HomeMy WebLinkAbout#05 - Old Village Phase 3 Change Order 5 STAFF REPORT DATE: September 4, 2018 CONSENT #5 AGENDA ITEM: Old Village Phase 3 Street, Drainage, and Utility Improvements - Change Order No. 5 SUBMITTED BY: Jack Griffin, City Engineer REVIEWED BY: Kristina Handt, City Administrator Rob Weldon, Public Works Director Chad Isakson, Project Engineer ISSUE BEFORE COUNCIL: Should the City Council approve Change Order No. 5 for the Old Village Phase 3 Street, Drainage, and Utility Improvements? BACKGROUND: Douglas-Kerr Underground, LLC was awarded a construction contract to complete the Old Village Phase 3 Street, Drainage, and Utility Improvements on May 16, 2017. PROPOSAL DETAILS/ANALYSIS: Douglas-Kerr Underground, LLC has submitted a change order to address additional work completed to replace the crosswalk at Lake Elmo Avenue and 31st Street. The existing crosswalk had to be removed for construction purposes but was not included in the construction documents. FISCAL IMPACT: This change order will increase the contract in the amount of $2,970.00 bringing the revised construction contract to $1,586,910.42. With this change order the project remains within the authorized project budget and contingencies. RECOMMENDATION: Staff is recommending that the City Council approve, as part of the Consent Agenda, Change Order No. 5 for the Old Village Phase 3 Street, Drainage, and Utility Improvements. If removed from the consent agenda, the recommended motion for the action is as follows: “Move to approve Change Order No. 5 for the Old Village Phase 3 Street, Drainage, and Utility Improvements, thereby increasing the contract amount by $2,970.00”. ATTACHMENTS: 1. Change Order No. 5. CONTRACT CHANGE ORDER FORM CHANGE ORDER NO. DATE: TO: UNIT SF Amount of Original Contract $ Sum of Additions/Deductions approved to date (CO Nos. 1,2,3,4) $ Contract Amount to date $ Amount of this Change Order   (ADD)   (DEDUCT)   (NO CHANGE)$ Revised Contract Amount $ The Contract Period for Completion will be   (UNCHANGED)  (INCREASED)  (DECREASED)days APPROVED BY ENGINEER:  FOCUS ENGINEERING APPROVED BY CONTRACTOR DATE DATE APPROVED BY OWNER:  CITY OF LAKE ELMO, MINNESOTA DATE DATE $2,970.00 CITY OF LAKE ELMO, MINNESOTA BYBY CHANGE ORDER DESCRIPTION / JUSTIFICATION: This change order is being processed to address additional work completed by the contractor to replace the crosswalk at Lake  Elmo Avenue and 31st Street. The existing crosswalk had to be removed for construction purposes but was not included in the  construction documents. Attachments  (list documents supporting change):N/A DESCRIPTION OF PAY ITEM QTY UNITE PRICE CO 5‐1 REMOVE AND REPLACE CROSSWALK NET CONTRACT CHANGE ITEM $2,970.0090$33.00 Douglas‐Kerr Underground, LLC, 2142 330th Ave, Mora, MN 55051 OLD VILLAGE PHASE 3 IMPROVEMENTS PROJECT NO. 2016.133 5 August 27, 2018 0 This Document will become a supplement to the Contract and all provisions will apply hereto. The Contract Documents are  modified as follows upon execution of this Change Order.  BYENGINEER 1,576,039.15 7,901.27 1,583,940.42 2,970.00 1,586,910.42 INCREASE/(DECREASE) 8/27/2018 FOCUS Engineering, inc.CHANGE ORDER FORM