Loading...
HomeMy WebLinkAbout#09 - Library Site Improvements STAFF REPORT DATE: September 18, 2018 CONSENT ITEM # 9 AGENDA ITEM: Public Library Site Improvements – Accept Improvements and Approve Pay Request No. 2 (Final) SUBMITTED BY: Chad Isakson, Project Engineer REVIEWED BY: Kristina Handt, City Administrator Jack Griffin, City Engineer Rob Weldon, Public Works Director ISSUE BEFORE COUNCIL: Should the City Council accept the Public Library Site Improvements and approve Pay Request No. 2 (Final) to Miller Excavating, Inc.? BACKGROUND: Miller Excavating, Inc. was awarded a construction contract to complete the Public Library Site Improvements in accordance with a Construction Contract dated December 7, 2017. The Project Engineer has prepared a Certificate of Completion indicating that all work is completed including all punch list items and is recommending acceptance of the improvements and release of final retainage. Project acceptance will initiate the one-year warranty period for the improvements. The one-year warranty will begin on September 18, 2018 and will extend through September 18, 2019. PROPOSAL DETAILS/ANALYSIS: Miller Excavating, Inc. has submitted Partial Pay Request No. 2 (Final) in the amount of $7,477.09. The work has been reviewed by the Engineer and is fully completed in accordance with the Contract and Specifications. The City Council is respectfully requested to consider accepting the improvements and approving Pay Request No. 2 (Final) for the Public Library Site Improvements. FISCAL IMPACT: The final total construction cost for the project is $59,402.05, which is 18.2% below the original contract award amount of $71,401.80. The total amount of engineering expended on design, construction observation, construction administration for the improvements was $10,000. The total project cost was $69,402.05 compare to the total authorized budget of $76,000. RECOMMENDATION: Staff is recommending that the City Council consider, as part of the Consent Agenda, accepting the Public Library Site Improvements and approving Pay Request No. 2 (Final) in the amount of $7,477.09. If removed from the consent agenda, the recommended motion for the action is as follows: “Move to accept the improvements and approve Pay Request No. 2 (Final) to Miller Excavating, Inc. in the amount of $7,477.09 for the Public Library Site Improvements project”. ATTACHMENTS: 1. Partial Pay Estimate No. 2 (Final). 2. Certificate of Completion. PARTIAL PAY ESTIMATE NO. 2 (Final) PUBLIC LIBRARY PARKING LOT IMPROVEMENTS CITY OF LAKE ELMO, MINNESOTA PROJECT NO. 2016.132 QUANTITY UNIT PRICE AMOUNT QUANTITY AMOUNT QUANTITY AMOUNT 1 LS 1 $3,400.00 $3,400.00 0.00 $0.00 1.00 $3,400.00 2 CY 792 $11.00 $8,712.00 0.00 $0.00 792.00 $8,712.00 3 CY 325 $12.50 $4,062.50 0.00 $0.00 325 $4,062.50 4 CY 165 $20.50 $3,382.50 0.00 $0.00 165 $3,382.50 5 TN 150 $115.00 $17,250.00 0.00 $0.00 147.69 $16,984.35 6 LF 60 $48.00 $2,880.00 0.00 $0.00 0 $0.00 7 EA 1 $3,260.00 $3,260.00 0.00 $0.00 1 $3,260.00 8 EA 1 $2,266.00 $2,266.00 0.00 $0.00 0 $0.00 9 SF 221 $7.40 $1,635.40 0.00 $0.00 93 $688.20 10 LF 330 $22.65 $7,474.50 0.00 $0.00 362 $8,199.30 11 LF 10 $40.00 $400.00 0.00 $0.00 0 $0.00 12 EA 2 $550.00 $1,100.00 0.00 $0.00 2 $1,100.00 13 SF 24 $75.00 $1,800.00 0.00 $0.00 24 $1,800.00 14 SF 6 $45.00 $270.00 3.50 $157.50 4 $157.50 15 LF 230 $5.00 $1,150.00 0.00 $0.00 0 $0.00 16 EA 2 $100.00 $200.00 0.00 $0.00 0 $0.00 17 SY 459 $7.00 $3,213.00 272.00 $1,904.00 272 $1,904.00 18 CY 92 $40.00 $3,680.00 0.00 $0.00 32 $1,280.00 19 EA 2 $500.00 $1,000.00 2.00 $1,000.00 2 $1,000.00 20 LF 642 $3.95 $2,535.90 426.00 $1,682.70 426 $1,682.70 21 LF 100 $14.00 $1,400.00 0.00 $0.00 116 $1,624.00 22 EA 2 $165.00 $330.00 0.00 $0.00 1 $165.00 $71,401.80 $4,744.20 $59,402.05 TOTALS $71,401.80 $4,744.20 $59,402.05 4” SOLID LINE WHITE – EPOXY 4” PVC SCH 40 DRAINTILE WITH COARSE FILTER AGGREGATE (MNDOT SPEC DRAINTILE CLEANOUT AGG. BASE, CL. 6 (CV) (PV) (6‐INCH DEPTH) TYPE SP 9.5 WEARING COURSE MIXTURE (3,B) (3‐INCH DEPTH) CONST DRAINAGE STRUCTURE TYPE 406 (W/ CASTING) (INCLUDES DIAMET 15” RC PIPE SEWER, DES 3006 PAVT MESSAGE (HANDICAP SYMBOL) – EPOXY ITEM DESCRIPTION OF PAY ITEM UNIT CONTRACT THIS PERIOD TOTAL TO DATE DIVISION 1 MOBILIZATION COMMON EXCAVATION (P) SELECT GRANULAR – MOD. 5% (CV) (P) (12‐INCH DEPTH) IMPORT TOPSOIL (CV) (6‐INCH DEPTH) PEDESTRIAN CURB RAMP SIGN TYPE C SILT FENCE, TYPE MS SODDING TYPE LAWN TRUNCATED DOMES CONST DRAINAGE STRUCTURE TYPE 404‐2’x3’ (W/ CASTING) 5‐INCH CONCRETE WALK CONCRETE CURB & GUTTER DESIGN B618 5‐INCH CONCRETE FLUME STORM DRAIN INLET PROTECTION SUBTOTAL ‐ DIVISION 1