HomeMy WebLinkAbout#08 - Old Village Phase 3 Assessment Hearing STAFF REPORT
DATE: September 4, 2018
CONSENT
ITEM #: 8
AGENDA ITEM: Old Village Phase 3 Street and Utility Improvements – Resolution Declaring Costs
to be Assessed, Ordering Preparation of Proposed Assessments, and Calling for
Hearing on Proposed Assessment
SUBMITTED BY: Jack Griffin, City Engineer
REVIEWED BY: Kristina Handt, City Administrator
Sue Iverson, Finance Director
Sarah Sonsalla, City Attorney Chad Isakson, Project Engineer
ISSUE BEFORE COUNCIL: Should the City Council call a final assessment hearing for the Old Village
Phase 3 Street and Utility Improvements project to be held on October 2, 2018?
BACKGROUND: The City of Lake Elmo is extending sanitary sewer to serve the existing properties in
the Old Village area to replace the use of private on-site sewage treatment systems. The projects also include
regional drainage improvements to address historic flooding issues in the Downtown area, the replacement
of aged watermain pipes and reconstructing the public streets that are disturbed during the work. The
Improvements are being constructed in phases and through separate projects. Phase 1 was constructed in
2015, Phase 2 was constructed in 2016. The Old Village Phase 3 Street and Utility Improvements project
was constructed in 2017 and 2018 and the work is now complete.
PROPOSAL DETAILS/ANALYSIS: Pursuant to Minnesota Statutes, Section 429 the Council must
declare the amount to be assessed against the benefitting properties and Call the Hearing on the Proposed
Assessment for these improvements. The Assessment Hearing is proposed for October 2, 2018. The Final
Assessment Roll must be certified to the County Auditor by November 30, 2018.
The total project cost, at completion, is $2,052,500; down from the feasibility report cost of $2,498,100.
The tables below summarize the preliminary unit assessments from the feasibility report and the proposed
final unit assessments based on final project costs and the Adopted Feasibility Report recommendations.
The attached final assessment roll details the proposed assessment for each parcel.
For the Laverne Avenue commercial area, the final street and drainage unit assessment has been calculated
using 100% of the total Street and Drainage Improvement project costs, assessed per lineal front foot.
However, this portion of the project cost exceeded the feasibility report estimate and the unit assessment is
not allowed to be increased. Therefore, the feasibility report unit assessment for the commercial properties
was held at the preliminary assessment amount of $205 / linear foot or 93% of the total project costs.
Laverne Avenue Area, North of
CSAH14
Feasibility Report
Assessment Rate
Final Assessment
Rate Difference
Street and Storm Sewer
Improvements
$205 / Linear Foot $205 / Linear Foot $0
Sanitary Sewer Improvements $11,300 / SAC $11,300 / SAC $0
Watermain Assessment Rate $0 $34,837* $34,837
*The owner of 3825 Lake Elmo Avenue North requested water service be extended to their property and signed a
waiver of assessment to complete the work.
For the 31st Street neighborhood, the street and drainage improvements were assessed at 30% of the total
project costs, assessed per unit (or residential household). In accordance with the City assessment policy,
one property is being assessed 50% of the unit assessment because they have a driveway access to two
different streets and will be assessed for improvements to each street project.
31st Street Neighborhood Feasibility Report
Assessment Rate
Final Assessment
Rate Difference
Street and Storm Sewer
Improvements
$8,700 $6,900 ($1,800)
Sanitary Sewer Improvements $11,300 / SAC $11,300 / SAC $0
FISCAL IMPACT: The total project cost is $2,052,500 with the City cost share at $890,838, including
$447,075 for the street and drainage improvements and $418,063 for watermain improvements. The
remaining costs are proposed to be assessed against the benefitting properties consistent with the City’s
Special Assessment Policy including proposed assessments in the amount of $567,225 for the street and
drainage improvements, $983,100 for the sanitary sewer improvements, and $34,837 for watermain
improvements. The remainder of watermain improvements will be funded through the water enterprise fund
and the trail improvements will be funded through the park funds.
RECOMMENDATION: Staff is recommending that the City Council approve, as part of the Consent
Agenda, a Resolution declaring the costs to be assessed; ordering the preparation of the proposed
assessments and Calling for the Hearing on the proposed Assessments for October 2, 2018 at or around
7:00 pm. If removed from the consent agenda, the recommended motion for the action is as follows:
“Move to approve Resolution No. 2018-103; A Resolution Declaring Costs to be Assessed, Ordering
Preparation of Proposed Assessment, and Calling for the Hearing on the Proposed Assessment for the
Old Village Phase 3 Street and Utility Improvements.”
ATTACHMENTS:
1. Resolution Declaring Cost to be Assessed, Ordering Preparation of Proposed Assessment, and
Calling for Hearing on Proposed Assessment.
2. Notice of Hearing on Proposed Assessment.
3. Final Assessment Roll.
CITY OF LAKE ELMO
WASHINGTON COUNTY
STATE OF MINNESOTA
RESOLUTION NO. 2018-103
A RESOLUTION DECLARING COST TO BE ASSESSED AND CALLING
HEARING ON PROPOSED ASSESSMENT FOR OLD VILLAGE PHASE 3
STREET AND UTILITY IMPROVEMENTS
WHEREAS, estimated project costs have been calculated for the Old Village Phase 3
Street and Utility Improvements; and
WHEREAS, the estimated total cost of the improvements is $2,052,500.
WHEREAS, the City Clerk and City Engineer have prepared the proposed assessment roll
and will maintain said assessment roll on file in the City offices for public inspection.
NOW, THEREFORE, BE IT RESOLVED,
1. The portion of the cost of such street, drainage, and sidewalk improvements to be paid by
the City is hereby declared to be $447,075, and the portion of the cost to be assessed against
benefited property owners is declared to be $567,225.
2. The portion of the cost of such sanitary sewer improvements to be paid by the City is hereby
declared to be $0, and the portion of the cost to be assessed against benefited property
owners is declared to be $983,100.
3. The portion of the cost of such watermain improvements to be paid by the City is hereby
declared to be $418,063, and the portion of the cost to be assessed against benefited
property owners is declared to be $34,837.
4. The City Clerk, with the assistance of the City Engineer, has calculated the proper amount
to be specially assessed for such improvements against every assessable lot, piece or parcel
of land to be benefited by the improvements, and the Clerk has filed a copy of such
proposed assessment in the City offices for public inspection.
5. Assessments shall be payable in equal annual installments extending over 15 years for
street and drainage improvements, and 20 years for sanitary sewer improvements, the first
of the installments to be payable on or before the first Monday in January, 2019 and shall
bear interest at the rate of 3.26 percent per annum from the date of the adoption of the
assessment resolution.
6. A public hearing shall be held on the 2nd day of October, 2018, in the Council Chambers
of the City Hall at or approximately after 7:00 P.M. to pass upon such proposed assessment.
All persons owning property affected by such improvement will be given an opportunity
to be heard with reference to such assessment.
7. The City Clerk is hereby directed to cause a notice of the hearing on the proposed
assessment to be published once in the official newspaper at least two weeks prior to the
hearing, and she shall state in the notice the total cost of the improvement. She shall also
cause mailed notice to be given to the owner of each parcel described in the assessment
roll not less than two weeks prior to the hearings.
8. The owner of any property so assessed may, at any time prior to certification of the
assessment to the county auditor, pay the entire assessment on such property, with interest
accrued to the date of payment, to the City Clerk. No interest shall be charged if the entire
assessment is paid to the City Clerk within 30 days from the adoption of this assessment.
A property owner may at any time thereafter, pay to the City Clerk the entire amount of
the assessment remaining unpaid, with interest accrued to December 31 of the year in
which such payment is made. Such payment must be made before October 31 or interest
will be charged through December 31 of the succeeding year.
ADOPTED BY THE LAKE ELMO CITY COUNCIL ON THE FOURTH DAY OF SEPTEMBER,
2018.
CITY OF LAKE ELMO
By: __________________________
Mike Pearson
(Seal) Mayor
ATTEST:
________________________________
Julie Johnson
City Clerk
CITY OF LAKE ELMO
NOTICE OF HEARING ON PROPOSED ASSESSMENT
OLD VILLAGE PHASE 3 STREET AND UTILITY IMPROVEMENTS
Notice is hereby given that the City Council of Lake Elmo will meet in the Council
Chambers of the City Hall at or approximately after 7:00 P.M. on Tuesday, October 2,
2018, to consider, and possibly adopt, the proposed assessment against abutting property
for the Old Village Phase 3 Street and Utility Improvements. Adoption by the Council of
the proposed assessment may occur at the hearing. The following describes the area
proposed to be assessed:
• Street, drainage, and sidewalk improvements along Laverne Avenue, from 39th
Street North to CSAH 14.
• Street and drainage improvements along 31st Street North, from CSAH 17 to the
east end; Laverne Court North, from 31st Street North to south cul-de-sac; and
Layton Court North, from 31st Street North to south cul-de-sac.
• Sanitary sewer improvements to the Lake Elmo Elementary School, City Hall and
the Westbrook Building (3825 Lake Elmo Avenue) as well as extending sanitary
sewer along Laverne Avenue, from 39th Street North to CSAH 14; 31st Street
North, from CSAH 17 to the east end; Laverne Court North, from 31st Street
North to south cul-de-sac; and Layton Court North, from 31st Street North to south
cul-de-sac.
• Watermain improvements to the Westbrook Building (3825 Lake Elmo Avenue).
You may at any time prior to certification of the assessment to the county auditor on
November 15, 2018, pay the entire assessment on such property to the City Clerk with
interest accrued to the date of payment. No interest shall be charged if the entire
assessment is paid to the City Clerk within 30 days from the adoption of this assessment.
You may at any time thereafter, pay to the City Clerk the entire amount of the assessment
remaining unpaid, with interest accrued to December 31 of the year in which such
payment is made. Such payment must be made before October 31 (date assessment
certified to County Auditor) or interest will be charged through December 31 of the
succeeding year. If you decide not to prepay the assessment before the date given above
the rate of interest that will apply is 3.26 percent per year.
Once assessments are certified to the County, the assessments are payable in equal annual
installments extending over a period of 15 years for street and drainage improvements
and 20 years for sanitary sewer improvements, the first of the installments to be payable
on or before the first Monday in January 2019 and will bear interest at the rate of 3.26
percent per annum from the date of adoption of the assessment resolution. To the first
installment shall be added interest on the entire assessment from the date of the
assessment resolution until December 31, 2018. To each subsequent installment when
due shall be added interest for one year on all unpaid installments.
The proposed assessment roll is on file for public inspection at the City Clerk’s office.
The total amount of the proposed street improvement assessment is $567,225. The total
amount of the proposed sanitary sewer improvement assessment is $983,100. The total
amount of the proposed watermain improvement assessment is $34,837. The City
contribution for the overall improvement project is $890,838. Written or oral objections
will be considered at the meeting. No appeal may be taken as to the amount of an
assessment unless a written objection signed by the affected property owner is filed with
the municipal clerk prior to the assessment hearing or presented to the presiding officer at
the hearing. The Council may upon such notice consider any objection to the amount of a
proposed individual assessment at an adjourned meeting upon such further notice to the
affected property owners as it deems advisable.
An owner may appeal an assessment to district court pursuant to Minnesota Statutes,
Section 429.081 by serving notice of the appeal upon the Mayor or Clerk within 30 days
after the adoption of the assessment and filing such notice with the district court within
ten days after service upon the Mayor or Clerk.
The City Council is authorized in its discretion to defer the payment of an assessment for
any homestead property owned by a person for whom it would be a hardship to make
payment if the owner is 65 years of age or older and/or the owner is a person retired by
virtue of a permanent and total disability or by a person who is a member of the
Minnesota National Guard or other military reserves who is ordered into active military
service, as defined in section 190.05 subdivision 5b or 5c, as stated in the person’s
military orders, for whom it would be a hardship to make the payments. The owner must
request a deferment of the assessment at or before the public hearing at which the
assessment is adopted and make application on forms prescribed by the City Clerk within
30 days after the adoption.
Notwithstanding the standards and guidelines established by the City for determining a
hardship, a deferment of an assessment may be obtained pursuant to Minnesota Statutes
Section 435.193.
DATED: September 4, 2018
BY ORDER OF THE LAKE ELMO CITY COUNCIL
Mike Pearson, Mayor
(Published in the Oakdale-Lake Elmo Review on September 12, 2018)
CITY OF LAKE ELMO, MN.
SEPTEMBER 2018
OLD VILLAGE PHASE 3: STREET AND UTILITY IMPROVEMENTS
31ST STREET NEIGHBORHOOD
FINAL ASSESSMENT ROLL
STREET AND DRAINAGE AND SANITARY SEWER ASSESSMENT ROLL
PAGE 1 of 1
NO. NAME PID
TOTAL
ASSESSMENT
AMOUNT
STREET &
DRAINAGE
ASSESSMENT
AMOUNT
SANITARY
SEWER
ASSESSMENT
AMOUNT SAC
1 KELLY LISA M & JOHN W 11200 31ST ST N 11200 31ST ST N LAKE ELMO MN 55042 1302921330032 18,200.00$ 6,900.00$ 11,300.00$ 1
2 SACHS RICHARD J & DEBORAH J 11212 31ST ST N 11212 31ST ST N LAKE ELMO MN 55042 1302921330033 18,200.00$ 6,900.00$ 11,300.00$ 1
3 TERRELL SARA A 11230 31ST ST N 11230 31ST ST N LAKE ELMO MN 55042 1302921330034 18,200.00$ 6,900.00$ 11,300.00$ 1
4 COSTELLO PAUL T 11252 31ST ST N 11252 31ST ST N LAKE ELMO MN 55042 1302921340011 18,200.00$ 6,900.00$ 11,300.00$ 1
5 CRIEGO GAIL A 11272 31ST ST N 11272 31ST ST N LAKE ELMO MN 55042 1302921340012 18,200.00$ 6,900.00$ 11,300.00$ 1
6 KENT S TARBUTTON TRS 11292 31ST ST N 7656 BIRMINGHAM FOREST DR FRISCO TX 75034 1302921340013 18,200.00$ 6,900.00$ 11,300.00$ 1
7 BURNS AMY P 11306 31ST ST N 11306 31ST ST N LAKE ELMO MN 55042 1302921340014 18,200.00$ 6,900.00$ 11,300.00$ 1
8 WAGONER BRIAN K & ELIZABETH A FLAMO WAGONER 11334 31ST ST N 11334 31ST ST N LAKE ELMO MN 55042 1302921340015 18,200.00$ 6,900.00$ 11,300.00$ 1
9 DUPIUS LUC M & ROCHELLE M MCCUNE 3151 LAKE ELMO AVE N PO BOX 34 LAKE ELMO MN 55042 1302921330009 3,450.00$ 3,450.00$ ‐$ 0
10 BLOOMQUIST ERIN C & LEE C 11225 31ST ST N 11225 31ST ST N LAKE ELMO MN 55042 1302921330035 18,200.00$ 6,900.00$ 11,300.00$ 1
11 PRITCHARD KENNETH L & AUDRA L 11269 31ST ST N 11269 31ST ST N LAKE ELMO MN 55042 1302921340017 18,200.00$ 6,900.00$ 11,300.00$ 1
12 SCORE BLAKE N & BRENDA K 11295 31ST ST N 11295 31ST ST N LAKE ELMO MN 55042 1302921340016 18,200.00$ 6,900.00$ 11,300.00$ 1
13 WILLIAM C HJELMGREN TRS 3153 LAYTON CT N 3153 LAYTON CT N LAKE ELMO MN 55042 1302921340020 18,200.00$ 6,900.00$ 11,300.00$ 1
14 KECK BRIAN W & SCHILTGEN MOLLY 3127 LAYTON CT N 3127 LAYTON CT N LAKE ELMO MN 55042 1302921340021 18,200.00$ 6,900.00$ 11,300.00$ 1
15 MENENDEZ ARMANDO & ELLA S 3105 LAYTON CT N 3105 LAYTON CT N LAKE ELMO MN 55042 1302921340022 18,200.00$ 6,900.00$ 11,300.00$ 1
16 MATTILA JOSHUA & JESSICA 3091 LAYTON CT N 3091 LAYTON CT N LAKE ELMO MN 55042 1302921340025 18,200.00$ 6,900.00$ 11,300.00$ 1
17 IRENE DAU TRS AGR 3081 LAYTON CT N 3081 LAYTON CT N LAKE ELMO MN 55042 1302921340030 18,200.00$ 6,900.00$ 11,300.00$ 1
18 KINDLER BRIAN T 3084 LAYTON CT N 3084 LAYTON CT N LAKE ELMO MN 55042 1302921340029 18,200.00$ 6,900.00$ 11,300.00$ 1
19 KOFOED DONALD E & CAROL A 3094 LAYTON CT N 3094 LAYTON CT N LAKE ELMO MN 55042 1302921340026 18,200.00$ 6,900.00$ 11,300.00$ 1
20 GLANZER RICHARD D & EILEEN S 3112 LAYTON CT N 3112 LAYTON CT N LAKE ELMO MN 55042 1302921340019 18,200.00$ 6,900.00$ 11,300.00$ 1
21 AUDREY L OLSEN TRS 3124 LAYTON CT N 3124 LAYTON CT N LAKE ELMO MN 55042 1302921340018 18,200.00$ 6,900.00$ 11,300.00$ 1
22 KNOLL CRAIG M & DIANE C 3127 LAVERNE CT N 3127 LAVERNE CT N LAKE ELMO MN 55042 1302921340023 18,200.00$ 6,900.00$ 11,300.00$ 1
23 MAGISTAD JOHN M & AMY T 3115 LAVERNE CT N 3115 LAVERNE CT N LAKE ELMO MN 55042 1302921340024 18,200.00$ 6,900.00$ 11,300.00$ 1
24 MADSEN STEPHEN & ANNE M SCHLOEGEL 3099 LAVERNE CT N 3099 LAVERNE CT N LAKE ELMO MN 55042 1302921340027 18,200.00$ 6,900.00$ 11,300.00$ 1
25 LUCILLE C ZIGNEGO TRS 3081 LAVERNE CT N 3081 LAVERNE CT N LAKE ELMO MN 55042 1302921340028 18,200.00$ 6,900.00$ 11,300.00$ 1
26 SNOWELL N RALEIGH REV TRS 3074 LAVERNE CT N 3074 LAVERNE CT N LAKE ELMO MN 55042 1302921340033 18,200.00$ 6,900.00$ 11,300.00$ 1
27 GEVING NANCY E 3124 LAVERNE CT N 3124 LAVERNE CT N LAKE ELMO MN 55042 1302921330036 18,200.00$ 6,900.00$ 11,300.00$ 1
TOTAL 476,650.00$ 182,850.00$ 293,800.00$
ADDRESS MAILING ADDRESS
CITY OF LAKE ELMO, MN.
SEPTEMBER 2018
OLD VILLAGE PHASE 3: STREET AND UTILITY IMPROVEMENTS
LAVERNE AVENUE AREA
FINAL ASSESSMENT ROLL
STREET, SANITARY SEWER, AND WATERMAIN ASSESSMENT ROLL
PAGE 1 of 1
NO. NAME PID
TOTAL
ASSESSMENT
AMOUNT
STREET,
DRAINAGE,
SIDEWALK
ASSESSMENT
AMOUNT
STREET
FRONT
FOOTAGE
SANITARY
SEWER
ASSESSMENT
AMOUNT SAC
WATERMAIN
ASSESSMENT
AMOUNT
1 ISD 834 STILLWATER 1875 GREELY ST S STILLWATER MN 55082 1302921220001 20,500.00$ 20,500.00$ 100 ‐$ 0
2 ISD 834 STILLWATER 11030 STILLWATER BLVD N 1875 GREELY ST S STILLWATER MN 55082 1302921230001 474,600.00$ ‐$ 0 474,600.00$ 42
3 WESTBROOK ASSOCIATES 3825 LAKE ELMO AVE N PO BOX 36 STILLWATER MN 55082 1302921220002 80,037.00$ ‐$ 0 45,200.00$ 4 34,837.00$
4 CITY OF LAKE ELMO 3800 LAVERNE AVE N 3880 LAVERNE AVE N LAKE ELMO MN 55042 1302921220009 44,920.00$ 33,620.00$ 164 11,300.00$ 1
5 CITY OF LAKE ELMO 3880 LAVERNE AVE N 3880 LAVERNE AVE N LAKE ELMO MN 55042 1302921220026 46,125.00$ 46,125.00$ 225 ‐$ 0
6 CITY OF LAKE ELMO 3880 LAVERNE AVE N LAKE ELMO MN 55042 1302921220025 25,625.00$ 25,625.00$ 125 ‐$ 0
7 EXCEL PARTNERS LLC 11343 39TH ST N 11343 39TH ST N LAKE ELMO MN 55042 1302921220008 56,785.00$ 56,785.00$ 277 ‐$ 0
8 RULE 36 LMDT PARTNRSHP DULUTH 3819 LAVERNE AVE N 600 25TH AVE S #105 ST. CLOUD MN 56301 1302921220007 81,050.00$ 47,150.00$ 230 33,900.00$ 3
9 LEONARD INVESTMENTS LLC 11144 STILLWATER BLVD N 1000 CONCORD ST S SOUTH ST. PAUL MN 55075 1302921230004 124,330.00$ 79,130.00$ 386 45,200.00$ 4
10 THARROS LLC 11200 STILLWATER BLVD N #100 4350 MCDONALD DRIVE CT N STILLWATER MN 55082 1302921220016 13,667.50$ 9,430.00$ 46 4,237.50$ 0.375
11 NORTHERN LIGHTS INFO SYS LLC 11200 STILLWATER BLVD N #101 11200 STILLWATER BLVD N #101 LAKE ELMO MN 55042 1302921220017 13,667.50$ 9,430.00$ 46 4,237.50$ 0.375
12 ERBAN DOROTHY DAVIDSON 11200 STILLWATER BLVD N #102 3748 OAKGREEN AVE N STILLWATER MN 55082 1302921220018 13,667.50$ 9,430.00$ 46 4,237.50$ 0.375
13 ERBAN DOROTHY DAVIDSON 11200 STILLWATER BLVD N #103 3748 OAKGREEN AVE N STILLWATER MN 55082 1302921220019 13,667.50$ 9,430.00$ 46 4,237.50$ 0.375
14 FLACKEY DEAN E 11200 STILLWATER BLVD N #104 532 OLD HWY 35 HUDSON WI 54016 1302921220020 13,667.50$ 9,430.00$ 46 4,237.50$ 0.375
15 STROP BRIAN A & DENISE M 11200 STILLWATER BLVD N #105 2930 30TH STREET CIRCLE N LAKE ELMO MN 55042 1302921220021 13,667.50$ 9,430.00$ 46 4,237.50$ 0.375
16 HOBBY FARMS INC 11200 STILLWATER BLVD N #106 11550 STILLWATER BLVD N #123 LAKE ELMO MN 55042 1302921220022 13,667.50$ 9,430.00$ 46 4,237.50$ 0.375
17 SCMC PROPERTIES LLC 11200 STILLWATER BLVD N #107 11200 STILLWATER BLVD N #107 LAKE ELMO MN 55042 1302921220023 13,667.50$ 9,430.00$ 46 4,237.50$ 0.375
18 D3PL PROPERTIES LLC 11240 STILLWATER BLVD N 11240 STILLWATER BLVD N LAKE ELMO MN 55042 1302921210006 45,200.00$ ‐$ 0 45,200.00$ 4
TOTAL 1,108,512.00$ 384,375.00$ 689,300.00$ 34,837.00$
ASSESSABLE PROPERTY ADDRESS MAILING ADDRESS