BACKGROUND:
Based off the scheduled capital improvements the Planning and Public Works department would like to begin
procedure of executing the outlined improvements for Tablyn Park. The Parks commission had a chance to review
the capital improvements for the park on January 7th 2018 and later revisited the topic to further address the need
for parking.
Recommendations from the January 7th 2018 meeting were to:
- Remove the basketball court and replace with parking
- Move the swing set/play area down the hill
Since then the recommendations have changed significantly and are outlined below.
ISSUES BEFORE CITY COUNCIL:
Does the Council support the recommendation of the Parks Commission for Tablyn Park Improvements?
PROPOSAL DETAILS/ANALYSIS:
January 7th 2018 Meeting:
The commission recommended removal of the basketball court to replace with parking as well as move the swing set
down the hill to be with the other equipment. Staff does not necessarily feel that removal of the equipment will
provide more of a benefit than other options. Removal of the swing set as well as basketball court will provide the
park with 18 parking spaces. However, staff also does not feel that the structural integrity of the swing set could be
maintained if it were to be moved. The City would have to purchase a new swing set.
August 20th 2018 meeting:
The commission was presented with the options listed below at the August 20th meeting. The Tablyn Park
improvements consist of adding lighting and additional parking to the parking area/sliding hill to increase safety, at
a cost of $55,000.
In an effort minimize impact to the park and maximize usable park amenities the following possibilities were
presented. Staff had encouraged the options outlined below.
1. Extend the current parking lot to the north 60’-80’ along the park entrance road. This would add 6-8 additional
parking stalls and not require removal of the basketball court or swings. Approximate cost $12,000 - $15,000
2. Post the eastern side of the park entrance (along the sliding hill) no parking while allowing parking on the
western side of the entrance. This would improve visibility and safety to those on the sledding hill while
encouraging users to park on the western side of the park entrance and not require removal of the swings or
basketball court. Approximate cost $1,000.
Page 2
Park lighting upgrades through Xcel Energy will consist of one to two additional light poles being installed to provide
lighting to the parking lot and sliding hill. Based on pricing from the 2016 light installation our estimate for additional
lighting is $10,000.
The Commission did not follow the recommendation to expand the parking lot to the north.
FISCAL IMPACT (2018):
Tablyn Improvements $25,000 - $55,000
OPTIONS:
1) Motion to approve the recommendation of the Parks Commission
2) Motion to approve improvements with amendments to the plan
3) Motion to deny improvements
RECOMMENDATION:
Parks Commission:
The recommendation of the parks commission is as follows “Motion to recommend improvements to Tablyn Park as
follows, add a gravel parking lot in the lower area (north), add lighting for the gravel lot and asphalt lot, sign the east
side of the entrance road as no parking and allow parking on the west side, stripe the existing parking spots as well
as the newly created spots on the entrance road, and add a split rail fence at the top of the hill to create separation.
If the Council still chooses to follow the recommendation of the Commission staff would be inclined to close the lot
during the spring months to prevent ruts and damage to the lot. The primary purpose would be to serve the winter
parking needs.
“Motion to approve the Parks Commission recommendation and seek bids to construct a gravel parking lot in
the lower area (north), add lighting for the gravel lot and asphalt lot, sign the east side of the entrance road as
no parking and allow parking on the west side, stripe the existing parking spots as well as the newly created
spots on the entrance road, and add a split rail fence at the top of the hill to create separation”
Staff Comments:
Staff does not support the recommendation to create a gravel lot in the lower section of the park. Creating this lot
would have the possibility to conflict with the sliding hill in which hill users could collide with parked cars, sledders
my also not be visible to cars entering and exiting the lot. Also, after communicating with the company that would
stripe the entrance road for parallel parking, they encouraged dismissal of this idea because of potential sightline
issues due to the grade and curvature of the road. Because of this, staff is not inclined to support this aspect of the
recommendation. Staff still recommends expanding the lot to the north which is expected to add 6-8 additional spots
totaling 16-18.
ATTACHMENTS:
• Parking Lot Design Options
o A, B, C, and D
Washington County, MN
Au gust 28, 2018
0 40 8020 ft
0 10 205 m
1:5 00
Disclaimer: Map and parcel data are believed to be accurate, but accuracy is not guaranteed. This is not a legal document and should not be substituted for a title search,appraisal, survey, or for zoning verification.
Washington County, MN
Au gust 27, 2018
0 20 4010 ft
0 7 143.5 m
1:2 50
Disclaimer: Map and parcel data are believed to be accurate, but accuracy is not guaranteed. This is not a legal document and should not be substituted for a title search,appraisal, survey, or for zoning verification.
Washington County, MN
Au gust 27, 2018
0 20 4010 ft
0 7 143.5 m
1:2 50
Disclaimer: Map and parcel data are believed to be accurate, but accuracy is not guaranteed. This is not a legal document and should not be substituted for a title search,appraisal, survey, or for zoning verification.
Washington County, MN
Au gust 30, 2018
0 110 22055 ft
0 30 6015 m
1:1,200
Disclaimer: Map and parcel data are believed to be accurate, but accuracy is not guaranteed. This is not a legal document and should not be substituted for a title search,appraisal, survey, or for zoning verification.