watershed District had indicated that the provided storwmater treatment volume is adequate for the PUD amendment request. Additionally, the City Engineer has stated that generally pervious pavers do not necessarily decrease runoff. As such, Staff has prepared a Resolution which removes the requirement that the increase in impervious surface utilize pervious pavers. Alternative Mitigation. If the Council would still like to mitigate the increased impervious surface, the amendment may be made to provide the option of installing a raingarden. In order to mitigate the increase in 163 square feet, a raingarden 14.94 cubic feet in size would need to be installed on the property (163 square feet * 1.1 inches * one foot/12 inches=14.94). As such, Staff has prepared two resolutions in the case Council would like to go in this direction. Additional Note. It should be noted that no building permits have been issued in the Wildflower Development since the PUD amendment was approved. Therefore, no applicant has been required to install pervious pavers. Public Hearing Required. Since the PUD amendments have already been approved by Council and in effect have amended the PUD, and a PUD amendment requires a public hearing, Council will need to hold a public hearing. Notice has been published in the official City newspaper, and notices have been sent to property owners within 350 feet of the development as required by ordinance. FISCAL IMPACT: None. OPTIONS: The Council has the following options: 1. Adopt Resolution 2018-074 amending the Wildflower Planned Unit Development, not requiring utilization of pervious pavers for impervious coverage over 50% to 56% 2. Adopt Resolution 2018-074a adding an option for a raingarden in addition to pervious pavers to mitigate impervious coverage over 50% to 56% 3. Amend Resolution 2018-074 and adopt as amended 4. Do not adopt Resolution 2018-074 City Council Meeting 7/17/2018 Page 3 RECOMMENDATION: Staff recommends that Council amend the Resolution approving the Wildflower at Lake Elmo PUD amendment by either removing the requirement that impervious coverage above 50% - 56% require pervious pavers or adding the option of installing a raingarden to mitigate the increase. “Move to adopt Resolution 2018-074/2018 074a approving the Wildflower at Lake Elmo Planned Unit Development PUD Amendment.” ATTACHMENTS: • Resolution 2018-074 removing pervious pavers requirement • Resolution 2018-074a adding option for raingarden Resolution No. 2018-074 CITY OF LAKE ELMO WASHINGTON COUNTY, MINNESOTA RESOLUTION NO. 2018-074 A RESOLUTION APPROVING THE WILDFLOWER AT LAKE ELMO PLANNED UNIT DEVELOPMENT AMENDMENTS WHEREAS, the City Council adopted Resolution 2015-023 approving the Wildflower at Lake Elmo PUD Preliminary Plat and Preliminary Plans on April 7, 2015; and WHEREAS, the City Council adopted Resolution 2015-060 on July 21, 2015 approving the Final Plat and Final PUD plans for Wildflower at Lake Elmo 1st Addition; and WHEREAS, the City Council adopted Resolution 2016-106 on December 6, 2016 approving the Final Plat and Final PUD plans for Wildflower at Lake Elmo 2nd Addition: and WHEREAS, the City Council adopted Resolution 2018-025 on March 20, 2018 approving the Final Plat and Final PUD plans for Wildflower at Lake Elmo 3rd Addition; WHEREAS, Robert Engstrom Companies made application for amendments to the approved Planned Unit Development Plans and Agreement on April 21, 2017; and WHEREAS, the City Council adopted Resolution 2017-048 approving amendments to the approved Planned Unit Development Plans and Agreement on June 6, 2017; and WHEREAS, the City Council wishes to reconsider previously approved amendments to the approved Planned Unit Development Plans and Agreement NOW, THEREFORE, based upon the testimony elicited and information received, the City Council makes the following: FINDINGS 1. The PUD amendment is consistent with the Comprehensive Plan designation for the subject property. 2. The PUD amendment is generally consistent with the Wildflower at Lake Elmo PUD Concept Plan and Preliminary PUD Plans. 3. The PUD amendment has provided the City additional benefit in exchange for additional PUD flexibility consistent with the PUD regulations. 4. The PUD amendment meets the PUD objectives set forth in Section 154.751 of the City Code. 2 Resolution No. 2018- 5. The PUD amendment will have no impact on stormwater management for the development. 6. That the proposed PUD will allow a more flexible, creative, and efficient approach to the use of the land with the following amendments: o Up to 6% impervious coverage is allowed beyond the 50% impervious coverage maximum for the courtyard lots. CONCLUSIONS AND DECISION Based on the foregoing, the PUD Amendment is approved. Passed and duly adopted this 17th day of July, 2018 by the City Council of the City of Lake Elmo, Minnesota. __________________________________ Mike Pearson, Mayor ATTEST: ________________________________ Julie Johnson, City Clerk Resolution No. 2018-074 CITY OF LAKE ELMO WASHINGTON COUNTY, MINNESOTA RESOLUTION NO. 2018-074a A RESOLUTION APPROVING THE WILDFLOWER AT LAKE ELMO PLANNED UNIT DEVELOPMENT AMENDMENTS WHEREAS, the City Council adopted Resolution 2015-023 approving the Wildflower at Lake Elmo PUD Preliminary Plat and Preliminary Plans on April 7, 2015; and WHEREAS, the City Council adopted Resolution 2015-060 on July 21, 2015 approving the Final Plat and Final PUD plans for Wildflower at Lake Elmo 1st Addition; and WHEREAS, the City Council adopted Resolution 2016-106 on December 6, 2016 approving the Final Plat and Final PUD plans for Wildflower at Lake Elmo 2nd Addition: and WHEREAS, the City Council adopted Resolution 2018-025 on March 20, 2018 approving the Final Plat and Final PUD plans for Wildflower at Lake Elmo 3rd Addition; WHEREAS, Robert Engstrom Companies made application for amendments to the approved Planned Unit Development Plans and Agreement on April 21, 2017; and WHEREAS, the City Council adopted Resolution 2017-048 approving amendments to the approved Planned Unit Development Plans and Agreement on June 6, 2017; and WHEREAS, the City Council wishes to reconsider previously approved amendments to the approved Planned Unit Development Plans and Agreement NOW, THEREFORE, based upon the testimony elicited and information received, the City Council makes the following: FINDINGS 1. The PUD amendment is consistent with the Comprehensive Plan designation for the subject property. 2. The PUD amendment is generally consistent with the Wildflower at Lake Elmo PUD Concept Plan and Preliminary PUD Plans. 3. The PUD amendment has provided the City additional benefit in exchange for additional PUD flexibility consistent with the PUD regulations. 4. The PUD amendment meets the PUD objectives set forth in Section 154.751 of the City Code. 2 Resolution No. 2018- 5. The PUD amendment will have no impact on stormwater management for the development. 6. That the proposed PUD will allow a more flexible, creative, and efficient approach to the use of the land with the following amendments: o Up to 6% impervious coverage is allowed beyond the 50% impervious coverage maximum for the courtyard lots if the additional impervious utilizes pervious paving or if a raingarden is installed to mitigate the additional impervious coverage. CONCLUSIONS AND DECISION Based on the foregoing, the PUD Amendment is approved. Passed and duly adopted this 17th day of July, 2018 by the City Council of the City of Lake Elmo, Minnesota. __________________________________ Mike Pearson, Mayor ATTEST: ________________________________ Julie Johnson, City Clerk STAFF REPORT DATE: July 17, 2018 REGULAR ITEM # 15 AGENDA ITEM: Eagle Point Blvd Street Improvements – Assessment Hearing on Improvements and Adopting the Final Assessment Roll SUBMITTED BY: Jack Griffin, City Engineer REVIEWED BY: Kristina Handt, City Administrator Sue Iverson, Finance Director Sarah Sonsalla, City Attorney Chad Isakson, Assistant City Engineer ISSUE BEFORE COUNCIL: Should the City Council hold the final assessment hearing for the Eagle Point Boulevard Street Improvements and, after closing the hearing, adopt the final assessment roll? BACKGROUND: On June 19, 2018, the City Council approved a Resolution declaring the costs to be assessed, ordering the preparation of the proposed assessment, and calling for the hearing on proposed assessment for the Eagle Point Boulevard Street Improvements. Mailed notice has been provided to each assessed property and notice of the public hearing has been published in the local paper. The Eagle Point Boulevard Street Improvements project had a final completion date of February 7, 2017. All project costs have been accounted for and are summarized below. The project is being 100% assessed to the benefitting properties due to the area being within a commercial district. PROPOSAL DETAILS/ANALYSIS: Pursuant to Minnesota Statutes, Section 429 the Council must declare the final amount to be assessed against the benefitting properties and the hearing on the proposed assessment for these improvements must be conducted. Staff has attached a Final Assessment Roll which must be certified to the County Auditor by November 30, 2018. The Final Assessment Roll has been calculated based on the final project costs and in accordance with the City’s Special Assessment Policy. The final total project cost, at completion, is $1,344,000; down from the feasibility report cost of $1,351,000. The attached final assessment roll details the proposed assessment for each parcel. Assessments are being levied over 10 years at the rate of 4.30 percent for this project. FISCAL IMPACT: The total project cost is $1,344,000 with $1,182,900 paid through special assessments, $99,000 paid directly by Inwood 10, LLC for sanitary sewer improvements, and the remaining $62,100 paid through the Water Enterprise Fund. Holding the final assessment hearing follows state statute for assessing benefitting properties and adopting the final assessment roll finalizes the special assessments to be levied for the improvements. RECOMMENDATION: Staff is recommending that the City Council approve a resolution adopting the final assessment roll for the Eagle Point Boulevard Street Improvements. The recommended motion for the action is as follows: “Move to approve Resolution No. 2018-075; Adopting the Final Assessment Roll for the Eagle Point Boulevard Street Improvements.” ATTACHMENTS: 1. Resolution Adopting the Final Assessment Roll on Street Improvements. 2. Notice of Hearing on Proposed Assessment. 3. Final Assessment Roll. CITY OF LAKE ELMO WASHINGTON COUNTY STATE OF MINNESOTA RESOLUTION NO. 2018-075 A RESOLUTION ADOPTING THE FINAL ASSESSMENT ROLL FOR THE EAGLE POINT BLVD – STREET IMPROVEMENTS WHEREAS, pursuant to proper notice duly given as required by law, the Council has met and heard and passed upon all objections to the proposed assessment for the Eagle Point Boulevard Street Improvements consisting of the reconstruction of Eagle Point Boulevard from Inwood Avenue to Hudson Boulevard with a sand subbase, draintile, new concrete curb and gutter and extension of the existing storm sewer. NOW, THEREFORE, BE IT RESOLVED, 1. Such proposed assessment, a copy of which is attached hereto and made a part hereof, is hereby accepted and shall constitute the special assessment against the lands named therein, and each tract of land therein included is hereby found to be benefited by the proposed improvement in the amount of the assessment levied against it. 2. Such assessment shall be payable in equal annual installments extending over 10 years, the first of the installments to be payable on or before the first Monday in January, 2019, and shall bear interest at the rate of 4.30% percent per annum from the date of the adoption of the assessment resolution. To the first installment shall be added interest on the entire assessment from the date of this resolution until December 31, 2018. To each subsequent installment, when due, shall be added interest for one year on all unpaid installments. 3. The owner of any property so assessed may, at any time prior to the certification of the assessment to the county auditor, pay the whole of the assessment on such property, with the interest accrued to the date of payment, to the City Clerk, except that no interest shall be charged if the entire assessment is paid within 30 days from the adoption of this resolution; and he/she may, at any time thereafter, pay to the City Clerk the entire amount of the assessment remaining unpaid, with interest accrued to December 31 of the year in which such payment is made. Such payment must be made before November 15 or interest will be charged through December 31 of the next succeeding year. 4. The City Clerk shall forthwith transmit a certified duplicate of this assessment to the County Auditor to be extended on the property tax lists of the county. Such assessments shall be collected and paid over in the same manner as other municipal taxes. ADOPTED BY THE LAKE ELMO CITY COUNCIL ON THE SEVENTEENTH DAY OF JULY, 2018. CITY OF LAKE ELMO By: __________________________ Mike Pearson (Seal) Mayor ATTEST: ________________________________ Julie Johnson City Clerk CITY OF LAKE ELMO NOTICE OF HEARING ON PROPOSED ASSESSMENT EAGLE POINT BLVD – STREET IMPROVEMENTS Notice is hereby given that the City Council of Lake Elmo will meet in the council chambers of the city hall at or approximately after 7:00 P.M. on Tuesday, July 17, 2018, to consider, and possibly adopt, the proposed assessment against benefitting property for the Eagle Point Boulevard Street Improvements. Adoption by the Council of the proposed assessment may occur at the hearing. The following describes the area proposed to be assessed: • Street improvements completed along Eagle Point Boulevard from Inwood Avenue to Hudson Boulevard and consisted of the reconstruction of the existing street with a sand subbase, draintile, new concrete curb and gutter and extension of the existing storm sewer system. You may at any time prior to certification of the assessment to the county auditor pay the entire assessment on such property to the City Clerk with interest accrued to the date of payment. No interest shall be charged if the entire assessment is paid to the City Clerk within 30 days from the adoption of this assessment. You may at any time thereafter, pay to the City Clerk the entire amount of the assessment remaining unpaid, with interest accrued to December 31 of the year in which such payment is made. Such payment must be made before November 15 or interest will be charged through December 31 of the succeeding year. If you decide not to prepay the assessment before the date given above the rate of interest that will apply is 4.30 percent per year. Once assessments are certified to the County, the assessments are payable in equal annual installments extending over a period of 10 years for street improvements, the first of the installments to be payable on or before the first Monday in January 2019, and will bear interest at the rate of 4.30 percent per annum from the date of adoption of the assessment resolution. To the first installment shall be added interest on the entire assessment from the date of the assessment resolution until December 31, 2018. To each subsequent installment when due shall be added interest for one year on all unpaid installments. The proposed assessment roll is on file for public inspection at the City Clerk’s office. The total amount of the proposed street improvement assessments is $1,182,900. Written or oral objections will be considered at the meeting. No appeal may be taken as to the amount of an assessment unless a written objection signed by the affected property owner is filed with the municipal clerk prior to the assessment hearing or presented to the presiding officer at the hearing. The Council may upon such notice consider any objection to the amount of a proposed individual assessment at an adjourned meeting upon such further notice to the affected property owners as it deems advisable. An owner may appeal an assessment to district court pursuant to Minnesota Statutes, Section 429.081 by serving notice of the appeal upon the Mayor or Clerk within 30 days after the adoption of the assessment and filing such notice with the district court within ten days after service upon the Mayor or Clerk. The City Council may, in its discretion, defer the payment of this assessment for any homestead property owned by a person for whom it would be a hardship to make payment if the owner is 65 years of age or older and/or the owner is a person retired by virtue of a permanent and total disability or by a person who is a member of the Minnesota National Guard or other military reserves who is ordered into active military service, as defined in section 190.05 subdivision 5b or 5c, as stated in the person’s military orders. The owner must request a deferment of the assessment at or before the public hearing at which the assessment is adopted and make application on forms prescribed by the City Clerk within 30 days after the adoption. Notwithstanding the standards and guidelines established by the City for determining a hardship, a deferment of an assessment may be obtained pursuant to Minnesota Statutes Section 435.193. DATED: June 19, 2018 BY ORDER OF THE LAKE ELMO CITY COUNCIL Mike Pearson, Mayor (Published in the Oakdale-Lake Elmo Review on June 27, 2018) CITY OF LAKE ELMO, MN JUNE 2018 STREET IMPROVEMENTS EAGLE POINT BOULEVARD FINAL ASSESSMENT ROLL AREA METHOD PAGE 1 OF 1 NO. NAME PID AREA (AC) AMOUNT 1 UNITED LAND LLC 3600 AMERICAN BLVD W #750 BLOOMINGTON MN 55431 3302921440009 11.68 168,500$      2 DAKOTA UPREIT LP 8530 EAGLE POINT BLVD LAKE ELMO 55042 3003 32ND AVE S FARGO ND 58203 3302921420015 5.06 73,000$        3 BREMER FINANCIAL SERVICES INC 8555 EAGLE POINT BLVD LAKE ELMO 55042 8555 EAGLE POINT BLVD LAKE ELMO MN 55042 3302921410054 25.69 370,500$      4 BREMER FINANCIAL SERVICES INC 8555 EAGLE POINT BLVD LAKE ELMO MN 55042 3302921420007 1.47 21,200$        5 NORTHEASTERN METROPOLITAN ISD #916 8568 EAGLE POINT BLVD N LAKE ELMO 55042 2540 COUNTY ROAD F E WHITE BEAR LAKE MN 55110 3302921420019 19.49 281,100$      6 DANATE PROP INV I LLC 8519 EAGLE POINT BLVD LAKE ELMO 55042 1590 MEADOW VIEW TR S HASTINGS MN 55033 3302921420008 3.82 55,100$        7 EAGLE POINT MEDICAL BUILDING LLC 8515 EAGLE POINT BLVD LAKE ELMO 55042 222 S 9TH ST #3255 MINNEAPOLIS MN 55402 3302921420014 3.77 54,400$        8 DAKOTA UPREIT LP 8550 HUDSON BLVD N LAKE ELMO 55042 3003 32ND AVE S FARGO ND 58203 3302921420012 3.69 53,300$        9 RPSLEGACYDESOTO LLC 2935 COUNTY DR LITTLE CANADA MN 55117 3302921420017 0.45 6,500$          10 RPSLEGACYDESOTO LLC 2935 COUNTY DR LITTLE CANADA MN 55117 3302921420018 0.43 6,300$          11 DOMINUS PROPERTIES LLC 8687 EAGLE POINT BLVD LAKE ELMO 55042 2500 EAGLE VALLEY DR WOODBURY MN 55129 3302921440012 0.27 4,000$          12 C&G PROPERTIES LLC 8685 EAGLE POINT BLVD N LAKE ELMO 55042 16220 53RD AVE N PLYMOUTH MN 55446 3302921440013 0.27 4,000$          13 LAW SPACE LLC 8681 EAGLE POINT BLVD N LAKE ELMO 55042 8681 EAGLE POINT BLVD N LAKE ELMO MN 55042 3302921440014 0.27 4,000$          14 LAW SPACE LLC 8679 EAGLE POINT BLVD N LAKE ELMO 55042 8681 EAGLE POINT BLVD N LAKE ELMO MN 55042 3302921440015 0.23 3,300$          15 ZYWIEC JOSEPH J & DEBORAH A 8677 EAGLE POINT BLVD N LAKE ELMO 55042 7980 113TH ST S COTTAGE GROVE MN 55016 3302921440016 0.27 4,000$          16 ZYWIEC JOSEPH J 8673 EAGLE POINT BLVD N LAKE ELMO 55042 9471 JEFFERY AVE S COTTAGE GROVE MN 55016 3302921440017 0.32 4,600$          17 BACHMANN CLINIC PROPERTY 8671 EAGLE POINT BLVD N LAKE ELMO 55042 8669 EAGLE POINT BLVD N LAKE ELMO MN 55042 3302921440018 0.23 3,300$          18 BACHMANN CLINIC PROPERTY 8669 EAGLE POINT BLVD N LAKE ELMO 55042 8669 EAGLE POINT BLVD N LAKE ELMO MN 55042 3302921440019 0.32 4,600$          19 JTZ LLC & TMZ LLC 8665 EAGLE POINT BLVD N LAKE ELMO 55042 8665 EAGLE POINT BLVD N LAKE ELMO MN 55042 3302921440020 0.27 4,000$          20 P & R PROPERTIES LLC 8663 EAGLE POINT BLVD N LAKE ELMO 55042 8661 EAGLE POINT BLVD LAKE ELMO MN 55042 3302921440021 0.23 3,300$          21 P & R PROPERTIES LLC 8661 EAGLE POINT BLVD N LAKE ELMO 55043 8661 EAGLE POINT BLVD LAKE ELMO MN 55042 3302921440022 0.27 4,000$          22 MILES LLC 8657 EAGLE POINT BLVD N LAKE ELMO 55042 8657 EAGLE POINT BLVD N LAKE ELMO MN 55042 3302921440023 0.27 4,000$          23 EJM PROPERTIES LLC 8655 EAGLE POINT BLVD N LAKE ELMO 55042 8653 EAGLE POINT BLVD N LAKE ELMO MN 55042 3302921440024 0.23 3,300$          24 EJM PROPERTIES LLC 8653 EAGLE POINT BLVD N LAKE ELMO 55042 8653 EAGLE POINT BLVD N LAKE ELMO MN 55042 3302921440025 0.27 4,000$          25 JTAAA PROPERTIES LLC 8649 EAGLE POINT BLVD N LAKE ELMO 55042 8649 EAGLE POINT BLVD N LAKE ELMO MN 55042 3302921440026 0.27 4,000$          26 JTAAA PROPERTIES LLC 8647 EAGLE POINT BLVD N LAKE ELMO 55042 8649 EAGLE POINT BLVD N LAKE ELMO MN 55042 3302921440027 0.23 3,300$          27 GIGUERE ROBIN M 8645 EAGLE POINT BLVD N LAKE ELMO 55042 1101 PARIS AVE N WEST LAKELAND MN 55082 3302921440028 0.27 4,000$          28 JTZ LLC & TMZ LLC 8615 EAGLE POINT BLVD N LAKE ELMO 55042 8665 EAGLE POINT BLVD N LAKE ELMO MN 55042 3302921440029 0.27 4,000$          29 LEE EDWARD CASEY TRS 8617 EAGLE POINT BLVD N LAKE ELMO 55042 1251 SILVERWOOD RD WOODBURY MN 55125 3302921440030 0.27 4,000$          30 D GETSCH LLC 8621 EAGLE POINT BLVD N LAKE ELMO 55042 11711 ASTER WAY WOODBURY MN 55129 3302921440031 0.27 4,000$          31 LEGACY ASSET PROPERTIES 8623 EAGLE POINT BLVD N LAKE ELMO 55042 8623 EAGLE POINT BLVD N LAKE ELMO MN 55042 3302921440032 0.23 3,300$          32 SCHNY ZONE LLC 8625 EAGLE POINT BLVD N LAKE ELMO 55042 8625 EAGLE POINT BLVD N LAKE ELMO MN 55042 3302921440033 0.27 4,000$          33 LUCIA INVESTMENTS LLC 8631 EAGLE POINT BLVD N LAKE ELMO 55042 8631 EAGLE POINT BLVD N LAKE ELMO MN 55042 3302921440034 0.27 4,000$          34 LUCIA INVESTMENTS LLC 8633 EAGLE POINT BLVD N LAKE ELMO 55042 8631 EAGLE POINT BLVD N LAKE ELMO MN 55042 3302921440035 0.27 4,000$          TOTAL 81.86 1,182,900$   ADDRESS MAILING ADDRESS STAFF REPORT DATE: 7/17/2018 REGULAR ITEM #: 16 MOTION TO: City Council FROM: Rob Weldon, Public Works Director AGENDA ITEM: Public Hearing and Approval of Wellhead Protection Plan Part 2 REVIEWED BY: Chad Isakson, Assistant City Engineer Kristina Handt, City Administrator BACKGROUND: As required by the State of Minnesota, every 10 years the city must complete a Wellhead Protection Plan. Part One of the WHPP was completed and approved by the Department of health in 2017. That portion included delineation of Wellhead Protection Areas (WHPAs) and the Drinking Water Supply Management Areas (DWSMAs). Part 2 of the WHPP focuses on the areas within the DWSMA and WHPA to identify possible areas and routes of contamination. Items such as existing/abandoned wells, above/below ground storage tanks are located identified and mapped in the second portion of the plan. ISSUE BEFORE COUNCIL: Should the City Council approve Part 2 of the Wellhead Protection Plan? PROPOSAL DETAILS/ANALYSIS: Over the past year, Public Works and Engineering have worked closely with Minnesota Rural Water, Minnesota Department of Health and Bayerl Water Resources to develop Part 2 of the Well Head Protection Plan. In doing so, several items were discussed, developed and added to the new plan. Those topics include; Data Elements & Assessment, Changes of Public Water Supply Well, Problems and Opportunities, Wellhead Protection Goals, Objectives and Plans of Action, Evaluation Program and Contingency Strategy. The overall goal of the WHPP is to protect the public water supply from contamination due to safety and land use activities. Upon City Council approval, Part 2 of the Wellhead Protection Plan will be submitted to the State of Minnesota for final approval. OPTIONS: • Approve Part 2 of the Wellhead Protection Plan • Deny approval of Part 2 of the Wellhead Protection Plan RECOMMENDATION: “Motion to approve Part 2 of the Wellhead Protection Plan” STAFF REPORT DATE: 7/17/2018 REGULAR ITEM #: 17 MOTION TO: City Council FROM: Emily Becker, Planning Director AGENDA ITEM: Zoning Map Amendment, Preliminary and Final Plat, Bus Terminal Ordinance Zoning Text Amendment, and Conditional Use Permit REVIEWED BY: Ben Gozola, Consultant Planner Soren Mattick, Campbell Knutson BACKGROUND: The City has received a set of applications from Stillwater Area Public Schools (Kristen Hoheisel) and Terry Emerson requesting consideration of the following four (4) items: 1) A Zoning Map Amendment to re-zone a portion of the subject property to Business Park; 2) Preliminary and Final Plats to subdivide the property located at 11530 Hudson Boulevard North; 3) A Zoning Text Amendment to allow "bus terminal" as a conditionally permitted principal use within the Business Park Zoning District; and 4) A Conditional Use Permit to operate a school district transportation center on the subject property. ISSUE BEFORE COUNCIL: The Council is being asked to hold a public hearing and make recommendation on each of the four requests beginning with the broadest issue (zoning district change) and working towards the most specific (approval of a CUP to allow operation of a bus terminal). As all four of the applications are generally linked, denial of any individual request may impact the Council’s decision(s) on subsequent requests. PROPOSAL DETAILS/ANALYSIS: Applicants: Stillwater Area Public Schools (Kristen Hoheisel), 1875 Greeley Street South, Stillwater, MN 55082 (Zoning Map Amendment, Zoning Text Amendment, and Conditional Use Permit) and Terry Emerson, 2204 Legion Ln Cir N, Lake Elmo, MN 55042 (Preliminary and Final Plat) Council Meeting 7/17/2018 Item #17 Page 2 Property Owners: EN Properties, LLC (Terry Emerson), 11530 Hudson Boulevard North, Lake Elmo, MN 55042 Location: 11530 Hudson Boulevard North (PID# 36.029.21.43.0001) Request: Zoning Text Amendment, Preliminary and Final Plat, Zoning Map Amendment, and Conditional Use Permit. Existing Land Use: Trucking Terminal – sales, repairs, and service of diesel trucks Existing Zoning: RT - Rural Development Transitional Surrounding Land Use / Zoning: South – I-94 and Woodbury; West – Outdoor Storage (RT – Rural Development Transitional); East – Vacant land (RT – Rural Development Transitional); North – Vacant land (RT – Rural Development Transitional) Comprehensive Plan Guidance: BP – Business Park Deadline(s) for Action: Application Complete – 5/4/2018 60 Day Deadline – 7/3/2018 Extension Letter Mailed – At request of Applicant – extended to July 29, 2018 120 Day Deadline – N/A Applicable Regulations: Chapter 153 – Subdivision Regulations §154.210 – Off-Street Parking Article XIV: Commercial Districts §154.258: Landscape Requirements ZONING MAP AMENDMENT The applicant is seeking approval to rezone a portion of the subject property (11 acres of approximately 63.73 total acres) from RT (Rural Development Transitional) to BP (Business Park). The RT designation provides landowners with interim use options as they wait for the availability of sewer, and/or until such time as a landowner requests a zoning change to a new district consistent with the future guided land use. In this case, the land in question is guided for Business Park both within the current 2030 Comprehensive Plan and within the draft 2040 Comprehensive Plan. Therefore, staff does find it would be appropriate to approve the requested rezoning if that is the desire of the landowner. Note that if the rezoning is ultimately approved but subsequent applications are denied, the applicant will be consulted as to whether this change should still occur, or whether the zoning change application will be withdrawn. Council Meeting 7/17/2018 Item #17 Page 3 Recommended Condition of Approval. 1. That the Four Corners 1st Addition Preliminary and Final Plat obtain approval from the City. PRELIMINARY AND FINAL PLAT Purpose. The preliminary and final plat portion of this application package assumes the City approves the requested zoning map amendment to BP. If the rezoning failed, this application fails due to the inability to meet minimum RT zoning standards. If the rezoning was approved, the following analysis will apply: Minimum Lot Size Requirements. The following table outlines how the lot dimension and setback requirements of the Business Park zoning district are met by the requested lot layout. Lot Dimension Requirements, Business Park District Standard Required Proposed Minimum Lot Area 2 acres 11 acres Minimum Lot Width 200 feet 670 feet Minimum Lot Depth - 715feet Parkland Dedication. The City requires $4500 per acre for commercial subdivisions. The proposed subdivision will create one new lot of 11 acres. Therefore, it is recommended that a condition of approval require the applicant to pay $49,500 ($4500 X 11 acres) in park dedication fees for this development should the plan move forward. As staff did not identify any ways in which the proposed lot layout would be deficient to minimum zoning standards, we are recommending the requests can be approved. Note that if the Preliminary and Final plats are ultimately approved but subsequent applications are denied, the applicant will be consulted as to whether this application should still move forward, or whether it will be withdrawn. City Engineer Review. Stormwater Management • State and Valley Branch Watershed District permit will be required. • The site plan is subject to a storm water management plan meeting State, VBWD and City rules and regulations. No proposed storm water management plan was provided as part of the Plan submittal. • The storm water facilities constructed for this development should remain privately owned and maintained. The applicant will be required to execute and record a Stormwater Maintenance and Easement Agreement in the City’s standard form of agreement. Council Meeting 7/17/2018 Item #17 Page 4 • Even as privately owned and maintain facilities, maintenance access roads meeting the City engineering design standards must be provided for all storm water facilities. • The storm water facility 100‐year HWL must be fully contained within the subject property or easements must be acquired to protect the 100‐year HWL flood area. The proposed plans show the 100‐year HWL event discharging off‐site at the southeast corner. Streets and Transportation • A traffic study should be required as a condition of approval to determine the timing and extent of improvements required for the CSAH 15 and Hudson Boulevard intersection realignment and traffic signal improvements. A financial contribution to CSAH 15/Hudson Boulevard traffic signal/realignment should be considered. In addition, the study is needed to determine if an eastbound left turn lane along Hudson Boulevard is also needed at the site access. • No additional right-of-way dedication is required unless an eastbound turn lane is required as determined by the traffic study. A 10-foot utility corridor easement for small utilities must be dedicated ot the City along the north boulevard of Hudson Boulevard. • Hudson Boulevard must be improved per the City design standards to an urban section on the north side of the street including a westbound right turn lane to the site, a 4-foot shoulder (curb section), a 9-foot boulevard, and 10-foot shared use bituminous trail with 2-foot clear zone. Municipal Sanitary Sewer • Because the property is guided in the City’s Comprehensive Plan for 2020-2030 Regional Sewer Staging Plan and would discharge to the MCES Cottage Grove Ravine Interceptor, provisions for connecting to the municipal sanitary sewer service must be included with this application. The site plans/application indicates a new sewer service line connecting to future sanitary sewer but does not address the extension of sewer to the site. • The applicant will be responsible to connect to the City sanitary sewer system and extend sanitary sewer into the property at applicant’s sole cost and must stub sewer to adjacent parcels. • Sanitary sewer is available along Hudson Boulevard near the MCES Meter Station. The sanitary sewer trunk size will need to be determined based on the 2040 Comprehensive Plan. • Sanitary sewer capacity demands including the number of residential equivalency units (RECs) based on the Met Council SAC determination policty should be provided and account for all land uses and connections to the sewer system including bus wash wastewater. • Existing sanitary sewer utility easements along Hudson Boulevard and the new commercial street corridor must be shown on the plans and plans must be made to avoid encroachments/conflicts with these easements. • Any main sewer lines placed within the development will require minimum 30‐foot easements centered over the pipe (or wider dependent upon the sewer depths) dedicated to the City and in the form of the • City’s Utility Easement Agreement. Municipal Water Supply • Because the property is located in the MUSA, provisions for connecting to the municipal water supply must be included. • The applicant will be responsible for extending municipal water to the property at the applicant’s cost, and watermain stubs will be required to eastern property limits. Water is available to be extended to the property from the Hunter’s Crossing development but will require easements Council Meeting 7/17/2018 Item #17 Page 5 across adjacent properties. The watermain extension to the site will likely be a 12-inch trunk watermain. • The applicant shall provide water capacity demands including average day use, peak day use, and fire suppression demands. All demands should be included, including potable drinking water, bus washing operations, etc. in order to evaluate eater improvements needed to support the development and to determine the water availability charges. • The proposed site is in the water system’s low pressure zone which has limited capacity until a new water tower is constructed to serve the area. • Hydrants will be required to be placed at the direction of the Fire Department, and all fire hydrants shall be owned and maintained by the City. Recommended Findings. 1. That the Four Corners preliminary and final plat is consistent with the Lake Elmo Comprehensive Plan and the Future Land Use Map for this area. 2. That the Four Corners preliminary and final plat complies with the minimum lot frontage and area requirements of the City’s BP – Business Park zoning district. 3. That the Four Corners preliminary and final plat complies with the City’s subdivision ordinance. 4. That the Four Corners preliminary and final plat meets other City zoning ordinances, such as landscaping, erosion and sediment control, and other ordinances, provided comments outlined in the City Engineer Review Memo dated May 30, 2018 are met; or as may be amended due to changes in the site plan or proposed use. 5. That the Four Corners preliminary and final plat is consistent with the City’s engineering standards provided final plans are updated to address the City Engineer’s comments documented in a letter dated May 30, 2018; or as may be amended due to changes in the site plan or proposed use. 6. The land being subdivided is legally described as: S1/2-SE1/4 EXC WEST 2 RODS EXC TO HWY EXC HWY PARCEL 44 MN DOT R/W PLAT #82-35 SECTION 36 TOWNSHIP 029 RANGE 021 7. That the Four Corners preliminary and final plat will create one new lot of 11 acres to be legally described as Lot 1, Block 1, Four Corners; and three outlots: A (46.64acres), B (5.01 acres), and C (1.08 acres). Recommended Conditions of Approval. Staff recommends the following conditions be attached to any approval of the Four Corners Preliminary and Final plats: 1) The property shall be rezoned to BP – Business Park. 2) The applicant shall pay a fee in lieu of parkland dedication in the amount of $4500 per acre of the newly created lot (11 acres X $4500 = $49,500 total) prior to any formal City authorization. Council Meeting 7/17/2018 Item #17 Page 6 3) Prior to the execution of the Final Plat by City officials, the Developer shall enter into a Developer’s Agreement acceptable to the City Attorney and approved by the City Council that delineates who is responsible for the design, construction, landscaping, and payment of the required improvements for the Four Corners Final Plat with financial guarantees therefore. 4) Final grading, drainage and erosion control, sanitary sewer and stormwater management, street and utility construction plans shall be submitted, reviewed and approved by the City Engineer, meeting City Engineering Design Standards, prior to the recording of the Final Plat. All changes and modifications to the plans requested by the City Engineer in a memorandum dated May 30, 2018 and all subsequent memorandums regarding the plans shall be incorporated into these documents before they are approved. 5) The applicant must obtain all other necessary City, State, and other governing body permits prior to the commencement of any construction activity on the parcel including but not limited to building permits, conditional use permits, etc. 6) Any plans for construction on the newly created parcel must comply with the Lake Elmo Design Standards Manual and specific general site considerations and development standards for specific uses within the Business Park District. 7) The site plan is subject to a storm water management plan meeting State, Valley Branch Watershed District and City rules and regulations. All applicable permits must be obtained. Maintenance access roads meeting City engineering design standards must be provided for all storm water facilities. 8) Stormwater facilities shall remain privately owned and maintained. The applicant will be required to execute a Stormwater Maintenance and Easement Agreement in the City’s standard form of agreement. 9) A Traffic Impact Study shall be completed and submitted in order to determine timing and extent of improvements required for the CSAH 15 and Hudson Boulevard intersection realignment and traffic signal improvements as well as the need for an eastbound left turn lane along Hudson Boulevard for site access. Additional right-of-way along Hudson Boulevard may be required if the eastbound left turn lane is required. 10) Hudson Boulevard must be improved per the City design standards to an urban section on the north side of the street including a west bound right turn lane to the site, a four foot shoulder (curb reaction), a nine foot boulevard, and a ten foot shared use bituminous trail with two foot clear zone. 11) Provisions for connecting municipal sanitary sewer service and for connecting to the municipal water supply must be provided on submitted plans. The applicant shall be responsible to extend and connect to the City sanitary sewer system and municipal water at the applicant’s sole cost and extend such services to adjacent properties. The applicant shall be required to obtain easements Council Meeting 7/17/2018 Item #17 Page 7 from adjacent properties in order to extend water. A detailed description of the sanitary sewer and water capacity demands shall be provided. 12) Hydrants will be required to be placed at the direction of the Fire Department, and all fire hydrants shall be owned and maintained by the City. 13) All easements as requested by the City Engineer and Public Works Department shall be documented on the Final Plat prior to its execution by City Officials. ZONING TEXT AMENDMENT Purpose. The zoning text amendment being requested would allow "bus terminals" as a conditionally permitted principal use on properties zoned Business Park. If approved, the applicant would seek a conditional use permit to authorize a permanent bus terminal on the subject property. What’s currently in the Zoning Code Regarding Bus Terminals? • Definition of Local Transit 154.012.B.12. The Zoning Code defines bus terminals as local transit: o “Local Transit. Establishments primarily engaged in furnishing local and suburban passenger transportation, including taxicabs, passenger charter services, school buses, and terminals (including service facilities) for motor vehicle passenger transportation.” o Currently, local transit is not an allowed use within any of the zoning districts. • Parking Standards for Local Transit. The Zoning Code sets forth the following minimum o “2 spaces per 3 employees on the largest shift, based on maximum planned employment.” • Local Transit is currently not an allowed use within any Zoning District as indicated by the list of Permitted, Conditional, and Interim Uses within the Commercial Zoning Districts. Intent of Business Park Land Use/Zoning District within the Comprehensive Plan and Zoning Code. The 2030 Comprehensive Plan states that “the Business Park land use category is intended to encourage the creation of significant employment centers that accommodate a diverse mix of office and light industrial uses and jobs. Specific desired attributes of this land use include a diversity of jobs, high development densities and jobs per acre, high quality site and building architectural design, and increased tax revenues for the community. Office, office showroom/warehousing, research and development services, light and high-tech electronic manufacturing and assembly, and medical laboratories are typical uses appropriate for this land use category. Some retail and service uses may be allowed as supporting uses for the primary office and light industrial uses of the employment center.” Council Meeting 7/17/2018 Item #17 Page 8 While this proposal does create a significant number of jobs per acre (200 jobs on about 11 acres of property), the jobs it is creating don’t really fit in to the category of types of jobs this land use category is intended to have (office and light industrial uses and jobs). Additionally, a bus terminal does not necessarily fit in to the category of "high quality site and building architectural design." It also does not fit in to any of the described uses appropriate for this land category. Finally, it would not add to increased tax revenues for the community since it would be tax exempt. The Draft 2040 Comprehensive Plan states that Business Park (BP) areas are to “…provide for a wide variety of professional businesses such as medical and research facilities, offices, and corporate headquarters. Uses specifically excluded from existing business park areas include warehousing, manufacturing, distribution, assembly and truck terminals. Retail sales of goods and services are allowable uses by conditional use permit provided such uses are goods and services for the employees of the permitted business use. This category excludes any residential use.” While truck terminals are not exactly the same as local transit in that truck terminals provide tax base, they are similar in assumed site layout and traffic, noise, etc. Trucking terminals are currently a conditional use within the BP – Business Park zoning district and have not been explicitly disallowed per the current Comprehensive Plan. The draft 2040 Comprehensive Plan will exclude such a use within the Business Park land use if the plan in its current draft form is ultimately adopted. The Zoning Code states the following about the BP Business Park/Light Manufacturing District: “The purpose of the BP District is to provide areas for attractive, high quality business park development primarily for office, high quality manufacturing and assembly, and non-retail uses in developments which provide a harmonious transition to residential development and neighborhoods by: 1) Conducting all business activities and essentially all storage inside buildings; 2) Consisting of high quality and attractive buildings which blend in with the environment; 3) providing open space, quality landscaping and berming; 4) including berming and buffering of parking, loading docks and other similar functions; and 5) protecting and enhancing the natural environment; and 6) providing users with an attractive working environment that is unique in the eastern metropolitan area with immediate access to I-94.” A bus terminal does not necessarily provide a harmonious transition to residential development and neighborhoods as most business and activities are conducted outside, not inside buildings. While there are limited peak traffic times, there is a significant amount of traffic at those peak times. There will be only one building which is existing and will not be remodeled. There is opportunity to provide berming and buffering on the site should this move forward. Recommendation. Due to guidance of the current 2030 and draft 2040 Comprehensive Plans as well as the Zoning Code, staff would not recommend that bus terminals be an allowed use (conditional nor permitted) within the Business Park Zoning District due to the following findings: 1. That the procedures for requesting a Zoning Text Amendment are found in the Lake Elmo Zoning Ordinance, Section 154.105. 2. That all the submission requirements of said Section 154.105 have been met by the Applicant. Council Meeting 7/17/2018 Item #17 Page 9 3. That the proposed Zoning Text Amendment includes the following components: a. That local transit be a conditional use within the Business Park zoning district. 4. The Current comprehensive plan calls for Business Park areas to become "significant employment centers," and bus terminals do not provide significant employment relative to acreage needed for the use; 5. Business Park areas are to include uses with "high quality site and building architectural design," and bus terminals will typically include neither quality by the nature of the use; 6. Business Park land is meant to generate increased tax revenues for the City, and public bus terminals are tax exempt; 7. The use is specifically excluded from Business Park areas in the draft comprehensive plan anticipated to move forward for approval by the end of 2018; 8. The Zoning Code calls for Business Park areas to provide a harmonious transition between the City's commercial areas and its residential areas, and a bus terminal with outdoor storage of busses is antithetical to that goal; 9. The Zoning Code calls for Business Park activities to occur inside of buildings, and bus terminals by their nature include outdoor use and storage of vehicles; 10. The applicant's request to make bus terminals a conditionally permitted use cannot overcome all of the listed problems in findings 4 through 10 via conditions (as proposed or otherwise). Possible Standards. It should be noted that motor freight and warehousing, which is defined as follows: “establishments engaged primarily in either the storage or shipment of goods and materials, including terminal facilities for handling freight, and maintenance facilities in which the trucks (including tractor trailer units) involved with the operation of the business are stored, parked and serviced. Materials within a warehouse or terminal facility may be combined, broken down, or aggregated for trans-shipment or storage purposes where the original material is not chemically or physically changed,” (this includes truck terminals) are a conditional use currently within the Business Park zoning district. A bus terminal is quite similar in use to that of a truck terminal, though the definitions in the Zoning Code differentiate the two. It is also recognized that the development of this property would prompt the extension of City services to this area. If the Council disagrees with staff and believes that bus terminals are an appropriate use within areas guided for Business Park, staff would recommend the City only adopt narrowly tailored language to preclude bus terminals from certain Business Park areas in order to limit the number of bus terminals allowed in the City and to minimize impact to adjacent properties. If the Council goes this route, staff would suggest the following standards accompany any such change: Council Meeting 7/17/2018 Item #17 Page 10 1. The use shall be limited to a school district transportation center, owned by a public school district, serving as a bus terminal for buses and vans which transport passengers to and from schools or between school programs and community residences. o This provision would limit “local transit” to bus terminals and not allow, as per definition from the zoning code, taxicab terminals, passenger charter services, etc. 2. The property on which the use is located must be located within one half mile of property owned and used by a public school district for an active school or school administration building. o The property on which the bus terminal is being proposed would be the only parcel on the east side of the City that is guided for Business Park and that is within one half mile of such school property. 3. Must be on a property of at least 10 acres in size or more. o There are parcels on the west side of the city that are zoned Business Park that are in within one half mile of school district land, but none of those parcels meet a ten acre minimum and therefore could not qualify for use as a bus terminal. 4. Must be sufficiently screened, as determined by the City, from adjacent properties through techniques such as berming and landscaping. o This condition would provide the City with authority to determine the level and location of screening needed to hopefully ensure an acceptable separation of uses. 5. Accessory uses to bus terminals may include an office and routine maintenance of operable school buses including but not limited to washing and fueling. o This condition would ensure the site is used as a hub for a bus operation, but would not become a major maintenance center for inoperable vehicles in the bus fleet. CONDITIONAL USE PERMIT Purpose. The conditional use permit application would seek to utilize the previous text amendment and allow a "bus terminal" on a portion of the subject property. Failure of the previous application(s) to be approved will likely preclude approval of this application. Council Meeting 7/17/2018 Item #17 Page 11 Existing Conditions. The applicant is planning to re-locate the existing bus terminal on the property that was previously operating as Rihm Kenworth at 11530 Hudson Boulevard N in Lake Elmo, MN (see below). Current Interim Use Permit. The property currently operates under an interim use permit which was granted by Resolution No. 2014-095, which allows a bus/truck terminal. This interim use permit will expire on December 2, 2019, and may be renewed with approval by Council. It will terminate when any portion of the property is rezoned or when public sanitary sewer is provided on site. The consent agreement states that the remaining portion of the property must be used for agricultural purposes and that the interim use shall terminate upon any redevelopment of the property for a permitted or conditional use. There has been discussion of the eastern portion of this property developing, being provided sanitary sewer, and no longer being used for agricultural purposes. Therefore, the applicant does not want to operate under the current interim use permit. Current Building. The current building was constructed in the 1990’s and was used for office space by E&H Earthmovers and also provided bus storage for Stillwater Schools. It was then used by Kenworth Diesel Trucks for sales, repairs and service of diesel trucks. Current Bus Terminal Operation. The current bus terminal operates in Oak Park Heights within Stagecoach in the Old Junker Landfill. Proposed Operation and Jobs Created. School buses for the Stillwater School District will be parked at this facility when not in use, and routine maintenance will be performed at this facility, including washing and fueling. The existing building will be used for office workers (dispatch, payroll, safety manager, etc.); a home base for drivers to check in and out, training, assignments, and mechanical work (repair and maintenance on buses). Approximately 200 people would work at the facility, with morning and afternoon shifts of drivers and attendants. Hours of operation would be from about 6:00 a.m. to 6:00 p.m. during the Future planned bus terminal area Council Meeting 7/17/2018 Item #17 Page 12 weekdays with occasional Saturday use for limited special school district transportation needs. There would be parking provided for school buses (140 spaces), transportation vans (approximately 20), and employees’ personal vehicles (approximately 200). Why this Location? The location is adjacent to major traffic corridors and routes within this area of the City of Lake Elmo. The School District has proposed this location as opposed to a location located adjacent to lower volume roads so as to create less impact. Peak bus traffic times will be limited to morning hours (7:00 a.m. to 9:00 a.m.) and afternoon (2:00 p.m. to 4:00 p.m.). Setback and Impervious Surface Requirements. The following table outlines how the proposed use adheres to the setback and impervious surface requirements of the Business Park Zoning District. All of the proposed requirements are met. The property to the north is guided for Business Park in both the current (2030) and proposed (2040) Comprehensive Plan Land Use Plan, and so the required setback from residential zones does not apply. Setback Requirements, Business Park District Standard Required Proposed Maximum Height 50 feet Less than 50 feet Maximum Impervious Coverage 75% 57% Front Yard Setback – Building 50 feet 120 feet from existing right-of-way line Interior Side Yard Setback – Building 30 feet 120 feet from west side and 470 feet from east side Corner Side Yard Setback – Building 30 feet N/A Rear Yard Setback - Building 30 feet Approximately 445 feet Residential Zones – Building 150 feet Approximately 445 feet Front Yard – Parking 30 feet Approximately 60 feet from existing right-of-way line Interior Side Yard – Parking 15 feet Approximately 45 feet from west side and approximately 130 feet from east side Corner Side Yard – Parking 30 feet N/A Rear Yard - Parking 15 feet Approximately 32 feet Minimum Building Floor Size 5,000 square feet 15,498 square feet General Site Design Considerations, Commercial Districts. The following outlines how the proposed development adheres to the City’s General Site Design considerations for the Business Park zoning district.  Circulation. o Internal connections when feasible. The parcel to the west has an existing access owned by the parcel to the northwest, so it does not make sense to require this. Additionally, a bus garage would not need to access an adjacent development. Council Meeting 7/17/2018 Item #17 Page 13 o Curb cuts minimized. The proposed development will use an existing curb cut.  Fencing and Screening. There is a proposed chain link fence, which will be consistent with what is currently on the property, enclosing the eastern portion of the parking lot.  Lighting Design. It is a recommended condition of approval that the applicant submit a photometric plan that meets the requirements of Sections 150.035-150.038 of the City Code.  Exterior Storage. Exterior materials storage must be screened from view from adjacent public streets and adjacent residential properties. It is a recommended condition of approval that the applicant provide sufficient berming and screening of the parking lot and that the fueling area and above ground storage tank also be sufficiently screened from adjacent properties and the public right-of-way. Parking Lot Requirements  Surface and Drainage. It is required that in commercial districts, all areas intended to be utilized for parking spaces for five or more vehicles be paved with a durable surface including, but not limited to, hot asphalt, bituminous, or concrete. Additionally, industrial districts are required to be surfaced with materials suitable to control dust and drainage. The applicant has indicated that the existing paved and gravel parking area would remain and that the site would be expanded to provide additional gravel surfaced parking for school buses and employee cars. It is a recommended condition of approval that the parking area be paved as required by the Zoning Code.  Marking of Parking Spaces. Parking areas containing five or more spaces are required to be marked with painted lines at least four inches wide. This is a recommended condition of approval.  Curbing. Open off-street parking areas designed to have head-in parking along the property line shall provide a bumper curb or barrier of normal height. This is a recommended condition of approval.  Accessible Parking. The proposed number of parking spaces is 365, of these, 199 are proposed to be car stalls. The Americans with Disabilities Act (ADA) requires six accessible stalls with one van accessible stall with six accessible stalls. The proposed number of ADA stalls is six, though there does not appear to be a van accessible stall provided. Landscape Plans. The applicant has submitted landscape plans which include 62 Norway Spruces and 61 Colorado Blue Spruce. The existing berms would also remain. Some cursory comments on the landscape plan include the following:  There is proposed 670 feet of street frontage on the property, requiring at least 14 trees be planted along Hudson Boulevard. There are no trees proposed to be planted along Hudson Boulevard. This requirement is not met.  The applicant has not submitted a Tree Preservation Plan, as is required. It is a recommended condition of approval that this also be submitted and approved by the Landscape Architect. Council Meeting 7/17/2018 Item #17 Page 14  It is not known whether or not the requirement that a minimum of five trees be planted for every one acre of land developed or disturbed is met, as the applicant has not submitted a Tree Preservation Plan as indicated above. Parking Lot Screening Standards  Interior Parking Lot Landscaping. It is not known whether or not the parking lot meets the interior parking lot landscaping requirements, as the applicant has not indicated what percentage of interior parking lot area is devoted to landscaping planting areas. At least 5% of the parking lot will need to be devoted to islands or corner planting beds and include shade trees in accordance with the table below. Provided the parking lot contains 365 spaces as currently proposed, a minimum of 25 trees will be required within these interior landscaped areas. Number of Parking Spaces Minimum Required Tree Planting 0-30 None required 31-100 1 tree per 10 spaces or fraction thereof 101+ 1 tree per 15 spaces or fraction thereof  Perimeter Parking Lot Landscaping. o Frontage Strip. A well-over 8-foot wide frontage strip is provided between parking areas and public street as required for parking lots with over 100 spaces. There is a berm that is already located along Hudson Blvd which screens the parking lot.  Screening. Screening is required to provide visual and noise separation of intensive uses from less intensive uses. The property to the west is used as exterior storage, and it is unknown what the property to the east will be used as. It is recommended that the screening be provided from the property to the west and east that consists of either a masonry wall or fence in combination with landscape material that forms a screen at least six feet in height and at least 90% opaque on a year-round basis and include at least one deciduous or coniferous tree per 40 linear feet along the property line. Lake Elmo Design Guidelines and Standards. The property is located within the I-94 district, and therefore must adhere to the Lake Elmo Design Guidelines and Standards. As previously indicated, the applicant has proposed to use the existing building. The building generally adheres to Lake Elmo Design Guidelines and standards in that the building does not have a blank façade, the window and door styles reflect the prevailing architecture style of the structure, there is variety in building façade through a change in materials, high quality and durable materials are used in street facing facades, and the building is constructed of pre-cast concrete. Storage Tank. There is a provision in the Zoning Code that requires that the Council permit uses associated with the bulk storage of over 2,000 gallons of diesel after finding that fire, explosion, or water or soil contamination hazards are not present that would be detrimental to the public health, safety, and general welfare and that the Zoning Administrator require the development of diking around the tanks, suitably sealed to hold a leakage capacity equal to 115% of the tank capacity. The proposed fueling area contains Council Meeting 7/17/2018 Item #17 Page 15 an above ground storage tank that will store 8,000 gallons of diesel. Staff has contacted the Minnesota Pollution Control Agency (MPCA), and the only requirement they have is for their Aboveground Storage Tank (AST) Program is that the applicant fill out an AST Notification of Installation or Change in Status Form informing the MPCA of when the tank has been “closed” from the former location and when it has been moved to the new location. It is a recommended condition of approval that the applicant fill out this form both times (when removing it from the former location and when installing it in the new location) as required by the MPCA. Bus Washing. The applicant has indicated on the application that the property use will include washing buses. The applicant has indicated that the buses will be washed at the facility’s wash bay and that waste water from the wash bay will run in to an oil separator with all of the shop drains, which will go in to a holding tank, which is then disposed of by a sewer transport service. The oil separator is then emptied and maintained by a licensed transporter. The applicant indicates that once the septic system is converted to the municipal sewer system that the wastewater will go directly to the treatment plant after passing through the oil separator, and the oil separator will be emptied and maintained by a licensed transporter. The disposal of this water is addressed in the engineering comments. City Engineer Review. This can be referenced in the Preliminary and Final Plat section of this report. Fire Chief and Building Official Review. The biggest concern that was provided from the Fire Chief and Building Official is that the building is sprinklered yet not hooked up to City water. It is a recommended condition of approval that the property be serviced by City sewer and water prior to the operation of the bus terminal. Staff Recommendation. Due to recommended denial of the zoning text amendment request due to its inconsistency with the Comprehensive Plan and recommended findings outlined below, which are required for a conditional use permit, staff had recommended denial of the requested conditional use permit to operate a school district transportation center at a portion of the property located at 11530 Hudson Blvd N based on the following: 1. The proposed use will not be detrimental to or endanger the public health, safety, comfort, convenience or general welfare of the neighborhood or the city. With over 200 employees and a use that requires both employee trips in and out of the facility each day as well as two bus trips in and out of the facility each day, the use will generate a significant amount of traffic. 2. The use or development conforms to the City of Lake Elmo Comprehensive Plan. The property is guided for Business Park. While the proposal does create a significant number of jobs per acre, the parcel will be tax exempt, as it will be owned by the school district. It also does not fit in to the described uses appropriate for this land category. Finally, it does not propose high quality site and building architectural design, which, per the Comprehensive Plan, is a trait this land use category should have. 3. The use or development is compatible with the existing neighborhood. The use is compatible with the existing neighborhood, as the existing use is a truck terminal, which is similar in Council Meeting 7/17/2018 Item #17 Page 16 use and design to a bus terminal, and the surrounding parcels are mostly vacant and undeveloped. However, the surrounding area is planned for uses such as offices, showroom/warehousing, research and development, manufacturing and assembly, and medical laboratories, which are not compatible uses with a bus terminal. 4. The proposed use meets all specific development standards for such use listed in Article 7 of this Chapter. There are no specific development standards for this use listed in Article 7. The use does not comply with many parking lot, screening, and landscape standards of the Zoning Code. 5. If the proposed use is in a flood plain management or shoreland area, the proposed use meets all the specific standards for such use listed in Chapter 150, §150.250 through 150.257 (Shoreland Regulations) and Chapter 152 (Flood Plain Management). The property is located outside the 0.2% annual chance floodplain. 6. The proposed use will be designed, constructed, operated and maintained so as to be compatible in appearance with the existing or intended character of the general vicinity and will not change the essential character of that area. The proposed project is a redevelopment/repurposing of an existing site, to which minimal improvements are proposed, and will not significantly change the existing character of the area. Operations are not within a building and so would not meet the intended character of the neighborhood. 7. The proposed use will not be hazardous or create a nuisance as defined under this Chapter to existing or future neighboring structures. The proposed use will create a significant amount of traffic, at least at certain times of the day. 8. The proposed use will be served adequately by essential public facilities and services, including streets, police and fire protection, drainage structures, refuse disposal, water and sewer systems and schools or will be served adequately by such facilities and services provided by the persons or agencies responsible for the establishment of the proposed use. The property is within the Metropolitan Urban Service Area (MUSA) and therefore should be required to be provided by city sewer and water. The application did not detail provisions to connect to City sewer and water. The use may require the prompt need for the CSAH 15/Hudson Blvd traffic signal, for which the City will be required to share 25% of the cost, and the Hudson Boulevard realignment. It is not yet known if the applicant’s stormwater management plan meets all City, State, and Valley Branch Watershed District requirements. 9. The proposed use will not create excessive additional requirements at public cost for public facilities and services and will not be detrimental to the economic welfare of the community. The use may require the prompt need for the CSAH 15/Hudson Blvd traffic signal/realignment, for which the City will be required to share 25% of the cost. It is not Council Meeting 7/17/2018 Item #17 Page 17 yet known if the applicant’s stormwater management plan meets all City, State, and Valley Branch Watershed District requirements. 10. The proposed use will not involve uses, activities, processes, materials, equipment and conditions of operation that will be detrimental to any persons, property or the general welfare because of excessive production of traffic, noise, smoke, fumes, glare or odors. The proposed use will generate a significant number of trips per day, which may generate excessive production of traffic. 11. Vehicular approaches to the property, where present, will not create traffic congestion or interfere with traffic on surrounding public thoroughfares. Traffic congestion may be created from the significant number of trips to the site the use would generate. 12. The proposed use will not result in the destruction, loss or damage of a natural or scenic feature of major importance. N/A Recommendation Findings for Approval. The Planning Commission recommended approval and the following findings and conditions of approval: 1. The proposed use will not be detrimental to or endanger the public health, safety, comfort, convenience or general welfare of the neighborhood or the city. Bus traffic is not expected to be detrimental or dangerous, as trips and traffic will be limited to certain times of the day. It is a recommended condition of approval that there be significant berming to provide a sufficient screening of the parking lot. 2. The use or development conforms to the City of Lake Elmo Comprehensive Plan. The property is guided for Business Park, in which local transit, which meets certain standards, is a conditional use per the Zoning Code. The use also provides a significant number of jobs per acre, which is a desired trait of the Business Park land use designation per the Comprehensive Plan. 3. The use or development is compatible with the existing neighborhood. The use is compatible with the existing neighborhood, as the existing use is a truck terminal, which is similar in use and design to a bus terminal. The surrounding parcels are mostly vacant and undeveloped. 4. The proposed use meets all specific development standards for such use listed in Article 7 of this Chapter. The proposal complies with the proposed development standards as recommended in the requested Zoning Text Amendment, although it does not comply with many parking lot, screening, and landscape standards, which have been required as a recommended condition of approval. 5. If the proposed use is in a flood plain management or shoreland area, the proposed use meets all the specific standards for such use listed in Chapter 150, §150.250 through 150.257 (Shoreland Regulations) and Chapter 152 (Flood Plain Management). The property is located outside the 0.2% annual chance floodplain. 6. The proposed use will be designed, constructed, operated and maintained so as to be compatible in appearance with the existing or intended character of the general vicinity Council Meeting 7/17/2018 Item #17 Page 18 and will not change the essential character of that area. While the proposed project is a redevelopment/repurposing of an existing site and will not change the existing character of the area, operations are not within a building and so would not meet the intended character of the neighborhood. 7. The proposed use will not be hazardous or create a nuisance as defined under this Chapter to existing or future neighboring structures. While the proposed use will create a significant amount of traffic, it will be limited to certain times of the day. 8. The proposed use will be served adequately by essential public facilities and services, including streets, police and fire protection, drainage structures, refuse disposal, water and sewer systems and schools or will be served adequately by such facilities and services provided by the persons or agencies responsible for the establishment of the proposed use. There are plans to connect to City sewer and water at the applicant’s cost. The use may require the prompt need for the CSAH 15/Hudson Blvd traffic signal, for which the City will be required to share 25% of the cost, and the Hudson Boulevard realignment. It is not yet known if the applicant’s stormwater management plan meets all City, State, and Valley Branch Watershed District requirements. 9. The proposed use will not create excessive additional requirements at public cost for public facilities and services and will not be detrimental to the economic welfare of the community. While the use will not pay property taxes, sewer and water service charges will be paid by the applicant. 10. The proposed use will not involve uses, activities, processes, materials, equipment and conditions of operation that will be detrimental to any persons, property or the general welfare because of excessive production of traffic, noise, smoke, fumes, glare or odors. The proposed use will generate a significant number of trips per day, though this will be limited to certain times of the day. Minimal noise is expected to come from the site, except during heavy traffic times at specific times within the morning or afternoon. 11. Vehicular approaches to the property, where present, will not create traffic congestion or interfere with traffic on surrounding public thoroughfares. Traffic congestion could be created from the significant number of trips to the site, though these would be limited to certain times of the day. 12. The proposed use will not result in the destruction, loss or damage of a natural or scenic feature of major importance. N/A Recommended Conditions of Approval. If the Council wishes to recommend approval, staff recommends the following conditions: 1) The Zoning Text Amendment to allow local transit (school district transportation center) within the Business Park Zoning District must be approved. 2) No construction or use of the bus terminal (unless in accordance with the Interim Use Permit approved by the City by Resolution 2014-095) may commence until all items as outlined in the City Engineer review memo regarding the Four Corners Preliminary & Final Plat (Stillwater Council Meeting 7/17/2018 Item #17 Page 19 Transportation Center) dated May 30, 2018 and all other subsequent construction plan memos regarding the Stillwater Transportation Center have been addressed; the Four Corners 1st Addition Final Plat has been recorded. 3) The applicant must obtain all other necessary City, State, and other governing body permits prior to the commencement of any construction activity on the parcel including but not limited to an approved stormwater management plan, utility plans, grading plan, street construction plans (if required), parking lot permit, building permits, etc. 4) The Applicant shall submit a photometric plan, and all lighting must meet requirements of Sections 150.035-150.038 of the City Code. 5) The above ground storage tank shall require development of diking around the tank, suitably sealed to hold a leakage capacity equal to 115% of the tank capacity. The applicant shall demonstrate that fire, explosion, or water or soil contamination hazards are not present that would be detrimental to the public health, safety, and general welfare. The applicant shall also fill out an Aboveground Storage Tank Notification of Installation or Change in Status Form as required by the Minnesota Pollution Control Agency (MPCA). 6) The Applicant shall submit an updated Landscape Plan and Tree Preservation Plan which includes sufficient berming and screening and addresses the comments in this report to be reviewed and approved by the City’s Landscape Architect. 7) Parking areas shall be paved with a durable surface including, but not limited to, hot asphalt, bituminous or concrete; spaces shall be marked with painted lines at least four inches wide; required interior and exterior parking lot screening is required; a bumper curb or barrier of normal bumper height shall be provided; and must provide an adequate number of Americans with Disabilities Act (ADA) accessible stalls. 8) A sign permit shall be obtained prior to erection of any sign on the property. 9) The property shall be connected to City sewer and water prior to operation of the bus terminal. 10) A Traffic Impact Study is required to determine timing and extent of improvements required for the CSAH 15 and Hudson Boulevard intersection realignment and traffic signal improvements as well as to determine if an eastbound left turn lane along Hudson Boulevard is also needed at the site access. 11) The applicant shall be required to include a description of the sanitary sewer capacity demands including the number of residential equivalency units (REC) based on the Metropolitan Council Sewer Availability Charge (SAC) determination policy as well as a description of the water capacity demands including average day use, peak day use, and fire suppression demands. Demands must account for all planned uses and connections to the sewer system including bus wash wastewater as well as include potable drinking water, bus washing operations, etc. 12) Applicant shall be responsible to place hydrants throughout the property at the direction of the Fire Department. All fire hydrants shall be owned and maintained by the City. Planning Commission Review. The Planning Commission held a public hearing and considered the requests for a zoning map amendment, preliminary and final plat, zoning text amendment and conditional use permit at its June 18, 2018 meeting. No public comments were received prior to the meeting, and no one from the public spoke at the meeting. Council Meeting 7/17/2018 Item #17 Page 20 During the meeting, the applicant’s representative explained that they have been working with the City, offering to pay the water accessory charge, for a number of years. The applicant believes that the development will help bring water and sewer to the site. It is anticipated that the development will spur other development which will generate higher taxes. The school district also explained that a school bus terminal creates quality public services. The location is ideal, as their district spans a number of miles, and this is a more centralized location for their students. The Planning Commission was supportive of all of the requests and believed that the requests would spur development and bring City services to the area. They indicated that the City should not wait for a better opportunity to come along. They were concerned that the condition that the parking lot be paved and brought to City standards was a burden to the applicant, but it was explained that these are City standards and must be met unless a variance is granted. The Planning Commission recommended approval of all four requests with a vote of 4-0. FISCAL IMPACT: If approved and recommended conditions of approval are adopted, the applicant will be required to pay sewer and water availability charges and will be responsible at its sole cost for bringing sewer and water to the property and extending it to adjacent properties. Maintenance of streets, trails, sanitary sewer mains, and other public infrastructure should be considered. The City will collect Sewer Accessibility Charges and Water Accessibility Charges, building permit fees, and property taxes OPTIONS: The Council may: • Approve the requests for a zoning map amendment to rezone a portion of the property located at 11530 Hudson Blvd N and for the Four Corners preliminary and final plat to subdivide the property located at 11530 Hudson Blvd N and deny the requests for a zoning text amendment to allow local transit as a conditional use within the Business Park zoning district and for a conditional use permit to operate a school district transportation center on a portion of the property located at 11530 Hudson Blvd N with staff recommended findings and applicable conditions of approval. • Approve the requests for a zoning map amendment to rezone a portion of the property located at 11530 Hudson Blvd N and for the Four Corners preliminary and final plat to subdivide the property located at 11530 Hudson Blvd N and deny the requests for a zoning text amendment to allow local transit as a conditional use within the Business Park zoning district and for a conditional use permit to operate a school district transportation center on a portion of the property located at 11530 Hudson Blvd N with amended findings and applicable conditions of approval. • Deny all requests with findings to support denial for the Four Corners preliminary and final plat and zoning map amendment. • Approve all requests with staff-drafted findings and conditions of approval. • Amend any recommended findings and conditions of approval and approve all requests with amended findings and conditions of approval. RECOMMENDATION: Council Meeting 7/17/2018 Item #17 Page 21 The Planning Commission recommends approval of the requests for a zoning map amendment, preliminary and final plat, zoning text amendment, and conditional use permit: “Move to adopt Ord. 08-244 approving the request from Stillwater Area Public Schools for a Zoning Map Amendment to rezone Lot 1, Block 1, Four Corners from Rural Development Transitional to Business Park, subject to recommended condition of approval.” “Move to adopt Resolution 2018-076 approving the request from Terry Emerson for the Four Corners preliminary and final plat to subdivide the property located at 11530 Hudson Blvd N in to Lot 1, Block 1, Four Corners, along with three separate outlots, subject to recommended conditions of approval.” “Move to adopt Ord. 08-215 approving the request from Stillwater Area Public Schools for a Zoning Text Amendment to allow local transit as a conditional use within the Business Park zoning district.” “Move to adopt Resolution 2018-077 approving the request from Stillwater Area Public Schools for a Conditional Use Permit to allow a school district transportation center at the property located at Lot 1, Block 1, Four Corners with the conditions as recommended by Staff/with the amended conditions of approval.” Staff recommends denial of the zoning text amendment and conditional use permit: “Move to adopt Resolution 2018-078 denying the request from Stillwater Area Public Schools for a Zoning Text Amendment to allow local transit as a conditional use within the Business Park zoning district based on recommended findings.” “Move to adopt Resolution 2018-079 denying the request from Stillwater Area Public Schools for a Conditional Use Permit to allow a school district transportation center at the property located at Lot 1, Block 1, Four Corners based on recommended findings.” ATTACHMENTS: • Applications for Zoning Text Amendment, Zoning Map Amendment, Conditional Use Permit and Four Corners preliminary and final plat and Narratives. • Preliminary and Final Plat • Engineer Memo • Bus Terminal Plans • Ord. 08-214 approving the Zoning Map Amendment • Resolution 2018-076 approving the Preliminary and Final Plat • Resolution 2018-078 denying the Zoning Text Amendment • Resolution 2018-079 denying the Conditional Use Permit • Ord. 08-215 approving the Zoning Text Amendment • Resolution 2018-077 approving the Conditional Use Permit City of Lake Elmo Narrative for Zoning Map Amendment April 30, 2018 The property being considered for re-development is currently being used for after-market parts and equipment sales, along with service of Kenworth Diesel Trucks. The proposed use for a School District Transportation Center. School buses for the District would be parked at this facility when not in use, along with performing routine maintenance of the buses at this location. As part of the servicing and maintenance of the buses, it is also planned to wash and fuel buses at this facility. Approximately 200 people would work at this facility, with morning and afternoon shifts of drivers and attendants, along with the vehicle maintenance and administrative staff This proposed use would be similar to the existing use of the property, in providing routine service of vehicles. Parking for the school buses (total of 140) transportation vans (about 20) and personal vehicles of the employees (about 200) would be provided on-site. This location is adjacent to major traffic corridors and routes within this area of the City of Lake Elmo and this would have less of an impact on traffic flow than would occur on lower volume roads or those through residential areas. Water and sanitary sewer infrastructure are also proposed to this area of the City as part of the adjacent development and re-alignment of Hudson Boulevard, eliminating the need for septic systems for treatment of wastewater from this facility. As the water for the facility is switched from the well to municipal water, the existing well would be abandoned in accordance with Minnesota Health Department requirements. City of Lake Elmo Narrative for Zoning Text Amendment April 30, 2018 The property being considered for re-development is currently being used for after-market parts and equipment sales, along with service of Kenworth Diesel Trucks. The proposed use is for local school buses to be parked along with routine maintenance at this location. This proposed use (local transit) is currently not listed in the zoning code as a permitted use in the Business Park Zoning District, but would be similar to the existing use of the property. In addition, this location is adjacent to major traffic corridors and routes, and this would limit bus traffic on lower volume roads and through residential areas. This proposed use would not be detrimental to the other permitted uses in the Business Park District. This use would be consistent with the City of Lake Elmo Comprehensive Plan for the Business Park District in providing a diverse mixed use, with a high density of jobs at this location. This facility will employee about 200 people, including the various shifts, positions and administrative staff. Water and sanitary sewer infrastructure are also proposed to this area of the City as part of the adjacent development and re-alignment of Hudson Boulevard, eliminating the need for septic systems for treatment of wastewater from this facility. As the water for the facility is switched from the well to municipal water, the existing well would be abandoned in accordance with Minnesota Health Department requirements. City of Lake Elmo Narrative for Conditional Use Permit Stillwater Area Public Schools April 30, 2018 Contact Information: Stillwater Area Public Schools – Kristen Hoheisel – 651-351-8321, Email: hoheiselk@stilwaterschools.org Property Owner: Terry Emerson – 651-845-3373, Email: tse03@comcast.net Engineer: Greg Buchal - Larson Engineering 651-255-0328, Email: gbuchal@larsonengr.com Surveyor: Tim Freeman – FFE Surveying 651-439-8833, Email: freeman@ffe-inc.com Property Address: 11530 Hudson Blvd. North, Lake Elmo, MN 55042 Current Zoning: Business Park Parcel Size: 11 acres (approximately 479,160 sq. ft.) PID Number: 36 029 21 43 0001 Current building was constructed in the 1990’s and was used for office space by E& H Earthmovers and also provided bus storage for Stillwater Schools. The building was then used by Kenworth Diesel Trucks for sales, repairs and service of diesel trucks, and is currently being considered for bus parking and maintenance by Stillwater Schools again. The proposed use is for a School District Transportation Center. The existing building, paved and gravel parking area, along with the existing landscaped berms would remain as they are and the site would be expanded to provide additional gravel surfaced parking for school buses and employee cars. School buses for the District would be parked at this facility when not in use, along with performing routine maintenance of the buses at this location. As part of the servicing and maintenance of the buses, it is also planned to wash and fuel buses at this facility. Approximately 200 people would work at this facility, with morning and afternoon shifts of drivers and attendants, along with the vehicle maintenance and administrative staff. Hours of operation would be from about 6:00am to about 6:00pm during the weekdays with occasional Saturday use for limited special school district transportation needs. This proposed use would be similar to the existing use of the property, in providing routine service of vehicles. Parking for the school buses (total of 140) transportation vans (about 20) and personal vehicles of the employees (about 200) would be provided on-site. This location is adjacent to major traffic corridors and routes within this area of the City of Lake Elmo and this would have less of an impact on traffic flow than would occur on lower volume roads or those through residential areas. Being located along the Highway 94 corridor, the bus traffic would have a minimal impact on the already higher volumes of traffic in this area. In addition, the peak bus traffic times will be limited to the morning hours, from about 7:00am to 9:00am to get student to school, and from about 2:00pm to 4:00pm to get students back home from school. This proposed use would not be detrimental to the other permitted uses in the Business Park District. This use would be consistent with the City of Lake Elmo Comprehensive Plan for the Business Park District in providing a diverse mixed use, with a high density of jobs at this location. This facility will employee about 200 people, including the various shifts, positions and administrative staff. Water and sanitary sewer infrastructure are also proposed to this area of the City as part of the adjacent re-development and re-alignment of Hudson Boulevard, eliminating the need for septic systems for treatment of wastewater from this facility. As the water for the facility is switched from the well to municipal water, the existing well would be abandoned in accordance with Minnesota Health Department requirements.   PAGE 1 of 3  MEMORANDUM           Date:  May 30, 2018      To: Emily Becker, Planner Director Re: Four Corners Preliminary & Final Plat  (Stillwater Transportation Center)  Cc:  Chad Isakson, Assistant City Engineer      From: Jack Griffin, P.E., City Engineer          An engineering review has been completed for the Four Corners Preliminary and Final Plat including the Stillwater  Transportation Center. Preliminary Plat/Final Plat and Site Plans were received on May 16, 2018. The submittal  consisted of the following documentation:     Four Corners Preliminary Plat, dated May 4, 2‐18, prepared by Folz Freeman Surveying LLC.   Four Corners Final Plat, not dated, prepared by Folz Freeman Surveying LLC.   Stillwater Bus Facility Site Plans, dated April 30, 2018, prepared by Larson Engineering Inc.   Project Narratives, dated April 30, 2018.      Engineering has the following review comments:    STORMWATER MANAGEMENT   A State and Valley Branch Watershed District (VBWD) permit will be required. The site plan is subject to a  storm water management plan meeting State, VBWD and City rules and regulations. No proposed storm  water management plan was provided as part of the Plan submittal.   A storm water management plan must be submitted detailing the stormwater management calculations  to support any proposed improvements to meet agency requirements including the HydroCAD model in  electronic format. The Management plan must include a summary report describing the overall  stormwater management plan and performance criteria for all required storm events.    Storm water facilities proposed for meeting State and VBWD permitting requirements must be designed  and constructed in accordance with the City Engineering Design Standards Manual available on the City  website, dated March 2017.   The storm  water facilities constructed for this development should remain privately  owned and  maintained. The applicant will be required to execute and record a  Stormwater Maintenance and  Easement Agreement in the City’s standard form of agreement.   Even as privately owned and maintain facilities, maintenance access roads meeting the City engineering  design standards must be provided for all storm water facilities.   The storm water facility 100‐year HWL must be fully contained within the subject property or easements  must be acquired to protect the 100‐year HWL flood area. The proposed plans show the 100‐year HWL  event discharging off‐site at the southeast corner.   City design standards, details and plan notes must be used for erosion control.        FOCUS ENGINEERING, inc.  Cara Geheren, P.E.  651.300.4261  Jack Griffin, P.E.               651.300.4264  Ryan Stempski, P.E. 651.300.4267  Chad Isakson, P.E. 651.300.4285    PAGE 2 of 3  STREETS AND TRANSPORTATION     Hudson Boulevard Right‐of‐Way/Easement Dedication. No additional right‐of‐way dedication is required  unless an eastbound left turn lane is required (see below). However, a 10‐foot utility corridor easement  for small utilities must be dedicated to the City along the north boulevard of Hudson Blvd.   Site Access. The site plans propose the continued use of the existing commercial driveway with dedicated  right and left turn lanes leaving the site.   Hudson Boulevard Improvements. As part of the development, Hudson Boulevard must be improved per  the City design standards to an urban section on the north side of the street including a west bound right  turn lane to the site, a 4‐foot shoulder (curb reaction), a 9‐foot boulevard, and  10‐foot shared use  bituminous trail with 2‐foot clear zone (see attached typical section and preliminary layout).   Traffic Impact Study. A traffic impact study should be completed and submitted as part of the preliminary  plat application to determine the timing and  extent of improvements required for the CSAH 15 and  Hudson Boulevard intersection realignment and traffic signal improvements. A financial contribution to  CSAH 15/Hudson Blvd traffic signal/realignment should be considered. In addition, the study is needed to  determine if an eastbound left turn land along Hudson Boulevard is also needed at the Site access.    MUNICIPAL SANITARY SEWER   The proposed site is guided in the City’s Comprehensive Plan for 2020‐2030 Regional Sewer Staging Plan  and would discharge to the MCES Cottage Grove Ravine Interceptor. Therefore, provisions for connecting  to the municipal sanitary sewer service must be included with this application. The site plans/application  indicates a new sewer service line connecting to future sanitary sewer but does not address the extension  of sanitary sewer to the site.   The applicant will be responsible to connect to the City sanitary sewer system and extend sanitary sewer  into the property at applicant’s sole cost. In addition, the applicant will be required to stub sanitary sewer  mains to adjacent properties so that these parcels maintain sewer access. Sanitary sewer is available  along Hudson Blvd near the MCES Meter Station. The sanitary sewer trunk size will need to be determined  based on the 2040 Comprehensive Plan.   The application should include a description of the sanitary sewer capacity demands including the number  of residential equivalent units (REC) based on the Met Council SAC determination policy. Demands must  account for all planned uses and connections to the sewer system including bus wash wastewater. This  information is required for staff evaluation of the sewer system improvements needed to support the  development and to determine the applicable sewer availability charges.   Existing Utility Easements. The existing sanitary sewer utility easements along Hudson Boulevard and the  new commercial street corridor must be shown with the preliminary plan submittal and plan revisions  must be made to avoid encroachments/conflicts with these easements.   Any main sewer lines placed within the development will require minimum 30‐foot easements centered  over the pipe (or wider dependent upon the sewer depths) dedicated to the City and in the form of the  City’s Utility Easement Agreement.     MUNICIPAL WATER SUPPLY   The  proposed facility resides within  the Planned  MUSA, therefore provisions for connecting to the  municipal water supply must be included with this application. The site plans/application indicate a new  water service line connecting to future water but does not address the extension of the municipal water  supply to the site.   The applicant will be responsible  to extend municipal water  to the property at the applicant’s cost.  Watermain stubs will be required to eastern property limits. Water is available to be extended to the  property from the Hunter’s Crossing development but will require easements across adjacent properties.  The watermain extension to the site will likely be a 12‐inch trunk watermain.     The application should include a description of the water capacity demands including average day use,  peak day use, and fire suppression demands. All demand should be provided including potable drinking    PAGE 3 of 3  water, bus washing operations, etc. This information  is required  for staff  evaluation of  the  water  improvements needed to support the development and to determine the water availability charges.   The proposed site is in the water system’s low‐pressure zone which has limited capacity until a new water  tower is constructed to serve the area.   The applicant will be responsible to place hydrants throughout the property at the direction of the Fire  Department.  All fire hydrants shall be owned and maintained by the City.   Any watermain  lines and hydrants  placed within  the development will require minimum  30‐foot  easements centered over the pipe. Easements must be dedicated to the City and be provided in the City’s  standard form of easement agreement.              PROJECT: 2018 STILLWATER BUS FACILITY IMPROVEMENTS STILLWATER AREA PUBLIC SCHOOLS 1875 SOUTH GREELEY STREET STILLWATER, MINNESOTA 55082 VICINITY MAP INDEX OF DRAWINGS PROJECT CONTACTS T - C1 C2 C3 C3.1 C4 C5 C6 Title Sheet Topographic Survey Demolition Plan Paving and Dimension Plan Grading and Erosion Control Plan Landscape Plan Utility Plan Details Details Civil Engineer: Greg A. Buchal, P.E. Larson Engineering, Inc. 3524 Labore Road White Bear Lake, MN 55110 Tel: 651.481.9120 Fax: 651.481.9201 DescriptionRev. Date 20 1 8 S T I L L W A T E R BU S F A C I L I T Y IM P R O V E M E N T S ST I L L W A T E R A R E A P U B L I C S C H O O L S ST I L L W A T E R , M N 5 5 0 8 2 Sheet: Sheet Title: Project #: Drawn By: Checked By: Issue Date: 12176010 KJA GAB 04.30.18 35 2 4 L a b o r e R o a d Wh i t e B e a r L a k e , M N 5 5 1 1 0 65 1 . 4 8 1 . 9 1 2 0 ( f ) 6 5 1 . 4 8 1 . 9 2 0 1 ww w . l a r s o n e n g r . c o m C 2 0 1 8 L a r s o n E n g i n e e r i n g , I n c . A l l r i g h t s r e s e r v e d . P:\Projects\Projects - 2017\12176010 - Stillwater Bus Facility Evals\C. Design\Drawing Files\12176010 - T.dwg 35 2 4 L a b o r e R o a d Wh i t e B e a r L a k e , M N 5 5 1 1 0 65 1 . 4 8 1 . 9 1 2 0 ( f ) 6 5 1 . 4 8 1 . 9 2 0 1 ww w . l a r s o n e n g r . c o m Pr o j e c t T i t l e : ST I L L W A T E R A R E A PU B L I C S C H O O L S 18 7 5 S O U T H G R E E L E Y S T R E E T ST I L L W A T E R , M I N N E S O T A 5 5 0 8 2 Cl i e n t : Greg A. Buchal, P.E. Date: Reg. No.:04.30.18 23793 I hereby certify that this plan, specifications or report was prepared by me or under my direct supervision and that I am a duly licensed Professional Engineer under the laws of the state of Minnesota. CI T Y S U B M I T T A L TITLE SHEET T Surveyor: Tim Freeman, P.L.S. FFE Surveying LLC 12445 55th Street North Lake Elmo, MN 55042 Tel: 651.439.8833 Fax: 651.430.9331 Proposed Stillwater Bus Facility 11530 Hudson Boulevard North Lake Elmo, MN 55042 FFE = 904.50 BUILDING AREA= 15,498 SF EXISTING STORMWATER POND AREA 1 1 32 2 2 4 4 5 DescriptionRev. Date 20 1 8 S T I L L W A T E R BU S F A C I L I T Y IM P R O V E M E N T S ST I L L W A T E R A R E A P U B L I C S C H O O L S ST I L L W A T E R , M N 5 5 0 8 2 Sheet: Sheet Title: Project #: Drawn By: Checked By: Issue Date: 12176010 KJA GAB 04.30.18 35 2 4 L a b o r e R o a d Wh i t e B e a r L a k e , M N 5 5 1 1 0 65 1 . 4 8 1 . 9 1 2 0 ( f ) 6 5 1 . 4 8 1 . 9 2 0 1 ww w . l a r s o n e n g r . c o m C 2 0 1 8 L a r s o n E n g i n e e r i n g , I n c . A l l r i g h t s r e s e r v e d . P:\Projects\Projects - 2017\12176010 - Stillwater Bus Facility Evals\C. Design\Drawing Files\12176010 - C1.dwg 35 2 4 L a b o r e R o a d Wh i t e B e a r L a k e , M N 5 5 1 1 0 65 1 . 4 8 1 . 9 1 2 0 ( f ) 6 5 1 . 4 8 1 . 9 2 0 1 ww w . l a r s o n e n g r . c o m Pr o j e c t T i t l e : ST I L L W A T E R A R E A PU B L I C S C H O O L S 18 7 5 S O U T H G R E E L E Y S T R E E T ST I L L W A T E R , M I N N E S O T A 5 5 0 8 2 Cl i e n t : Greg A. Buchal, P.E. Date: Reg. No.:04.30.18 23793 I hereby certify that this plan, specifications or report was prepared by me or under my direct supervision and that I am a duly licensed Professional Engineer under the laws of the state of Minnesota. CI T Y S U B M I T T A L 0 NORTH 20 40 80 REMOVE AND DISPOSE OF EXISTING BITUMINOUS PAVEMENT SECTION REMOVE AND DISPOSE OF EXISTING CONCRETE PAVEMENT SECTION REMOVE AND DISPOSE OF EXISTING GRAVEL SECTION SYMBOL LEGEND REMOVE AND DISPOSE OF EXISTING CONCRETE CURB AND GUTTER. REMOVE AND DISPOSE OF EXISTING CHAIN LINK FENCE FABRIC, POSTS, AND FOOTINGS. REMOVE AND DISPOSE OF EXISTING CONCRETE PAVEMENT SECTION. SAWCUT, REMOVE, AND DISPOSE OF EXISTING BITUMINOUS PAVEMENT SECTION. REMOVE AND DISPOSE OF EXISTING STORM SEWER. 1 2 DEMOLITION PLAN C1 KEY NOTES DEMOLITION NOTES 1.Verify all existing utility locations. 2.It is the responsibility of the Contractor to perform or coordinate all necessary utility demolitions and relocations from existing utility locations to all onsite amenities and buildings. These connections include, but are not limited to, water, sanitary sewer, cable tv, telephone, gas, electric, site lighting, etc. 3.Prior to beginning work, contact Gopher State Onecall (651-454-0002) to locate utilities throughout the area under construction. The Contractor shall retain the services of a private utility locator to locate the private utilities. 4.Sawcut along edges of pavements, sidewalks, and curbs to remain. 5.All construction shall be performed in accordance with state and local standard specifications for construction. 3 4 5 LOT SIZE Total Lot Size: 478,997 s.f. = 11.00 Acres Breakdown: Existing Building: 15,498 s.f. = 3.23% Existing Gravel: 91,861 s.f. = 19.18% Existing Pavement: 9,022 s.f. = 1.88% Existing Open Space: 362,616 s.f. = 75.71% FFE = 904.50 BUILDING AREA= 15,498 SF EXISTING STORMWATER POND AREA 9 6 3 16 17 17 20 25 56 56 34 NO PARKING NO PARKING NO PARKING 6 1818 16161616 STORMWATER POND AREA C5 1 C5 1 C5 4 C5 4 C5 4 C5 4 C5 4 C5 4 C5 6 C5 6 C5 6 C5 6 C5 7 C5 2 C5 2 C5 2 C5 2 C5 2 C5 3 C5 5 C6 1 (9 TYP) STORMWATER POND AREA FUELING AREA & ABOVE GROUND STORAGE TANK C5 5 18'24'18'18'24'18'18'24'18'14' 45'87'45'87'45.7' 119.7' 98 . 5 ' 2' 10 ' 57.5'60'45'87' 2' 10 ' 2' 10 ' 2' 10 ' 35 . 2 ' 20 ' 39 . 8 ' 39 . 8 ' 19 ' 5' 45 ' 45 ' 2'10' 9' 9' 9' 9' 9'9'9' 9' 24 ' 24 ' 24 ' 22 . 6 ' 49 . 3 ' 7' 18 . 7 ' 24 ' 18 . 7 ' 26 . 3 ' 34.3' 9'9' 9' DescriptionRev. Date 20 1 8 S T I L L W A T E R BU S F A C I L I T Y IM P R O V E M E N T S ST I L L W A T E R A R E A P U B L I C S C H O O L S ST I L L W A T E R , M N 5 5 0 8 2 Sheet: Sheet Title: Project #: Drawn By: Checked By: Issue Date: 12176010 KJA GAB 04.30.18 35 2 4 L a b o r e R o a d Wh i t e B e a r L a k e , M N 5 5 1 1 0 65 1 . 4 8 1 . 9 1 2 0 ( f ) 6 5 1 . 4 8 1 . 9 2 0 1 ww w . l a r s o n e n g r . c o m C 2 0 1 8 L a r s o n E n g i n e e r i n g , I n c . A l l r i g h t s r e s e r v e d . P:\Projects\Projects - 2017\12176010 - Stillwater Bus Facility Evals\C. Design\Drawing Files\12176010 - C2.dwg 35 2 4 L a b o r e R o a d Wh i t e B e a r L a k e , M N 5 5 1 1 0 65 1 . 4 8 1 . 9 1 2 0 ( f ) 6 5 1 . 4 8 1 . 9 2 0 1 ww w . l a r s o n e n g r . c o m Pr o j e c t T i t l e : ST I L L W A T E R A R E A PU B L I C S C H O O L S 18 7 5 S O U T H G R E E L E Y S T R E E T ST I L L W A T E R , M I N N E S O T A 5 5 0 8 2 Cl i e n t : Greg A. Buchal, P.E. Date: Reg. No.:04.30.18 23793 I hereby certify that this plan, specifications or report was prepared by me or under my direct supervision and that I am a duly licensed Professional Engineer under the laws of the state of Minnesota. CI T Y S U B M I T T A L 0 NORTH 20 40 80 NEW 6" BITUMINOUS PAVEMENT OVER NEW 8" CRUSHED AGGREGATE BASE OVER 24" GRANULAR BACKFILL SEE DETAIL 1/C5 NEW 6" CONCRETE PAVEMENT OVER NEW 6" CRUSHED AGGREGATE BASE SEE DETAIL 3/C5 NEW 10" AGGREGATE OVER NEW 24" GRANULAR BACKFILL SEE DETAIL 2/C5 SYMBOL LEGEND WHERE APPLICABLE, DIMENSIONS ARE FROM BACK OF CURB TO BACK OF CURB OR BACK OF CURB TO END OF STALL LINE. PAVING AND DIMENSION PLAN C2 ADA STALLS = 6 CAR STALLS = 199 VAN STALLS = 20 SHORT BUS STALLS = 40 LARGE BUS STALLS = 100 PARKING STALL COUNT LOT SIZE Total Lot Size: 478,997 s.f. = 11.00 Acres Breakdown: Proposed Building: 15,498 s.f. = 3.23% Proposed Gravel: 245,791 s.f. = 51.31% Proposed Pavement: 12,588 s.f. = 2.63% Proposed Open Space: 205,120 s.f. = 42.83% 901 900 90 2 905 905 904 904 906 907 903 902 902 903 910911 909 908 91 2 91 0 90 9 90 8 90 8 903 90 5 9 0 4 9 0 8 90 6 9 0 3 90 7 90 6 90 5 90 4 90 3 90 2 90 1 90 0 89 9 89 8 89 7 906 907 908 909 909 908 907 906 905 89 7 89 8 89 9 90 0 90 1 89 9 89 7 89 8 89 9 89 6 89 5 . 8 0 901.38 GV* 901.27 RIM 903.40 GV* 903.35 GV*903.60 GV* 907.26 GV 907.31 GV 907.13 GV 906.29 GV 906.11 GV 905.98 GV 904.06 GV 904.18 GV 903.89 GV 903.77 GV 903.00 GV 903.05 GV 903.40 GV903.05 GV 903.25 GV 905.48 GV 904.57 TC 904.07 GL905.00 GV 904.52 GV 904.42 TC 903.92 GL 903.61 TC 903.11 GL 901.78 TC 901.34 GL 902.14 TC 901.64 GL 902.04 TC 901.54 GL 904.50 TC 904.00 GL 904.50 TC 904.00 GL 904.50 TC 904.00 GL 903.40 C 904.90 TC 904.40 GL 904.90 TC 904.40 GL 903.55 TC 903.25 GL* 903.92 TC 903.42 GL* PRETREATMENT POND NWL: 895.00 100-YR HWL: 898.19 INFILTRATION POND BOT: 895.80 100-YR HWL: 898.19 INFIL. VOL: 33,658 CF 1 . 1 1 % 1 . 1 1 % 1. 5 % 1.5% 1.8% 1.6 % 1 . 0 % 1. 0 % 904.50 TC 904.00 GL FFE = 904.50 BUILDING AREA= 15,498 SF EXISTING STORMWATER POND AREA C6 6 C6 6 C6 6 C6 6 C6 5 C6 5 C6 5 C6 7(TYP) C6 4 DescriptionRev. Date 20 1 8 S T I L L W A T E R BU S F A C I L I T Y IM P R O V E M E N T S ST I L L W A T E R A R E A P U B L I C S C H O O L S ST I L L W A T E R , M N 5 5 0 8 2 Sheet: Sheet Title: Project #: Drawn By: Checked By: Issue Date: 12176010 KJA GAB 04.30.18 35 2 4 L a b o r e R o a d Wh i t e B e a r L a k e , M N 5 5 1 1 0 65 1 . 4 8 1 . 9 1 2 0 ( f ) 6 5 1 . 4 8 1 . 9 2 0 1 ww w . l a r s o n e n g r . c o m C 2 0 1 8 L a r s o n E n g i n e e r i n g , I n c . A l l r i g h t s r e s e r v e d . P:\Projects\Projects - 2017\12176010 - Stillwater Bus Facility Evals\C. Design\Drawing Files\12176010 - C3.dwg 35 2 4 L a b o r e R o a d Wh i t e B e a r L a k e , M N 5 5 1 1 0 65 1 . 4 8 1 . 9 1 2 0 ( f ) 6 5 1 . 4 8 1 . 9 2 0 1 ww w . l a r s o n e n g r . c o m Pr o j e c t T i t l e : ST I L L W A T E R A R E A PU B L I C S C H O O L S 18 7 5 S O U T H G R E E L E Y S T R E E T ST I L L W A T E R , M I N N E S O T A 5 5 0 8 2 Cl i e n t : Greg A. Buchal, P.E. Date: Reg. No.:04.30.18 23793 I hereby certify that this plan, specifications or report was prepared by me or under my direct supervision and that I am a duly licensed Professional Engineer under the laws of the state of Minnesota. CI T Y S U B M I T T A L 0 NORTH 20 40 80 GRADING AND EROSION CONTROL PLAN C3 PROPOSED CONTOURS - MAJOR INTERVAL GRADE BREAK LINE PROPOSED CONTOURS - MINOR INTERVAL949 950 950 EXISTING CONTOURS 2.0% 950.00 TC 949.50 GL GRADE SLOPE SPOT ABBREVIATIONS: TC - TOP OF CURB GL - GUTTER LINE B - BITUMUNOUS C - CONCRETE EO - EMERGENCY OVERFLOW TW - TOP OF WALL BW - BOTTOM OF WALL (F/G) (*) - EXISTING TO BE VERIFIED SILT FENCE RIP-RAP INLET PROTECTION CONCRETE WASHOUT STATION LEGEND 1. Owner and Contractor shall obtain MPCA-NPDES permit. Contractor shall be responsible for all fees pertaining to this permit. The SWPPP shall be kept onsite at all times. 2. Install temporary erosion control measures (inlet protection, silt fence, and rock construction entrances) prior to beginning any excavation or demolition work at the site. 3. Erosion control measures shown on the erosion control plan are the absolute minimum. The contractor shall install temporary earth dikes, sediment traps or basins, additional siltation fencing, and/or disk the soil parallel to the contours as deemed necessary to further control erosion. All changes shall be recorded in the SWPPP. 4. All construction site entrances shall be surfaced with crushed rock across the entire width of the entrance and from the entrance to a point 50' into the construction zone. 5.7KHWRHRIWKHVLOWIHQFHVKDOOEHWUHQFKHGLQDPLQLPXPRI´7KHWUHQFKEDFNILOO shall be compacted with a vibratory plate compactor. 6. All areas with steeper than 4:1 slope shall have erosion control blankets placed on them when grading is complete. 7. All grading operations shall be conducted in a manner to minimize the potential for site erosion. Sediment control practices must be established on all down gradient perimeters before any up gradient land disturbing activities begin. 8. All exposed soil areas must be stabilized as soon as possible to limit soil erosion but in no case later than 14 days after the construction activity in that portion of the site has temporarily or permanently ceased. Temporary stockpiles without significant silt, clay or organic components (e.g., clean aggregate stockpiles, demolition concrete stockpiles, sand stockpiles) and the constructed base components of roads, parking lots and similar surfaces are exempt from this requirement. 9. The normal wetted perimeter of any temporary or permanent drainage ditch or swale that drains water from any portion of the construction site, or diverts water around the site, must be stabilized within 200 lineal feet from the property edge, or from the point of discharge into any surface water. Stabilization of the last 200 lineal feet must be completed within 24 hours after connecting to a surface water. Stabilization of the remaining portions of any temporary or permanent ditches or swales must be complete within 14 days after connecting to a surface water and construction in that portion of the ditch has temporarily or permanently ceased. 10. Pipe outlets must be provided with energy dissipation within 24 hours of connection to surface water. 11. All riprap shall be installed with a filter material or soil separation fabric and comply with the Minnesota Department of Transportation Standard Specifications. 12. All storm sewers discharging into wetlands or water bodies shall outlet at or below the normal water level of the respective wetland or water body at an elevation where the downstream slope is 1 percent or flatter. The normal water level shall be the invert elevation of the outlet of the wetland or water body. 13. All storm sewer catch basins not needed for site drainage during construction shall be covered to prevent runoff from entering the storm sewer system. Catch basins necessary for site drainage during construction shall be provided with inlet protection. 14. In areas where concentrated flows occur (such as swales and areas in front of storm catch basins and intakes) the erosion control facilities shall be backed by stabilization structure to protect those facilities from the concentrated flows. 15. Inspect the construction site once every seven days during active construction and within 24 hours after a rainfall event greater than 0.5 inches in 24 hours. All inspections shall be recorded in the SWPPP. 16. All silt fences must be repaired, replaced, or supplemented when they become nonfunctional or the sediment reaches 1/3 of the height of the fence. These repairs must be made within 24 hours of discovery, or as soon as field conditions allow access. All repairs shall be recorded in the SWPPP. 17. If sediment escapes the construction site, off-site accumulations of sediment must be removed in a manner and at a frequency sufficient to minimize off-site impacts. 18. All soils tracked onto pavement shall be removed daily. 19. All infiltration areas must be inspected to ensure that no sediment from ongoing construction activity is reaching the infiltration area and these areas are protected from compaction due to construction equipment driving across the infiltration area. 20. Temporary soil stockpiles must have silt fence or other effective sediment controls, and cannot be placed in surface waters, including stormwater conveyances such as curb and gutter systems, or conduits and ditches unless there is a bypass in place for the stormwater. 21. Collected sediment, asphalt and concrete millings, floating debris, paper, plastic, fabric, construction and demolition debris and other wastes must be disposed of properly and must comply with MPCA disposal requirements. 22. Oil, gasoline, paint and any hazardous substances must be properly stored, including secondary containment, to prevent spills, leaks or other discharge. Restricted access to storage areas must be provided to prevent vandalism. Storage and disposal of hazardous waste must be in compliance with MPCA regulations. 23. External washing of trucks and other construction vehicles must be limited to a defined area of the site. Runoff must be contained and waste properly disposed of. No engine degreasing is allowed onsite. 24. All liquid and solid wastes generated by concrete washout operations must be contained in a leak-proof containment facility or impermeable liner. A compacted clay liner that does not allow washout liquids to enter ground water is considered an impermeable liner. The liquid and solid wastes must not contact the ground, and there must not be runoff from the concrete washout operations or areas. Liquid and solid wastes must be disposed of properly and in compliance with MPCA regulations. A sign must be installed adjacent to each washout facility to inform concrete equipment operators to utilize the proper facilities. 25. Upon completion of the project and stabilization of all graded areas, all temporary erosion control facilities (silt fences, hay bales, etc.) shall be removed from the site. 26. All permanent sedimentation basins must be restored to their design condition immediately following stabilization of the site. 27. Contractor shall submit Notice of Termination for MPCA-NPDES permit within 30 days after Final Stabilization. EROSION CONTROL NOTES GRADING NOTES 1. Tree protection consisting of snow fence or safety fence installed at the drip line shall be in place prior to beginning any grading or demolition work at the site. 2. All elevations with an asterisk (*) shall be field verified. If elevations vary significantly, notify the Engineer for further instructions. 3. Grades shown in paved areas represent finish elevation. 4.5HVWRUHDOOGLVWXUEHGDUHDVZLWK´RIJRRGTXDOLW\ topsoil and seed or sod. See Landscape Plan. 5. All construction shall be performed in accordance with state and local standard specifications for construction. EROSION CONTROL BLANKET 901 900 90 2 905 905 904 904 906 907 903 902 902 903 910911 909 908 91 2 91 0 90 9 90 8 90 8 903 90 5 9 0 4 9 0 8 90 6 9 0 3 90 7 90 6 90 5 90 4 90 3 90 2 90 1 90 0 89 9 89 8 89 7 906 907 908 909 909 908 907 906 905 89 7 89 8 89 9 90 0 90 1 89 9 89 7 89 8 89 9 89 6 89 5 . 8 0 FFE = 904.50 BUILDING AREA= 15,498 SF EXISTING STORMWATER POND AREA 20 ' T Y P DescriptionRev. Date 20 1 8 S T I L L W A T E R BU S F A C I L I T Y IM P R O V E M E N T S ST I L L W A T E R A R E A P U B L I C S C H O O L S ST I L L W A T E R , M N 5 5 0 8 2 Sheet: Sheet Title: Project #: Drawn By: Checked By: Issue Date: 12176010 KJA GAB 04.30.18 35 2 4 L a b o r e R o a d Wh i t e B e a r L a k e , M N 5 5 1 1 0 65 1 . 4 8 1 . 9 1 2 0 ( f ) 6 5 1 . 4 8 1 . 9 2 0 1 ww w . l a r s o n e n g r . c o m C 2 0 1 8 L a r s o n E n g i n e e r i n g , I n c . A l l r i g h t s r e s e r v e d . P:\Projects\Projects - 2017\12176010 - Stillwater Bus Facility Evals\C. Design\Drawing Files\12176010 - C3.1.dwg 35 2 4 L a b o r e R o a d Wh i t e B e a r L a k e , M N 5 5 1 1 0 65 1 . 4 8 1 . 9 1 2 0 ( f ) 6 5 1 . 4 8 1 . 9 2 0 1 ww w . l a r s o n e n g r . c o m Pr o j e c t T i t l e : ST I L L W A T E R A R E A PU B L I C S C H O O L S 18 7 5 S O U T H G R E E L E Y S T R E E T ST I L L W A T E R , M I N N E S O T A 5 5 0 8 2 Cl i e n t : Greg A. Buchal, P.E. Date: Reg. No.:04.30.18 23793 I hereby certify that this plan, specifications or report was prepared by me or under my direct supervision and that I am a duly licensed Professional Engineer under the laws of the state of Minnesota. CI T Y S U B M I T T A L 0 NORTH 20 40 80 LANDSCAPE PLAN C3.1 LEGEND NORWAY SPRUCE (PICEA ABIES): 6' TALL, 62 TOTAL (50.4%) COLORADO BLUE SPRUCE (PICEA PUNGENS): 6' TALL 61 TOTAL (49.6%) /#: žÄžž 1(6470-&+#/'6'4 4#&+75HV2'4KP .+/+651(%4+6+%#.4116<10' ('0%'.1%#6+10 &4+2Ä.+0' 8#4+'5 žž&+#64'' žÄžž(14 64''2416'%6+10('0%' %4+6+%#.4116<10' &4+2Ä.+0' 64''2416'%6+10('0%' žÄžž NOT TO SCALE TREE PROTECTION2 SOD MATERIAL NATIVE PRAIRIE SEED RESTORATION BWSR MIX 34-241(MESIC PRAIRIE) 36.5 LB/AC INFILTRATION POND SEED BWSR MIX 34-271 (WET MEADOW) 12 LB/AC WET POND SEED BWSR MIX 34.181 (EMERGENT WETLAND) 5 LB/AC EQUALS TWICE BALL DIAMETER 12 " M I N . 18" MIN. OPTIONAL STAKING METHOD - 6' METAL POSTS AND RUBBER HOSE STRAPS HOSE LOOPS 3 GUYS EACH OF 10 GAUGE TWISTED WIRE 120 DEGREES APART AROUND TREECOLORED FLAGS 1 PER WIRE TURNBUCKLE 4" DEEP MULCH, HOLD BACK 2" FROM STEM. SOD 24" STAKE TYP. BACKFILL WITH TOPSOIL AND PEAT MOSS 3:1 RATIO FOLD BACK BURLAP AND REMOVE ALL TIES &/OR WIRES FROM TOP OF BALL REFER ALSO TO SPECIFICATIONS SCARIFY ALL SIDES AND BOTTOM OF EXCAVATED HOLE PLANTING DETAIL1 CONIFEROUS TREE 64''2416'%6+10(14 #..':+56+0)64''5#&,#%'06 61241215'&914-#4'#5 FFE = 904.50 BUILDING AREA= 15,498 SF EXISTING STORMWATER POND AREA CB-5 RIM: 901.27 INV: 897.40 CB-7 RIM: 901.00 INV: 897.56 CB-8 RIM: 903.00 INV: 898.58 CB-9 RIM: 902.00 INV: 898.95 FES INV: 897.00 62 LF 27" PVC @ 0.57% MH-1 RIM: 903.50 INV: 897.36 CB-6 RIM: 901.35 INV: 897.44 52 LF 18" PVC @1.0% 91 L F 1 5 " P V C @ 1 . 0 % 82 L F 1 2 " P V C @ 1 . 0 % CB-2 RIM: 901.28 INV: 897.88 CB-3 RIM: 902.15 INV: 898.79 CB-4 RIM: 902.89 INV: 899.61 36 LF 18" PVC @1.02% 98 LF 18" PVC @1.27% CONNECT TO EXIST 18" PIPE INV: 900.20 (FIELD VERIFY ELEVATION) CONNECT TO FUTURE WATER AND SANITARY SEWER(TBD) C6 2 C6 2 C6 2 C6 2 C6 2 C6 2 C6 2 C6 2 C6 2 C6 3 DescriptionRev. Date 20 1 8 S T I L L W A T E R BU S F A C I L I T Y IM P R O V E M E N T S ST I L L W A T E R A R E A P U B L I C S C H O O L S ST I L L W A T E R , M N 5 5 0 8 2 Sheet: Sheet Title: Project #: Drawn By: Checked By: Issue Date: 12176010 KJA GAB 04.30.18 35 2 4 L a b o r e R o a d Wh i t e B e a r L a k e , M N 5 5 1 1 0 65 1 . 4 8 1 . 9 1 2 0 ( f ) 6 5 1 . 4 8 1 . 9 2 0 1 ww w . l a r s o n e n g r . c o m C 2 0 1 8 L a r s o n E n g i n e e r i n g , I n c . A l l r i g h t s r e s e r v e d . P:\Projects\Projects - 2017\12176010 - Stillwater Bus Facility Evals\C. Design\Drawing Files\12176010 - C4.dwg 35 2 4 L a b o r e R o a d Wh i t e B e a r L a k e , M N 5 5 1 1 0 65 1 . 4 8 1 . 9 1 2 0 ( f ) 6 5 1 . 4 8 1 . 9 2 0 1 ww w . l a r s o n e n g r . c o m Pr o j e c t T i t l e : ST I L L W A T E R A R E A PU B L I C S C H O O L S 18 7 5 S O U T H G R E E L E Y S T R E E T ST I L L W A T E R , M I N N E S O T A 5 5 0 8 2 Cl i e n t : Greg A. Buchal, P.E. Date: Reg. No.:04.30.18 23793 I hereby certify that this plan, specifications or report was prepared by me or under my direct supervision and that I am a duly licensed Professional Engineer under the laws of the state of Minnesota. CI T Y S U B M I T T A L 0 NORTH 20 40 80 UTILITY PLAN C4 CABLE UNDERGROUND LINE FIBER OPTIC UNDERGROUND LINE ELECTRIC UNDERGROUND LINE ELECTRIC OVERHEAD LINE TELEPHONE UNDERGROUND LINE STORM SEWER PIPE SANITARY SEWER PIPE NATURAL GAS UNDERGROUND LINE WATERMAIN PIPE LIGHT POLE STORM MANHOLE FLARED END CURB INLET CATCH BASIN WATER SHUTOFF GATE VALVE & BOX HYDRANT SANITARY MANHOLE DRAINTILE PIPE LEGEND UTILITY NOTES 1. It is the responsibility of the contractor to perform or coordinate all necessary utility connections and relocations from existing utility locations to the proposed building, as well as to all onsite amenities. These connections include but are not limited to water, sanitary sewer, cable TV, telephone, gas, electric, site lighting, etc. 2. All service connections shall be performed in accordance with state and local standard specifications for construction. Utility connections (sanitary sewer, watermain, and storm sewer) may require a permit from the City. 3. The contractor shall verify the elevations at proposed connections to existing utilities prior to any demolition or excavation. 4. The contractor shall notify all appropriate engineering departments and utility companies 72 hours prior to construction. All necessary precautions shall be made to avoid damage to existing utilities. 5. Storm sewer requires testing in accordance with Minnesota plumbing code 4714.1109 where located within 10 feet of waterlines or the building. 6. HDPE storm sewer piping shall meet ASTM F2306 and fittings shall meet ASTM D3212 joint pressure test. Installation shall meet ASTM C2321. 7. All RCP pipe shown on the plans shall be MN/DOT class 3. 8.0DLQWDLQDPLQLPXPRIò RIFRYHURYHUDOOZDWHUOLQHVDQGVDQLWDU\VHZHUOLQHV,QVWDOOZDWHU OLQHV´DERYHVDQLWDU\VHZHUVZKHUHWKHVDQLWDU\VHZHUFURVVHVRYHUWKHZDWHUOLQHLQVWDOOVHZHU SLSLQJRIPDWHULDOVHTXDOWRZDWHUPDLQVWDQGDUGVIRUIHHWRQERWKVLGHVDQGPDLQWDLQ´RI separation. 9.:KHUHò RIFRYHULVQRWSURYLGHGRYHUVDQLWDU\VHZHUDQGZDWHUOLQHVLQVWDOO´ULJLGSRO\VW\UHQH insulation (MN/DOT 3760) with a thermal resistance of at least 5 and a compressive strength of at OHDVWSVL,QVXODWLRQVKDOOEH ZLGHFHQWHUHGRYHUSLSHZLWK´VDQGFXVKLRQEHWZHHQSLSHDQG LQVXODWLRQ:KHUHGHSWKLVOHVVWKDQ XVH´RILQVXODWLRQ 10. All watermain piping shall be class 52 ductile iron pipe unless noted otherwise. 11. See Project Specifications for bedding requirements. 12. Pressure test and disinfect all new watermains in accordance with state and local requirements. 13. Sanitary sewer piping shall be PVC, SDR-35 for depths less than 12', PVC SDR-26 for depths between 12' and 26', and class 52 D.I.P. for depths of 26' or more. 14. A structure adjustment shall include removing and salvaging the existing casting assembly, removing existing concrete rings to the precast section. Install new rings and salvaged casting to proposed grades, cleaning casting flange by mechanical means to insure a sound surface and install an external chimney seal from casting to precast section. Chimney seals shall be Infi-Shield Uni-Band or an approved equal. 40'-0" = CLEAR OPENING 14'-1" = C/B POST SPACING C/C 14'-1" = C/B POST SPACING C/C 12 1 / 2 " CL E A R 30'-0" = OVERALL GATE LENGTH 6' - 0 " = P O S T HE I G H T 6' - 0 " = N O M I N A L GA T E H E I G H T 10'-0" = C/B LENGTH 5" 30'-0" = OVERALL GATE LENGTH 10'-0" = C/B LENGTH DescriptionRev. Date 20 1 8 S T I L L W A T E R BU S F A C I L I T Y IM P R O V E M E N T S ST I L L W A T E R A R E A P U B L I C S C H O O L S ST I L L W A T E R , M N 5 5 0 8 2 Sheet: Sheet Title: Project #: Drawn By: Checked By: Issue Date: 12176010 KJA GAB 04.30.18 35 2 4 L a b o r e R o a d Wh i t e B e a r L a k e , M N 5 5 1 1 0 65 1 . 4 8 1 . 9 1 2 0 ( f ) 6 5 1 . 4 8 1 . 9 2 0 1 ww w . l a r s o n e n g r . c o m C 2 0 1 8 L a r s o n E n g i n e e r i n g , I n c . A l l r i g h t s r e s e r v e d . P:\Projects\Projects - 2017\12176010 - Stillwater Bus Facility Evals\C. Design\Drawing Files\12176010 - C5&C6.dwg 35 2 4 L a b o r e R o a d Wh i t e B e a r L a k e , M N 5 5 1 1 0 65 1 . 4 8 1 . 9 1 2 0 ( f ) 6 5 1 . 4 8 1 . 9 2 0 1 ww w . l a r s o n e n g r . c o m Pr o j e c t T i t l e : ST I L L W A T E R A R E A PU B L I C S C H O O L S 18 7 5 S O U T H G R E E L E Y S T R E E T ST I L L W A T E R , M I N N E S O T A 5 5 0 8 2 Cl i e n t : Greg A. Buchal, P.E. Date: Reg. No.:04.30.18 23793 I hereby certify that this plan, specifications or report was prepared by me or under my direct supervision and that I am a duly licensed Professional Engineer under the laws of the state of Minnesota. CI T Y S U B M I T T A L DETAILS C5 NOT TO SCALE PAVEMENT SECTION HEAVY-DUTY BITUMINOUS 1 C5 EXISTING SUBGRADE SOIL NEW 8" BASE AGGREGATE NEW 6" BITUMINOUS PAVEMENT PLACED IN 3 LIFTS NEW 24" GRANULAR BACKFILL NOT TO SCALE GRAVEL SECTION2 C5 EXISTING SUBGRADE SOIL NEW 10" AGGREGATE NEW 24" GRANULAR BACKFILL NOT TO SCALE CURB & GUTTER DETAIL B612 CONCRETE 4 C5 EXISTING SUBGRADE SOIL 6" 12" 13 . 5 " 6" 7" 6" BACKFILL WITH NEW GOOD QUALITY TOPSOIL AND SOD NEW BITUMINOUS PAVEMENT NEW BASE AGGREGATE SLOPE 3 4" PER FT. 8" R3" R3" 6" NOT TO SCALE CONSTRUCTION DETAIL CONCRETE SIDEWALK 3 C5 EXISTING SUBGRADE SOIL NEW 6" BASE AGGREGATE NEW 6" PORTLAND CEMENT CONCRETE < 10 ' 1:2 0 1: 2 0 2% M A X 10' 9' 10' 2% M A X 2% M A X NOT TO SCALE ACCESSIBLE RAMP DETAIL5 C5 6' 4' - 6 " 5' 1" CHAIN LINK FENCE FABRIC 3" O.D. TERMINAL POST 2.5" O.D. LINE POST TENSION BANDS SPACED MAXIMUM OF 15" APART TENSION BAR MIDDLE RAIL TOP RAIL BOTTOM RAIL FENCE DETAIL6 C5 10' MAX 6" 12" DIA. X 5' CONCRETE FOOTING (TYPICAL) 7 6 CATCH ASSEMBLY (SEE DETAIL 2/1) GATE HANGER ASSEMBLY (SEE DETAIL 1/1) GATE FRAME (TYP.)4" O.D. POST (TYP.) GATE HANGER ASSEMBLY (SEE DETAIL 1/1) 3/16" S.S. CABLE (TYP.) CATCH ASSEMBLY (SEE DETAIL 2/1) BOTTOM GUIDE ASSEMBLY (SEE DETAIL 3/1) 2" x 2" ALUM. TUBE (TYP.)2 X 5" ALUM. TUBE 1" x 1" ALUM. TUBE PICKET AT 3" O.C. (TYP.) TOP PRIMARY MEMBER 4" O.D. POST (TYP.) 1" x 2" ALUM. TUBE (TYP.) NOTES: 1. ALL HARDWARE IS PROVIDED FOR 4" O.D. SCHEDULE 40 POSTS. 2. GATE ELEVATION IS VIEWED FROM OUTSIDE THE SECURE AREA LOOKING IN. 3. FOR GATES THAT REQUIRE TWO PIECE FABRICATION, A 5" ALUMINUM CHANNEL WILL BE SUBSTITUTED FOR THE 2" x 5" ALUMINUM TUBE. 5 GATE HANGER ASSEMBLY (SEE DETAIL 1/1) GATE FRAME (SEE DETAIL 4/1) 4" 0.D. SCHEDULE 40 POST BOTTOM GUIDE ASSEMBLY (SEE DETAIL 3/1) 4 STANDARD TRACK TOP PRIMARY MEMBER 2" x 5" ALUM. TUBE 3 2 1 4" O.D. SCHEDULE 40 POST BOTTOM GUIDE BRACKET GUIDE WHEELS WITH UL COVERS W4 TRUCK STANDARD NUT LOCK NUT 5/8" BOLT HANGER BRACKET 2" x 2" ALUM. TUBE @ ENDS CATCH POST COMPANIONGATE FRAME CATCHER 1" x 1" ALUM. TUBE 1" x 1" HANGER POST U-BOLT U-BOLT U-BOLT 1" x 2" ALUM. TUBE 12 1/2" 5" NOT TO SCALE SLIDE GATE DETAIL GEORGETOWN 7 C5 DOUBLE GATE DETAIL 7A 7A 7A7A7A 7A 7A 2" x 1/4" ALUMINUM BAR (THIRD RAIL) SOIL SEPARATION FABRIC SOIL SEPARATION FABRIC DescriptionRev. Date 20 1 8 S T I L L W A T E R BU S F A C I L I T Y IM P R O V E M E N T S ST I L L W A T E R A R E A P U B L I C S C H O O L S ST I L L W A T E R , M N 5 5 0 8 2 Sheet: Sheet Title: Project #: Drawn By: Checked By: Issue Date: 12176010 KJA GAB 04.30.18 35 2 4 L a b o r e R o a d Wh i t e B e a r L a k e , M N 5 5 1 1 0 65 1 . 4 8 1 . 9 1 2 0 ( f ) 6 5 1 . 4 8 1 . 9 2 0 1 ww w . l a r s o n e n g r . c o m C 2 0 1 8 L a r s o n E n g i n e e r i n g , I n c . A l l r i g h t s r e s e r v e d . P:\Projects\Projects - 2017\12176010 - Stillwater Bus Facility Evals\C. Design\Drawing Files\12176010 - C5&C6.dwg 35 2 4 L a b o r e R o a d Wh i t e B e a r L a k e , M N 5 5 1 1 0 65 1 . 4 8 1 . 9 1 2 0 ( f ) 6 5 1 . 4 8 1 . 9 2 0 1 ww w . l a r s o n e n g r . c o m Pr o j e c t T i t l e : ST I L L W A T E R A R E A PU B L I C S C H O O L S 18 7 5 S O U T H G R E E L E Y S T R E E T ST I L L W A T E R , M I N N E S O T A 5 5 0 8 2 Cl i e n t : Greg A. Buchal, P.E. Date: Reg. No.:04.30.18 23793 I hereby certify that this plan, specifications or report was prepared by me or under my direct supervision and that I am a duly licensed Professional Engineer under the laws of the state of Minnesota. CI T Y S U B M I T T A L DETAILS C6 SIGN 2.5 LB./FT. FLANGED CHANNEL SIGN POST (MNDOT 3401) 12" 18 " 5' 3' 6 " NOT TO SCALE SIGN DETAIL ACCESSIBLE PARKING 1 C6 "O"BOLTS 5/8" 3/4" 1" 4" 6" 12" "O " BARS 3/4" 1" 1-1/4" SIZE OF PIPE 12" TO 18" 21" TO 42" 48" TO 72" 6" M A X 24"MAX TIE LAST 3 JOINTS ON INLET AND OUTLET. IF NO APRON IS USED TIE THE LAST 3 SECTIONS OF PIPE. USE 2 TIE BOLT FASTENERS PER JOINT INSTALLED AT 60 FROM TOP OR BOTTOM OF PIPE. USE 5/8" TIE FOR PIPE SIZES 12" TO 27". USE 3/4" TIE FOR PIPE SIZES 30" TO 66". USE 1" TIE FOR PIPE SIZES OVER 72". NUTS AND WASHERS ARE NOT REQUIRED ON PIPE SIZE LESS THAN 21". TRASH GUARDS WILL BE REQUIRED ON 18" OR LARGER PIPE. PROVIDE 3 CLIPS TO FASTEN TRASH GUARD TO F.E.S. HOT DIP GALVANIZE AFTER FABRICATION. NOT TO SCALE SECTION DETAIL FLARED END 3 C6 Staples/Anchors: The type of anchors used to secure the blanket to the JURXQGVKDOOEH6WHHOZLUH*DXJH´ZLGH[´ORQJ NOT TO SCALE EROSION CONTROL BLANKET5 C6 Category 4 Erosion Control Blanket: North American Green S150 erosion control blanket or approved equal. Top Net Polypropylene 1.5 lbs/1,000 ft2 (0.73 kg/100 m2) approx. wt. Straw Fiber 0.50 LBS/YD2 (0.27 KG/M2) SLOPE INSTALLATION NOTE: WHEN USING CELL-O-SEED DO NOT SEED PREPARED AREA. CELL-O-SEED MUST BE INSTALLED WITH PAPER SIDE DOWN. 3" (7.5 CM) OVERLAP. STAPLE THROUGH OVERLAPPED AREA, APPROXIMATELY 12" (30 CM) APART ACROSS ENTIRE *IN LOOSE SOIL CONDITIONS, THE USE OF STAPLE OR STAKE LENGTHS GREATER THAN 6" (15 CM) MAY BE NECESSARY TO BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. APPLY SEED TO COMPACTED SOIL AND FOLD REMAINING 12" (30 CM) IN APPROPRIATE LOCATIONS AS SHOWN IN THE STAPLE PATTERN GUIDE. WHEN USING THE DOT SYSTEM , STAPLES/STAKES SHOULD BE PLACED THROUGH EACH OF THE COLORED DOTS CORRESPONDING TO THE APPROPRIATE STAPLE PATTERN. 1. PREPARE SOIL BEFORE INSTALLING ROLLED EROSION CONTROL PRODUCTS (RECP's), INCLUDING ANY NECESSARY APPLICATION 3. ROLL THE RECP's (A.) DOWN OR (B.) HORIZONTALLY ACROSS THE SLOPE. RECP's WILL UNROLL WITH APPROPRIATE SIDE 4. THE EDGES OF PARALLEL RECP's MUST BE STAPLED WITH APPROXIMATELY 2" - 5" (5 CM - 12.5 CM) OVERLAP DEPENDING 5. CONSECUTIVE RECP's SPLICED DOWN THE SLOPE MUST BE PLACED END OVER END (SHINGLE STYLE) WITH AN APPROXIMATE AGAINST THE SOIL SURFACE. ALL RECP's MUST BE SECURELY FASTENED TO SOIL SURFACE BY PLACING STAPLES/STAKES 2. BEGIN AT THE TOP OF THE SLOPE BY ANCHORING THE RECP's IN A 6" (15 CM) DEEP X 6" (15 CM) WIDE TRENCH WITH APPROXIMATELY 12" (30cm) OF RECP's EXTENDED BEYOND THE UP-SLOPE PORTION OF THE TRENCH. ANCHOR THE RECP's WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12" (30 CM) APART IN THE BOTTOM OF THE TRENCH. PORTION OF RECP's BACK OVER SEED AND COMPACTED SOIL. SECURE RECP's OVER COMPACTED SOIL WITH A ROW OF STAPLES/STAKES SPACED APPROXIMATELY 12" (30 CM) APART ACROSS THE WIDTH OF THE RECP's. OF LIME, FERTILIZER, AND SEED. RECP's WIDTH. ON RECP's TYPE. PROPERLY SECURE THE RECP's. NOTE: EVANSVILLE, IN 47725 14649 HIGHWAY 41 NORTH Guaranteed EROSION CONTROL 800-772-2040 www.nagreen.com SOLUTIONS Products 1. 3B. 12" (30 cm) (15 cm) 6" 3A. 2"-5" 4. (5cm-12.5cm) (7.5cm) 3" 2. (15 cm) 6" Bottom Net Polypropylene 1.5 lbs/1,000 ft2 (0.73 kg/100 m2) approx. wt. Thread Photodegradable NOT TO SCALE RIP-RAP AT OUTLETS4 C6 D 5D (10' MIN.) 4 1 4 1 2 ' 2' MN/DOT CLASS III RIP-RAP AA MN/DOT CLASS III RIP-RAP 2' PLAN SECTION A-A NOTE: FW300 MIRAFI FABRIC OR EQUAL 5D (10' MIN.)2' 2'2' WOVEN FILTER FABRIC 6" 1 4 D WOVEN FILTER FABRIC ENGINEERING FABRIC WIRE MESH REINFORCEMENT (OPTIONAL) METAL, WOOD POST, OR STAKE. 8' MAX. SPACING, 2' INTO GROUND. NATURAL SOIL DIRECTION OF RUNOFF NOT TO SCALE INSTALLATION DETAIL SILT FENCE 6 C6 NOTE: DEPENDING UPON CONFIGURATION, ATTACH FABRIC TO WIRE MESH WITH HOG RINGS, STEEL POSTS WITH WIRES, OR WOOD POSTS WITH STAPLES. FABRIC ANCHORAGE TRENCH. BACKFILL WITH TAMPED NATURAL SOIL NOTE: 1. IF INSTALLED ON WALL, BOTTOM OF SIGN TO BE 5'-0" ABOVE GRADE. VA R I A B L E 1' - 4 " VARIABLE 5" MIN. 8" MINIMUM SLAB THICKNESS, 6' MINIMUM DIAMETER PRECAST CONCRETE SLAB, REINFORCED WITH #4 REBAR @ 8" E.W. GROUT BOTTOM PRECAST CONCRETE SECTION 8" PRECAST SEGMENTAL CONCRETE BLOCK TO TOP OF THE PIPE SHALL BE USED WITH SIZE AND DEPTH PROHIBIT THE FABRICATION OF PRECAST UNITS. NOT TO SCALE MANHOLE DETAIL STORM 2 C6 SECTION 8" PIP E DIA . ALL JOINTS IN MANHOLE TO HAVE 'O' RING RUBBER GASKETS. SEAL WITH 2 BEADS OF RAM-NEK. 6" PRECAST REINFORCED CONCRETE SLAB. MANHOLE STEPS, COPOLYMER POLYPROPYLENE PLASTIC, WITH 1/2" GRADE 60 STEEL REINFORCEMENT OR EQUAL, 16" O.C. MINIMUM OF 2, MAXIMUM OF 5 CONCRETE ADJUSTMENT RINGS WITH FULL BED OF MORTAR BETWEEN EACH AND A 4" COLLAR ON THE OUTSIDE. NO SHIMS OF ANY MATERIAL ALLOWED. PLACE EXTERNAL CHIMNEY SEAL. A A PLAN SL O P E 2" / F T . SL O P E 2" / F T . WATERTIGHT CONNECTION (BOOT, TYPICAL) MANHOLE FRAME & COVER: CBMH: NEENAH R-2501, TYPE C GRATE CB: NEENAH R-3067, TYPE L GRATE (HIGH FLOW) MH: NEENAH R-1642, TYPE B LID REUSEABLE 400 MICRON FILTER BAG IN EACH BASKET NOT TO SCALE PROTECTION DEVICE INFRASAFE INLET 7 C6 SIDE VIEW FRONT VIEW (OR EQUAL) 1 CITY OF LAKE ELMO COUNTY OF WASHINGTON STATE OF MINNESOTA ORDINANCE NO. 08-214 AN ORDINANCE AMENDING THE LAKE ELMO CITY CODE OF ORDINANCES BY AMENDING THE OFFICIAL ZONING MAP OF THE CITY OF LAKE ELMO SECTION 1. The City Council of the City of Lake Elmo hereby ordains a portion of the following property (PID# 36.029.21.43.0001) to be rezoned from RR – Rural Residential to BP – Business Park: Lot 1, Block 1, Four Corners SECTION 2. The City Council of the City of Lake Elmo also hereby ordains that the Zoning Administrator shall make the applicable changes to the official Zoning Map of the City of Lake Elmo. SECTION 3. Effective Date. This ordinance shall become effective immediately upon adoption and publication in the official newspaper of the City of Lake Elmo. SECTION 4. Adoption Date. This Ordinance 08-214 was adopted on this 17th day of July, 2018, by a vote of ___ Ayes and ___ Nays. LAKE ELMO CITY COUNCIL ___________________________________ Mike Pearson, Mayor ATTEST: __________________________________ Julie Johnson, City Clerk This Ordinance 08-214 was published on the ____ day of July, 2018. Resolution No. 2018- 076 CITY OF LAKE ELMO WASHINGTON COUNTY, MINNESOTA RESOLUTION NO. 2018-076 A RESOLUTION APPROVING THE FOUR CORNERS PRELIMINARY AND FINAL PLAT WHEREAS, Terry Emerson, 2204 Legion Lane Circle North, Lake Elmo, MN 55042 (“Applicant”), has submitted an application to the City of Lake Elmo (“City”) for approval of Preliminary and Final Plat for Four Corners; and WHEREAS, the Lake Elmo Planning Commission held a Public Hearing on June 4, 2018 and June 18, 2018 to consider the Preliminary and Final Plat for Four Corners and recommended approval subject to a number of conditions; and WHEREAS, the City Council reviewed the recommendation of the Planning Commission and the proposed Four Corners Preliminary and Final Plat at a meeting on July 17, 2018; and NOW, THEREFORE, based upon the testimony elicited and information received, the City Council makes the following: FINDINGS 1. That the Four Corners preliminary and final plat is consistent with the Lake Elmo Comprehensive Plan and the Future Land Use Map for this area. 2. That the Four Corners preliminary and final plat complies with the minimum lot frontage and area requirements of the City’s BP – Business Park zoning district. 3. That the Four Corners preliminary and final plat complies with the City’s subdivision ordinance. 4. That the Four Corners preliminary and final plat meets other City zoning ordinances, such as landscaping, erosion and sediment control, and other ordinances, provided comments outlined in the City Engineer Review Memo dated May 30, 2018 are met; or as may be amended due to changes in the site plan or proposed use. 5. That the Four Corners preliminary and final plat is consistent with the City’s engineering standards provided final plans are updated to address the City Engineer’s comments documented in a letter dated May 30, 2018; or as may be amended due to changes in the site plan or proposed use. 6. The land being subdivided is legally described as: 2 Resolution No. 2018- S1/2-SE1/4 EXC WEST 2 RODS EXC TO HWY EXC HWY PARCEL 44 MN DOT R/W PLAT #82-35 SECTION 36 TOWNSHIP 029 RANGE 021 7. That the Four Corners preliminary and final plat will create one new lot of 11 acres to be legally described as Lot 1, Block 1, Four Corners; and three outlots: A (46.64acres), B (5.01 acres), and C (1.08 acres). CONCLUSIONS AND DECISION Based on the foregoing, the Applicants’ application for Preliminary and Final Plat, subject to the following conditions of approval: 1) The property shall be rezoned to BP – Business Park. 2) The applicant shall pay a fee in lieu of parkland dedication in the amount of $4500 per acre of the newly created lot (11 acres X $4500 = $49,500 total) prior to any formal City authorization. 3) Prior to the execution of the Final Plat by City officials, the Developer shall enter into a Developer’s Agreement acceptable to the City Attorney and approved by the City Council that delineates who is responsible for the design, construction, landscaping, and payment of the required improvements for the Four Corners Final Plat with financial guarantees therefore. 4) Final grading, drainage and erosion control, sanitary sewer and stormwater management, street and utility construction plans shall be submitted, reviewed and approved by the City Engineer, meeting City Engineering Design Standards, prior to the recording of the Final Plat. All changes and modifications to the plans requested by the City Engineer in a memorandum dated May 30, 2018 and all subsequent memorandums regarding the plans shall be incorporated into these documents before they are approved. 5) The applicant must obtain all other necessary City, State, and other governing body permits prior to the commencement of any construction activity on the parcel including but not limited to building permits, conditional use permits, etc. 6) Any plans for construction on the newly created parcel must comply with the Lake Elmo Design Standards Manual and specific general site considerations and development standards for specific uses within the Business Park District. 7) The site plan is subject to a storm water management plan meeting State, Valley Branch Watershed District and City rules and regulations. All applicable permits must be obtained. Maintenance access roads meeting City engineering design standards must be provided for all storm water facilities. 3 Resolution No. 2018- 8) Stormwater facilities shall remain privately owned and maintained. The applicant will be required to execute a Stormwater Maintenance and Easement Agreement in the City’s standard form of agreement. 9) A Traffic Impact Study shall be completed and submitted in order to determine timing and extent of improvements required for the CSAH 15 and Hudson Boulevard intersection realignment and traffic signal improvements as well as the need for an eastbound left turn lane along Hudson Boulevard for site access. Additional right-of-way along Hudson Boulevard may be required if the eastbound left turn lane is required. 10) Hudson Boulevard must be improved per the City design standards to an urban section on the north side of the street including a west bound right turn lane to the site, a four foot shoulder (curb reaction), a nine foot boulevard, and a ten foot shared use bituminous trail with two foot clear zone. 11) Provisions for connecting municipal sanitary sewer service and for connecting to the municipal water supply must be provided on submitted plans. The applicant shall be responsible to extend and connect to the City sanitary sewer system and municipal water at the applicant’s sole cost and extend such services to adjacent properties. The applicant shall be required to obtain easements from adjacent properties in order to extend water. A detailed description of the sanitary sewer and water capacity demands shall be provided. 12) Hydrants will be required to be placed at the direction of the Fire Department, and all fire hydrants shall be owned and maintained by the City. 13) All easements as requested by the City Engineer and Public Works Department shall be documented on the Final Plat prior to its execution by City Officials. Passed and duly adopted this 17th day of July, 2018 by the City Council of the City of Lake Elmo, Minnesota. __________________________________ Mike Pearson, Mayor ATTEST: ________________________________ Julie Johnson, City Clerk 1 509017v1 SJS LA515-1 CITY OF LAKE ELMO COUNTY OF WASHINGTON STATE OF MINNESOTA RESOLUTION NO. 2018-078 A RESOLUTION DENYING A ZONING TEXT AMENDMENT TO AMEND THE CITY’S ZONING CODE TO ALLOW LOCAL TRANSIT AS A CONDITIONAL USE WITHIN THE BUSINESS PARK ZONING DISTRICT WHEREAS, the City of Lake Elmo (the “City”) has established a Zoning Map by Ordinance that implements the various land use policies in the City’s Comprehensive Plan; and WHEREAS, Stillwater Area Public Schools (Kristen Hoheisel), 1875 Greeley Street South, Stillwater, MN 55042 (the “Applicant”) has submitted an application to the City of Lake Elmo (the “City”) for a Zoning Text Amendment to allow local transit as a conditional use within the Business Park zoning district; and WHEREAS, the request for a Zoning Text Amendment was submitted by the Applicant along with a request by Terry Emerson, 2204 Legion Lane Circle North, Lake Elmo, MN 55042, for a Minor Subdivision to subdivide the Property in to Lot 1, Block 1 of Four Corners, with three separate outlots; a Zoning Map Amendment to re-zone Lot 1, Block 1 of Four Corners from Rural Development Transitional to Business Park; and Conditional Use Permit for a school transportation center for Lot 1, Block 1, Four Corners; and WHEREAS, the Planning Commission held a public hearing on June 4, 2018 and June 18, 2018 to consider the Applicant’s requests; and WHEREAS, the Planning Commission submitted its report and recommendation to the City Council as part of a Staff Memorandum dated July 17, 2018; and WHEREAS, the City Council considered said matter at its meeting on July 17, 2018; and NOW THEREFORE BE IT RESOLVED based upon the testimony elicited, information received, staff reports and the record as a whole, the City Council makes the following findings of fact: FINDINGS. 1. That the procedures for requesting a Zoning Text Amendment are found in the Lake Elmo Zoning Ordinance, Section 154.105. 2. That all the submission requirements of said Section 154.105 have been met by the Applicant. 3. That the proposed Zoning Text Amendment includes the following components: a. That local transit be a conditional use within the Business Park zoning district. 2 509017v1 SJS LA515-1 b. That standards for local transit within the Business Park zoning district be added to include the following: i. Use is limited to a school district transportation center, owned by a public shool district, serving as a bus terminal for buses and vans which transport passengers to and from schools or between school programs and community residences. ii. The property on which the use is located must be located within one half mile of property owned by a public school district. iii. Must be on a property of at least 10 acres in size or more. iv. Must be sufficiently screened from adjacent residential properties through berming and landscaping as approved by the City. v. Accessory uses may include an office and routine maintenance of school buses, including but not limited to washing and fueling. 4. That the 2030 Comprehensive Plan indicates that the specific desired attributes of the Business Park land use category include a diversity of jobs, high development densities and jobs per acre, high quality site and building architectural design, and increased tax revenues for the community. 5. That the draft 2040 Comprehensive Plan indicates that Business Park areas are to provide for a wide variety of professional businesses such as medical and research facilities, offices, and corporate headquarters. Uses specifically excluded from existing business park areas include warehousing, manufacturing, distribution, assembly and truck terminals. 6. That school district transportation centers owned by a public school district would likely not provide high quality site and building architectural design or increase tax revenues for the community, as are specific desired attributes of the Business Park land use category of the 2030 Comprehensive Plan and the proposed text amendment is therefore inconsistent with the Comprehensive Plan. 7. That school district transportation centers are similar to truck terminals, which are specifically excluded from business park areas as per the draft 2040 Comprehensive Plan. 8. That school district transportation centers would increase traffic on Hudson Boulevard, creating congestion and would likely trigger the need for a traffic signal at the intersection of Manning Avenue and Hudson Boulevard, the cost for which the City will be required to pay 25%. NOW, THEREFORE, BE IT FURTHER RESOLVED, that the Lake Elmo City Council hereby denies the request by Stillwater Area Public Schools for a Zoning Text Amendment to allow local transit as a conditional use within the Business Park zoning district. Passed and duly adopted this 17th day of July 2018, by the City Council of the City of Lake Elmo, Minnesota. ______________________________ Mike Pearson, Mayor 3 509017v1 SJS LA515-1 ATTEST: _____________________________ Julie Johnson, City Clerk Resolution 2018-079 509020v1 SJS LA515-1 1 CITY OF LAKE ELMO WASHINGTON COUNTY STATE OF MINNESOTA RESOLUTION 2018-079 A RESOLUTION DENYING A CONDITIONAL USE PERMIT FOR A SCHOOL DISTRICT TRANSPORTATION CENTER FOR A PORTION OF THE PROPERTY LOCATED AT 11530 HUDSON BOULEVARD NORTH WHEREAS, the City of Lake Elmo is a municipal corporation organized and existing under the laws of the State of Minnesota; and WHEREAS, Stillwater Area Schools (Kristen Hoheisel), 1875 Greeley Street South, Stillwater, MN 55082 (the “Applicant”) has submitted an application to the City of Lake Elmo (the “City”) for a Conditional Use Permit for a school district transportation center for a portion of the property located at 11530 Hudson Blvd N (PID# 36.029.21.43.0001) (the “Property”); and WHEREAS, a request for a Preliminary and Final Plat to subdivide the Property in to Lot 1, Block 1 of Four Corners, with three separate outlots was submitted by Terry Emerson, 2204 Legion Lane Circle North, Lake Elmo, MN 55042; and WHEREAS, the Applicant also submitted applications to the City for a Zoning Text Amendment to allow local transit as a conditional use within the Business Park zoning district; and a Zoning Map Amendment to re-zone Lot 1, Block 1 of Four Corners from Rural Development Transitional to Business Park; and WHEREAS, notice has been published, mailed and posted pursuant to the Lake Elmo Zoning Ordinance, Section 154.102; and WHEREAS, the Lake Elmo Planning Commission held a public hearing on said matter on June 4, 2018 and June 18, 2018; and WHEREAS, the Lake Elmo Planning Commission has submitted its report and recommendation to the City Council as part of a Staff Memorandum dated July 17, 2018, and WHEREAS, the City Council considered said matter at its July 17, 2018 meeting; and NOW, THEREFORE, based on the testimony elicited, staff reports and information received and the entire record presented, the City Council makes the following: FINDINGS 1) That the procedures for obtaining said Conditional Use Permit are found in the Lake Elmo Zoning Ordinance, Section 154.106. Resolution 2018-079 509020v1 SJS LA515-1 2 2) That all the submission requirements of said Section 154.106 have been met by the Applicant. 3) That the proposed Conditional Use Permit includes the following components: a) A Conditional Use Permit for a school district transportation center for a portion of the property located at 11530 Hudson Blvd N. 4) That the Conditional Use Permit for a school district transportation center will be for the Property legally described as follows: Lot 1, Block 1 of Four Corners. 5) That the Zoning Text Amendment that was proposed by the Applicants allows local transit as a conditional use within the Business Park zoning district. 6) That the City denied the Applicant’s request for a Zoning Text Amendment to allow local transit as a conditional use within the Business Park zoning district. 7) That the City approved the Applicant’s request for a Preliminary and Final Plat to subdivide the Property in to Lot 1, Block 1 of Four Corners along with three separate outlots. 8) That the City denied the Applicant’s request for a Zoning Map Amendment to re-zone the Property from Rural Development Transitional to Business Park. 9) That since the Applicant’s Zoning Text Amendment application was denied, the Applicant’s application for a conditional use permit for a school transportation center must also be denied because local transit is not an allowed use within the Property’s current zone, which is Business Park. 10) The proposed use will not be detrimental to or endanger the public health, safety, comfort, convenience or general welfare of the neighborhood or the city. With over 200 employees and a use that requires both employee trips in and out of the facility each day as well as two bus trips in and out of the facility each day, the use will generate a significant amount of traffic, which will likely trigger a need for a traffic signal at the intersection of Manning Avenue and Hudson Boulevard, the cost of which the City will be required to pay 25%. 11) The use or development conforms to the City of Lake Elmo Comprehensive Plan. The property is guided for Business Park. While the proposal does create a significant number of jobs per acre, the parcel will be tax exempt, as it will be owned by the school district. It also does not fit in to the described uses appropriate for this land category. Finally, it does not propose high quality site and building architectural design, which, per the Comprehensive Plan, is a trait this land use category should have. 12) The use or development is compatible with the existing neighborhood.The surrounding area is planned for uses such as offices, showroom/warehousing, research and development, manufacturing and assembly, and medical laboratories, which are not compatible uses with a bus terminal. Resolution 2018-079 509020v1 SJS LA515-1 3 13) The proposed use meets all specific development standards for such use listed in Article 7 of this Chapter. There are no specific development standards for this use listed in Article 7. The use does not comply with many parking lot, screening, and landscape standards of the Zoning Code. 14) If the proposed use is in a flood plain management or shoreland area, the proposed use meets all the specific standards for such use listed in Chapter 150, §150.250 through 150.257 (Shoreland Regulations) and Chapter 152 (Flood Plain Management). The property is located outside the 0.2% annual chance floodplain. 15) The proposed use will be designed, constructed, operated and maintained so as to be compatible in appearance with the existing or intended character of the general vicinity and will not change the essential character of that area. The proposed project is a redevelopment/repurposing of an existing site, to which minimal improvements are proposed. Operations are not within a building and so would not meet the intended character of the neighborhood, and outdoor storage is not an allowed use within the Business Park zoning district. 16) The proposed use will not be hazardous or create a nuisance as defined under this Chapter to existing or future neighboring structures. The proposed use will create a significant amount of traffic, at least at certain times of the day. 17) The proposed use will be served adequately by essential public facilities and services, including streets, police and fire protection, drainage structures, refuse disposal, water and sewer systems and schools or will be served adequately by such facilities and services provided by the persons or agencies responsible for the establishment of the proposed use. The property is within the Metropolitan Urban Service Area (MUSA) and therefore should be required to be provided by city sewer and water. The application did not detail provisions to connect to City sewer and water. The use may require the prompt need for the CSAH 15/Hudson Blvd traffic signal, for which the City will be required to share 25% of the cost, and the Hudson Boulevard realignment. It is not yet known if the applicant’s stormwater management plan meets all City, State, and Valley Branch Watershed District requirements. 18) The proposed use will not create excessive additional requirements at public cost for public facilities and services and will not be detrimental to the economic welfare of the community. The use may require the prompt need for the CSAH 15/Hudson Blvd traffic signal/realignment, for which the City will be required to share 25% of the cost. It is not yet known if the applicant’s stormwater management plan meets all City, State, and Valley Branch Watershed District requirements. 19) The proposed use will not involve uses, activities, processes, materials, equipment and conditions of operation that will be detrimental to any persons, property or the general welfare because of excessive production of traffic, noise, smoke, fumes, glare or odors. The Resolution 2018-079 509020v1 SJS LA515-1 4 proposed use will generate a significant number of trips per day, which will generate excessive production of traffic. 20) Vehicular approaches to the property, where present, will not create traffic congestion or interfere with traffic on surrounding public thoroughfares. Traffic congestion will be created from the significant number of trips to the site the use would generate. 21) The proposed use will not result in the destruction, loss or damage of a natural or scenic feature of major importance. N/A NOW, THEREFORE, BE IT FURTHER RESOLVED, that the Lake Elmo City Council hereby denies the request by Stillwater Area Schools for a Conditional Use Permit for a school transportation center. Passed and duly adopted this 17th day of July 2018 by the City Council of the City of Lake Elmo, Minnesota. __________________________________ Mike Pearson, Mayor ATTEST: ________________________________ Julie Johnson, City Clerk 1 CITY OF LAKE ELMO COUNTY OF WASHINGTON STATE OF MINNESOTA ORDINANCE NO. 08-215 AN ORDINANCE AMENDING THE LAKE ELMO CITY CODE OF ORDINANCES BY ADDING LOCAL TRANSIT AS A CONDITIONAL USE WITHIN THE BUSINESS PARK ZONING DISTRICT AND ADDING ADDITIONAL STANDARDS FOR LOCAL TRANSIT WITHIN THE BUSINESS PARK ZONING DISTRICT SECTION 1. The City Council of the City of Lake Elmo hereby amends Title XV: Land Usage; Chapter 154: Zoning Code; Article XIV: Commercial Districts; Section 154.551; Table 12-1 by amending the following: LC CC C BP Standard Public and Civic Uses Colleges and universities - - C C 154.012 (B) (2), 154.303 (A) Community service - C C C 154.012 (B) (2) Day care center C C C C 154.012 (B) (2) Schools, public and private - - C C 154.012 (B) (2), 154.303 (A) Local Transit - - - C 154.554 (O) SECTION 2. The City Council of the City of Lake Elmo hereby amends Title XV: Land Usage; Chapter 154: Zoning Code; Article XIV: Commercial Districts; Section 154.554 by adding the following: O. Local Transit, BP District. School bus terminals shall be allowed as a conditional principal use within the Business Park zoning district, provided that: 1. The us shall be limited to a school district transportation center, owned by a public shool district, serving as a bus terminal for buses which transport passengers to and from schools or between school programs and community residences. 2. The property on which the use is located must be located within one half mile of property owned by a public school district for an active school or school administration building. 3. Must be on property of at least 10 acres in size or more. 4. Must be sufficiently screened, as determined by the City, from adjacent residential properties through techniques such as berming and landscaping. 5. Accessory uses to bus terminals may include an office and routine maintenance of school buses, including but not limited to washing and fueling. 2 SECTION 3. Effective Date. This ordinance shall become effective immediately upon adoption and publication in the official newspaper of the City of Lake Elmo. SECTION 7. Adoption Date. This Ordinance 08-215 was adopted on this ______ day of ___ 2018 by a vote of ___ Ayes and ___ Nays. LAKE ELMO CITY COUNCIL _________________________________ Mike Pearson, Mayor ATTEST: _________________________________ Julie Johnson, City Clerk This Ordinance 08-215 was published on the ____ day of ___________________, 2018. Resolution 2018-077 509020v1 SJS LA515-1 1 CITY OF LAKE ELMO WASHINGTON COUNTY STATE OF MINNESOTA RESOLUTION 2018-077 A RESOLUTION APPROVING A CONDITIONAL USE PERMIT FOR A SCHOOL DISTRICT TRANSPORTATION CENTER FOR A PORTION OF THE PROPERTY LOCATED AT 11530 HUDSON BOULEVARD NORTH WHEREAS, the City of Lake Elmo is a municipal corporation organized and existing under the laws of the State of Minnesota; and WHEREAS, Stillwater Area Schools (Kristen Hoheisel), 1875 Greeley Street South, Stillwater, MN 55082 (the “Applicant”) has submitted an application to the City of Lake Elmo (the “City”) for a Conditional Use Permit for a school district transportation center for a portion of the property located at 11530 Hudson Blvd N (PID# 36.029.21.43.0001) (the “Property”); and WHEREAS, a request for a Preliminary and Final Plat to subdivide the Property in to Lot 1, Block 1 of Four Corners, with three separate outlots was submitted by Terry Emerson, 2204 Legion Lane Circle North, Lake Elmo, MN 55042; and WHEREAS, the Applicant also submitted applications to the City for a Zoning Text Amendment to allow local transit as a conditional use within the Business Park zoning district; and a Zoning Map Amendment to re-zone Lot 1, Block 1 of Four Corners from Rural Development Transitional to Business Park; and WHEREAS, notice has been published, mailed and posted pursuant to the Lake Elmo Zoning Ordinance, Section 154.102; and WHEREAS, the Lake Elmo Planning Commission held a public hearing on said matter on June 4, 2018 and June 18, 2018; and WHEREAS, the Lake Elmo Planning Commission has submitted its report and recommendation to the City Council as part of a Staff Memorandum dated July 17, 2018, and WHEREAS, the City Council considered said matter at its July 17, 2018 meeting; and NOW, THEREFORE, based on the testimony elicited and information received, the City Council makes the following: FINDINGS 1) That the procedures for obtaining said Conditional Use Permit are found in the Lake Elmo Zoning Ordinance, Section 154.106. Resolution 2018-077 509020v1 SJS LA515-1 2 2) That all the submission requirements of said Section 154.106 have been met by the Applicant. 3) That the proposed Conditional Use Permit includes the following components: a) A Conditional Use Permit for a school district transportation center for a portion of the property located at 11530 Hudson Blvd N. 4) That the Conditional Use Permit for a school district transportation center will be for the Property legally described as follows: Lot 1, Block 1 of Four Corners. 5) That the Zoning Text Amendment that was proposed by the Applicants allows local transit as a conditional use within the Business Park zoning district. 6) That the City approved the Applicant’s request for a Zoning Text Amendment to allow local transit as a conditional use within the Business Park zoning district. 7) That the City approved the Applicant’s request for a Preliminary and Final Plat to subdivide the Property in to Lot 1, Block 1 of Four Corners along with three separate outlots. 8) That the City approved the Applicant’s request for a Zoning Map Amendment to re-zone the Property from Rural Development Transitional to Business Park. 9) The proposed use will not be detrimental to or endanger the public health, safety, comfort, convenience or general welfare of the neighborhood or the city. Bus traffic is not expected to be detrimental or dangerous, as trips and traffic will be limited to certain times of the day. It is a recommended condition of approval that there be significant berming to provide a sufficient screening of the parking lot. 10) The use or development conforms to the City of Lake Elmo Comprehensive Plan. The property is guided for Business Park, in which local transit, which meets certain standards, is a conditional use per the Zoning Code. The use also provides a significant number of jobs per acre, which is a desired trait of the Business Park land use designation per the Comprehensive Plan. 11) The use or development is compatible with the existing neighborhood. The use is compatible with the existing neighborhood, as the existing use is a truck terminal, which is similar in use and design to a bus terminal. The surrounding parcels are mostly vacant and undeveloped. 12) The proposed use meets all specific development standards for such use listed in Article 7 of this Chapter. The proposal complies with the proposed development standards as recommended in the requested Zoning Text Amendment, although it does not comply with many parking lot, screening, and landscape standards, which have been required as a recommended condition of approval. 13) If the proposed use is in a flood plain management or shoreland area, the proposed use meets all the specific standards for such use listed in Chapter 150, §150.250 through 150.257 Resolution 2018-077 509020v1 SJS LA515-1 3 (Shoreland Regulations) and Chapter 152 (Flood Plain Management). The property is located outside the 0.2% annual chance floodplain. 14) The proposed use will be designed, constructed, operated and maintained so as to be compatible in appearance with the existing or intended character of the general vicinity and will not change the essential character of that area. While the proposed project is a redevelopment/repurposing of an existing site and will not change the existing character of the area, operations are not within a building and so would not meet the intended character of the neighborhood. 15) The proposed use will not be hazardous or create a nuisance as defined under this Chapter to existing or future neighboring structures. While the proposed use will create a significant amount of traffic, it will be limited to certain times of the day. 16) The proposed use will be served adequately by essential public facilities and services, including streets, police and fire protection, drainage structures, refuse disposal, water and sewer systems and schools or will be served adequately by such facilities and services provided by the persons or agencies responsible for the establishment of the proposed use. There are plans to connect to City sewer and water at the applicant’s cost. The use may require the prompt need for the CSAH 15/Hudson Blvd traffic signal, for which the City will be required to share 25% of the cost, and the Hudson Boulevard realignment. It is not yet known if the applicant’s stormwater management plan meets all City, State, and Valley Branch Watershed District requirements. 17) The proposed use will not create excessive additional requirements at public cost for public facilities and services and will not be detrimental to the economic welfare of the community. While the use will not pay property taxes, sewer and water service charges will be paid by the applicant. 18) The proposed use will not involve uses, activities, processes, materials, equipment and conditions of operation that will be detrimental to any persons, property or the general welfare because of excessive production of traffic, noise, smoke, fumes, glare or odors. The proposed use will generate a significant number of trips per day, though this will be limited to certain times of the day. Minimal noise is expected to come from the site, except during heavy traffic times at specific times within the morning or afternoon. 19) Vehicular approaches to the property, where present, will not create traffic congestion or interfere with traffic on surrounding public thoroughfares. Traffic congestion could be created from the significant number of trips to the site, though these would be limited to certain times of the day. 20) The proposed use will not result in the destruction, loss or damage of a natural or scenic feature of major importance. N/A NOW, THEREFORE, BE IT FURTHER RESOLVED, that the Lake Elmo City Council hereby approves the request by Stillwater Area Schools for a Conditional Use Permit for a school district transportation center with the following conditions of approval: Resolution 2018-077 509020v1 SJS LA515-1 4 1) The Zoning Text Amendment to allow local transit (school district transportation center) within the Business Park Zoning District must be approved. 2) No construction or use of the bus terminal (unless in accordance with the Interim Use Permit approved by the City by Resolution 2014-095) may commence until all items as outlined in the City Engineer review memo regarding the Four Corners Preliminary & Final Plat (Stillwater Transportation Center) dated May 30, 2018 and all other subsequent construction plan memos regarding the Stillwater Transportation Center have been addressed; the Four Corners 1st Addition Final Plat has been recorded. 3) The applicant must obtain all other necessary City, State, and other governing body permits prior to the commencement of any construction activity on the parcel including but not limited to an approved stormwater management plan, utility plans, grading plan, street construction plans (if required), parking lot permit, building permits, etc. 4) The Applicant shall submit a photometric plan, and all lighting must meet requirements of Sections 150.035-150.038 of the City Code. 5) The above ground storage tank shall require development of diking around the tank, suitably sealed to hold a leakage capacity equal to 115% of the tank capacity. The applicant shall demonstrate that fire, explosion, or water or soil contamination hazards are not present that would be detrimental to the public health, safety, and general welfare. The applicant shall also fill out an Aboveground Storage Tank Notification of Installation or Change in Status Form as required by the Minnesota Pollution Control Agency (MPCA). 6) The Applicant shall submit an updated Landscape Plan and Tree Preservation Plan which includes sufficient berming and screening and addresses the comments in this report to be reviewed and approved by the City’s Landscape Architect. 7) Parking areas shall be paved with a durable surface including, but not limited to, hot asphalt, bituminous or concrete; spaces shall be marked with painted lines at least four inches wide; required interior and exterior parking lot screening is required; a bumper curb or barrier of normal bumper height shall be provided; and must provide an adequate number of Americans with Disabilities Act (ADA) accessible stalls. 8) A sign permit shall be obtained prior to erection of any sign on the property. 9) The property shall be connected to City sewer and water prior to operation of the bus terminal. 10) A Traffic Impact Study is required to determine timing and extent of improvements required for the CSAH 15 and Hudson Boulevard intersection realignment and traffic signal improvements as well as to determine if an eastbound left turn lane along Hudson Boulevard is also needed at the site access. 11) The applicant shall be required to include a description of the sanitary sewer capacity demands including the number of residential equivalency units (REC) based on the Metropolitan Council Sewer Availability Charge (SAC) determination policy as well as a description of the water capacity demands including average day use, peak day use, and fire suppression demands. Demands must account for all planned uses and connections to Resolution 2018-077 509020v1 SJS LA515-1 5 the sewer system including bus wash wastewater as well as include potable drinking water, bus washing operations, etc. 12) Applicant shall be responsible to place hydrants throughout the property at the direction of the Fire Department. All fire hydrants shall be owned and maintained by the City. Passed and duly adopted this 17th day of July 2018 by the City Council of the City of Lake Elmo, Minnesota. __________________________________ Mike Pearson, Mayor ATTEST: ________________________________ Julie Johnson, City Clerk STAFF REPORT DATE: 7/17/2018 REGULAR ITEM #: 17 MOTION TO: City Council FROM: Emily Becker, Planning Director AGENDA ITEM: Zoning Map Amendment, Preliminary and Final Plat, Bus Terminal Ordinance Zoning Text Amendment, and Conditional Use Permit REVIEWED BY: Ben Gozola, Consultant Planner Soren Mattick, Campbell Knutson BACKGROUND: The City has received a set of applications from Stillwater Area Public Schools (Kristen Hoheisel) and Terry Emerson requesting consideration of the following four (4) items: 1) A Zoning Map Amendment to re-zone a portion of the subject property to Business Park; 2) Preliminary and Final Plats to subdivide the property located at 11530 Hudson Boulevard North; 3) A Zoning Text Amendment to allow "bus terminal" as a conditionally permitted principal use within the Business Park Zoning District; and 4) A Conditional Use Permit to operate a school district transportation center on the subject property. ISSUE BEFORE COUNCIL: The Council is being asked to hold a public hearing and make recommendation on each of the four requests beginning with the broadest issue (zoning district change) and working towards the most specific (approval of a CUP to allow operation of a bus terminal). As all four of the applications are generally linked, denial of any individual request may impact the Council’s decision(s) on subsequent requests. PROPOSAL DETAILS/ANALYSIS: Applicants: Stillwater Area Public Schools (Kristen Hoheisel), 1875 Greeley Street South, Stillwater, MN 55082 (Zoning Map Amendment, Zoning Text Amendment, and Conditional Use Permit) and Terry Emerson, 2204 Legion Ln Cir N, Lake Elmo, MN 55042 (Preliminary and Final Plat) Council Meeting 7/17/2018 Item #17 Page 2 Property Owners: EN Properties, LLC (Terry Emerson), 11530 Hudson Boulevard North, Lake Elmo, MN 55042 Location: 11530 Hudson Boulevard North (PID# 36.029.21.43.0001) Request: Zoning Text Amendment, Preliminary and Final Plat, Zoning Map Amendment, and Conditional Use Permit. Existing Land Use: Trucking Terminal – sales, repairs, and service of diesel trucks Existing Zoning: RT - Rural Development Transitional Surrounding Land Use / Zoning: South – I-94 and Woodbury; West – Outdoor Storage (RT – Rural Development Transitional); East – Vacant land (RT – Rural Development Transitional); North – Vacant land (RT – Rural Development Transitional) Comprehensive Plan Guidance: BP – Business Park Deadline(s) for Action: Application Complete – 5/4/2018 60 Day Deadline – 7/3/2018 Extension Letter Mailed – At request of Applicant – extended to July 29, 2018 120 Day Deadline – N/A Applicable Regulations: Chapter 153 – Subdivision Regulations §154.210 – Off-Street Parking Article XIV: Commercial Districts §154.258: Landscape Requirements ZONING MAP AMENDMENT The applicant is seeking approval to rezone a portion of the subject property (11 acres of approximately 63.73 total acres) from RT (Rural Development Transitional) to BP (Business Park). The RT designation provides landowners with interim use options as they wait for the availability of sewer, and/or until such time as a landowner requests a zoning change to a new district consistent with the future guided land use. In this case, the land in question is guided for Business Park both within the current 2030 Comprehensive Plan and within the draft 2040 Comprehensive Plan. Therefore, staff does find it would be appropriate to approve the requested rezoning if that is the desire of the landowner. Note that if the rezoning is ultimately approved but subsequent applications are denied, the applicant will be consulted as to whether this change should still occur, or whether the zoning change application will be withdrawn. Council Meeting 7/17/2018 Item #17 Page 3 Recommended Condition of Approval. 1. That the Four Corners 1st Addition Preliminary and Final Plat obtain approval from the City. PRELIMINARY AND FINAL PLAT Purpose. The preliminary and final plat portion of this application package assumes the City approves the requested zoning map amendment to BP. If the rezoning failed, this application fails due to the inability to meet minimum RT zoning standards. If the rezoning was approved, the following analysis will apply: Minimum Lot Size Requirements. The following table outlines how the lot dimension and setback requirements of the Business Park zoning district are met by the requested lot layout. Lot Dimension Requirements, Business Park District Standard Required Proposed Minimum Lot Area 2 acres 11 acres Minimum Lot Width 200 feet 670 feet Minimum Lot Depth - 715feet Parkland Dedication. The City requires $4500 per acre for commercial subdivisions. The proposed subdivision will create one new lot of 11 acres. Therefore, it is recommended that a condition of approval require the applicant to pay $49,500 ($4500 X 11 acres) in park dedication fees for this development should the plan move forward. As staff did not identify any ways in which the proposed lot layout would be deficient to minimum zoning standards, we are recommending the requests can be approved. Note that if the Preliminary and Final plats are ultimately approved but subsequent applications are denied, the applicant will be consulted as to whether this application should still move forward, or whether it will be withdrawn. City Engineer Review. Stormwater Management • State and Valley Branch Watershed District permit will be required. • The site plan is subject to a storm water management plan meeting State, VBWD and City rules and regulations. No proposed storm water management plan was provided as part of the Plan submittal. • The storm water facilities constructed for this development should remain privately owned and maintained. The applicant will be required to execute and record a Stormwater Maintenance and Easement Agreement in the City’s standard form of agreement. Council Meeting 7/17/2018 Item #17 Page 4 • Even as privately owned and maintain facilities, maintenance access roads meeting the City engineering design standards must be provided for all storm water facilities. • The storm water facility 100‐year HWL must be fully contained within the subject property or easements must be acquired to protect the 100‐year HWL flood area. The proposed plans show the 100‐year HWL event discharging off‐site at the southeast corner. Streets and Transportation • A traffic study should be required as a condition of approval to determine the timing and extent of improvements required for the CSAH 15 and Hudson Boulevard intersection realignment and traffic signal improvements. A financial contribution to CSAH 15/Hudson Boulevard traffic signal/realignment should be considered. In addition, the study is needed to determine if an eastbound left turn lane along Hudson Boulevard is also needed at the site access. • No additional right-of-way dedication is required unless an eastbound turn lane is required as determined by the traffic study. A 10-foot utility corridor easement for small utilities must be dedicated ot the City along the north boulevard of Hudson Boulevard. • Hudson Boulevard must be improved per the City design standards to an urban section on the north side of the street including a westbound right turn lane to the site, a 4-foot shoulder (curb section), a 9-foot boulevard, and 10-foot shared use bituminous trail with 2-foot clear zone. Municipal Sanitary Sewer • Because the property is guided in the City’s Comprehensive Plan for 2020-2030 Regional Sewer Staging Plan and would discharge to the MCES Cottage Grove Ravine Interceptor, provisions for connecting to the municipal sanitary sewer service must be included with this application. The site plans/application indicates a new sewer service line connecting to future sanitary sewer but does not address the extension of sewer to the site. • The applicant will be responsible to connect to the City sanitary sewer system and extend sanitary sewer into the property at applicant’s sole cost and must stub sewer to adjacent parcels. • Sanitary sewer is available along Hudson Boulevard near the MCES Meter Station. The sanitary sewer trunk size will need to be determined based on the 2040 Comprehensive Plan. • Sanitary sewer capacity demands including the number of residential equivalency units (RECs) based on the Met Council SAC determination policty should be provided and account for all land uses and connections to the sewer system including bus wash wastewater. • Existing sanitary sewer utility easements along Hudson Boulevard and the new commercial street corridor must be shown on the plans and plans must be made to avoid encroachments/conflicts with these easements. • Any main sewer lines placed within the development will require minimum 30‐foot easements centered over the pipe (or wider dependent upon the sewer depths) dedicated to the City and in the form of the • City’s Utility Easement Agreement. Municipal Water Supply • Because the property is located in the MUSA, provisions for connecting to the municipal water supply must be included. • The applicant will be responsible for extending municipal water to the property at the applicant’s cost, and watermain stubs will be required to eastern property limits. Water is available to be extended to the property from the Hunter’s Crossing development but will require easements Council Meeting 7/17/2018 Item #17 Page 5 across adjacent properties. The watermain extension to the site will likely be a 12-inch trunk watermain. • The applicant shall provide water capacity demands including average day use, peak day use, and fire suppression demands. All demands should be included, including potable drinking water, bus washing operations, etc. in order to evaluate eater improvements needed to support the development and to determine the water availability charges. • The proposed site is in the water system’s low pressure zone which has limited capacity until a new water tower is constructed to serve the area. • Hydrants will be required to be placed at the direction of the Fire Department, and all fire hydrants shall be owned and maintained by the City. Recommended Findings. 1. That the Four Corners preliminary and final plat is consistent with the Lake Elmo Comprehensive Plan and the Future Land Use Map for this area. 2. That the Four Corners preliminary and final plat complies with the minimum lot frontage and area requirements of the City’s BP – Business Park zoning district. 3. That the Four Corners preliminary and final plat complies with the City’s subdivision ordinance. 4. That the Four Corners preliminary and final plat meets other City zoning ordinances, such as landscaping, erosion and sediment control, and other ordinances, provided comments outlined in the City Engineer Review Memo dated May 30, 2018 are met; or as may be amended due to changes in the site plan or proposed use. 5. That the Four Corners preliminary and final plat is consistent with the City’s engineering standards provided final plans are updated to address the City Engineer’s comments documented in a letter dated May 30, 2018; or as may be amended due to changes in the site plan or proposed use. 6. The land being subdivided is legally described as: S1/2-SE1/4 EXC WEST 2 RODS EXC TO HWY EXC HWY PARCEL 44 MN DOT R/W PLAT #82-35 SECTION 36 TOWNSHIP 029 RANGE 021 7. That the Four Corners preliminary and final plat will create one new lot of 11 acres to be legally described as Lot 1, Block 1, Four Corners; and three outlots: A (46.64acres), B (5.01 acres), and C (1.08 acres). Recommended Conditions of Approval. Staff recommends the following conditions be attached to any approval of the Four Corners Preliminary and Final plats: 1) The property shall be rezoned to BP – Business Park. 2) The applicant shall pay a fee in lieu of parkland dedication in the amount of $4500 per acre of the newly created lot (11 acres X $4500 = $49,500 total) prior to any formal City authorization. Council Meeting 7/17/2018 Item #17 Page 6 3) Prior to the execution of the Final Plat by City officials, the Developer shall enter into a Developer’s Agreement acceptable to the City Attorney and approved by the City Council that delineates who is responsible for the design, construction, landscaping, and payment of the required improvements for the Four Corners Final Plat with financial guarantees therefore. 4) Final grading, drainage and erosion control, sanitary sewer and stormwater management, street and utility construction plans shall be submitted, reviewed and approved by the City Engineer, meeting City Engineering Design Standards, prior to the recording of the Final Plat. All changes and modifications to the plans requested by the City Engineer in a memorandum dated May 30, 2018 and all subsequent memorandums regarding the plans shall be incorporated into these documents before they are approved. 5) The applicant must obtain all other necessary City, State, and other governing body permits prior to the commencement of any construction activity on the parcel including but not limited to building permits, conditional use permits, etc. 6) Any plans for construction on the newly created parcel must comply with the Lake Elmo Design Standards Manual and specific general site considerations and development standards for specific uses within the Business Park District. 7) The site plan is subject to a storm water management plan meeting State, Valley Branch Watershed District and City rules and regulations. All applicable permits must be obtained. Maintenance access roads meeting City engineering design standards must be provided for all storm water facilities. 8) Stormwater facilities shall remain privately owned and maintained. The applicant will be required to execute a Stormwater Maintenance and Easement Agreement in the City’s standard form of agreement. 9) A Traffic Impact Study shall be completed and submitted in order to determine timing and extent of improvements required for the CSAH 15 and Hudson Boulevard intersection realignment and traffic signal improvements as well as the need for an eastbound left turn lane along Hudson Boulevard for site access. Additional right-of-way along Hudson Boulevard may be required if the eastbound left turn lane is required. 10) Hudson Boulevard must be improved per the City design standards to an urban section on the north side of the street including a west bound right turn lane to the site, a four foot shoulder (curb reaction), a nine foot boulevard, and a ten foot shared use bituminous trail with two foot clear zone. 11) Provisions for connecting municipal sanitary sewer service and for connecting to the municipal water supply must be provided on submitted plans. The applicant shall be responsible to extend and connect to the City sanitary sewer system and municipal water at the applicant’s sole cost and extend such services to adjacent properties. The applicant shall be required to obtain easements Council Meeting 7/17/2018 Item #17 Page 7 from adjacent properties in order to extend water. A detailed description of the sanitary sewer and water capacity demands shall be provided. 12) Hydrants will be required to be placed at the direction of the Fire Department, and all fire hydrants shall be owned and maintained by the City. 13) All easements as requested by the City Engineer and Public Works Department shall be documented on the Final Plat prior to its execution by City Officials. ZONING TEXT AMENDMENT Purpose. The zoning text amendment being requested would allow "bus terminals" as a conditionally permitted principal use on properties zoned Business Park. If approved, the applicant would seek a conditional use permit to authorize a permanent bus terminal on the subject property. What’s currently in the Zoning Code Regarding Bus Terminals? • Definition of Local Transit 154.012.B.12. The Zoning Code defines bus terminals as local transit: o “Local Transit. Establishments primarily engaged in furnishing local and suburban passenger transportation, including taxicabs, passenger charter services, school buses, and terminals (including service facilities) for motor vehicle passenger transportation.” o Currently, local transit is not an allowed use within any of the zoning districts. • Parking Standards for Local Transit. The Zoning Code sets forth the following minimum o “2 spaces per 3 employees on the largest shift, based on maximum planned employment.” • Local Transit is currently not an allowed use within any Zoning District as indicated by the list of Permitted, Conditional, and Interim Uses within the Commercial Zoning Districts. Intent of Business Park Land Use/Zoning District within the Comprehensive Plan and Zoning Code. The 2030 Comprehensive Plan states that “the Business Park land use category is intended to encourage the creation of significant employment centers that accommodate a diverse mix of office and light industrial uses and jobs. Specific desired attributes of this land use include a diversity of jobs, high development densities and jobs per acre, high quality site and building architectural design, and increased tax revenues for the community. Office, office showroom/warehousing, research and development services, light and high-tech electronic manufacturing and assembly, and medical laboratories are typical uses appropriate for this land use category. Some retail and service uses may be allowed as supporting uses for the primary office and light industrial uses of the employment center.” Council Meeting 7/17/2018 Item #17 Page 8 While this proposal does create a significant number of jobs per acre (200 jobs on about 11 acres of property), the jobs it is creating don’t really fit in to the category of types of jobs this land use category is intended to have (office and light industrial uses and jobs). Additionally, a bus terminal does not necessarily fit in to the category of "high quality site and building architectural design." It also does not fit in to any of the described uses appropriate for this land category. Finally, it would not add to increased tax revenues for the community since it would be tax exempt. The Draft 2040 Comprehensive Plan states that Business Park (BP) areas are to “…provide for a wide variety of professional businesses such as medical and research facilities, offices, and corporate headquarters. Uses specifically excluded from existing business park areas include warehousing, manufacturing, distribution, assembly and truck terminals. Retail sales of goods and services are allowable uses by conditional use permit provided such uses are goods and services for the employees of the permitted business use. This category excludes any residential use.” While truck terminals are not exactly the same as local transit in that truck terminals provide tax base, they are similar in assumed site layout and traffic, noise, etc. Trucking terminals are currently a conditional use within the BP – Business Park zoning district and have not been explicitly disallowed per the current Comprehensive Plan. The draft 2040 Comprehensive Plan will exclude such a use within the Business Park land use if the plan in its current draft form is ultimately adopted. The Zoning Code states the following about the BP Business Park/Light Manufacturing District: “The purpose of the BP District is to provide areas for attractive, high quality business park development primarily for office, high quality manufacturing and assembly, and non-retail uses in developments which provide a harmonious transition to residential development and neighborhoods by: 1) Conducting all business activities and essentially all storage inside buildings; 2) Consisting of high quality and attractive buildings which blend in with the environment; 3) providing open space, quality landscaping and berming; 4) including berming and buffering of parking, loading docks and other similar functions; and 5) protecting and enhancing the natural environment; and 6) providing users with an attractive working environment that is unique in the eastern metropolitan area with immediate access to I-94.” A bus terminal does not necessarily provide a harmonious transition to residential development and neighborhoods as most business and activities are conducted outside, not inside buildings. While there are limited peak traffic times, there is a significant amount of traffic at those peak times. There will be only one building which is existing and will not be remodeled. There is opportunity to provide berming and buffering on the site should this move forward. Recommendation. Due to guidance of the current 2030 and draft 2040 Comprehensive Plans as well as the Zoning Code, staff would not recommend that bus terminals be an allowed use (conditional nor permitted) within the Business Park Zoning District due to the following findings: 1. That the procedures for requesting a Zoning Text Amendment are found in the Lake Elmo Zoning Ordinance, Section 154.105. 2. That all the submission requirements of said Section 154.105 have been met by the Applicant. Council Meeting 7/17/2018 Item #17 Page 9 3. That the proposed Zoning Text Amendment includes the following components: a. That local transit be a conditional use within the Business Park zoning district. 4. The Current comprehensive plan calls for Business Park areas to become "significant employment centers," and bus terminals do not provide significant employment relative to acreage needed for the use; 5. Business Park areas are to include uses with "high quality site and building architectural design," and bus terminals will typically include neither quality by the nature of the use; 6. Business Park land is meant to generate increased tax revenues for the City, and public bus terminals are tax exempt; 7. The use is specifically excluded from Business Park areas in the draft comprehensive plan anticipated to move forward for approval by the end of 2018; 8. The Zoning Code calls for Business Park areas to provide a harmonious transition between the City's commercial areas and its residential areas, and a bus terminal with outdoor storage of busses is antithetical to that goal; 9. The Zoning Code calls for Business Park activities to occur inside of buildings, and bus terminals by their nature include outdoor use and storage of vehicles; 10. The applicant's request to make bus terminals a conditionally permitted use cannot overcome all of the listed problems in findings 4 through 10 via conditions (as proposed or otherwise). Possible Standards. It should be noted that motor freight and warehousing, which is defined as follows: “establishments engaged primarily in either the storage or shipment of goods and materials, including terminal facilities for handling freight, and maintenance facilities in which the trucks (including tractor trailer units) involved with the operation of the business are stored, parked and serviced. Materials within a warehouse or terminal facility may be combined, broken down, or aggregated for trans-shipment or storage purposes where the original material is not chemically or physically changed,” (this includes truck terminals) are a conditional use currently within the Business Park zoning district. A bus terminal is quite similar in use to that of a truck terminal, though the definitions in the Zoning Code differentiate the two. It is also recognized that the development of this property would prompt the extension of City services to this area. If the Council disagrees with staff and believes that bus terminals are an appropriate use within areas guided for Business Park, staff would recommend the City only adopt narrowly tailored language to preclude bus terminals from certain Business Park areas in order to limit the number of bus terminals allowed in the City and to minimize impact to adjacent properties. If the Council goes this route, staff would suggest the following standards accompany any such change: Council Meeting 7/17/2018 Item #17 Page 10 1. The use shall be limited to a school district transportation center, owned by a public school district, serving as a bus terminal for buses and vans which transport passengers to and from schools or between school programs and community residences. o This provision would limit “local transit” to bus terminals and not allow, as per definition from the zoning code, taxicab terminals, passenger charter services, etc. 2. The property on which the use is located must be located within one half mile of property owned and used by a public school district for an active school or school administration building. o The property on which the bus terminal is being proposed would be the only parcel on the east side of the City that is guided for Business Park and that is within one half mile of such school property. 3. Must be on a property of at least 10 acres in size or more. o There are parcels on the west side of the city that are zoned Business Park that are in within one half mile of school district land, but none of those parcels meet a ten acre minimum and therefore could not qualify for use as a bus terminal. 4. Must be sufficiently screened, as determined by the City, from adjacent properties through techniques such as berming and landscaping. o This condition would provide the City with authority to determine the level and location of screening needed to hopefully ensure an acceptable separation of uses. 5. Accessory uses to bus terminals may include an office and routine maintenance of operable school buses including but not limited to washing and fueling. o This condition would ensure the site is used as a hub for a bus operation, but would not become a major maintenance center for inoperable vehicles in the bus fleet. CONDITIONAL USE PERMIT Purpose. The conditional use permit application would seek to utilize the previous text amendment and allow a "bus terminal" on a portion of the subject property. Failure of the previous application(s) to be approved will likely preclude approval of this application. Council Meeting 7/17/2018 Item #17 Page 11 Existing Conditions. The applicant is planning to re-locate the existing bus terminal on the property that was previously operating as Rihm Kenworth at 11530 Hudson Boulevard N in Lake Elmo, MN (see below). Current Interim Use Permit. The property currently operates under an interim use permit which was granted by Resolution No. 2014-095, which allows a bus/truck terminal. This interim use permit will expire on December 2, 2019, and may be renewed with approval by Council. It will terminate when any portion of the property is rezoned or when public sanitary sewer is provided on site. The consent agreement states that the remaining portion of the property must be used for agricultural purposes and that the interim use shall terminate upon any redevelopment of the property for a permitted or conditional use. There has been discussion of the eastern portion of this property developing, being provided sanitary sewer, and no longer being used for agricultural purposes. Therefore, the applicant does not want to operate under the current interim use permit. Current Building. The current building was constructed in the 1990’s and was used for office space by E&H Earthmovers and also provided bus storage for Stillwater Schools. It was then used by Kenworth Diesel Trucks for sales, repairs and service of diesel trucks. Current Bus Terminal Operation. The current bus terminal operates in Oak Park Heights within Stagecoach in the Old Junker Landfill. Proposed Operation and Jobs Created. School buses for the Stillwater School District will be parked at this facility when not in use, and routine maintenance will be performed at this facility, including washing and fueling. The existing building will be used for office workers (dispatch, payroll, safety manager, etc.); a home base for drivers to check in and out, training, assignments, and mechanical work (repair and maintenance on buses). Approximately 200 people would work at the facility, with morning and afternoon shifts of drivers and attendants. Hours of operation would be from about 6:00 a.m. to 6:00 p.m. during the Future planned bus terminal area Council Meeting 7/17/2018 Item #17 Page 12 weekdays with occasional Saturday use for limited special school district transportation needs. There would be parking provided for school buses (140 spaces), transportation vans (approximately 20), and employees’ personal vehicles (approximately 200). Why this Location? The location is adjacent to major traffic corridors and routes within this area of the City of Lake Elmo. The School District has proposed this location as opposed to a location located adjacent to lower volume roads so as to create less impact. Peak bus traffic times will be limited to morning hours (7:00 a.m. to 9:00 a.m.) and afternoon (2:00 p.m. to 4:00 p.m.). Setback and Impervious Surface Requirements. The following table outlines how the proposed use adheres to the setback and impervious surface requirements of the Business Park Zoning District. All of the proposed requirements are met. The property to the north is guided for Business Park in both the current (2030) and proposed (2040) Comprehensive Plan Land Use Plan, and so the required setback from residential zones does not apply. Setback Requirements, Business Park District Standard Required Proposed Maximum Height 50 feet Less than 50 feet Maximum Impervious Coverage 75% 57% Front Yard Setback – Building 50 feet 120 feet from existing right-of-way line Interior Side Yard Setback – Building 30 feet 120 feet from west side and 470 feet from east side Corner Side Yard Setback – Building 30 feet N/A Rear Yard Setback - Building 30 feet Approximately 445 feet Residential Zones – Building 150 feet Approximately 445 feet Front Yard – Parking 30 feet Approximately 60 feet from existing right-of-way line Interior Side Yard – Parking 15 feet Approximately 45 feet from west side and approximately 130 feet from east side Corner Side Yard – Parking 30 feet N/A Rear Yard - Parking 15 feet Approximately 32 feet Minimum Building Floor Size 5,000 square feet 15,498 square feet General Site Design Considerations, Commercial Districts. The following outlines how the proposed development adheres to the City’s General Site Design considerations for the Business Park zoning district.  Circulation. o Internal connections when feasible. The parcel to the west has an existing access owned by the parcel to the northwest, so it does not make sense to require this. Additionally, a bus garage would not need to access an adjacent development. Council Meeting 7/17/2018 Item #17 Page 13 o Curb cuts minimized. The proposed development will use an existing curb cut.  Fencing and Screening. There is a proposed chain link fence, which will be consistent with what is currently on the property, enclosing the eastern portion of the parking lot.  Lighting Design. It is a recommended condition of approval that the applicant submit a photometric plan that meets the requirements of Sections 150.035-150.038 of the City Code.  Exterior Storage. Exterior materials storage must be screened from view from adjacent public streets and adjacent residential properties. It is a recommended condition of approval that the applicant provide sufficient berming and screening of the parking lot and that the fueling area and above ground storage tank also be sufficiently screened from adjacent properties and the public right-of-way. Parking Lot Requirements  Surface and Drainage. It is required that in commercial districts, all areas intended to be utilized for parking spaces for five or more vehicles be paved with a durable surface including, but not limited to, hot asphalt, bituminous, or concrete. Additionally, industrial districts are required to be surfaced with materials suitable to control dust and drainage. The applicant has indicated that the existing paved and gravel parking area would remain and that the site would be expanded to provide additional gravel surfaced parking for school buses and employee cars. It is a recommended condition of approval that the parking area be paved as required by the Zoning Code.  Marking of Parking Spaces. Parking areas containing five or more spaces are required to be marked with painted lines at least four inches wide. This is a recommended condition of approval.  Curbing. Open off-street parking areas designed to have head-in parking along the property line shall provide a bumper curb or barrier of normal height. This is a recommended condition of approval.  Accessible Parking. The proposed number of parking spaces is 365, of these, 199 are proposed to be car stalls. The Americans with Disabilities Act (ADA) requires six accessible stalls with one van accessible stall with six accessible stalls. The proposed number of ADA stalls is six, though there does not appear to be a van accessible stall provided. Landscape Plans. The applicant has submitted landscape plans which include 62 Norway Spruces and 61 Colorado Blue Spruce. The existing berms would also remain. Some cursory comments on the landscape plan include the following:  There is proposed 670 feet of street frontage on the property, requiring at least 14 trees be planted along Hudson Boulevard. There are no trees proposed to be planted along Hudson Boulevard. This requirement is not met.  The applicant has not submitted a Tree Preservation Plan, as is required. It is a recommended condition of approval that this also be submitted and approved by the Landscape Architect. Council Meeting 7/17/2018 Item #17 Page 14  It is not known whether or not the requirement that a minimum of five trees be planted for every one acre of land developed or disturbed is met, as the applicant has not submitted a Tree Preservation Plan as indicated above. Parking Lot Screening Standards  Interior Parking Lot Landscaping. It is not known whether or not the parking lot meets the interior parking lot landscaping requirements, as the applicant has not indicated what percentage of interior parking lot area is devoted to landscaping planting areas. At least 5% of the parking lot will need to be devoted to islands or corner planting beds and include shade trees in accordance with the table below. Provided the parking lot contains 365 spaces as currently proposed, a minimum of 25 trees will be required within these interior landscaped areas. Number of Parking Spaces Minimum Required Tree Planting 0-30 None required 31-100 1 tree per 10 spaces or fraction thereof 101+ 1 tree per 15 spaces or fraction thereof  Perimeter Parking Lot Landscaping. o Frontage Strip. A well-over 8-foot wide frontage strip is provided between parking areas and public street as required for parking lots with over 100 spaces. There is a berm that is already located along Hudson Blvd which screens the parking lot.  Screening. Screening is required to provide visual and noise separation of intensive uses from less intensive uses. The property to the west is used as exterior storage, and it is unknown what the property to the east will be used as. It is recommended that the screening be provided from the property to the west and east that consists of either a masonry wall or fence in combination with landscape material that forms a screen at least six feet in height and at least 90% opaque on a year-round basis and include at least one deciduous or coniferous tree per 40 linear feet along the property line. Lake Elmo Design Guidelines and Standards. The property is located within the I-94 district, and therefore must adhere to the Lake Elmo Design Guidelines and Standards. As previously indicated, the applicant has proposed to use the existing building. The building generally adheres to Lake Elmo Design Guidelines and standards in that the building does not have a blank façade, the window and door styles reflect the prevailing architecture style of the structure, there is variety in building façade through a change in materials, high quality and durable materials are used in street facing facades, and the building is constructed of pre-cast concrete. Storage Tank. There is a provision in the Zoning Code that requires that the Council permit uses associated with the bulk storage of over 2,000 gallons of diesel after finding that fire, explosion, or water or soil contamination hazards are not present that would be detrimental to the public health, safety, and general welfare and that the Zoning Administrator require the development of diking around the tanks, suitably sealed to hold a leakage capacity equal to 115% of the tank capacity. The proposed fueling area contains Council Meeting 7/17/2018 Item #17 Page 15 an above ground storage tank that will store 8,000 gallons of diesel. Staff has contacted the Minnesota Pollution Control Agency (MPCA), and the only requirement they have is for their Aboveground Storage Tank (AST) Program is that the applicant fill out an AST Notification of Installation or Change in Status Form informing the MPCA of when the tank has been “closed” from the former location and when it has been moved to the new location. It is a recommended condition of approval that the applicant fill out this form both times (when removing it from the former location and when installing it in the new location) as required by the MPCA. Bus Washing. The applicant has indicated on the application that the property use will include washing buses. The applicant has indicated that the buses will be washed at the facility’s wash bay and that waste water from the wash bay will run in to an oil separator with all of the shop drains, which will go in to a holding tank, which is then disposed of by a sewer transport service. The oil separator is then emptied and maintained by a licensed transporter. The applicant indicates that once the septic system is converted to the municipal sewer system that the wastewater will go directly to the treatment plant after passing through the oil separator, and the oil separator will be emptied and maintained by a licensed transporter. The disposal of this water is addressed in the engineering comments. City Engineer Review. This can be referenced in the Preliminary and Final Plat section of this report. Fire Chief and Building Official Review. The biggest concern that was provided from the Fire Chief and Building Official is that the building is sprinklered yet not hooked up to City water. It is a recommended condition of approval that the property be serviced by City sewer and water prior to the operation of the bus terminal. Staff Recommendation. Due to recommended denial of the zoning text amendment request due to its inconsistency with the Comprehensive Plan and recommended findings outlined below, which are required for a conditional use permit, staff had recommended denial of the requested conditional use permit to operate a school district transportation center at a portion of the property located at 11530 Hudson Blvd N based on the following: 1. The proposed use will not be detrimental to or endanger the public health, safety, comfort, convenience or general welfare of the neighborhood or the city. With over 200 employees and a use that requires both employee trips in and out of the facility each day as well as two bus trips in and out of the facility each day, the use will generate a significant amount of traffic. 2. The use or development conforms to the City of Lake Elmo Comprehensive Plan. The property is guided for Business Park. While the proposal does create a significant number of jobs per acre, the parcel will be tax exempt, as it will be owned by the school district. It also does not fit in to the described uses appropriate for this land category. Finally, it does not propose high quality site and building architectural design, which, per the Comprehensive Plan, is a trait this land use category should have. 3. The use or development is compatible with the existing neighborhood. The use is compatible with the existing neighborhood, as the existing use is a truck terminal, which is similar in Council Meeting 7/17/2018 Item #17 Page 16 use and design to a bus terminal, and the surrounding parcels are mostly vacant and undeveloped. However, the surrounding area is planned for uses such as offices, showroom/warehousing, research and development, manufacturing and assembly, and medical laboratories, which are not compatible uses with a bus terminal. 4. The proposed use meets all specific development standards for such use listed in Article 7 of this Chapter. There are no specific development standards for this use listed in Article 7. The use does not comply with many parking lot, screening, and landscape standards of the Zoning Code. 5. If the proposed use is in a flood plain management or shoreland area, the proposed use meets all the specific standards for such use listed in Chapter 150, §150.250 through 150.257 (Shoreland Regulations) and Chapter 152 (Flood Plain Management). The property is located outside the 0.2% annual chance floodplain. 6. The proposed use will be designed, constructed, operated and maintained so as to be compatible in appearance with the existing or intended character of the general vicinity and will not change the essential character of that area. The proposed project is a redevelopment/repurposing of an existing site, to which minimal improvements are proposed, and will not significantly change the existing character of the area. Operations are not within a building and so would not meet the intended character of the neighborhood. 7. The proposed use will not be hazardous or create a nuisance as defined under this Chapter to existing or future neighboring structures. The proposed use will create a significant amount of traffic, at least at certain times of the day. 8. The proposed use will be served adequately by essential public facilities and services, including streets, police and fire protection, drainage structures, refuse disposal, water and sewer systems and schools or will be served adequately by such facilities and services provided by the persons or agencies responsible for the establishment of the proposed use. The property is within the Metropolitan Urban Service Area (MUSA) and therefore should be required to be provided by city sewer and water. The application did not detail provisions to connect to City sewer and water. The use may require the prompt need for the CSAH 15/Hudson Blvd traffic signal, for which the City will be required to share 25% of the cost, and the Hudson Boulevard realignment. It is not yet known if the applicant’s stormwater management plan meets all City, State, and Valley Branch Watershed District requirements. 9. The proposed use will not create excessive additional requirements at public cost for public facilities and services and will not be detrimental to the economic welfare of the community. The use may require the prompt need for the CSAH 15/Hudson Blvd traffic signal/realignment, for which the City will be required to share 25% of the cost. It is not Council Meeting 7/17/2018 Item #17 Page 17 yet known if the applicant’s stormwater management plan meets all City, State, and Valley Branch Watershed District requirements. 10. The proposed use will not involve uses, activities, processes, materials, equipment and conditions of operation that will be detrimental to any persons, property or the general welfare because of excessive production of traffic, noise, smoke, fumes, glare or odors. The proposed use will generate a significant number of trips per day, which may generate excessive production of traffic. 11. Vehicular approaches to the property, where present, will not create traffic congestion or interfere with traffic on surrounding public thoroughfares. Traffic congestion may be created from the significant number of trips to the site the use would generate. 12. The proposed use will not result in the destruction, loss or damage of a natural or scenic feature of major importance. N/A Recommendation Findings for Approval. The Planning Commission recommended approval and the following findings and conditions of approval: 1. The proposed use will not be detrimental to or endanger the public health, safety, comfort, convenience or general welfare of the neighborhood or the city. Bus traffic is not expected to be detrimental or dangerous, as trips and traffic will be limited to certain times of the day. It is a recommended condition of approval that there be significant berming to provide a sufficient screening of the parking lot. 2. The use or development conforms to the City of Lake Elmo Comprehensive Plan. The property is guided for Business Park, in which local transit, which meets certain standards, is a conditional use per the Zoning Code. The use also provides a significant number of jobs per acre, which is a desired trait of the Business Park land use designation per the Comprehensive Plan. 3. The use or development is compatible with the existing neighborhood. The use is compatible with the existing neighborhood, as the existing use is a truck terminal, which is similar in use and design to a bus terminal. The surrounding parcels are mostly vacant and undeveloped. 4. The proposed use meets all specific development standards for such use listed in Article 7 of this Chapter. The proposal complies with the proposed development standards as recommended in the requested Zoning Text Amendment, although it does not comply with many parking lot, screening, and landscape standards, which have been required as a recommended condition of approval. 5. If the proposed use is in a flood plain management or shoreland area, the proposed use meets all the specific standards for such use listed in Chapter 150, §150.250 through 150.257 (Shoreland Regulations) and Chapter 152 (Flood Plain Management). The property is located outside the 0.2% annual chance floodplain. 6. The proposed use will be designed, constructed, operated and maintained so as to be compatible in appearance with the existing or intended character of the general vicinity Council Meeting 7/17/2018 Item #17 Page 18 and will not change the essential character of that area. While the proposed project is a redevelopment/repurposing of an existing site and will not change the existing character of the area, operations are not within a building and so would not meet the intended character of the neighborhood. 7. The proposed use will not be hazardous or create a nuisance as defined under this Chapter to existing or future neighboring structures. While the proposed use will create a significant amount of traffic, it will be limited to certain times of the day. 8. The proposed use will be served adequately by essential public facilities and services, including streets, police and fire protection, drainage structures, refuse disposal, water and sewer systems and schools or will be served adequately by such facilities and services provided by the persons or agencies responsible for the establishment of the proposed use. There are plans to connect to City sewer and water at the applicant’s cost. The use may require the prompt need for the CSAH 15/Hudson Blvd traffic signal, for which the City will be required to share 25% of the cost, and the Hudson Boulevard realignment. It is not yet known if the applicant’s stormwater management plan meets all City, State, and Valley Branch Watershed District requirements. 9. The proposed use will not create excessive additional requirements at public cost for public facilities and services and will not be detrimental to the economic welfare of the community. While the use will not pay property taxes, sewer and water service charges will be paid by the applicant. 10. The proposed use will not involve uses, activities, processes, materials, equipment and conditions of operation that will be detrimental to any persons, property or the general welfare because of excessive production of traffic, noise, smoke, fumes, glare or odors. The proposed use will generate a significant number of trips per day, though this will be limited to certain times of the day. Minimal noise is expected to come from the site, except during heavy traffic times at specific times within the morning or afternoon. 11. Vehicular approaches to the property, where present, will not create traffic congestion or interfere with traffic on surrounding public thoroughfares. Traffic congestion could be created from the significant number of trips to the site, though these would be limited to certain times of the day. 12. The proposed use will not result in the destruction, loss or damage of a natural or scenic feature of major importance. N/A Recommended Conditions of Approval. If the Council wishes to recommend approval, staff recommends the following conditions: 1) The Zoning Text Amendment to allow local transit (school district transportation center) within the Business Park Zoning District must be approved. 2) No construction or use of the bus terminal (unless in accordance with the Interim Use Permit approved by the City by Resolution 2014-095) may commence until all items as outlined in the City Engineer review memo regarding the Four Corners Preliminary & Final Plat (Stillwater Council Meeting 7/17/2018 Item #17 Page 19 Transportation Center) dated May 30, 2018 and all other subsequent construction plan memos regarding the Stillwater Transportation Center have been addressed; the Four Corners 1st Addition Final Plat has been recorded. 3) The applicant must obtain all other necessary City, State, and other governing body permits prior to the commencement of any construction activity on the parcel including but not limited to an approved stormwater management plan, utility plans, grading plan, street construction plans (if required), parking lot permit, building permits, etc. 4) The Applicant shall submit a photometric plan, and all lighting must meet requirements of Sections 150.035-150.038 of the City Code. 5) The above ground storage tank shall require development of diking around the tank, suitably sealed to hold a leakage capacity equal to 115% of the tank capacity. The applicant shall demonstrate that fire, explosion, or water or soil contamination hazards are not present that would be detrimental to the public health, safety, and general welfare. The applicant shall also fill out an Aboveground Storage Tank Notification of Installation or Change in Status Form as required by the Minnesota Pollution Control Agency (MPCA). 6) The Applicant shall submit an updated Landscape Plan and Tree Preservation Plan which includes sufficient berming and screening and addresses the comments in this report to be reviewed and approved by the City’s Landscape Architect. 7) Parking areas shall be paved with a durable surface including, but not limited to, hot asphalt, bituminous or concrete; spaces shall be marked with painted lines at least four inches wide; required interior and exterior parking lot screening is required; a bumper curb or barrier of normal bumper height shall be provided; and must provide an adequate number of Americans with Disabilities Act (ADA) accessible stalls. 8) A sign permit shall be obtained prior to erection of any sign on the property. 9) The property shall be connected to City sewer and water prior to operation of the bus terminal. 10) A Traffic Impact Study is required to determine timing and extent of improvements required for the CSAH 15 and Hudson Boulevard intersection realignment and traffic signal improvements as well as to determine if an eastbound left turn lane along Hudson Boulevard is also needed at the site access. 11) The applicant shall be required to include a description of the sanitary sewer capacity demands including the number of residential equivalency units (REC) based on the Metropolitan Council Sewer Availability Charge (SAC) determination policy as well as a description of the water capacity demands including average day use, peak day use, and fire suppression demands. Demands must account for all planned uses and connections to the sewer system including bus wash wastewater as well as include potable drinking water, bus washing operations, etc. 12) Applicant shall be responsible to place hydrants throughout the property at the direction of the Fire Department. All fire hydrants shall be owned and maintained by the City. Planning Commission Review. The Planning Commission held a public hearing and considered the requests for a zoning map amendment, preliminary and final plat, zoning text amendment and conditional use permit at its June 18, 2018 meeting. No public comments were received prior to the meeting, and no one from the public spoke at the meeting. Council Meeting 7/17/2018 Item #17 Page 20 During the meeting, the applicant’s representative explained that they have been working with the City, offering to pay the water accessory charge, for a number of years. The applicant believes that the development will help bring water and sewer to the site. It is anticipated that the development will spur other development which will generate higher taxes. The school district also explained that a school bus terminal creates quality public services. The location is ideal, as their district spans a number of miles, and this is a more centralized location for their students. The Planning Commission was supportive of all of the requests and believed that the requests would spur development and bring City services to the area. They indicated that the City should not wait for a better opportunity to come along. They were concerned that the condition that the parking lot be paved and brought to City standards was a burden to the applicant, but it was explained that these are City standards and must be met unless a variance is granted. The Planning Commission recommended approval of all four requests with a vote of 4-0. FISCAL IMPACT: If approved and recommended conditions of approval are adopted, the applicant will be required to pay sewer and water availability charges and will be responsible at its sole cost for bringing sewer and water to the property and extending it to adjacent properties. Maintenance of streets, trails, sanitary sewer mains, and other public infrastructure should be considered. The City will collect Sewer Accessibility Charges and Water Accessibility Charges, building permit fees, and property taxes OPTIONS: The Council may: • Approve the requests for a zoning map amendment to rezone a portion of the property located at 11530 Hudson Blvd N and for the Four Corners preliminary and final plat to subdivide the property located at 11530 Hudson Blvd N and deny the requests for a zoning text amendment to allow local transit as a conditional use within the Business Park zoning district and for a conditional use permit to operate a school district transportation center on a portion of the property located at 11530 Hudson Blvd N with staff recommended findings and applicable conditions of approval. • Approve the requests for a zoning map amendment to rezone a portion of the property located at 11530 Hudson Blvd N and for the Four Corners preliminary and final plat to subdivide the property located at 11530 Hudson Blvd N and deny the requests for a zoning text amendment to allow local transit as a conditional use within the Business Park zoning district and for a conditional use permit to operate a school district transportation center on a portion of the property located at 11530 Hudson Blvd N with amended findings and applicable conditions of approval. • Deny all requests with findings to support denial for the Four Corners preliminary and final plat and zoning map amendment. • Approve all requests with staff-drafted findings and conditions of approval. • Amend any recommended findings and conditions of approval and approve all requests with amended findings and conditions of approval. RECOMMENDATION: Council Meeting 7/17/2018 Item #17 Page 21 The Planning Commission recommends approval of the requests for a zoning map amendment, preliminary and final plat, zoning text amendment, and conditional use permit: “Move to adopt Ord. 08-244 approving the request from Stillwater Area Public Schools for a Zoning Map Amendment to rezone Lot 1, Block 1, Four Corners from Rural Development Transitional to Business Park, subject to recommended condition of approval.” “Move to adopt Resolution 2018-076 approving the request from Terry Emerson for the Four Corners preliminary and final plat to subdivide the property located at 11530 Hudson Blvd N in to Lot 1, Block 1, Four Corners, along with three separate outlots, subject to recommended conditions of approval.” “Move to adopt Ord. 08-215 approving the request from Stillwater Area Public Schools for a Zoning Text Amendment to allow local transit as a conditional use within the Business Park zoning district.” “Move to adopt Resolution 2018-077 approving the request from Stillwater Area Public Schools for a Conditional Use Permit to allow a school district transportation center at the property located at Lot 1, Block 1, Four Corners with the conditions as recommended by Staff/with the amended conditions of approval.” Staff recommends denial of the zoning text amendment and conditional use permit: “Move to adopt Resolution 2018-078 denying the request from Stillwater Area Public Schools for a Zoning Text Amendment to allow local transit as a conditional use within the Business Park zoning district based on recommended findings.” “Move to adopt Resolution 2018-079 denying the request from Stillwater Area Public Schools for a Conditional Use Permit to allow a school district transportation center at the property located at Lot 1, Block 1, Four Corners based on recommended findings.” ATTACHMENTS: • Applications for Zoning Text Amendment, Zoning Map Amendment, Conditional Use Permit and Four Corners preliminary and final plat and Narratives. • Preliminary and Final Plat • Engineer Memo • Bus Terminal Plans • Ord. 08-214 approving the Zoning Map Amendment • Resolution 2018-076 approving the Preliminary and Final Plat • Resolution 2018-078 denying the Zoning Text Amendment • Resolution 2018-079 denying the Conditional Use Permit • Ord. 08-215 approving the Zoning Text Amendment • Resolution 2018-077 approving the Conditional Use Permit City of Lake Elmo Narrative for Zoning Map Amendment April 30, 2018 The property being considered for re-development is currently being used for after-market parts and equipment sales, along with service of Kenworth Diesel Trucks. The proposed use for a School District Transportation Center. School buses for the District would be parked at this facility when not in use, along with performing routine maintenance of the buses at this location. As part of the servicing and maintenance of the buses, it is also planned to wash and fuel buses at this facility. Approximately 200 people would work at this facility, with morning and afternoon shifts of drivers and attendants, along with the vehicle maintenance and administrative staff This proposed use would be similar to the existing use of the property, in providing routine service of vehicles. Parking for the school buses (total of 140) transportation vans (about 20) and personal vehicles of the employees (about 200) would be provided on-site. This location is adjacent to major traffic corridors and routes within this area of the City of Lake Elmo and this would have less of an impact on traffic flow than would occur on lower volume roads or those through residential areas. Water and sanitary sewer infrastructure are also proposed to this area of the City as part of the adjacent development and re-alignment of Hudson Boulevard, eliminating the need for septic systems for treatment of wastewater from this facility. As the water for the facility is switched from the well to municipal water, the existing well would be abandoned in accordance with Minnesota Health Department requirements. City of Lake Elmo Narrative for Zoning Text Amendment April 30, 2018 The property being considered for re-development is currently being used for after-market parts and equipment sales, along with service of Kenworth Diesel Trucks. The proposed use is for local school buses to be parked along with routine maintenance at this location. This proposed use (local transit) is currently not listed in the zoning code as a permitted use in the Business Park Zoning District, but would be similar to the existing use of the property. In addition, this location is adjacent to major traffic corridors and routes, and this would limit bus traffic on lower volume roads and through residential areas. This proposed use would not be detrimental to the other permitted uses in the Business Park District. This use would be consistent with the City of Lake Elmo Comprehensive Plan for the Business Park District in providing a diverse mixed use, with a high density of jobs at this location. This facility will employee about 200 people, including the various shifts, positions and administrative staff. Water and sanitary sewer infrastructure are also proposed to this area of the City as part of the adjacent development and re-alignment of Hudson Boulevard, eliminating the need for septic systems for treatment of wastewater from this facility. As the water for the facility is switched from the well to municipal water, the existing well would be abandoned in accordance with Minnesota Health Department requirements. City of Lake Elmo Narrative for Conditional Use Permit Stillwater Area Public Schools April 30, 2018 Contact Information: Stillwater Area Public Schools – Kristen Hoheisel – 651-351-8321, Email: hoheiselk@stilwaterschools.org Property Owner: Terry Emerson – 651-845-3373, Email: tse03@comcast.net Engineer: Greg Buchal - Larson Engineering 651-255-0328, Email: gbuchal@larsonengr.com Surveyor: Tim Freeman – FFE Surveying 651-439-8833, Email: freeman@ffe-inc.com Property Address: 11530 Hudson Blvd. North, Lake Elmo, MN 55042 Current Zoning: Business Park Parcel Size: 11 acres (approximately 479,160 sq. ft.) PID Number: 36 029 21 43 0001 Current building was constructed in the 1990’s and was used for office space by E& H Earthmovers and also provided bus storage for Stillwater Schools. The building was then used by Kenworth Diesel Trucks for sales, repairs and service of diesel trucks, and is currently being considered for bus parking and maintenance by Stillwater Schools again. The proposed use is for a School District Transportation Center. The existing building, paved and gravel parking area, along with the existing landscaped berms would remain as they are and the site would be expanded to provide additional gravel surfaced parking for school buses and employee cars. School buses for the District would be parked at this facility when not in use, along with performing routine maintenance of the buses at this location. As part of the servicing and maintenance of the buses, it is also planned to wash and fuel buses at this facility. Approximately 200 people would work at this facility, with morning and afternoon shifts of drivers and attendants, along with the vehicle maintenance and administrative staff. Hours of operation would be from about 6:00am to about 6:00pm during the weekdays with occasional Saturday use for limited special school district transportation needs. This proposed use would be similar to the existing use of the property, in providing routine service of vehicles. Parking for the school buses (total of 140) transportation vans (about 20) and personal vehicles of the employees (about 200) would be provided on-site. This location is adjacent to major traffic corridors and routes within this area of the City of Lake Elmo and this would have less of an impact on traffic flow than would occur on lower volume roads or those through residential areas. Being located along the Highway 94 corridor, the bus traffic would have a minimal impact on the already higher volumes of traffic in this area. In addition, the peak bus traffic times will be limited to the morning hours, from about 7:00am to 9:00am to get student to school, and from about 2:00pm to 4:00pm to get students back home from school. This proposed use would not be detrimental to the other permitted uses in the Business Park District. This use would be consistent with the City of Lake Elmo Comprehensive Plan for the Business Park District in providing a diverse mixed use, with a high density of jobs at this location. This facility will employee about 200 people, including the various shifts, positions and administrative staff. Water and sanitary sewer infrastructure are also proposed to this area of the City as part of the adjacent re-development and re-alignment of Hudson Boulevard, eliminating the need for septic systems for treatment of wastewater from this facility. As the water for the facility is switched from the well to municipal water, the existing well would be abandoned in accordance with Minnesota Health Department requirements.   PAGE 1 of 3  MEMORANDUM           Date:  May 30, 2018      To: Emily Becker, Planner Director Re: Four Corners Preliminary & Final Plat  (Stillwater Transportation Center)  Cc:  Chad Isakson, Assistant City Engineer      From: Jack Griffin, P.E., City Engineer          An engineering review has been completed for the Four Corners Preliminary and Final Plat including the Stillwater  Transportation Center. Preliminary Plat/Final Plat and Site Plans were received on May 16, 2018. The submittal  consisted of the following documentation:     Four Corners Preliminary Plat, dated May 4, 2‐18, prepared by Folz Freeman Surveying LLC.   Four Corners Final Plat, not dated, prepared by Folz Freeman Surveying LLC.   Stillwater Bus Facility Site Plans, dated April 30, 2018, prepared by Larson Engineering Inc.   Project Narratives, dated April 30, 2018.      Engineering has the following review comments:    STORMWATER MANAGEMENT   A State and Valley Branch Watershed District (VBWD) permit will be required. The site plan is subject to a  storm water management plan meeting State, VBWD and City rules and regulations. No proposed storm  water management plan was provided as part of the Plan submittal.   A storm water management plan must be submitted detailing the stormwater management calculations  to support any proposed improvements to meet agency requirements including the HydroCAD model in  electronic format. The Management plan must include a summary report describing the overall  stormwater management plan and performance criteria for all required storm events.    Storm water facilities proposed for meeting State and VBWD permitting requirements must be designed  and constructed in accordance with the City Engineering Design Standards Manual available on the City  website, dated March 2017.   The storm  water facilities constructed for this development should remain privately  owned and  maintained. The applicant will be required to execute and record a  Stormwater Maintenance and  Easement Agreement in the City’s standard form of agreement.   Even as privately owned and maintain facilities, maintenance access roads meeting the City engineering  design standards must be provided for all storm water facilities.   The storm water facility 100‐year HWL must be fully contained within the subject property or easements  must be acquired to protect the 100‐year HWL flood area. The proposed plans show the 100‐year HWL  event discharging off‐site at the southeast corner.   City design standards, details and plan notes must be used for erosion control.        FOCUS ENGINEERING, inc.  Cara Geheren, P.E.  651.300.4261  Jack Griffin, P.E.               651.300.4264  Ryan Stempski, P.E. 651.300.4267  Chad Isakson, P.E. 651.300.4285    PAGE 2 of 3  STREETS AND TRANSPORTATION     Hudson Boulevard Right‐of‐Way/Easement Dedication. No additional right‐of‐way dedication is required  unless an eastbound left turn lane is required (see below). However, a 10‐foot utility corridor easement  for small utilities must be dedicated to the City along the north boulevard of Hudson Blvd.   Site Access. The site plans propose the continued use of the existing commercial driveway with dedicated  right and left turn lanes leaving the site.   Hudson Boulevard Improvements. As part of the development, Hudson Boulevard must be improved per  the City design standards to an urban section on the north side of the street including a west bound right  turn lane to the site, a 4‐foot shoulder (curb reaction), a 9‐foot boulevard, and  10‐foot shared use  bituminous trail with 2‐foot clear zone (see attached typical section and preliminary layout).   Traffic Impact Study. A traffic impact study should be completed and submitted as part of the preliminary  plat application to determine the timing and  extent of improvements required for the CSAH 15 and  Hudson Boulevard intersection realignment and traffic signal improvements. A financial contribution to  CSAH 15/Hudson Blvd traffic signal/realignment should be considered. In addition, the study is needed to  determine if an eastbound left turn land along Hudson Boulevard is also needed at the Site access.    MUNICIPAL SANITARY SEWER   The proposed site is guided in the City’s Comprehensive Plan for 2020‐2030 Regional Sewer Staging Plan  and would discharge to the MCES Cottage Grove Ravine Interceptor. Therefore, provisions for connecting  to the municipal sanitary sewer service must be included with this application. The site plans/application  indicates a new sewer service line connecting to future sanitary sewer but does not address the extension  of sanitary sewer to the site.   The applicant will be responsible to connect to the City sanitary sewer system and extend sanitary sewer  into the property at applicant’s sole cost. In addition, the applicant will be required to stub sanitary sewer  mains to adjacent properties so that these parcels maintain sewer access. Sanitary sewer is available  along Hudson Blvd near the MCES Meter Station. The sanitary sewer trunk size will need to be determined  based on the 2040 Comprehensive Plan.   The application should include a description of the sanitary sewer capacity demands including the number  of residential equivalent units (REC) based on the Met Council SAC determination policy. Demands must  account for all planned uses and connections to the sewer system including bus wash wastewater. This  information is required for staff evaluation of the sewer system improvements needed to support the  development and to determine the applicable sewer availability charges.   Existing Utility Easements. The existing sanitary sewer utility easements along Hudson Boulevard and the  new commercial street corridor must be shown with the preliminary plan submittal and plan revisions  must be made to avoid encroachments/conflicts with these easements.   Any main sewer lines placed within the development will require minimum 30‐foot easements centered  over the pipe (or wider dependent upon the sewer depths) dedicated to the City and in the form of the  City’s Utility Easement Agreement.     MUNICIPAL WATER SUPPLY   The  proposed facility resides within  the Planned  MUSA, therefore provisions for connecting to the  municipal water supply must be included with this application. The site plans/application indicate a new  water service line connecting to future water but does not address the extension of the municipal water  supply to the site.   The applicant will be responsible  to extend municipal water  to the property at the applicant’s cost.  Watermain stubs will be required to eastern property limits. Water is available to be extended to the  property from the Hunter’s Crossing development but will require easements across adjacent properties.  The watermain extension to the site will likely be a 12‐inch trunk watermain.     The application should include a description of the water capacity demands including average day use,  peak day use, and fire suppression demands. All demand should be provided including potable drinking    PAGE 3 of 3  water, bus washing operations, etc. This information  is required  for staff  evaluation of  the  water  improvements needed to support the development and to determine the water availability charges.   The proposed site is in the water system’s low‐pressure zone which has limited capacity until a new water  tower is constructed to serve the area.   The applicant will be responsible to place hydrants throughout the property at the direction of the Fire  Department.  All fire hydrants shall be owned and maintained by the City.   Any watermain  lines and hydrants  placed within  the development will require minimum  30‐foot  easements centered over the pipe. Easements must be dedicated to the City and be provided in the City’s  standard form of easement agreement.              PROJECT: 2018 STILLWATER BUS FACILITY IMPROVEMENTS STILLWATER AREA PUBLIC SCHOOLS 1875 SOUTH GREELEY STREET STILLWATER, MINNESOTA 55082 VICINITY MAP INDEX OF DRAWINGS PROJECT CONTACTS T - C1 C2 C3 C3.1 C4 C5 C6 Title Sheet Topographic Survey Demolition Plan Paving and Dimension Plan Grading and Erosion Control Plan Landscape Plan Utility Plan Details Details Civil Engineer: Greg A. Buchal, P.E. Larson Engineering, Inc. 3524 Labore Road White Bear Lake, MN 55110 Tel: 651.481.9120 Fax: 651.481.9201 DescriptionRev. Date 20 1 8 S T I L L W A T E R BU S F A C I L I T Y IM P R O V E M E N T S ST I L L W A T E R A R E A P U B L I C S C H O O L S ST I L L W A T E R , M N 5 5 0 8 2 Sheet: Sheet Title: Project #: Drawn By: Checked By: Issue Date: 12176010 KJA GAB 04.30.18 35 2 4 L a b o r e R o a d Wh i t e B e a r L a k e , M N 5 5 1 1 0 65 1 . 4 8 1 . 9 1 2 0 ( f ) 6 5 1 . 4 8 1 . 9 2 0 1 ww w . l a r s o n e n g r . c o m C 2 0 1 8 L a r s o n E n g i n e e r i n g , I n c . A l l r i g h t s r e s e r v e d . P:\Projects\Projects - 2017\12176010 - Stillwater Bus Facility Evals\C. Design\Drawing Files\12176010 - T.dwg 35 2 4 L a b o r e R o a d Wh i t e B e a r L a k e , M N 5 5 1 1 0 65 1 . 4 8 1 . 9 1 2 0 ( f ) 6 5 1 . 4 8 1 . 9 2 0 1 ww w . l a r s o n e n g r . c o m Pr o j e c t T i t l e : ST I L L W A T E R A R E A PU B L I C S C H O O L S 18 7 5 S O U T H G R E E L E Y S T R E E T ST I L L W A T E R , M I N N E S O T A 5 5 0 8 2 Cl i e n t : Greg A. Buchal, P.E. Date: Reg. No.:04.30.18 23793 I hereby certify that this plan, specifications or report was prepared by me or under my direct supervision and that I am a duly licensed Professional Engineer under the laws of the state of Minnesota. CI T Y S U B M I T T A L TITLE SHEET T Surveyor: Tim Freeman, P.L.S. FFE Surveying LLC 12445 55th Street North Lake Elmo, MN 55042 Tel: 651.439.8833 Fax: 651.430.9331 Proposed Stillwater Bus Facility 11530 Hudson Boulevard North Lake Elmo, MN 55042 FFE = 904.50 BUILDING AREA= 15,498 SF EXISTING STORMWATER POND AREA 1 1 32 2 2 4 4 5 DescriptionRev. Date 20 1 8 S T I L L W A T E R BU S F A C I L I T Y IM P R O V E M E N T S ST I L L W A T E R A R E A P U B L I C S C H O O L S ST I L L W A T E R , M N 5 5 0 8 2 Sheet: Sheet Title: Project #: Drawn By: Checked By: Issue Date: 12176010 KJA GAB 04.30.18 35 2 4 L a b o r e R o a d Wh i t e B e a r L a k e , M N 5 5 1 1 0 65 1 . 4 8 1 . 9 1 2 0 ( f ) 6 5 1 . 4 8 1 . 9 2 0 1 ww w . l a r s o n e n g r . c o m C 2 0 1 8 L a r s o n E n g i n e e r i n g , I n c . A l l r i g h t s r e s e r v e d . P:\Projects\Projects - 2017\12176010 - Stillwater Bus Facility Evals\C. Design\Drawing Files\12176010 - C1.dwg 35 2 4 L a b o r e R o a d Wh i t e B e a r L a k e , M N 5 5 1 1 0 65 1 . 4 8 1 . 9 1 2 0 ( f ) 6 5 1 . 4 8 1 . 9 2 0 1 ww w . l a r s o n e n g r . c o m Pr o j e c t T i t l e : ST I L L W A T E R A R E A PU B L I C S C H O O L S 18 7 5 S O U T H G R E E L E Y S T R E E T ST I L L W A T E R , M I N N E S O T A 5 5 0 8 2 Cl i e n t : Greg A. Buchal, P.E. Date: Reg. No.:04.30.18 23793 I hereby certify that this plan, specifications or report was prepared by me or under my direct supervision and that I am a duly licensed Professional Engineer under the laws of the state of Minnesota. CI T Y S U B M I T T A L 0 NORTH 20 40 80 REMOVE AND DISPOSE OF EXISTING BITUMINOUS PAVEMENT SECTION REMOVE AND DISPOSE OF EXISTING CONCRETE PAVEMENT SECTION REMOVE AND DISPOSE OF EXISTING GRAVEL SECTION SYMBOL LEGEND REMOVE AND DISPOSE OF EXISTING CONCRETE CURB AND GUTTER. REMOVE AND DISPOSE OF EXISTING CHAIN LINK FENCE FABRIC, POSTS, AND FOOTINGS. REMOVE AND DISPOSE OF EXISTING CONCRETE PAVEMENT SECTION. SAWCUT, REMOVE, AND DISPOSE OF EXISTING BITUMINOUS PAVEMENT SECTION. REMOVE AND DISPOSE OF EXISTING STORM SEWER. 1 2 DEMOLITION PLAN C1 KEY NOTES DEMOLITION NOTES 1.Verify all existing utility locations. 2.It is the responsibility of the Contractor to perform or coordinate all necessary utility demolitions and relocations from existing utility locations to all onsite amenities and buildings. These connections include, but are not limited to, water, sanitary sewer, cable tv, telephone, gas, electric, site lighting, etc. 3.Prior to beginning work, contact Gopher State Onecall (651-454-0002) to locate utilities throughout the area under construction. The Contractor shall retain the services of a private utility locator to locate the private utilities. 4.Sawcut along edges of pavements, sidewalks, and curbs to remain. 5.All construction shall be performed in accordance with state and local standard specifications for construction. 3 4 5 LOT SIZE Total Lot Size: 478,997 s.f. = 11.00 Acres Breakdown: Existing Building: 15,498 s.f. = 3.23% Existing Gravel: 91,861 s.f. = 19.18% Existing Pavement: 9,022 s.f. = 1.88% Existing Open Space: 362,616 s.f. = 75.71% FFE = 904.50 BUILDING AREA= 15,498 SF EXISTING STORMWATER POND AREA 9 6 3 16 17 17 20 25 56 56 34 NO PARKING NO PARKING NO PARKING 6 1818 16161616 STORMWATER POND AREA C5 1 C5 1 C5 4 C5 4 C5 4 C5 4 C5 4 C5 4 C5 6 C5 6 C5 6 C5 6 C5 7 C5 2 C5 2 C5 2 C5 2 C5 2 C5 3 C5 5 C6 1 (9 TYP) STORMWATER POND AREA FUELING AREA & ABOVE GROUND STORAGE TANK C5 5 18'24'18'18'24'18'18'24'18'14' 45'87'45'87'45.7' 119.7' 98 . 5 ' 2' 10 ' 57.5'60'45'87' 2' 10 ' 2' 10 ' 2' 10 ' 35 . 2 ' 20 ' 39 . 8 ' 39 . 8 ' 19 ' 5' 45 ' 45 ' 2'10' 9' 9' 9' 9' 9'9'9' 9' 24 ' 24 ' 24 ' 22 . 6 ' 49 . 3 ' 7' 18 . 7 ' 24 ' 18 . 7 ' 26 . 3 ' 34.3' 9'9' 9' DescriptionRev. Date 20 1 8 S T I L L W A T E R BU S F A C I L I T Y IM P R O V E M E N T S ST I L L W A T E R A R E A P U B L I C S C H O O L S ST I L L W A T E R , M N 5 5 0 8 2 Sheet: Sheet Title: Project #: Drawn By: Checked By: Issue Date: 12176010 KJA GAB 04.30.18 35 2 4 L a b o r e R o a d Wh i t e B e a r L a k e , M N 5 5 1 1 0 65 1 . 4 8 1 . 9 1 2 0 ( f ) 6 5 1 . 4 8 1 . 9 2 0 1 ww w . l a r s o n e n g r . c o m C 2 0 1 8 L a r s o n E n g i n e e r i n g , I n c . A l l r i g h t s r e s e r v e d . P:\Projects\Projects - 2017\12176010 - Stillwater Bus Facility Evals\C. Design\Drawing Files\12176010 - C2.dwg 35 2 4 L a b o r e R o a d Wh i t e B e a r L a k e , M N 5 5 1 1 0 65 1 . 4 8 1 . 9 1 2 0 ( f ) 6 5 1 . 4 8 1 . 9 2 0 1 ww w . l a r s o n e n g r . c o m Pr o j e c t T i t l e : ST I L L W A T E R A R E A PU B L I C S C H O O L S 18 7 5 S O U T H G R E E L E Y S T R E E T ST I L L W A T E R , M I N N E S O T A 5 5 0 8 2 Cl i e n t : Greg A. Buchal, P.E. Date: Reg. No.:04.30.18 23793 I hereby certify that this plan, specifications or report was prepared by me or under my direct supervision and that I am a duly licensed Professional Engineer under the laws of the state of Minnesota. CI T Y S U B M I T T A L 0 NORTH 20 40 80 NEW 6" BITUMINOUS PAVEMENT OVER NEW 8" CRUSHED AGGREGATE BASE OVER 24" GRANULAR BACKFILL SEE DETAIL 1/C5 NEW 6" CONCRETE PAVEMENT OVER NEW 6" CRUSHED AGGREGATE BASE SEE DETAIL 3/C5 NEW 10" AGGREGATE OVER NEW 24" GRANULAR BACKFILL SEE DETAIL 2/C5 SYMBOL LEGEND WHERE APPLICABLE, DIMENSIONS ARE FROM BACK OF CURB TO BACK OF CURB OR BACK OF CURB TO END OF STALL LINE. PAVING AND DIMENSION PLAN C2 ADA STALLS = 6 CAR STALLS = 199 VAN STALLS = 20 SHORT BUS STALLS = 40 LARGE BUS STALLS = 100 PARKING STALL COUNT LOT SIZE Total Lot Size: 478,997 s.f. = 11.00 Acres Breakdown: Proposed Building: 15,498 s.f. = 3.23% Proposed Gravel: 245,791 s.f. = 51.31% Proposed Pavement: 12,588 s.f. = 2.63% Proposed Open Space: 205,120 s.f. = 42.83% 901 900 90 2 905 905 904 904 906 907 903 902 902 903 910911 909 908 91 2 91 0 90 9 90 8 90 8 903 90 5 9 0 4 9 0 8 90 6 9 0 3 90 7 90 6 90 5 90 4 90 3 90 2 90 1 90 0 89 9 89 8 89 7 906 907 908 909 909 908 907 906 905 89 7 89 8 89 9 90 0 90 1 89 9 89 7 89 8 89 9 89 6 89 5 . 8 0 901.38 GV* 901.27 RIM 903.40 GV* 903.35 GV*903.60 GV* 907.26 GV 907.31 GV 907.13 GV 906.29 GV 906.11 GV 905.98 GV 904.06 GV 904.18 GV 903.89 GV 903.77 GV 903.00 GV 903.05 GV 903.40 GV903.05 GV 903.25 GV 905.48 GV 904.57 TC 904.07 GL905.00 GV 904.52 GV 904.42 TC 903.92 GL 903.61 TC 903.11 GL 901.78 TC 901.34 GL 902.14 TC 901.64 GL 902.04 TC 901.54 GL 904.50 TC 904.00 GL 904.50 TC 904.00 GL 904.50 TC 904.00 GL 903.40 C 904.90 TC 904.40 GL 904.90 TC 904.40 GL 903.55 TC 903.25 GL* 903.92 TC 903.42 GL* PRETREATMENT POND NWL: 895.00 100-YR HWL: 898.19 INFILTRATION POND BOT: 895.80 100-YR HWL: 898.19 INFIL. VOL: 33,658 CF 1 . 1 1 % 1 . 1 1 % 1. 5 % 1.5% 1.8% 1.6 % 1 . 0 % 1. 0 % 904.50 TC 904.00 GL FFE = 904.50 BUILDING AREA= 15,498 SF EXISTING STORMWATER POND AREA C6 6 C6 6 C6 6 C6 6 C6 5 C6 5 C6 5 C6 7(TYP) C6 4 DescriptionRev. Date 20 1 8 S T I L L W A T E R BU S F A C I L I T Y IM P R O V E M E N T S ST I L L W A T E R A R E A P U B L I C S C H O O L S ST I L L W A T E R , M N 5 5 0 8 2 Sheet: Sheet Title: Project #: Drawn By: Checked By: Issue Date: 12176010 KJA GAB 04.30.18 35 2 4 L a b o r e R o a d Wh i t e B e a r L a k e , M N 5 5 1 1 0 65 1 . 4 8 1 . 9 1 2 0 ( f ) 6 5 1 . 4 8 1 . 9 2 0 1 ww w . l a r s o n e n g r . c o m C 2 0 1 8 L a r s o n E n g i n e e r i n g , I n c . A l l r i g h t s r e s e r v e d . P:\Projects\Projects - 2017\12176010 - Stillwater Bus Facility Evals\C. Design\Drawing Files\12176010 - C3.dwg 35 2 4 L a b o r e R o a d Wh i t e B e a r L a k e , M N 5 5 1 1 0 65 1 . 4 8 1 . 9 1 2 0 ( f ) 6 5 1 . 4 8 1 . 9 2 0 1 ww w . l a r s o n e n g r . c o m Pr o j e c t T i t l e : ST I L L W A T E R A R E A PU B L I C S C H O O L S 18 7 5 S O U T H G R E E L E Y S T R E E T ST I L L W A T E R , M I N N E S O T A 5 5 0 8 2 Cl i e n t : Greg A. Buchal, P.E. Date: Reg. No.:04.30.18 23793 I hereby certify that this plan, specifications or report was prepared by me or under my direct supervision and that I am a duly licensed Professional Engineer under the laws of the state of Minnesota. CI T Y S U B M I T T A L 0 NORTH 20 40 80 GRADING AND EROSION CONTROL PLAN C3 PROPOSED CONTOURS - MAJOR INTERVAL GRADE BREAK LINE PROPOSED CONTOURS - MINOR INTERVAL949 950 950 EXISTING CONTOURS 2.0% 950.00 TC 949.50 GL GRADE SLOPE SPOT ABBREVIATIONS: TC - TOP OF CURB GL - GUTTER LINE B - BITUMUNOUS C - CONCRETE EO - EMERGENCY OVERFLOW TW - TOP OF WALL BW - BOTTOM OF WALL (F/G) (*) - EXISTING TO BE VERIFIED SILT FENCE RIP-RAP INLET PROTECTION CONCRETE WASHOUT STATION LEGEND 1. Owner and Contractor shall obtain MPCA-NPDES permit. Contractor shall be responsible for all fees pertaining to this permit. The SWPPP shall be kept onsite at all times. 2. Install temporary erosion control measures (inlet protection, silt fence, and rock construction entrances) prior to beginning any excavation or demolition work at the site. 3. Erosion control measures shown on the erosion control plan are the absolute minimum. The contractor shall install temporary earth dikes, sediment traps or basins, additional siltation fencing, and/or disk the soil parallel to the contours as deemed necessary to further control erosion. All changes shall be recorded in the SWPPP. 4. All construction site entrances shall be surfaced with crushed rock across the entire width of the entrance and from the entrance to a point 50' into the construction zone. 5.7KHWRHRIWKHVLOWIHQFHVKDOOEHWUHQFKHGLQDPLQLPXPRI´7KHWUHQFKEDFNILOO shall be compacted with a vibratory plate compactor. 6. All areas with steeper than 4:1 slope shall have erosion control blankets placed on them when grading is complete. 7. All grading operations shall be conducted in a manner to minimize the potential for site erosion. Sediment control practices must be established on all down gradient perimeters before any up gradient land disturbing activities begin. 8. All exposed soil areas must be stabilized as soon as possible to limit soil erosion but in no case later than 14 days after the construction activity in that portion of the site has temporarily or permanently ceased. Temporary stockpiles without significant silt, clay or organic components (e.g., clean aggregate stockpiles, demolition concrete stockpiles, sand stockpiles) and the constructed base components of roads, parking lots and similar surfaces are exempt from this requirement. 9. The normal wetted perimeter of any temporary or permanent drainage ditch or swale that drains water from any portion of the construction site, or diverts water around the site, must be stabilized within 200 lineal feet from the property edge, or from the point of discharge into any surface water. Stabilization of the last 200 lineal feet must be completed within 24 hours after connecting to a surface water. Stabilization of the remaining portions of any temporary or permanent ditches or swales must be complete within 14 days after connecting to a surface water and construction in that portion of the ditch has temporarily or permanently ceased. 10. Pipe outlets must be provided with energy dissipation within 24 hours of connection to surface water. 11. All riprap shall be installed with a filter material or soil separation fabric and comply with the Minnesota Department of Transportation Standard Specifications. 12. All storm sewers discharging into wetlands or water bodies shall outlet at or below the normal water level of the respective wetland or water body at an elevation where the downstream slope is 1 percent or flatter. The normal water level shall be the invert elevation of the outlet of the wetland or water body. 13. All storm sewer catch basins not needed for site drainage during construction shall be covered to prevent runoff from entering the storm sewer system. Catch basins necessary for site drainage during construction shall be provided with inlet protection. 14. In areas where concentrated flows occur (such as swales and areas in front of storm catch basins and intakes) the erosion control facilities shall be backed by stabilization structure to protect those facilities from the concentrated flows. 15. Inspect the construction site once every seven days during active construction and within 24 hours after a rainfall event greater than 0.5 inches in 24 hours. All inspections shall be recorded in the SWPPP. 16. All silt fences must be repaired, replaced, or supplemented when they become nonfunctional or the sediment reaches 1/3 of the height of the fence. These repairs must be made within 24 hours of discovery, or as soon as field conditions allow access. All repairs shall be recorded in the SWPPP. 17. If sediment escapes the construction site, off-site accumulations of sediment must be removed in a manner and at a frequency sufficient to minimize off-site impacts. 18. All soils tracked onto pavement shall be removed daily. 19. All infiltration areas must be inspected to ensure that no sediment from ongoing construction activity is reaching the infiltration area and these areas are protected from compaction due to construction equipment driving across the infiltration area. 20. Temporary soil stockpiles must have silt fence or other effective sediment controls, and cannot be placed in surface waters, including stormwater conveyances such as curb and gutter systems, or conduits and ditches unless there is a bypass in place for the stormwater. 21. Collected sediment, asphalt and concrete millings, floating debris, paper, plastic, fabric, construction and demolition debris and other wastes must be disposed of properly and must comply with MPCA disposal requirements. 22. Oil, gasoline, paint and any hazardous substances must be properly stored, including secondary containment, to prevent spills, leaks or other discharge. Restricted access to storage areas must be provided to prevent vandalism. Storage and disposal of hazardous waste must be in compliance with MPCA regulations. 23. External washing of trucks and other construction vehicles must be limited to a defined area of the site. Runoff must be contained and waste properly disposed of. No engine degreasing is allowed onsite. 24. All liquid and solid wastes generated by concrete washout operations must be contained in a leak-proof containment facility or impermeable liner. A compacted clay liner that does not allow washout liquids to enter ground water is considered an impermeable liner. The liquid and solid wastes must not contact the ground, and there must not be runoff from the concrete washout operations or areas. Liquid and solid wastes must be disposed of properly and in compliance with MPCA regulations. A sign must be installed adjacent to each washout facility to inform concrete equipment operators to utilize the proper facilities. 25. Upon completion of the project and stabilization of all graded areas, all temporary erosion control facilities (silt fences, hay bales, etc.) shall be removed from the site. 26. All permanent sedimentation basins must be restored to their design condition immediately following stabilization of the site. 27. Contractor shall submit Notice of Termination for MPCA-NPDES permit within 30 days after Final Stabilization. EROSION CONTROL NOTES GRADING NOTES 1. Tree protection consisting of snow fence or safety fence installed at the drip line shall be in place prior to beginning any grading or demolition work at the site. 2. All elevations with an asterisk (*) shall be field verified. If elevations vary significantly, notify the Engineer for further instructions. 3. Grades shown in paved areas represent finish elevation. 4.5HVWRUHDOOGLVWXUEHGDUHDVZLWK´RIJRRGTXDOLW\ topsoil and seed or sod. See Landscape Plan. 5. All construction shall be performed in accordance with state and local standard specifications for construction. EROSION CONTROL BLANKET 901 900 90 2 905 905 904 904 906 907 903 902 902 903 910911 909 908 91 2 91 0 90 9 90 8 90 8 903 90 5 9 0 4 9 0 8 90 6 9 0 3 90 7 90 6 90 5 90 4 90 3 90 2 90 1 90 0 89 9 89 8 89 7 906 907 908 909 909 908 907 906 905 89 7 89 8 89 9 90 0 90 1 89 9 89 7 89 8 89 9 89 6 89 5 . 8 0 FFE = 904.50 BUILDING AREA= 15,498 SF EXISTING STORMWATER POND AREA 20 ' T Y P DescriptionRev. Date 20 1 8 S T I L L W A T E R BU S F A C I L I T Y IM P R O V E M E N T S ST I L L W A T E R A R E A P U B L I C S C H O O L S ST I L L W A T E R , M N 5 5 0 8 2 Sheet: Sheet Title: Project #: Drawn By: Checked By: Issue Date: 12176010 KJA GAB 04.30.18 35 2 4 L a b o r e R o a d Wh i t e B e a r L a k e , M N 5 5 1 1 0 65 1 . 4 8 1 . 9 1 2 0 ( f ) 6 5 1 . 4 8 1 . 9 2 0 1 ww w . l a r s o n e n g r . c o m C 2 0 1 8 L a r s o n E n g i n e e r i n g , I n c . A l l r i g h t s r e s e r v e d . P:\Projects\Projects - 2017\12176010 - Stillwater Bus Facility Evals\C. Design\Drawing Files\12176010 - C3.1.dwg 35 2 4 L a b o r e R o a d Wh i t e B e a r L a k e , M N 5 5 1 1 0 65 1 . 4 8 1 . 9 1 2 0 ( f ) 6 5 1 . 4 8 1 . 9 2 0 1 ww w . l a r s o n e n g r . c o m Pr o j e c t T i t l e : ST I L L W A T E R A R E A PU B L I C S C H O O L S 18 7 5 S O U T H G R E E L E Y S T R E E T ST I L L W A T E R , M I N N E S O T A 5 5 0 8 2 Cl i e n t : Greg A. Buchal, P.E. Date: Reg. No.:04.30.18 23793 I hereby certify that this plan, specifications or report was prepared by me or under my direct supervision and that I am a duly licensed Professional Engineer under the laws of the state of Minnesota. CI T Y S U B M I T T A L 0 NORTH 20 40 80 LANDSCAPE PLAN C3.1 LEGEND NORWAY SPRUCE (PICEA ABIES): 6' TALL, 62 TOTAL (50.4%) COLORADO BLUE SPRUCE (PICEA PUNGENS): 6' TALL 61 TOTAL (49.6%) /#: žÄžž 1(6470-&+#/'6'4 4#&+75HV2'4KP .+/+651(%4+6+%#.4116<10' ('0%'.1%#6+10 &4+2Ä.+0' 8#4+'5 žž&+#64'' žÄžž(14 64''2416'%6+10('0%' %4+6+%#.4116<10' &4+2Ä.+0' 64''2416'%6+10('0%' žÄžž NOT TO SCALE TREE PROTECTION2 SOD MATERIAL NATIVE PRAIRIE SEED RESTORATION BWSR MIX 34-241(MESIC PRAIRIE) 36.5 LB/AC INFILTRATION POND SEED BWSR MIX 34-271 (WET MEADOW) 12 LB/AC WET POND SEED BWSR MIX 34.181 (EMERGENT WETLAND) 5 LB/AC EQUALS TWICE BALL DIAMETER 12 " M I N . 18" MIN. OPTIONAL STAKING METHOD - 6' METAL POSTS AND RUBBER HOSE STRAPS HOSE LOOPS 3 GUYS EACH OF 10 GAUGE TWISTED WIRE 120 DEGREES APART AROUND TREECOLORED FLAGS 1 PER WIRE TURNBUCKLE 4" DEEP MULCH, HOLD BACK 2" FROM STEM. SOD 24" STAKE TYP. BACKFILL WITH TOPSOIL AND PEAT MOSS 3:1 RATIO FOLD BACK BURLAP AND REMOVE ALL TIES &/OR WIRES FROM TOP OF BALL REFER ALSO TO SPECIFICATIONS SCARIFY ALL SIDES AND BOTTOM OF EXCAVATED HOLE PLANTING DETAIL1 CONIFEROUS TREE 64''2416'%6+10(14 #..':+56+0)64''5#&,#%'06 61241215'&914-#4'#5 FFE = 904.50 BUILDING AREA= 15,498 SF EXISTING STORMWATER POND AREA CB-5 RIM: 901.27 INV: 897.40 CB-7 RIM: 901.00 INV: 897.56 CB-8 RIM: 903.00 INV: 898.58 CB-9 RIM: 902.00 INV: 898.95 FES INV: 897.00 62 LF 27" PVC @ 0.57% MH-1 RIM: 903.50 INV: 897.36 CB-6 RIM: 901.35 INV: 897.44 52 LF 18" PVC @1.0% 91 L F 1 5 " P V C @ 1 . 0 % 82 L F 1 2 " P V C @ 1 . 0 % CB-2 RIM: 901.28 INV: 897.88 CB-3 RIM: 902.15 INV: 898.79 CB-4 RIM: 902.89 INV: 899.61 36 LF 18" PVC @1.02% 98 LF 18" PVC @1.27% CONNECT TO EXIST 18" PIPE INV: 900.20 (FIELD VERIFY ELEVATION) CONNECT TO FUTURE WATER AND SANITARY SEWER(TBD) C6 2 C6 2 C6 2 C6 2 C6 2 C6 2 C6 2 C6 2 C6 2 C6 3 DescriptionRev. Date 20 1 8 S T I L L W A T E R BU S F A C I L I T Y IM P R O V E M E N T S ST I L L W A T E R A R E A P U B L I C S C H O O L S ST I L L W A T E R , M N 5 5 0 8 2 Sheet: Sheet Title: Project #: Drawn By: Checked By: Issue Date: 12176010 KJA GAB 04.30.18 35 2 4 L a b o r e R o a d Wh i t e B e a r L a k e , M N 5 5 1 1 0 65 1 . 4 8 1 . 9 1 2 0 ( f ) 6 5 1 . 4 8 1 . 9 2 0 1 ww w . l a r s o n e n g r . c o m C 2 0 1 8 L a r s o n E n g i n e e r i n g , I n c . A l l r i g h t s r e s e r v e d . P:\Projects\Projects - 2017\12176010 - Stillwater Bus Facility Evals\C. Design\Drawing Files\12176010 - C4.dwg 35 2 4 L a b o r e R o a d Wh i t e B e a r L a k e , M N 5 5 1 1 0 65 1 . 4 8 1 . 9 1 2 0 ( f ) 6 5 1 . 4 8 1 . 9 2 0 1 ww w . l a r s o n e n g r . c o m Pr o j e c t T i t l e : ST I L L W A T E R A R E A PU B L I C S C H O O L S 18 7 5 S O U T H G R E E L E Y S T R E E T ST I L L W A T E R , M I N N E S O T A 5 5 0 8 2 Cl i e n t : Greg A. Buchal, P.E. Date: Reg. No.:04.30.18 23793 I hereby certify that this plan, specifications or report was prepared by me or under my direct supervision and that I am a duly licensed Professional Engineer under the laws of the state of Minnesota. CI T Y S U B M I T T A L 0 NORTH 20 40 80 UTILITY PLAN C4 CABLE UNDERGROUND LINE FIBER OPTIC UNDERGROUND LINE ELECTRIC UNDERGROUND LINE ELECTRIC OVERHEAD LINE TELEPHONE UNDERGROUND LINE STORM SEWER PIPE SANITARY SEWER PIPE NATURAL GAS UNDERGROUND LINE WATERMAIN PIPE LIGHT POLE STORM MANHOLE FLARED END CURB INLET CATCH BASIN WATER SHUTOFF GATE VALVE & BOX HYDRANT SANITARY MANHOLE DRAINTILE PIPE LEGEND UTILITY NOTES 1. It is the responsibility of the contractor to perform or coordinate all necessary utility connections and relocations from existing utility locations to the proposed building, as well as to all onsite amenities. These connections include but are not limited to water, sanitary sewer, cable TV, telephone, gas, electric, site lighting, etc. 2. All service connections shall be performed in accordance with state and local standard specifications for construction. Utility connections (sanitary sewer, watermain, and storm sewer) may require a permit from the City. 3. The contractor shall verify the elevations at proposed connections to existing utilities prior to any demolition or excavation. 4. The contractor shall notify all appropriate engineering departments and utility companies 72 hours prior to construction. All necessary precautions shall be made to avoid damage to existing utilities. 5. Storm sewer requires testing in accordance with Minnesota plumbing code 4714.1109 where located within 10 feet of waterlines or the building. 6. HDPE storm sewer piping shall meet ASTM F2306 and fittings shall meet ASTM D3212 joint pressure test. Installation shall meet ASTM C2321. 7. All RCP pipe shown on the plans shall be MN/DOT class 3. 8.0DLQWDLQDPLQLPXPRIò RIFRYHURYHUDOOZDWHUOLQHVDQGVDQLWDU\VHZHUOLQHV,QVWDOOZDWHU OLQHV´DERYHVDQLWDU\VHZHUVZKHUHWKHVDQLWDU\VHZHUFURVVHVRYHUWKHZDWHUOLQHLQVWDOOVHZHU SLSLQJRIPDWHULDOVHTXDOWRZDWHUPDLQVWDQGDUGVIRUIHHWRQERWKVLGHVDQGPDLQWDLQ´RI separation. 9.:KHUHò RIFRYHULVQRWSURYLGHGRYHUVDQLWDU\VHZHUDQGZDWHUOLQHVLQVWDOO´ULJLGSRO\VW\UHQH insulation (MN/DOT 3760) with a thermal resistance of at least 5 and a compressive strength of at OHDVWSVL,QVXODWLRQVKDOOEH ZLGHFHQWHUHGRYHUSLSHZLWK´VDQGFXVKLRQEHWZHHQSLSHDQG LQVXODWLRQ:KHUHGHSWKLVOHVVWKDQ XVH´RILQVXODWLRQ 10. All watermain piping shall be class 52 ductile iron pipe unless noted otherwise. 11. See Project Specifications for bedding requirements. 12. Pressure test and disinfect all new watermains in accordance with state and local requirements. 13. Sanitary sewer piping shall be PVC, SDR-35 for depths less than 12', PVC SDR-26 for depths between 12' and 26', and class 52 D.I.P. for depths of 26' or more. 14. A structure adjustment shall include removing and salvaging the existing casting assembly, removing existing concrete rings to the precast section. Install new rings and salvaged casting to proposed grades, cleaning casting flange by mechanical means to insure a sound surface and install an external chimney seal from casting to precast section. Chimney seals shall be Infi-Shield Uni-Band or an approved equal. 40'-0" = CLEAR OPENING 14'-1" = C/B POST SPACING C/C 14'-1" = C/B POST SPACING C/C 12 1 / 2 " CL E A R 30'-0" = OVERALL GATE LENGTH 6' - 0 " = P O S T HE I G H T 6' - 0 " = N O M I N A L GA T E H E I G H T 10'-0" = C/B LENGTH 5" 30'-0" = OVERALL GATE LENGTH 10'-0" = C/B LENGTH DescriptionRev. Date 20 1 8 S T I L L W A T E R BU S F A C I L I T Y IM P R O V E M E N T S ST I L L W A T E R A R E A P U B L I C S C H O O L S ST I L L W A T E R , M N 5 5 0 8 2 Sheet: Sheet Title: Project #: Drawn By: Checked By: Issue Date: 12176010 KJA GAB 04.30.18 35 2 4 L a b o r e R o a d Wh i t e B e a r L a k e , M N 5 5 1 1 0 65 1 . 4 8 1 . 9 1 2 0 ( f ) 6 5 1 . 4 8 1 . 9 2 0 1 ww w . l a r s o n e n g r . c o m C 2 0 1 8 L a r s o n E n g i n e e r i n g , I n c . A l l r i g h t s r e s e r v e d . P:\Projects\Projects - 2017\12176010 - Stillwater Bus Facility Evals\C. Design\Drawing Files\12176010 - C5&C6.dwg 35 2 4 L a b o r e R o a d Wh i t e B e a r L a k e , M N 5 5 1 1 0 65 1 . 4 8 1 . 9 1 2 0 ( f ) 6 5 1 . 4 8 1 . 9 2 0 1 ww w . l a r s o n e n g r . c o m Pr o j e c t T i t l e : ST I L L W A T E R A R E A PU B L I C S C H O O L S 18 7 5 S O U T H G R E E L E Y S T R E E T ST I L L W A T E R , M I N N E S O T A 5 5 0 8 2 Cl i e n t : Greg A. Buchal, P.E. Date: Reg. No.:04.30.18 23793 I hereby certify that this plan, specifications or report was prepared by me or under my direct supervision and that I am a duly licensed Professional Engineer under the laws of the state of Minnesota. CI T Y S U B M I T T A L DETAILS C5 NOT TO SCALE PAVEMENT SECTION HEAVY-DUTY BITUMINOUS 1 C5 EXISTING SUBGRADE SOIL NEW 8" BASE AGGREGATE NEW 6" BITUMINOUS PAVEMENT PLACED IN 3 LIFTS NEW 24" GRANULAR BACKFILL NOT TO SCALE GRAVEL SECTION2 C5 EXISTING SUBGRADE SOIL NEW 10" AGGREGATE NEW 24" GRANULAR BACKFILL NOT TO SCALE CURB & GUTTER DETAIL B612 CONCRETE 4 C5 EXISTING SUBGRADE SOIL 6" 12" 13 . 5 " 6" 7" 6" BACKFILL WITH NEW GOOD QUALITY TOPSOIL AND SOD NEW BITUMINOUS PAVEMENT NEW BASE AGGREGATE SLOPE 3 4" PER FT. 8" R3" R3" 6" NOT TO SCALE CONSTRUCTION DETAIL CONCRETE SIDEWALK 3 C5 EXISTING SUBGRADE SOIL NEW 6" BASE AGGREGATE NEW 6" PORTLAND CEMENT CONCRETE < 10 ' 1:2 0 1: 2 0 2% M A X 10' 9' 10' 2% M A X 2% M A X NOT TO SCALE ACCESSIBLE RAMP DETAIL5 C5 6' 4' - 6 " 5' 1" CHAIN LINK FENCE FABRIC 3" O.D. TERMINAL POST 2.5" O.D. LINE POST TENSION BANDS SPACED MAXIMUM OF 15" APART TENSION BAR MIDDLE RAIL TOP RAIL BOTTOM RAIL FENCE DETAIL6 C5 10' MAX 6" 12" DIA. X 5' CONCRETE FOOTING (TYPICAL) 7 6 CATCH ASSEMBLY (SEE DETAIL 2/1) GATE HANGER ASSEMBLY (SEE DETAIL 1/1) GATE FRAME (TYP.)4" O.D. POST (TYP.) GATE HANGER ASSEMBLY (SEE DETAIL 1/1) 3/16" S.S. CABLE (TYP.) CATCH ASSEMBLY (SEE DETAIL 2/1) BOTTOM GUIDE ASSEMBLY (SEE DETAIL 3/1) 2" x 2" ALUM. TUBE (TYP.)2 X 5" ALUM. TUBE 1" x 1" ALUM. TUBE PICKET AT 3" O.C. (TYP.) TOP PRIMARY MEMBER 4" O.D. POST (TYP.) 1" x 2" ALUM. TUBE (TYP.) NOTES: 1. ALL HARDWARE IS PROVIDED FOR 4" O.D. SCHEDULE 40 POSTS. 2. GATE ELEVATION IS VIEWED FROM OUTSIDE THE SECURE AREA LOOKING IN. 3. FOR GATES THAT REQUIRE TWO PIECE FABRICATION, A 5" ALUMINUM CHANNEL WILL BE SUBSTITUTED FOR THE 2" x 5" ALUMINUM TUBE. 5 GATE HANGER ASSEMBLY (SEE DETAIL 1/1) GATE FRAME (SEE DETAIL 4/1) 4" 0.D. SCHEDULE 40 POST BOTTOM GUIDE ASSEMBLY (SEE DETAIL 3/1) 4 STANDARD TRACK TOP PRIMARY MEMBER 2" x 5" ALUM. TUBE 3 2 1 4" O.D. SCHEDULE 40 POST BOTTOM GUIDE BRACKET GUIDE WHEELS WITH UL COVERS W4 TRUCK STANDARD NUT LOCK NUT 5/8" BOLT HANGER BRACKET 2" x 2" ALUM. TUBE @ ENDS CATCH POST COMPANIONGATE FRAME CATCHER 1" x 1" ALUM. TUBE 1" x 1" HANGER POST U-BOLT U-BOLT U-BOLT 1" x 2" ALUM. TUBE 12 1/2" 5" NOT TO SCALE SLIDE GATE DETAIL GEORGETOWN 7 C5 DOUBLE GATE DETAIL 7A 7A 7A7A7A 7A 7A 2" x 1/4" ALUMINUM BAR (THIRD RAIL) SOIL SEPARATION FABRIC SOIL SEPARATION FABRIC DescriptionRev. Date 20 1 8 S T I L L W A T E R BU S F A C I L I T Y IM P R O V E M E N T S ST I L L W A T E R A R E A P U B L I C S C H O O L S ST I L L W A T E R , M N 5 5 0 8 2 Sheet: Sheet Title: Project #: Drawn By: Checked By: Issue Date: 12176010 KJA GAB 04.30.18 35 2 4 L a b o r e R o a d Wh i t e B e a r L a k e , M N 5 5 1 1 0 65 1 . 4 8 1 . 9 1 2 0 ( f ) 6 5 1 . 4 8 1 . 9 2 0 1 ww w . l a r s o n e n g r . c o m C 2 0 1 8 L a r s o n E n g i n e e r i n g , I n c . A l l r i g h t s r e s e r v e d . P:\Projects\Projects - 2017\12176010 - Stillwater Bus Facility Evals\C. Design\Drawing Files\12176010 - C5&C6.dwg 35 2 4 L a b o r e R o a d Wh i t e B e a r L a k e , M N 5 5 1 1 0 65 1 . 4 8 1 . 9 1 2 0 ( f ) 6 5 1 . 4 8 1 . 9 2 0 1 ww w . l a r s o n e n g r . c o m Pr o j e c t T i t l e : ST I L L W A T E R A R E A PU B L I C S C H O O L S 18 7 5 S O U T H G R E E L E Y S T R E E T ST I L L W A T E R , M I N N E S O T A 5 5 0 8 2 Cl i e n t : Greg A. Buchal, P.E. Date: Reg. No.:04.30.18 23793 I hereby certify that this plan, specifications or report was prepared by me or under my direct supervision and that I am a duly licensed Professional Engineer under the laws of the state of Minnesota. CI T Y S U B M I T T A L DETAILS C6 SIGN 2.5 LB./FT. FLANGED CHANNEL SIGN POST (MNDOT 3401) 12" 18 " 5' 3' 6 " NOT TO SCALE SIGN DETAIL ACCESSIBLE PARKING 1 C6 "O"BOLTS 5/8" 3/4" 1" 4" 6" 12" "O " BARS 3/4" 1" 1-1/4" SIZE OF PIPE 12" TO 18" 21" TO 42" 48" TO 72" 6" M A X 24"MAX TIE LAST 3 JOINTS ON INLET AND OUTLET. IF NO APRON IS USED TIE THE LAST 3 SECTIONS OF PIPE. USE 2 TIE BOLT FASTENERS PER JOINT INSTALLED AT 60 FROM TOP OR BOTTOM OF PIPE. USE 5/8" TIE FOR PIPE SIZES 12" TO 27". USE 3/4" TIE FOR PIPE SIZES 30" TO 66". USE 1" TIE FOR PIPE SIZES OVER 72". NUTS AND WASHERS ARE NOT REQUIRED ON PIPE SIZE LESS THAN 21". TRASH GUARDS WILL BE REQUIRED ON 18" OR LARGER PIPE. PROVIDE 3 CLIPS TO FASTEN TRASH GUARD TO F.E.S. HOT DIP GALVANIZE AFTER FABRICATION. NOT TO SCALE SECTION DETAIL FLARED END 3 C6 Staples/Anchors: The type of anchors used to secure the blanket to the JURXQGVKDOOEH6WHHOZLUH*DXJH´ZLGH[´ORQJ NOT TO SCALE EROSION CONTROL BLANKET5 C6 Category 4 Erosion Control Blanket: North American Green S150 erosion control blanket or approved equal. Top Net Polypropylene 1.5 lbs/1,000 ft2 (0.73 kg/100 m2) approx. wt. Straw Fiber 0.50 LBS/YD2 (0.27 KG/M2) SLOPE INSTALLATION NOTE: WHEN USING CELL-O-SEED DO NOT SEED PREPARED AREA. CELL-O-SEED MUST BE INSTALLED WITH PAPER SIDE DOWN. 3" (7.5 CM) OVERLAP. STAPLE THROUGH OVERLAPPED AREA, APPROXIMATELY 12" (30 CM) APART ACROSS ENTIRE *IN LOOSE SOIL CONDITIONS, THE USE OF STAPLE OR STAKE LENGTHS GREATER THAN 6" (15 CM) MAY BE NECESSARY TO BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. APPLY SEED TO COMPACTED SOIL AND FOLD REMAINING 12" (30 CM) IN APPROPRIATE LOCATIONS AS SHOWN IN THE STAPLE PATTERN GUIDE. WHEN USING THE DOT SYSTEM , STAPLES/STAKES SHOULD BE PLACED THROUGH EACH OF THE COLORED DOTS CORRESPONDING TO THE APPROPRIATE STAPLE PATTERN. 1. PREPARE SOIL BEFORE INSTALLING ROLLED EROSION CONTROL PRODUCTS (RECP's), INCLUDING ANY NECESSARY APPLICATION 3. ROLL THE RECP's (A.) DOWN OR (B.) HORIZONTALLY ACROSS THE SLOPE. RECP's WILL UNROLL WITH APPROPRIATE SIDE 4. THE EDGES OF PARALLEL RECP's MUST BE STAPLED WITH APPROXIMATELY 2" - 5" (5 CM - 12.5 CM) OVERLAP DEPENDING 5. CONSECUTIVE RECP's SPLICED DOWN THE SLOPE MUST BE PLACED END OVER END (SHINGLE STYLE) WITH AN APPROXIMATE AGAINST THE SOIL SURFACE. ALL RECP's MUST BE SECURELY FASTENED TO SOIL SURFACE BY PLACING STAPLES/STAKES 2. BEGIN AT THE TOP OF THE SLOPE BY ANCHORING THE RECP's IN A 6" (15 CM) DEEP X 6" (15 CM) WIDE TRENCH WITH APPROXIMATELY 12" (30cm) OF RECP's EXTENDED BEYOND THE UP-SLOPE PORTION OF THE TRENCH. ANCHOR THE RECP's WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12" (30 CM) APART IN THE BOTTOM OF THE TRENCH. PORTION OF RECP's BACK OVER SEED AND COMPACTED SOIL. SECURE RECP's OVER COMPACTED SOIL WITH A ROW OF STAPLES/STAKES SPACED APPROXIMATELY 12" (30 CM) APART ACROSS THE WIDTH OF THE RECP's. OF LIME, FERTILIZER, AND SEED. RECP's WIDTH. ON RECP's TYPE. PROPERLY SECURE THE RECP's. NOTE: EVANSVILLE, IN 47725 14649 HIGHWAY 41 NORTH Guaranteed EROSION CONTROL 800-772-2040 www.nagreen.com SOLUTIONS Products 1. 3B. 12" (30 cm) (15 cm) 6" 3A. 2"-5" 4. (5cm-12.5cm) (7.5cm) 3" 2. (15 cm) 6" Bottom Net Polypropylene 1.5 lbs/1,000 ft2 (0.73 kg/100 m2) approx. wt. Thread Photodegradable NOT TO SCALE RIP-RAP AT OUTLETS4 C6 D 5D (10' MIN.) 4 1 4 1 2 ' 2' MN/DOT CLASS III RIP-RAP AA MN/DOT CLASS III RIP-RAP 2' PLAN SECTION A-A NOTE: FW300 MIRAFI FABRIC OR EQUAL 5D (10' MIN.)2' 2'2' WOVEN FILTER FABRIC 6" 1 4 D WOVEN FILTER FABRIC ENGINEERING FABRIC WIRE MESH REINFORCEMENT (OPTIONAL) METAL, WOOD POST, OR STAKE. 8' MAX. SPACING, 2' INTO GROUND. NATURAL SOIL DIRECTION OF RUNOFF NOT TO SCALE INSTALLATION DETAIL SILT FENCE 6 C6 NOTE: DEPENDING UPON CONFIGURATION, ATTACH FABRIC TO WIRE MESH WITH HOG RINGS, STEEL POSTS WITH WIRES, OR WOOD POSTS WITH STAPLES. FABRIC ANCHORAGE TRENCH. BACKFILL WITH TAMPED NATURAL SOIL NOTE: 1. IF INSTALLED ON WALL, BOTTOM OF SIGN TO BE 5'-0" ABOVE GRADE. VA R I A B L E 1' - 4 " VARIABLE 5" MIN. 8" MINIMUM SLAB THICKNESS, 6' MINIMUM DIAMETER PRECAST CONCRETE SLAB, REINFORCED WITH #4 REBAR @ 8" E.W. GROUT BOTTOM PRECAST CONCRETE SECTION 8" PRECAST SEGMENTAL CONCRETE BLOCK TO TOP OF THE PIPE SHALL BE USED WITH SIZE AND DEPTH PROHIBIT THE FABRICATION OF PRECAST UNITS. NOT TO SCALE MANHOLE DETAIL STORM 2 C6 SECTION 8" PIP E DIA . ALL JOINTS IN MANHOLE TO HAVE 'O' RING RUBBER GASKETS. SEAL WITH 2 BEADS OF RAM-NEK. 6" PRECAST REINFORCED CONCRETE SLAB. MANHOLE STEPS, COPOLYMER POLYPROPYLENE PLASTIC, WITH 1/2" GRADE 60 STEEL REINFORCEMENT OR EQUAL, 16" O.C. MINIMUM OF 2, MAXIMUM OF 5 CONCRETE ADJUSTMENT RINGS WITH FULL BED OF MORTAR BETWEEN EACH AND A 4" COLLAR ON THE OUTSIDE. NO SHIMS OF ANY MATERIAL ALLOWED. PLACE EXTERNAL CHIMNEY SEAL. A A PLAN SL O P E 2" / F T . SL O P E 2" / F T . WATERTIGHT CONNECTION (BOOT, TYPICAL) MANHOLE FRAME & COVER: CBMH: NEENAH R-2501, TYPE C GRATE CB: NEENAH R-3067, TYPE L GRATE (HIGH FLOW) MH: NEENAH R-1642, TYPE B LID REUSEABLE 400 MICRON FILTER BAG IN EACH BASKET NOT TO SCALE PROTECTION DEVICE INFRASAFE INLET 7 C6 SIDE VIEW FRONT VIEW (OR EQUAL) 1 CITY OF LAKE ELMO COUNTY OF WASHINGTON STATE OF MINNESOTA ORDINANCE NO. 08-214 AN ORDINANCE AMENDING THE LAKE ELMO CITY CODE OF ORDINANCES BY AMENDING THE OFFICIAL ZONING MAP OF THE CITY OF LAKE ELMO SECTION 1. The City Council of the City of Lake Elmo hereby ordains a portion of the following property (PID# 36.029.21.43.0001) to be rezoned from RR – Rural Residential to BP – Business Park: Lot 1, Block 1, Four Corners SECTION 2. The City Council of the City of Lake Elmo also hereby ordains that the Zoning Administrator shall make the applicable changes to the official Zoning Map of the City of Lake Elmo. SECTION 3. Effective Date. This ordinance shall become effective immediately upon adoption and publication in the official newspaper of the City of Lake Elmo. SECTION 4. Adoption Date. This Ordinance 08-214 was adopted on this 17th day of July, 2018, by a vote of ___ Ayes and ___ Nays. LAKE ELMO CITY COUNCIL ___________________________________ Mike Pearson, Mayor ATTEST: __________________________________ Julie Johnson, City Clerk This Ordinance 08-214 was published on the ____ day of July, 2018. Resolution No. 2018- 076 CITY OF LAKE ELMO WASHINGTON COUNTY, MINNESOTA RESOLUTION NO. 2018-076 A RESOLUTION APPROVING THE FOUR CORNERS PRELIMINARY AND FINAL PLAT WHEREAS, Terry Emerson, 2204 Legion Lane Circle North, Lake Elmo, MN 55042 (“Applicant”), has submitted an application to the City of Lake Elmo (“City”) for approval of Preliminary and Final Plat for Four Corners; and WHEREAS, the Lake Elmo Planning Commission held a Public Hearing on June 4, 2018 and June 18, 2018 to consider the Preliminary and Final Plat for Four Corners and recommended approval subject to a number of conditions; and WHEREAS, the City Council reviewed the recommendation of the Planning Commission and the proposed Four Corners Preliminary and Final Plat at a meeting on July 17, 2018; and NOW, THEREFORE, based upon the testimony elicited and information received, the City Council makes the following: FINDINGS 1. That the Four Corners preliminary and final plat is consistent with the Lake Elmo Comprehensive Plan and the Future Land Use Map for this area. 2. That the Four Corners preliminary and final plat complies with the minimum lot frontage and area requirements of the City’s BP – Business Park zoning district. 3. That the Four Corners preliminary and final plat complies with the City’s subdivision ordinance. 4. That the Four Corners preliminary and final plat meets other City zoning ordinances, such as landscaping, erosion and sediment control, and other ordinances, provided comments outlined in the City Engineer Review Memo dated May 30, 2018 are met; or as may be amended due to changes in the site plan or proposed use. 5. That the Four Corners preliminary and final plat is consistent with the City’s engineering standards provided final plans are updated to address the City Engineer’s comments documented in a letter dated May 30, 2018; or as may be amended due to changes in the site plan or proposed use. 6. The land being subdivided is legally described as: 2 Resolution No. 2018- S1/2-SE1/4 EXC WEST 2 RODS EXC TO HWY EXC HWY PARCEL 44 MN DOT R/W PLAT #82-35 SECTION 36 TOWNSHIP 029 RANGE 021 7. That the Four Corners preliminary and final plat will create one new lot of 11 acres to be legally described as Lot 1, Block 1, Four Corners; and three outlots: A (46.64acres), B (5.01 acres), and C (1.08 acres). CONCLUSIONS AND DECISION Based on the foregoing, the Applicants’ application for Preliminary and Final Plat, subject to the following conditions of approval: 1) The property shall be rezoned to BP – Business Park. 2) The applicant shall pay a fee in lieu of parkland dedication in the amount of $4500 per acre of the newly created lot (11 acres X $4500 = $49,500 total) prior to any formal City authorization. 3) Prior to the execution of the Final Plat by City officials, the Developer shall enter into a Developer’s Agreement acceptable to the City Attorney and approved by the City Council that delineates who is responsible for the design, construction, landscaping, and payment of the required improvements for the Four Corners Final Plat with financial guarantees therefore. 4) Final grading, drainage and erosion control, sanitary sewer and stormwater management, street and utility construction plans shall be submitted, reviewed and approved by the City Engineer, meeting City Engineering Design Standards, prior to the recording of the Final Plat. All changes and modifications to the plans requested by the City Engineer in a memorandum dated May 30, 2018 and all subsequent memorandums regarding the plans shall be incorporated into these documents before they are approved. 5) The applicant must obtain all other necessary City, State, and other governing body permits prior to the commencement of any construction activity on the parcel including but not limited to building permits, conditional use permits, etc. 6) Any plans for construction on the newly created parcel must comply with the Lake Elmo Design Standards Manual and specific general site considerations and development standards for specific uses within the Business Park District. 7) The site plan is subject to a storm water management plan meeting State, Valley Branch Watershed District and City rules and regulations. All applicable permits must be obtained. Maintenance access roads meeting City engineering design standards must be provided for all storm water facilities. 3 Resolution No. 2018- 8) Stormwater facilities shall remain privately owned and maintained. The applicant will be required to execute a Stormwater Maintenance and Easement Agreement in the City’s standard form of agreement. 9) A Traffic Impact Study shall be completed and submitted in order to determine timing and extent of improvements required for the CSAH 15 and Hudson Boulevard intersection realignment and traffic signal improvements as well as the need for an eastbound left turn lane along Hudson Boulevard for site access. Additional right-of-way along Hudson Boulevard may be required if the eastbound left turn lane is required. 10) Hudson Boulevard must be improved per the City design standards to an urban section on the north side of the street including a west bound right turn lane to the site, a four foot shoulder (curb reaction), a nine foot boulevard, and a ten foot shared use bituminous trail with two foot clear zone. 11) Provisions for connecting municipal sanitary sewer service and for connecting to the municipal water supply must be provided on submitted plans. The applicant shall be responsible to extend and connect to the City sanitary sewer system and municipal water at the applicant’s sole cost and extend such services to adjacent properties. The applicant shall be required to obtain easements from adjacent properties in order to extend water. A detailed description of the sanitary sewer and water capacity demands shall be provided. 12) Hydrants will be required to be placed at the direction of the Fire Department, and all fire hydrants shall be owned and maintained by the City. 13) All easements as requested by the City Engineer and Public Works Department shall be documented on the Final Plat prior to its execution by City Officials. Passed and duly adopted this 17th day of July, 2018 by the City Council of the City of Lake Elmo, Minnesota. __________________________________ Mike Pearson, Mayor ATTEST: ________________________________ Julie Johnson, City Clerk 1 509017v1 SJS LA515-1 CITY OF LAKE ELMO COUNTY OF WASHINGTON STATE OF MINNESOTA RESOLUTION NO. 2018-078 A RESOLUTION DENYING A ZONING TEXT AMENDMENT TO AMEND THE CITY’S ZONING CODE TO ALLOW LOCAL TRANSIT AS A CONDITIONAL USE WITHIN THE BUSINESS PARK ZONING DISTRICT WHEREAS, the City of Lake Elmo (the “City”) has established a Zoning Map by Ordinance that implements the various land use policies in the City’s Comprehensive Plan; and WHEREAS, Stillwater Area Public Schools (Kristen Hoheisel), 1875 Greeley Street South, Stillwater, MN 55042 (the “Applicant”) has submitted an application to the City of Lake Elmo (the “City”) for a Zoning Text Amendment to allow local transit as a conditional use within the Business Park zoning district; and WHEREAS, the request for a Zoning Text Amendment was submitted by the Applicant along with a request by Terry Emerson, 2204 Legion Lane Circle North, Lake Elmo, MN 55042, for a Minor Subdivision to subdivide the Property in to Lot 1, Block 1 of Four Corners, with three separate outlots; a Zoning Map Amendment to re-zone Lot 1, Block 1 of Four Corners from Rural Development Transitional to Business Park; and Conditional Use Permit for a school transportation center for Lot 1, Block 1, Four Corners; and WHEREAS, the Planning Commission held a public hearing on June 4, 2018 and June 18, 2018 to consider the Applicant’s requests; and WHEREAS, the Planning Commission submitted its report and recommendation to the City Council as part of a Staff Memorandum dated July 17, 2018; and WHEREAS, the City Council considered said matter at its meeting on July 17, 2018; and NOW THEREFORE BE IT RESOLVED based upon the testimony elicited, information received, staff reports and the record as a whole, the City Council makes the following findings of fact: FINDINGS. 1. That the procedures for requesting a Zoning Text Amendment are found in the Lake Elmo Zoning Ordinance, Section 154.105. 2. That all the submission requirements of said Section 154.105 have been met by the Applicant. 3. That the proposed Zoning Text Amendment includes the following components: a. That local transit be a conditional use within the Business Park zoning district. 2 509017v1 SJS LA515-1 b. That standards for local transit within the Business Park zoning district be added to include the following: i. Use is limited to a school district transportation center, owned by a public shool district, serving as a bus terminal for buses and vans which transport passengers to and from schools or between school programs and community residences. ii. The property on which the use is located must be located within one half mile of property owned by a public school district. iii. Must be on a property of at least 10 acres in size or more. iv. Must be sufficiently screened from adjacent residential properties through berming and landscaping as approved by the City. v. Accessory uses may include an office and routine maintenance of school buses, including but not limited to washing and fueling. 4. That the 2030 Comprehensive Plan indicates that the specific desired attributes of the Business Park land use category include a diversity of jobs, high development densities and jobs per acre, high quality site and building architectural design, and increased tax revenues for the community. 5. That the draft 2040 Comprehensive Plan indicates that Business Park areas are to provide for a wide variety of professional businesses such as medical and research facilities, offices, and corporate headquarters. Uses specifically excluded from existing business park areas include warehousing, manufacturing, distribution, assembly and truck terminals. 6. That school district transportation centers owned by a public school district would likely not provide high quality site and building architectural design or increase tax revenues for the community, as are specific desired attributes of the Business Park land use category of the 2030 Comprehensive Plan and the proposed text amendment is therefore inconsistent with the Comprehensive Plan. 7. That school district transportation centers are similar to truck terminals, which are specifically excluded from business park areas as per the draft 2040 Comprehensive Plan. 8. That school district transportation centers would increase traffic on Hudson Boulevard, creating congestion and would likely trigger the need for a traffic signal at the intersection of Manning Avenue and Hudson Boulevard, the cost for which the City will be required to pay 25%. NOW, THEREFORE, BE IT FURTHER RESOLVED, that the Lake Elmo City Council hereby denies the request by Stillwater Area Public Schools for a Zoning Text Amendment to allow local transit as a conditional use within the Business Park zoning district. Passed and duly adopted this 17th day of July 2018, by the City Council of the City of Lake Elmo, Minnesota. ______________________________ Mike Pearson, Mayor 3 509017v1 SJS LA515-1 ATTEST: _____________________________ Julie Johnson, City Clerk Resolution 2018-079 509020v1 SJS LA515-1 1 CITY OF LAKE ELMO WASHINGTON COUNTY STATE OF MINNESOTA RESOLUTION 2018-079 A RESOLUTION DENYING A CONDITIONAL USE PERMIT FOR A SCHOOL DISTRICT TRANSPORTATION CENTER FOR A PORTION OF THE PROPERTY LOCATED AT 11530 HUDSON BOULEVARD NORTH WHEREAS, the City of Lake Elmo is a municipal corporation organized and existing under the laws of the State of Minnesota; and WHEREAS, Stillwater Area Schools (Kristen Hoheisel), 1875 Greeley Street South, Stillwater, MN 55082 (the “Applicant”) has submitted an application to the City of Lake Elmo (the “City”) for a Conditional Use Permit for a school district transportation center for a portion of the property located at 11530 Hudson Blvd N (PID# 36.029.21.43.0001) (the “Property”); and WHEREAS, a request for a Preliminary and Final Plat to subdivide the Property in to Lot 1, Block 1 of Four Corners, with three separate outlots was submitted by Terry Emerson, 2204 Legion Lane Circle North, Lake Elmo, MN 55042; and WHEREAS, the Applicant also submitted applications to the City for a Zoning Text Amendment to allow local transit as a conditional use within the Business Park zoning district; and a Zoning Map Amendment to re-zone Lot 1, Block 1 of Four Corners from Rural Development Transitional to Business Park; and WHEREAS, notice has been published, mailed and posted pursuant to the Lake Elmo Zoning Ordinance, Section 154.102; and WHEREAS, the Lake Elmo Planning Commission held a public hearing on said matter on June 4, 2018 and June 18, 2018; and WHEREAS, the Lake Elmo Planning Commission has submitted its report and recommendation to the City Council as part of a Staff Memorandum dated July 17, 2018, and WHEREAS, the City Council considered said matter at its July 17, 2018 meeting; and NOW, THEREFORE, based on the testimony elicited, staff reports and information received and the entire record presented, the City Council makes the following: FINDINGS 1) That the procedures for obtaining said Conditional Use Permit are found in the Lake Elmo Zoning Ordinance, Section 154.106. Resolution 2018-079 509020v1 SJS LA515-1 2 2) That all the submission requirements of said Section 154.106 have been met by the Applicant. 3) That the proposed Conditional Use Permit includes the following components: a) A Conditional Use Permit for a school district transportation center for a portion of the property located at 11530 Hudson Blvd N. 4) That the Conditional Use Permit for a school district transportation center will be for the Property legally described as follows: Lot 1, Block 1 of Four Corners. 5) That the Zoning Text Amendment that was proposed by the Applicants allows local transit as a conditional use within the Business Park zoning district. 6) That the City denied the Applicant’s request for a Zoning Text Amendment to allow local transit as a conditional use within the Business Park zoning district. 7) That the City approved the Applicant’s request for a Preliminary and Final Plat to subdivide the Property in to Lot 1, Block 1 of Four Corners along with three separate outlots. 8) That the City denied the Applicant’s request for a Zoning Map Amendment to re-zone the Property from Rural Development Transitional to Business Park. 9) That since the Applicant’s Zoning Text Amendment application was denied, the Applicant’s application for a conditional use permit for a school transportation center must also be denied because local transit is not an allowed use within the Property’s current zone, which is Business Park. 10) The proposed use will not be detrimental to or endanger the public health, safety, comfort, convenience or general welfare of the neighborhood or the city. With over 200 employees and a use that requires both employee trips in and out of the facility each day as well as two bus trips in and out of the facility each day, the use will generate a significant amount of traffic, which will likely trigger a need for a traffic signal at the intersection of Manning Avenue and Hudson Boulevard, the cost of which the City will be required to pay 25%. 11) The use or development conforms to the City of Lake Elmo Comprehensive Plan. The property is guided for Business Park. While the proposal does create a significant number of jobs per acre, the parcel will be tax exempt, as it will be owned by the school district. It also does not fit in to the described uses appropriate for this land category. Finally, it does not propose high quality site and building architectural design, which, per the Comprehensive Plan, is a trait this land use category should have. 12) The use or development is compatible with the existing neighborhood.The surrounding area is planned for uses such as offices, showroom/warehousing, research and development, manufacturing and assembly, and medical laboratories, which are not compatible uses with a bus terminal. Resolution 2018-079 509020v1 SJS LA515-1 3 13) The proposed use meets all specific development standards for such use listed in Article 7 of this Chapter. There are no specific development standards for this use listed in Article 7. The use does not comply with many parking lot, screening, and landscape standards of the Zoning Code. 14) If the proposed use is in a flood plain management or shoreland area, the proposed use meets all the specific standards for such use listed in Chapter 150, §150.250 through 150.257 (Shoreland Regulations) and Chapter 152 (Flood Plain Management). The property is located outside the 0.2% annual chance floodplain. 15) The proposed use will be designed, constructed, operated and maintained so as to be compatible in appearance with the existing or intended character of the general vicinity and will not change the essential character of that area. The proposed project is a redevelopment/repurposing of an existing site, to which minimal improvements are proposed. Operations are not within a building and so would not meet the intended character of the neighborhood, and outdoor storage is not an allowed use within the Business Park zoning district. 16) The proposed use will not be hazardous or create a nuisance as defined under this Chapter to existing or future neighboring structures. The proposed use will create a significant amount of traffic, at least at certain times of the day. 17) The proposed use will be served adequately by essential public facilities and services, including streets, police and fire protection, drainage structures, refuse disposal, water and sewer systems and schools or will be served adequately by such facilities and services provided by the persons or agencies responsible for the establishment of the proposed use. The property is within the Metropolitan Urban Service Area (MUSA) and therefore should be required to be provided by city sewer and water. The application did not detail provisions to connect to City sewer and water. The use may require the prompt need for the CSAH 15/Hudson Blvd traffic signal, for which the City will be required to share 25% of the cost, and the Hudson Boulevard realignment. It is not yet known if the applicant’s stormwater management plan meets all City, State, and Valley Branch Watershed District requirements. 18) The proposed use will not create excessive additional requirements at public cost for public facilities and services and will not be detrimental to the economic welfare of the community. The use may require the prompt need for the CSAH 15/Hudson Blvd traffic signal/realignment, for which the City will be required to share 25% of the cost. It is not yet known if the applicant’s stormwater management plan meets all City, State, and Valley Branch Watershed District requirements. 19) The proposed use will not involve uses, activities, processes, materials, equipment and conditions of operation that will be detrimental to any persons, property or the general welfare because of excessive production of traffic, noise, smoke, fumes, glare or odors. The Resolution 2018-079 509020v1 SJS LA515-1 4 proposed use will generate a significant number of trips per day, which will generate excessive production of traffic. 20) Vehicular approaches to the property, where present, will not create traffic congestion or interfere with traffic on surrounding public thoroughfares. Traffic congestion will be created from the significant number of trips to the site the use would generate. 21) The proposed use will not result in the destruction, loss or damage of a natural or scenic feature of major importance. N/A NOW, THEREFORE, BE IT FURTHER RESOLVED, that the Lake Elmo City Council hereby denies the request by Stillwater Area Schools for a Conditional Use Permit for a school transportation center. Passed and duly adopted this 17th day of July 2018 by the City Council of the City of Lake Elmo, Minnesota. __________________________________ Mike Pearson, Mayor ATTEST: ________________________________ Julie Johnson, City Clerk 1 CITY OF LAKE ELMO COUNTY OF WASHINGTON STATE OF MINNESOTA ORDINANCE NO. 08-215 AN ORDINANCE AMENDING THE LAKE ELMO CITY CODE OF ORDINANCES BY ADDING LOCAL TRANSIT AS A CONDITIONAL USE WITHIN THE BUSINESS PARK ZONING DISTRICT AND ADDING ADDITIONAL STANDARDS FOR LOCAL TRANSIT WITHIN THE BUSINESS PARK ZONING DISTRICT SECTION 1. The City Council of the City of Lake Elmo hereby amends Title XV: Land Usage; Chapter 154: Zoning Code; Article XIV: Commercial Districts; Section 154.551; Table 12-1 by amending the following: LC CC C BP Standard Public and Civic Uses Colleges and universities - - C C 154.012 (B) (2), 154.303 (A) Community service - C C C 154.012 (B) (2) Day care center C C C C 154.012 (B) (2) Schools, public and private - - C C 154.012 (B) (2), 154.303 (A) Local Transit - - - C 154.554 (O) SECTION 2. The City Council of the City of Lake Elmo hereby amends Title XV: Land Usage; Chapter 154: Zoning Code; Article XIV: Commercial Districts; Section 154.554 by adding the following: O. Local Transit, BP District. School bus terminals shall be allowed as a conditional principal use within the Business Park zoning district, provided that: 1. The us shall be limited to a school district transportation center, owned by a public shool district, serving as a bus terminal for buses which transport passengers to and from schools or between school programs and community residences. 2. The property on which the use is located must be located within one half mile of property owned by a public school district for an active school or school administration building. 3. Must be on property of at least 10 acres in size or more. 4. Must be sufficiently screened, as determined by the City, from adjacent residential properties through techniques such as berming and landscaping. 5. Accessory uses to bus terminals may include an office and routine maintenance of school buses, including but not limited to washing and fueling. 2 SECTION 3. Effective Date. This ordinance shall become effective immediately upon adoption and publication in the official newspaper of the City of Lake Elmo. SECTION 7. Adoption Date. This Ordinance 08-215 was adopted on this ______ day of ___ 2018 by a vote of ___ Ayes and ___ Nays. LAKE ELMO CITY COUNCIL _________________________________ Mike Pearson, Mayor ATTEST: _________________________________ Julie Johnson, City Clerk This Ordinance 08-215 was published on the ____ day of ___________________, 2018. Resolution 2018-077 509020v1 SJS LA515-1 1 CITY OF LAKE ELMO WASHINGTON COUNTY STATE OF MINNESOTA RESOLUTION 2018-077 A RESOLUTION APPROVING A CONDITIONAL USE PERMIT FOR A SCHOOL DISTRICT TRANSPORTATION CENTER FOR A PORTION OF THE PROPERTY LOCATED AT 11530 HUDSON BOULEVARD NORTH WHEREAS, the City of Lake Elmo is a municipal corporation organized and existing under the laws of the State of Minnesota; and WHEREAS, Stillwater Area Schools (Kristen Hoheisel), 1875 Greeley Street South, Stillwater, MN 55082 (the “Applicant”) has submitted an application to the City of Lake Elmo (the “City”) for a Conditional Use Permit for a school district transportation center for a portion of the property located at 11530 Hudson Blvd N (PID# 36.029.21.43.0001) (the “Property”); and WHEREAS, a request for a Preliminary and Final Plat to subdivide the Property in to Lot 1, Block 1 of Four Corners, with three separate outlots was submitted by Terry Emerson, 2204 Legion Lane Circle North, Lake Elmo, MN 55042; and WHEREAS, the Applicant also submitted applications to the City for a Zoning Text Amendment to allow local transit as a conditional use within the Business Park zoning district; and a Zoning Map Amendment to re-zone Lot 1, Block 1 of Four Corners from Rural Development Transitional to Business Park; and WHEREAS, notice has been published, mailed and posted pursuant to the Lake Elmo Zoning Ordinance, Section 154.102; and WHEREAS, the Lake Elmo Planning Commission held a public hearing on said matter on June 4, 2018 and June 18, 2018; and WHEREAS, the Lake Elmo Planning Commission has submitted its report and recommendation to the City Council as part of a Staff Memorandum dated July 17, 2018, and WHEREAS, the City Council considered said matter at its July 17, 2018 meeting; and NOW, THEREFORE, based on the testimony elicited and information received, the City Council makes the following: FINDINGS 1) That the procedures for obtaining said Conditional Use Permit are found in the Lake Elmo Zoning Ordinance, Section 154.106. Resolution 2018-077 509020v1 SJS LA515-1 2 2) That all the submission requirements of said Section 154.106 have been met by the Applicant. 3) That the proposed Conditional Use Permit includes the following components: a) A Conditional Use Permit for a school district transportation center for a portion of the property located at 11530 Hudson Blvd N. 4) That the Conditional Use Permit for a school district transportation center will be for the Property legally described as follows: Lot 1, Block 1 of Four Corners. 5) That the Zoning Text Amendment that was proposed by the Applicants allows local transit as a conditional use within the Business Park zoning district. 6) That the City approved the Applicant’s request for a Zoning Text Amendment to allow local transit as a conditional use within the Business Park zoning district. 7) That the City approved the Applicant’s request for a Preliminary and Final Plat to subdivide the Property in to Lot 1, Block 1 of Four Corners along with three separate outlots. 8) That the City approved the Applicant’s request for a Zoning Map Amendment to re-zone the Property from Rural Development Transitional to Business Park. 9) The proposed use will not be detrimental to or endanger the public health, safety, comfort, convenience or general welfare of the neighborhood or the city. Bus traffic is not expected to be detrimental or dangerous, as trips and traffic will be limited to certain times of the day. It is a recommended condition of approval that there be significant berming to provide a sufficient screening of the parking lot. 10) The use or development conforms to the City of Lake Elmo Comprehensive Plan. The property is guided for Business Park, in which local transit, which meets certain standards, is a conditional use per the Zoning Code. The use also provides a significant number of jobs per acre, which is a desired trait of the Business Park land use designation per the Comprehensive Plan. 11) The use or development is compatible with the existing neighborhood. The use is compatible with the existing neighborhood, as the existing use is a truck terminal, which is similar in use and design to a bus terminal. The surrounding parcels are mostly vacant and undeveloped. 12) The proposed use meets all specific development standards for such use listed in Article 7 of this Chapter. The proposal complies with the proposed development standards as recommended in the requested Zoning Text Amendment, although it does not comply with many parking lot, screening, and landscape standards, which have been required as a recommended condition of approval. 13) If the proposed use is in a flood plain management or shoreland area, the proposed use meets all the specific standards for such use listed in Chapter 150, §150.250 through 150.257 Resolution 2018-077 509020v1 SJS LA515-1 3 (Shoreland Regulations) and Chapter 152 (Flood Plain Management). The property is located outside the 0.2% annual chance floodplain. 14) The proposed use will be designed, constructed, operated and maintained so as to be compatible in appearance with the existing or intended character of the general vicinity and will not change the essential character of that area. While the proposed project is a redevelopment/repurposing of an existing site and will not change the existing character of the area, operations are not within a building and so would not meet the intended character of the neighborhood. 15) The proposed use will not be hazardous or create a nuisance as defined under this Chapter to existing or future neighboring structures. While the proposed use will create a significant amount of traffic, it will be limited to certain times of the day. 16) The proposed use will be served adequately by essential public facilities and services, including streets, police and fire protection, drainage structures, refuse disposal, water and sewer systems and schools or will be served adequately by such facilities and services provided by the persons or agencies responsible for the establishment of the proposed use. There are plans to connect to City sewer and water at the applicant’s cost. The use may require the prompt need for the CSAH 15/Hudson Blvd traffic signal, for which the City will be required to share 25% of the cost, and the Hudson Boulevard realignment. It is not yet known if the applicant’s stormwater management plan meets all City, State, and Valley Branch Watershed District requirements. 17) The proposed use will not create excessive additional requirements at public cost for public facilities and services and will not be detrimental to the economic welfare of the community. While the use will not pay property taxes, sewer and water service charges will be paid by the applicant. 18) The proposed use will not involve uses, activities, processes, materials, equipment and conditions of operation that will be detrimental to any persons, property or the general welfare because of excessive production of traffic, noise, smoke, fumes, glare or odors. The proposed use will generate a significant number of trips per day, though this will be limited to certain times of the day. Minimal noise is expected to come from the site, except during heavy traffic times at specific times within the morning or afternoon. 19) Vehicular approaches to the property, where present, will not create traffic congestion or interfere with traffic on surrounding public thoroughfares. Traffic congestion could be created from the significant number of trips to the site, though these would be limited to certain times of the day. 20) The proposed use will not result in the destruction, loss or damage of a natural or scenic feature of major importance. N/A NOW, THEREFORE, BE IT FURTHER RESOLVED, that the Lake Elmo City Council hereby approves the request by Stillwater Area Schools for a Conditional Use Permit for a school district transportation center with the following conditions of approval: Resolution 2018-077 509020v1 SJS LA515-1 4 1) The Zoning Text Amendment to allow local transit (school district transportation center) within the Business Park Zoning District must be approved. 2) No construction or use of the bus terminal (unless in accordance with the Interim Use Permit approved by the City by Resolution 2014-095) may commence until all items as outlined in the City Engineer review memo regarding the Four Corners Preliminary & Final Plat (Stillwater Transportation Center) dated May 30, 2018 and all other subsequent construction plan memos regarding the Stillwater Transportation Center have been addressed; the Four Corners 1st Addition Final Plat has been recorded. 3) The applicant must obtain all other necessary City, State, and other governing body permits prior to the commencement of any construction activity on the parcel including but not limited to an approved stormwater management plan, utility plans, grading plan, street construction plans (if required), parking lot permit, building permits, etc. 4) The Applicant shall submit a photometric plan, and all lighting must meet requirements of Sections 150.035-150.038 of the City Code. 5) The above ground storage tank shall require development of diking around the tank, suitably sealed to hold a leakage capacity equal to 115% of the tank capacity. The applicant shall demonstrate that fire, explosion, or water or soil contamination hazards are not present that would be detrimental to the public health, safety, and general welfare. The applicant shall also fill out an Aboveground Storage Tank Notification of Installation or Change in Status Form as required by the Minnesota Pollution Control Agency (MPCA). 6) The Applicant shall submit an updated Landscape Plan and Tree Preservation Plan which includes sufficient berming and screening and addresses the comments in this report to be reviewed and approved by the City’s Landscape Architect. 7) Parking areas shall be paved with a durable surface including, but not limited to, hot asphalt, bituminous or concrete; spaces shall be marked with painted lines at least four inches wide; required interior and exterior parking lot screening is required; a bumper curb or barrier of normal bumper height shall be provided; and must provide an adequate number of Americans with Disabilities Act (ADA) accessible stalls. 8) A sign permit shall be obtained prior to erection of any sign on the property. 9) The property shall be connected to City sewer and water prior to operation of the bus terminal. 10) A Traffic Impact Study is required to determine timing and extent of improvements required for the CSAH 15 and Hudson Boulevard intersection realignment and traffic signal improvements as well as to determine if an eastbound left turn lane along Hudson Boulevard is also needed at the site access. 11) The applicant shall be required to include a description of the sanitary sewer capacity demands including the number of residential equivalency units (REC) based on the Metropolitan Council Sewer Availability Charge (SAC) determination policy as well as a description of the water capacity demands including average day use, peak day use, and fire suppression demands. Demands must account for all planned uses and connections to Resolution 2018-077 509020v1 SJS LA515-1 5 the sewer system including bus wash wastewater as well as include potable drinking water, bus washing operations, etc. 12) Applicant shall be responsible to place hydrants throughout the property at the direction of the Fire Department. All fire hydrants shall be owned and maintained by the City. Passed and duly adopted this 17th day of July 2018 by the City Council of the City of Lake Elmo, Minnesota. __________________________________ Mike Pearson, Mayor ATTEST: ________________________________ Julie Johnson, City Clerk 1 STAFF REPORT DATE: 7/17/2018 REGULAR ITEM #: 18 TO: City Council FROM: Emily Becker, Planning Director AGENDA ITEM: Four Corners 2nd Addition General Planned Unit Development (PUD) Concept Plan REVIEWED BY: Jack Griffin, City Engineer BACKGROUND: The City has received a request from Terry Emerson for a General Planned Unit Development (PUD) Concept Plan for a 15.77 acre commercial development which includes a park and ride and commercial development in the southeast corner of 11530 Hudson Boulevard North. ISSUE BEFORE COUNCIL: The Council is being asked to hold a public hearing, review and make recommendation on the above- mentioned request. PROPOSAL DETAILS/ANALYSIS: General Information. • Property Owner: Terry Emerson, 2204 Legion Lane Circle North, Lake Elmo, MN 55042 • Location: North of I-94/Hudson Boulevard and West of Manning Avenue North, Southeast Corner of 11530 Hudson Boulevard North • Current Site Area: 70.21 acres • Land Use Guidance: The 2030 Comprehensive Plan guides the eastern portion of the site as Mixed-Use Commercial and Commercial, and the western portion is guided as Business Park. • Current Zoning: Rural Development Transitional • Proposed Zoning: Commercial and Convenience Commercial • Current Surrounding Land Use Guidance: Vacant land to the north (Rural Development Transitional); I-94 to the south (Woodbury); vacant land to the west (Rural Development Transitional); Manning Avenue to the east (West Lakeland). • History: The property has been used as rural vacant land. • Application Timeline: Application received: 5/18/18. 60-day Review: 7/17/18. No extension sent. Request Details/Reason for PUD. The applicant is proposing to construct a park-and-ride facility on Outlot C along with a commercial development to the north on Outlot B. Currently, the Zoning Code states that transit-related park-and-ride lots are allowed in the Convenience Commercial zoning district within the written Purpose and District Descriptions of Article XIV: Commercial Districts, but it does not specifically designate park-and-ride facilities as an allowed use within Table 12-1: Permitted, Conditional and Interim Uses, Commercial Districts. Because of this, the applicant has submitted a Planned Unit 2 Development Application, which allows the applicant to propose a number of uses which then become permitted uses within the development. Staff believes this is more appropriate than requesting a Zoning Text Amendment in order to avoid allowing park-and-rides within every commercial area of the City. Additionally, the site plan proposes more than one principal building and use on a platted lot, which is only allowed within a PUD. Zoning. As per the Comprehensive Plan, the eastern portion of the site is guided for Commercial. With the Preliminary Plat and PUD application, Outlots B and D should be rezoned to Commercial, and Outlot C should be rezoned to Convenience Commercial, as the Zoning Code alludes that park-and-rides are an appropriate use within this zoning district. Outlot A would be rezoned at a later time when a development application is received for that parcel. Allowed Uses. As previously mentioned, the applicant is requesting park-and-ride as an allowed use within this development. The commercial development also proposes to include a gas station/convenience store (conditional use in Commercial zoning district), financial institution (permitted), restaurant (permitted), and daycare (conditional). Additionally, all other allowed uses within the Commercial zoning district would be allowed within Outlots B and D. Because the applicant has not secured prospective tenants at this time, the applicant is requesting the following uses be allowed (marked as either conditional, permitted, or not allowed within the Commercial zoning district): • Commercial kennel (conditional) • Apartments (conditional) • Automotive service center (conditional) • Drinking and entertainment (permitted) • Indoor recreation (conditional) • Post Office (not allowed) • Personal Services (permitted) • Carwash (conditional) • Financial institution (permitted) • Offices (permitted) • Restaurant (permitted) • Retail (permitted) • Lodging (permitted) • Schools (permitted) • Convent (not allowed) • Day care center (conditional) • Drive-through restaurant (conditional) • Farm equipment sales (not allowed) • Funeral home (permitted) • Sales and storage lots (conditional) • Bus/truck service station or garage (not allowed) • Veterinary Services (permitted) • Wholesales (permitted) The purpose of allowing conditional uses to become permitted with a PUD is that the City has a chance to review site plans. Because of the lack of any plans to accompany the requested uses listed in bullet points above, Staff would recommend that this request be denied and recommends that a condition of approval be that uses other than gas station/convenience store, daycare, and any permitted use within the Commercial zoning district be allowed require a conditional use permit unless the preliminary and final plans detail alternative uses with an approved site plan. 3 Consistency with the Comprehensive Plan. The City’s Planned Land Use Map indicates that this area is guided for Commercial. This area is intended to accommodate a wide range and scale of commercial uses (such as retail, service, entertainment, and office) throughout the City’s planned urban centers. Commercial uses can range from small neighborhood convenience nodes, to community retail areas along maj or roadways, to large shopping centers, to auto-related commercial uses along freeways. The Draft 2040 Comprehensive Plan also designates this area as Commercial but states that commercial land uses are for retail business solely. While a park and ride is not a commercial use, there is potential benefit of the draw for other businesses near the Park and Ride. Additionally, the City wide planning policy in regards to transportation of the 2030 Comprehensive Plan encourages, supports, and advocates public transit service to the City at appropriate geographic locations as determined by the City. Also, public transportation has less of a negative impact on the environment than taking a car, and financial savings result from eliminating parking fees, not needing to pay for gas for individual vehicles and the personal time saved when bypassing slow traffic. According to the US Census Bureau, in 2016 approximately 85% of Lake Elmo residents commute to work, and approximately 1.8% of those who commute to work utilize public transportation. It is not known whether or not a park and ride would encourage increased use of public transportation. A deterrent of a park and ride is that if the purchase of the land is by a public entity for use as a park and ride (or any other public use), the City would not collect any property taxes on the site. Site Plan. The proposed site plan includes one 6,800 square foot building financial building, 5,600 square foot restaurant, a 20,200 square foot gas station/convenience store, and a 10,400 square foot daycare along with 154 parking spaces, including 6 handicap parking spaces, within Outlot B. Outlot C includes a park and ride that will provide approximately 550 parking spaces, including 12 handicap parking spaces; electric charging stations; bike racks with overhead canopy; two 6’X13’ bus shelters; 10.5’X12’ restroom building. There is no current proposal for Outlot D. Outlot A will remain an outlot. Park and Ride. A park and ride facility is a parking lot or structure located along a public transit route designed to encourage transfer from private automobile to mass transit or to encourage carpooling for purposes of commuting, or for access to recreation uses. The City does not currently have a park and ride. The Draft 2040 Comprehensive Plan designates the proposed area as a park and ride. The park and ride has been in discussion with the City since at least 2011, when the Planning Commission’s Work Plan included an item to discuss on potential rezoning on two sites for a park and ride along I-94. The corner of Hudson Boulevard and Manning Avenue was one of these sites. The Council adopted an ordinance on May 4, 2011, which allowed park and rides as a conditional use within the Rural Residential Limited Business Holding District (HD-RR-LB), which is no longer a zoning district within the City. According to a slide show presentation to the Metropolitan Council in 2015, a location was previously considered in Woodbury, but that has moved to the northwest quadrant. Seven locations were reviewed, but many were not possible due to various reasons. The park and ride will serve a new express bus service to downtown Minneapolis. Five daily trips are anticipated for express bus service. Current and Future Park and Rides. There currently are six lots in adjacent cities that could be used by Lake Elmo commuters. The figure below shows existing and proposed park and ride facilities near the proposed facility. Additionally, there is a new park and ride facility planned less than 1 mile from the southwestern city border to provide access to the Metro Gold Line Bus Rapid Transit (BRT). The numbers and percentages indicate the 2017 capacity of each park and ride. This information was derived from the 2017 Annual Regional Park and Ride System Report. • St. Croix Valley Recreation Center in Stillwater. • Guardian Angels Church in Oakdale (415 spaces, 81% utilized in 2017). • Walton Park in Oakdale (58 spaces, 50% utilized in 2017). • Woodbury Mall Theater in Woodbury (550 spaces, 79% utilized in 2017). 4 • Woodbury Lutheran Church in Woodbury (90 spaces, 97% utilized in 2017). • Christ Episcopal Church Park and Ride next to Woodbury Lutheran Church Park-and-Ride. • There is also a park and pool lot available in Grant near the intersection of TH 36 and Manning Avenue (CSAH 15). Bus service is not provided at this lot, but commuters may still park for free and carpool from this location (15 spaces, 7% utilized in 2017). I-94 Impact. I-94 is identified as a High Priority on the Minnesota Interregional Corridor System (IRC) 2000 plan as part of the State Transportation Plan. Under this designation, I-94 has a goal 60-mph average peak hour operating speeds with minimal conflicts and interruptions to traffic flow. A corridor management plan has not yet been developed to examine the existing operations and determine future plans to meet those goals. It is expected that such a plan will be developed in the near future. It is also anticipated that Lake Elmo will have the opportunity to participate on some type of advisory panel in conjunction with development of that plan to express the City’s views and opinions on the corridor. The City will work with the Minnesota Department of Transportation (Mn/DOT), the County, and adjacent communities on a corridor plan that is effective for all involved. Urban Services Required. Because the property is within the MUSA, any development of the property would require that the property be hooked up to city services. Therefore, utility and other applicable construction plans will need to be submitted as part of the approval process. Proposed Design. The applicant has not yet provided architectural renderings of the buildings. It is a recommended condition of approval that the applicant submit architectural renderings of the proposed buildings so that Staff and the City may further review their compliance with the City’s Zoning Code and Lake Elmo Design Guidelines and Standards. Parking. Because the applicant is currently unsure of the exact tenants that will occupy Outlot B, Staff has not conducted a thorough analysis to determine whether or not adequate parking will be provided for tenants of Outlot B. Parking Lot Screening. • Interior Parking Lot Landscaping. At least 5% of the interior area of parking lots with more than 30 spaces is required to be devoted to landscape planting areas, which may consist of islands or corner beds. It is unclear from the site plan what percentage is devoted to this on both Outlots B and C. Additionally, a minimum of 1 shade tree per 15 5 spaces within parking lots that total 101 spaces or more are required to be located within these corner islands or beds. With the proposed 550 parking spaces of the park and ride (Outlot C) a minimum of 37 shade trees are required to be provided within these corner beds or islands. The 154 parking spaces within Outlot B would require a minimum of 11 shade trees. • Perimeter Parking Lot Landscaping. A landscaped frontage strip of at least eight feet in width is required, as the parking area contains over 100 spaces. Screening is required consisting of a masonry wall, fence, berm, or hedge or combination that forms a screen a minimum of three and a half and maximum of four feet in height and not less than 50% opaque on a year-round basis and a minimum of one deciduous tree per 50 linear feet. It is a recommended condition of approval that the Preliminary Plat and PUD Plans submittal provide required interior and perimeter parking lot landscaping as required by the Zoning Code. Off-Street Loading. Off-street loading space is required for all districts for any nonresidential use which will involve the receipt or distribution of materials or merchandise by trucks or similar vehicles and has a gross floor area of 5,000 square feet or more. For facilities with 20,000 square feet gross floor area or greater, one off-street loading berth shall be provided every 30,000 square feet or fraction thereof. Depending on the final uses that are proposed with the Preliminary Plat and PUD Plans for this development, it should be evaluated whether or not an off-street loading berth should be provided. Consistency with Commercial and Convenience Commercial Zoning Districts. The proposed development will require a Zoning Map Amendment to rezone the property to Commercial and Convenience Commercial. The standards for this district are shown below. The applicant has not provided sufficient information to complete a detailed review of the proposal against these standards, though it is obvious that the maximum impervious surface of the Convenience Commercial zoning district is exceeded. It is a recommended condition of approval that the applicant outline all requested PUD flexibility with the Preliminary Plat and PUD application or meet required standards. Standard Commercial Convenience Commercial Impervious Surface Maximum 75% 60% Minimum Lot Area 20,000 square feet 12,000 square feet Minimum Lot Width 60 feet 75 feet Building Front Yard Setback 30 feet 30 feet Building Interior Side Yard Setback 10 feet 10 feet Building Corner Side Yard Setback 10 feet 10 feet Building Rear Yard Setback 30 feet 30 feet Building Residential Zones 50 feet 50 feet Parking Front Yard Setback 15 feet 15 feet Parking Interior Yard Setback 10 feet 10 feet Parking Corner Side Yard Setback 15 feet 15 feet Parking Rear Yard Setback 10 feet 10 feet Parking Residential Zones 35 feet 35 feet Maximum Building Height 45 feet 35 feet 6 Consistency with Planned Unit Development Regulations. Staff has reviewed the proposed plan for its consistency with requirements of Article XVII: Planned Unit Development (PUD) Regulations and has found the following: • Intent. The intent of a PUD is to provide for flexibility in the use of land and the placement and size of buildings in order to better utilize site features and obtain a higher quality of development. A PUD is required for the proposed development, as a park and ride is not specifically an allowed use within the Convenience Commercial zoning district, and a zoning text amendment to allow it any area that was guided for the Commercial land use designation would likely not be appropriate. Additionally, there is more than one principal building and use proposed on one parcel. It is a recommended condition of approval that the applicant submit specific requests for flexibility from the Zoning Code with the Preliminary Plat and PUD application. • Identified Objectives. When reviewing requests for PUDs, the City is to consider whether one or more objectives as outlined in Section 154.751: Identified Objectives of the Zoning Code will be served or is achieved. Staff has found that the following objectives are being met with the proposed development. B. Promotion of integrated land uses, allowing for a mixture of residential, commercial and public facilities. • The proposed development is mixed use and includes a mixture of buildings and uses on one parcel. The uses have not yet been specifically identified yet, but it is a recommended condition of approval that the uses be identified on the parcel with the Preliminary Plat and PUD application. I. Allowing the development to operate in concert with a redevelopment plan in certain areas of the City and to ensure the redevelopment goals and objectives will be achieved. • While this isn’t necessarily a redevelopment, the proposed development will bring city utilities to this area of the City and assist with the realignment of Hudson Boulevard. Minimum Requirements. PUDs must meet the following minimum requirements: A. Lot Area. A PUD must include a minimum of 5 acres for undeveloped land or 2 acres for developed land within the approved development. • The proposed development exceeds this requirement with a proposed 15.77 acre development. B. Open Space: For all PUDs, at least 20% of the project area not within street rights-of- way to be preserved as protected open space. Other public or site amenities may be approved as an alternative to this requirement. Any required open space must be available to the residents, tenants, or customers of the PUD for recreational purposes or similar benefit. Land reserved for storm water detention facilities and other required site improvements may be applied to this requirement. Open space shall be designed to meet the needs of residents of the PUD and the surrounding neighborhoods, to the extent practicable, for parks, playgrounds, playing fields and other recreational facilities. • The applicant has not provided sufficient information to determine if this is true. It is a recommended condition of approval that the applicant either provide the required 20% open space within the development or specify with the Preliminary 7 Plat and PUD application what the proposed public or site amenity the development will provide that the City may consider an alternative to the open space requirement. C. Street Layout… In newly developing areas, streets shall be designed to maximize connectivity in each cardinal direction, except where environmental or physical constraints make this infeasible. All streets shall terminate at other streets, at public land, or at a park or other community facility, except that local streets may terminate in stub streets when those will be connected to other streets in future phases of the development or adjacent developments. • The proposed realignment of Hudson Boulevard meets this requirement. The Preliminary Plat and PUD Plans will need to provide detailed plans that meet all engineering standards. It is a recommended condition of approval that all comments outlined in the Engineering memo dated June 14, 2018 be addressed. Proposed Amenities. The City’s PUD ordinance provides that amenities may be provided for increased density. In this case, the applicant is not requesting additional density, as this is a commercial development. However, a PUD should still offer the City amenities in exchange for the flexibility of allowing more than one building and principal use on a parcel as well as flexibility from any other standard that is requested as part of the preliminary phase of the planned development. Staff finds that no amenities as designated in Table 16-2: Site Amenities are provided in the proposed site plan. • Site Amenities Not Listed? Additionally, the City may also consider the allotment of amenity “points” for site amenities that are not otherwise specified within the ordinance as part of the preliminary phase of the planned development. Parkland Dedication. Commercial development is required to provide fees in lieu of park land dedication. These fees will be required prior to recording the plat of each phase of the development. Because the proposed development will consist of 15.77 acres, a parkland dedication fee of $70,965.00 (15.77 acres X $4500 commercial park dedication fee per acre) will be required. Engineering Comments. The City Engineer has provided a review memo regarding the proposed General Concept PUD. This memo is attached for reference. Staff would like to highlight the following comments in summary: • Streets and Transportation o Hudson Boulevard Realignment. Hudson Boulevard must be realigned to move the existing Hudson Boulevard/Manning Avenue intersection north approximately 470 feet to align with the existing Holiday gas station, which the Concept Plan shows. This realignment must be designed meeting Municipal State Aid Design Standards for urban section roadways with a 45-mph design speed. Additional design details and geometrics are required for City review and changes to this realignment are likely needed. o Traffic Signal/Turn Lane Improvements. These will be needed at the new CSAH 15 and Hudson Boulevard intersection, and the concept plan shows this. A financial contribution to the intersection improvements should be considered. o Hudson Boulevard Improvements. This must be improved per the City design standards to an urban section on the north side of the street, a 4-foot shoulder (curb reaction), a 9-foot boulevard, and 10-foot shared bituminous trail with 2- foot clear zone. It is further recommended that the south side of the street include 8 an urban section across Outlots B, C, and D. A rural section is permitted along the south boulevard once the road passes Outlot D. o Hudson Boulevard Right-of-Way/Easement Dedication. Significant right-of-way dedication is required to facilitate the Hudson Boulevard realignment and improvements necessary for this development. Additional right-of-way should also be granted to facilitate access to the new Hudson Boulevard access to the property to the north via the first intersection east of Manning Avenue to the north property line. o Off-Site Permissions/Right-of-Way. A ROW easement will be required from the property to the north to allow for the Hudson Boulevard realignment at Manning Avenue. o Access. There are three access points proposed along Hudson Boulevard, two of which meet spacing guidelines. The access to be shared by outlots B and C can only be permitted right-in/right-out, and a center median will be required. o Turn Lanes. The addition of turn lanes will need to be evaluated as determined by the City, which may require additional right-of-way. • Stormwater Management o A stormwater management plan meeting all applicable jurisdictions should be submitted with preliminary plans and meeting all applicable standards. o Stormwater facilities should remain privately owned, a stormwater maintenance agreement will be required. • Municipal Sanitary Sewer o Provisions to connect to municipal sanitary sewer must be included in the preliminary plans. Sewer would discharge to the MCES Cottage Grove Ravine Interceptor. o Applicant will be responsible to connect to City sanitary sewer at the applicant’s sole cost and will need to stub sanitary sewer mains to adjacent properties. o Preliminary plans must include a description of the sanitary sewer capacity demands including the number of residential equivalency units (RECs) based on Met Council SAC determination charge. o Any extension will require utility easements 15 feet on each side centered from the pipe from off-site properties. • Municipal Water Supply o Provisions to connect to municipal water supply must be included in preliminary plat application. o Applicant will be responsible to extend municipal water at the applicant’s sole cost and will need to stub water mains to adjacent properties. o Preliminary plans must include a description of the water capacity demands including average day use, peak day uses, and fire suppression demands. This information is required for staff evaluation of the water improvements needed to support the development and to determine water availability charges. o Water is available from Hunter’s Crossing but will require easements across adjacent properties. o The site is in the water system’s low-pressure zone which has limited capacity until a new water tower is constructed to serve the area. o The applicant is required to place hydrants throughout the property at the direction of the Fire Department, and the hydrants shall be owned and maintained by the City. o Watermain lines and hydrants will require easements. 9 Building Official and Fire Chief Review. The Building Official and Fire Chief have reviewed the proposed plan and have no comments. They will be consulted during the Preliminary and Final phases of the PUD in order to ensure that adequate essential services are being provided. County Review. The application has been sent to the County requesting review. The County had the following outlined comments in regards to this review: • The proposed park and ride will be a great amenity for Lake Elmo as development continues to grow along CSAH 15 and within the City. The proposed site is an ideal location, as it is on the inbound side for commuting traffic along I-94 and will serve as a reliever for the Guardian Angels park-and-ride location in Oakdale, which is at capacity. • Bicycle and pedestrian connectivity are encouraged, and the proposed building and parking lot orientation are not conducive with walkability and livability principles. • The Draft Washington County 2040 Comprehensive Plan future right-of-way requirements for “A” Minor Arterial roadways (classification of CSAH 15) requires a 180 feet (90 feet from center of roadway) right-of-way, and there appears to be adequate right-of-way today, though more may be necessary if an expanded interchange is constructed. • The realigned access to Hudson Boulevard is acceptable as shown. A soutbound righ-turn lane and a northbound center left-turn lane will be constructed as part of this realignment. A plan section will need to be prepared and approved by the County Traffic Engineer, and a Washington County right-of-way will be required for any turn lane improvements. • No traffic study was submitted to the County as part of the application, and so it cannot be determined at this time if the new intersection will warrant a new traffic signal. The City will need to participate in 25% cost share of this signal. • A trail is needed on the south side of Hudson Boulevard to connect these facility to CSAH and the trail towards Hudson, Wisconsin. • Left turn lanes are needed in to the site access to prevent queuing back to CSAH 15. Planning Commission Review. The Planning Commission held a public hearing and considered the General PUD Concept Plan at its June 18, 2018 meeting. No one spoke at the public hearing, and no written comments were received prior to the public hearing. The Planning Commission had the following comments in regards to the proposed PUD Concept Plan: • That the applicant should propose contributing the City’s 25% cost share to the signal as an amenity. • There was the general consensus that the development of this area would prompt development in this area of the City and that the park and ride would be a good amenity for the City, as the Guardian Angels lot is nearing capacity. The Planning Commission recommended approval of the proposed PUD Concept Plan with Staff- recommended conditions of approval with a vote of 4-0. Recommended Findings. Staff and the Planning Commission recommends approval of the Concept PUD Plan based on the following findings: 1. That the Applicant has submitted all application requirements outlined in Section 154.759: Application Requirements for General PUD Concept Plan. 2. That the PUD Concept Plan is consistent with the intent of the Lake Elmo Comprehensive Plan and the Future Land Use Map for this area. 3. That the PUD Concept Plan complies with the general intent of the Commercial zoning districts with PUD modifications. 4. That the PUD Concept Plan generally complies with the City’s Subdivision regulations. 5. That the PUD Concept Plan is generally consistent with the City’s engineering standards with exceptions as noted in the City Engineer’s memorandum dated June 14, 2018. 6. The PUD Concept Plan meets the minimum requirement for a PUD including minimum lot area and street layout. It is not known whether the minimum requirement for open space is met. 10 7. The PUD Concept Plan meets at least one of the required PUD objectives identified in Section 154.751. Recommended Conditions of Approval. Staff recommends the Planning Commission recommend approval of the Concept PUD with the following conditions: 1. The future Preliminary Plat and PUD Plans include a portion of PID# 34.029.21.43.0003. 2. The future Preliminary Plat and PUD Plans shall identify proposed land uses, and those land uses shall accompany a detailed site plan to be approved by the City. Any use that is not designated on the Preliminary Plat and PUD Plans and is not designated as a permitted use within the Commercial zoning district shall require a conditional use permit. 3. The future Preliminary Plat and PUD Plans shall provide the required 20% open space within the development or specify what the proposed public or site amenity the development will provide that the City may consider as an alternative to the open space requirement. 4. The future Preliminary Plat and PUD Plans should detail proposed amenities in exchange for flexibility from standards of the Zoning Code. 5. The future Preliminary Plat and PUD Plans shall comply with comments outlined in the City Engineer Review Memo named Four Corners 2nd Addition Concept Plan dated June 14, 2018. 6. The future Preliminary Plat and PUD Plans shall include provisions for City sanitary sewer and municipal water as well as sanitary sewer and water capacity demands. The Applicant shall be responsible to extend City sanitary sewer and municipal water to the site at the applicant’s cost. Sanitary sewer and water main stubs will be required to all adjacent properties. 7. The future Preliminary Plat and PUD Plans shall include right-of-way and easement from the adjacent property to the north to allow for the Hudson Boulevard realignment at Manning Avenue. 8. The future Preliminary Plat and PUD Plans shall include a stormwater management plan including a summary report describing the overall management plan and performance criteria for all required storm events. 9. The Applicant shall obtain all necessary permits including but not limited to all applicable city permits (building, grading, sign, etc.), NPDES/SWPPP permits and Valley Branch Watershed District approval. 10. Stormwater facilities shall be privately owned and maintained. A maintenance agreement in a form acceptable to the City should be executed and recorded. 11. The future Preliminary Plat and PUD Plans shall include tree preservation and landscape plans to be approved by the City’s Landscape Architect. 12. The future Preliminary Plant and PUD Plans shall include architectural renderings. 13. The Applicant shall submit a photometric plan, and all lighting must meet requirements of Sections 150.035-150.038 of the City Code. 14. That fees in lieu of park land dedication be provided as required by 153.15 of the City Code with future final plat. 15. The Applicant shall adhere to all requirements as outlined in the Washington County review memo dated June 13, 2018. Possible Findings for Denial. The City has legislative authority to rezone a parcel and may not wish to rezone Outlot C to Convenience Commercial. While the Convenience Commercial zoning district describes park and ride as an allowed use within the Convenience Commercial zoning district, it is not an outlined use within the Commercial-guided areas of the Comprehensive Plan. The Planned Unit 11 Development ordinance states that uses within the PUD may include only those uses generally considered associated with the general land use category shown for the area on the official Comprehensive Land Use Plan. A park and ride is not generally a commercial use if owned by a public entity, and so the Council may wish to deny the proposed Concept PUD Plan based on this. If the Council wishes to deny the proposed General PUD Concept Plan, Staff would recommend the following findings: 1. That the City’s Planned Unit Development (PUD) ordinance states that uses within a PUD may include only those uses generally considered associated with the general land use category shown for the area on the City’s official Comprehensive Land Use Plan. The area in which the Concept PUD Plan is located is guided by the Comprehensive Land Use Plan as Commercial. A park and ride facility is not considered a commercial use because it would be owned by a public entity and therefore would not generate property taxes like a commercial use. 2. That the Comprehensive Land Use Plan does not specifically designate park-and-ride facilities or any other similar type facilities as an allowed, conditional, or interim use for the Commercial Zoning District. 3. That while park and ride facilities are considered an allowed use within the City’s Convenience Commercial Zoning District, the City does not believe that the Convenience Commercial zoning district is appropriate for the area in which the Concept PUD Plan is being proposed as there is not a need for a park and ride facility in the City. There currently are six park and ride facilities in adjacent cities that may be used by Lake Elmo commuters. Additionally, there is a new park and ride facility being planned for less than one mile from the southwestern Lake Elmo border to provide access to the Metro Gold Line Bus Rapid Transit. 4. The Applicant has also requested that other uses that are either not currently permitted or are conditional uses be designated as permitted uses within the PUD. The Applicant has not submitted any plans to accompany the uses that he is requesting be changed to permitted uses and therefore, due to the lack of information, this is an unreasonable request. 5. The City’s PUD regulations require that applicants offer the City amenities in exchange for any requests for flexibility from the City standards. The Applicant is requesting flexibility from the City standards, including, but not limited to, exceeding the City’s impervious surface requirements, but yet he has not offered the City any amenities in exchange for the flexibility being requested. FISCAL IMPACT: There would be no fiscal impact to the City at this time, as the developer would be required to pay for any amendments needed to accommodate the development. Concept Plan approval does not afford the applicant development rights. When the property develops, it will have urban services and will pay sewer and water connection charges, building permit fees and the like. OPTIONS: The Council may: • Adopt Resolution 2018-080 approving the Four Corners 2nd Addition Concept PUD with Staff- recommended conditions of approval and findings. • Amend Staff and Planning Commission-recommended conditions of approval and findings and adopt Resolution 2018-080 as amended. • Adopt Resolution 2018-080 denying the Four Corners 2nd Addition Concept PUD with Staff- recommended findings. • Amend Staff-recommended findings for denial and adopt Resolution 2018- as amended. RECOMMENDATION: Staff and the Planning Commission recommend approval of the proposed PUD Concept Plan with the recommended conditions of approval. 12 “Motion to adopt Resolution 2018-080 approving the Four Corners 2nd Addition PUD Concept Plan as requested by Terry Emerson for the southwest corner of 11530 Hudson Boulevard with recommended conditions of approval.” If the Council wishes to deny the proposed PUD Concept Plan, the following motion may be made: “Motion to adopt Resolution 2018-080 denying the Four Corners 2nd Addition PUD Concept Plan as requested by Terry Emerson for the southwest corner 11530 Hudson Boulevard with recommended findings for denial.” ATTACHMENTS: • Application materials • Engineer review memo dated June 14, 2018 • Washington County review memo dated June 13, 2018 • Resolution 2018-080 approving the PUD Concept Plan • Resolution 2018-080 denying the PUD Concept Plan   PAGE 1 of 3  MEMORANDUM           Date:  June 14, 2018      To: Emily Becker, Planner Director Re: Four Corners 2nd Addition Concept Plan   (Commercial Site / Metro Transit Park & Ride)  Cc:  Chad Isakson, Assistant City Engineer      From: Jack Griffin, P.E., City Engineer          An engineering review has been completed for the Four Corners 2nd Addition Concept Plan which includes a  Commercial Site and Metro Transit Park & Ride. A Concept Plan was received on May 21, 2018. The submittal  consisted of the following documentation:     Four Corners 2nd Addition Concept Plan, dated May 18, 2018, prepared by Folz Freeman Surveying LLC.      Engineering has the following review comments:    STREETS AND TRANSPORTATION     Hudson Boulevard Realignment. As part of the development, Hudson Boulevard must be realigned to  move the existing Hudson Boulevard/Manning Avenue intersection north approximately 470 feet to align  with the existing Holiday Station driveway. The concept plan shows this realignment as proposed. The  realignment of Hudson Boulevard must be designed meeting Municipal State Aid Design Standards for  urban section  roadways with a  45‐mph design speed. Additional design details and geometrics  are  required for City review and changes to this realignment are very likely needed.   Traffic Signal/Turn Lane Improvements. A traffic signal and turn lanes will be required at the new CSAH 15  and Hudson Boulevard intersection. A financial contribution to traffic signal/turn lane improvements  should be considered. The concept plan shows turn lanes at this new intersection.   Hudson Boulevard Improvements. In addition, Hudson Boulevard must be improved per the City design  standards to an urban section on the north side of the street, a 4‐foot shoulder (curb reaction), a 9‐foot  boulevard, and 10‐foot shared use bituminous trail with 2‐foot clear zone. It is further recommended that  the south side of the street include an urban section across Outlots B, C and D. A rural section is permitted  along the south boulevard once the road passes Outlot D.   Hudson Boulevard Right‐of‐Way/Easement Dedication. Significant right‐of‐way dedication is required to  facilitate the Hudson Boulevard realignment and improvements necessary for this development. Right‐of‐ way requirements will need to be reviewed carefully as the development plans evolve and all right‐of‐way  dedicated to the City as part of the project. Additional right‐of‐way dedication should also be granted to  facilitate access to the new Hudson Boulevard roadway for the adjacent property to the north. This access  should be provided from the first intersection east of Manning Avenue to the north property line.    Off‐site permissions/right‐of‐way. Right‐of‐way and easement is required from the adjacent property to  the north to allow for the Hudson Boulevard realignment at Manning Avenue.    A 10‐foot utility corridor easement for small utilities must be dedicated to the City along both sides of the  Hudson Boulevard right‐of‐way.  FOCUS ENGINEERING, inc.  Cara Geheren, P.E.  651.300.4261  Jack Griffin, P.E.               651.300.4264  Ryan Stempski, P.E. 651.300.4267  Chad Isakson, P.E. 651.300.4285    PAGE 2 of 3   Site Access. The concept plan proposes three access points along Hudson Boulevard. One full access to  Outlot B is approximately 660 feet from the CSAH 15/Hudson Boulevard intersection thereby meeting the  City’s access spacing requirement. One full access to Outlot C is approximately 700 feet from the Outlot B  access, also meeting the City’s access spacing requirement. A third access is proposed to be shared by  Outlots B/C with access spacing at approximately 350+/‐ feet. This third access can only be permitted as  right‐in/right‐out. A center median will be required as part of the Hudson Boulevard improvements to  enable the proposed right‐in/right‐out access.    Turn Lanes. The addition of turn lanes at each proposed access point will need to be evaluated and added  to the plans as determined by the City which may require additional right‐of‐way at these locations.    STORMWATER MANAGEMENT   A State and Valley Branch Watershed District (VBWD) permit will be required. The site plan is subject to a  storm water management plan meeting State, VBWD and City rules and regulations. No storm water  management plan was provided as part of the Plan submittal and is not required for concept plan review,  however  storm water management can impact  site design requiring significant plan revisions. The  concept plan shows one storm water pond that is likely two small  to accommodate the entire  development as proposed. Additional storm water facilities are likely needed.   A storm water management plan must be submitted with preliminary plans detailing the storm water  management calculations to support any proposed improvements to meet agency requirements including  the HydroCAD model in electronic format. The storm water management plan must include a summary  report describing the overall management plan and performance criteria for all required storm events.    Storm water facilities proposed for meeting State and VBWD permitting requirements must be designed  and constructed in accordance with the City Engineering Design Standards Manual available on the City  website, dated March 2017.   The storm  water facilities constructed for this development should remain privately  owned and  maintained. The applicant will be required to execute and record  a Storm Water Maintenance and  Easement Agreement in the City’s standard form of agreement.   Even as privately owned and maintain facilities, maintenance access roads meeting the City engineering  design standards must be provided for all storm water facilities.   The storm water facility 100‐year HWL must be fully contained within the subject property or easements  must be acquired to protect the 100‐year HWL flood area.   City design standards, details and plan notes must be used for erosion control.    MUNICIPAL SANITARY SEWER   The proposed site is guided in the City’s Comprehensive Plan for 2020‐2030 Regional Sewer Staging Plan  and would discharge to the MCES Cottage Grove Ravine Interceptor. Therefore, provisions for connecting  to the municipal sanitary sewer service must be included with any preliminary plan application.    The applicant will be responsible to connect to the City sanitary sewer system and extend sanitary sewer  into the property at applicant’s sole cost. In addition, the applicant will be required to stub sanitary sewer  mains to adjacent properties so that these parcels maintain sewer access. Sanitary sewer is available  along Hudson Blvd near the MCES Meter Station. The sanitary sewer trunk size will need to be determined  based on the 2040 Comprehensive Plan.   The Preliminary  Plan application  must include a description of the sanitary sewer capacity demands  including the number of residential equivalent units (REC) based on the Met Council SAC determination  policy. Demands must account for all planned uses and connections to the sewer system. This information  is required for staff evaluation of the sewer system improvements needed to support the development  and to determine the applicable sewer availability charges.   Utility Easements. Any extension of sanitary sewer to the subject property will require utility easements  from off‐site properties. The Preliminary Plans must identify the necessary easements to implement the  proposed improvements and must be a minimum 15‐feet each side centered from the pipe.    PAGE 3 of 3    MUNICIPAL WATER SUPPLY   The  proposed facility resides within  the Planned  MUSA, therefore  provisions for connecting to the  municipal water supply must be included with any preliminary paln application.    The applicant will be responsible  to extend municipal water  to the property at the applicant’s cost.  Watermain stubs will be required to all adjacent properties so that these parcels maintain access to water  service. Water is available to be extended to the property from the Hunter’s Crossing development but  will require easements across adjacent properties. The watermain extension to the site will likely be a 12‐ inch trunk watermain.     The Preliminary Plan application should include a description of the water capacity demands including  average day use, peak day use, and fire suppression demands. This information is required for staff  evaluation of the water improvements needed to support the development and to determine the water  availability charges.   The proposed site is in the water system’s low‐pressure zone which has limited capacity until a new water  tower is constructed to serve the area.   The applicant will be responsible to place hydrants throughout the property at the direction of the Fire  Department.  All fire hydrants shall be owned and maintained by the City.   Any watermain  lines and hydrants  placed within  the development will require minimum  30‐foot  easements centered over the pipe. Easements must be dedicated to the City and be provided in the City’s  standard form of easement agreement.              11660 Myeron Road North, Stillwater, Minnesota 55082-9573 Phone: 651-430-4300 • Fax: 651-430-4350 • TTY: 651-430-6246 www.co.washington.mn.us Equal Employment Opportunity / Affirmative Action Public Works Department Donald J. Theisen, P.E. Director Wayne H. Sandberg, P.E. Deputy Director/County Engineer June 13, 2017 Emily Becker Community Development Director City of Lake Elmo 3600 Laverne Avenue North Lake Elmo, MN 55042 RE: Washington County comments on Four Corners Second Addition, Proposed Concept Plan Dear Emily, Thank you for providing Washington County with the Four Corners Second Addition, Proposed Concept Plan in the City of Lake Elmo. The project consists of an express park-and-ride lot, a gas/convenience store, daycare, financial institution and restaurant. The property is located on the northwest corner of Interstate 94 (I-94) and County State Aid Highway (CSAH) 15/Manning Avenue. Our comments are as follows: • The proposed park-and-ride will be a great amenity for Lake Elmo as development continues to grow along CSAH 15 and within the city. The proposed site is an ideal location, as it is on the in-bound side for commuting traffic along I-94. The proposed park-and-ride would serve as a reliever for the Guardian Angels park- and-ride located in Oakdale, which is currently experiencing constrained capacity. • Washington County encourages the City to consider bicycle and pedestrian connectivity within the site. The proposed building and parking lot orientation is not conducive with walkability and livability principles. These considerations align with CG Goal 3, LU Goal 2, PTOS Goal 2, and TRIN Goal 4 as stated in the City of Lake Elmo’s draft 2040 Comprehensive Plan. The aesthetics and desirability of the commercial sites could be much improved with trail connectivity, intentional building orientation and implementation of green space elements. • The Functional Classification of CSAH 15/ Lake Elmo Avenue is an “A” Minor Arterial Roadway, expander category. The Draft Washington County Comprehensive Plan 2040 future right-of-way requirement is 180 feet (90 feet from the center of the roadway). There appears to be adequate right-of-way today; however, if an expanded interchange were to be constructed in the future, more right-of-way may be necessary. • The 2016 Washington County traffic volume count for this section of CSAH15 is 15,700 Annual Average Daily Trips (AADT). The Draft Washington County Comprehensive Plan 2040 has estimated that traffic will increase to 21,000 Vehicles per Day (VPD) by 2040. June 13, 2018 Four Corners Addition Page 2 of 3 • The realigned access location of Hudson Boulevard, which aligns with the access road to the Holiday Gas station in West Lakeland Township at CSAH 15, is acceptable to the County as shown. Turn lanes on CSAH 15, including a southbound right-turn lane and northbound center left-turn lane, will need to be constructed as part of the Hudson Boulevard realignment. A plan section will need to be prepared and approved by the county traffic engineer, and a Washington County Right of Way Permit will be required for any turn lane improvements. • Since no traffic study has been submitted to Washington County as part of the concept plan, it can’t be determined at this time if the new intersection will meet warrants for a traffic signal. If a traffic signal is warranted, the City of Lake Elmo would have a 25% cost share. • A trail is needed on the south side of Hudson Blvd to connect these facilities to CSAH 15 and the trail towards Hudson, Wisconsin. • Lane configuration at the intersection as shown is acceptable to the County. • Left turn lanes are needed into the site accesses to prevent queuing back to CSAH 15. • The developer or the city must submit the drainage report and calculations to our office for review of any downstream impacts to the county drainage system. Along with the drainage calculations, we will request written conclusions that the volume and rate of stormwater run-off into the county right-of way will not increase as part of the project. • Access control should be dedicated to Washington County along the CSAH 15 frontage, except for the opening corresponding to Hudson Boulevard North. • Washington County's policy is to assist local governments in promoting compatibility between land use and highways. Residential uses located adjacent to highways often result in complaints about traffic noise. Traffic noise from this highway could exceed noise standards established by the Minnesota Pollution Control Agency (MPCA), the U.S. Department of Housing and Urban Development, and the U.S. Department of Transportation. Minnesota Rule 7030.0030 states that municipalities are responsible for taking all reasonable measures to prevent land use activities listed in the MPCA's Noise Area Classification (NAC) where the establishment of the land use would result in violations of established noise standards. Minnesota Statute 116.07, Subpart 2a exempts County Roads and County State Aid Highways from noise thresholds. County policy regarding development adjacent to existing highways prohibits the expenditure of highway funds for noise mitigation measures in such areas. The developer should assess the noise situation and take any action outside of County right of way deemed necessary to minimize the impact of any highway noise. June 13, 2018 Four Corners Addition Page 3 of 3 • A Right-of-Way Permit will be required for any work in the CSAH 15 right-of-way as it relates to the development. A plan set is required with the application and must include any grading, installation of culverts, installation of water and sewer services, left and right turn lanes on CSAH 15, parallel trail grading, signage and any landscaping and other improvements within County right-of-way. • All utility connections for the development require Washington County Right-of- Way Permits. Typically, these are the responsibility of the utility companies. Thank you for the opportunity to comment on this preliminary plat. If you have any questions, please contact me at 651-430-4316 or jan.lucke@co.washington.mn.us. For permit applications, please contact Carol Hanson at Carol.hanson@co.washington.mn.us. Regards, Jan Lucke Public Works Planning Director C: Carol Hanson, Office Specialist 1 Resolution 2018-080 CITY OF LAKE ELMO WASHINGTON COUNTY STATE OF MINNESOTA RESOLUTION NO. 2018-080 RESOLUTION APPROVING THE CONCEPT PLANNED UNIT DEVELOPMENT PLAN AS PROPOSED BY TERRY EMERSON FOR A PORTION OF 11530 HUDSON BOULEVARD N WHEREAS, the City of Lake Elmo is a municipal corporation organized and existing under the laws of the State of Minnesota; and WHEREAS, Terry Emerson, 2204 Legion Lane Circle N, Lake Elmo, MN 55042 (the “Applicant”) has submitted an application to the City of Lake Elmo (City) for a Concept PUD Plan for a mixed use commercial development including commercial uses and a park and ride on a 15.77 acre portion of 11530 Hudson Boulevard N, a copy of which is on file in the City of Lake Elmo Planning and Zoning Department; and WHEREAS, notice has been published, mailed and posted pursuant to the Lake Elmo Zoning Ordinance, Section 154.102; and WHEREAS, the Lake Elmo Planning Commission held a public hearing on June 18, 2018 to consider the Concept PUD approval request; and WHEREAS, the Lake Elmo Planning Commission adopted a motion recommending approval of the Concept PUD Plan; and WHEREAS, the Lake Elmo Planning Commission has submitted its report and recommendation concerning the Concept PUD as part of a memorandum to the City Council from the Planning Director for the July 17, 2018 Council Meeting; and WHEREAS, the City Council reviewed the application at its meeting held on July 17, 2018 and made the following findings: 1. That the Applicant has submitted all application requirements outlined in Section 154.759: Application Requirements for General PUD Concept Plan. 2. That the PUD Concept Plan is consistent with the intent of the Lake Elmo Comprehensive Plan and the Future Land Use Map for this area. 3. That the PUD Concept Plan complies with the general intent of the Commercial zoning districts with PUD modifications. 4. That the PUD Concept Plan generally complies with the City’s Subdivision regulations. 5. That the PUD Concept Plan is generally consistent with the City’s engineering standards with exceptions as noted in the City Engineer’s memorandum dated June 14, 2018. 6. The PUD Concept Plan meets the minimum requirement for a PUD including minimum lot area and street layout. It is not known whether the minimum requirement for open space is met. 2 Resolution 2018-080 7. The PUD Concept Plan meets at least one of the required PUD objectives identified in Section 154.751. NOW, THEREFORE, BE IT RESOLVED THAT the City Council does hereby approve the Concept PUD Plans as proposed by Terry Emerson subject to the following conditions: 1. The future Preliminary Plat and PUD Plans include a portion of PID# 34.029.21.43.0003. 2. The future Preliminary Plat and PUD Plans shall identify proposed land uses, and those land uses shall accompany a detailed site plan to be approved by the City. Any use that is not designated on the Preliminary Plat and PUD Plans and is not designated as a permitted use within the Commercial zoning district shall require a conditional use permit. 3. The future Preliminary Plat and PUD Plans shall provide the required 20% open space within the development or specify what the proposed public or site amenity the development will provide that the City may consider as an alternative to the open space requirement. 4. The future Preliminary Plat and PUD Plans should detail proposed amenities in exchange for flexibility from standards of the Zoning Code. 5. The future Preliminary Plat and PUD Plans shall comply with comments outlined in the City Engineer Review Memo named Four Corners 2nd Addition Concept Plan dated June 14, 2018. 6. The future Preliminary Plat and PUD Plans shall include provisions for City sanitary sewer and municipal water as well as sanitary sewer and water capacity demands. The Applicant shall be responsible to extend City sanitary sewer and municipal water to the site at the applicant’s cost. Sanitary sewer and water main stubs will be required to all adjacent properties. 7. The future Preliminary Plat and PUD Plans shall include right-of-way and easement from the adjacent property to the north to allow for the Hudson Boulevard realignment at Manning Avenue. 8. The future Preliminary Plat and PUD Plans shall include a stormwater management plan including a summary report describing the overall management plan and performance criteria for all required storm events. 9. The Applicant shall obtain all necessary permits including but not limited to all applicable city permits (building, grading, sign, etc.), NPDES/SWPPP permits and Valley Branch Watershed District approval. 10. Stormwater facilities shall be privately owned and maintained. A maintenance agreement in a form acceptable to the City should be executed and recorded. 11. The future Preliminary Plat and PUD Plans shall include tree preservation and landscape plans to be approved by the City’s Landscape Architect. 12. The future Preliminary Plant and PUD Plans shall include architectural renderings. 13. The Applicant shall submit a photometric plan, and all lighting must meet requirements of Sections 150.035-150.038 of the City Code. 14. That fees in lieu of park land dedication be provided as required by 153.15 of the City Code with future final plat. 3 Resolution 2018-080 15. The Applicant shall adhere to all requirements as outlined in the Washington County review memo dated June 13, 2018. Passed and duly adopted this 17th day of July, 2018 by the City Council of the City of Lake Elmo, Minnesota. ___________________________________ Mike Pearson, Mayor ATTEST: ____________________________________ Julie Johnson, City Clerk 1 Resolution 2018-080 529352v2 SJS LA515-1 CITY OF LAKE ELMO WASHINGTON COUNTY STATE OF MINNESOTA RESOLUTION NO. 2018-080 RESOLUTION DENYING THE CONCEPT PLANNED UNIT DEVELOPMENT PLAN AS PROPOSED BY TERRY EMERSON FOR A PORTION OF 11530 HUDSON BOULEVARD N WHEREAS, the City of Lake Elmo is a municipal corporation organized and existing under the laws of the State of Minnesota; and WHEREAS, Terry Emerson, 2204 Legion Lane Circle N, Lake Elmo, MN 55042 (the “Applicant”) has submitted an application to the City of Lake Elmo (City) for a Concept PUD Plan for a mixed use development including commercial uses and a park and ride on a 15.77 acre portion on the southeast portion of 11530 Hudson Boulevard N, a copy of which is on file in the City of Lake Elmo Planning and Zoning Department (the “Concept PUD Plan”); and WHEREAS, notice has been published, mailed and posted pursuant to the Lake Elmo Zoning Ordinance, Section 154.102; and WHEREAS, the Lake Elmo Planning Commission held a public hearing on June 18, 2018 to consider the Concept PUD Plan application; and WHEREAS, the Lake Elmo Planning Commission has submitted its report and recommendation concerning the Concept PUD Plan as part of a memorandum to the City Council from the Planning Director for the July 17, 2018 Council Meeting; and WHEREAS, the City Council reviewed the application at its meeting held on July 17, 2018 and made the following findings: 1. That the City’s Planned Unit Development (PUD) ordinance states that uses within a PUD may include only those uses generally considered associated with the general land use category shown for the area on the City’s official Comprehensive Land Use Plan. The area in which the Concept PUD Plan is located is guided by the Comprehensive Land Use Plan as Commercial. A park and ride facility is not considered a commercial use because it would be owned by a public entity and therefore would not generate property taxes like a commercial use. 2. That the Comprehensive Land Use Plan does not specifically designate park-and-ride facilities or any other similar type facilities as an allowed, conditional, or interim use for the Commercial Zoning District. 3. That while park and ride facilities are considered an allowed use within the City’s Convenience Commercial Zoning District, the City does not believe that the Convenience Commercial zoning district is appropriate for the area in which the Concept PUD Plan is being proposed as there is not a need for a park and ride facility in the City. There currently are six park and ride facilities in adjacent cities that may be used by Lake Elmo 2 Resolution 2018-080 529352v2 SJS LA515-1 commuters. Additionally, there is a new park and ride facility being planned for less than one mile from the southwestern Lake Elmo border to provide access to the Metro Gold Line Bus Rapid Transit. 4. The Applicant has also requested that other uses that are either not currently permitted or are conditional uses be designated as permitted uses within the PUD. The Applicant has not submitted any plans to accompany the uses that he is requesting be changed to permitted uses and therefore, due to the lack of information, this is an unreasonable request. 5. The City’s PUD regulations require that applicants offer the City amenities in exchange for any requests for flexibility from the City standards. The Applicant is requesting flexibility from the City standards, including, but not limited to, exceeding the City’s impervious surface requirements, but yet he has not offered the City any amenities in exchange for the flexibility being requested. NOW, THEREFORE, BE IT RESOLVED THAT the City Council does hereby deny the Concept PUD Plan as proposed by Terry Emerson. Passed and duly adopted this 17th day of July, 2018 by the City Council of the City of Lake Elmo, Minnesota. ___________________________________ Mike Pearson, Mayor ATTEST: ____________________________________ Julie Johnson, City Clerk STAFF REPORT DATE: July 17, 2018 REGULAR ITEM #: 19 AGENDA ITEM: Manning Avenue North (CSAH 15) and Stillwater Boulevard (CSAH 14) Realignment – Project Update on Additional Work to Realign City Watermain SUBMITTED BY: Jack Griffin, City Engineer REVIEWED BY: Kristina Handt, City Administrator Rob Weldon, Public Works Director Chad Isakson, Assistant City Engineer ISSUE BEFORE COUNCIL: Should the City Council receive a project update and provide feedback/direction to staff in regards to the need to realign the city owned watermain in Washington County right-of-way in conflict with county facilities being constructed as a part of the Manning Avenue North (CSAH 15) and Stillwater Boulevard (CSAH 14) Realignment project? BACKGROUND, PROPOSAL DETAILS/ANALYSIS: The City of Lake Elmo owns a 12-inch watermain which runs along the north side of CSAH 14 between 39th Street and Little Blue Stem Trail North within Washington County right-of-way. Field review of the existing watermain route and proposed infrastructure being built as a part of the project shows the watermain is in conflict with future drainage basin facilities and requires approximately 1,000 feet of watermain to be relocated. Staff is working with the county and their design engineers to complete a detailed design of the relocation and soliciting pricing from the contractor to complete the work. This agenda report is intended to inform the Council of the issue. Additionally, as a part of the watermain relocation, the City will be providing water service stubs to the 4 residential properties and 1 commercial property shown on the attached exhibit. Under current City policy, these properties are not required to connect to City water but will have the option to connect as they deem appropriate. The watermain was installed in 2002 as part of the Fields in St. Croix development using directional drilling and passes beneath two Northern Natural Gas mains. The pipe was therefore installed using HDPE pipe at depths up to 15-feet and using no ductile iron pipe fittings. The watermain is therefore very difficult to locate and the record drawings are not reflective of the project as constructed. FISCAL IMPACT: Costs are unknown at this time. Staff will provide an estimate once the relocation design is complete and the contractor has provided pricing for the work. Washington County has stated that they believe the relocation construction costs should be the City’s responsibility, similar to the City requiring Xcel Energy to relocate utilities found in City right-of-way. RECOMMENDATION: Staff is recommending that the City Council receive a staff update and provide any feedback/direction as deemed appropriate in regards to the work to realign the City owned watermain in Washington County right-of-way as a part of the Manning Avenue North (CSAH 15) and Stillwater Boulevard (CSAH 14) Realignment project. ATTACHMENTS: 1. Exhibit A. CSAH 15-CSAH 14 Roadway Realignment showing storm water basin locations. 2. Exhibit B. Proposed Watermain Realignment Exhibit. DI E EE T T T T TTT T 605 60 0 110 115 120 1 2 6 4 5 4 0 600 120 scale in feet