HomeMy WebLinkAbout#13 - Boulder Ponds 2nd Add Security Reduction STAFF REPORT
DATE: October 1st, 2019
CONSENT
AGENDA ITEM: Private Development Projects – Approve Security Reduction for Boulder Ponds 2nd
Addition Landscaping Improvements and redact previous approval.
SUBMITTED BY: Ben Prchal, City Planner
REVIEWED BY: Ken Roberts, Planning Director
ISSUE BEFORE COUNCIL: Should the City Council approve a revision to its previous approval of the Security
Reduction and made at the September 17th meeting and authorize a corrected amount for release?
PROPOSAL DETAILS/ANALYSIS:
At the September 17th, 2019 meeting Staff had recommended that the City Council approve a substantial release of
the security for Phase 2 of the Boulder Ponds development. At that time Staff had a misunderstanding of where Phase
2 in the Development was regarding its two year warranty period. Generally speaking reductions are allowed in
increments. The developer would be eligible for a decrease in security after the 1st year of the warranty period has
been accepted and then again at final acceptance. The DA states that at least 25% of the security shall be retained
until the City has issued final acceptance of the improvements.
After the City Council meeting Staff followed up on the project and came to the conclusion that too much money
was released too early. The amount that can be released is 28% of the $93,750 being held for Phase 2 landscaping.
This percentage fiscally represents the amount that was final accepted by the City but it is strictly tied to the 5th St.
improvements. Fortunately Staff caught the mistake and stopped the authorization of the reduction to the bank.
As stated above Staff believes the City Council should revise the previous approval and instead approve a 28%
reduction to match what has been accepted:
Current Security Amount Proposed Security Reduction Amount
1. Boulder Ponds 1st Addition: $3,125 $0
2. Boulder Ponds 2nd Addition: $93,750 $26,250
3. Boulder Ponds 5th Street: $1,000 $0
Phase 2 has not had its first inspection to start the two year warranty clock. The developer is hoping to have all of
the necessary plantings in place before October 10th for our Landscape architect to inspect the site. During the
previous landscaping reduction for the 1st and 2nd phases and 5th St. the City held $3,125 until 5 additional trees were
planted following construction of the homes within the neighborhood, and $1,000 for some minor plantings needed
along the 5th Street median. The City will continue to hold the remaining $4,125 until the developer addresses the
outstanding items and will hold $70,500 until the plantings are approved.
FISCAL IMPACT: It is the City’s goal to retain a security amount that is sufficient to cover all improvements
needed to address public needs should the developer default. This is done to protect the City and taxpayers from
financial harm. With this reduction, the remaining security amount held by the City remains sufficient to complete
the remaining improvements, specifically related to landscaping. At this point there has not been a reduction for
Phase 3.
RECOMMENDATION: Staff is recommending that the City Council approve, as part of the Consent Agenda, the
security reductions for the Boulder Ponds 2nd Addition Landscaping Improvements and revise its previous approval
of releasing $93,750. If removed from the consent agenda, the recommended motion for the action is as follows:
“Move to revise the previous security reduction of $93,750 for the Boulder Ponds 2nd Addition Landscaping
Improvements and approve a reduction of $26,250 as detailed in the attached Security Reduction Worksheets.”
ATTACHMENTS:
1. Security Reduction Worksheet – Boulder Ponds 1st Addition.
2. Security Reduction Worksheet – Boulder Ponds 2nd Addition.
3. Security Reduction Worksheet – Boulder Ponds 5th Street Improvements.
4. Landscape Architect Email.
BOULDER PONDS 1ST ADDITION Time of Performance: October 31, 2016
DEVELOPMENT AGREEMENT AMOUNTS
CATEGORY CONSTRUCTION 125%REMARKS #1 #2 #3 #4 #5 #6
Grading $116,600 $116,600 100%$116,600
Grading $68,194 $85,243 100%$42,621 $42,621
Sanitary Sewer $405,451 $506,813 75%$380,110
Watermain $349,674 $437,092 75%$327,819
Streets $1,084,327 $1,355,409 75%$677,704 $338,852
Surface Water Facilities $721,027 $901,284 75%$450,642 $225,321 SWWD sign-off needed
Erosion Control $48,406 $60,508 75%$45,381
Sidewalks/Trails Included in Streets Included in Streets
Street Lighting NA NA By Xcel Energy
Street Signs and Traffic Control Signs Included in Streets Included in Streets
Landscaping $204,302 $255,378 50%$127,689 $60,719 $3,125
Tree Preservation and Restoration NA NA
Wetland Mitigation and Buffers NA NA LOC Through VBWD
Monuments $4,700 $5,875 75%$4,406
Miscellaneous Facilities NA NA
Record Drawings $2,500 $3,125 75%$2,344
TOTALS $2,888,581 $3,727,326 RELEASED AMOUNTS:$1,995,497 $606,794 $179,819 $60,719 $3,125
$881,371 CUMMULATIVE AMOUNTS:$1,995,497 $2,602,291 $2,782,111 $2,842,830 $2,845,955
SECURITY AMOUNT REMAINING:$1,731,829 $1,125,035 $945,215 $884,496 $881,371
DATE:12/15/2015 8/2/2016 12/20/2016 7/17/2018 TBD
REDUCTIONS
Holding for 5 trees
to be planted with Lots
BOULDER PONDS 2ND ADDITION Time of Performance: October 31, 2016
DEVELOPMENT AGREEMENT AMOUNTS
CATEGORY CONSTRUCTION 125%REMARKS #1 #2 #3 #4 #5 #6
Grading NA NA Included in Boulder Ponds 1st Addition
Sanitary Sewer $73,000 $91,250 $68,438
Watermain $67,000 $83,750 $62,813
Storm Sewer (w/pond structures)$39,500 $49,375 $37,031
Streets $84,175 $105,219 $78,914
Sidewalks/Trails $19,850 $24,813
Surface Water Facilities $13,000 $16,250
Street Lighting $12,000 $15,000
Street Signs and Traffic Control Signs $1,600 $2,000
Private Utilities (electricity, natural gas, telephone, and cable)
Landscaping $75,000 $93,750 $26,250
Tree Preservation and Restoration NA NA
Wetland Mitigation and Buffers $1,000 $1,250
Monuments $1,800 $2,250
Erosion Control $36,650 $45,813
Miscellaneous Facilities NA NA
Record Drawings $2,500 $3,125
TOTALS $427,075 $533,844 RELEASED AMOUNTS:$247,195 $26,250 $0 $0 $0 $0
CUMMULATIVE AMOUNTS:$247,195 $26,250
SECURITY AMOUNT REMAINING:$286,648 $260,398
DATE:9/5/2017 10/1/2019
REDUCTIONS
BOULDER PONDS 5TH STREET NORTH Time of Performance: October 31, 2017
DEVELOPMENT AGREEMENT AMOUNTS
CATEGORY CONSTRUCTION 125%REMARKS #1 #2 #3 #4 #5 #6
Grading NA NA Included in Boulder Ponds 1st Addition
Sanitary Sewer $46,600 $58,250 $43,688
Watermain $64,000 $80,000 $60,000
Storm Sewer (w/pond structures)$97,300 $121,625 $91,219
Streets $287,700 $359,625 $269,719
Sidewalks/Trails $71,000 $88,750 $66,563
Surface Water Facilities NA NA SWWD infiltration basin sign-off
Street Lighting NA NA
Street Signs and Traffic Control Signs $11,600 $14,500 $10,875
Private Utilities (electricity, natural gas, telephone, and cable)NA
Landscaping $100,753 $125,941 $93,456 $1,000 $1,000
Tree Preservation and Restoration NA NA
Wetland Mitigation and Buffers NA NA
Monuments NA NA
Erosion Control NA NA
Miscellaneous Facilities NA NA
Record Drawings NA NA
TOTALS $678,953 $848,691 RELEASED AMOUNTS:$103,688 $360,938 $170,893 $1,000
$212,173 CUMMULATIVE AMOUNTS:$103,688 $464,625 $635,518 $636,518
SECURITY AMOUNT REMAINING:$745,004 $384,066 $213,173 $212,173
DATE:2/21/2017 9/5/2017 7/17/2018 TBD
REDUCTIONS
Holding for 5th Street
median plantings
1
Ben Prchal
From:Lucius N. Jonett <ljonett@wenck.com>
Sent:Thursday, September 26, 2019 11:02 AM
To:Ben Prchal
Subject:Boulder Ponds
Attachments:2019-09-26 Boulder Ponds Landscape Plan Review Calc.xlsx
Caution: This email originated outside our organization; please use caution.
Ben,
I have attached a spreadsheet breaking down how many of what trees are proposed to be installed per phase.
For phase 2, 51 of the 179 trees to be installed were the 5th Street trees. These 51 trees were accepted with the 1st
addition landscape, therefor 28% of the 2nd addition landscape escrow could be eligible for a LOC reduction.
Lucius Jonett, PLA (MN, ND, IA)
Landscape Architect / Associate
ljonett@wenck.com D| 763-479-4254 C| 715-207-9850
1800 Pioneer Creek Center | Maple Plain, MN 55359
Master Plan Phase 1 Phase 2 Phase 3 Master Plan Qty % Composition
(Code Required)Proposed Proposed Proposed Deciduous Shade Trees 362 57%>25% required
Street frontage 10043 Lineal Feet Coniferous Trees 79 12%>25% required
Lake Shore 0 Lineal Feet Ornamental Trees 97 15%<15% required
Stream Frontage 0 Lineal Feet 5th Street Blvd Trees 99
Total Linear Feet 10043 Lineal Feet Tree Count 637
/50 Feet = Required Frontage Trees 201 Trees
Phase 1 Qty % Composition
Development or Disturbed Area -SF Deciduous Shade Trees 192 55%>25% required
Development or Disturbed Area 48.8 Acres Coniferous Trees 42 12%>25% required
*5 = Required Development Trees 244 Trees Ornamental Trees 68 19%<15% required
5th Street Blvd Trees 48
5th Street Boulevard Frontage 3965 Spaces Tree Count 350
/40 Feet = Required Blvd Frontage Trees 99 48 51 Trees
Required Mitigation Trees 0 Phase 2 Qty % Composition
Deciduous Shade Trees 110 61%>25% required
Required Number of Trees*544 Coniferous Trees 2 1%>25% required
Ornamental Trees 16 9%<15% required
Total Trees to Date 350 179 108 5th Street Blvd Trees 51
Tree Count 179
Phase 3 Qty % Composition
Deciduous Shade Trees 60 56%>25% required
Coniferous Trees 35 32%>25% required
Ornamental Trees 13 12%<15% required
5th Street Blvd Trees 0
Tree Count 108
* Residential development - mitigation replacement trees are in addition to landscape required tree counts.
Phone (952) 937-5150 7699 Anagram Drive
Fax (952) 937-5822 Eden Prairie, MN 55344
Toll Free (888) 937-5150
56#0&&4#9+0)01
.#-''./1
%+6;1(.#-''./1
('$47#4;
Phone (952) 937-5150 7699 Anagram Drive
Fax (952) 937-5822 Eden Prairie, MN 55344
Toll Free (888) 937-5150
56#0&&4#9+0)01
.#-''./1
%+6;1(.#-''./1
('$47#4;