Loading...
HomeMy WebLinkAbout#18- Springs at Lake Elmo Final Plat and PUD1 STAFF REPORT DATE: 10/01/19 REGULAR TO: City Council FROM: Ken Roberts, Planning Director AGENDA ITEM: Final Plat and Final Planned Unit Development (PUD) Plans – Springs at Lake Elmo Apartments REVIEWED BY: Ben Prchal, City Planner Jack Griffin, City Engineer BACKGROUND: The City has received land use requests from Continental 483 Fund LLC (c/o Gwyn Wheeler) for approval of Final Plat and Final Planned Unit Development (PUD) Plans for a 300 unit multi-family residential development on a 17.01-acre parcel to be called Springs Apartments. On May 13, 2019, the Planning Commission reviewed the proposal, held a public hearing and recommended approval of the Preliminary Plat and Preliminary PUD (including an increase in project density because of the proposed development amenities) for the Springs Apartments. On June 18, 2019, the City Council approved a Zoning Map Amendment and Preliminary Plat and Preliminary PUD Plans for a 300 unit multi-family residential development on a 17.01-acre parcel to be called Springs Apartments. This approval was subject to 37 conditions of approval. On September 9, 2019, the Planning Commission reviewed the proposed final project plans and held a public hearing about the proposed Final Plat and Final PUD Plans for Springs Apartments. They recommended approval of the proposed Final Plat and Final planned unit development (PUD) plans for the Springs at Lake Elmo Apartments, subject to the conditions of approval listed in the staff report. ISSUE BEFORE THE CITY COUNCIL: The City Council is being requested to review and make a decision about the proposed Final Plat and Final planned unit development (PUD) plans for the development to known as the Springs at Lake Elmo Apartments. GENERAL INFORMATION: • Property Owner: DPS-Lake Elmo, LLC of 6007 Culligan Way, Minnetonka, MN 55345 • Applicant: Continental 483 Fund LLC (c/o Gwyn Wheeler) • Location: North of Hudson Blvd. N, west of Keats Avenue • Site Area: 17.57 gross acres, 17.33 net acres • Land Use Guidance: 2030 Comprehensive Plan – Commercial, 2040 Comprehensive Plan – Mixed Use Commercial • Existing Zoning: Rural Development Transitional 2 • Proposed Zoning: Urban High Density Residential (subject to final approval of the 2040 Comprehensive Plan update) • Surrounding Land Use Guidance: Commercial to the East, Urban Medium Density Residential to the North (Union Park Townhouses), Commercial to the West, and Hudson Boulevard and I-94 to South. • History: The property has been used as rural vacant land and as a homestead. There is a wetland on the site that staff is estimating is about 0.3 acres in size. It is located along the north side of Hudson Blvd about 240 feet west of the east property line of the site. A large portion of the eastern part of the site is covered in trees. • Deadline for Action: Initial Application Received: July 26, 2019 Incomplete letter sent: August 5, 2019 Updated Information Received: August 19, 2019 60-day timeline: October 17, 2019 120-day timeline: December 16, 2019 PROPOSAL DETAILS/ANALYSIS: Project Overview/Site Plan. The proposed site plan includes 15 buildings with 20 units each. The buildings are a townhouse design, two stories tall with a mix of studio, 1-bedroom, 2-bedroom and 3- bedroom units. Many units provide attached, direct-access garages for a total of 120 attached garage spaces for the 300 units. The applicant also is planning to have seven detached garage buildings (with a total of 42 spaces), 399 surface parking spaces, an approximately 4,300 square foot club house (including a large gathering room, fitness center, kitchen area, coffee bar and office space), pool with sun deck, trash enclosure, mail kiosk, and one pet playground all within a fenced, controlled access community. The site plan shows the primary entrance to the development would be off of Hudson Boulevard and there would be an emergency access drive connecting to the north/south road (Julia Avenue) to the west of the site. The applicant also is proposing to preserve much of an existing wetland on the site that is near Hudson Boulevard. The proposed final plans are generally consistent with the plans City approved earlier this year. The primary changes to the Subdivision plans have been to the grading and drainage plans to meet the standards and requirements of the City and Watershed District. The project engineer also has expanded the plans to now include the public improvements to Hudson Boulevard and Julia Avenue, including storm water management for these improvements, as required by the City as part of the preliminary plat conditions of approval. About the Applicant. Continental 483 Fund LLC. (Applicant) desires to develop a Class A, market-rate apartment community within the City. The company, started in 1979, is based out of Menomonee Falls, WI, and as of 2019 has broken ground on 22,000 apartment homes in 18 states. 65 Springs Apartment communities, similar to this proposed development, have been developed, including three in Minnesota (Apple Valley, Rochester, and Savage). The applicant has indicated in meetings with City that Continental owns and operates all Springs developments and they do not have third party management of their properties. 2040 Comprehensive Plan Update. As the City Council is aware, the City has been working to complete its required 2040 Comprehensive Plan update. The City Council approved the proposed Plan update at its February 5, 2019 meeting and authorized City staff to submit the updated Comprehensive Plan to the Metropolitan Council for their approval. Since then, City staff and the City Planning consultant have been working with the Metropolitan Council to clarify information in the proposed plan and we have submitted additional information to ensure the 2040 Comprehensive Plan will be complete and will meet all the requirements of the Metropolitan Council. The City received notification on August 20, 2019 that the Metropolitan Council determined the proposed Comprehensive Plan update is complete for their review purposes. This review and approval 3 process by the Metropolitan Council may take up to 120 days. They have notified the City that they expect to review the proposed Comprehensive Plan update in September and that they will act on it (and hopefully approve it) in October 2019. Once the Metropolitan Council approves the proposed 2040 Comprehensive Plan, the City must give the proposed 2040 Comprehensive Plan final approval and then start using and implementing the updated Plan. Land Use. The proposed land use map in the 2040 Comprehensive Plan update shows this site designated as MU-C (mixed use commercial). The proposed 2040 Plan notes “this designation is a new land use and identifies where a mix of commercial and residential uses may be integrated to benefit from proximity and adjacencies to each other. Commercial uses in this category include service and retail uses such as, but not limited to, restaurants, shops, convenience stores, salons, studios and dry cleaners. Land with this designation is assumed to develop with a minimum of 50 percent residential use with a density ranging from 10-15 dwelling units per acre.” In this case, the applicant is proposing a development with 300 dwelling units on 17.33 net acres. This calculates to 17.31 dwelling units per net acre thus exceeding the density limits set for this area in the 2040 Comprehensive Plan (without any credit for density bonuses that the City may grant through the PUD process). At 15 dwelling units per net acre, this site could accommodate 260 units. (Please see the Density Analysis below for more information about this.) With the pending land use designation (MU-C) for this site, the City will not be able to give final approval to the proposal until after the Metropolitan Council and the City Council have finalized the 2040 Comprehensive Plan. As such, the City will need to make any and all final project approvals contingent upon final approvals of the 2040 Comprehensive Plan by the Metropolitan Council and by the City Council. Zoning Map Amendment. In order for this development to proceed, the City Council approved a zoning map amendment (rezoning) for the property from RT (rural development transitional) to HDR (urban high density residential). According the Lake Elmo Zoning Code, the HDR district is to provide for moderate to high density attached and multi-family housing, designed to present an attractive appearance to neighboring street and adjacent uses, to include sufficient private and semi-private outdoor space and to be well-integrated into their surroundings. Development in this district may occur at densities in excess of seven dwelling units per acre, provided the overall densities are consistent with the net densities specified in the Comprehensive Plan. As drafted by staff (and as approved by the City Council), the Ordinance to amend the Zoning Map for this site will only become effective after the Metropolitan Council approves the 2040 Comprehensive Plan. Final Plat/PUD Plans As I noted above, the proposed final plat/final PUD plans are generally consistent with the approved preliminary plat/PUD plans. I note the important elements as follows: Final Plat. The final plat shows one parcel for the project site. This site will be on one lot within the proposed final plat for the former Bentley Village (now Union Park) development. I have attached a copy of the proposed Union Park final plat for your reference. This proposed final plat creates several lots and outlots for development and would dedicate the right-of-way for Julia Avenue and for 5th Street North. The original project plans did not show the required 100-foot-wide street right-of-way for the north/south street (Julia Avenue) and any additional right-of-way along Hudson Boulevard needed to accommodate the required turn lanes and public trail. The City should require the developer to include all necessary street right-of-way on the final plat as a condition of approval. 4 Density Analysis. The proposed development includes 300 dwelling units. The applicant’s data shows the site with a total of 20.36 acres (including right-of-way for Hudson Boulevard (2.23 acres)) and right- of-way for the north/south road (1.12 acres) with no proposed parkland or arterial right-of-way and a 0.24 acre wetland. The calculation by the developer of net density for the site is as follows: 20.36 acre site – 0.24 acre wetland = 20.12 net acres. 300 units divided by 20.12 acres = 14.91 units per acre. The net project density as calculated by the developer is 14.91 units per acre. However, the City calculates the site density in this case as follows: Site – 17.01 acres plus 0.56 acres (1/2 right-of-way for north/south road) – 0.24 acres (wetland) = 17.33 net acres. 300 units divided by 17.33 acres = 17.31 units per net acre. As noted above, this density would exceed the City’s density requirements for residential development in the mixed use commercial land use designation of 15 unit units per acre. This is the maximum allowed density without any credit for an increase in density through bonuses the City may grant through the PUD process. Proposed Unit Breakdown. The proposed number of dwelling units totals 300. The following table provides a breakdown of the proposed unit types and the number of units of each: Unit Type Number of Units Studios 30 1-Bedroom 120 2-Bedroom 120 3-Bedroom 30 PUD – Overlay and Minimum Requirements. Consistency with Planned Unit Development Regulations. Staff has reviewed the proposed plan for its consistency with requirements of Article XVII: Planned Unit Development (PUD) Regulations and has found the following: • Intent. The intent of a PUD is to provide for flexibility in the use of land and the placement and size of buildings in order to better utilize site features and obtain a higher quality of development. A PUD is required for the proposed development, as more than one principal building is proposed to be placed on a platted lot, there is a proposed reduce building setback from the west property line and the proposed detached garage buildings are larger than the maximum-allowed 1,000 square feet in size. • Identified Objectives. When reviewing requests for PUDs, the City is to consider whether one or more objectives as outlined in Section 154.751: Identified Objectives of the Zoning Code will be served or is achieved. Staff has found that the proposed development would meet the following objectives: A. Innovation in land development techniques that may be more suitable for a given parcel than conventional approaches. • The proposed development is not a typical, multi-story apartment building and instead proposes a townhouse design two stories in height with private, ground-level entrances to each unit. 5 C. Provision of a more adequate, usable, and suitably located open space, recreational amenities and other public facilities than would otherwise be provided under conventional land development techniques. • The proposed development is proposing a number of recreational amenities to residents within the PUD including a pet playground, clubhouse and a swimming pool. D. Accommodation of housing of all types with convenient access to employment opportunities and/or commercial facilities; and especially to create additional opportunities for senior and affordable housing. • The proposed development will provide additional housing opportunities within the City, as there are currently very few multi-family residential buildings within the City. G. Coordination of architectural styles and building forms to achieve greater compatibility within the development and surrounding land uses. • The townhouse design will be compatible in design those of the nearby Savona townhomes and with the future Pulte townhomes to the north of the site. H. Higher standards of site and building design than would otherwise be provided under conventional land development technique. • The City may impose (and should use) such design guidelines on high density residential development such as this proposal. This also may include setting higher design standards for site amenities and design features such as landscaping, fencing, etc. • Minimum Requirements. PUDs must meet the following minimum requirements: A. Lot Area. A PUD must include a minimum of 5 acres for undeveloped land or 2 acres for developed land within the approved development. • The proposed development exceeds this requirement with a proposed 20.36 acre development. B. Open Space: For all PUDs, at least 20% of the project area not within street rights-of- way to be preserved as protected open space. Other public or site amenities may be approved as an alternative to this requirement. Any required open space must be available to the residents, tenants, or customers of the PUD for recreational purposes or similar benefit. Land reserved for storm water detention facilities and other required site improvements may be applied to this requirement. Open space shall be designed to meet the needs of residents of the PUD and the surrounding neighborhoods, to the extent practicable, for parks, playgrounds, playing fields and other recreational facilities. • The applicant indicated in their project narrative that there will be 5.77 acres of open space with this development. This is 28 percent of the gross project site area including the pet area, green spaces and landscaped areas. C. Street Layout… In newly developing areas, streets shall be designed to maximize connectivity in each cardinal direction, except where environmental or physical constraints make this infeasible. All streets shall terminate at other streets, at public land, or at a park or other community facility, except that local streets may terminate in stub streets when those will be connected to other streets in future phases of the development or adjacent developments. 6 • The new north/south road connecting 5th Street to Hudson Blvd (Julia Avenue) meets this requirement. It was a recommended condition of approval of the preliminary plat/PUD that the developer address all the comments outlined in the Engineering memo dated May 8, 2019 before submitting plans for a final plat and final PUD approval for this site. Proposed PUD Amenities. The City’s PUD ordinance provides that if developers provide amenities with their projects the City may increase density by up to 20 percent. In this case, because the applicant is proposing a housing density of 17.31 units per net acre, the developer will need to provide amenities with the project to justify the increased housing density above the expected allowed density range 10-15 units per acre of the future MU-C land use designation. In addition, a PUD should include features or elements that meet the one or more of the City’s identified objectives (as noted above). The PUD also should offer the City (and future residents) amenities in exchange for the flexibility of allowing a reduced setback to the westerly and north property lines, having more than one building on a parcel as well as allowing detached garages larger than 1,000 square feet. As part of the City Council approval of the preliminary PUD/plat plans on June 18, 2019, they granted the developer approval to have up to 300 units with the requirement the developer include design amenities to receive the density bonus. In this case, the developer noted on Pages 5 and 6 of their land use request narrative (and in Appendix A) the following site amenities they believe qualify for amenity points: • Contained Parking. The purpose of this amenity is better integrate surface parking into the site and reduce the amount of visible surface parking from the public right-of-way. Parking should be rear-loaded and hidden by the building façade or integrated into the site in some other fashion that is acceptable to the City. (5 points possible) By proposing 162 garage spaces for its residents, the proposed development limits the amount of visible surface parking. The plans show some vehicle surface parking that would be visible from Hudson Boulevard and Julia Avenue, but much of the surface parking would be set behind the proposed buildings. This design reduces the amount of the surface parking that would be visible from the public rights-of-way adjacent to the site. (5 points) • Pedestrian Improvements. By proposing a site and building design that allows for exceptional and accessible pedestrian and/or bicycle access through and /or around the site. The improvements shall use a combination of trails, landscaping, decorative materials, access control and lighting to create safe, clear and aesthetically pleasing pedestrian facilities through and/or around the site that comply with ADA accessibility requirements. (5 points possible) In this case, the developer is proposing a series of trails and sidewalks in and around their site that will provide many places for pedestrians to move about without having to walk on the streets or on the driveways. Many of the proposed sidewalks provide access to the entrances to the individual units while other sidewalks allow for safer and easier pedestrian movement throughout the site. The City should require the developer to add a 5-foot-wide concrete sidewalk with ADA ramps at driveway crossings along the west side of the main entrance driveway. This sidewalk should run from the club house to Hudson Boulevard to help facilitate pedestrian movement to and from their site to the trail along Hudson Boulevard. However, if the City wants to award amenity points for these trails and sidewalks, then the City should not give the developer credit toward their park dedication fees for these same items. • Plaza. The applicant is proposing a pool, an approximately 4,300 square foot club house (including a large gathering room, fitness center, a kitchen area, coffee bar and office space) and the pet play area (dog park) within the development. The clubhouse/pool area could serve as a plaza within this development as the PUD ordinance indicates that plazas are landscaped or paved open areas of a minimum of 1,000 square feet and wholly or partially enclosed by a building or 7 buildings. The PUD ordinance requires that plazas within commercial or mixed-use development shall be open to the public during daylight hours. The PUD ordinance does not require that plazas within residential PUDs be open to the public. It also should also be noted that the proposed development is providing a dog park that Staff believes in and of itself warrants an additional amenity point. (5 points possible) (PC and staff recommended - 5 points) • Providing theming. Significant use of various elements of theming consistent with the 2013 Lake Elmo Branding and Theming Project, including but not limited to signage, fencing, landscaping lighting and site furnishings. The City will award amenity points based upon the quality and magnitude of the Theming elements integrated into the project. (1-3 points possible) For theming purposes, the applicant is proposing to create a well-designed lighting plan, including using City-standard light poles with banners to enhance the Julia Avenue corridor, add two benches along Julia Avenue and include an ornamental black metal fence around the edge of the project. (These are shown in the attachment labeled Appendix A – Theming Elements) The City could award the developer amenity points for the use vehicular and pedestrian lighting in and around their site, increasing their landscaping and tree planting well above the minimums set by the Code, (especially along Hudson Boulevard), adding several benches within their site and using a white, post and rail style fence (instead of black decorative) around their site. According the City Code, “Increases in density will be awarded through a 1:1 ration with amenity points. For every increase in amenity points, the applicant will be allowed an equivalent amount of density increase, up to a maximum increase of 20 percent.” Or put another way, 5 amenity points equals a 5 percent increase in density, 10 amenity points equals a density increase of 10 percent, etc. (each amenity point equals a density increase of one percent). To have 300 units on the 17.33 net acre site (17.31 units per net acre), the City would need to approve enough amenity points to increase the allowed density an additional 2.31 units an acre (17.31 – 15 = 2.31 units per acre). 2.31 divided by 15 equals 0.154 (a 15.4 percent increase) above the 15 units per acre now allowed by the City. This means the development needs a total of 16 amenity points to meet their density of 300 units. Without any amenity points for increased density, the applicant would need to reduce the number of dwelling units in the development to a maximum of 260 units – a reduction in 40 units from the 300 units they are proposing. AMENITY POINTS SUMMARY AND REVIEW The Planning Commission, during their review of the proposal on May 13, 2019, considered the various proposed amenities and made recommendations about the points they thought the City should award for the amenities to justify increasing the project density. Their recommendations for amenity points were: Right-of-way dedication – 10 points Contained parking – 5 points Plaza – 5 points PC recommended total – 20 Points The applicant, on Pages 5 and 6 in their latest project land use request narrative, suggests the City should award the proposal the following amenity points: Contained parking – 5 points Pedestrian Improvements – 5 points Plaza – 5 points 8 Theming Elements – 2 points Applicant suggested total – 16- 17 points The City Council approved the following amenity points for this proposal on June 18, 2019: Contained parking – 5 points Plaza – 5 points Pedestrian Improvements – 5 points Theming – 1-3 points possible (1 point minimum required) City Council Total – 15 - 16 points Staff Review (of original submittal): In reviewing the proposed design amenities, staff is recommending the developer/applicant make several changes and additions to meet the City Code requirement of “significant utilization of various elements of Theming consistent with the 2013 Lake Elmo Theming project.” They are: 1. Lighting: The developer is proposing to install two street lights along Julia Avenue. To receive credit for lighting, the City should require the developer to add one street and two pedestrian lights along Hudson Boulevard that meet City standards. The new street light would be next to the development entrance on Hudson Boulevard and the two pedestrian lights would be located between the street lights along the Hudson Boulevard trail. 2. Benches: The developer is proposing to install two benches along Julia Avenue – one near the intersection with Hudson Boulevard and the other would be near the emergency entrance/exit. Staff is recommending the applicant install a bench near the entrance to their site along the Hudson Boulevard Trail. 3. Fencing: The proposed 5-foot-tall black decorative fence does not meet the design criteria for fencing in this part of Lake Elmo as listed in the City’s Theming Study. The fence is to be a white post and rail fence to receive amenity points. As such, the City should not award amenity points for the proposed black, decorative fence 4. Landscaping: The City Code also allow the City to grant amenity points for developments that include a significant increase in landscaping above code requirements on their site – especially along public rights of way. Additional landscaping (above the minimum required by the Code) may not be possible within this development, however, because of the layout of the buildings, parking areas, driveways and storm water features. On August 29, 2019, the applicant amended their request for amenity points for the use of theming elements by: 1. Dropping the fence element (as they want to install the black ornamental fence instead of the white post and rail fence required by the City). 2. Proposing to install a total of five street lights – two along Julia and three along Hudson Boulevard. They had originally proposed 2 street lights along Julia Avenue. 3. Proposing to install a total of 3 benches (instead of 2 benches) – 2 along Julia Avenue and adding a bench near their main entrance along the Hudson Boulevard trail. The City will need to review the lighting plan for Julia Avenue and for Hudson Boulevard to ensure the proposed lights are consistent with the City expectations and design standards. The City typically requires developers to install street lights at intersections and at driveways - primarily for safety purposes. There may be a need for street lighting on both sides of Julia Avenue so the City will need to review and approve an overall street lighting plan for the area. 9 These proposed elements should meet the standards of the theming study but their exact design and placement shall be subject to City staff approval. Summary: The addition of three lights (for a total of five lights) and another bench to the project area are the minimum additional design elements the City should require of the developer to have enough Theming points toward the total amenity points for the proposed increased density to allow 300 units for the Springs Apartments. The final design and placement of each of these items shall be subject to City staff approval. Staff can memorialize these amenities within the findings of fact (on pages 16 and 17) and in the Resolution for action by the City Council. Consistency with Proposed Urban High Density Zoning District. As noted earlier, the proposed development required City approval of a Zoning Map Amendment to rezone the property to Urban High Density Residential (from the current RT (rural development transition)) zoning designation. As such, staff reviewed the proposed PUD Plans against the standards including setbacks, impervious coverage, etc. of the Urban High Density Residential zoning district, as shown below. Standard Required Proposed Impervious Surface Maximum 75 percent 66 percent Minimum Lot Area 1,800 square feet per unit 2,469 square feet per unit (average) Minimum Lot Width 60 feet 1,085 feet on Hudson Blvd. Front Yard Setback (Hudson Blvd) 20 feet 20 feet Interior Side Yard 10 feet 55 feet Corner Side Yard 15 feet 10 feet (to Julia Avenue) Rear Yard Setback 20 feet 20 feet Rear Yard Setback (Garages) 20 feet 10 feet (to north property line) Accessory Building Setbacks 10 feet 15 feet Maximum Building Height 50 feet 35 feet (to roof peak) Detached Structures 1,000 square feet maximum 3,000 square feet Parking Not to be located in the front yard or between the front façade and street. Parking is located in front of the proposed club house, though this parking lot design is consistent the design of parking lots for commercial/office buildings and would not be parking for the residential buildings on the site. Open space 200 square feet of common open space provided per unit. In this case, at least 60,000 square feet. 251,449 square feet = 5.77 acres (830 square feet per unit) Site Plan Review Streets and Access. The proposed site plan shows a primary access driveway into the site from Hudson Boulevard. After their initial submittal, the applicant submitted a revised site plan showing the secondary site access (at least for emergency vehicles) moved from Hudson Boulevard to the planned north/south street (Julia Avenue) on the west side of the site. They made this change to the access based on early staff comments about the proposal. The new Julia Avenue is a planned public street connection between 5th Street North and Hudson Boulevard North. The developer should either construct the portion of the Julia 10 Avenue adjacent to the development with a temporary turnaround on the north end or work with the existing property owner and the proposed development to the north (Union Park) to construct all of Julia Avenue to make a continuous street connection from 5th Street North to Hudson Boulevard North. Issues with the proposed setbacks. The applicant is asking the City to approve a 10-foot side yard setback (instead of the required 15-foot setback) from the west property line for the buildings along Julia Avenue. The applicant notes that because of the 100-foot-wide right-of-way for Julia Avenue, they need the reduce setback to make their proposed site plan work. The applicant also asking the City to approve a 10 foot setback (instead of 20 feet) for the detached garages from the north property line. They are making this request to help make the site grades and the storm water management work on their site to help ensure the garages do not flood and so the grades work for storm water emergency over flow. Impervious Surfaces. As noted by the applicant in the project narrative and in the table above, the proposed plan is 66 percent impervious, well below the maximum impervious surface standard in the HDR zoning district of 75 percent. Streets, Sidewalks and Trails. The City will be requiring the applicant to reconstruct Hudson Boulevard along the frontage of their site to an “Urban Section” (with curb and gutter, turn lanes and a bituminous trail along the north side of the road). The City also will be requiring the applicant to design and construct the north/south road (Julia Avenue) adjacent to their western property line from Hudson Boulevard north to the Union Park development. This road section will be in a 100-foot-wide right-of- way to accommodate drive lanes, a center turn lane, turn lanes, a bituminous trail on one side of the road and a concrete sidewalk on the other side. This right-of-way width and design is consistent with the City requirements for Julia Avenue in the Union Park development to the north of the site. The Comprehensive Plan’s Trail Plan shows a planned trail along the proposed north/south street that will be on the west side of the development. The latest proposed project plans show the future road with a trail and a sidewalk along the future north/south road. The City should require the developer to show the north/south road on all project plans and to install the planned trail(s) along Hudson Boulevard and along the north/south street and crosswalks with pedestrian ramps where needed as part of this development. 11 Within the development site itself, the developer will be constructing 4 and 5-foot-wide concrete sidewalks along the private driveways and between the buildings to provide pedestrian access throughout the site. As noted above, the City should require the applicant to extend the concrete side along the west side of their entrance drive to the trail along Hudson Boulevard. Easements. The City will require the applicant to dedicate 10-foot-wide drainage and utility easements along all property lines and 30-foot wide drainage and utility easements centered over the watermains and fire hydrants internal to the Subdivision property, as they will become public infrastructure. The City also may require other easements as the applicant refines their project plans – especially in regards to the stormwater management system. This includes permanent easements for the wetland, wetland buffer proposed storm sewer running west of Julia Avenue (including the proposed infiltration basin) and for the proposed storm sewer running east of the site along the north side of Hudson Boulevard. Architecture/Proposed Design. The proposed design of the development is a townhouse design with the residential buildings being two stories in height with private, ground-level entrances to each unit. The building elevations provide architectural interest with use of exterior accents, a large percentage of windows, and high quality materials including fiber cement board siding and stone masonry. The buildings create additional high architectural value with use of varied roof lines, and vertical and horizontal articulation. These features will give the buildings a more attractive appearance than buildings with flat facades and consistent or straight facades and roof lines. The proposed color pallets for the buildings include slate, gray, beige and browns. I have included several images of the proposed building elevations for your review. The typical interiors of the units include dark wood colored cabinets, stainless steel appliances, granite countertops in all kitchens and wood laminate flooring. Select units will be upgraded to include enhanced finishes, painted access walls, granite countertops throughout, among other features. Adherence to Lake Elmo Design Guidelines and Standards. The proposed development adheres to the Lake Elmo Design Guidelines and Standards in that: • The proposed structures are located and oriented in a manner that allows for pedestrian accessibility and provides visual interest from the public right-of-way. • The buildings are located as close to the public street as possible, easily accessible from the street; setbacks are varied slightly; recreational and common spaces are located at the interior or rear of the site. • The parking areas do not account for more than 50% of street frontage. • The trash enclosure is located away from most of the residential buildings. • Examples of past developments adhere to building design requirements. It is a recommended condition of final PUD approval that the applicant include a detailed architectural plan proposal (with a listing of colors, materials, etc) for the all the buildings in the development for City approval. All of the building exterior designs and materials will need to conform to the design standards in the Lake Elmo Design Guidelines and Standards Manual including those regarding building facades, rooflines, colors entries, lighting and exterior building materials. It appears that all the building styles and materials will meet or exceed the City’s design standards for multiple-family structures. City staff will need to verify the proposed exterior designs and materials will meet the City’s design standards before the City issues building permits for the clubhouse or for the residential buildings. 12 Garages. The proposed plans include 120 attached garages and 7 detached garage buildings with 6 garage stalls in each building. There also is a proposed maintenance garage building for the residents to perform minor service to their vehicles and to wash their vehicles. Wetland and Buffers. The site has a 0.4 acre wetland on the south side of the property along Hudson Boulevard. The applicant had proposed with the Concept Plan for the site to fill the entire wetland. The latest project plans show the applicant preserving much of the wetland and providing a 25-foot-wide buffer around the wetland on their site. The only filling of the wetland is the part along Hudson Boulevard to accommodate the City- required turn lane and trail on the north side of the road. The City requires the applicant to put easements on the final plat to accommodate the wetland and the wetland buffer. Tree Removal, Preservation and Replacement. There is an area of about 300,000 square feet (6.9 acres) of tree cover on the site. The applicant provided a tree inventory that documented the significant or specimen trees on the property. They include several large spruce trees in the southeast corner of the site, along with elms, oaks, maples and aspen trees on the property. The proposed project would remove all the existing trees on the site. Landscaping. The applicant has provided the City with an updated landscaping plan for the site. The City’s Landscape Architect has reviewed these plans and found that they do not meet all City requirements. I have attached his review comments (dated July 30, 2019) for your review. He noted that the latest plans meet most of the City requirements but that the applicant is proposing to plant trees near proposed utility lines. The City prefers to have trees placed at least 10 feet from the nearest utility with a minimum separation of 5 five feet between any tree and a utility, including yard drains and storm sewer lines. He is recommending that the applicant revise the landscape layout to ensure there are no conflicts between the landscaping and utilities by having the trunk of trees be at least 5 feet (and preferably 10 feet) from the nearest utility. The City will require the applicant to revise the landscaping plans to meet or exceed the City’s Landscape Requirements for the replanting of trees and for screening as a condition of approval. Landscape Walls. The applicant is proposing several landscape (retaining) walls around much of the perimeter of the site. The proposed grading plans show these walls ranging in height from 3 feet to 12 feet. Any such wall that is taller than 4 feet requires a separate building permit from the City and must be designed by a licensed Minnesota engineer or architect. Fencing. The applicant is proposing to install a 5-foot tall, black decorative fence along the Hudson Boulevard and Julia Avenue frontages of the site. However, along the north and east property lines of the site the applicant is proposing a 5-foot-tall chain link fence. The City should require the applicant to install the decorative fence around the entire site as part of the PUD approval for design consistency and to have a better looking feature that the neighboring property users and owners will see. Watering Ban. Due to a shortage of water, the City may need to implement severe watering restrictions in the City in the future. This could include limiting or prohibiting the use water outside including for vehicle washing and for watering grass and landscaping. This could affect future home builders, buyers and renters as there may be a limited supply of water available for outdoor uses. It may be wise for the City to put a condition on this plat to require the owner/developer to inform the renters of the units about the possible outdoor watering restrictions. Parkland Dedication. The Parks Commission reviewed the proposed development at its February 20, 2019 meeting. At that meeting they recommended that the developer pay the City cash in lieu of land dedication to meet the City’s park dedication requirements. The proposed development does not propose a public park but does provide recreation for its residents through the club house, pool and open space. This area of Lake Elmo is already served by Savona Park. 13 The proposed development site (include road right-of-ways) consists of 17.57 acres, and the required parkland dedication for the Urban High Density Residential zoning district is 10%. The required amount of fees would be 10% of the fair market value of the property. This value is usually determined by the purchase price of the property, which has yet to be revealed to the City. If the purchase price is not available, then the City would consider using the appraised value of the property to determine the dollar amount of the contribution for parks as created by this development. Subdivision Signs. Section 154.212(G) (1) (c) of the Zoning Code allows each residential subdivision to have one subdivision identification sign per entrance. The maximum size for subdivision identification sign is 32 square feet in area for the main entrance and a maximum sign area of 24 square feet per sign for all other locations. The developer submitted a drawing for an entrance monument sign with the PUD plans that has 52.1 square feet of sign face. They will need to reduce the size of this sign to a maximum of 32 square feet of sign face to meet the City Code standards. Any signs would require a permit from the City. Parking. The City’s Zoning Code requires one parking space per studio and 1 bedroom unit, two parking spaces per 2 and 3 bedroom units and at least one visitor space per four units. With the proposed mix of 300 units, the City Zoning Code requires the developer to provide at least 525 parking spaces on site. In this case, the developer is proposing a total of 562 parking spaces – including attached garage and detached garage spaces (163 total) and 399 surface parking spaces. The proposed plans include 17 parking spaces to the west of the main entrance drive aisle for the clubhouse. This computes to a unit parking ratio of 1.87 spaces per unit – above the 1.75 parking spaces per unit required by the City Code. The proposed width and length of parking stalls is compliant with code, and the proposed width (estimated to be 24’) is adequate for a 2-way drive aisle width according to the Zoning Code. Of these parking spaces, a total of 22 spaces are proposed to be Americans with Disabilities Act (ADA)-accessible. The ADA requires 2% of parking spaces totaling over 501 to be ADA-accessible, and so the proposed number of ADA parking spaces is compliant, provided they are built with adequate width and access aisle spacing. Engineering Comments. The City Engineer has provided a detailed review memo (dated August 28, 2019) regarding the proposed Final Plat/Plans. I have attached this memo for reference. Staff would like to highlight the following comments in summary: 14 • Streets and Transportation o Hudson Boulevard Right-of-Way. Additional right-of-way on Hudson Blvd must be dedicated to the City as needed to accommodate the Hudson Boulevard improvements, including turn lanes and a 10-foot-wide drainage and utility easement. The applicant must update the final plat and project plans to clearly identify both the existing and proposed Hudson Boulevard right-of-way to clearly depict the right-of-way dedication being granted along Hudson Boulevard. o Hudson Boulevard Improvements. Hudson Boulevard must be improved along the frontage of the proposed development in accordance with the Hudson Boulevard design Standards, with and Urban Section along the north boulevard and a bituminous trail. The developer will be required to construct right turn lanes at both the entrance to the proposed development and at the intersection with Julia Avenue and a left turn lane at the development entrance. o Julia Avenue Improvements. The developer must construct new north-south collector street (Julia Avenue) along the west side of the development, from Hudson Boulevard to the northerly plat line of the Springs of Lake Elmo. The new street shall be designed and constructed as an urban collector street consistent with City design standards and within a 100-foot-wide right-of-way, including a bituminous trail along one side and a concrete sidewalk along the other side. o Julia Avenue Right-of-Way Dedication. The Union Park final plat includes the right-of- way for Julia Avenue. As such, the final plat approval for the Springs of Lake Elmo must be contingent upon the owner or developer recording the final plat for Union Park (with the Julia Avenue right-of-way) at Washington County. The proposed perimeter fencing must be located outside of the 10-foot-wide drainage and utility easement. o Site Access. The proposed site plan proposes a single primary access to the site on Hudson Boulevard approximately 660 feet east of the proposed new north-south collector street. This proposed access spacing from the new collector street meets the City minimum spacing of 660 feet. o Secondary/Emergency Access. The latest site plan shows a secondary access to the new north-south collector street (Julia Avenue) and is called out a proposed emergency access point. o Perimeter Decorative Fence. As shown, this fence encroaches the 10 foot utility easement, and so the fence location must be revised to preserve the City standard 10-foot- wide drainage and utility easement. o Private Streets. Private streets are proposed within the development that would remain privately owned and maintained. The interior street and driveway design may require revisions to ensure the adequacy of fire lanes and safety access. • Municipal Sanitary Sewer o The plans include a sanitary sewer utility plan that proposes 300 REC units plus additional facilities such as a fitness center, swimming pool and a car care center. o Sanitary sewer is available to the site. The applicant or developer will be responsible for connecting to the City’s 10-inch sanitary sewer system and extend sanitary sewer in to the property, including the replacement of about 250 feet of 8-inch sanitary sewer with 10-inch sanitary at the applicant’s sole cost. • Municipal Water Supply o The existing water system has sufficient capacity for domestic service for the proposed 300 REC units and additional facilities. o The watermain and hydrants in the Subdivision will be owned and maintained by the City. 15 o The applicant will be responsible to place fire hydrants throughout the property at the direction of the Fire Department. All fire hydrants shall be owned and maintained by the City. o All watermain lines and fire hydrants placed within the development will require 30-foot- wide utility easements centered over the pipe. These easements must be dedicated to the City as part of the final plat. o The northerly watermain connection to Union Park must be coordinated with the Union Park developer. The applicant or project engineer shall redesign this connection to minimize bends and fittings and to fully detail the proposed connection. • Stormwater Management o The storm water management plan is not complete. The proposed development is subject the construction of a storm water management plan and system that meets State, Valley Branch Watershed District (VBWD), South Washington Watershed District (SWWD), and City rules. All stormwater facilities need to be designed and installed in accordance with City, VBWD and SWWD requirements. The storm water management plan must incorporate storm water management for the Hudson Boulevard and Julia Avenue Street improvements. The final plat shall be contingent upon the applicant obtaining the required storm water management permits and the proposed designs for meeting these rules being acceptable to the City. o The approval of the proposed final plat is contingent upon the storm water construction plans meeting the approval of the City. All required easements or Outlots for these facilities shall be dedicated to the City in an agreement or form acceptable to the City. o The proposed storm water facilities internal to the subdivision include several underground storage chambers and a storm water reuse irrigation system. These facilities will remain privately owned and maintained. o The City will require the applicant or developer to execute and record of a Stormwater Maintenance and Easement Agreement with the City in a form acceptable to the City. This agreement must include a detailed maintenance plan and schedule for all the private storm sewer facilities. o Even as privately owned and maintained facilities, the City requires the developer to provide maintenance access roads or drives and benches that meet City engineering design standards for all storm water facilities, including any off-site storm water basins or storm sewer structures. Julia Avenue Design. The City Engineer noted the City standards for this road in his comments. The developer’s plans must include this road section with a design acceptable to the City Engineer. Development Phasing/Grading Phasing. The project narrative notes that the developer intends to grade the entire site and install the public improvements in a single phase with each building gaining occupancy in sequential order starting with the Clubhouse. Their hope is start site work this fall (pending all City and Watershed District approvals) with final completion of the entire development by the fall of 2021. Valley Branch Watershed District Review. The developer has been revising and updating their project plans since the preliminary PUD approval to meet all the requirements of the watershed district. To this point the developer has not yet met all the requirements of the Watershed District. The applicant has told staff they are working toward completing and revising all the necessary project plans and specifications to get Watershed District approval. Stormwater Management and Storm Sewer System Improvements. The proposed development site is in the Valley Branch Watershed District (VBWD). The applicant has chosen to direct storm water runoff from the public improvements for Julia Avenue and Hudson Boulevard to the SWWD. Therefore, the proposed project requires permits from the State (MPCA), VBWD, and SWWD, and must be 16 complaint with the City of Lake Elmo Storm Water Management Ordinance and the City of Lake Elmo design standards manual. In his project review, the City Engineer noted the following: The storm water facilities will be privately owned and maintained so no outlots will be required for the underground storm water facilities. The storm water management plan must incorporate storm water management for the Hudson Boulevard and Julia Avenue Street improvements. The City will require drainage and utility easements over all 100-year high water level areas and to protect all overland emergency overflow paths. The City Engineer’s review memo further addresses the stormwater management considerations and requirements for this development. Utilities – Municipal Water Supply and Municipal Sanitary Sewer. The City Engineer’s review memo provides a review of the municipal sewer and water considerations for this development. Public water and sanitary sewer service are available in this area of Lake Elmo and the developer will be extending them into and through the site. He noted the following: The applicant will be responsible for extending municipal water into the development at its sole cost and will be required to construct a looped watermain network with multiple connection points. This includes a connection to the future watermain in the Union Park development to the north. The applicant will be responsible to place hydrants throughout the property at the direction of the Fire Department. All fire hydrants shall be owned and maintained by the City. All utility plans will be subject to the final approval of the City Engineer. Staff has reviewed the plans based on the assumption that the sanitary sewer extended internal to the site will be privately owned and maintained by the applicant. Fire Chief Comments. The Fire Chief reviewed and commented on the preliminary project plans. He notes the developer will need to space and place fire hydrants in the development according to code and that access to the buildings must be maintained in all weather conditions. I have attached his comments for your reference. RECOMMENDED FINDINGS: Recommended Findings for Final Plat/Final PUD. Staff recommends approval of the Final Plat and Final PUD Plan for the Springs Apartments based on the following findings: 1. That if the 2040 Lake Elmo Comprehensive Plan Update and updated Land Use Map are approved in 2019, that the new land use designation for the site of the proposed planned development will be MU-C (mixed use commercial); and that the preliminary PUD Plan would be consistent with the intent of the 2040 Lake Elmo Comprehensive Plan and the 2040 Land Use Map for this area. 2. That the Final PUD Plan complies with the general intent of the Urban High Density Residential zoning district with PUD modifications including the reduced building setbacks to Julia Avenue and to the north property line. 3. That the Final Plat and Final PUD Plan generally complies with the City’s Subdivision regulations. 4. That the Final PUD Plan must be revised to be consistent with the City’s engineering standards as noted in the City Engineer’s plat review memorandum dated August 28, 2019 and in his construction review memorandum dated September 6, 2019. 17 5. That the preliminary PUD Plan meets the minimum requirements for a PUD including minimum lot area, open space and street layout. 6. That the preliminary PUD Plan meets more than one of the required PUD objectives identified in Section 154.751 including providing: innovation in land development techniques that may be more suitable for a given parcel than conventional approaches; provision of a more adequate, usable, and suitably located open space, recreational amenities and other public facilities than would otherwise be provided under conventional land development techniques; accommodation of housing of all types with convenient access to employment opportunities and/or commercial facilities; and especially to create additional opportunities for senior and affordable housing; coordination of architectural styles and building forms to achieve greater compatibility within the development and surrounding land uses; and higher standards of site and building design than would otherwise be provided under conventional land development technique. 7. That the Final PUD Plan includes several amenities that may be worthy of amenity points to increase the overall housing density in the development. These amenities may include: right-of- way dedication, contained parking, pedestrian improvements, a plaza (gathering area) and the use of design elements consistent with the 2013 Lake Elmo Branding and Theming project. 8. That the Applicant’s Final PUD plan provides the following amenities, for which the City may award amenity points: a. Pedestrian improvements. (5 points) b. Theming elements from the Lake Elmo Theming Study (1-2 points). c. Plaza/gathering location (5 points). d. Contained Parking (5 points) FISCAL IMPACT: There would be no fiscal impact to the City at this time, as the developer will be required to pay for any amendments needed to accommodate the increase in REC units. The Concept Plan approval did not afford the applicant development rights. When the property develops, it will have urban services and will pay sewer and water connection charges, building permit fees and the like that the developer and/or contractors will pay. RECOMMENDATIONS: Recommended Conditions of Approval. Staff and the Planning Commission recommend City Council approval of the requested Final Plat and Final PUD plans for the Springs Apartments on Hudson Boulevard subject to the following conditions: 1. That the Metropolitan Council give final approval of a City’s 2040 Comprehensive Plan Update and adoption of the final version of the 2040 Comprehensive Plan by the Lake Elmo City Council. The City’s final plat approval will be good for 120 days after the Met Council’s approval of the City’s 2040 Comprehensive Plan update or for 120 days after the City Council’s approval of the final plat, whichever comes first. 2. That the developer or property owner for the Union Park development recording with Washington County the Union Park final plat to create the street rights-of-ways and the lot (proposed Outlot H) for this development. 3. That the Final Plat approval is contingent upon the City receiving separate drainage and utility easements, in the City’s standard form of easement agreement for all temporary and off-site development improvements. The easements must be obtained and recorded before recording of final plat. 18 4. That the City approves a Zoning Map Amendment to rezone the site from RT (Rural Development Transitional) to HDR (Urban High Density Residential). (Completed – subject to the final approvals of the 2040 Comprehensive Plan) 5. That the final plat and final PUD Plans submittal identify all requests for flexibility from the Zoning Code. 6. That the applicant address all comments and conditions of approval in the City Engineer’s plat review Memorandum dated August 28, 2019. The City will not release the final plat for recording until the City has granted approval of the construction plans. 7. That the final Plat and final PUD project and construction plans include a revised tree preservation/replanting and revised landscape plans to address all the comments and changes noted in the memo from the City’s Landscape Architect dated July 30, 2019. The City’s Landscape Architect must review and approve all final landscape plans before the City will release the final plat for recording or before the start of construction or grading. 8. That the final Plat and final PUD Plans include updated open space and impervious surface calculations. 9. That the final plat show a drainage and utility easement over the wetland and the wetland buffers, including the 100-year high water level. 10. That the developer or contractor install an 8-foot-wide bituminous trail along Hudson Boulevard and along the future north/south road (Julia Avenue) as part of this development. 11. That the applicant provide the City fees in lieu of park land dedication as required by Section 153.14 with the final plat. 12. That if the applicant wants amenity points for theming, that they provide the City for staff approval specific examples of proposed development fencing, landscaping, lighting and site furnishings, including the clubhouse, that will meet the standards outlined in the Lake Elmo Branding and Theming Study. The design and placement of these elements and features shall be subject to City staff approval. 13. That the final plat and final PUD Plans submittal include detailed architectural plans for the exterior of the buildings (including colors and a listing of all exterior materials) for staff review and approval. (Complete) 14. That the applicant receives a permit from the Valley Branch Watershed District and South Washington Watershed District for the construction of the proposed development. (Pending) 15. That the Final project plans shall include a complete storm water management plan and construction plans that provide all design details for the proposed underground storage systems including details regarding building roof drainage connections. These plans also must incorporate storm water management for the Hudson Boulevard and Julia Avenue Street improvements including the future east bound left turn lane along Hudson Boulevard at Julia Avenue and must meet all City, VBWD and SWWD requirements. (Pending) 16. All storm water facilities internal to the site shall be privately owned and maintained. A storm water maintenance and easement agreement in a form acceptable to the City shall be executed and recorded with the final plat. 17. That the final design and placement of each of theming design items (street lights, benches) shall be subject to City staff approval. 18. That the Final Plat approval is conditioned upon the applicant meeting all City standards and design requirements unless specifically addressed otherwise in these conditions. 19. That the PUD overlay zoning allow for the following: a. Setbacks: Springs Apartments at Lake Elmo Minimum Building Setbacks Front (Hudson Blvd). 20 ft. 19 Interior Side 10 ft. Corner Side (Julia Avenue) 10 ft. Rear (north property line) 20 ft. Rear (north property line – detached garages) 10 ft. b. Attached Garages: That the attached garages shall not exceed 1,000 sq. ft. in area at the ground floor level except by conditional use permit. c. Detached Garages: That the detached garages shall not exceed 3,000 sq. ft. in area at the ground floor level. 20. The Final Plat shall include all necessary public right-of-way and easements for Hudson Boulevard and for the new north/south road (Julia Avenue North). (Complete….pending the recording of Union Park final plat.) 21. Before the City issues any building permits, the developer shall delineate and identify all wetland buffers via staking, fencing and/or signage that is acceptable to the City. 22. The developer shall follow all of the rules and regulations spelled out in the Wetland Conservation Act, and shall acquire the needed permits from the appropriate watershed districts before the commencement of any grading or development activity on the site. 23. That the applicant shall obtain all necessary permits including but not limited to all applicable City permits (building, grading, sign, etc.), MPCA, MDH, MnDOT, NPDES/SWPPP permits and Valley Branch Watershed District, and SWWD approval before starting any site grading or construction activities. (Pending) 24. That if necessary, the applicant shall provide the City with a copy of written permission for any off-site grading work and storm sewer discharges to adjacent properties before starting any site work or grading. (Pending) 25. That the applicant or developer address all the comments of the Fire Chief and the Building Official with final PUD, site and building plans including the placement of buildings and fire hydrants, street and driveway design, parking and emergency vehicle access within the site. 26. That there shall be no encroachments into drainage and utility easements and corridors other than those reviewed and approved by the City and upon execution of an easement encroachment agreement. Prohibited encroachments include, but are not limited to trees, landscaping, fences, retaining walls, buildings and storm water retention. 27. That the developer prepare exhibits for City staff approval that clearly identifies the property lines, easements, proposed locations of retaining walls, fences and accessory buildings and the required and proposed setbacks for each building site within the development. 28. The Applicant(s) or developer shall submit a photometric plan for the development for staff review and approval. All lighting must meet the requirements of Sections 150.035-150.038 of the City Code. The City must approve this plan before issuing a building permit for the development. 29. Before to the installation or construction of any subdivision identification signs or neighborhood markers within the development, the developer shall submit sign plans to the City for review and obtain a sign permit from the City. The proposed monument entrance sign submitted with the preliminary PUD plans is not approved as it exceeds the City size limit of 32 square feet. 30. Before the execution and recording of a final plat for the development, the developer or applicant shall enter into a Developer’s Agreement with the City. The Developer’s Agreement must be approved by the City Attorney and by the City Council. Such Agreement shall delineate who is responsible for the design, construction and payment for the required improvements with financial guarantees therefore. (Pending) 31. The applicant or developer shall enter into a separate grading agreement with the City before starting any grading activity in advance of final plat approval. The City shall review any grading 20 plan that is submitted in advance of a final plat and said plan shall document extent of any proposed grading on the site. 32. That the applicant revise the site and project plans to show a five-foot-wide concrete sidewalk along the west side of the entrance driveway (with the necessary pedestrian ramps) connecting the Clubhouse to the trail along Hudson Boulevard. (Completed) 33. That the City’s final plat approval is good for 120 days from the date of City Council action, unless the applicant requests and the City Council approves a time extension. 34. That the applicant record the final plat with Washington County within 120 days of City Council approval (as required by the City Code). 35. That the maximum density shall not exceed 15 dwelling units per net acre unless the City Council approves specific project design elements and amenity points that increase the allowed density for the proposal. 36. That the applicant change the project plans to show a 5-foot-tall decorative fence around the entire site. The City does not approve the use of chain link fencing around the perimeter of this PUD. 37. That the applicant/owner notify all renters that the City may impose restrictions or limits on outdoor water use including no vehicle washing and no watering of grass, sod or landscaping. 38. That the applicant shall submit revised project plans meeting all conditions of approval for City review and approval. The revised applicant/developer project plans shall meet all of the above conditions before the start of any clearing or grading or construction activity on the site. RECOMMENDATIONS: Staff and the Planning Commission recommend that the City Council approve the Final Plat and Final PUD Plans for the Springs Apartments of Lake Elmo to be located on Hudson Boulevard with the following motion (the City Council cannot give this development final approval until the Metropolitan Council approves the Lake Elmo 2040 Comprehensive Plan update) with the following motion: “Motion to adopt Resolution 2019 -072 approving the final plat and final PUD Plans as requested by Continental 483 Fund LLC for PID# 34.029.21.43.0003 for the project to be known as the Springs Apartments of Lake Elmo located on the north side of Hudson Boulevard, subject to recommended findings and conditions of approval as listed in the staff report.” ATTACHMENTS: 1. Project Land Use Narrative (6 pages) 2. 2 City Maps 3. Aerial Photo 2 4. Overall Plan and Revised Site Plan 5. Proposed Union Park Final Plat 6. Proposed Springs at Lake Elmo Final Plat (3 pages) 7. Project Plans (#21654) 8. Proposed Building Elevations 9. City Engineer’s comments dated August 28, 2019 10. Landscape Architect comments dated July 30, 2019 11. Revised Site/Storm Sewer Plan dated August 30, 2019 12. June 18, 2019 City Council minutes 13. Proposed Theming Elements (Appendix A) 14. Resolution 2019 – 072 W134 N8675 Executive Parkway • Menomonee Falls, WI 53051-3310 • Telephone: 262.502.5500 • Facsimile: 262.502.5522 LAND USE REQUEST _____________________________________________________________________________________ Continental 483 Fund LLC ("Continental") formally requests consideration of a Final Plat/PUD application for its proposed Springs at Lake Elmo (the “Springs”) from the City of Lake Elmo. The proposed site for the Springs apartment community is generally located west of Keats Avenue on the north side of Hudson Boulevard, as shown on the enclosed site plan. Continental proposes an up-scale, market-rate apartment community on the 17.63-acre site (17.01 acres excluding right of way), see enclosed Density Exhibit. The Springs includes 300 homes within 15 residential buildings. The buildings will offer a townhouse design featuring two stories with private, ground-level entrances to each unit. Residents will have a choice between attached, direct-access garages, detached garages and ample surface parking to best fit their needs. There will be a mix of studio, 1-bedroom, 2-bedroom, and 3-bedroom units, as broken down in the chart to the right. The proposed land use is consistent with the 2040 Comprehensive Plan Future Land Use designation of Mixed Use-Commercial (MU-C). The subject site requires a rezoning from Rural Development Transitional (RT) to Urban High Density Planned Unit Development (HDR-PUD). The Future Land Use designation of MU-C allows for residential densities up to 15 units per acre; with greater densities allowed through the PUD process. Continental’s request proposes a density of 17.02 du/acre gross and 17.34 du/acre net (excluding onsite predevelopment wetland area). The proposed project density will require the incorporation of site amenity points to achieve a density increase from the base MU- C density maximum. The proposed density bonus amenity points are outlined in detail on Page 5. A PUD is necessary to have more than one principal building per parcel of land. Continental’s proposal meets or exceeds the criteria of the base HDR zoning district, with the exception of the interior corner building setback and the size of the detached garages (see Dimensional Standards on page 4). Additionally, the Springs will be a high-quality apartment community that is compatible in architecture and scale to existing land uses. Continental would like the opportunity to provide a unique, upscale rental housing option in this very fitting location to support Lake Elmo's growth. W134 N8675 Executive Parkway • Menomonee Falls, WI 53051-3310 • Telephone: 262.502.5500 • Facsimile: 262.502.5522 Continental has reached a private agreement with the current land owner to design and construct Julia Avenue North. The new connector road will be complete prior to completion of the Springs community. The City of Lake Elmo has determined the necessary width of the Julia Avenue right of way is to be 100’ instead of the originally planned 80’. Continental requires a reduced setback on that frontage in order to accommodate the City’s requirement for the additional right of way area. Continental has received approval for a partial fill of the existing wetland from the Valley Branch Watershed District. The project has gone through a number of site plan revisions in order to minimize the impact to the wetland. However, a portion of the wetland will need to be impacted in order to provide the multiuse bituminous trail required by the City. The existing wetland is approximately 0.4 acres and the remaining area after the impact is 0.24 acres. A 25’ minimum wetland buffer will be maintained around the remaining portion of the wetland, apart from the required trail on the south side along Hudson Blvd. The proposed Springs community is anticipated to break ground in late summer of 2019, pending municipal approvals. Construction is to be completed in a single phase with each building gaining occupancy in sequential order starting with the Clubhouse. All public improvements will occur with initial sitework early in the project. Occupancy of the Clubhouse is expected in Spring of 2020, with the residential buildings coming online every 2-3 weeks thereafter and final completion of the community to be achieved by late summer of 2021. In accordance with the approved Preliminary PUD and the submitted engineering plans, elevations, sign package and associated documents, the following is a list of the project standards to be considered as a part of the Final PUD: • Architectural Standards: o Maximum 2 stories or 35’ to top of roof peak o Minimum 25’ principal building separation o Exterior Materials:  Mix of stone masonry and fiber cement siding on all four facades of the primary buildings.  The percentage of each material will be provided as shown in the enclosed elevations. W134 N8675 Executive Parkway • Menomonee Falls, WI 53051-3310 • Telephone: 262.502.5500 • Facsimile: 262.502.5522 o Resident amenities to include:  Minimum 4,000 sf clubhouse  Pool with outdoor seating  Grill area  Fitness center  Pet playground  Car care center with  Pet Spa • Signage: o 3 illuminated clubhouse tower building signs  Maximum of 20 SF each o 1 illuminated double faced monument sign with electronic reader board  Sign to be setback from property line a minimum of 5’  Gross sign area may be 60 SF per side maximum (sign area plus electronic reader board)  Maximum 12’ tall from adjacent grade • Accessory Structures: o The design and construction of any garage, carport, or storage building shall be similar to or compatible with the design and construction of the main building. The exterior building materials, roof style, and colors shall be similar to and compatible with the main building. o The structure shall meet the required yard setbacks for a principal structures. o Detached garages shall not exceed 3,000 square feet at ground floor level and shall not exceed a height of 22 feet. • Overall Parking Standards: o Parking will meet the City Ordinance. W134 N8675 Executive Parkway • Menomonee Falls, WI 53051-3310 • Telephone: 262.502.5500 • Facsimile: 262.502.5522 • Dimensional Standards: PROPOSED SPRINGS DEVELOPMENT MINIMUM LOT AREA 17.01 acres (2,469 sf/unit) OPEN SPACE REQUIREMENT 830 sf / unit (251,449 sf = 5.772 ac) BUILDING SETBACK- FRONT (Hudson Blvd) 20' BUILDING SETBACK- REAR 20' BUILDING SETBACK- CORNER SIDE 10' (Julia Ave N) BUILDING SETBACK- INTERIOR SIDE 10' BUILDING HEIGHT 2 stories - 32' BUILDING HEIGHT-CLUBHOUSE 32' LOT COVERAGE 66% (489,765 sf = 11.243 ac) DENSITY 17.02 du/ac (gross) 17.34 du/ac (net) BUILDING SEPARATION 30' min. PARKING 1.75 spaces / unit GARAGE PARKING 163 spaces (.54 / unit) DETACHED STRUCTURES 3,000 SF LANDSCAPING Meets LIGHTING Meets W134 N8675 Executive Parkway • Menomonee Falls, WI 53051-3310 • Telephone: 262.502.5500 • Facsimile: 262.502.5522 Density Bonus Calculation The Planned Unit Development (PUD) being proposed by Continental 483 Fund LLC is formally seeking an increase of 18 points (18%) in the Amenity Points and Equivalent Density Increase system for its residential development. The increased density has been previously approved through the Preliminary PUD process for the following site amenities: Contained Parking (5 Points) The Springs at Lake Elmo has made a conscientious effort to creatively integrate parking into the site and reduce the number of visible surface parking stalls from the public right-of-way. This has been achieved by rear-loading the parking stalls throughout the project and by using the principal and accessory structures to block the public’s view of those stalls. Pedestrian Improvements (5 Points) The Springs at Lake Elmo will serve as a critical component in expanding the Lake Elmo trail system, ultimately contributing to a greater quality of life in Lake Elmo. The project will offer improvements on Hudson Boulevard and the future Julia Avenue North. Beyond resident amenities and high-quality finishes, a sense of place is created for the community through a thoughtfully designed site plan. Ample open space, landscaping, courtyards, and pedestrian connectivity throughout will foster neighbor interaction and contribute to place making in Lake Elmo. The development will support pedestrian and bicycle access by connecting and constructing a new 8’ wide trail, and will provide ADA connection to the right-of-way designed to the specifications of the Hudson Boulevard and Julia Avenue North design guidelines. Plaza (5 Points) The Springs at Lake Elmo understands the importance of connecting communities, which is why the 4,340 square foot clubhouse and pool (“plaza”) will serve as a gathering space for Springs residents and provide opportunities for community outreach events hosted by the onsite operations team. Theming (1-3 Points) The Springs at Lake Elmo proposal achieves three (3) amenity points under the Amenity Points and Equivalent Density Increase system by capturing the intent of the Lake Elmo Branding and Theming study through considerate investment in the Julia Avenue North streetscape. Continental commits to work with staff to create a well-designed lighting plan, including City standard light poles with community identifying banners to enhancing the corridor. Additionally, The Springs at Lake Elmo will integrate two timeless-style benches comprised of cast aluminum and a durable powder-coated finish and wood seat along the Eastern portion of Julia Avenue North. Further, the project will include an ornamental metal fence around the edge of the project to keep in character with the historic style of the site furnishings and light poles in the area. W134 N8675 Executive Parkway • Menomonee Falls, WI 53051-3310 • Telephone: 262.502.5500 • Facsimile: 262.502.5522 Conclusion The Springs at Lake Elmo is requesting a density increase through the Amenity Points and Equivalent Density Increase system for 18 allowable points (18%). The development will provide a smooth transition from the existing single family and townhome developments to the north and the higher intensity retail corridor along I-94. Ultimately, the project will serve as an important community destination and catalyst for the City’s future. The high quality, amenity-driven Springs at Lake Elmo project will set a precedent for multifamily developments for years to come and will produce a significant public benefit in Lake Elmo. Washington County, MN January 24, 2019 0 375 750187.5 ft 0 110 22055 m 1:4,000 Disclaimer: Map and parcel data are believed to be accurate, but accuracy is not guaranteed. This is not a legal document and should not be substituted for a title search,appraisal, survey, or for zoning verification. HUDSON BLVD N J U N C O R D N 5TH S T R E E T N 5 T H S T R E E T L N N 5TH STR E E T N HUDSON BLVD N 5TH S T R E E T N JU N E A V E N . PULTE DEVELOPMENT PULTE DEVELOPMENT CONTINENTAL DEVELOPMENT12.85 AC SCALE IN FEET 0 200100 NORTH Project Location Date Submittal / RevisionNo. Certification Sheet Title Summary Revision History Sheet No.Revision Project No. By Designed:Drawn: Approved:Book / Page: Phase:Initial Issue: Client CONTINENTAL 483 FUND LLC W134 N8675 EXECUTIVE PARKWAY MENOMONEE FALLS, WI 53051 SPRINGS AT LAKE ELMO LAKE ELMO, MINNESOTA 9955 HUDSON BOULEVARD NORTH EAV CJL EAV PRELIMINARY 4/12/2019 21654 PREL I M I N A R Y 4/12/2019 CITY SUBMITTAL 5/1/2019 CITY PRELIMINARY RESUBMITTAL May 01, 2019 - 10:02am - User:mlarson L:\PROJECTS\20355\CAD\Civil\Exhibit\20355 Dale Properties Exhibit.dwg C2.06 OVERALL DEVELOPMENT PLAN HUDSON BLVD N B20E BLDG 5B FFE=1006.35 GFE=1006.02 B20E BLDG 6A FFE=XXX.X GFE=XXX.X B20E BLDG 8A FFE=1004.85 GFE=1004.52 B20E BLDG 7B FFE=1004.60 GFE=1004.27 B20E BLDG 4B FFE=1006.65 GFE=1006.32 B20E BLDG 3A FFE=1006.20 GFE=1005.87 B20E BLDG 2B FFE=1005.47 GFE=1005.14 B20E BLDG 1A FFE=1005.50 GFE=1005.17 B20E BLDG 14A FFE=1001.75 GFE=1001.42 B20E BLDG 9B FFE=1003.00 GFE=1002.67 B20E BLDG 11B FFE=1003.00 GFE=1002.67 B20E BLDG 10A FFE=1002.50 GFE=1002.17 B20E BLDG 12A FFE=1003.00 GFE=1002.67 B20E BLDG 13B FFE=1002.50 GFE=1002.17 6G GFE=1004.95 6G GFE=1004.05 6G GFE=1001.90 6G GFE=1001.85 6G GFE=1001.85 6GS-2 GFE=1000.50 MG-P GFE=1000.90 CLUBHOUSE FFE=1005.00 B20E BLDG 6B FFE=1006.10 GFE=1005.77 ADA B20E BLDG 15B FFE=1002.20 GFE=1001.87 D E F F B A TYP A TYP A TYP A TYP A TYP A TYP A TYP A TYP A TYP A TYP A TYP A TYP A TYP A TYP A TYP 01 01 01 01 01 010101 111111111111 9 10 9 10 7 7 11 11 6 6 6 9 10 11 12 8 9 6 7 7 10 9 10 10 10 10 9 7 6 2 04 04 04 04 04 04 04 04 05 050505 05 05 05 05 22 ' 22' 22 ' R 1 8 ' R18 ' R1 8 ' 05 05 04 04 05 20'12' F 23 ' 9' TYP18 ' TY P 9' TYP 9' TYP 9' TYP 9' TYP 9' TYP 9' TYP 9' TYP 9' TYP 9' TYP9' TYP 9' TYP 9' TYP 9' TYP 9' TY P 18 ' TY P 18 ' TY P 18 ' TY P 18 ' TY P 18 ' TY P 18 ' TY P 18 ' TY P 18 ' TY P 08 08 08 08 08 08 08 08 08 0808 08 I I H TY P TYP 9' TY P 18' TYP 07 07 07 07 07 07 04 04 040404 R4' R18' R4' R4 0 ' R1 8 ' 22 ' R 1 8 ' R18 ' 09 06 06 01 04 04 04 04 04 9' 18 ' 04 04 04 22' C 07 07 29 . 4 ' 22' 07 07 07 J J J A TYP 07 08 07 07 09 09 09 09 09 09 09 09 09 09 09 09 08 H H H HH I I H 10' J J 24'18'22' 20' 2' 6'12.2'13.8'12'13.8'10.2'8' 2' 4. 5 ' 8' 14 ' 12 ' 12 ' 12 ' 5. 9 ' Project Location Date Submittal / RevisionNo. Certification Sheet Title Summary Revision History Sheet No.Revision Project No. By Designed:Drawn: Approved:Book / Page: Phase:Initial Issue: Client CONTINENTAL 483 FUND LLC W134 N8675 EXECUTIVE PARKWAY MENOMONEE FALLS, WI 53051 SPRINGS AT LAKE ELMO LAKE ELMO, MINNESOTA 9955 HUDSON BOULEVARD NORTH EAV CJL EAV PRELIMINARY 4/12/2019 21654 Registration No.Date: I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly licensed professional ENGINEER under the laws of the state of Minnesota. If applicable, contact us for a wet signed copy of this plan which is available upon request at Sambatek's, Minnetonka, MN office. 4/12/201954914 Eric A. Vogel PREL I M I N A R Y 4/12/2019 CITY SUBMITTAL 5/1/2019 CITY PRELIMINARY RESUBMITTAL SCALE IN FEET 0 10050 NORTH May 01, 2019 - 10:02am - User:mlarson L:\PROJECTS\21654\CAD\Civil\Sheets\21654-C3-SITE.dwg C3.01 SITE PLAN AREA GROSS SITE AREA BUILDING INFORMATION B20E (20 DU/BUILDING) TOTAL RESIDENT BUILDINGS GENERAL HOME MIX STUDIO 1-BEDROOM 2-BEDROOM 3-BEDROOM TOTAL HOMES ZONING EXISTING ZONING PROPOSED ZONING PARKING INFORMATION GARAGE TOTALS: NUMBER OF ATTACHED MAINTENANCE GARAGES NUMBER OF STAND ALONE TOTAL GARAGE PARKING REQUIRED PER CODE SURFACE PARKING AMOUNT TOTAL PARKING PROVIDED UNIT PARKING RATIO COVERED PARKING RATIO CLUBHOUSE PARKING *INCLUDED IN PARKING CALCS 1.ALL DIMENSIONS ARE ROUNDED TO THE NEAREST TENTH FOOT. 2.ALL DIMENSIONS SHOWN ARE TO THE FACE OF CURB TO FACE OF CURB UNLESS OTHERWISE NOTED. 3.CONTRACTOR SHALL REVIEW PAVEMENT GRADIENT AND CONSTRUCT “GUTTER OUT” WHERE WATER DRAINS AWAY FROM CURB. ALL OTHER AREAS SHALL BE CONSTRUCTED AS “GUTTER IN” CURB. COORDINATE WITH GRADING CONTRACTOR. 4.ALL AREAS ARE ROUNDED TO THE NEAREST SQUARE FOOT. 5.ALL PARKING STALLS TO BE 9' IN WIDTH AND 18' IN LENGTH UNLESS OTHERWISE INDICATED. 6.CONTRACTOR SHALL REFER TO ARCHITECTURAL PLANS FOR EXACT LOCATIONS AND DIMENSIONS OF EXIT PORCHES, RAMPS, PRECISE BUILDING DIMENSIONS AND EXACT BUILDING UTILITY ENTRANCE LOCATIONS. 7.SEE ARCHITECTURAL PLANS FOR LIGHT POLE FOUNDATION DETAIL AND FOR EXACT LOCATIONS OF LIGHT POLE. 8.REFER TO FINAL PLAT FOR LOT BOUNDARIES, LOT NUMBERS, LOT AREAS, AND LOT DIMENSIONS. 9.ALL GRADIENTS ON SIDEWALKS ALONG THE ADA ROUTE SHALL HAVE A MAXIMUM LONGITUDINAL SLOPE OF 5% (1:20), EXCEPT AT CURB RAMPS (1:12), AND A MAXIMUM CROSS SLOPE OF 2.08% (1:48). THE MAXIMUM SLOPE IN ANY DIRECTION ON AN ADA PARKING STALL OR ACCESS AISLE SHALL BE 2.08% (1:48). THE CONTRACTOR SHALL REVIEW AND VERIFY THE GRADIENT IN THE FIELD ALONG THE ADA ROUTES PRIOR TO PLACING CONCRETE OR BITUMINOUS PAVEMENT. THE CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY IF THERE IS A DISCREPANCY BETWEEN THE GRADIENT IN THE FIELD VERSUS THE DESIGN GRADIENT AND COORDINATE WITH GRADING CONTRACTOR. 10."NO PARKING" SIGNS SHALL BE PLACED ALONG ALL DRIVEWAYS AS REQUIRED BY CITY. LEGEND EASEMENT CURB & GUTTER BUILDING RETAINING WALL SAWCUT LINE NUMBER OF PARKING STALLS PER ROW SIGN PIPE BOLLARD STANDARD DUTY ASPHALT PAVING CONCRETE PAVING PROPERTY LIMIT EXISTINGPROPOSED KEY NOTE DEVELOPMENT SUMMARY DEVELOPMENT NOTES KEY NOTES WETLAND LIMITS TREELINE BUILDING, STOOPS, STAIRS SEE ARCHITECTURAL PLANS TRASH/RECYCLING PICKUP AREA - SEE ARCHITECTURAL PLANS MAIL KIOSK - SEE ARCHITECTURAL PLANS POOL - SEE ARCHITECTURAL PLANS MONUMENT SIGN - SEE ARCHITECTURAL PLANS VEHICLE GATE - SEE ARCHITECTURAL PLANS TRANSFORMER - LOCATION TBD 741,214 SF 17.02 AC QUANTITY HEIGHT 15 UNITS 2-STORY / 35' 15 UNITS HOMES PERCENTAGE 30 10% 120 40% 120 40% 30 10% 300 100% RURAL DEVELOPMENT TRANSITIONAL URBAN HIGH-DENSITY PLANNED UNIT (HDR.PUD) 120 GARAGES 1 42 GARAGES 163 GARAGES 525 SPACES 399 SPACES 562 SPACES 1.87 0.29 17 SPACES (24 ADA) XX XX THE SUBSURFACE UTILITY INFORMATION SHOWN ON THESE PLANS IS A UTILITY QUALITY LEVEL D. THIS QUALITY LEVEL WAS DETERMINED ACCORDING TO THE GUIDELINES OF ASCE/CI 38-02, TITLED "STANDARD GUIDELINES FOR THE COLLECTION AND DEPICTION OF EXISTING SUBSURFACE UTILITY DATA." THE CONTRACTOR AND/OR SUBCONTRACTORS SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, BY CONTACTING THE NOTIFICATION CENTER (GOPHER STATE ONE FOR MINNESOTA). THE CONTRACTOR AND/OR SUBCONTRACTOR AGREE TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES, WHICH MIGHT BE OCCASIONED BY HIS OR HER FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UTILITIES (UNDERGROUND AND OVERHEAD). IF THE CONTRACTOR ENCOUNTERS ANY DRAIN TILE WITHIN THE SITE, HE OR SHE SHALL NOTIFY THE ENGINEER WITH THE LOCATION, SIZE, INVERT AND IF THE TILE LINE IS ACTIVE. NO DRAIN TILE SHALL BE BACKFILLED WITHOUT APPROVAL FROM THE PROJECT ENGINEER. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE ALL EXISTING UTILITIES WHICH CONFLICT WITH THE PROPOSED IMPROVEMENTS SHOWN ON THE PLANS. CONCRETE SIDEWALK DETAILS A B C D E F G B-612 CONCRETE CURB AND GUTTER - SEE SHEET C9.0101 B-618 CONCRETE CURB AND GUTTER - SEE SHEET C9.0102 TAPERED CURB - SEE SHEET C9.0103 4' SIDEWALK - SEE SHEET C9.0104 5' SIDEWALK - SEE SHEET C9.0105 STOP SIGN - SEE SHEET C9.0106 ACCESSIBLE PARKING SIGN - SEE SHEET C9.0107 ACCESSIBLE PARKING STALL - SEE SHEET C9.0108 ARCHITECTURAL CONCRETE DETAIL XX CHAIN LINK FENCE - SEE ARCHITECTURAL PLANSH DECORATIVE WOODEN FENCE - SEE ARCHITECTURAL PLANSI CHAIN LINK FENCE DECORATIVE WOODEN FENCE AIR CONDITIONING UNIT VALLEY GUTTER - SEE SHEET C9.0109 BITUMINOUS PATHJ Project Location Date Submittal / RevisionNo. Certification Sheet Title Summary Revision History Sheet No.Revision Project No. By Designed:Drawn: Approved:Book / Page: Phase:Initial Issue: Client CONTINENTAL 483 FUND LLC W134 N8675 EXECUTIVE PARKWAY MENOMONEE FALLS, WI 53051 SPRINGS AT LAKE ELMO LAKE ELMO, MINNESOTA 9955 HUDSON BOULEVARD NORTH JEB CJL ETL FINAL 4/12/2019 21654 Registration No.Date: I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly licensed professional ENGINEER under the laws of the state of Minnesota. If applicable, contact us for a wet signed copy of this plan which is available upon request at Sambatek's, Minnetonka, MN office. 7/26/201950475 Eric T. Luth 4/12/2019 CITY SUBMITTAL 5/1/2019 CITY PRELIMINARY RESUBMITTAL 6/11/2019 BID SET 7/26/2019 CITY SUBMITTAL Jul 26, 2019 - 12:21pm - User:jbalzer L:\PROJECTS\21654\CAD\Civil\Sheets\21654-C1-TITLE.dwg C1.01 TITLE SHEET GEOTECHNICAL PROFESSIONAL SERVICE INDUSTRIES, INC. 2915 WATERS ROAD, SUITE 112 EAGAN, MN 55121 TEL 651-646-8148 CONTACT: JOSEPH ROZMIAREK DEVELOPER/OWNER CONTINENTAL 483 FUND LLC W134 N8675 EXECUTIVE PARKWAY MENOMONEE FALLS, WI 53051 TEL 262-653-9352 CONTACT: GWYN WHEELER ARCHITECT KHALER SLATER 111 W WISCONSIN AVE MILWAUKEE, WI 53203 TEL 414-373-2000 FAX 414-272-2001 CONTACT: DENNIS POHLMAN ELECTRIC COMPANY - XCEL ENERGY 825 RICE STREET 1ST FLOOR ST. PAUL, MN 55117 651-229-5535 CONTACT: JESSE KUHLMAN UTILITY LOCATION MINNESOTA GOPHER STATE ONE CALL (800) 252-1166 CENTURY LINK 425 MONROE STREET ANOKA, MN 55303 651-312-5662 CONTACT: LUCAS PELUSO COMCAST 4255 LEXINGTON AVE ST 100 ARDEN HILLS, MN 55126 651-564-2513 CONTACT: BRAD GREENWALDT FIRE 3510 LAVERNE AVE NORTH LAKE ELMO, MN 55042 651-770-5006 CONTACT: GREG MALMQUIST CIVIL ENGINEER SAMBATEK 12800 WHITEWATER DRIVE, SUITE 300 MINNETONKA, MN 55343 TEL 763-476-6010 FAX 763-476-8532 CONTACT: ERIC LUTH, PE LANDSCAPE ARCHITECT SAMBATEK 12800 WHITEWATER DRIVE, SUITE 300 MINNETONKA, MN 55343 TEL 763-476-6010 FAX 763-476-8532 CONTACT: WILLIAM DELANEY, PLA SURVEYOR SAMBATEK 12800 WHITEWATER DRIVE, SUITE 300 MINNETONKA, MN 55343 TEL 763-476-6010 FAX 763-476-8532 CONTACT: CRAIG JOHNSON, LS SHEET INDEX SHEET DESCRIPTION C1.01 TITLE SHEET C2.01 ALTA SURVEY C2.02 FINAL PLAT (1 OF 2) C2.03 FINAL PLAT (2 OF 2) C2.04 EXISTING CONDITIONS C2.05 DEMOLITION PLAN C2.06 OVERALL DEVELOPMENT PLAN C3.00 OVERALL SITE PLAN C3.01 SITE PLAN NORTH WEST C3.02 SITE PLAN SOUTH WEST C3.03 SITE PLAN NORTH CENTRAL C3.04 SITE PLAN SOUTH CENTRAL C3.05 SITE PLAN NORTH EAST C3.06 SITE PLAN SOUTH EAST C3.07 ADA OVERALL C3.08 ADA NORTH WEST C3.09 ADA SOUTH WEST C3.10 ADA NORTH CENTRAL C3.11 ADA SOUTH CENTRAL C3.12 ADA NORTH EAST C3.13 ADA SOUTH EAST C4.00 OVERALL GRADING PLAN C4.01 GRADING PLAN NORTH WEST C4.02 GRADING PLAN SOUTH WEST C4.03 GRADING PLAN NORTH CENTRAL C4.04 GRADING PLAN SOUTH CENTRAL C4.05 GRADING PLAN NORTH EAST C4.06 GRADING PLAN SOUTH EAST C5.01 EROSION CONTROL PHASE I C5.02 EROSION CONTROL PHASE II C5.03 EROSION CONTROL NOTES AND DETAILS C5.04 EROSION CONTROL NOTES AND DETAILS C6.00 SANITARY SEWER AND WATERMAIN PLAN C6.01 SANITARY SEWER AND WATERMAIN PLAN NORTH WEST C6.02 SANITARY SEWER AND WATERMAIN PLAN SOUTH WEST C6.03 SANITARY SEWER AND WATERMAIN PLAN NORTH CENTRAL C6.04 SANITARY SEWER AND WATERMAIN PLAN SOUTH CENTRAL C6.05 SANITARY SEWER AND WATERMAIN PLAN NORTH EAST C6.06 SANITARY SEWER AND WATERMAIN PLAN SOUTH EAST C6.08 WATERMAIN PROFILE C6.09 WATERMAIN PROFILE C6.10 WATERMAIN PROFILE C6.11 WATERMAIN PROFILE C7.00 STORM SEWER PLAN C7.01 STORM SEWER PLAN NW C7.02 STORM SEWER PLAN SW C7.03 STORM SEWER PLAN N CENTRAL C7.04 STORM SEWER PLAN S CENTRAL C7.05 STORM SEWER PLAN NE C7.06 STORM SEWER PLAN SE C8.01 DEMOLITION JULIA AVENUE C8.02 DEMOLITION HUDSON BLVD EAST C8.03 STREETS JULIA AVENUE C8.04 STREETS HUDSON BLVD CENTRAL C8.05 STREETS HUDSON BLVD WEST C8.06 STREETS HUDSON BLVD EAST C8.07 STORM PROFILES C8.08 INTERSECTION DETAILS C8.09 EROSION CONTROL & TURF ESTABLISHMENT C8.10 EROSION CONTROL & TURF ESTABLISHMENT C8.11 SIGN & STRIPE - JULIA AVENUE C8.12 SIGN & STRIPE - HUDSON BLVD C9.01 DETAILS C9.02 DETAILS C9.03 DETAILS C9.04 DETAILS C9.05 DETAILS C9.06 DETAILS C9.07 DETAILS C9.08 DETAILS C9.09 DETAILS L1.01 LANDSCAPE PLAN L1.02 SHRUB PLAN WEST L1.03 SHRUB PLAN EAST L1.04 LANDSCAPE NOTE AND DETAILS L1.05 CITY NOTES AND DETAILS L1.06 TREE INVENTORY X1-1 CROSS SECTIONS - JULIA X1-2 CROSS SECTIONS - JULIA X1-3 CROSS SECTIONS - JULIA X1-4 CROSS SECTIONS - JULIA X1-5 CROSS SECTIONS - JULIA X1-6 CROSS SECTIONS - JULIA X2-1 CROSS SECTIONS - HUDSON X2-2 CROSS SECTIONS - HUDSON X2-3 CROSS SECTIONS - HUDSON X2-4 CROSS SECTIONS - HUDSON for Final Plans Springs at Lake Elmo Continental 483 FUND LLC Lake Elmo, Minnesota Presented by: NO SCALE VICINITY MAP SITE UTILITY & GOVERNING AGENCIES CONTACT LIST: CONSULTANT CONTACT LIST: BENCHMARKS N.T.S. CITY OF LAKE ELMO ENGINEERING DESIGN STANDARDS (MARCH 2017) CITY ENGINEER'S ASSOCIATION OF MINNESOTA STANDARD SPECIFICATIONS (2013) MNDOT STANDARD SPECIFICATIONS FOR CONSTRUCTION (2016 EDITION) GOVERNING SPECIFICATIONS COMMERCE DR 94 19 TAMARACK RD WO O D B U R Y D R HUD S O N R D 10 BENCHMARK #1 = MNDOT Disc "8282 AX" - Elev=938.31 Located at NE Quad. of Int. Hwy. 94 & Keats Ave. BENCHMARK #2 = TNH - ELEV=1001.01 South property line of subject property @ midpoint of line. GAS COMPANY - XCEL ENERGY 825 RICE STREET 1ST FLOOR ST. PAUL, MN 55117 651-229-5535 CONTACT: JESSE KUHLMAN HUDSON BLVD N SCALE IN FEET 0 12060 NORTH To Continental 483 Fund LLC, DPS-Lake Elmo, LLC, a Minnesota limited liability company and First American Title Insurance Company: This is to certify that this map or plat and the survey on which it is based were made in accordance with the 2016 Minimum Standard Detail Requirements for ALTA/NSPS Land Title Surveys, jointly established and adopted by ALTA and NSPS, and includes Items 1, 2, 3, 4, 5, 6(b), 7(a), 7(b)(1), 7(c), 8, 9, 10, 11, 13, 14, 16, 17, 18, 19, and 20 of Table A thereof. The field work was completed on 01/21/2019. Dated this 12th day of March, 2019 Sambatek, Inc. Craig E. Johnson, LS Minnesota License No. 44530 cjohnson@sambatek.com 1. Referencing Title Commitment No. NCS-938972-MKE, dated December 17, 2018, First American Title Insurance Company. 2. The bearing system is based on the Washington County coordinate system, NAD83 (1986 Adjust). With an assumed bearing of South 00 degrees 01 minutes 13 seconds West for the east line of the Southwest Quarter of the Southeast Quarter, Section 34, Township 29, Range 21. 3. The vertical datum is based on NAVD88. BENCHMARK #1 = MNDOT Disc "8282 AX" - Elev=938.31 Located at NE Quad. of Int. Hwy. 94 & Keats Ave. BENCHMARK #2 = TNH - ELEV=1001.01 South property line of subject property @ midpoint of line. VICINITY MAP SURVEY NOTES Proposed Description That part of the Southwest Quarter of the Southeast Quarter, Section 34, Township 29, Range 21, Washington County, Minnesota described as follows: Commencing at the southwest corner of said Southwest Quarter of the Southeast Quarter; thence North 00 degrees 06 minutes 31 seconds East, assumed bearing, along the west line of said Southwest Quarter of the Southeast Quarter, a distance of 82.86 feet to the north line of Parcel 29C of Minnesota Department of Transportation Right of Way Plat No. 82-43; thence North 89 degrees 18 minutes 27 seconds East, along said north line, a distance of 40.00 to the point of beginning; thence North 00 degrees 06 minutes 31 seconds East, a distance of 607.73 feet; thence North 89 degrees 40 minutes 54 seconds East, a distance of 1284.76 feet to the east line of said Southwest Quarter of the Southeast Quarter; thence South 00 degrees 01 minutes 13 seconds West, along said east line, a distance of 428.20 feet to a point 267.8 feet north of the southeast corner of said Southwest Quarter of the Southeast Quarter; thence South 89 degrees 54 minutes 16 seconds West, parallel to the south line of said Southwest Quarter of the Southeast Quarter, a distance of 200.00 feet; thence South 00 degrees 01 minutes 13 seconds West, parallel to the east line of said Southwest Quarter of the Southeast Quarter, a distance of 173.21 feet to said north line of Parcel 29C; thence South 89 degrees 18 minutes 27 seconds West, along said north line, a distance of 1085.76 feet to the point of beginning. The following notes correspond to the reference numbers listed in Schedule B, Section 2 of the title commitment. SUBJECT PROPERTY 1.The surveyor has depicted the property corner monuments, or the witness to the corner that were found during the field work, and set property corner monuments, or witnesses to the corner, at the locations where there did not appear to be any evidence of an existing monument. 2.The property does not have an assigned address. 3.The subject property lies within Flood Plain Zone X – 'Area Of Minimal Flood Hazard', according to FEMA per FIRM Map No. 27163C0245E dated 2/3/2010. 4.The gross area information of subject property 17.0159 Acres or 741,214 Square Feet. 5. The vertical relief is shown on the graphical portion of the survey. 6b. The zoning information has not been provided by the client. 7a.There are no buildings on the subject property. 7b.There is a building foundation on the subject property as shown and dimensioned. 7c.There are no buildings or heights to measure on subject property. The building foundations as shown, are at ground level. 8.Visible substantial features observed in the process of conducting the fieldwork are shown hereon. 9.There are no parking areas on the subject property. 10a.There were no division or party walls designated by the client to be shown on the survey. 11.A Gopher State One Call (GSOC) request was placed on 12/26/2018 for utility locates on this site and assigned GSOC Ticket No. 183600280. The surveyor makes no guarantees that the underground utilities shown hereon comprise all such utilities in the area, either in service or abandoned. Utility suppliers often do not respond to these requests in the field but may provide maps, plans, and drawings in lieu of physical location. Utility information shown hereon is a compilation of the provided map information and those visible utilities and marked utilities which were located during the survey field work. The surveyor further does not warrant that the underground utilities shown hereon are in the exact location as indicated, although they are located as accurately as possible from the available information. The surveyor has not physically located the underground utilities. Pursuant to MS 216.D contact Gopher State One Call at (651-454-0002) prior to any excavation. 13.The names of adjoining land owners according to the current county tax records are shown on the survey. 14.The distance to the nearest intersecting street is 1000 feet to 5th St. N. & Keats Av. 16.There is no evidence of recent earth moving work, building construction or building additions observed in the process of conducting the fieldwork. 17.No changes in street right of ways are proposed per City of Lake Elmo Bay. There is no observable evidence of recent street or sidewalk construction or repair. 18.There were wetland delineation markers observed in the process of conducting the field work.See survey. Per a Letter by the Department of the Navy, dated February 8, 2019, File No. MVP-2018-03459-MMW, the wetland was delineated by Kjolhaug Environmental. The Department of the Navy agrees with the delineated location per said Letter. A permit from the Department of the Navy must be obtained prior to any fill or dredging of the wetland. 19.Plottable off site easements and servitudes disclosed in the provided title documents and/or observed during the field work that appear to benefit and/or affect the subject property are shown hereon. 20.A Sambatek Professional Liability Insurance Certificate of Insurance will be provided upon request. "TABLE A" NOTES CERTIFICATION N.T.S. KE A T S A V E SITE 10TH STREET N OVERHEAD ELECTRICAL WIRE LIGHT SANITARY SEWER STORM SEWER WATERMAIN UNDERGROUND ELECTRIC GUY ANCHOR UTILITY POLE GUARD POST UNDERGROUND TELEPHONE UNDERGROUND GAS CHAIN LINK FENCE WOOD FENCE CONCRETE SURFACE SIGN FOUND MONUMENT FOUND CAST IRON MONUMENT FOUND RIGHT-OF-WAY MONUMENT SET MONUMENT MARKED LS 43933 SECTION LINE UNDERLYING / ADJACENT LOT TIE LINE BOUNDARY LINE DEED DISTANCE(100.00) TRANSFORMER GAS METER COMMUNICATIONS MANHOLE ELECTRIC MANHOLE GAS MANHOLE ELECTRIC METER TELEPHONE PEDESTAL CABLE TV BOX GATE VALVE / HYDRANT SANITARY MANHOLE CLEAN OUT STORM MANHOLE STORM CATCH BASIN FLARED END SECTION RIGHT-OF-WAY LINE WIRE FENCE DECIDUOUS TREE LEGEND REGISTERED LAND SURVEYORRLS FOUNDFD FIBER OPTIC IN W O O D A V E INT HWY 94 5TH STREET N 11.The right to erect and to maintain temporary on land adjoining Trunk Highway 12 and Interstate Highway 94, and also limitations on access to said highways, as contained or shown in the following: (a) Highway Easement, dated January 17, 1927, recorded February 18, 1927, in Book 111 of Deeds, at page 1; (Easement does not affect subject property) (b) Highway Easement, dated January 19, 1927, recorded June 23, 1927, in Book 111 of Deeds, at page 206; (Easement does not affect subject property - lies within existing R.O.W.) (c) Final Certificate by the State of Minnesota, recorded April 30, 1959, in Book 220 of Deeds, at page 11; (Easement does not affect subject property - lies within existing R.O.W.) (d) Minnesota Department of Transportation Right of Way Plat No. 82-43 recorded March 22, 1882 as Doc. No. 429592; (Affects property and is depicted hereon) (e) Warranty Deed, to the State of Minnesota, recorded September 30, 1983, as Doc. No. 452990 conveying Parcel 29G in the above Right of Way Plat No. 82-43; (does not affect subject property) (f) Final Certificate by the State of Minnesota, recorded August 17, 1987, as Doc. No. 548829 (acquiring Parcel 29C in the above Right of Way Plat No. 82-43); and (R.O.W. Plat shown on survey) (g) Quitclaim Deed, from the State of Minnesota, to the City of Lake Elmo, dated November 13, 2013, recorded December 30, 2013, as Doc. No. 3975938 (R.O.W. Plat shown on survey) 12.Reservation of 50% of all minerals and mineral rights in the East Half of the Southwest Quarter of Section 34, as reserved in the following: (a) Limited Warranty Deed, from the Federal Farm Mortgage Corporation, as grantor, to Lawrence Fehlen and Marie A. Fehlen, as grantees, dated November 8, 1939, recorded November 21, 1939, in Book 135 of Deeds, at page 632; and (does not affect subject property) (b) Quit Claim Deed, from the Federal Farm Mortgage Corporation, to the United States of America, dated September 6, 1957, recorded November 22, 1957, in Book 209 of Deeds, at page 493. (Does not affect subject property) 13.Terms and conditions, including an easement for pipeline purposes, as contained in the following: (a) Right of Way Conveyance in favor of Standard Oil Company, dated August 7, 1946, recorded August 26, 1946, in Book 150 of Deeds, at page 219; (does not affect subject property) (b) Assignment of Rights of Way, from Standard Oil Company, to The American Oil Company, dated December 31, 1960, recorded January 25, 1961, in Book 236 of Deeds, at page 240; (does not affect subject property) (c) Partial Release of Right of Way Conveyance, dated May 5, 1972, recorded May 8, 1972, as Doc. No. 298638; (does not affect subject property) (d) Quit Claim Deed, from Amoco Oil Company, to the State of Minnesota, dated October 25, 1983, recorded December 29, 1983, as Doc. No. 457465; (does not affect subject property). (e)Agreement Limiting Right of Way Easement, dated July 19, 2001, recorded August 3, 2001, as Doc. No. 3172091; (does not affect subject property) (f)Non Fee Property Assignment Agreement, from BP Products North America Inc., to BP Pipelines (North America) Inc., dated January 1, 2015, recorded April 10, 2015, as Doc. No. 4021457; and (affects subject property-blanket in nature therefor not shown) (g)Agreement and Acknowledgement, between BP Pipelines (North America) Inc., the City of Lake Elmo, and U.S. Home Corporation, dated June 15, 2016, recorded July 28, 2016, as Doc. No. 4076835. (Does not affect subject property) 14.Easement for power line purposes as contained in the following: (A)Final Decree, recorded April 13, 1972, in Book 316 of Deeds, at page 69; and (does not affect subject property) (B)Assignment and Assumption of Easements, from XCEL Energy Inc., to Northern States Power Company, dated February 7, 2001, recorded March 8, 2001, as Doc. No. 3145752. (Affects property - no easements to depict on survey) 15.Terms and conditions of the Petition and Waiver Agreement, dated September 4, 2013, recorded September 12, 2013, as Doc. No. 3964045. (Affects property - no easements to depict on survey) 16.Terms and conditions of the Petition and Waiver Agreement, dated September 4, 2013, recorded September 12, 2013, as Doc. No. 3964046. (Affects property - no easements to depict on survey) 17.Terms and conditions, including an easement for drainage and utility purposes in favor of the City of Lake Elmo, as contained in the Public Drainage & Utility Easement, dated September 4, 2013, recorded September 12, 2013, as Doc. No. 3964047. (Affects property and easement is depicted hereon) 18.Terms and conditions, including an easement for public and drainage purposes in favor of the City of Lake Elmo, as contained in the Public Drainage & Utility Easement, dated September 4, 2013, recorded September 12, 2013, as Doc. No. 3964048. (Does not affect subject property) 19.Terms and conditions, including an easement for public and drainage purposes in favor of the City of Lake Elmo, as contained in the Public Drainage and Utility Easement, dated September __, 2013, recorded September 12, 2013, as Doc. No. 3964049. (Does not affect subject property) 20.Terms and conditions, including an easement for street purposes in favor of the City of Lake Elmo, as contained in the Permanent Public Street Easement Agreement, recorded November 20, 2014, as Doc. No. 4007702. (Does not affect subject property) 21.Terms and conditions, including easements for drainage and utility purposes in favor of the City of Lake Elmo, as contained in the Drainage and Utility Easement Agreement, recorded November 20, 2014, as Doc. No. 4007703. (Does not affect subject property) 22.Terms and conditions, including an easement for utility purposes in favor of the City of Lake Elmo, as contained in the Utility Easement, recorded November 20, 2014, as Doc. No. 4007704. (Easement affects property as shown - falls within proposed R.O.W.) 23.Terms and conditions of the Memorandum of Understanding, between U.S. Home Corporation, and DPS-Lake Elmo, LLC, dated October 3, 2014, which is unrecorded, and of the Notice of Lien Rights by DPS-Lake Elmo, LLC, recorded November 20, 2014, as Doc. No. 4007705, which refers to said Memorandum of Understanding. (Affects property - no easements to depict on survey). 24.Possible overlap of the Land with the parcel to the southeast, said parcel is described in the Warranty Deed, recorded September 21, 2015, as Doc. No. 4041879. The legal description prepared by Sambatek, shown as proposed on this survey is contiguous to, and creates no gaps or overlaps with the southeast parcel as described in said document. Jul 26, 2019 - 12:21pm - User:jbalzer L:\PROJECTS\21654.01\CAD\Survey\Sheets\2165401-ALTA.dwg C1.02 ALTA/NSPS LAND TITLE SURVEY WELL Project Location Date Submittal / RevisionNo. Certification Sheet Title Summary Revision History Sheet No.Revision Project No. By Designed:Drawn: Approved:Book / Page: Phase:Initial Issue: Client CONTINENTAL 483 FUND LLC W134 N8675 EXECUTIVE PARKWAY MENOMONEE FALLS, WI 53051 SPRINGS AT LAKE ELMO LAKE ELMO, MINNESOTA 9955 HUDSON BOULEVARD NORTH JEB CJL ETL FINAL 4/12/2019 21654 4/12/2019 CITY SUBMITTAL 5/1/2019 CITY PRELIMINARY RESUBMITTAL 6/11/2019 BID SET 7/26/2019 CITY SUBMITTAL Know all persons by these presents: That Continental 483 Fund LLC, a Minnesota limited liability company, owner, of the following described property situated in the County of Washington, State of Minnesota, to wit: Outlot H, UNION PARK, Washington County, Minnesota Has caused the same to be surveyed and platted as SPRINGS AT LAKE ELMO and does hereby dedicate to the public for public use the public way and also dedicate the drainage and utility easements as created by this plat. In witness whereof said Continental 483 Fund LLC, a Minnesota limited liability company, has caused these presents to be signed by its proper officer this day of , 20 . Signed: Continental 483 Fund LLC, a Minnesota limited liability company By:, its STATE OF COUNTY OF The foregoing instrument was acknowledged before me on this day of , 20 , by , , of Continental 483 Fund LLC, a Minnesota limited liability company, on behalf of the company. Notary Public, County, Minnesota Notary Printed Name My Commission Expires I Craig E. Johnson do hereby certify that this plat was prepared by me or under my direct supervision; that I am a duly Licensed Land Surveyor in the State of Minnesota; that this plat is a correct representation of the boundary survey; that all mathematical data and labels are correctly designated on this plat; that all monuments depicted on this plat have been, or will be correctly set within one year; that all water boundaries and wet lands, as defined in Minnesota Statutes, Section 505.01, Subd. 3, existing as of the date of this certificate are shown and labeled on this Plat; and all public ways are shown and labeled on this plat. Dated this day of , 20 . Craig E. Johnson, Licensed Land Surveyor, Minnesota License No. 44530 STATE OF MINNESOTA COUNTY OF The foregoing instrument was acknowledged before me on this day of , 20 , by Craig E. Johnson, a Licensed Land Surveyor. Notary Public, County, Minnesota Notary Printed Name My Commission Expires CITY COUNCIL, Lake Elmo, Minnesota This plat was approved by the City Council of Lake Elmo, Minnesota, this day of , 20 , and hereby certifies compliance with all requirements as set forth in the Minnesota Statutes, Section 505.03, Subdivision 2. Signed: Attest: Mayor City Administrator COUNTY SURVEYOR, Washington County, Minnesota Pursuant to Chapter 820, Laws of Minnesota, 1971, and in accordance with Minnesota Statutes, Section 505.021, Subd. 11, this plat has been reviewed and approved this day of , 20 . By By Washington County Surveyor COUNTY AUDITOR/TREASURER, Washington County, Minnesota Pursuant to Minnesota Statutes, Section 505.021, Subd.9 and Section 272.12, taxes payable in the year 20 , on real estate hereinbefore described, have been paid; and there are no delinquent taxes and transfer has been entered, on this day of , 20 . By By Washington County Auditor / Treasurer Deputy COUNTY RECORDER, Washington County, Minnesota Document Number I hereby certify that this instrument was filed in the office of the County Recorder for record on this day of , 20 , at o'clock .M. and was duly recorded in Washington County Records. By: By: Washington County Recorder Deputy SAMBATEK, INC. ENGINEERING, PLANNING AND LAND SURVEYING SHEET 1 OF 2 SHEETS SPRINGS AT LAKE ELMO LOT 1 BLOCK 1 HUDSON BOULEVARD NORTH SAMBATEK, INC. ENGINEERING, PLANNING AND LAND SURVEYING DENOTES 1/2 INCH BY 14 INCH IRON MONUMENT SET AND MARKED BY LICENSE NO. 44530. DENOTES 1/2 INCH BY 14 INCH IRON PIPE FOUND AND MARKED BY LICENSE NO. 18425 UNLESS NOTED OTHERWISE SECTION 34, TOWNSHIP 29 N, RANGE 21 W, WASHINGTON COUNTY, MINNESOTA NORTH NOT TO SCALE VICINITY MAP SITE0 NORTH SCALE IN FEET 1 INCH = 120 FEET 60 120 SEC 34 SHEET 2 OF 2 SHEETS HUDSON BLVD. N. SPRINGS AT LAKE ELMO BEING 10 FEET IN WIDTH, UNLESS OTHERWISE INDICATED, AND ADJOINING RIGHT-OF-WAY LINES, FRONT, REAR AND SIDE LOT LINES AS SHOWN ON THE PLAT. 10 10 DRAINAGE AND UTILITY EASEMENTS ARE SHOWN THUS: (NOT TO SCALE) 10 THE NORTH LINE OF OUTLOT H IS ASSUMED TO HAVE A BEARING OF SOUTH 89 DEGREES 40 MINUTES 54 SECONDS WEST. HUDSON BLVD N SCALE IN FEET 0 12060 NORTH That part of the Southwest Quarter of the Southeast Quarter, Section 34, Township 29, Range 21, Washington County, Minnesota described as follows: Commencing at the southwest corner of said Southwest Quarter of the Southeast Quarter; thence North 00 degrees 06 minutes 31 seconds East, assumed bearing, along the west line of said Southwest Quarter of the Southeast Quarter, a distance of 82.86 feet to the north line of Parcel 29C of Minnesota Department of Transportation Right of Way Plat No. 82-43; thence North 89 degrees 18 minutes 27 seconds East, along said north line, a distance of 40.00 to the point of beginning; thence North 00 degrees 06 minutes 31 seconds East, a distance of 607.73 feet; thence North 89 degrees 40 minutes 54 seconds East, a distance of 1284.76 feet to the east line of said Southwest Quarter of the Southeast Quarter; thence South 00 degrees 01 minutes 13 seconds West, along said east line, a distance of 428.20 feet to a point 267.8 feet north of the southeast corner of said Southwest Quarter of the Southeast Quarter; thence South 89 degrees 54 minutes 16 seconds West, parallel to the south line of said Southwest Quarter of the Southeast Quarter, a distance of 200.00 feet; thence South 00 degrees 01 minutes 13 seconds West, parallel to the east line of said Southwest Quarter of the Southeast Quarter, a distance of 173.21 feet to said north line of Parcel 29C; thence South 89 degrees 18 minutes 27 seconds West, along said north line, a distance of 1085.76 feet to the point of beginning. SUBJECT PROPERTY OVERHEAD ELECTRICAL WIRE LIGHT SANITARY SEWER STORM SEWER WATERMAIN UNDERGROUND ELECTRIC GUY ANCHOR UTILITY POLE GUARD POST UNDERGROUND TELEPHONE UNDERGROUND GAS CHAIN LINK FENCE WOOD FENCE CONCRETE SURFACE SIGN FOUND MONUMENT FOUND CAST IRON MONUMENT FOUND RIGHT-OF-WAY MONUMENT SET MONUMENT MARKED LS 43933 SECTION LINE UNDERLYING / ADJACENT LOT TIE LINE BOUNDARY LINE DEED DISTANCE(100.00) TRANSFORMER GAS METER COMMUNICATIONS MANHOLE ELECTRIC MANHOLE GAS MANHOLE ELECTRIC METER TELEPHONE PEDESTAL CABLE TV BOX GATE VALVE / HYDRANT SANITARY MANHOLE CLEAN OUT STORM MANHOLE STORM CATCH BASIN FLARED END SECTION RIGHT-OF-WAY LINE WIRE FENCE DECIDUOUS TREE LEGEND REGISTERED LAND SURVEYORRLS FOUNDFD FIBER OPTIC Project Location Date Submittal / RevisionNo. Certification Sheet Title Summary Revision History Sheet No.Revision Project No. By Designed:Drawn: Approved:Book / Page: Phase:Initial Issue: Client CONTINENTAL 483 FUND LLC W134 N8675 EXECUTIVE PARKWAY MENOMONEE FALLS, WI 53051 SPRINGS AT LAKE ELMO LAKE ELMO, MINNESOTA 9955 HUDSON BOULEVARD NORTH JEB CJL ETL FINAL 4/12/2019 21654 4/12/2019 CITY SUBMITTAL 5/1/2019 CITY PRELIMINARY RESUBMITTAL 6/11/2019 BID SET 7/26/2019 CITY SUBMITTAL 1.SUBJECT PROPERTY IDENTIFICATION NUMBER IS 3402921430003. 2.THE GROSS AREA OF THE SUBJECT PROPERTY IS 17.0159 ACRES OR 741,214 SQUARE FEET. 1.SURVEY COORDINATE BASIS: WASHINGTON COUNTY COORDINATE SYATEM NAD 83 (1986) 2.FIELD WORK WAS COMPLETED ON 01/21/2019. 3.THE VERTICAL DATUM IS BASED ON NAVD88. BENCHMARK #1 = MNDOT DISC "8282 AX" - ELEV=938.31, LOCATED AT NE QUAD. OF INT. HWY. 94 & KEATS AVE. BENCHMARK #2 = TNH - ELEV=1001.01, SOUTH PROPERTY LINE OF SUBJECT PROPERTY @ MIDPOINT OF LINE. PROPERTY SUMMARY SURVEY NOTES WELL Jul 26, 2019 - 12:27pm - User:jbalzer L:\PROJECTS\21654\CAD\Civil\Sheets\21654-C2-2-EXCND.dwg C2.04 EXISTING CONDITIONS HUDSON BLVD N LEGEND DEMOLITION NOTES 1. DEMOLITION NOTES ARE NOT COMPREHENSIVE. CONTRACTOR SHALL VISIT THE SITE PRIOR TO CONSTRUCTION TO OBTAIN A CLEAR UNDERSTANDING OF THE INTENDED SCOPE OF WORK. 2. THE DESIGN SHOWN IS BASED ON ENGINEER'S UNDERSTANDING OF EXISTING CONDITIONS. THE EXISTING CONDITIONS SHOWN ON THIS PLAN ARE BASED UPON ALTA AND TOPOGRAPHIC MAPPING PREPARED BY XXXX DATED XX-XX-XXXX. IF CONTRACTOR DOES NOT ACCEPT EXISTING TOPOGRAPHY AS SHOWN ON THE PLANS WITHOUT EXCEPTION, CONTRACTOR SHALL HAVE MADE, AT OWN EXPENSE, A TOPOGRAPHIC SURVEY BY A REGISTERED LAND SURVEYOR AND SUBMIT IT TO THE OWNER FOR REVIEW. 3. THE CONTRACTOR IS RESPONSIBLE FOR DEMOLITION, REMOVAL, AND DISPOSING IN A LOCATION APPROVED BY ALL GOVERNING AUTHORITIES AND IN ACCORDANCE WITH APPLICABLE CODES, OF ALL STRUCTURES, PADS, WALLS, FLUMES, FOUNDATIONS, PARKING, DRIVES, DRAINAGE STRUCTURES, UTILITIES, ETC., SUCH THAT THE IMPROVEMENTS SHOWN ON THE PLANS CAN BE CONSTRUCTED. ALL FACILITIES TO BE REMOVED SHALL BE UNDERCUT TO SUITABLE MATERIAL AND BROUGHT TO GRADE WITH SUITABLE COMPACTED FILL MATERIAL PER THE GEOTECHNICAL REPORT AND/OR GEOTECHNICAL ENGINEER. 4. CLEARING AND GRUBBING: CONTRACTOR IS RESPONSIBLE FOR REMOVING ALL DEBRIS FROM THE SITE AND DISPOSING THE DEBRIS IN A LAWFUL MANNER. CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL PERMITS REQUIRED FOR DEMOLITION AND DISPOSAL. 6. CONTRACTOR IS RESPONSIBLE FOR THE DISCONNECTION OF UTILITY SERVICES TO EXISTING BUILDINGS PRIOR TO DEMOLITION OF THE BUILDINGS. 7. CONTRACTOR SHALL COORDINATE WITH RESPECTIVE UTILITY COMPANIES PRIOR TO REMOVAL AND/OR RELOCATION OF UTILITIES. CONTRACTOR SHALL COORDINATE WITH UTILITY COMPANIES CONCERNING PORTIONS OF WORK WHICH MAY BE PERFORMED BY THE UTILITY COMPANIES' FORCES AND ANY FEES WHICH ARE TO BE PAID TO UTILITY COMPANIES FOR SERVICES. CONTRACTOR IS RESPONSIBLE FOR PAYING ALL FEES AND CHARGES. 8. CONTRACTOR IS SPECIFICALLY CAUTIONED THAT LOCATIONS OF EXISTING UTILITIES SHOWN ON THIS PLAN HAVE BEEN DETERMINED FROM INFORMATION AVAILABLE. ENGINEER ASSUMES NO RESPONSIBILITY FOR THE UTILITY MAPPING ACCURACY. PRIOR TO START OF ANY DEMOLITION ACTIVITY, THE CONTRACTOR SHALL NOTIFY UTILITY COMPANIES 48 HOURS PRIOR TO ANY EXCAVATION FOR ON-SITE LOCATIONS OF EXISTING UTILITIES. THE LOCATIONS OF UTILITIES SHALL BE OBTAINED BY THE CONTRACTOR BY CALLING MINNESOTA GOPHER STATE ONE CALL AT 800-252-1166 OR 651-454-0002. 9. THE MAPPING LOCATION OF ALL EXISTING SEWERS, PIPING, AND UTILITIES SHOWN ARE NOT TO BE INTERPRETED AS THE EXACT LOCATION, OR AS THE ONLY OBSTACLES THAT MAY OCCUR ON THE SITE. VERIFY EXISTING CONDITIONS AND PROCEED WITH CAUTION AROUND ANY ANTICIPATED FEATURES. GIVE NOTICE TO ALL UTILITY COMPANIES REGARDING DESTRUCTION AND REMOVAL OF ALL SERVICE LINES AND CAP ALL LINES BEFORE PROCEEDING WITH WORK. UTILITIES DETERMINED TO BE ABANDONED SHALL BE REMOVED IF UNDER THE BUILDING INCLUDING 10' BEYOND FOUNDATIONS. 10. ELECTRICAL, TELEPHONE, CABLE, WATER, FIBER OPTIC CABLE AND/OR GAS LINES NEEDING TO BE REMOVED OR RELOCATED SHALL BE COORDINATED WITH THE AFFECTED UTILITY COMPANY. ADEQUATE TIME SHALL BE PROVIDED FOR RELOCATION AND CLOSE COORDINATION WITH THE UTILITY COMPANY IS NECESSARY TO PROVIDE A SMOOTH TRANSITION IN UTILITY SERVICE. CONTRACTOR SHALL PAY CLOSE ATTENTION TO EXISTING UTILITIES WITHIN THE ROAD RIGHT OF WAY DURING CONSTRUCTION. 11. CONTRACTOR MUST PROTECT THE PUBLIC AT ALL TIMES WITH FENCING, BARRICADES, ENCLOSURES, ETC., TO THE BEST PRACTICES. 12. CONTINUOUS ACCESS SHALL BE MAINTAINED FOR THE SURROUNDING PROPERTIES AT ALL TIMES DURING DEMOLITION OF THE EXISTING FACILITIES. 13. PRIOR TO DEMOLITION OCCURRING, ALL EROSION CONTROL DEVICES ARE TO BE INSTALLED AND APPROVED BY THE LOCAL AUTHORITY. 14. CONTRACTOR SHALL LIMIT SAW-CUT & PAVEMENT REMOVAL TO ONLY THOSE AREAS WHERE IT IS REQUIRED AS SHOWN ON THESE CONSTRUCTION PLANS BUT IF ANY DAMAGE IS INCURRED ON ANY OF THE SURROUNDING PAVEMENT, ETC. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ITS REMOVAL AND REPAIR. 15. CONTRACTOR TO PROTECT EXISTING FEATURES WHICH ARE TO REMAIN. DAMAGE TO ANY EXISTING CONDITIONS TO REMAIN WILL BE REPLACED AT CONTRACTOR'S EXPENSE. 16. ABANDON OR REMOVE ALL SANITARY, WATER AND STORM SERVICES PER CITY STANDARDS. COORDINATE ALL WORK WITH CITY. ALL STREET RESTORATION SHALL BE COMPLETED IN COMPLIANCE WITH LOCAL STANDARDS. 17. CONTRACTOR SHALL PREPARE AND SUBMIT TO THE GOVERNING AUTHORITY A TRAFFIC AND/OR PEDESTRIAN TRAFFIC PLAN PER CITY/COUNTY/STATE STANDARDS TO BE APPROVED BY THE LOCAL GOVERNING AUTHORITY. UNDERGROUND GAS STONE RETAINING WALL CHAIN LINK FENCE UNDERGROUND ELECTRIC UNDERGROUND CABLE TV UNDERGROUND TELEPHONE OVERHEAD ELECTRIC SANITARY SEWER WATERMAIN STORM SEWER LIGHT HYDRANT GAS METER SPRINKLER HEAD SPRINKLER VALVE EDGE OF TREES TREES / SHRUBS CONCRETE CONCRETE CURB BITUMINOUS CURB REMOVE EXISTING CHAIN LINK FENCE REMOVE EXISTING UTILITY REMOVE EXISTING REMOVE EXISTING TREE REMOVE EXISTING BUILDING REMOVE EXISTING CONCRETE PAVEMENT REMOVE EXISTING BITUMINOUS PAVEMENT SAW CUT EXIST BITUMINOUS PAVEMENT REMOVE EXIST CONCRETE CURB REMOVE EXISTING UTILITY LINE EXISTING REMOVE EXISTING LIGHT FIXTURE REMOVE EXISTING GRAVEL DRIVE REMOVE EXISTING LANDSCAPING THE SUBSURFACE UTILITY INFORMATION SHOWN ON THESE PLANS IS A UTILITY QUALITY LEVEL XX. THIS QUALITY LEVEL WAS DETERMINED ACCORDING TO THE GUIDELINES OF ASCE/CI 38-02, TITLED "STANDARD GUIDELINES FOR THE COLLECTION AND DEPICTION OF EXISTING SUBSURFACE UTILITY DATA." THE CONTRACTOR AND/OR SUBCONTRACTORS SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, BY CONTACTING THE NOTIFICATION CENTER (GOPHER STATE ONE FOR MINNESOTA). THE CONTRACTOR AND/OR SUBCONTRACTOR AGREE TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES, WHICH MIGHT BE OCCASIONED BY HIS OR HER FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UTILITIES (UNDERGROUND AND OVERHEAD). IF THE CONTRACTOR ENCOUNTERS ANY DRAIN TILE WITHIN THE SITE, HE OR SHE SHALL NOTIFY THE ENGINEER WITH THE LOCATION, SIZE, INVERT AND IF THE TILE LINE IS ACTIVE. NO DRAIN TILE SHALL BE BACKFILLED WITHOUT APPROVAL FROM THE PROJECT ENGINEER. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE ALL EXISTING UTILITIES WHICH CONFLICT WITH THE PROPOSED IMPROVEMENTS SHOWN ON THE PLANS. Project Location Date Submittal / RevisionNo. Certification Sheet Title Summary Revision History Sheet No.Revision Project No. By Designed:Drawn: Approved:Book / Page: Phase:Initial Issue: Client CONTINENTAL 483 FUND LLC W134 N8675 EXECUTIVE PARKWAY MENOMONEE FALLS, WI 53051 SPRINGS AT LAKE ELMO LAKE ELMO, MINNESOTA 9955 HUDSON BOULEVARD NORTH JEB CJL ETL FINAL 4/12/2019 21654 Registration No.Date: I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly licensed professional ENGINEER under the laws of the state of Minnesota. If applicable, contact us for a wet signed copy of this plan which is available upon request at Sambatek's, Minnetonka, MN office. 7/26/201950475 Eric T. Luth 4/12/2019 CITY SUBMITTAL 5/1/2019 CITY PRELIMINARY RESUBMITTAL 6/11/2019 BID SET 7/26/2019 CITY SUBMITTAL SCALE IN FEET 0 10050 NORTH Jul 26, 2019 - 12:27pm - User:jbalzer L:\PROJECTS\21654\CAD\Civil\Sheets\21654-C2-DEMO.dwg C2.05 DEMOLITION PLAN REMOVE TREE LINE JU L I A A V E N O R T H EXISTING WETLAND NWL: 992.4 HWL: 996.5 PERMANENT 30' UTILITY EASEMENT PERMANENT 30' UTILITY EASEMENT PERMANENT 30' UTILITY EASEMENT PE R M A N E N T 3 0 ' U T I L I T Y E A S E M E N T PE R M A N E N T 3 0 ' U T I L I T Y E A S E M E N T HUDSON BLVD N JAY A V E N J U N C O R D N 5TH S T R E E T N 5 T H S T R E E T L N N 5TH STR E E T N HUDSON BLVD N 5TH S T R E E T N JU N E A V E N . PULTE DEVELOPMENT PULTE DEVELOPMENT CONTINENTAL DEVELOPMENT12.85 AC SCALE IN FEET 0 200100 NORTH Project Location Date Submittal / RevisionNo. Certification Sheet Title Summary Revision History Sheet No.Revision Project No. By Designed:Drawn: Approved:Book / Page: Phase:Initial Issue: Client CONTINENTAL 483 FUND LLC W134 N8675 EXECUTIVE PARKWAY MENOMONEE FALLS, WI 53051 SPRINGS AT LAKE ELMO LAKE ELMO, MINNESOTA 9955 HUDSON BOULEVARD NORTH JEB CJL ETL FINAL 4/12/2019 21654 4/12/2019 CITY SUBMITTAL 5/1/2019 CITY PRELIMINARY RESUBMITTAL 6/11/2019 BID SET 7/26/2019 CITY SUBMITTAL Jul 26, 2019 - 12:28pm - User:jbalzer L:\PROJECTS\20355\CAD\Civil\Exhibit\20355 Dale Properties Exhibit.dwg C2.06 OVERALL DEVELOPMENT PLAN MATCH LINE MA T C H L I N E MATCH LINE MA T C H L I N E HUDSON BLVD N 5TH STR E E T N ADA DS DS DS DS DS DS DS DSDSDSDS DSDSDS DSDSDS DS DSDS DSDSDS DS DSDS DSDSDS DS DSDS DSDSDS DS DSDS DSDSDS DS DSDS DS DS DSDS DS DS DS DS DS DSDS DS DS DS DS DS DS DS DS DS DS DS DS DSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DSDS DS DS DS DS DS DS DS DS DSDS DS DS DS DS DS DS DS DS DS DSDS DSDS DSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DSDS DSDSDSDS DS DS DS DS DS DS DS DS DS DS DS DS DSDS DSDSDSDS DS DS DS DSDSDSDS DSDS DS DS DS DS DS DS DS DS DS DS DS DS DSDS DSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DSDSDSDS DSDS DS DS DS DS DS DS DS DS DS DS DS DS DSDSDSDS DSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DSDS DSDSDSDS DS DS DS DS DS DS DS DS DS DS DS DS DSDS DSDSDSDS DS DS DS DS DS PERMANENT 30' UTILITY EASEMENT PERMANENT 30' UTILITY EASEMENT PERMANENT 30' UTILITY EASEMENT PE R M A N E N T 3 0 ' U T I L I T Y E A S E M E N T PE R M A N E N T 3 0 ' U T I L I T Y E A S E M E N T Project Location Date Submittal / RevisionNo. Certification Sheet Title Summary Revision History Sheet No.Revision Project No. By Designed:Drawn: Approved:Book / Page: Phase:Initial Issue: Client CONTINENTAL 483 FUND LLC W134 N8675 EXECUTIVE PARKWAY MENOMONEE FALLS, WI 53051 SPRINGS AT LAKE ELMO LAKE ELMO, MINNESOTA 9955 HUDSON BOULEVARD NORTH JEB CJL ETL FINAL 4/12/2019 21654 Registration No.Date: I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly licensed professional ENGINEER under the laws of the state of Minnesota. If applicable, contact us for a wet signed copy of this plan which is available upon request at Sambatek's, Minnetonka, MN office. 7/26/201950475 Eric T. Luth 4/12/2019 CITY SUBMITTAL 5/1/2019 CITY PRELIMINARY RESUBMITTAL 6/11/2019 BID SET 7/26/2019 CITY SUBMITTAL SCALE IN FEET 0 200100 NORTH Jul 26, 2019 - 12:29pm - User:jbalzer L:\PROJECTS\21654\CAD\Civil\Sheets\21654-C3-SITE.dwg C3.00 OVERALL SITE PLAN AREA GROSS SITE AREA BUILDING INFORMATION B20E (20 DU/BUILDING) TOTAL RESIDENT BUILDINGS GENERAL HOME MIX STUDIO 1-BEDROOM 2-BEDROOM 3-BEDROOM TOTAL HOMES ZONING EXISTING ZONING PROPOSED ZONING PARKING INFORMATION GARAGE TOTALS: NUMBER OF ATTACHED MAINTENANCE GARAGES NUMBER OF STAND ALONE TOTAL GARAGE PARKING REQUIRED PER CODE SURFACE PARKING AMOUNT TOTAL PARKING PROVIDED UNIT PARKING RATIO COVERED PARKING RATIO CLUBHOUSE PARKING *INCLUDED IN PARKING CALCS 1.ALL DIMENSIONS ARE ROUNDED TO THE NEAREST TENTH FOOT. 2.ALL DIMENSIONS SHOWN ARE TO THE FACE OF CURB TO FACE OF CURB UNLESS OTHERWISE NOTED. 3.CONTRACTOR SHALL REVIEW PAVEMENT GRADIENT AND CONSTRUCT “GUTTER OUT” WHERE WATER DRAINS AWAY FROM CURB. ALL OTHER AREAS SHALL BE CONSTRUCTED AS “GUTTER IN” CURB. COORDINATE WITH GRADING CONTRACTOR. 4.ALL AREAS ARE ROUNDED TO THE NEAREST SQUARE FOOT. 5.ALL PARKING STALLS TO BE 9' IN WIDTH AND 18' IN LENGTH UNLESS OTHERWISE INDICATED. 6.CONTRACTOR SHALL REFER TO ARCHITECTURAL PLANS FOR EXACT LOCATIONS AND DIMENSIONS OF EXIT PORCHES, RAMPS, PRECISE BUILDING DIMENSIONS AND EXACT BUILDING UTILITY ENTRANCE LOCATIONS. 7.SEE ARCHITECTURAL PLANS FOR LIGHT POLE FOUNDATION DETAIL AND FOR EXACT LOCATIONS OF LIGHT POLE. 8.REFER TO FINAL PLAT FOR LOT BOUNDARIES, LOT NUMBERS, LOT AREAS, AND LOT DIMENSIONS. 9.ALL GRADIENTS ON SIDEWALKS ALONG THE ADA ROUTE SHALL HAVE A MAXIMUM LONGITUDINAL SLOPE OF 4.5% (1:22), EXCEPT AT CURB RAMPS (1:12), AND A MAXIMUM CROSS SLOPE OF 1.5% (1:66). THE MAXIMUM SLOPE IN ANY DIRECTION ON AN ADA PARKING STALL OR ACCESS AISLE SHALL BE 1.5% (1:66). THE CONTRACTOR SHALL REVIEW AND VERIFY THE GRADIENT IN THE FIELD ALONG THE ADA ROUTES PRIOR TO PLACING CONCRETE OR BITUMINOUS PAVEMENT. THE CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY IF THERE IS A DISCREPANCY BETWEEN THE GRADIENT IN THE FIELD VERSUS THE DESIGN GRADIENT AND COORDINATE WITH GRADING CONTRACTOR. 10."NO PARKING" SIGNS SHALL BE PLACED ALONG ALL DRIVEWAYS AS REQUIRED BY CITY. LEGEND EASEMENT CURB & GUTTER BUILDING RETAINING WALL SAWCUT LINE NUMBER OF PARKING STALLS PER ROW SIGN PIPE BOLLARD STANDARD DUTY ASPHALT PAVING CONCRETE PAVING PROPERTY LIMIT EXISTINGPROPOSED KEY NOTE DEVELOPMENT SUMMARY DEVELOPMENT NOTES KEY NOTES WETLAND LIMITS TREELINE BUILDING, STOOPS, STAIRS SEE ARCHITECTURAL PLANS TRASH/RECYCLING PICKUP AREA - SEE ARCHITECTURAL PLANS MAIL KIOSK - SEE ARCHITECTURAL PLANS POOL - SEE ARCHITECTURAL PLANS MONUMENT SIGN - SEE ARCHITECTURAL PLANS VEHICLE GATE - SEE ARCHITECTURAL PLANS TRANSFORMER - LOCATION TBD 741,214 SF 17.02 AC QUANTITY HEIGHT 15 UNITS 2-STORY / 35' 15 UNITS HOMES PERCENTAGE 30 10% 120 40% 120 40% 30 10% 300 100% RURAL DEVELOPMENT TRANSITIONAL URBAN HIGH-DENSITY PLANNED UNIT (HDR.PUD) 120 GARAGES 1 42 GARAGES 163 GARAGES 525 SPACES 402 SPACES 565 SPACES 1.87 0.29 17 SPACES (23 ADA) XX XX THE SUBSURFACE UTILITY INFORMATION SHOWN ON THESE PLANS IS A UTILITY QUALITY LEVEL D. THIS QUALITY LEVEL WAS DETERMINED ACCORDING TO THE GUIDELINES OF ASCE/CI 38-02, TITLED "STANDARD GUIDELINES FOR THE COLLECTION AND DEPICTION OF EXISTING SUBSURFACE UTILITY DATA." THE CONTRACTOR AND/OR SUBCONTRACTORS SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, BY CONTACTING THE NOTIFICATION CENTER (GOPHER STATE ONE FOR MINNESOTA). THE CONTRACTOR AND/OR SUBCONTRACTOR AGREE TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES, WHICH MIGHT BE OCCASIONED BY HIS OR HER FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UTILITIES (UNDERGROUND AND OVERHEAD). IF THE CONTRACTOR ENCOUNTERS ANY DRAIN TILE WITHIN THE SITE, HE OR SHE SHALL NOTIFY THE ENGINEER WITH THE LOCATION, SIZE, INVERT AND IF THE TILE LINE IS ACTIVE. NO DRAIN TILE SHALL BE BACKFILLED WITHOUT APPROVAL FROM THE PROJECT ENGINEER. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE ALL EXISTING UTILITIES WHICH CONFLICT WITH THE PROPOSED IMPROVEMENTS SHOWN ON THE PLANS. CONCRETE SIDEWALK DETAILS A B C D E F G B-612 CONCRETE CURB AND GUTTER - SEE SHEET C9.0101 B-618 CONCRETE CURB AND GUTTER - SEE SHEET C9.0102 TAPERED CURB - SEE SHEET C9.0103 4' SIDEWALK - SEE SHEET C9.0104 5' SIDEWALK - SEE SHEET C9.0105 STOP SIGN - SEE SHEET C9.0106 ACCESSIBLE PARKING SIGN - SEE SHEET C9.0107 ACCESSIBLE PARKING STALL - SEE SHEET C9.0108 ARCHITECTURAL CONCRETE DETAIL XX CHAIN LINK FENCE - SEE ARCHITECTURAL PLANSH DECORATIVE FENCE - SEE ARCHITECTURAL PLANSI CHAIN LINK FENCE DECORATIVE WOODEN FENCE AIR CONDITIONING UNIT VALLEY GUTTER - SEE SHEET C9.0109 BITUMINOUS PATHJ RETAINING WALLK PRESSURE REDUCING VALVEL PEDESTRIAN GATE - GATES ON ADA ROUTE TO HAVE 18" MIN ON PULL SIDE (SEE DETAIL, SHEET C9.04 AND C9.05)M HEAVY DUTY ASPHALT PAVING FLAG POLESN NO PARKING SIGN - SEE SHEET C9.0110 PEDESTRIAN RAMP - SEE DETAILS ON SHEETS C9.04AND C9.05O GUARD RAIL (PARKING)P GUARD RAIL (TRAFFIC)Q C3.01 C3.03 C3.05 C3.02 C3.04 C3.06 CURB CUTR INFILTRATION BASINS MATCH LINE MA T C H L I N E B20E BLDG 5B FFE=1007.50 GFE=1007.17 B20E BLDG 4B FFE=1007.60 GFE=1007.27 6G GFE=1006.39 B20E BLDG 6B FFE=1007.40 GFE=1007.07 ADA DSDSDS DS DSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DSDS DSDSDSDS DS DS DS DS DS DS DS DS DSDS DSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS UNDERGROUND STORAGE SYSTEM 1 FOOTPRINT = 27'x84' (60" CHAMBERS) CHAMBER IE = 998.15 6" OUTLET IE = 998.15 21" OUTLET IE = 1001.8 HWL: 1004.14 PERMANENT 30' UTILITY EASEMENT UNDERGROUND STORAGE SYSTEM 2 FOOTPRINT = 27'x200' (60" CHAMBERS) CHAMBER IE = 997.25 6" OUTLET IE = 997.25 24" OUTLET IE = 1000.95 HWL: 1003.24 TYP TYP TYP 1111 9 09 10 10 9 10 22' 23 ' 9' TYP 18 ' TY P 9'TYP 9' TYP 18 ' TY P 18 ' TY P 18 ' TY P R4' R18' 10' 6'8' START END START END B A A A 01 01 0101 01 04 04 04 05 05 05 05 05 F 08 08 I H 07 04 06 04 10 07 J K 07 08 K P 10 07 10 O O O O O O O O O O O P P P O O O R 22 ' 22 ' R 1 8 ' 22' 22 ' Project Location Date Submittal / RevisionNo. Certification Sheet Title Summary Revision History Sheet No.Revision Project No. By Designed:Drawn: Approved:Book / Page: Phase:Initial Issue: Client CONTINENTAL 483 FUND LLC W134 N8675 EXECUTIVE PARKWAY MENOMONEE FALLS, WI 53051 SPRINGS AT LAKE ELMO LAKE ELMO, MINNESOTA 9955 HUDSON BOULEVARD NORTH JEB CJL ETL FINAL 4/12/2019 21654 Registration No.Date: I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly licensed professional ENGINEER under the laws of the state of Minnesota. If applicable, contact us for a wet signed copy of this plan which is available upon request at Sambatek's, Minnetonka, MN office. 7/26/201950475 Eric T. Luth 4/12/2019 CITY SUBMITTAL 5/1/2019 CITY PRELIMINARY RESUBMITTAL 6/11/2019 BID SET 7/26/2019 CITY SUBMITTAL SCALE IN FEET 0 4020 NORTH Jul 26, 2019 - 12:30pm - User:jbalzer L:\PROJECTS\21654\CAD\Civil\Sheets\21654-C3-SITE.dwg C3.01 SITE PLAN NORTH WEST C3.01 C3.03 C3.05 C3.06C3.04C3.02 MATCH LINE MA T C H L I N E B20E BLDG 3A FFE=1007.50 GFE=1005.17 B20E BLDG 2B FFE=1006.50 GFE=1006.17 B20E BLDG 1A FFE=1006.10 GFE=1005.77 FFE=1007.40 GFE=1007.07 6G S - 2 GF E = 1 0 0 5 . 4 4 ADA DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DSDS DS DS DS DS DS DS DS DS DS DS DS DSDS DSDSDSDS DS DS DS DS DS DS PERMANENT 30' UTILITY EASEMENT UNDERGROUND FILTRATION SYSTEM 6 FOOTPRINT = 59'x96' (30" CHAMBERS) CHAMBER IE = 1000.5 60" WEIR WALL TOP = 1002.11 DRAINTILE OUTLET IE = 998.50 HWL: 1003.5 TYP TYP TYP 10 10 9 10 5 6 6 9 10 23 ' 9' TYP 18 ' TY P 9'TYP 9' TY P R4' R18' R4' R1 8 ' 22 ' R 1 8 ' R18 ' 10' 2' 6' 12.2'13.8'12'13.8'10.2' 8' 2' R4' START END START END B A A A 0101 01 05 05 05 05 04 F 08 08 08 07 06 04 04 04 04 10 J 07 J 10 08 K 07 07 10 P 10 10 O O O O O O O O O O O O O P P P O O O O K R 22 ' 22.2' 22.1' 22' 22 ' 22' 22 ' 22 ' Project Location Date Submittal / RevisionNo. Certification Sheet Title Summary Revision History Sheet No.Revision Project No. By Designed:Drawn: Approved:Book / Page: Phase:Initial Issue: Client CONTINENTAL 483 FUND LLC W134 N8675 EXECUTIVE PARKWAY MENOMONEE FALLS, WI 53051 SPRINGS AT LAKE ELMO LAKE ELMO, MINNESOTA 9955 HUDSON BOULEVARD NORTH JEB CJL ETL FINAL 4/12/2019 21654 Registration No.Date: I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly licensed professional ENGINEER under the laws of the state of Minnesota. If applicable, contact us for a wet signed copy of this plan which is available upon request at Sambatek's, Minnetonka, MN office. 7/26/201950475 Eric T. Luth 4/12/2019 CITY SUBMITTAL 5/1/2019 CITY PRELIMINARY RESUBMITTAL 6/11/2019 BID SET 7/26/2019 CITY SUBMITTAL SCALE IN FEET 0 4020 NORTH Jul 26, 2019 - 12:30pm - User:jbalzer L:\PROJECTS\21654\CAD\Civil\Sheets\21654-C3-SITE.dwg C3.02 SITE PLAN SOUTH WEST C3.01 C3.03 C3.05 C3.06C3.04C3.02 O MATCH LINE MA T C H L I N E MATCH LINE MA T C H L I N E B20E BLDG 8A FFE=1007.10 GFE=1006.77 B20E BLDG 7B FFE=1007.00 GFE=1006.67 B20E BLDG 9B FFE=1005.45 GFE=1005.12 6G GFE=1006.20 6G GFE=1003.50 B20E BLDG 15B FFE=1004.30 ADA ADA ADA DSDSDS DS DSDS DSDSDS DS DSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DSDS DS DS DS DS DS DS DS DS DS DSDS DSDSDSDS DS DS DS DSDS DS DS DS DS DS DSDS DSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DSDS DS DS DS DS DS DS DS DS DS DS DS DS DSDSDS DS DS DS UNDERGROUND STORAGE SYSTEM 2 FOOTPRINT = 27'x200' (60" CHAMBERS) CHAMBER IE = 997.25 6" OUTLET IE = 997.25 24" OUTLET IE = 1000.95 HWL: 1003.24 UNDERGROUND STORAGE SYSTEM 3 FOOTPRINT = 27'x212' (60" CHAMBERS) CHAMBER IE = 995.55 6" OUTLET IE = 995.55 24" OUTLET IE = 997.85 HWL: 1001.53 TYP TYP TYP TYP TYP 11111111 10 6 7 10 9 22 ' 22 ' R1 8 ' 9' TYP 9'TYP 9'TYP 9'TYP 9'TYP9'TYP 18 ' TY P 18 ' TY P 18 ' TY P 18 ' TY P R4' R18' 22' 4 2 A A A A A 01 01 01 01 01 04 04 04 0505 08 08 08 07 07 07 04 09 01 0404 04 04 10 08 H H I 07 10 10 O OOO O O O O O 10 O O O O O O O O 07 R R Project Location Date Submittal / RevisionNo. Certification Sheet Title Summary Revision History Sheet No.Revision Project No. By Designed:Drawn: Approved:Book / Page: Phase:Initial Issue: Client CONTINENTAL 483 FUND LLC W134 N8675 EXECUTIVE PARKWAY MENOMONEE FALLS, WI 53051 SPRINGS AT LAKE ELMO LAKE ELMO, MINNESOTA 9955 HUDSON BOULEVARD NORTH JEB CJL ETL FINAL 4/12/2019 21654 Registration No.Date: I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly licensed professional ENGINEER under the laws of the state of Minnesota. If applicable, contact us for a wet signed copy of this plan which is available upon request at Sambatek's, Minnetonka, MN office. 7/26/201950475 Eric T. Luth 4/12/2019 CITY SUBMITTAL 5/1/2019 CITY PRELIMINARY RESUBMITTAL 6/11/2019 BID SET 7/26/2019 CITY SUBMITTAL SCALE IN FEET 0 4020 NORTH Jul 26, 2019 - 12:30pm - User:jbalzer L:\PROJECTS\21654\CAD\Civil\Sheets\21654-C3-SITE.dwg C3.03 SITE PLAN NORTH CENTRAL C4.01 C4.03 C4.05 C4.06C4.04C4.02 C3.01 C3.03 C3.05 C3.06C3.04C3.02 MATCH LINE MA T C H L I N E MATCH LINE MA T C H L I N E HUDSON BLVD N GFE=1006.67 B20E BLDG 1A FFE=1006.10 GFE=1005.77 CLUBHOUSE FFE=1005.50 B20E BLDG 15B FFE=1004.30 GFE=1003.97 25' B U F F E R BUFFER AVERAGING/ D/U EASEMENT ADA DS DS DSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DSDS DSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DSDS DS DS DSDS DSDSDSDS DS DS DS DSDS DS DSDSDS DS DS DS DS EXISTING WETLAND NWL: 992.4 HWL: 996.5 HWL HWL H W L UNDERGROUND FILTRATION SYSTEM 7 FOOTPRINT = 68'x82' (30" CHAMBERS) CHAMBER IE = 997.57 60" WEIR WALL TOP = 999.33 DRAINTILE OUTLET IE = 995.07 HWL: 1001.57 TYP TYP 6 10 11 8 8 9 6 7 8 08 10 22 ' 20'12' 9'TYP9'TYP 9' TYP TY P TYP 9' TY P 18'TYP R4' R18' R4' R1 8 ' 22 ' 9' 18 ' 22' TYP 20' 4. 5 ' 8' 14 ' 12 ' 12 ' 6 4 R4' R 4 ' D E F F A A 0101 0505 05 05 04 05 08 08 I 07 07 06 01 0404 04 04 04 C 10 J J A 08I L M N 07 10 O O O O O OOO O 10 O O O O O O O 07 R R R 22 ' 22' 22 ' 23' Project Location Date Submittal / RevisionNo. Certification Sheet Title Summary Revision History Sheet No.Revision Project No. By Designed:Drawn: Approved:Book / Page: Phase:Initial Issue: Client CONTINENTAL 483 FUND LLC W134 N8675 EXECUTIVE PARKWAY MENOMONEE FALLS, WI 53051 SPRINGS AT LAKE ELMO LAKE ELMO, MINNESOTA 9955 HUDSON BOULEVARD NORTH JEB CJL ETL FINAL 4/12/2019 21654 Registration No.Date: I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly licensed professional ENGINEER under the laws of the state of Minnesota. If applicable, contact us for a wet signed copy of this plan which is available upon request at Sambatek's, Minnetonka, MN office. 7/26/201950475 Eric T. Luth 4/12/2019 CITY SUBMITTAL 5/1/2019 CITY PRELIMINARY RESUBMITTAL 6/11/2019 BID SET 7/26/2019 CITY SUBMITTAL SCALE IN FEET 0 4020 NORTH Jul 26, 2019 - 12:30pm - User:jbalzer L:\PROJECTS\21654\CAD\Civil\Sheets\21654-C3-SITE.dwg C3.04 SITE PLAN SOUTH CENTRAL C3.01 C3.03 C3.05 C3.06C3.04C3.02 MATCH LINE MA T C H L I N E B20E BLDG 11B FFE=1005.00 GFE=1004.67 B20E BLDG 10A FFE=1005.00 GFE=1004.67 B20E BLDG 12A FFE=1005.00 GFE=1004.67 B20E BLDG 13B FFE=1005.00 GFE=1004.67 6G GFE=1003.50 6G GFE=1003.40 6G GFE=1003.40 6GS-2 GFE=1003.10 MG-P GFE=1003.34ADA B20E BLDG 15B FFE=1004.30 ADA ADA DSDSDSDS DSDSDS DSDSDS DS DSDS DSDSDS DS DSDS DSDSDS DS DSDS DS DSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DSDS DSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DSDS DSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DSDS DSDSDSDS DS DS DS DS DS DS DS DS DS DS DS DS DSDS DSDSDSDS DS DS DS PE R M A N E N T 3 0 ' U T I L I T Y E A S E M E N T PE R M A N E N T 3 0 ' U T I L I T Y E A S E M E N T UNDERGROUND STORAGE SYSTEM 5 FOOTPRINT = 27'x68' (60" CHAMBERS) CHAMBER IE = 994.25 6" OUTLET IE = 994.25 30" OUTLET IE = 997.29 HWL: 1000.25 UNDERGROUND STORAGE SYSTEM 9 FOOTPRINT = 27'x51' (60" CHAMBERS) CHAMBER IE = 993.75 6" OUTLET IE = 993.75 30" OUTLET IE = 996.99 HWL: 999.75 TYP TYP TYP TYP 1111 9 7 6 2 R 1 8 ' R18 ' 9'TYP 9' TYP 9' TYP 9' TYP 9'TYP 18 ' TY P 18 ' TY P 18 ' TY P 22' START END 2 2 A A AA 04 04 04 05 08 08 08 08 08 07 07 04 04 0404 04 04 04 04 10 07 07 07 09 09 08 H H HH H K K K Q 10 O O O O OO O O 10 O O O O O O O O O O O 10 10 Q 07 K 22 ' 22' 33 ' 32 . 2 ' R2 4 ' 22 ' 22 'Project Location Date Submittal / RevisionNo. Certification Sheet Title Summary Revision History Sheet No.Revision Project No. By Designed:Drawn: Approved:Book / Page: Phase:Initial Issue: Client CONTINENTAL 483 FUND LLC W134 N8675 EXECUTIVE PARKWAY MENOMONEE FALLS, WI 53051 SPRINGS AT LAKE ELMO LAKE ELMO, MINNESOTA 9955 HUDSON BOULEVARD NORTH JEB CJL ETL FINAL 4/12/2019 21654 Registration No.Date: I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly licensed professional ENGINEER under the laws of the state of Minnesota. If applicable, contact us for a wet signed copy of this plan which is available upon request at Sambatek's, Minnetonka, MN office. 7/26/201950475 Eric T. Luth 4/12/2019 CITY SUBMITTAL 5/1/2019 CITY PRELIMINARY RESUBMITTAL 6/11/2019 BID SET 7/26/2019 CITY SUBMITTAL SCALE IN FEET 0 4020 NORTH Jul 26, 2019 - 12:30pm - User:jbalzer L:\PROJECTS\21654\CAD\Civil\Sheets\21654-C3-SITE.dwg C3.05 SITE PLAN NORTH EAST C3.01 C3.03 C3.05 C3.06C3.04C3.02 MATCH LINE MA T C H L I N E B20E BLDG 14A FFE=1004.30 GFE=1003.97 B20E BLDG 10A FFE=1005.00 GFE=1004.67 B20E BLDG 13B FFE=1005.00 GFE=1004.67 6GS-2 GFE=1003.10 MG-P GFE=1003.34ADA B20E BLDG 15B FFE=1004.30 GFE=1003.97 BUFFER AVERAGING/ D/U EASEMENT DSDSDSDS DSDSDS DS DSDS DS DS DS DS DS DS DS DS DS DS DS DS DSDS DS DS DS DS DS DS DS DS DS DSDS DSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DSDS DSDSDSDS DS DS DS DS DS DSDS DSDSDSDS DS DS DS EXISTING WETLAND NWL: 992.4 HWL: 996.5 HWL HWL H W L PERMANENT 30' UTILITY EASEMENT PE R M A N E N T 3 0 ' U T I L I T Y E A S E M E N T UNDERGROUND RAINWATER REUSE CISTERN 8B FOOTPRINT = 45'x136' (60" PIPES) CHAMBER IE = 987.20 OUTLET IE = 991.75 HWL: 992.2 UNDERGROUND STORAGE SYSTEM 8A FOOTPRINT = 31'x38' (60" CHAMBERS) CHAMBER IE = 991.75 OUTLET IE = 991.75 48" WEIR WALL TOP = 995.15 HWL: 997.27 TYP TYP TYP TYP 08 10 09 09 9 2 R 1 8 ' 9'TYP TY P TYP 9' 18 ' 24'18'22' END AA A A 04 05 05 08 08 08 07 04 04 04 04 10 07 J J 07 09 09 08 H K K Q O O O O OO O O O O O O O 10 O O O O 10 K 07 K 22 ' 22' 22' 12 ' 22 ' 22 ' 23' 33 ' 32 . 2 ' R2 4 ' Project Location Date Submittal / RevisionNo. Certification Sheet Title Summary Revision History Sheet No.Revision Project No. By Designed:Drawn: Approved:Book / Page: Phase:Initial Issue: Client CONTINENTAL 483 FUND LLC W134 N8675 EXECUTIVE PARKWAY MENOMONEE FALLS, WI 53051 SPRINGS AT LAKE ELMO LAKE ELMO, MINNESOTA 9955 HUDSON BOULEVARD NORTH JEB CJL ETL FINAL 4/12/2019 21654 Registration No.Date: I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly licensed professional ENGINEER under the laws of the state of Minnesota. If applicable, contact us for a wet signed copy of this plan which is available upon request at Sambatek's, Minnetonka, MN office. 7/26/201950475 Eric T. Luth 4/12/2019 CITY SUBMITTAL 5/1/2019 CITY PRELIMINARY RESUBMITTAL 6/11/2019 BID SET 7/26/2019 CITY SUBMITTAL SCALE IN FEET 0 4020 NORTH Jul 26, 2019 - 12:30pm - User:jbalzer L:\PROJECTS\21654\CAD\Civil\Sheets\21654-C3-SITE.dwg C3.06 SITE PLAN SOUTH EAST C3.01 C3.03 C3.05 C3.06C3.04C3.02 HUDSON BLVD N B20E BLDG 5B FFE=1007.50 GFE=1007.17 B20E BLDG 8A FFE=1007.10 GFE=1006.77 B20E BLDG 7B FFE=1007.00 GFE=1006.67 B20E BLDG 4B FFE=1007.60 GFE=1007.27 B20E BLDG 3A FFE=1007.50 GFE=1005.17 B20E BLDG 2B FFE=1006.50 GFE=1006.17 B20E BLDG 1A FFE=1006.10 GFE=1005.77 B20E BLDG 14A FFE=1004.30 GFE=1003.97 B20E BLDG 9B FFE=1005.45 GFE=1005.12 B20E BLDG 11B FFE=1005.00 GFE=1004.67 B20E BLDG 10A FFE=1005.00 GFE=1004.67 B20E BLDG 12A FFE=1005.00 GFE=1004.67 B20E BLDG 13B FFE=1005.00 GFE=1004.67 6G GFE=1006.39 6G GFE=1006.20 6G GFE=1003.50 6G GFE=1003.40 6G GFE=1003.40 6GS-2 GFE=1003.10 MG-P GFE=1003.34 CLUBHOUSE FFE=1005.50 B20E BLDG 6B FFE=1007.40 GFE=1007.07 ADA B20E BLDG 15B FFE=1004.30 GFE=1003.97 25' B U F F E R BUFFER AVERAGING/ D/U EASEMENT ADA 6G S - 2 GF E = 1 0 0 5 . 4 4 ADA ADA ADA ADA ADA JU L I A A V E N O R T H EXISTING WETLAND NWL: 992.4 HWL: 996.5 UNDERGROUND STORAGE SYSTEM 1 FOOTPRINT = 27'x84' (60" CHAMBERS) CHAMBER IE = 998.15 6" OUTLET IE = 998.15 21" OUTLET IE = 1001.8 HWL: 1004.14 HWL HWL H W L PERMANENT 30' UTILITY EASEMENT PERMANENT 30' UTILITY EASEMENT PERMANENT 30' UTILITY EASEMENT PE R M A N E N T 3 0 ' U T I L I T Y E A S E M E N T PE R M A N E N T 3 0 ' U T I L I T Y E A S E M E N T UNDERGROUND STORAGE SYSTEM 2 FOOTPRINT = 27'x200' (60" CHAMBERS) CHAMBER IE = 997.25 6" OUTLET IE = 997.25 24" OUTLET IE = 1000.95 HWL: 1003.24 UNDERGROUND STORAGE SYSTEM 3 FOOTPRINT = 27'x212' (60" CHAMBERS) CHAMBER IE = 995.55 6" OUTLET IE = 995.55 24" OUTLET IE = 997.85 HWL: 1001.53 UNDERGROUND STORAGE SYSTEM 5 FOOTPRINT = 27'x68' (60" CHAMBERS) CHAMBER IE = 994.25 6" OUTLET IE = 994.25 30" OUTLET IE = 997.29 HWL: 1000.25 UNDERGROUND STORAGE SYSTEM 9 FOOTPRINT = 27'x51' (60" CHAMBERS) CHAMBER IE = 993.75 6" OUTLET IE = 993.75 30" OUTLET IE = 996.99 HWL: 999.75 UNDERGROUND RAINWATER REUSE CISTERN 8B FOOTPRINT = 45'x136' (60" PIPES) CHAMBER IE = 987.20 OUTLET IE = 991.75 HWL: 992.2 UNDERGROUND FILTRATION SYSTEM 7 FOOTPRINT = 68'x82' (30" CHAMBERS) CHAMBER IE = 997.57 60" WEIR WALL TOP = 999.33 DRAINTILE OUTLET IE = 995.07 HWL: 1001.57 UNDERGROUND FILTRATION SYSTEM 6 FOOTPRINT = 59'x96' (30" CHAMBERS) CHAMBER IE = 1000.5 60" WEIR WALL TOP = 1002.11 DRAINTILE OUTLET IE = 998.50 HWL: 1003.5 UNDERGROUND STORAGE SYSTEM 8A FOOTPRINT = 31'x38' (60" CHAMBERS) CHAMBER IE = 991.75 OUTLET IE = 991.75 48" WEIR WALL TOP = 995.15 HWL: 997.27 MATCH LINE MA T C H L I N E MATCH LINE MA T C H L I N E SCALE IN FEET 0 ##### NORTH Jul 26, 2019 - 12:32pm - User:jbalzer L:\PROJECTS\21654\CAD\Civil\Sheets\21654-C3-SITE - ADA.dwg C3.07 ADA OVERALL Project Location Date Submittal / RevisionNo. Certification Sheet Title Summary Revision History Sheet No.Revision Project No. By Designed:Drawn: Approved:Book / Page: Phase:Initial Issue: Client CONTINENTAL 483 FUND LLC W134 N8675 EXECUTIVE PARKWAY MENOMONEE FALLS, WI 53051 SPRINGS AT LAKE ELMO LAKE ELMO, MINNESOTA 9955 HUDSON BOULEVARD NORTH JEB CJL ETL FINAL 4/12/2019 21654 4/12/2019 CITY SUBMITTAL 5/1/2019 CITY PRELIMINARY RESUBMITTAL 6/11/2019 BID SET 7/26/2019 CITY SUBMITTAL 1.CONTRACTOR IS TO ENSURE ADA ROUTE IS COMPLIANT WITH ADA AND MINNESOTA STATE ACCESSIBILITY CODE REGULATIONS AND IS TO NOTIFY ENGINEER IF FIELD CONDITIONS PROHIBIT COMPLIANCE. 2.ALL GRADIENT ON SIDEWALKS ALONG THE ADA ROUTE SHALL HAVE A MAXIMUM LONGITUDINAL SLOPE OF 4.5% (1:22), EXCEPT AT CURB RAMPS (1:12), AND A MAXIMUM CROSS SLOPE OF 1.5% (1:66). MAXIMUM SLOPE IN ANY DIRECTION ON AN ADA PARKING STALL OR ACCESS AISLE SHALL BE IN 1.5% (1:66). CONTRACTOR SHALL REVIEW AND VERIFY THE GRADIENT IN THE FIELD ALONG THE ADA ROUTES PRIOR TO PLACING CONCRETE OR BITUMINOUS. CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY IF THERE IS A DISCREPANCY BETWEEN THE GRADIENT IN THE FIELD VERSUS THE DESIGN GRADIENT. COORDINATE ALL WORK WITH PAVING CONTRACTOR. 3.ALL TURNING LOCATIONS SHOWN SHOULD PROVIDE A MAXIMUM SLOPE OF 1.5% IN ALL DIRECTIONS IN A 4'x4' AREA. 4.SEE PED RAMP DETAILS ON SHEET C9.09 FOR SPECIFIC PED RAMP CONSTRUCTION REQUIREMENTS FOR USE AT ALL SIDEWALK TO PAVEMENT TRANSITIONS. ACCESSIBILITY NOTES PROPOSED ACCESSIBLE ROUTE LEGEND C3.08 C3.10 C3.12 C3.09 C3.11 C3.13 B20E BLDG 5B FFE=1007.50 GFE=1007.17 B20E BLDG 4B FFE=1007.60 GFE=1007.27 6G GFE=1006.39 B20E BLDG 6B FFE=1007.40 GFE=1007.07 ADA TC1 0 1 6 . 5 1 UNDERGROUND STORAGE SYSTEM 1 FOOTPRINT = 27'x84' (60" CHAMBERS) CHAMBER IE = 998.15 6" OUTLET IE = 998.15 21" OUTLET IE = 1001.8 HWL: 1004.14 PERMANENT 30' UTILITY EASEMENT UNDERGROUND STORAGE SYSTEM 2 FOOTPRINT = 27'x200' (60" CHAMBERS) CHAMBER IE = 997.25 6" OUTLET IE = 997.25 24" OUTLET IE = 1000.95 HWL: 1003.24 MATCH LINE MA T C H L I N E Project Location Date Submittal / RevisionNo. Certification Sheet Title Summary Revision History Sheet No.Revision Project No. By Designed:Drawn: Approved:Book / Page: Phase:Initial Issue: Client CONTINENTAL 483 FUND LLC W134 N8675 EXECUTIVE PARKWAY MENOMONEE FALLS, WI 53051 SPRINGS AT LAKE ELMO LAKE ELMO, MINNESOTA 9955 HUDSON BOULEVARD NORTH JEB CJL ETL FINAL 4/12/2019 21654 4/12/2019 CITY SUBMITTAL 5/1/2019 CITY PRELIMINARY RESUBMITTAL 6/11/2019 BID SET 7/26/2019 CITY SUBMITTAL SCALE IN FEET 0 4020 NORTH Jul 26, 2019 - 12:32pm - User:jbalzer L:\PROJECTS\21654\CAD\Civil\Sheets\21654-C3-SITE - ADA.dwg C3.08 ADA NORTH WEST C3.08 C3.10 C3.12 C3.13C3.11C3.09 B20E BLDG 3A FFE=1007.50 GFE=1005.17 B20E BLDG 2B FFE=1006.50 GFE=1006.17 B20E BLDG 1A FFE=1006.10 GFE=1005.77 BLDG 6B FFE=1007.40 GFE=1007.07 6G S - 2 GF E = 1 0 0 5 . 4 4 ADA JU L I A A V E N O R T H PERMANENT 30' UTILITY EASEMENT UNDERGROUND FILTRATION SYSTEM 6 FOOTPRINT = 59'x96' (30" CHAMBERS) CHAMBER IE = 1000.5 60" WEIR WALL TOP = 1002.11 DRAINTILE OUTLET IE = 998.50 HWL: 1003.5 MATCH LINE MA T C H L I N E Project Location Date Submittal / RevisionNo. Certification Sheet Title Summary Revision History Sheet No.Revision Project No. By Designed:Drawn: Approved:Book / Page: Phase:Initial Issue: Client CONTINENTAL 483 FUND LLC W134 N8675 EXECUTIVE PARKWAY MENOMONEE FALLS, WI 53051 SPRINGS AT LAKE ELMO LAKE ELMO, MINNESOTA 9955 HUDSON BOULEVARD NORTH JEB CJL ETL FINAL 4/12/2019 21654 4/12/2019 CITY SUBMITTAL 5/1/2019 CITY PRELIMINARY RESUBMITTAL 6/11/2019 BID SET 7/26/2019 CITY SUBMITTAL SCALE IN FEET 0 4020 NORTH Jul 26, 2019 - 12:32pm - User:jbalzer L:\PROJECTS\21654\CAD\Civil\Sheets\21654-C3-SITE - ADA.dwg C3.09 ADA SOUTH WEST C3.08 C3.10 C3.12 C3.13C3.11C3.09 B20E BLDG 8A FFE=1007.10 GFE=1006.77 B20E BLDG 7B FFE=1007.00 GFE=1006.67 B20E BLDG 9B FFE=1005.45 GFE=1005.12 BLDG 11B FFE=1005.00 GFE=1004.67 BLDG 10A FFE=1005.00 GFE=1004.67 6G GFE=1006.20 6G GFE=1003.50 B20E BLDG 15B ADA ADA ADA REAR 1008.8REAR 1011.3 REAR 1013.2 UNDERGROUND STORAGE SYSTEM 2 FOOTPRINT = 27'x200' (60" CHAMBERS) CHAMBER IE = 997.25 6" OUTLET IE = 997.25 24" OUTLET IE = 1000.95 HWL: 1003.24 UNDERGROUND STORAGE SYSTEM 3 FOOTPRINT = 27'x212' (60" CHAMBERS) CHAMBER IE = 995.55 6" OUTLET IE = 995.55 24" OUTLET IE = 997.85 HWL: 1001.53 MATCH LINE MA T C H L I N E MATCH LINE MA T C H L I N E Project Location Date Submittal / RevisionNo. Certification Sheet Title Summary Revision History Sheet No.Revision Project No. By Designed:Drawn: Approved:Book / Page: Phase:Initial Issue: Client CONTINENTAL 483 FUND LLC W134 N8675 EXECUTIVE PARKWAY MENOMONEE FALLS, WI 53051 SPRINGS AT LAKE ELMO LAKE ELMO, MINNESOTA 9955 HUDSON BOULEVARD NORTH JEB CJL ETL FINAL 4/12/2019 21654 4/12/2019 CITY SUBMITTAL 5/1/2019 CITY PRELIMINARY RESUBMITTAL 6/11/2019 BID SET 7/26/2019 CITY SUBMITTAL SCALE IN FEET 0 4020 NORTH Jul 26, 2019 - 12:32pm - User:jbalzer L:\PROJECTS\21654\CAD\Civil\Sheets\21654-C3-SITE - ADA.dwg C3.10 ADA NORTH CENTRAL C3.08 C3.10 C3.12 C3.13C3.11C3.09 HUDSON BLVD N FFE=1007.00 GFE=1006.67 B20E BLDG 1A FFE=1006.10 GFE=1005.77 FFE=1005.00 GFE=1004.67 CLUBHOUSE FFE=1005.50 B20E BLDG 15B FFE=1004.30 GFE=1003.97 25' B U F F E R BUFFER AVERAGING/ D/U EASEMENT ADA EXISTING WETLAND NWL: 992.4 HWL: 996.5 HWL HWL H W L UNDERGROUND FILTRATION SYSTEM 7 FOOTPRINT = 68'x82' (30" CHAMBERS) CHAMBER IE = 997.57 60" WEIR WALL TOP = 999.33 DRAINTILE OUTLET IE = 995.07 HWL: 1001.57 MATCH LINE MA T C H L I N E MATCH LINE MA T C H L I N E Project Location Date Submittal / RevisionNo. Certification Sheet Title Summary Revision History Sheet No.Revision Project No. By Designed:Drawn: Approved:Book / Page: Phase:Initial Issue: Client CONTINENTAL 483 FUND LLC W134 N8675 EXECUTIVE PARKWAY MENOMONEE FALLS, WI 53051 SPRINGS AT LAKE ELMO LAKE ELMO, MINNESOTA 9955 HUDSON BOULEVARD NORTH JEB CJL ETL FINAL 4/12/2019 21654 4/12/2019 CITY SUBMITTAL 5/1/2019 CITY PRELIMINARY RESUBMITTAL 6/11/2019 BID SET 7/26/2019 CITY SUBMITTAL SCALE IN FEET 0 4020 NORTH Jul 26, 2019 - 12:32pm - User:jbalzer L:\PROJECTS\21654\CAD\Civil\Sheets\21654-C3-SITE - ADA.dwg C3.11 ADA SOUTH CENTRAL C3.08 C3.10 C3.12 C3.13C3.11C3.09 BLDG 9B FFE=1005.45 GFE=1005.12 B20E BLDG 11B FFE=1005.00 GFE=1004.67 B20E BLDG 10A FFE=1005.00 GFE=1004.67 B20E BLDG 12A FFE=1005.00 GFE=1004.67 B20E BLDG 13B FFE=1005.00 GFE=1004.67 6G GFE=1003.50 6G GFE=1003.40 6G GFE=1003.40 6GS-2 GFE=1003.10 MG-P GFE=1003.34ADA B20E BLDG 15B ADA ADA REAR 1008.8REAR 1011.3 PE R M A N E N T 3 0 ' U T I L I T Y E A S E M E N T PE R M A N E N T 3 0 ' U T I L I T Y E A S E M E N T UNDERGROUND STORAGE SYSTEM 5 FOOTPRINT = 27'x68' (60" CHAMBERS) CHAMBER IE = 994.25 6" OUTLET IE = 994.25 30" OUTLET IE = 997.29 HWL: 1000.25 UNDERGROUND STORAGE SYSTEM 9 FOOTPRINT = 27'x51' (60" CHAMBERS) CHAMBER IE = 993.75 6" OUTLET IE = 993.75 30" OUTLET IE = 996.99 HWL: 999.75 MATCH LINE MA T C H L I N E Project Location Date Submittal / RevisionNo. Certification Sheet Title Summary Revision History Sheet No.Revision Project No. By Designed:Drawn: Approved:Book / Page: Phase:Initial Issue: Client CONTINENTAL 483 FUND LLC W134 N8675 EXECUTIVE PARKWAY MENOMONEE FALLS, WI 53051 SPRINGS AT LAKE ELMO LAKE ELMO, MINNESOTA 9955 HUDSON BOULEVARD NORTH JEB CJL ETL FINAL 4/12/2019 21654 4/12/2019 CITY SUBMITTAL 5/1/2019 CITY PRELIMINARY RESUBMITTAL 6/11/2019 BID SET 7/26/2019 CITY SUBMITTAL SCALE IN FEET 0 4020 NORTH Jul 26, 2019 - 12:32pm - User:jbalzer L:\PROJECTS\21654\CAD\Civil\Sheets\21654-C3-SITE - ADA.dwg C3.12 ADA NORTH EAST C3.08 C3.10 C3.12 C3.13C3.11C3.09 B20E BLDG 14A FFE=1004.30 GFE=1003.97 B20E BLDG 10A FFE=1005.00 GFE=1004.67 B20E BLDG 13B FFE=1005.00 GFE=1004.67 6GS-2 GFE=1003.10 MG-P GFE=1003.34ADA B20E BLDG 15B FFE=1004.30 GFE=1003.97 EXISTING WETLAND NWL: 992.4 HWL: 996.5 PERMANENT 30' UTILITY EASEMENT PE R M A N E N T 3 0 ' U T I L I T Y E A S E M E N T UNDERGROUND RAINWATER REUSE CISTERN 8B FOOTPRINT = 45'x136' (60" PIPES) CHAMBER IE = 987.20 OUTLET IE = 991.75 HWL: 992.2 UNDERGROUND STORAGE SYSTEM 8A FOOTPRINT = 31'x38' (60" CHAMBERS) CHAMBER IE = 991.75 OUTLET IE = 991.75 48" WEIR WALL TOP = 995.15 HWL: 997.27 MATCH LINE MA T C H L I N E Project Location Date Submittal / RevisionNo. Certification Sheet Title Summary Revision History Sheet No.Revision Project No. By Designed:Drawn: Approved:Book / Page: Phase:Initial Issue: Client CONTINENTAL 483 FUND LLC W134 N8675 EXECUTIVE PARKWAY MENOMONEE FALLS, WI 53051 SPRINGS AT LAKE ELMO LAKE ELMO, MINNESOTA 9955 HUDSON BOULEVARD NORTH JEB CJL ETL FINAL 4/12/2019 21654 4/12/2019 CITY SUBMITTAL 5/1/2019 CITY PRELIMINARY RESUBMITTAL 6/11/2019 BID SET 7/26/2019 CITY SUBMITTAL SCALE IN FEET 0 4020 NORTH Jul 26, 2019 - 12:32pm - User:jbalzer L:\PROJECTS\21654\CAD\Civil\Sheets\21654-C3-SITE - ADA.dwg C3.13 ADA SOUTH EAST C3.08 C3.10 C3.12 C3.13C3.11C3.09 HUDSON BLVD N 5TH STR E E T N ADA 25' B U F F E R BUFFER AVERAGING/ D/U EASEMENTHWL HWL H W L PERMANENT 30' UTILITY EASEMENT PERMANENT 30' UTILITY EASEMENT PERMANENT 30' UTILITY EASEMENT PE R M A N E N T 3 0 ' U T I L I T Y E A S E M E N T PE R M A N E N T 3 0 ' U T I L I T Y E A S E M E N T MATCH LINE MA T C H L I N E MATCH LINE MA T C H L I N E Project Location Date Submittal / RevisionNo. Certification Sheet Title Summary Revision History Sheet No.Revision Project No. By Designed:Drawn: Approved:Book / Page: Phase:Initial Issue: Client CONTINENTAL 483 FUND LLC W134 N8675 EXECUTIVE PARKWAY MENOMONEE FALLS, WI 53051 SPRINGS AT LAKE ELMO LAKE ELMO, MINNESOTA 9955 HUDSON BOULEVARD NORTH JEB CJL ETL FINAL 4/12/2019 21654 Registration No.Date: I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly licensed professional ENGINEER under the laws of the state of Minnesota. If applicable, contact us for a wet signed copy of this plan which is available upon request at Sambatek's, Minnetonka, MN office. 7/26/201950475 Eric T. Luth 4/12/2019 CITY SUBMITTAL 5/1/2019 CITY PRELIMINARY RESUBMITTAL 6/11/2019 BID SET 7/26/2019 CITY SUBMITTAL SCALE IN FEET 0 200100 NORTH Jul 26, 2019 - 12:35pm - User:jbalzer L:\PROJECTS\21654\CAD\Civil\Sheets\21654-C4-GRAD.dwg C4.00 OVERALL GRADING PLAN 1.PROPOSED CONTOURS ARE TO FINISHED SURFACE ELEVATION. SPOT ELEVATIONS ALONG PROPOSED CURB DENOTE GUTTER GRADE. 2.CONTRACTOR SHALL REVIEW PAVEMENT GRADIENT AND CONSTRUCT “GUTTER OUT” WHERE WATER DRAINS AWAY FROM CURB. ALL OTHER AREAS SHALL BE CONSTRUCTED AS “GUTTER IN” CURB. 3.ALL GRADIENT ON SIDEWALKS ALONG THE ADA ROUTE SHALL HAVE A MAXIMUM LONGITUDINAL SLOPE OF 5% (1:20), EXCEPT AT CURB RAMPS (1:12), AND A MAXIMUM CROSS SLOPE OF 2.08% (1:48). MAXIMUM SLOPE IN ANY DIRECTION ON AN ADA PARKING STALL OR ACCESS AISLE SHALL BE IN 2.08% (1:48). CONTRACTOR SHALL REVIEW AND VERIFY THE GRADIENT IN THE FIELD ALONG THE ADA ROUTES PRIOR TO PLACING CONCRETE OR BITUMINOUS. CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY IF THERE IS A DISCREPANCY BETWEEN THE GRADIENT IN THE FIELD VERSUS THE DESIGN GRADIENT. COORDINATE ALL WORK WITH PAVING CONTRACTOR. 4.CONTRACTOR SHALL TAKE ALL PRECAUTIONS NECESSARY TO AVOID PROPERTY DAMAGE TO ADJACENT PROPERTIES DURING THE CONSTRUCTION PHASES OF THIS PROJECT. CONTRACTOR WILL BE HELD SOLELY RESPONSIBLE FOR ANY DAMAGES TO THE ADJACENT PROPERTIES OCCURRING DURING THE CONSTRUCTION PHASES OF THIS PROJECT. 5.SAFETY NOTICE TO CONTRACTORS: IN ACCORDANCE WITH GENERALLY ACCEPTED CONSTRUCTION PRACTICES, CONTRACTOR WILL BE SOLELY AND COMPLETELY RESPONSIBLE FOR CONDITIONS ON THE JOB SITE, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY DURING PERFORMANCE OF THE WORK. THIS REQUIREMENT WILL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS. THE DUTY OF THE ENGINEER OR THE DEVELOPER TO CONDUCT CONSTRUCTION REVIEW OF THE CONTRACTOR'S PERFORMANCE IS NOT INTENDED TO INCLUDE REVIEW OF THE ADEQUACY OF THE CONTRACTOR'S SAFETY MEASURES IN, ON OR NEAR THE CONSTRUCTION SITE. 6.CONTRACTOR SHALL COMPLETE THE SITE GRADING CONSTRUCTION IN ACCORDANCE WITH THE REQUIREMENTS OF THE OWNER'S SOILS ENGINEER. ALL SOIL TESTING SHALL BE COMPLETED BY THE OWNER'S SOILS ENGINEER. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING ALL REQUIRED SOIL TESTS AND INSPECTIONS WITH THE SOILS ENGINEER. A GEOTECHNICAL ENGINEERING SOILS REPORT HAS BEEN COMPLETED BY: COMPANY: INTERTEK-PSI ADDRESS: 2915 WATERS ROAD, SUITE 112 EAGAN, MN 55121 PHONE: 651-646-8148 DATED: FEBRUARY 11, 2019 CONTRACTOR SHALL OBTAIN A COPY OF THE SOILS REPORT. 7.CONTRACTOR SHALL COMPLETE DEWATERING AS REQUIRED TO COMPLETE THE SITE GRADING CONSTRUCTION. 8.PRIOR TO PLACEMENT OF THE AGGREGATE BASE, A TEST ROLL SHALL BE PERFORMED ON THE STREET AND PARKING AREA SUBGRADE. CONTRACTOR SHALL PROVIDE A LOADED TANDEM AXLE TRUCK WITH A GROSS WEIGHT OF 25 TONS. THE TEST ROLLING SHALL BE AT THE DIRECTION OF THE SOILS ENGINEER AND SHALL BE COMPLETED IN AREAS AS DIRECTED BY THE SOILS ENGINEER. CORRECTION OF THE SUBGRADE SOILS SHALL BE COMPLETED IN ACCORDANCE WITH THE REQUIREMENTS OF THE SOILS ENGINEER. 9.REPLACE ALL SUBGRADE SOIL DISTURBED DURING THE CONSTRUCTION THAT HAVE BECOME UNSUITABLE AND WILL NOT PASS A TEST ROLL. REMOVE UNSUITABLE SOIL FROM THE SITE AND IMPORT SUITABLE SOIL AT NO ADDITIONAL COST TO THE OWNER. 10.CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING AND MAINTAINING VEHICULAR AND PEDESTRIAN TRAFFIC CONTROL DEVICES SUCH AS BARRICADES, WARNING SIGNS, DIRECTIONAL SIGNS, FLAGMEN AND LIGHTS TO CONTROL THE MOVEMENT OF TRAFFIC WHERE NECESSARY. TRAFFIC CONTROL DEVICES SHALL CONFORM TO APPROPRIATE MINNESOTA DEPARTMENT OF TRANSPORTATION STANDARDS. 11.EXCAVATE TOPSOIL FROM AREAS TO BE FURTHER EXCAVATED OR REGRADED AND STOCKPILE IN AREAS DESIGNATED ON THE SITE. CONTRACTOR SHALL SALVAGE ENOUGH TOPSOIL FOR RESPREADING ON THE SITE AS SPECIFIED. EXCESS TOPSOIL SHALL BE PLACED IN EMBANKMENT AREAS, OUTSIDE OF BUILDING PADS, ROADWAYS AND PARKING AREAS. CONTRACTOR SHALL SUBCUT CUT AREAS, WHERE TURF IS TO BE ESTABLISHED, TO A DEPTH OF 6 INCHES. RESPREAD TOPSOIL IN AREAS WHERE TURF IS TO BE ESTABLISHED TO A MINIMUM DEPTH OF 6 INCHES. 12.TRENCH BORROW CONSTRUCTION: IF ALLOWED BY THE OWNER, CONTRACTOR SHALL COMPLETE “TRENCH BORROW” EXCAVATION IN AREAS DIRECTED BY THE ENGINEER IN ORDER TO OBTAIN STRUCTURAL MATERIAL. TREES SHALL NOT BE REMOVED OR DAMAGED AS A RESULT OF THE EXCAVATION, UNLESS APPROVED BY THE ENGINEER. THE EXCAVATION SHALL COMMENCE A MINIMUM OF 10 FEET FROM THE LIMIT OF THE BUILDING PAD. THE EXCAVATION FROM THIS LIMIT SHALL EXTEND AT A MINIMUM SLOPE OF 1 FOOT HORIZONTAL TO 1 FOOT VERTICAL (1:1) DOWNWARD AND OUTWARD FROM THE FINISHED SURFACE GRADE ELEVATION. THE TRENCH BORROW EXCAVATION SHALL BE BACKFILLED TO THE PROPOSED FINISHED GRADE ELEVATION, AND SHALL BE COMPACTED IN ACCORDANCE WITH REQUIREMENTS OF THE QUALITY COMPACTION METHOD AS OUTLINED IN MN/DOT SPECIFICATION 2105.3F2. SNOW FENCE SHALL BE FURNISHED AND PLACED ALONG THE PERIMETER OF THE TRENCH BORROW AREA WHERE THE SLOPES EXCEED 2 FOOT HORIZONTAL TO 1 FOOT VERTICAL (2:1). 13.FINISHED GRADING SHALL BE COMPLETED, CONTRACTOR SHALL UNIFORMLY GRADE AREAS WITHIN LIMITS OF GRADING, INCLUDING ADJACENT TRANSITION AREAS. PROVIDE A SMOOTH FINISHED SURFACE WITHIN SPECIFIED TOLERANCES, WITH UNIFORM LEVELS OR SLOPES BETWEEN POINTS WHERE ELEVATIONS ARE SHOWN, OR BETWEEN SUCH POINTS AND EXISTING GRADES. AREAS THAT HAVE BEEN FINISHED GRADED SHALL BE PROTECTED FROM SUBSEQUENT CONSTRUCTION OPERATIONS, TRAFFIC AND EROSION. REPAIR ALL AREAS THAT HAVE BECOME RUTTED, ERODED OR HAS SETTLED BELOW THE CORRECT GRADE. ALL AREAS DISTURBED BY THE CONTRACTOR'S OPERATIONS SHALL BE RESTORED TO EQUAL OR BETTER THAN ORIGINAL CONDITION OR TO THE REQUIREMENTS OF THE NEW WORK. 14.TOLERANCES 14.a.THE RESIDENTIAL BUILDING SUBGRADE FINISHED SURFACE ELEVATION SHALL NOT VARY BY MORE THAN 0.30 FOOT ABOVE, OR 0.30 FOOT BELOW, THE PRESCRIBED ELEVATION AT ANY POINT WHERE MEASUREMENT IS MADE. 14.b.THE COMMERCIAL BUILDING SUBGRADE FINISHED SURFACE ELEVATION SHALL NOT VARY BY MORE THAN 0.10 FOOT ABOVE, OR 0.10 FOOT BELOW, THE PRESCRIBED ELEVATION AT ANY POINT WHERE MEASUREMENT IS MADE. 14.c.THE STREET OR PARKING AREA SUBGRADE FINISHED SURFACE ELEVATION SHALL NOT VARY BY MORE THAN 0.05 FOOT ABOVE, OR 0.10 FOOT BELOW, THE PRESCRIBED ELEVATION OF ANY POINT WHERE MEASUREMENT IS MADE. 14.d.AREAS WHICH ARE TO RECEIVE TOPSOIL SHALL BE GRADED TO WITHIN 0.30 FOOT ABOVE OR BELOW THE REQUIRED ELEVATION, UNLESS DIRECTED OTHERWISE BY THE ENGINEER. 14.e.TOPSOIL SHALL BE GRADED TO PLUS OR MINUS 1/2 INCH OF THE SPECIFIED THICKNESS. 15.AFTER THE SITE GRADING IS COMPLETED, IF EXCESS OR SHORTAGE OF SOIL MATERIAL EXISTS, CONTRACTOR SHALL TRANSPORT ALL EXCESS SOIL MATERIAL OFF THE SITE TO AN AREA SELECTED BY THE CONTRACTOR, OR IMPORT SUITABLE MATERIAL TO THE SITE. 16.CONTRACTOR SHALL DETERMINE THE LOCATION OF ANY HAUL ROADS THAT MAY BE REQUIRED TO COMPLETE THE SITE GRADING CONSTRUCTION AND SHALL INDICATE HAUL ROADS ON EROSION AND SEDIMENT CONTROL “SITE MAP”. CONTRACTOR SHALL COMPLY WITH THE REQUIREMENTS OF THE GOVERNING AUTHORITY OF EACH ROADWAY. CONTRACTOR SHALL POST WHATEVER SECURITY, AND COMPLY WITH ALL CONDITIONS WHICH ARE REQUIRED BY EACH GOVERNING AUTHORITY OF EACH ROADWAY. 17.DISTURBED AREAS WITHIN WETLAND MITIGATION SITE AND ANY DISTURBED AREAS WITHIN THE WETLAND SHALL BE RESTORED WITH 6 TO 12 INCHES OF ORGANIC SOILS, PREFERABLY SOILS THAT WERE PREVIOUSLY REMOVED FROM WETLAND AREAS. SEEDING IN THE WETLAND MITIGATION AREAS ABOVE THE NORMAL WATER LEVEL SHALL BE MN STATE SEED MIX 34-271, WET MEADOW SOUTH AND WEST, OR APPROVED EQUAL. FOR STATE SEED MIXES, OATS AND WINTER WHEAT SHOULD BE SELECTED BASED ON THE TIME OF YEAR THAT THE MIX IS BEING USED. OATS SHOULD BE INCLUDED IN MIXES IF BEING USED BETWEEN OCTOBER 15TH AND AUGUST 1ST. WINTER WHEAT SHOULD BE USED BETWEEN AUGUST 1ST AND OCTOBER 15TH. THE SEEDING RATE IS THE SAME FOR OATS AND WINTER WHEAT. MIX 34-271 SHOULD BE APPLIED AT 12 POUNDS PER ACRE. SEED SHALL BE WATERED UNTIL A HEALTHY STAND OF VEGETATION IS OBTAINED. 18.FILL PLACED WITHIN THE BUILDING PAD AREAS SHALL BE IN CONFORMANCE WITH HUD/FHA PROCEDURES AND DATA SHEET 79G. 19.RETAINING WALL(S) SHALL BE CONSTRUCTED OF MODULAR BLOCK MATERIAL. CONTRACTOR SHALL SUBMIT TO THE ENGINEER AND LOCAL AUTHORITY CERTIFIED ENGINEERING DRAWINGS, DESIGN CALCULATIONS AND SOIL BORINGS. THE CERTIFIED ENGINEER FOR THE RETAINING WALL(S) SHALL PROVIDE CONSTRUCTION OBSERVATIONS OF THE RETAINING WALL IMPROVEMENT, AND A LETTER CERTIFYING THE INSTALLATION OF THE WALL(S) WAS CONSTRUCTED IN CONFORMANCE WITH THE PLANS AND SPECIFICATIONS. 20.RETAINING WALL TIE BACKS MUST NOT ENCROACH WITHIN THE UTILITY EASEMENT. 902.5 X 902 SPOT ELEVATION CONTOUR RIP RAP OVERFLOW ELEV. CURB & GUTTER BUILDING RETAINING WALL PROPERTY LIMIT EXISTINGPROPOSED LEGEND WETLAND LIMITS TREELINE STORM SEWER SOIL BORINGS GRADING NOTES DRAINTILE EOF 902.5 D THE SUBSURFACE UTILITY INFORMATION SHOWN ON THESE PLANS IS A UTILITY QUALITY LEVEL D. THIS QUALITY LEVEL WAS DETERMINED ACCORDING TO THE GUIDELINES OF ASCE/CI 38-02, TITLED "STANDARD GUIDELINES FOR THE COLLECTION AND DEPICTION OF EXISTING SUBSURFACE UTILITY DATA." THE CONTRACTOR AND/OR SUBCONTRACTORS SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, BY CONTACTING THE NOTIFICATION CENTER (GOPHER STATE ONE FOR MINNESOTA). THE CONTRACTOR AND/OR SUBCONTRACTOR AGREE TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES, WHICH MIGHT BE OCCASIONED BY HIS OR HER FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UTILITIES (UNDERGROUND AND OVERHEAD). IF THE CONTRACTOR ENCOUNTERS ANY DRAIN TILE WITHIN THE SITE, HE OR SHE SHALL NOTIFY THE ENGINEER WITH THE LOCATION, SIZE, INVERT AND IF THE TILE LINE IS ACTIVE. NO DRAIN TILE SHALL BE BACKFILLED WITHOUT APPROVAL FROM THE PROJECT ENGINEER. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE ALL EXISTING UTILITIES WHICH CONFLICT WITH THE PROPOSED IMPROVEMENTS SHOWN ON THE PLANS. C4.01 C4.03 C4.05 C4.02 C4.04 C4.06 Board and Batten "Phantom" PPG 1036-6 Door "Phantom" PPG 1036-6 Lap "Sharkskin" PPG 1025-4 Stone "Texas Rubble" Coronado CT501 Flat Panel "Sharkskin" PPG 1025-4 Trim "Crushed Silk" PPG 1024-3 "Slate Tile" SW 7624 "Slate Tile" SW 7624 "Gray Area" SW 7052 "Gray Area" SW 7052 "Accessible Beige" SW 7052 Right Elevation SCALE: 1/16":1'0' Left Elevation SCALE: 1/16":1'0' vqu ARE HERE Board and Batten "Clam Shell" PPG 1023-6 Door "Clam Shell" PPG 1023-6 Lap "Rock Cliffs" PPG 1101-4 Stone "Texas Rubble" Coronado CT501 Flat Panel "Rock Cliffs" PPG 1101-4 Trim "Crushed Silk" PPG 1024-3 12-112-15-201610/17/2017 "Foothills" SW 7514 "Foothills" SW 7514 "Basket Beige" SW 6143 "Basket Beige" SW 6143 "Accessible Beige" SW 7036 Right Elevation SCALE: 1/16":1'0' Left Elevation SCALE: 1/16":1'0' vqu ARE HERE Front Elevation I � Right Side Elevation SCAl.£. l/ll'":l"O" _, LJ\ J J [ I CLUBHOUSE vqu ARE HERE L __ I Rear Elevation Left Side Elevation SCALE: 3/32":1'0" CLUBHOUSE vqu ARE HERE :nm ii------- 1nm nm KITCHEN !11'-4"CLG! MUL Tl-PURPOSE !14'-0" CLG! FILES/IT !10'-0"CLG! CONFERENCE ROOM !10'-0" CLG! OFFICE !10'-0" CLG! ( _J ,,.-- - VESTIBULE 125'-0" CLG! Clubhouse Floor Plan SCALE, 3/32",l'O" nm: --------mnm nm1 POOL EQ. STORAGE !10'-0" CLG! MEP !10'-0" CLG! OFFICE !10'-0"CLG! 24-HR ENTRY !10'-0" CLG! YOGNWARM UP L _________ __J FITNESS CENTER !13'-0" CLG! D D D CLUBHOUSE FLOOR PLAN vqu ARE HERE     PAGE 1 of 3  MEMORANDUM           Date:  August 28, 2019      To:  Ken Roberts, Planner Director  Re:  Springs at Lake Elmo (Continental Properties)  Cc:  Chad Isakson, Assistant City Engineer    Final Plat/Plan Submittals/Review  From:  Jack Griffin, P.E., City Engineer          An engineering review has been completed for the Springs at Lake Elmo Addition. Final Plat/Construction Plans  were received August 19, 2019 consisting of the following documentation:   Final Plat and Construction Plans dated August 19, 2019.   Stormwater Management Plan dated March 22, 2019; updated August 13, 2019.      STATUS/FINDINGS:   Engineering review comments have been provided in two separate memos; one for Final Plat  approval, and one to assist with the completion of the final Construction Plans.  Please see the following review  comments relating to the Final Plat application.      FINAL PLAT AND EASEMENTS   There are no Outlots proposed with this Plat.   Final Plat must be contingent upon the City receiving separate drainage and utility easements, or temporary  grading/construction easements in the City’s standard form of easement agreement for all temporary and  off‐site development improvements. The easements must be obtained and recorded prior to recording of  final plat.   A permanent off‐site drainage and utility easement is required for the storm sewer run west of Julia  Avenue and for the proposed infiltration basin.   A permanent off‐site drainage and utility easement may be required for the storm sewer run east of the  Subdivision  along  the  north  side  of  Hudson  Boulevard  and  for  any  ditch  improvements  required  to  accommodate the proposed discharges.   All off‐site easements must be clearly shown on the site, street, grading and utility plans, with all dimensions  labeled. Type of easement must also be noted on the plans.   All easements as requested by the City Engineer and Public Works department shall be documented on the  Final Plat prior to the release of the Final Plat for recording.    No pipe oversize pipe costs are anticipated for this development.   Final Construction Plans and Specifications must be prepared in accordance with the latest version of the  City Engineering Design Standards Manual, using City details, plan notes and specifications and meeting City  Engineering Design Guidelines.   Final  Construction  Plans  and  Specifications  must  be  revised  in accordance  with  the  Construction  Plan  engineering review memorandum dated September 6, 2019.    The Final Plat shall not be recorded until final construction plan approval is granted.   No construction for Springs at Lake Elmo may begin until the applicant has received City Engineer approval  for the Final Construction Plans; the applicant has obtained and submitted to the City all applicable permits,  FOCUS ENGINEERING, inc.  Cara Geheren, P.E.   651.300.4261  Jack Griffin, P.E.                651.300.4264  Ryan Stempski, P.E.  651.300.4267  Chad Isakson, P.E.  651.300.4285      PAGE 2 of 3  easements and permissions needed for the project; and a preconstruction meeting has been held by the  City’s engineering department.    PUBLIC IMPROVEMENTS, RIGHT‐OF‐WAY AND EASEMENTS    Julia Avenue Right‐of‐way. The Julia Avenue right‐of‐way (the north‐south collector street connecting 5th  Street North to Hudson Boulevard) is shown to be dedicated as part of the Union Park Subdivision and is an  important roadway corridor for the City. Therefore, Final Plat approval for Springs at Lake Elmo must be  contingent upon the Union Park Final Plat being recorded at Washington County with the Julia Avenue 100‐ foot right‐of‐way.    Julia Avenue Improvements. The construction of Julia Avenue, from the north plat boundary of the Springs  Subdivision to Hudson Boulevard, is a requirement for the Springs at Lake Elmo development. Final Plat must  be contingent upon the final construction plans for Julia Avenue demonstrating no encroachments by  elements of the proposed Subdivision, including the perimeter fencing.   Hudson Boulevard Improvements and Right‐of‐way. Final Plat must be contingent upon sufficient right‐of‐ way being dedicated along Hudson Boulevard to allow for the Hudson Boulevard Improvements to be  constructed in accordance with the Hudson Boulevard Design Standards. No encroachments will be allowed  by design elements of the proposed Subdivision to either the right‐of‐way or 10‐foot utility easement along  the north right‐of‐way line of Hudson Boulevard. The Final Plat must be updated to clearly identify both the  existing and proposed Hudson Boulevard right‐of‐way to clearly depict the right‐of‐way dedication being  granted along Hudson Boulevard. The construction plans must also be updated to clearly show both the  existing and proposed Hudson Boulevard right‐of‐way.    Municipal  Watermain.  The  watermain  and  hydrants  extended  into  the Subdivision will  be owned and  maintained  by  the  City.  All  watermain  lines  and  hydrants  placed  within  the  development  will  require  minimum 30‐foot easements centered over the pipe. Easements will be dedicated as part of the Final Plat.  The northerly watermain connection to Union Park must be coordinated with the Union Park developer and  redesigned to minimize bends and fittings and to fully detail the proposed connection. The Final Plat  easements must be updated to reflect the City approved watermain connection plans.   Sanitary Sewer. The applicant will be responsible to connect to the City’s existing 10‐inch sanitary sewer  extending  along  Julia  Avenue  north  from  Hudson  Boulevard.  This will require the replacement of  approximately 250 feet of 8‐inch sanitary sewer with 10‐inch sanitary sewer at applicant’s sole cost.     STORMWATER MANAGEMENT   The proposed development is subject to a storm water management plan meeting State, Valley Branch  Watershed District (VBWD) rules, South Washington Watershed District (SWWD) rules, and City rules. The  proposed Subdivision resides within the VBWD jurisdiction; however, the applicant has proposed to direct  and manage the storm water from the public improvements (Hudson Boulevard and Julia Avenue) to land  within the SWWD jurisdiction. Permits will be required from the VBWD, SWWD and Minnesota Pollution  Control Agency. A stormwater permit may also be required from MnDOT. Final Plat must be contingent upon  the applicant obtaining the required storm water management permits and the proposed designs for  meeting these rules being acceptable to the City.   Permitting requirements will require rate control from all points of discharge from the site. The proposed  easterly storm water outfall pipe discharges to an existing ditch on the north side of Hudson Boulevard. Ditch  improvements will be required to accommodate this new combined discharge, or calculations must be  submitted to demonstrate that the existing ditch can accommodate the proposed discharge rates.    Storm water facilities proposed for the public improvements must be designed and constructed to meet the  requirements of the City Engineering Design Standards Manual.   The SWWD storm water management system is incomplete. Final Plat must be contingent upon the storm  water construction plans meeting the approval of the City and all required easements or Outlots for these  facilities being dedicated to the City in the city standard form of agreements.   Soil borings must be submitted in the number according to the City design standards for the proposed off‐ site infiltration basin. Type A or B soils are required to propose infiltration.        PAGE 3 of 3   Maintenance access roads and benches must be provided for the off‐site storm water basin, meeting the  City engineering design standards. Access must also be provided to all storm sewer structures.   The storm water facilities constructed internal to the Subdivision include several underground storage  chambers and a proposed storm water reuse irrigation system. These facilities will remain privately owned  and maintained. The applicant will be required to execute and record a Stormwater Maintenance and  Easement Agreement in the City’s standard form of agreement and must include a detailed maintenance  plan and schedule for these facilities.                          Wenck | Colorado | Georgia | Minnesota | North Dakota | Wyoming Toll Free 800-472-2232 Web wenck.com To: Ken Roberts, City of Lake Elmo Planning Director From: Lucius Jonett, Wenck Landscape Architect Date: July 30, 2019 Subject: City of Lake Elmo Landscape Plan Review Springs at Lake Elmo, Review #3 Submittals  Final Plat Resubmittal Tree Preservation Plan, dated July 26, 2019, received June 26, 2019.  Final Plat Resubmittal Landscape Plans, dated July 26, 2019, received June 26, 2019. Location: North of Hudson Boulevard North, West of Keats Avenue North in Lake Elmo, MN Land Use Category: Rural Development Transitional being rezoned to Urban High Density Planned Unit Development Surrounding Land Use Concerns: The property to the north (Bentley Village) is Urban Medium Density Residential and is less intensive land use than the proposed Urban High Density Residential. Screening is required on the north boundary. The property’s use to the west (Rural Development Transitional) is unknown at the moment and east (Commercial) is a zone that is more intensive land use than this proposed Urban High Density Residential. Screening is not required on the east or west boundaries. To the south is Interstate 94 where screening is suggested to help with noise abatement. Special landscape provisions in addition to the zoning code: None. Ken Roberts Planning Director City of Lake Elmo July 30, 2019 2 T:\6443 Lake Elmo\22 Springs of Lake Elmo\01 Preliminary Plans\2019-07-26\2019-07-30 Springs of Lake Elmo Landscape Plan Review.docx Tree Preservation: A. A tree preservation plan has been submitted that does meet all requirements. Entire Site Total Caliper Inches of Significant Trees On-Site: 1050 Cal Inches Common Trees 489 Conifer/Evergreen Trees 303 Hardwood Trees 258 Nuisance Trees 0 Significant Inches Removed On-Site 1050 Cal Inches Common Trees 489 Conifer/Evergreen Trees 303 Hardwood Trees 258 Nuisance Trees 0 30% Tree Removal Limits (Cal. Inches) Allowed Proposed Subtract Common Tree Removals 146.7 489 Subtract Conifer/Evergreen Tree Removals 90.9 303 Subtract Hardwood Tree Removals 77.4 258 Removals in excess of 30% allowances Removals in excess of 30% allowances 142.0 Cal Inches Common Removals in Excess of 30% Allowance 342.3 Conifer Removals in Excess of 30% Allowance 212.1 Hardwood Removals in Excess of 30% Allowance 180.6 Common Tree Replacement Needed (1/4 the dia inches removed) 85.6 Cal Inches Conifer Tree Replacement Needed (1/2 the dia inches removed) 106.1 Cal Inches Hardwood Tree Replacement Needed (1/2 the dia inches removed) 90.3 Cal Inches Common Tree Replacement Required @ 3" per Tree 29 # Trees Conifer Tree Replacement Required @ 3" per 6' Tall Tree 36 # Trees Hardwood Tree Replacement Required @ 3" per Tree 31 # Trees B. There are 37 specimen trees identified in the tree inventory. The following tree ID numbers are defined as specimen, 3501-3534, 3557, 3561, and 3563. All specimen trees are proposed for removal. C. Tree replacement is required because more than thirty (30) percent of the diameter inches of significant trees surveyed will be removed. D. Tree replacement calculations does follow the required procedure. E. This project is residential development; therefore, mitigation replacement trees shall be in addition to landscape required tree counts. Ken Roberts Planning Director City of Lake Elmo July 30, 2019 3 T:\6443 Lake Elmo\22 Springs of Lake Elmo\01 Preliminary Plans\2019-07-26\2019-07-30 Springs of Lake Elmo Landscape Plan Review.docx Landscape Requirements: The preliminary landscape plans do meet the code required number of trees. Master Plan Master Plan (Code Required) Proposed Street frontage 1100 1100 Lineal Feet Lake Shore 0 0 Lineal Feet Stream Frontage 0 0 Lineal Feet Total Linear Feet 1100 1100 Lineal Feet /50 Feet = Required Frontage Trees 22 22 Trees Development or Disturbed Area - SF Development or Disturbed Area 17 17 Acres *5 = Required Development Trees 85 85 Trees Interior Parking Lot Spaces* 0 0 Spaces /10 = Required Parking Lot Trees 0 0 Trees Perimeter Parking Lot Frontage Length* 1286 Lineal Feet /50 = Required Frontage Strip Trees 26 26 Trees Required Mitigation Trees 96 96 Required Number of Trees 229 229 Total Trees to Date 284 * Residential development - mitigation replacement trees are in addition to landscape required tree counts. The landscape plans do meet the minimum compositions of required trees: • At least 25% of the required number of trees shall be deciduous shade trees • At least 25% of the required number of trees shall be coniferous trees • Up to 15% of the required number of trees may be ornamental tree Master Plan Qty % Composition Deciduous Shade Trees 142 50% >25% required Coniferous Trees 107 38% >25% required Ornamental Trees 35 12% <15% required Tree Count 284 A. A landscape plan has been submitted that does include all requirements. B. The landscape plan does not meet the landscape layout requirements; 1. No utility conflicts; prefer that the trunk of trees shall be 10 feet from the nearest utility, 5 feet minimum required, including yard drains and storm sewer lines. Ken Roberts Planning Director City of Lake Elmo July 30, 2019 4 T:\6443 Lake Elmo\22 Springs of Lake Elmo\01 Preliminary Plans\2019-07-26\2019-07-30 Springs of Lake Elmo Landscape Plan Review.docx C. Interior Parking Lot Landscaping – The development does include several interior parking lots and none of the proposed parking lots exceed 30 stalls requiring additional landscaping. D. Perimeter Parking Lot Landscaping – The development does include perimeter parking lots and meets all landscape requirements by providing vegetated screening between four and six feet in height and 90% opaque year round and includes one deciduous or coniferous tree for every 40 linear feet along the property line. E. Screening – The landscape plan does meet screening requirements by providing a vegetated screen of at least six feet in height and not less than 90% opaque year round and includes one deciduous or coniferous tree for every 40 linear feet along the property line. Findings: 1. Resubmitted plans address all comments from the previous review. 2. See attached markup on the landscape plan showing trees in conflict with yard drains and utility lines. There are several constrained open spaces, where after the utilities are installed, field adjustments of trees to fit the remaining open space will be difficult to meet City spacing requirements. The landscape plan needs to be updated with adjusted tree locations to maintain 10’ clearance where possible, otherwise maintaining at least 5’ as agreed upon. Recommendation: It is recommended that a condition of final approval includes submitting a revised landscape plan. Sincerely, Lucius Jonett, PLA (MN) Wenck Associates, Inc. City of Lake Elmo Municipal Landscape Architect HUDSON BLVD N B20E BLDG 5B FFE=1007.50 GFE=1007.17 B20E BLDG 8A FFE=1007.10 GFE=1006.77 B20E BLDG 7B FFE=1007.00 GFE=1006.67 B20E BLDG 4B FFE=1007.60 GFE=1007.27 B20E BLDG 3A FFE=1007.50 GFE=1005.17 B20E BLDG 2B FFE=1006.50 GFE=1006.17 B20E BLDG 1A FFE=1006.10 GFE=1005.77 B20E BLDG 14A FFE=1004.30 GFE=1003.97 B20E BLDG 9B FFE=1005.45 GFE=1005.12 B20E BLDG 11B FFE=1005.00 GFE=1004.67 B20E BLDG 10A FFE=1005.00 GFE=1004.67 B20E BLDG 12A FFE=1005.00 GFE=1004.67 B20E BLDG 13B FFE=1005.00 GFE=1004.67 6G GFE=1006.39 6G GFE=1006.20 6G GFE=1003.50 6G GFE=1003.40 6G GFE=1003.40 6GS-2 GFE=1003.10 MG-P GFE=1003.34 CLUBHOUSE FFE=1005.50 B20E BLDG 6B FFE=1007.40 GFE=1007.07 ADA B20E BLDG 15B FFE=1004.30 GFE=1003.97 25' B U F F E R BUFFER AVERAGING/ D/U EASEMENT ADA 6G S - 2 GF E = 1 0 0 5 . 4 4 ADA ADA ADA ADA ADA DS DS DS DS DS DS DS DSDSDSDS DSDSDS DSDSDS DS DSDS DSDSDS DS DSDS DSDSDS DS DSDS DSDSDS DS DSDS DSDSDS DS DSDS DS DS DSDS DS DS DS DS DS DSDS DS DS DS DS DS DS DS DS DS DS DS DS DSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DSDS DS DS DS DS DS DS DS DS DSDS DS DS DS DS DS DS DS DS DS DSDS DSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DSDS DSDSDSDS DS DS DS DS DS DS DS DS DS DS DS DS DSDS DSDSDSDS DS DS DS DSDS DSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DSDS DSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DSDS DSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DSDS DSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DSDS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DSDS DSDSDSDS DS DS DS DS DS DS DS DS DS DS DS DS DSDS DSDSDSDS DS DS DS DS DS REAR 1008.8REAR 1011.3REAR 1013.2 RE A R 1 0 1 6 . 0 REA R 1 0 1 9 . 2 TC10 1 6 . 3 8 TCLP 1 0 1 6 . 2 4 EXISTING WETLAND NWL: 992.4 HWL: 996.5 UNDERGROUND STORAGE SYSTEM 1 FOOTPRINT = 27'x84' (60" CHAMBERS) CHAMBER IE = 998.15 6" OUTLET IE = 998.15 21" OUTLET IE = 1001.8 HWL: 1004.14 HWL HWL H W L PERMANENT 30' UTILITY EASEMENT PERMANENT 30' UTILITY EASEMENT PERMANENT 30' UTILITY EASEMENT PE R M A N E N T 3 0 ' U T I L I T Y E A S E M E N T PE R M A N E N T 3 0 ' U T I L I T Y E A S E M E N T UNDERGROUND STORAGE SYSTEM 2 FOOTPRINT = 27'x200' (60" CHAMBERS) CHAMBER IE = 997.25 6" OUTLET IE = 997.25 24" OUTLET IE = 1000.95 HWL: 1003.24 UNDERGROUND STORAGE SYSTEM 3 FOOTPRINT = 27'x212' (60" CHAMBERS) CHAMBER IE = 995.55 6" OUTLET IE = 995.55 24" OUTLET IE = 997.85 HWL: 1001.53 UNDERGROUND STORAGE SYSTEM 5 FOOTPRINT = 27'x68' (60" CHAMBERS) CHAMBER IE = 994.25 6" OUTLET IE = 994.25 30" OUTLET IE = 997.29 HWL: 1000.25 UNDERGROUND STORAGE SYSTEM 9 FOOTPRINT = 27'x51' (60" CHAMBERS) CHAMBER IE = 993.75 6" OUTLET IE = 993.75 30" OUTLET IE = 996.99 HWL: 999.75 UNDERGROUND RAINWATER REUSE CISTERN 8B FOOTPRINT = 45'x136' (60" PIPES) CHAMBER IE = 987.20 OUTLET IE = 991.75 HWL: 992.2 UNDERGROUND FILTRATION SYSTEM 7 FOOTPRINT = 68'x82' (30" CHAMBERS) CHAMBER IE = 997.57 60" WEIR WALL TOP = 999.33 DRAINTILE OUTLET IE = 995.07 HWL: 1001.57 UNDERGROUND FILTRATION SYSTEM 6 FOOTPRINT = 59'x96' (30" CHAMBERS) CHAMBER IE = 1000.5 60" WEIR WALL TOP = 1002.11 DRAINTILE OUTLET IE = 998.50 HWL: 1003.5 UNDERGROUND STORAGE SYSTEM 8A FOOTPRINT = 31'x38' (60" CHAMBERS) CHAMBER IE = 991.75 OUTLET IE = 991.75 48" WEIR WALL TOP = 995.15 HWL: 997.27 Project Location Date Submittal / RevisionNo. Certification Sheet Title Summary Revision History Sheet No.Revision Project No. By Designed:Drawn: Approved:Book / Page: Phase:Initial Issue: Client CONTINENTAL 483 FUND LLC W134 N8675 EXECUTIVE PARKWAY MENOMONEE FALLS, WI 53051 SPRINGS AT LAKE ELMO LAKE ELMO, MINNESOTA 9955 HUDSON BOULEVARD NORTH JEB CJL ETL FINAL 4/12/2019 21654 Registration No.Date: I hereby certify that this survey, plan or report was prepared by me or under my direct supervision and that I am a duly Licensed LANDSCAPE ARCHITECT under the laws of the State of Minnesota. This certification is not valid unless wet signed in blue ink. If applicable, contact us for a wet signed copy of this survey which is available upon request at Sambatek, Minnetonka, MN office. 40252 William L Delaney 4/12/2019 CITY SUBMITTAL 5/1/2019 CITY PRELIMINARY RESUBMITTAL 6/11/2019 BID SET 7/26/2019 CITY SUBMITTAL SCALE IN FEET 0 10050 NORTH Jul 26, 2019 - 12:45pm - User:jpistorius L:\PROJECTS\21654\CAD\Civil\Sheets\21654-L1-LAND.dwg L1.01 LANDSCAPE PLAN LEGEND EASEMENT CURB & GUTTER BUILDING RETAINING WALL NUMBER OF PARKING STALLS PER ROW SIGN PIPE BOLLARD STANDARD DUTY ASPHALT PAVING HEAVY DUTY ASPHALT PAVING CONCRETE PAVING PROPERTY LIMIT EXISTINGPROPOSED KEY NOTE WETLAND LIMITS TREELINE XX XX CONCRETE SIDEWALK ARCHITECTURAL CONCRETE DETAIL XX CHAIN LINK FENCE DECORATIVE WOODEN FENCE AIR CONDITIONING UNIT MITIGATION FROM TREE PRESERVATION PLAN REQUIRED COMMON TREES (85.6" @ 3" TREES)29 TREES CONIFER TREES (106.1" @ 3" = 6' TREES) 36 TREES HARDWOOD TREES (90.3" @ 3" TREES)31 TREES TOTAL 96 TREES SETBACK AREA LANDSCAPE REQUIREMENTS REQUIRED STREET FRONTAGE (1100 FT / 50 = 22 TREES @ 2.5")22 TREES DISTURBED AREA (17 ACRES X 5 = 85 TREES @ 2.5")85 TREES INTERIOR PARKING LOT = # ABOVE 30 STALLS/10 = 0 0 TREES --- MAY NOT NEED IF UNDER # STALLS PARKING PERIMETER - LOT FRONTAGE LENGTH 1286 / 50 = 25.72 26 TREES TOTAL 133 TREES MITIGATION AND LANDSCAPE REQUIRED TREES 229 TREES PROPOSED PLANTINGS REQUIRED PROPOSED PERCENTAGE OVERSTORY TREES 142 TREES 60% CONIFEROUS TREES 59 TREES 25% ORNAMENTAL TREES*35 TREES 15% TOTAL 229 TREES 236 TREES SHRUBS AND PERENNIALS 1,449 UNITS *DOES NOT COUNT TOWARDS REPLACEMENT TREE TOTALS. LAKE ELMO, MN LANDSCAPE CODE NON-STEEL EDGER TREES CODE BOTANICAL / COMMON NAME CONT CAL SIZE QTY CM Acer x freemanii `Armstrong` / Armstrong Freeman Maple B & B 3"Cal.21 HB Celtis occidentalis / Common Hackberry B & B 3"Cal.14 GB Ginkgo biloba `Autumn Gold` TM / Maidenhair Tree B & B 3"Cal.18 IH Gleditsia triacanthos `Imperial` / Imperial Honeylocust B & B 3"Cal.22 KC Gymnocladus dioica `Espresso` / Kentucky Coffeetree B & B 3"Cal.14 SO Quercus bicolor / Swamp White Oak B & B 3"Cal.9 RP Quercus robur x warei`Long` / Regal Prince Oak B & B 3"Cal.18 BL Tilia americana `Boulevard` / Boulevard Linden B & B 3"Cal.7 PE Ulmus americana `Princeton` / American Elm B & B 3"Cal.19 CONIFERS CODE BOTANICAL / COMMON NAME CONT CAL SIZE QTY BF Abies balsamea / Balsam Fir B & B 6`18 NS Picea abies / Norway Spruce B & B 6`20 AP Pinus nigra / Austrian Black Pine B & B 6`10 WP Pinus strobus / White Pine B & B 6`11 AT Thuja occidentalis `Bail John` / Technito Arborvitae B & B 5`48 ORN. TREES CODE BOTANICAL / COMMON NAME CONT CAL SIZE QTY SB Amelanchier canadensis `Autumn Brilliance` / Autumn Brilliance Serviceberry B & B 2"Cal 10 PF Malus x `Prairifire` / Prairifire Crab Apple B & B 2"Cal 7 JL Syringa reticulata / Japanese Tree Lilac B & B 2"Cal 18 GROUND COVERS CODE BOTANICAL / COMMON NAME CONT QTY 34-171 MNDOT Seed Mix 34-171 / Wetland Edge Seed 8,317 sf 36-211 MNDOT Seed Mix 36-211 / Upland buffer Seed 10,817 sf TUR HIG Turf Sod Highland Sod / Sod Sod 165,664 sf PLANT SCHEDULE TREES Project Location Date Submittal / RevisionNo. Certification Sheet Title Summary Revision History Sheet No.Revision Project No. By Designed:Drawn: Approved: Book / Page: Phase: Initial Issue: Client CONTINENTAL 483 FUND LLC W134 N8675 EXECUTIVE PARKWAY MENOMONEE FALLS, WI 53051 SPRINGS AT LAKE ELMO LAKE ELMO, MINNESOTA 9955 HUDSON BOULEVARD NORTH JEB CJL ETL FINAL 4/12/2019 21654 Registration No.Date: I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly licensed professional ENGINEER under the laws of the state of Minnesota. If applicable, contact us for a wet signed copy of this plan which is available upon request at Sambatek's, Minnetonka, MN office. 7/26/201950475 Eric T. Luth 4/12/2019 CITY SUBMITTAL 5/1/2019 CITY PRELIMINARY RESUBMITTAL 6/11/2019 BID SET 7/26/2019 CITY SUBMITTAL 7/30/2019 STORM SEWER UPDATE 8/14/2019 VBWD COMMENTS 8/19/2019 CITY SUBMITTAL Aug 19, 2019 - 1:29pm - User:csyverson L:\PROJECTS\21654\CAD\Civil\Sheets\21654-C7-STM.dwg C7.00 STORM SEWER PLAN SCALE IN FEET 0 200100 1. THE UTILITY IMPROVEMENTS FOR THIS PROJECT SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE "STANDARD UTILITIES SPECIFICATIONS" AS PUBLISHED BY THE CITY ENGINEERS ASSOCIATION OF MINNESOTA (CEAM), EXCEPT AS MODIFIED HEREIN. CONTRACTOR SHALL OBTAIN A COPY OF THESE SPECIFICATIONS. 1.1. ALL UTILITIES SHALL BE CONSTRUCTED IN ACCORDANCE WITH CITY REQUIREMENTS. 1.2. CONTRACTOR SHALL NOT OPEN, TURN OFF, INTERFERE WITH, OR ATTACH ANY PIPE OR HOSE TO OR TAP WATERMAIN BELONGING TO THE CITY UNLESS DULY AUTHORIZED TO DO SO BY THE CITY. ANY ADVERSE CONSEQUENCES OF ANY SCHEDULED OR UNSCHEDULED DISRUPTIONS OF SERVICE TO THE PUBLIC ARE THE LIABILITY OF CONTRACTOR. 1.3. A MINIMUM VERTICAL SEPARATION OF 18 INCHES AND HORIZONTAL SEPARATION OF 10-FEET BETWEEN OUTSIDE PIPE DIAMETERS IS REQUIRED AT ALL WATERMAIN AND SEWER MAIN (BUILDING, STORM AND SANITARY) CROSSINGS. 2. ALL MATERIALS SHALL BE AS SPECIFIED IN CEAM SPECIFICATIONS EXCEPT AS MODIFIED HEREIN. 2.1. ALL STORM SEWER PIPE TO BE SMOOTH INTERIOR DUAL WALL HDPE PIPE WITH WATER TIGHT GASKETS, UNLESS NOTED OTHERWISE. 2.1.1. ALL STORM SEWER PIPE FOR ROOF DRAIN AND YARD DRAIN SERVICES TO BUILDING SHALL BE PVC SCH 40 CONFORMING TO ASTM D2665, WITHIN 10' OF THE BUILDING. ALL OTHER AREAS 2.2. RIP RAP SHALL BE Mn/DOT CLASS 3. 3. COORDINATE ALL BUILDING SERVICE CONNECTION LOCATIONS AND INVERT ELEVATIONS WITH MECHANICAL CONTRACTOR PRIOR TO CONSTRUCTION. 4. ALL BUILDING SERVICE CONNECTIONS (STORM, SANITARY, WATER) WITH FIVE FEET OR LESS COVER ARE TO BE INSULATED FROM BUILDING TO POINT WHERE 5-FEET OF COVER IS ACHIEVED. 5. CONTRACTOR SHALL TAKE ALL PRECAUTIONS NECESSARY TO AVOID PROPERTY DAMAGE TO ADJACENT PROPERTIES DURING THE CONSTRUCTION PHASES OF THIS PROJECT. CONTRACTOR WILL BE HELD SOLELY RESPONSIBLE FOR ANY DAMAGES TO THE ADJACENT PROPERTIES OCCURRING DURING THE CONSTRUCTION PHASES OF THIS PROJECT. 6. SAFETY NOTICE TO CONTRACTORS: IN ACCORDANCE WITH GENERALLY ACCEPTED CONSTRUCTION PRACTICES, CONTRACTOR WILL BE SOLELY AND COMPLETELY RESPONSIBLE FOR CONDITIONS ON THE JOB SITE, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY DURING PERFORMANCE OF THE WORK. THIS REQUIREMENT WILL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS. THE DUTY OF THE ENGINEER OR THE DEVELOPER TO CONDUCT CONSTRUCTION REVIEW OF CONTRACTOR'S PERFORMANCE IS NOT INTENDED TO INCLUDE REVIEW OF THE ADEQUACY OF CONTRACTOR'S SAFETY MEASURES IN, ON OR NEAR THE CONSTRUCTION SITE. 7. ALL AREAS OUTSIDE THE PROPERTY BOUNDARIES THAT ARE DISTURBED BY UTILITY CONSTRUCTION SHALL BE RESTORED IN KIND. SODDED AREAS SHALL BE RESTORED WITH 6 INCHES OF TOPSOIL PLACED BENEATH THE SOD. 8. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING AND MAINTAINING TRAFFIC CONTROL DEVICES SUCH AS BARRICADES, WARNING SIGNS, DIRECTIONAL SIGNS, FLAGMEN AND LIGHTS TO CONTROL THE MOVEMENT OF TRAFFIC WHERE NECESSARY. TRAFFIC CONTROL DEVICES SHALL CONFORM TO APPROPRIATE MINNESOTA DEPARTMENT OF TRANSPORTATION STANDARDS. 9. ALL SOILS TESTING SHALL BE COMPLETED BY AN INDEPENDENT SOILS ENGINEER. EXCAVATION FOR THE PURPOSE OF REMOVING UNSTABLE OR UNSUITABLE SOILS SHALL BE COMPLETED AS REQUIRED BY THE SOILS ENGINEER. THE UTILITY BACKFILL CONSTRUCTION SHALL COMPLY WITH THE REQUIREMENTS OF THE SOILS ENGINEER. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING ALL REQUIRED SOILS TESTS AND SOIL INSPECTIONS WITH THE SOILS ENGINEER. A GEOTECHNICAL ENGINEERING REPORT HAS BEEN COMPLETED BY: COMPANY: INTERTEK-PSI ADDRESS: 2915 WATERS ROAD, SUITE 112 EAGAN, MN 55121 PHONE: 651-646-8148 DATED: FEBRUARY 11, 2019 CONTRACTOR SHALL OBTAIN A COPY OF THIS SOILS REPORT. 10. CONTRACTOR SHALL SUBMIT 2 COPIES OF SHOP DRAWINGS FOR MANHOLE AND CATCH BASIN STRUCTURES TO ENGINEER. CONTRACTOR SHALL ALLOW 5 WORKING DAYS FOR SHOP DRAWING REVIEW. 11. CONTRACTOR AND MATERIAL SUPPLIER SHALL DETERMINE THE MINIMUM DIAMETER REQUIRED FOR EACH STORM SEWER STRUCTURE. 12. THE UNDERGROUND STORMWATER SYSTEM SHOWN ON THE UTILITY PLAN AND THE DETAIL SHEETS IS FOR INFORMATIONAL PURPOSES ONLY AND DEPICTS THE MINIMUM STORAGE REQUIREMENTS AND THE SYSTEM ELEVATIONS. THE CONTRACTOR (WITH THEIR SUPPLIER OR DESIGNER) SHALL SUBMIT DESIGN DRAWINGS TO THE ENGINEER FOR REVIEW AND APPROVAL PRIOR TO CONSTRUCTION. THE DESIGN DRAWINGS SHALL DEPICT THE FINAL LAYOUT AND DETAILS FOR CONSTRUCTION. THE DRAWINGS SHALL BE CERTIFIED BY A LICENSED ENGINEER FOR THE STATE IN WHICH THE PROJECT IS CONSTRUCTED. THE SUBMITTAL SHALL INCLUDE ALL NECESSARY PRODUCT INFORMATION, DESIGN CALCULATIONS AND BEDDING REQUIREMENTS FOR THE PROPOSED STORMWATER SYSTEM. FOLLOWING CONSTRUCTION, THE CERTIFYING ENGINEER SHALL SUBMIT A LETTER TO THE OWNER AND ENGINEER INDICATING THEY OBSERVED THE INSTALLATION AND THE INSTALLATION OF THE STORMWATER SYSTEM WAS IN CONFORMANCE WITH THE CERTIFIED DRAWINGS. TELEPHONE ELECTRIC GAS LINE FORCEMAIN (SAN.) EASEMENT WATERMAIN SANITARY SEWER EXISTINGPROPOSED STORM SEWER CURB & GUTTER DRAINTILE D S S SLS THE SUBSURFACE UTILITY INFORMATION SHOWN ON THESE PLANS IS A UTILITY QUALITY LEVEL D. THIS QUALITY LEVEL WAS DETERMINED ACCORDING TO THE GUIDELINES OF ASCE/CI 38-02, TITLED "STANDARD GUIDELINES FOR THE COLLECTION AND DEPICTION OF EXISTING SUBSURFACE UTILITY DATA." THE CONTRACTOR AND/OR SUBCONTRACTORS SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, BY CONTACTING THE NOTIFICATION CENTER (GOPHER STATE ONE FOR MINNESOTA). THE CONTRACTOR AND/OR SUBCONTRACTOR AGREE TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES, WHICH MIGHT BE OCCASIONED BY HIS OR HER FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UTILITIES (UNDERGROUND AND OVERHEAD). IF THE CONTRACTOR ENCOUNTERS ANY DRAIN TILE WITHIN THE SITE, HE OR SHE SHALL NOTIFY THE ENGINEER WITH THE LOCATION, SIZE, INVERT AND IF THE TILE LINE IS ACTIVE. NO DRAIN TILE SHALL BE BACKFILLED WITHOUT APPROVAL FROM THE PROJECT ENGINEER. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE ALL EXISTING UTILITIES WHICH CONFLICT WITH THE PROPOSED IMPROVEMENTS SHOWN ON THE PLANS. UNDERGROUND STORM SEWER SYSTEM UTILITY CONSTRUCTION NOTESLEGEND 14. THE PROPOSED STORM LOCATED WITHIN SPRINGS WILL BE PRIVATELY OWNED. 13. ALL ROOF DRAINS PIPE LEADS FROM THE DOWNSPOUT LOCATION TO THE STORM MAIN SHALL HAVE A 1% MIN PIPE SLOPE. ALL OTHER AREAS MAY USE HDPE PIPE WHEN GREATER THAN 10' FROM BUILDING AND PIPE SIZES ARE GREATER THAN 12". C7.01 C7.03 C7.05 C7.02 C7.04 C7.06 10' setback line Detached garage shifted to north clear EOF Detached garage shifted to north to clear EOF CITY OF LAKE ELMO CITY COUNCIL MINUTES JUNE 18, 2019 CALL TO ORDER/PLEDGE OF ALLEGIANCE Mayor Pearson called the meeting to order at 7:00 pm. PRESENT: Mayor Mike Pearson and Councilmembers Justin Bloyer, Dale Dorschner, Lisa McGinn and Christine Nelson Staff present: Administrator Handt, City Attorney Sonsalla, City Engineer Griffin, Planning Director Roberts, Finance Director Iverson, Public Works Director Powers and City Clerk Johnson APPROVAL OF AGENDA “City Sponsorship of 4th of July Parade” added as item 13 on the Regular agenda. Councilmember Bloyer, seconded by Councilmember Nelson, moved TO APPROVE THE AGENDA AS AMENDED. Motion passed 5 – 0. ACCEPT MINUTES Minutes of the June 4, 2019 Regular Meeting were accepted as presented. PUBLIC COMMENTS/INQUIRIES Susan Dunn, 11018 Upper 33rd St. N., suggested additions to the City’s newsletter recognizing the contributions of Bernie Wilke and David Steel to the city, and expressed opposition to proposed mountain biking trails in Sunfish Lake Park. PRESENTATIONS None CONSENT AGENDA 2. Approve Payment of Disbursements 3. Accept May 2019 Fire Department Report 4. Accept May 2019 Building Department Report 5. Accept May 2019 Public Works Department Report 6. Approve 2019 Staff Wage Adjustments 7. Approve Summer Newsletter 8. Approve Old Village Phase 4 - Pay Request No. 6 9. Approve Mowing Contract 10. Approve Sale of Excess and Retired Equipment 11. Approve Development Security Reduction LAKE ELMO CITY COUNCIL MINUTES JUNE 18, 2019 Page 2 of 3 Councilmember Bloyer, seconded by Councilmember Nelson, moved TO APPROVE THE CONSENT AGENDA AS PRESENTED. Motion passed 5 - 0. ITEM 12: Springs of Lake Elmo – Preliminary Plat and PUD, Zoning Map Amendment Planning Director Roberts presented the preliminary plat for the Springs of Lake Elmo multifamily housing proposal, noting plans for trails, access points and building layouts. Gwen Wheeler, Continental Properties, spoke on behalf of the applicant, providing an overview of the site plan, market demand, exterior elevations, site amenities and density. Discussion was held concerning density, pedestrian improvements and amenity points. Susan Dunn, expressed concerns with the proposal, including density and aesthetics. Mayor Pearson, seconded by Councilmember Nelson, MOVED TO ADOPT RESOLUTION 2019 - 043 APPROVING THE PRELIMINARY PLAT AND PRELIMINARY PUD PLANS AS REQUESTED BY CONTINENTAL 483 FUND LLC FOR PID# 34.029.21.43.0003 FOR THE PROJECT TO BE KNOWN AS THE SPRINGS APARTMENTS LOCATED ON THE NORTH SIDE OF HUDSON BOULEVARD, SUBJECT TO RECOMMENDED FINDINGS AND CONDITIONS OF APPROVAL AS LISTED IN THE STAFF REPORT AND PROVIDE 17 AMENITY POINTS. Councilmember Dorschner, seconded by Councilmember McGinn, moved TO AMEND THE PRIMARY MOTION TO REPLACE THE PEDESTRIAN AMENITY POINTS WITH TWO STORY BUILDING AND SEPARATE ENTRANCE AMENITY POINTS AT THE SAVE LEVEL. Motion failed 1 – 4. (Pearson, Bloyer, McGinn, Nelson – nay) Primary motion passed 5 – 0. Councilmember Nelson, seconded by Councilmember Dorschner, moved TO ADOPT ORDINANCE 08- 223 APPROVING THE ZONING MAP AMENDMENT (REZONING) OF SITE OF THE SPRINGS APARTMENTS ON HUDSON BOULEVARD FROM RT (RURAL DEVELOPMENT TRANSITIONAL) TO HDR (URBAN HIGH DENSITY RESIDENTIAL) AFTER FINAL APPROVAL OF THE 2040 COMPREHENSIVE PLAN BASED ON THE FINDINGS LISTED IN THE STAFF REPORT. Motion passed 5 – 0. ITEM 13: City Sponsorship of 4th of July Parade City Administrator Handt explained that the City sponsorship of the 4th of July Parade allows the event to be covered by the City’s insurance. LAKE ELMO CITY COUNCIL MINUTES JUNE 18, 2019 Page 3 of 3 Councilmember Dorschner, seconded by Mayor Pearson, moved TO USE THE CITY’S INSURANCE FOR THE 4TH OF JULY PARADE. Motion passed 5 – 0. COUNCIL REPORTS Mayor Pearson: Commented on the recent passing of former Parks Commissioner David Steele. Councilmember Nelson: Thanked volunteers for the successful Nature Day event at Sunfish Lake Park. STAFF REPORTS AND ANNOUNCEMENTS Administrator Handt: New Deputy Clerk starting next week; LMC conference in Duluth next week. City Attorney Sonsalla: Attending the LMC Conference next week. City Engineer Griffin: Announced Keats Avenue closing next week for storm sewer work. CLOSED SESSION Mayor Pearson, seconded by Councilmember Dorschner, moved TO ADJOURN TO CLOSED SESSION PURUSANT TO MN STAT, SECTION 13D.05, SUBD 3(B) TO DISCUSS MATTERS PROTECTED BY THE ATTORNEY-CLIENT PRIVIEGE PERTAINING TO POTENTIAL LITIGATION AGAINST HAMLET ON SUNFISH LAKE HOA. Motion passed 5 – 0. Closed session held. Mayor Pearson, seconded by Councilmember Dorschner, moved TO RETURN TO OPEN SESSION. Motion passed 5 – 0. Meeting adjourned at 9:24 pm. LAKE ELMO CITY COUNCIL ATTEST: ______________________________ Mike Pearson, Mayor _______________________________ Julie Johnson, City Clerk     W134 N8675 Executive Parkway • Menomonee Falls, WI 53051-3310 • Telephone: 262.502.5500 • Facsimile: 262.502.5522     Appendix A: Theming Product Details and Imagery      1. Two City standard light poles with community identifying banners:    a. Street Light Fixture: Excel ‐ Evans (to match 5th St.) LED, 4000 Lumens, Black    b. Street Light Pole: 25 ft Evans (Type D) decorative base mounted fluted black aluminum  pole (to match 5th St.) with banner support accessory  c. To be provided at the Julia/Hudson intersection and at the Springs emergency only  driveway. Location exhibit and photometric plan enclosed. Image for conceptual purposes only      W134 N8675 Executive Parkway • Menomonee Falls, WI 53051-3310 • Telephone: 262.502.5500 • Facsimile: 262.502.5522   2. Two timeless‐style benches comprised of cast aluminum and a durable powder‐coated finish  and wood seat along the Eastern portion of Julia Avenue North. To be placed on a concrete pad. 3. 5’ tall black ornamental metal fence around the entire perimeter.     8 - 5 : : 3 = ; ? 1 -  17 3  8 9 ; -  @ 2 = ; :  8 A 2 F 3 1 > =  A 3 F !+  -  # F 2 <1 B   F   -   &   -  ; <  6 A 6 8 -    -  @ 2 = ; :  8 A 2 F  3 1 > = A 3 F ! +  F  '   F $ *    F                                                    F DF  ' ,  F          F  F % ( $   (  F                                                E.F   / F / F / F / F / F / F / F / F / F 0 F / F / F / F / F / F / F / F / F / F                       !  (    F   (  F  $  + !  F                                                                                  $ * F   %  $  # '  " ! F  &  F  F $  * F  %  $  # '  " ! F  )  F   ; : 2 1 C  F @ 4 @ = > F   F   F     F # F BENCH ON CONCRETE PAD BENCH ON CONCRETE PAD 20' LIGHT POLE WITH BANNER 5' BLACK DECORATIVE ALUMINUM FENCE 5' BLACK DECORATIVE ALUMINUM FENCE 20' LIGHT POLE WITH BANNER BENCH ON CONCRETE PAD 20' LIGHT POLE WITH BANNER 5' BLACK DECORATIVE ALUMINUM FENCE BENCH ON CONCRETE PAD 20' LIGHT POLE WITH BANNER C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C CC C C C C C C C C C C C C C C C C C C CC C C C C C C CC C C C C C C C C C C C C C C C C C C CC C C C C C C C C C C CC C C C C C C C C CC C C C C C C C C C C C C C C C C C C C C C C C D D D D D D D D D DDDDDDDDD B B AD AD A A A A A A A A A AD A A A A A A A A A A E E E EE A B B B B B B A B B B B B B B B B B B B B B D D D D A B A A A A B 5.4 0.1 0.1 0.2 0.2 0.3 0.4 0.5 0.5 0.4 0.4 0.5 0.5 0.5 0.5 0.5 0.5 0.4 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.8 0.8 0.9 1.1 2.1 2.2 2.2 1.4 0.7 0.6 0.5 0.5 0.5 0.5 0.6 0.5 0.6 0.6 0.6 0.6 0.6 0.6 0.6 0.5 0.6 0.5 0.5 0.5 0.7 0.6 0.5 0.4 0.1 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.6 0.6 0.7 0.6 0.6 0.6 0.7 0.6 0.6 0.6 0.6 0.6 0.6 0.7 0.7 0.7 0.7 1.0 1.0 1.1 1.5 2.3 2.4 2.7 1.7 0.9 0.7 0.7 0.7 0.7 0.7 0.7 0.6 0.6 0.7 0.8 0.8 0.8 0.7 0.6 0.6 0.7 0.8 0.7 0.7 0.9 0.8 0.7 0.6 0.1 0.1 0.3 0.4 0.5 0.6 0.7 0.8 0.8 0.9 0.8 0.7 0.6 0.7 0.8 0.9 0.8 0.8 0.7 0.6 0.6 0.8 1.0 1.0 0.8 1.3 1.3 1.4 1.6 2.5 2.5 2.7 1.8 1.2 0.9 0.8 0.8 0.9 0.9 0.7 0.6 0.7 0.8 1.0 1.1 1.0 0.7 0.6 0.6 0.7 1.0 1.0 0.8 1.1 1.0 0.8 0.6 0.1 0.1 0.3 0.4 0.6 0.7 0.8 0.8 0.7 0.9 0.8 0.6 0.6 0.6 0.8 1.0 1.0 0.7 0.4 0.3 0.2 1.2 1.3 1.3 1.4 2.2 2.4 2.5 1.9 1.5 1.0 0.4 0.1 0.8 0.8 0.6 0.4 0.1 0.1 0.2 0.3 0.5 0.6 0.7 0.5 0.1 1.3 1.6 1.7 2.0 2.3 2.2 2.3 2.1 1.7 1.4 0.6 0.8 0.9 0.7 0.5 0.1 0.1 0.2 0.4 0.5 0.8 0.9 0.7 1.2 1.4 2.0 2.3 2.5 2.2 2.6 2.4 2.2 1.4 0.6 0.8 0.7 0.5 0.1 0.1 0.1 0.1 0.2 0.2 0.4 0.5 0.7 0.9 1.0 0.8 1.2 1.5 2.2 2.6 2.7 2.4 2.9 2.6 2.7 1.6 0.4 0.7 0.7 0.6 0.1 0.3 0.4 0.5 0.5 0.6 0.8 0.9 0.9 1.0 1.0 0.6 0.8 2.4 2.0 2.7 2.8 2.5 3.0 2.6 2.7 1.4 0.7 0.6 0.6 0.1 0.7 1.0 0.9 0.9 1.0 1.2 1.5 1.3 1.0 0.4 0.4 1.4 2.2 2.7 2.7 2.5 2.8 2.7 2.5 0.9 0.8 0.8 0.6 0.2 0.6 1.1 1.3 1.2 1.3 1.5 1.6 1.4 0.8 0.7 0.5 1.8 2.2 2.3 2.5 2.5 2.6 2.4 2.4 1.0 0.9 0.6 0.2 0.7 1.2 1.3 0.9 1.1 1.4 1.5 1.3 0.9 0.8 0.3 1.9 2.0 2.1 2.5 2.8 2.0 2.1 2.2 1.1 0.8 0.6 0.2 0.7 1.1 1.3 1.0 1.0 1.4 1.5 1.2 1.0 0.7 0.1 0.1 0.3 0.4 0.5 0.7 1.0 1.1 0.8 0.5 0.4 0.3 0.1 0.1 0.2 1.7 2.0 2.5 2.9 2.9 2.5 2.6 1.8 0.5 0.4 0.5 0.1 0.2 0.7 0.6 0.7 0.9 1.0 0.9 0.7 0.6 0.6 0.8 0.6 0.4 1.1 0.9 0.7 0.2 0.7 1.2 1.4 1.3 1.3 1.5 1.6 1.3 1.0 0.9 0.6 0.9 1.1 1.2 1.0 0.9 0.9 1.0 1.1 1.1 1.1 0.9 0.9 1.0 1.1 1.1 0.9 0.7 0.7 1.7 2.4 3.2 3.5 3.3 2.9 2.4 1.7 0.9 0.5 0.7 1.0 1.0 1.0 0.9 0.8 0.9 1.1 1.1 1.0 0.9 0.8 0.8 0.9 1.0 1.0 0.7 0.5 0.9 0.8 0.6 0.1 0.1 0.2 0.7 1.3 1.4 1.4 1.5 1.6 1.5 1.1 0.8 0.8 0.7 0.9 1.0 1.2 1.2 1.2 1.2 1.3 1.2 1.2 1.3 1.2 1.0 1.1 1.0 0.9 0.9 0.8 1.2 2.1 2.9 3.2 3.7 3.6 3.0 2.5 1.4 1.1 0.5 0.7 0.8 0.9 1.0 0.9 0.8 0.9 1.0 1.0 1.0 0.9 0.8 0.8 0.9 0.9 0.8 0.7 0.5 0.7 0.6 0.5 0.2 0.3 0.5 1.0 1.3 1.3 1.3 1.4 1.3 1.5 1.2 1.0 1.0 0.9 1.1 1.3 1.6 2.0 2.2 2.2 2.0 2.0 2.1 2.2 2.0 1.6 1.3 1.0 0.9 0.9 1.0 1.8 2.6 2.6 2.5 3.0 3.4 2.7 2.1 1.8 1.1 0.6 0.7 0.7 0.8 0.9 1.0 0.9 0.9 0.9 0.9 0.9 1.0 0.9 0.9 0.9 0.8 0.8 0.7 0.6 0.7 0.7 0.5 0.4 0.9 0.9 1.1 1.1 1.3 1.5 1.5 1.2 1.6 1.8 2.0 1.8 2.0 2.0 2.2 2.2 2.7 3.0 2.9 2.5 2.5 2.7 2.8 2.6 2.0 1.3 0.9 0.7 0.5 1.0 1.7 2.2 2.1 2.3 1.6 1.8 1.9 1.5 1.3 1.0 0.7 0.7 0.7 0.9 1.0 1.1 1.0 0.9 0.9 0.9 0.9 1.0 1.0 0.9 0.9 1.0 1.0 1.0 0.9 1.0 0.9 0.8 0.5 0.9 1.2 1.2 1.2 1.3 1.4 1.2 1.2 2.2 3.2 2.9 2.4 3.2 3.5 2.9 2.6 2.7 2.7 2.9 3.0 3.0 2.9 2.6 2.5 2.1 1.5 0.9 0.6 1.2 1.8 1.9 1.5 1.3 1.1 1.2 1.1 1.0 0.9 0.7 0.7 0.8 1.1 1.2 1.2 1.0 0.9 0.9 0.9 0.9 1.0 1.0 0.9 0.9 0.9 1.4 1.5 1.4 1.4 1.4 1.2 0.5 1.0 1.2 1.0 1.0 1.2 1.4 0.9 0.4 2.0 2.2 3.6 2.9 3.6 3.7 2.9 4.2 2.3 2.1 2.0 1.1 1.7 1.3 1.1 0.9 0.7 0.8 0.8 0.8 0.8 0.7 0.7 0.8 1.3 1.2 1.2 1.0 1.0 0.9 1.0 1.0 1.0 0.8 0.8 1.0 1.0 1.3 1.7 1.8 1.6 1.6 1.5 0.5 0.9 1.1 0.7 0.9 1.3 1.4 1.0 0.4 1.8 2.5 2.7 3.0 3.1 3.2 3.1 2.8 2.7 2.1 1.8 1.3 1.4 1.6 1.3 1.2 1.0 0.7 0.9 0.9 0.6 0.7 0.9 0.9 1.1 1.3 1.2 1.3 1.1 1.0 1.0 1.1 1.0 0.5 0.8 0.9 1.0 1.0 1.3 1.8 1.7 1.3 1.3 1.4 0.5 1.0 1.3 1.3 1.3 1.5 1.5 1.1 0.6 1.9 2.5 2.7 2.8 2.6 2.6 2.9 2.8 2.7 2.2 1.7 1.7 2.0 2.2 2.3 2.4 2.1 1.7 1.5 1.0 0.6 0.9 1.1 1.3 1.6 1.5 1.4 0.9 0.8 0.4 0.7 1.1 1.5 1.4 1.0 0.7 1.1 0.5 1.0 1.3 1.5 1.4 1.6 1.7 1.5 1.5 2.2 3.2 2.8 2.3 3.1 3.2 2.9 2.4 2.6 2.6 2.6 2.4 2.5 2.7 2.8 2.5 2.1 1.8 1.8 2.3 2.6 2.7 2.9 2.6 2.2 1.9 1.3 1.3 1.4 1.4 0.7 0.9 1.3 1.5 1.3 1.2 1.1 1.1 0.5 0.9 0.9 1.1 1.1 1.3 1.4 1.6 1.3 1.4 1.8 2.0 1.8 2.0 2.2 1.9 1.6 1.6 1.6 1.5 1.5 1.5 1.6 1.7 1.6 1.5 1.6 1.8 2.2 2.2 2.1 2.8 3.1 2.9 2.6 1.6 1.5 1.5 1.5 1.0 1.0 1.4 1.5 1.4 1.2 1.2 1.1 0.4 0.6 0.7 0.8 0.9 1.1 1.2 1.3 1.2 0.6 0.8 1.1 1.2 1.2 1.1 1.0 1.1 1.1 1.1 1.1 1.1 1.0 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.8 2.5 2.0 3.2 3.3 3.0 1.6 1.6 1.5 1.3 1.1 1.1 1.4 1.5 1.1 0.9 0.8 0.7 0.4 0.9 0.9 1.0 1.1 1.3 1.5 1.6 1.2 0.4 0.6 0.9 1.1 1.0 0.8 0.7 0.8 1.0 1.1 1.1 0.9 0.8 0.8 0.9 1.2 1.1 0.9 0.8 1.4 2.0 1.7 2.2 2.7 2.9 2.9 1.7 0.2 0.5 1.3 1.4 1.2 0.4 0.9 1.1 1.3 1.2 0.6 0.4 0.3 0.3 0.4 0.9 1.2 1.2 1.2 1.5 1.6 1.5 1.2 0.2 0.3 0.4 0.6 0.8 0.1 0.2 1.1 1.2 1.5 1.6 2.6 2.7 2.5 1.4 0.5 1.2 1.2 1.1 0.5 0.7 1.0 1.5 1.8 0.5 1.0 1.2 1.1 1.1 1.5 1.7 1.6 1.3 0.9 1.1 1.4 1.6 2.1 2.2 2.1 1.3 0.3 0.5 1.2 1.3 1.2 0.5 0.7 0.9 1.9 3.1 0.4 0.9 1.1 0.7 1.0 1.6 1.7 1.5 1.1 0.7 1.2 1.3 1.7 1.8 1.8 1.7 1.3 0.2 0.5 1.5 1.5 1.4 0.4 0.8 1.1 2.1 3.4 0.5 1.0 1.3 1.3 1.4 1.7 1.9 1.5 1.0 1.1 1.1 1.1 1.4 1.5 1.5 1.6 1.5 1.7 1.7 1.6 1.1 1.3 2.1 2.6 0.4 0.9 1.3 1.5 1.5 1.7 1.9 1.5 1.0 0.4 0.8 1.2 1.1 1.1 1.2 1.5 1.4 1.5 1.5 1.7 1.7 1.7 1.2 1.3 2.2 3.2 0.4 0.9 0.9 1.1 1.1 1.3 1.5 1.6 1.1 0.7 0.9 1.2 1.1 1.1 1.3 1.5 1.5 1.6 1.4 0.9 1.6 1.7 1.6 0.9 1.2 2.1 3.4 0.4 0.6 0.7 0.8 0.9 1.1 1.2 1.3 1.3 1.1 0.7 1.2 1.2 1.2 1.6 1.8 1.8 1.7 1.3 0.6 0.5 1.3 1.4 1.3 0.4 0.7 1.0 1.9 2.8 0.4 0.9 0.9 1.1 1.1 1.4 1.5 1.7 1.4 1.4 0.6 0.7 0.7 0.8 1.1 1.2 1.0 0.8 0.7 0.7 0.7 1.2 1.2 1.3 1.6 2.1 2.2 2.1 1.3 0.3 0.5 1.2 1.2 1.2 0.5 0.7 0.9 1.3 1.5 0.3 0.2 0.2 0.1 0.4 0.9 1.2 1.3 1.3 1.7 2.0 1.9 1.7 1.7 1.2 1.4 1.5 1.3 1.2 1.1 1.2 1.3 1.4 1.4 1.4 1.3 1.2 1.3 1.5 1.6 1.5 1.5 1.6 1.5 1.6 1.7 2.7 2.8 2.6 1.5 0.5 1.2 1.2 1.2 0.5 0.8 1.0 1.4 1.4 0.9 0.7 0.5 0.5 0.4 1.0 1.3 1.2 1.3 1.7 2.1 2.0 1.7 1.6 1.4 1.5 1.5 1.5 1.3 1.1 1.2 1.4 1.4 1.4 1.4 1.3 1.2 1.3 1.5 1.6 1.5 1.5 1.7 1.6 1.6 2.2 2.5 2.8 2.9 1.7 0.2 0.1 1.3 1.4 1.4 0.1 0.9 1.1 1.6 1.6 1.3 1.2 1.1 1.0 0.4 0.9 1.2 0.8 1.1 1.7 2.1 1.9 1.6 1.5 1.4 1.4 1.5 1.4 1.2 1.2 1.3 1.4 1.4 1.4 1.3 1.2 1.2 1.3 1.4 1.6 1.5 1.4 1.8 1.7 1.6 1.6 2.6 2.7 2.7 1.7 1.5 1.6 1.6 1.0 1.1 1.4 1.7 1.7 1.4 1.4 1.4 0.4 1.0 1.3 1.4 1.5 1.7 2.0 1.8 1.3 1.1 0.7 0.7 0.7 0.8 1.0 1.2 1.2 0.9 0.8 0.7 0.6 1.5 1.3 1.2 1.4 2.0 2.2 2.2 1.3 1.6 1.6 1.6 0.9 1.0 1.4 1.7 1.6 1.2 1.1 1.3 0.4 0.9 1.3 1.5 1.5 1.7 1.9 1.7 1.4 1.1 0.3 0.1 1.2 1.2 1.1 1.5 1.7 1.7 1.6 1.0 1.5 1.6 1.4 0.6 0.9 1.3 1.6 1.5 1.0 0.8 1.1 0.4 0.9 0.9 1.1 1.1 1.4 1.5 1.6 1.3 1.2 0.1 0.9 1.0 1.1 1.3 1.5 1.4 1.3 1.0 0.7 0.9 1.2 1.2 2.0 2.0 1.9 1.2 1.2 1.3 1.2 0.6 0.9 1.3 1.7 1.5 1.3 1.2 1.2 0.1 0.4 0.6 0.7 0.8 0.9 1.1 1.2 1.3 1.2 1.2 0.1 0.8 1.0 1.2 1.4 1.7 1.7 1.9 2.0 1.5 1.3 1.1 1.1 1.2 1.3 1.5 1.6 2.0 1.9 1.9 1.5 1.4 1.4 1.4 1.5 1.1 1.3 1.3 1.4 1.3 1.7 1.8 1.6 1.4 1.3 1.2 0.1 0.4 0.9 0.9 1.0 1.1 1.4 1.6 1.6 1.2 0.4 0.8 0.9 1.1 1.5 1.8 1.8 2.0 1.9 1.5 1.3 1.3 1.2 1.3 1.4 1.4 1.5 2.0 2.0 2.0 1.6 1.5 1.4 1.4 1.5 1.6 1.6 1.2 1.4 1.3 1.5 1.5 1.3 1.1 1.0 0.8 0.1 0.4 0.9 1.2 1.2 1.3 1.6 1.9 1.6 1.3 0.3 0.8 1.0 1.2 1.8 2.0 2.0 2.0 1.7 1.4 1.4 1.4 1.4 1.4 1.3 1.4 1.5 2.0 2.1 2.0 1.6 1.5 1.4 1.4 1.4 1.6 1.6 1.2 1.3 1.3 1.1 0.9 0.8 0.6 0.5 0.4 0.1 0.4 0.9 1.2 1.1 1.1 1.5 1.9 1.8 1.1 0.1 0.8 1.1 1.3 1.5 2.1 2.4 2.4 1.6 1.2 1.3 1.6 1.4 1.3 1.4 1.4 1.5 1.9 1.8 1.9 1.5 1.5 1.4 1.4 1.4 1.0 1.3 1.3 1.5 1.2 1.0 0.8 0.6 0.4 0.3 0.2 0.1 0.4 0.8 1.1 0.7 1.0 1.5 1.8 1.6 1.2 0.3 1.0 1.0 0.1 1.0 1.2 1.3 1.4 2.5 2.6 2.4 1.3 0.7 1.0 1.2 1.4 1.9 1.8 1.6 0.5 1.0 1.2 1.2 0.5 0.6 0.6 0.5 0.4 0.3 0.2 0.1 0.1 0.4 0.9 1.3 1.3 1.4 1.7 1.9 1.7 1.3 0.4 0.4 0.7 0.9 1.0 0.9 1.0 1.3 1.5 2.1 2.0 1.5 1.3 1.1 1.0 1.1 0.9 0.7 0.5 1.2 1.4 1.3 1.8 2.3 2.6 2.6 1.4 1.4 1.7 1.8 0.4 0.6 0.6 0.6 0.5 0.4 0.3 0.3 0.1 0.4 0.9 1.3 1.5 1.6 1.9 2.0 1.7 1.3 1.0 0.8 1.0 1.1 1.2 1.2 1.3 1.8 2.0 2.5 2.5 1.9 1.7 1.2 1.1 1.0 1.0 0.9 0.7 1.1 1.2 1.2 1.3 2.4 2.6 2.6 1.5 1.6 1.6 1.6 0.7 0.9 1.1 1.1 1.0 0.8 0.7 0.7 0.3 0.9 1.0 1.4 1.7 1.8 1.9 1.9 1.7 1.8 1.6 1.4 1.3 1.4 1.6 2.1 2.6 2.4 2.2 2.2 2.3 2.3 1.4 1.0 0.9 0.9 0.8 0.7 0.9 0.9 1.0 1.3 2.0 2.1 2.2 1.6 1.6 1.6 1.5 0.9 1.1 1.4 1.6 1.4 1.3 1.3 1.1 0.1 0.2 0.3 0.4 1.0 1.5 1.6 1.8 1.8 1.9 2.4 2.2 1.7 1.6 1.7 1.9 2.6 3.0 2.6 2.7 2.6 2.6 2.6 1.6 0.9 0.8 0.8 0.8 0.8 0.9 0.8 0.9 1.3 1.6 1.7 1.7 1.3 0.2 0.1 1.4 1.5 1.3 0.1 1.0 1.2 1.4 1.7 1.7 1.4 1.4 1.3 0.1 0.1 0.2 0.7 1.2 1.4 1.5 1.6 1.9 2.3 2.1 1.6 1.5 1.7 1.9 2.4 3.0 2.4 3.1 3.1 2.4 2.6 1.4 0.8 0.8 0.9 1.0 1.1 1.3 0.9 0.7 1.0 1.3 1.3 1.4 1.1 0.5 1.2 1.3 1.2 0.5 0.8 1.1 1.5 1.8 1.6 1.1 1.0 1.2 0.1 0.2 0.6 1.0 1.2 1.1 1.2 1.7 2.1 1.9 1.4 1.1 1.2 1.7 2.0 2.5 2.2 2.1 2.1 2.1 2.3 1.7 1.2 2.5 1.6 2.0 2.2 2.1 1.3 0.7 0.8 1.1 1.2 1.1 1.0 0.5 1.2 1.2 1.2 0.5 0.7 1.0 1.4 1.8 1.6 1.1 1.0 1.2 0.1 0.1 0.2 0.6 1.1 1.3 1.2 1.1 1.7 2.1 1.9 1.4 0.9 1.2 1.6 1.7 1.8 1.6 1.8 1.9 1.7 2.0 2.1 2.6 2.9 3.7 3.7 4.2 3.2 1.2 0.8 0.7 1.0 1.2 1.2 1.1 0.2 0.5 1.3 1.5 1.3 0.5 0.8 1.1 1.5 1.8 1.6 1.3 1.2 1.1 0.1 0.2 0.6 1.0 1.5 1.7 1.8 1.6 2.2 2.2 2.0 1.6 1.2 1.5 1.7 1.6 1.3 1.4 1.7 2.8 3.9 4.0 4.4 5.2 3.5 2.4 0.9 0.8 1.0 1.1 1.3 1.3 1.6 1.7 1.6 0.9 1.2 1.7 1.7 1.4 1.2 1.1 1.0 0.3 0.9 1.5 2.0 1.9 2.1 2.2 2.6 2.8 2.4 1.8 1.7 1.8 1.9 1.7 0.6 0.5 1.2 1.6 2.2 2.3 3.5 5.0 4.6 1.7 0.8 1.0 1.2 1.3 1.4 1.4 1.7 1.7 1.7 1.1 1.2 1.5 1.5 1.0 0.7 0.6 0.6 0.1 0.4 0.9 1.4 1.6 1.6 1.7 1.9 2.3 2.5 2.2 1.9 1.8 1.7 1.7 1.2 0.4 0.2 0.4 0.4 0.4 0.7 2.3 3.7 3.9 2.1 0.7 1.2 1.5 1.7 1.8 1.5 0.9 1.6 1.7 1.7 1.0 1.2 1.3 1.4 0.5 0.3 0.2 0.2 0.1 0.4 0.9 1.3 1.2 1.0 1.3 1.6 1.8 1.7 1.6 1.5 1.5 1.5 1.2 0.7 0.3 0.1 0.2 0.2 0.5 2.2 4.0 3.7 1.5 0.8 0.9 1.8 2.2 2.3 1.5 0.7 0.4 1.4 1.5 1.4 0.4 0.8 1.0 1.7 2.2 0.1 0.5 0.9 1.3 1.0 1.1 1.3 1.6 1.6 1.5 1.4 1.0 1.0 1.0 1.0 0.6 0.2 0.1 0.2 0.5 2.6 4.6 3.5 2.5 1.0 1.3 2.3 2.4 2.6 1.6 0.6 0.5 1.2 1.3 1.2 0.5 0.3 0.6 0.9 1.8 3.4 0.2 0.8 1.5 1.8 1.8 1.9 1.9 2.1 1.9 1.6 1.3 0.9 0.9 1.1 1.1 0.6 0.1 0.2 0.5 2.4 4.5 4.4 1.7 1.0 1.7 2.2 2.5 2.8 1.7 0.5 0.5 1.1 1.2 1.2 0.5 0.7 1.0 1.9 3.1 0.2 1.0 1.9 2.2 2.2 2.2 2.2 2.3 2.1 1.5 1.3 1.2 1.1 1.2 1.1 0.2 0.2 0.6 2.2 3.7 3.9 2.1 0.8 1.0 2.2 2.6 2.8 1.8 0.3 0.4 1.2 1.3 1.3 0.5 0.8 1.1 1.9 2.4 0.3 0.9 1.8 1.9 1.7 1.8 1.8 1.6 1.9 1.4 1.1 1.2 1.4 1.5 1.5 0.8 1.1 1.4 2.9 4.3 3.9 1.6 0.8 1.2 1.9 2.2 2.4 1.9 1.3 1.5 1.5 0.9 1.1 1.9 3.1 0.3 0.8 1.3 1.5 1.1 1.1 1.3 1.2 1.0 0.8 0.7 0.8 1.4 1.6 1.6 1.3 2.6 3.9 4.1 4.8 3.7 2.7 0.9 1.4 1.8 1.9 2.0 1.7 1.5 1.5 1.5 0.9 1.0 1.8 3.1 0.3 0.8 1.2 1.4 1.0 1.0 1.2 1.1 0.7 0.3 0.3 0.5 0.9 1.4 1.3 1.2 1.2 2.6 3.0 3.3 4.4 5.0 4.2 1.5 0.8 1.4 1.8 1.9 1.9 1.4 1.4 1.4 1.4 0.6 0.8 1.5 1.9 0.3 0.9 1.5 1.7 1.6 1.5 1.6 1.5 1.1 0.4 0.3 0.4 0.9 1.3 1.3 0.8 1.0 1.1 0.9 0.4 0.1 1.2 1.5 1.6 2.5 3.1 2.6 1.3 0.6 1.0 1.9 2.1 2.1 1.3 0.2 1.3 1.4 1.5 0.9 0.9 1.0 1.0 0.4 0.6 0.9 1.1 0.3 0.1 0.1 0.1 0.3 1.4 2.0 2.0 1.9 2.0 2.0 2.4 1.9 0.8 0.6 0.6 1.0 1.3 1.3 0.9 1.0 1.2 0.9 0.5 0.1 0.1 0.3 0.6 0.8 1.1 1.2 1.4 0.9 0.8 1.1 2.5 2.7 3.0 2.1 1.2 1.0 0.8 0.7 0.8 0.9 1.0 1.3 1.6 1.5 1.5 1.1 1.1 1.1 1.1 1.1 0.6 0.9 1.0 1.1 1.0 1.0 1.0 0.7 0.5 0.4 0.3 0.2 0.3 1.1 1.8 1.8 1.8 2.0 2.2 2.4 1.9 1.3 1.1 1.1 1.4 1.7 1.7 1.6 1.5 1.5 1.3 0.8 0.4 0.2 0.1 0.2 0.4 0.5 0.6 0.7 0.8 0.6 0.8 1.5 2.4 2.8 3.2 2.2 1.3 1.0 0.9 0.7 0.8 1.0 1.0 1.1 1.4 1.3 1.3 1.1 1.1 1.0 1.0 1.0 1.0 0.8 0.8 1.0 1.1 1.3 1.4 1.1 1.0 0.9 0.8 0.8 0.3 0.8 1.2 1.3 1.2 1.4 1.9 2.0 1.8 1.3 1.2 1.5 1.9 2.4 2.5 2.0 2.1 2.0 1.9 1.4 1.0 0.4 0.2 0.2 0.3 0.3 0.4 0.5 0.5 0.5 0.7 1.3 2.8 2.9 3.2 2.0 1.1 0.9 0.9 0.8 0.9 0.9 0.9 1.0 1.2 1.3 1.2 1.1 1.0 0.9 0.9 0.9 1.0 0.9 0.8 0.9 1.0 1.4 1.7 1.6 1.5 1.4 1.3 1.1 0.2 0.7 1.0 1.1 0.8 1.2 1.8 2.0 1.5 1.1 1.1 1.5 2.0 2.0 2.0 1.9 2.0 1.8 2.1 1.7 1.1 0.6 0.4 0.4 0.4 0.5 0.5 0.4 0.4 0.4 0.7 1.6 2.6 2.9 3.0 1.8 1.1 0.9 0.9 0.9 0.9 0.9 1.0 0.9 1.1 1.2 1.1 1.0 1.0 0.9 0.9 0.9 0.9 0.8 0.8 0.9 1.0 1.4 1.7 1.7 1.5 1.4 1.3 1.1 0.2 0.7 1.1 1.0 0.8 1.5 2.1 2.2 1.6 1.0 1.0 1.4 1.4 1.3 1.4 1.4 1.3 1.3 1.4 1.7 1.8 1.2 1.0 0.9 1.0 1.0 1.1 0.6 0.4 0.5 0.8 1.6 2.6 3.0 2.9 1.7 1.0 0.9 0.8 0.9 0.9 0.9 0.9 0.9 1.0 1.1 1.1 1.0 0.9 0.9 0.9 0.8 0.8 0.7 0.6 0.8 1.0 1.3 1.7 1.6 1.2 0.9 1.0 1.0 0.2 0.6 1.1 1.1 1.2 1.7 2.2 2.1 1.7 1.2 1.2 1.3 1.0 0.9 1.0 1.1 1.0 0.8 1.3 1.7 2.0 1.7 1.5 1.4 1.6 1.6 1.3 0.8 0.6 0.7 1.0 1.5 2.7 3.1 3.1 1.7 0.9 0.9 0.9 0.9 1.0 0.9 0.8 0.9 1.1 1.1 1.1 1.0 0.9 0.9 1.0 0.9 0.8 0.7 0.5 0.8 0.9 1.3 1.7 1.5 1.1 1.0 1.2 1.0 0.2 0.6 0.8 0.8 0.9 1.1 1.4 1.7 1.4 1.2 1.3 1.2 0.9 0.7 1.0 1.1 1.0 0.8 1.3 1.7 2.1 1.9 1.6 1.5 1.7 1.8 1.5 1.1 0.9 0.9 1.1 1.8 2.6 3.0 3.1 1.7 0.9 0.8 1.0 1.0 1.0 0.9 0.8 0.9 1.1 1.2 1.2 1.0 0.8 0.9 1.0 1.0 1.0 0.7 0.5 0.9 1.0 1.3 1.6 1.5 1.3 1.2 1.2 1.0 0.2 0.3 0.4 0.4 0.4 0.6 0.7 0.8 0.9 1.0 1.0 0.6 0.5 0.9 1.1 1.2 1.1 1.2 1.9 1.6 1.3 1.7 1.9 1.6 1.2 1.0 1.0 1.0 1.5 2.8 2.9 3.0 2.0 0.7 0.7 0.1 0.2 0.2 0.3 0.2 0.2 0.2 0.2 0.2 1.0 1.0 1.4 1.5 1.3 1.1 1.0 1.0 1.0 0.1 0.1 0.1 0.1 0.1 0.1 0.3 0.4 0.6 0.7 0.3 0.3 0.8 0.8 0.9 0.8 0.9 1.8 1.7 1.2 1.9 2.2 1.8 1.3 1.1 0.9 1.2 1.7 2.3 2.5 2.6 1.9 0.9 0.9 1.0 0.9 0.8 0.7 0.6 0.6 0.5 0.1 0.1 0.2 0.2 0.2 0.3 0.3 0.4 0.4 0.4 1.6 1.6 1.7 2.1 2.2 1.8 0.7 0.7 1.8 2.0 2.1 2.2 1.9 0.8 1.0 0.8 0.7 0.6 0.5 0.4 0.4 0.3 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 1.6 0.6 0.7 1.7 1.5 1.1 1.7 1.7 2.0 1.9 0.8 0.9 1.1 1.3 1.0 0.9 0.8 0.8 0.8 0.1 0.2 0.3 0.4 0.6 1.3 0.8 0.1 1.4 2.0 2.0 2.0 1.7 0.7 0.8 1.2 1.6 1.5 1.4 1.3 1.2 1.1 0.1 0.2 0.3 0.5 0.8 1.0 0.8 1.9 2.4 2.4 2.2 1.8 0.8 0.6 0.8 0.9 1.2 1.5 1.6 1.4 1.3 1.3 1.1 0.1 0.1 0.2 0.4 0.5 0.7 0.8 0.6 1.7 2.6 2.8 2.9 2.1 1.0 0.9 0.9 0.9 1.2 1.5 1.5 1.1 0.9 0.9 1.1 0.1 0.1 0.3 0.4 0.6 0.6 0.7 0.5 0.5 2.1 3.0 3.1 3.4 2.4 1.3 0.1 0.3 1.1 1.1 1.0 1.2 1.6 1.5 1.1 1.0 1.2 1.1 0.1 0.1 0.3 0.5 0.6 0.6 0.6 0.5 0.5 2.4 2.8 3.2 3.6 2.6 1.6 0.1 0.4 0.4 0.4 0.6 0.7 0.7 0.6 1.3 1.3 1.3 1.4 1.6 1.6 1.3 1.2 1.2 1.0 0.1 0.2 0.3 0.5 0.6 0.7 0.7 0.5 0.5 1.7 3.0 3.4 3.7 2.8 2.1 1.5 1.6 1.6 1.3 1.2 1.2 1.3 1.7 1.9 1.9 1.6 1.4 1.4 1.5 1.7 1.8 1.5 1.8 1.6 1.4 1.6 1.7 1.4 1.2 1.0 1.0 1.0 0.1 0.1 0.2 0.3 0.6 0.7 0.8 0.9 0.7 0.5 2.1 2.9 2.9 3.1 2.5 2.0 1.6 1.5 1.6 1.4 1.3 1.3 1.5 1.8 1.9 1.9 1.6 1.6 1.6 1.7 1.8 1.8 1.7 1.8 1.5 1.2 1.3 1.2 1.0 0.8 0.6 0.6 0.5 0.1 0.1 0.1 0.2 0.3 0.4 0.6 0.8 1.0 1.1 0.9 2.3 2.8 2.6 2.6 2.3 1.8 1.5 1.3 1.1 1.1 1.4 1.4 1.6 1.9 1.9 1.8 1.6 1.6 1.7 1.7 1.6 1.6 1.3 1.4 1.3 1.2 1.1 0.9 0.7 0.4 0.3 0.2 0.1 0.1 0.1 0.2 0.5 0.7 0.7 1.1 1.4 1.2 1.4 1.3 2.1 2.5 2.3 2.1 1.8 0.7 0.4 0.4 0.5 1.4 1.5 1.9 1.9 1.8 1.3 1.2 1.2 1.2 0.9 0.3 0.8 0.9 1.0 0.7 0.2 0.1 0.1 0.1 0.3 0.5 0.9 1.4 1.6 1.9 2.3 2.0 2.0 1.5 0.4 0.2 2.0 2.6 2.6 2.4 1.7 0.5 1.0 1.4 1.9 1.9 1.8 0.5 0.8 1.2 1.4 1.0 0.1 0.1 0.2 0.3 0.6 1.0 1.5 2.0 2.1 2.2 2.2 1.9 1.3 0.4 0.4 1.5 2.5 2.9 3.1 2.1 0.4 1.5 1.5 1.5 1.0 1.6 2.4 2.1 0.1 0.1 0.1 0.1 0.2 0.4 0.9 1.3 1.6 2.3 2.5 2.6 2.2 1.8 1.2 0.4 0.5 1.7 2.6 3.0 3.4 2.4 1.5 1.6 1.6 1.0 1.7 2.9 3.6 0.1 0.1 0.1 0.1 0.1 0.2 0.4 1.0 1.5 1.8 2.1 1.9 1.8 1.6 1.4 1.1 0.4 2.1 2.8 3.0 3.4 2.3 1.5 1.5 1.4 1.1 1.9 2.6 1.9 0.1 0.1 0.1 0.1 0.2 0.3 0.4 0.6 1.7 1.9 2.0 1.2 0.9 0.9 1.0 1.0 1.8 2.9 2.9 3.0 1.9 0.3 0.4 1.2 1.3 1.3 0.5 0.3 0.9 1.8 2.5 1.9 0.1 0.1 0.1 0.1 0.1 0.1 0.2 0.3 0.5 1.5 1.3 1.9 2.0 1.0 0.6 0.7 0.9 1.1 2.0 2.5 2.4 2.3 1.6 0.3 0.5 1.1 1.2 1.2 0.5 0.2 0.5 0.8 1.6 3.0 3.4 0.1 0.1 0.1 0.1 0.1 0.1 0.2 0.3 0.3 0.7 0.8 1.5 1.8 1.9 1.0 0.5 0.6 0.8 1.0 0.2 1.7 2.1 1.9 1.8 1.4 0.3 0.4 1.2 1.4 1.3 0.6 0.3 0.7 0.9 1.5 2.7 2.4 0.1 0.1 0.1 0.2 0.2 0.2 0.2 0.2 0.3 0.4 0.4 0.6 1.3 1.6 1.6 0.9 0.6 0.7 0.8 0.8 0.3 1.1 1.6 1.7 1.7 1.5 0.2 0.1 1.4 1.6 1.5 0.1 0.1 0.9 1.0 1.3 1.5 1.1 0.1 0.1 0.1 0.1 0.2 0.3 0.3 0.4 0.3 0.3 0.3 0.4 0.4 0.5 0.9 1.1 1.1 1.1 0.8 0.7 0.7 0.8 0.8 0.6 0.8 1.0 1.0 0.1 0.3 1.0 1.5 1.6 1.7 1.7 1.6 1.7 1.7 1.1 1.0 1.1 1.3 0.9 0.4 0.4 0.4 0.3 0.1 0.2 0.4 0.6 0.5 1.3 1.4 0.8 1.1 0.8 0.9 0.7 0.7 1.0 1.2 0.9 0.9 0.7 0.6 0.6 0.7 0.7 0.6 0.8 0.9 1.0 1.0 0.8 1.0 1.2 1.4 1.5 1.6 1.7 1.7 1.5 1.7 1.7 1.1 1.0 1.3 1.6 1.2 1.0 0.9 0.9 0.9 0.2 0.4 0.8 1.2 1.4 1.8 2.0 1.9 2.2 2.0 1.9 2.0 1.7 1.6 1.4 1.1 0.9 0.7 0.6 0.6 0.7 0.8 0.7 0.7 0.8 0.8 0.9 1.1 1.1 1.0 1.3 1.6 1.6 1.7 1.5 0.3 0.1 1.3 1.6 1.5 0.6 0.8 1.0 1.3 1.7 1.7 1.5 1.4 1.3 1.1 0.3 0.4 0.7 1.2 1.7 1.9 2.0 2.2 2.2 2.2 2.2 2.1 2.1 1.7 1.4 1.1 0.9 0.8 0.7 0.7 0.7 0.8 0.7 0.7 0.7 0.8 0.9 1.0 1.0 1.1 1.4 1.8 1.7 1.6 1.3 0.4 0.4 1.1 1.3 1.3 0.7 0.3 0.5 0.9 1.2 1.7 1.7 1.5 1.3 1.2 1.2 0.3 0.4 0.7 1.2 1.8 2.3 2.5 2.3 2.1 2.3 2.5 2.6 2.3 1.8 1.4 1.1 0.9 0.8 0.8 0.8 0.8 0.9 0.7 0.7 0.7 0.7 0.8 0.9 1.0 1.0 1.7 2.0 1.9 1.8 1.4 0.3 0.4 1.1 1.2 1.2 0.8 0.2 0.3 0.9 1.2 1.6 1.6 1.1 0.6 1.1 1.0 0.2 0.4 0.6 0.9 1.3 1.6 1.8 1.8 1.5 1.6 1.9 1.9 1.7 1.5 1.3 1.1 1.0 0.9 0.8 0.8 0.9 0.8 0.8 0.8 0.8 0.8 0.7 0.7 0.9 1.0 1.4 2.2 2.4 2.4 1.7 0.3 0.4 1.1 1.3 1.3 0.9 0.2 1.0 1.3 1.6 1.6 1.2 1.0 1.1 1.1 0.2 0.2 0.3 0.5 0.7 0.8 0.9 1.0 0.7 0.8 1.0 1.2 1.2 1.1 1.0 0.9 1.0 1.0 1.0 1.0 0.9 0.8 0.9 1.0 0.9 0.9 0.7 0.6 1.0 1.1 1.4 2.6 2.6 2.8 2.1 1.2 1.5 1.5 1.1 1.1 1.3 1.5 1.6 1.4 1.1 1.2 1.1 0.1 0.2 0.3 0.5 0.6 0.8 0.8 0.4 0.5 0.8 1.1 1.2 1.0 0.9 0.8 1.0 1.1 1.1 1.0 0.8 0.8 0.9 1.0 1.1 0.8 0.5 0.5 1.2 1.3 1.6 2.3 2.5 2.9 2.1 1.4 1.5 1.6 1.2 1.1 1.3 1.5 1.2 1.1 0.9 0.9 0.9 0.1 0.2 0.4 0.5 0.8 0.8 0.2 0.3 0.4 0.6 0.8 0.9 0.7 0.4 0.3 0.2 0.1 1.1 1.2 1.3 2.4 2.5 2.8 1.8 0.2 1.4 1.6 1.6 1.2 0.9 1.1 1.1 0.9 0.6 0.5 0.4 0.3 0.1 0.2 0.4 0.6 0.8 1.1 1.1 1.2 1.3 2.0 2.2 2.2 1.5 1.3 1.5 1.5 1.1 0.5 0.1 0.8 1.0 1.1 0.9 0.3 0.1 0.1 0.1 0.1 0.2 0.4 0.6 0.9 1.1 1.0 1.1 1.5 1.8 1.7 1.6 1.3 0.9 1.2 1.2 1.0 1.0 1.5 1.6 1.5 1.2 0.7 0.6 0.5 0.5 0.2 0.6 0.9 1.2 1.5 1.4 0.1 0.2 0.4 0.6 0.8 0.9 0.3 0.9 1.0 1.3 1.7 1.6 1.7 1.7 1.4 1.4 1.8 1.7 1.6 1.5 1.5 1.3 1.6 1.7 1.7 1.4 1.1 1.0 1.0 1.2 1.5 1.6 1.5 1.4 1.3 1.7 2.6 2.8 0.1 0.2 0.4 0.6 0.7 0.7 0.4 0.6 0.9 1.0 1.2 1.5 1.6 1.6 1.9 1.7 1.7 1.7 1.9 1.6 1.5 1.5 1.4 1.7 1.8 1.8 1.5 1.3 1.3 1.3 1.5 1.7 1.7 1.6 1.5 1.3 1.8 3.0 3.9 0.1 0.2 0.3 0.5 0.7 0.8 0.6 0.8 1.0 1.0 1.2 1.6 1.7 1.8 1.8 1.6 1.7 1.7 1.4 1.5 1.5 1.4 1.5 1.9 1.9 1.8 1.4 1.4 1.5 1.5 1.6 1.7 1.7 1.4 1.2 1.2 1.9 2.6 2.4 0.1 0.2 0.3 0.4 0.6 0.8 0.8 0.8 0.9 0.9 0.8 1.3 1.7 1.7 1.6 1.4 0.6 0.6 0.6 1.1 1.3 1.4 1.9 1.9 1.7 1.3 1.1 1.3 1.3 1.0 0.4 0.8 1.6 2.5 2.3 0.1 0.1 0.2 0.4 0.5 0.7 0.8 0.8 0.9 0.8 0.8 1.3 2.0 2.2 2.2 1.4 0.3 1.2 1.4 1.9 1.9 1.7 0.8 1.5 2.8 3.9 0.1 0.2 0.3 0.5 0.7 1.0 1.1 0.6 0.9 1.0 0.7 0.6 0.5 0.6 0.7 1.0 1.1 0.9 0.7 0.6 0.7 0.9 1.2 1.2 1.5 1.2 1.1 1.1 1.6 2.6 2.8 2.8 1.8 0.3 1.3 1.6 1.6 0.8 1.5 2.4 2.3 0.2 0.1 0.1 0.2 0.3 0.5 0.7 0.8 0.9 0.6 0.8 0.8 0.8 0.6 0.6 0.6 0.8 0.9 0.9 0.9 0.7 0.6 0.7 0.9 1.1 1.2 1.5 1.0 1.0 1.0 2.2 3.1 2.9 3.0 2.1 1.5 1.6 1.6 1.1 1.5 2.0 1.8 0.6 0.6 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.5 0.6 0.6 0.6 0.6 0.5 0.6 0.7 0.7 0.7 0.7 0.6 0.6 0.6 0.7 1.1 1.4 1.9 0.7 3.0 4.0 3.2 2.9 2.1 1.5 1.6 1.5 1.1 1.6 2.0 1.8 1.3 1.2 1.1 1.1 0.5 0.5 0.5 0.5 1.0 2.1 3.1 4.4 3.9 3.0 2.4 1.7 0.3 0.4 1.3 1.4 1.3 0.5 0.2 1.0 1.5 1.8 1.9 1.6 1.4 1.3 1.1 0.3 0.4 0.3 0.3 0.8 2.0 3.5 3.1 3.6 2.7 1.9 1.4 0.3 1.1 1.2 1.2 0.6 0.9 1.3 1.7 1.8 1.3 1.1 1.2 1.1 0.2 0.2 0.2 0.2 0.7 1.4 2.3 1.1 3.0 3.4 2.5 1.6 1.3 0.3 0.4 1.1 1.3 1.3 0.6 0.4 0.9 1.3 1.6 1.7 1.2 1.0 1.1 1.1 0.2 0.2 0.2 0.2 0.5 0.8 1.7 2.2 4.6 3.7 2.5 1.8 1.4 0.2 0.4 1.3 1.5 1.5 0.6 0.1 0.2 1.0 1.5 1.8 1.7 1.4 1.1 1.1 1.0 0.6 0.6 0.6 0.7 0.5 0.5 1.3 2.6 3.4 3.6 2.6 2.1 1.6 1.4 1.7 1.7 1.2 1.6 2.0 1.9 1.3 1.1 1.0 1.0 1.0 1.0 1.0 1.0 0.7 0.3 1.0 1.5 2.0 2.9 2.9 2.4 1.7 1.5 1.7 1.7 1.2 1.6 2.0 1.9 0.7 0.6 1.0 1.1 1.2 1.0 0.6 0.4 0.6 0.8 0.3 0.6 2.2 2.2 2.9 2.6 1.6 1.3 1.6 1.6 1.1 1.6 2.3 2.3 0.2 0.1 0.9 0.9 1.2 1.1 0.6 0.3 0.4 0.5 0.2 0.9 1.3 2.2 2.7 2.4 1.3 0.1 0.4 1.1 1.4 1.4 0.7 0.4 0.9 1.5 2.7 4.3 0.9 1.0 1.3 1.1 0.6 0.4 0.5 0.4 0.2 0.5 1.3 2.3 2.3 2.0 1.1 0.1 0.4 1.0 1.2 1.2 0.8 0.4 0.8 1.5 2.5 2.8 1.3 1.3 1.4 1.1 0.6 0.4 0.6 0.7 0.1 0.5 1.6 2.2 2.0 1.6 1.1 0.1 1.1 1.2 1.2 0.9 0.9 1.7 2.4 2.6 1.1 1.2 1.1 1.1 0.6 0.6 1.1 1.4 2.4 1.9 1.4 1.3 0.1 0.1 1.1 1.4 1.4 1.1 0.1 1.1 1.6 2.7 3.7 0.6 0.6 0.6 0.7 0.4 0.6 1.7 2.7 3.1 1.8 1.2 1.3 1.2 1.5 1.6 1.2 1.1 1.5 2.5 3.2 0.3 0.2 0.2 0.2 0.2 0.1 0.2 0.6 1.9 2.8 3.2 1.9 1.1 1.1 1.3 1.5 1.5 1.3 1.0 1.6 2.3 2.3 0.8 0.8 0.1 0.1 0.1 0.1 0.1 0.8 1.6 2.1 2.6 2.0 1.1 0.8 1.3 1.7 1.8 1.7 0.8 0.8 0.7 1.3 2.0 2.1 1.4 1.3 1.2 1.2 0.1 0.1 0.1 0.1 0.1 0.7 1.9 2.5 3.3 2.3 1.2 0.7 0.8 1.3 2.0 2.0 1.9 1.8 1.3 1.2 0.2 0.6 1.1 1.7 1.9 1.6 1.4 1.3 1.2 0.3 0.3 0.4 0.5 0.5 0.9 2.1 3.4 3.7 2.6 1.9 1.2 0.4 0.5 0.7 1.2 1.4 1.6 2.0 2.0 1.9 2.0 1.7 1.6 1.5 1.0 1.1 1.2 1.2 1.2 1.3 1.6 1.9 2.0 1.5 1.2 1.0 1.2 0.5 0.9 1.3 1.5 1.5 1.6 2.1 2.1 3.0 2.8 2.4 1.9 1.0 0.7 1.1 1.6 2.0 2.2 2.2 1.9 2.0 2.1 2.3 2.5 2.6 2.5 2.3 2.0 1.6 1.6 1.8 2.1 2.3 2.6 2.8 2.5 1.7 1.3 1.4 1.3 0.6 1.1 1.6 1.9 1.9 1.8 1.5 1.3 0.4 0.4 1.1 2.0 1.9 2.1 2.2 1.5 1.1 1.3 1.9 2.2 2.3 2.2 1.8 1.7 1.9 2.2 2.5 2.6 2.6 2.3 1.9 1.7 1.5 1.8 2.3 2.5 2.7 2.8 2.5 1.9 1.5 1.4 1.2 0.7 1.1 1.5 1.2 1.4 1.5 1.4 1.0 0.4 0.4 0.7 1.9 2.1 1.9 1.8 1.6 1.3 1.5 1.7 1.6 1.6 1.9 1.7 1.6 1.6 1.9 2.1 1.8 1.8 2.0 1.8 1.6 1.5 1.7 1.9 1.8 2.0 2.7 2.2 1.8 1.4 1.2 1.1 0.7 1.0 0.8 1.4 0.9 0.9 1.1 0.7 0.3 0.3 0.4 0.7 0.7 1.4 1.4 1.1 1.2 1.4 1.1 1.2 1.5 0.9 1.1 1.2 1.2 1.4 1.2 1.2 1.6 1.0 1.2 1.2 1.1 1.4 1.1 1.3 1.7 1.3 1.4 1.1 0.8 0.7 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 PHOTOMETRIC SATISTICS PARKING AVERAGE (FC)MAXIMUM (FC)MINIMUM (FC)MAX/MIN AVG/MINZONE 1.2 5.4 0.0 N/A N/A W134 N8675 EXECUTIVE PARKWAY MENOMONEE FALLS, WI 53051 262.502.5500 * FAX 262.502.5522 Sheet No. Project No. Sheet Title Drawing Date Revisions CONTINENTAL 484 FUND LLC ATLANTA • CHARLOTTE • GREENVILLE • RICHMOND 877.4.DEVITA • corp@devitainc.com 6/ 1 0 / 2 0 1 9 4 : 3 9 : 0 0 P M E102S ELECTRICAL PHOTOMETRIC PLAN 06/11/19 219005.02 HUDSON BOULEVARD & KEATS AVENUE LAKE ELMO, MN 55042 CONSTRUCTION DOCUMENTS SPRINGS AT LAKE ELMO Drawn By: Author Checked By: Checker DeVita & Associates, Inc. Project : 19052-03 1" = 60'-0"2 ELECTRICAL PHOTOMETRIC PLAN 1 CITY OF LAKE ELMO WASHINGTON COUNTY STATE OF MINNESOTA RESOLUTION NO. 2019-072 RESOLUTION APPROVING THE CONTINENTAL 483 FUND LLC – SPRINGS APARTMENTS FINAL PLAT AND FINAL PLANNED UNIT DEVELOPMENT (PUD) PLANS WHEREAS, the City of Lake Elmo is a municipal corporation organized and existing under the laws of the State of Minnesota; and WHEREAS, Continental 483 Fund LLC, c/o Gwyn Wheeler, W134 N8675 Executive Parkway, Menomonee Falls, Wisconsin 53051, submitted an application to the City of Lake Elmo (City) for a Final Plat and Final PUD Plan approval for a 300 unit, attached housing residential planned unit development on a 17.33 acre site to be known as the Springs Apartments, a copy of which is on file in the City of Lake Elmo Planning Department; and WHEREAS, notice was published, mailed and posted pursuant to the Lake Elmo Zoning Ordinance, Section 154.102; and WHEREAS, the Lake Elmo Planning Commission held public hearing on September 9, 2019 to review and consider the proposed Final Plat and Final PUD plans; and WHEREAS, the Lake Elmo Planning Commission adopted a motion recommending to the City Council approval of the proposed Final Plat and Final PUD plans subject to conditions of approval; and WHEREAS, the Lake Elmo Planning Director submitted a report and recommendation regarding the proposed Final Plat and Final PUD plans as part of a memorandum to the City Council for the October 1, 2019 City Council Meeting; and WHEREAS, the City Council reviewed the proposed Final Plat and Final PUD application and plans for the Springs Apartments at its meeting held on October 1, 2019 and made the following findings of fact: 1. That if the 2040 Lake Elmo Comprehensive Plan Update and updated Land Use Map are approved in 2019, that the new land use designation for the site of the proposed planned development will be MU-C (mixed use commercial); and that the preliminary PUD Plan would be consistent with the intent of the 2040 Lake Elmo Comprehensive Plan and the 2040 Land Use Map for this area. 2. That the Final PUD Plan complies with the general intent of the Urban High Density Residential zoning district with PUD modifications including the reduced building setbacks to Julia Avenue and to the north property line. 3. That the Final Plat and Final PUD Plan generally complies with the City’s Subdivision regulations. 4. That the Final PUD Plan must be revised to be consistent with the City’s engineering standards as noted in the City Engineer’s plat review memorandum dated August 28, 2019 and in his construction review memorandum dated September 6, 2019. 5. That the preliminary PUD Plan meets the minimum requirements for a PUD including minimum lot area, open space and street layout. 2 6. That the preliminary PUD Plan meets more than one of the required PUD objectives identified in Section 154.751 including providing: innovation in land development techniques that may be more suitable for a given parcel than conventional approaches; provision of a more adequate, usable, and suitably located open space, recreational amenities and other public facilities than would otherwise be provided under conventional land development techniques; accommodation of housing of all types with convenient access to employment opportunities and/or commercial facilities; and especially to create additional opportunities for senior and affordable housing; coordination of architectural styles and building forms to achieve greater compatibility within the development and surrounding land uses; and higher standards of site and building design than would otherwise be provided under conventional land development technique. 7. That the Final PUD Plan includes several amenities that may be worthy of amenity points to increase the overall housing density in the development. These amenities may include: right-of- way dedication, contained parking, pedestrian improvements, a plaza (gathering area) and the use of design elements consistent with the 2013 Lake Elmo Branding and Theming project. 8. That the Applicant’s Final PUD plan provides the following amenities, for which the City may award amenity points: a. Pedestrian improvements. (5 points) b. Theming elements from the Lake Elmo Theming Study (1-2 points). c. Plaza/gathering location (5 points). d. Contained Parking (5 points) NOW, THEREFORE, BE IT RESOLVED THAT the City Council does hereby approve the Final Plat and Final PUD Plans for the Springs Apartments on Hudson Boulevard as prepared by Continental 483 Fund LLC subject to the following conditions: 1. That the Metropolitan Council give final approval of a City’s 2040 Comprehensive Plan Update and adoption of the final version of the 2040 Comprehensive Plan by the Lake Elmo City Council. The City’s final plat approval will be good for 120 days after the Met Council’s approval of the City’s 2040 Comprehensive Plan update or for 120 days after the City Council’s approval of the final plat, whichever comes first. 2. That the developer or property owner for the Union Park development recording with Washington County the Union Park final plat to create the street rights-of-ways and the lot (proposed Outlot H) for this development. 3. That the Final Plat approval is contingent upon the City receiving separate drainage and utility easements, in the City’s standard form of easement agreement for all temporary and off-site development improvements. The easements must be obtained and recorded before recording of final plat. 4. That the City approves a Zoning Map Amendment to rezone the site from RT (Rural Development Transitional) to HDR (Urban High Density Residential). (Completed – subject to the final approvals of the 2040 Comprehensive Plan) 5. That the final plat and final PUD Plans submittal identify all requests for flexibility from the Zoning Code. 6. That the applicant address all comments and conditions of approval in the City Engineer’s plat review Memorandum dated August 28, 2019. The City will not release the final plat for recording until the City has granted approval of the construction plans. 7. That the final Plat and final PUD project and construction plans include a revised tree preservation/replanting and revised landscape plans to address all the comments and changes noted in the memo from the City’s Landscape Architect dated July 30, 2019. The City’s 3 Landscape Architect must review and approve all final landscape plans before the City will release the final plat for recording or before the start of construction or grading. 8. That the final Plat and final PUD Plans include updated open space and impervious surface calculations. 9. That the final plat show a drainage and utility easement over the wetland and the wetland buffers, including the 100-year high water level. 10. That the developer or contractor install an 8-foot-wide bituminous trail along Hudson Boulevard and along the future north/south road (Julia Avenue) as part of this development. 11. That the applicant provide the City fees in lieu of park land dedication as required by Section 153.14 with the final plat. 12. That if the applicant wants amenity points for theming, that they provide the City for staff approval specific examples of proposed development fencing, landscaping, lighting and site furnishings, including the clubhouse, that will meet the standards outlined in the Lake Elmo Branding and Theming Study. The design and placement of these elements and features shall be subject to City staff approval. 13. That the final plat and final PUD Plans submittal include detailed architectural plans for the exterior of the buildings (including colors and a listing of all exterior materials) for staff review and approval. (Complete) 14. That the applicant receives a permit from the Valley Branch Watershed District and South Washington Watershed District for the construction of the proposed development. (Pending) 15. That the Final project plans shall include a complete storm water management plan and construction plans that provide all design details for the proposed underground storage systems including details regarding building roof drainage connections. These plans also must incorporate storm water management for the Hudson Boulevard and Julia Avenue Street improvements including the future east bound left turn lane along Hudson Boulevard at Julia Avenue and must meet all City, VBWD and SWWD requirements. (Pending) 16. All storm water facilities internal to the site shall be privately owned and maintained. A storm water maintenance and easement agreement in a form acceptable to the City shall be executed and recorded with the final plat. 17. That the final design and placement of each of theming design items (street lights, benches) shall be subject to City staff approval. 18. That the Final Plat approval is conditioned upon the applicant meeting all City standards and design requirements unless specifically addressed otherwise in these conditions. 19. That the PUD overlay zoning allow for the following: a. Setbacks: Springs Apartments at Lake Elmo Minimum Building Setbacks Front (Hudson Blvd). 20 ft. Interior Side 10 ft. Corner Side (Julia Avenue) 10 ft. Rear (north property line) 20 ft. Rear (north property line – detached garages) 10 ft. b. Attached Garages: That the attached garages shall not exceed 1,000 sq. ft. in area at the ground floor level except by conditional use permit. 4 c. Detached Garages: That the detached garages shall not exceed 3,000 sq. ft. in area at the ground floor level. 20. The Final Plat shall include all necessary public right-of-way and easements for Hudson Boulevard and for the new north/south road (Julia Avenue North). (Complete….pending the recording of Union Park final plat.) 21. Before the City issues any building permits, the developer shall delineate and identify all wetland buffers via staking, fencing and/or signage that is acceptable to the City. 22. The developer shall follow all of the rules and regulations spelled out in the Wetland Conservation Act, and shall acquire the needed permits from the appropriate watershed districts before the commencement of any grading or development activity on the site. 23. That the applicant shall obtain all necessary permits including but not limited to all applicable City permits (building, grading, sign, etc.), MPCA, MDH, MnDOT, NPDES/SWPPP permits and Valley Branch Watershed District, and SWWD approval before starting any site grading or construction activities. (Pending) 24. That if necessary, the applicant shall provide the City with a copy of written permission for any off-site grading work and storm sewer discharges to adjacent properties before starting any site work or grading. (Pending) 25. That the applicant or developer address all the comments of the Fire Chief and the Building Official with final PUD, site and building plans including the placement of buildings and fire hydrants, street and driveway design, parking and emergency vehicle access within the site. 26. That there shall be no encroachments into drainage and utility easements and corridors other than those reviewed and approved by the City and upon execution of an easement encroachment agreement. Prohibited encroachments include, but are not limited to trees, landscaping, fences, retaining walls, buildings and storm water retention. 27. That the developer prepare exhibits for City staff approval that clearly identifies the property lines, easements, proposed locations of retaining walls, fences and accessory buildings and the required and proposed setbacks for each building site within the development. 28. The Applicant(s) or developer shall submit a photometric plan for the development for staff review and approval. All lighting must meet the requirements of Sections 150.035-150.038 of the City Code. The City must approve this plan before issuing a building permit for the development. 29. Before to the installation or construction of any subdivision identification signs or neighborhood markers within the development, the developer shall submit sign plans to the City for review and obtain a sign permit from the City. The proposed monument entrance sign submitted with the preliminary PUD plans is not approved as it exceeds the City size limit of 32 square feet. 30. Before the execution and recording of a final plat for the development, the developer or applicant shall enter into a Developer’s Agreement with the City. The Developer’s Agreement must be approved by the City Attorney and by the City Council. Such Agreement shall delineate who is responsible for the design, construction and payment for the required improvements with financial guarantees therefore. (Pending) 31. The applicant or developer shall enter into a separate grading agreement with the City before starting any grading activity in advance of final plat approval. The City shall review any grading plan that is submitted in advance of a final plat and said plan shall document extent of any proposed grading on the site. 32. That the applicant revise the site and project plans to show a five-foot-wide concrete sidewalk along the west side of the entrance driveway (with the necessary pedestrian ramps) connecting the Clubhouse to the trail along Hudson Boulevard. (Completed) 33. That the City’s final plat approval is good for 120 days from the date of City Council action, unless the applicant requests and the City Council approves a time extension. 34. That the applicant record the final plat with Washington County within 120 days of City Council approval (as required by the City Code). 35. That the maximum density shall not exceed 15 dwelling units per net acre unless the City Council approves specific project design elements and amenity points that increase the allowed density for the proposal. 5 36. That the applicant change the project plans to show a 5-foot-tall decorative fence around the entire site. The City does not approve the use of chain link fencing around the perimeter of this PUD. 37. That the applicant/owner notify all renters that the City may impose restrictions or limits on outdoor water use including no vehicle washing and no watering of grass, sod or landscaping. 38. That the applicant shall submit revised project plans meeting all conditions of approval for City review and approval. The revised applicant/developer project plans shall meet all of the above conditions before the start of any clearing or grading or construction activity on the site. Passed and duly adopted this 1st day of October, 2019 by the Lake Elmo Minnesota City Council. ___________________________________ Mike Pearson, Mayor ATTEST: ____________________________________ Julie Johnson, City Clerk