Loading...
HomeMy WebLinkAbout#20 - Renaming Part of Stillwater BlvdMAYOR AND COUNCIL COMMUNICATION DATE: 1/02/2019 CONSENT AGENDA ITEM: Rename Part of Stillwater Boulevard to Stillwater Way. SUBMITTED BY: Ben Prchal, City Planner REVIEWED BY: Ken Roberts, Planning Director BACKGROUND: Washington County initiated and has completed most of the Stillwater Boulevard/County Road 14 road improvement project. The project created a new segment of Stillwater Boulevard to the south of its previous location. This change leaves the City with a new road that requires a rename. Since the existing road section had historically been known as Stillwater Boulevard. However, the road will now be named Stillwater Way N. ISSUE BEFORE COUNCIL: The Council should decide if renaming the section of street from Stillwater Boulevard, to Stillwater Way N. is appropriate. PROPOSAL DETAILS/ANALYSIS: Due to the realignment project the renaming or formal approval of the street name from Stillwater Boulevard to Stillwater Way N. is appropriate. Staff believes the change will only effect the street name aspect of existing address and not the numbering. If the proposal is approved it is anticipated that 4 properties will be impacted by the name change. Staff is aware that the attachment has a preliminary stamp. Though, this is the case staff does not believe there will be any changes that would impact the renaming of the street. City Council Meeting 2 FISCAL IMPACT: None. OPTIONS: The Council may approve the renaming of part of Stillwater Boulevard to Stillwater Way N. or deny the renaming. RECOMMENDATION: Staff respectfully requests, as part of tonight’s consent agenda, Council approve renaming part of Stillwater Boulevard. to Stillwater Way N. by adoption of Ordinance 08-219. If removed from the Consent Agenda, the recommended action can be completed through the following motion: “Move to approve the renaming of part of Stillwater Boulevard as designated in Exhibit A of Ordinance 08-219 to Stillwater Way N.” ATTACHMENTS: 1) Ordinance 08-219 1 CITY OF LAKE ELMO COUNTY OF WASHINGTON STATE OF MINNESOTA ORDINANCE NO. 08-219 AN ORDINANCE RENAMING A STREET IN THE CITY OF LAKE ELMO. SECTION 1. The City Council of the City of Lake Elmo hereby renames Stillwater Boulevard: SECTION 2. Subd. 1. For the purpose of this ordinance, the terms defined in this section shall have the meanings ascribed to them. Subd. 2. Existing Street Name. The term existing street name shall mean the name by which a street is designated on the on the Washington County Highway and platting records. Subd. 3. New Street Name. The term new street name shall mean the name by which a street shall be known from and after the effective date of this ordinance. SECTION 3. The Existing Street Name of Stillwater Boulevard shall have a New Street Name of Stillwater Way N. SECTION 4. The adjustment shall not affect the entire length of Stillwater Boulevard. The section which will be renamed is further described as North of the realigned Stillwater Boulevard/CSAH 14 and West of the realigned Stillwater Boulevard/CSAH 15 and is shown in Exhibit A. SECTION 5. Effective Date. This ordinance shall become effective immediately upon adoption and publication in the official newspaper of the City of Lake Elmo. SECTION 6. Adoption Date. This Ordinance 08-219 was adopted on this 2nd day of January 2019, by a vote of ___ Ayes and ___ Nays. LAKE ELMO CITY COUNCIL ___________________________________ Mike Pearson, Mayor ATTEST: __________________________________ Julie Johnson, City Clerk This Ordinance 08-219 was published on the ____ day of ___________________, 2019. 2 EXHIBIT A SUBJECT TO CHANGE PRELIMINARY 4000200 scale in feet LEGEND RAISED MEDIANS & CURBS PAVED SHOULDERS PROPOSED TRAFFIC SIGNAL EXISTING RIGHT OF WAY PROPOSED RIGHT OF WAY REMOVE PAVEMENT DIRECTION OF TRAFFIC PAVED ROADWAY LANDSCAPED MEDIANS BITUMINOUS TRAILS & BIKEWAYS WETLANDS GAS UTILITY WET POND INFILTRATION/DRY BASIN DRY STORAGE POND 40TH STREET NORTH UNION PACIFIC RAILROAD FAIRGROUNDS WASHINGTON COUNTY ANOTHER PHASE TO CONTINUE UNDER 4 - LANE SECTION PROJECT TERMINI FUTURE ROAD POTENTIAL FUTURE ROAD POTENTIAL STOP FUTURE ROAD POTENTIAL STOPACCESS ROAD FAIRGROUNDS 3/4 ACCESS STOPSTOPSTILLWATER BLVD. (CSAH 14)STILLWATER BLVD. (CSAH 15)MANNING AVENUE (CSAH 15)CSAH 14 STILLWATER WAY N. 3 9 T H S T. N.MCFAIR AVE. N.43RD ST. N. .N .RT METS EULB ELTTIL62 9625 620 615 610 605 600105 110 115 120 126 131 135 145 150 155 160 4540 50 55 60 65 139 3353003053103153203253303453503552520450445440434430425420416410405400340