Loading...
HomeMy WebLinkAbout#17 Salt Shed STAFF REPORT DATE: 8/21/2018 REGULAR ITEM #: 17 MOTION TO: City Council FROM: Rob Weldon, Public Works Director AGENDA ITEM: Construction of new Salt Storage Shed REVIEWED BY: Kristina Handt, City Administrator Sue Iverson, Finance Director BACKGROUND: Included in the 2018 Capital Improvement Plan is the construction of a new Salt Storage Shed at the Public Works Facility. The existing salt storage shed was constructed in 2006 as part of the new Public Works Facility construction project. The current salt storage structure has a capacity to store approximately 400 tons of salt. With the growth of the city and additional lane miles of streets added since 2006 public works is finding it increasingly difficult to keep a sufficient supply of road salt on hand in the winter months. After 4-5 snow fall events salt needs to be ordered to keep a minimal supply on hand. Delivery of a salt order can take up to a week depending on supply and demand of the product and the availability of trucking companies for delivery. In this weeklong time the remaining salt supply can and has dwindled down to the point where salt is borrowed from other communities during snow events and applied to streets in Lake Elmo. ISSUE BEFORE COUNCIL: Does the City Council support construction of a new Salt Storage Shed at the Public Works Facility? PROPOSAL DETAILS/ANALYSIS: With the construction of a new Salt Storage Shed, Public Works will have the capacity to store approximately 1,000 tons of salt on site during the winter months. This will allow ample time for orders to be placed and delivered to public works and decrease the likelihood of running out of salt as we currently face with the existing storage building. In addition, the existing salt storage building can be repurposed into cold storage or other commodity storage. The proposed new building will be 60’ long x 40’ wide and constructed as a engineered arched truss building with fabric roofing and interior concrete walls. It will be situate to the east of the existing building. FISCAL IMPACT: Cost of the building and concrete walls is expected to be approximately $90,000. Other cost associated with the project will be electrical/lighting cost and site paving. The total project cost will not exceed $150,000 and will be funded through the City Facilities Fund. OPTIONS: • Approve construction of a new Salt Storage Shed • Deny construction of a new Salt Storage Shed • Table for further discussion Page 2 RECOMMENDATION: “Motion to approve and award construction of a new Salt Storage Shed to Graystone Construction for a total project cost not to exceed $150,000” ATTACHMENTS: • Graystone Construction - Quote • ClearSpan Fabric Structures – Quote • Paving Quote 500 S. Marschall Road, Suite 300, Shakopee, MN 55379 | Phone: (952) 496-2227 | Toll Free: (888)742-6837 | Fax: (952) 445-4191 www.greystoneconstruction.com | Equal Opportunity Employer/Contractor July 19, 2018 City of Lake Elmo Public Works Rob Weldon 3445 Ideal Ave N Lake Elmo, MN 55042 Re: Lake Elmo Public Works Salt Storage Project Mr. Weldon, Thank you for the opportunity to provide you with this proposal for an engineered fabric structure for salt storage. We have prepared the following proposal for your review: Fabric Building Option #1 - Furnish and Install: - 42’ x 60’ Fabric Building, engineered to withstand 50psf snow loads, and 3 second 105 mph wind gusts (IBC2015) - 12’ on center bay spacing - Clear span (no interior columns) - 12.5oz, 23 mil NON-fire retardant polyethylene fabric - Building to set on 2’ above grade, engineered concrete pier foundation - (1) Fabric end wall with steel framing - (2) 4’ x 4’ mesh vent in end wall - Fabric to terminate 1’+/- above base plates - 10’ high pre-cast bunker panels – 3 sides Furnish and Install Price: $86,315.00 Add for Payment/Performance Bonds: $1,075.00 *Proposal valid for 30 days* Price Includes: - All materials, equipment, and labor to install the items listed above - Engineer stamped drawings for foundations and building - Anchor bolts - Shipping - Sales Tax 500 S. Marschall Road, Suite 300, Shakopee, MN 55379 | Phone: (952) 496-2227 | Toll Free: (888)742-6837 | Fax: (952) 445-4191 www.greystoneconstruction.com | Equal Opportunity Employer/Contractor Notes: - Owner to provide a flat, pad ready site - Owner responsible for all permits, governmental fees, licenses, concrete and soil testing, and special inspections - Base for asphalt and bunker panels by City – fine grade for bunker panels included in Greystone scope - Spoils to be left on site Exclusions: - Dewatering - Winter Conditions - Paving - Import or export of soils We thank you again for your interest in Greystone Construction. We look forward to working with you on this project. Please review the proposal and contact me with any questions at 952-496-2227. Sincerely, Greystone Construction Matt Lawrence Estimator/Project Coordinator Quote To: ROB WELDON CITY OF LAKE ELMO 3445 IDEAL AVE N LAKE ELMO MN 55042 Phone: 6517473941 Fax: Date:5/7/2018 Expires:6/6/2018 Truss Specialist:BRAD WILLIAMS BWILLIAMS@CLEARSPAN.COM Fax:860-760-0210 Quote Total : $64,147.00 Line Part Description Qty Price Total Price 1 100106 42W RD BY 60L TRUSS BLDG 8'6"OC 50/90 CAT 1 1.00 $16,220.00 $16,220.00 Line Part Description Qty Price Total Price 2 100106 42W END WALL PACKAGE 1.00 $2,876.00 $2,876.00 Line Part Description Qty Price Total Price 3 110452 36"WX36H" WALL LOUVER 2.00 $174.00 $348.00 Line Part Description Qty Price Total Price 4 700001 STAMPED ENGINEERED DRAWING BUILDING 1.00 $2,000.00 $2,000.00 Line Part Description Qty Price Total Price 5 100007 SALE OF FREIGHT 1.00 $938.00 $938.00 Line Part Description Qty Price Total Price 6 700007 PREVAILING WAGE RATE INSTALLATION 1.00 $41,765.00 $41,765.00 QuotForm:001:00 Quote Number: 853675 QUOTE Page: 8724441 1 of 1 Cust ID: DATE: 8 /1 4 /2018 PROPOSAL PLAN City of Lake Elmo Attention: Rob (651)747-3941 Blacktop Pros, LLC 2466 Galtier Circle, Roseville, MN 55113 Office: (651) 260-7345 Cell: (651) 983-2712 Email: Blacktopprosmn@yahoo.com A) Existing area for new parking pad approximately 108 by 75. City to have area ready to receive asphalt. Install 3 to 4” asphalt mat. Price: $16,900.00 B) Existing area in front of east entrance garage door approximately 100 by 60. City to have area ready to receive asphalt. Install 3 to 4” asphalt mat. Price: $12,600.00 We propose hereby to furnish material and labor- Complete in accordance with above specifications, for the sum of: $ 50% due before or on start date of job and payment due upon completion of job. A charge of 1 ½% per month will be made on all past due balances. “(A) Any person or company supplying labor or material for this improvement to your property may file a lien against your property if that person or company is not paid for the contributions. “(B) Under Minnesota law, you have the right to pay persons who supplied labor or materials for this improvement directly and deduct this amount from our contract price or withhold the amounts due them from us until 120 days after completion of the improvement unless we give you a lien waiver signed by persons who supplied any labor or materials for the improvement and who gave you timely notice.” You are authorized to do the work as specified. Payments will be made as outlined above: X Acceptance of Proposal