AGENDA ITEM: Public Works Director Report
SUBMITTED BY: Marty Powers, Public Works Director
REVIEWED BY: Kristina Handt, City Administrator
ISSUE BEFORE COUNCIL:
City Council is asked to review and accept, as part of Consent Agenda, a brief description of activities
that have taken place in the Public Works Department in the month of September, 2019.
PROPOSAL DETAILS/ANALYSIS:
STREETS
• Pothole Repair was completed
• Attend to Storm Related Down Trees in ROW and Parks during and after hours
• Continue tree trimming in ROW
• Staff attended CPR and Basic First Aid to comply with OSHA regulations
• Fall ditch mowing has begun
• Completed walkthroughs at Inwood 4th addition, Boulder Ponds and Hammes 1
addition
• Replace three out of date computers in the Public Works office
• Attended weekly construction meetings
• Rotate Plow trucks through DOT inspection and fall maintenance
• Assist in providing technical support for 5th street island maintenance options
• Public Works Staff member Mike Coleman is attending training to achieve his CDL
class A
PARKS
• Install more attractive gates across Discovery Crossing Bridge Stairways
• Tree Trimming continues on City owned/maintained trails
• Added new garbage receptacles at Pebble and Carriage Parks
• Fall Weed and Feed at City Park and Facility Lawns
• Cut numerous downed trees off Park Trails after storm events
• Submitted Buckthorn grant application
• Haul in Black dirt, landscape, seed and blanket the new Firefly park
• Prep and pour the Lions Park 45th parallel pad. The pad was stamped, colored and
sealed. The disk will be installed by the contractor soon
• Repair playground equipment
• Add Wood Mulch rings around Park trees, Lake Elmo Blvd trees, City facility trees
and in Facility Landscaping
• Maintenance on flower gardens in old village along Lake Elmo Ave
City Council Meeting Date Consent/Regular Agenda Item #__
Page 2
• Relocate buckthorn pile at Sunfish Lake Park
• Order Firefly Park sign
• The Lions Park Pickle Ball Court Surface has been corrected and is open for play
• Weekly Park Garbage Collection
• Pebble Park Lighting Improvements are scheduled for the second week in October
WATER
• Continue locating, GPS marking and mapping of water curb stops valves
• Measure & Record weekly well water levels and submit to DNR
• Storm event uprooted tree landing on the Well #2 Generator. An Insurance claim
was made and repairs are in process
• Updated Meter Reading Software
• Quarterly meter reading occurred
• Complete Monthly Generator and Safety Inspections of Equipment and Facilities
• Continue Correcting Water Meter Reading Issues
• Daily Rounds and fluoride/chloride sampling
• Completed the 1st annual Water Main Valve Exercising Program. Ten gate valves
were found inaccessible (in the selected S/W quarter of the system) due to
sediment, rocks, concrete or caps that would not open. Two were found closed that
should have been open. Staff corrected all issues found.
• Complete Monthly MDH fluoride and Bac-T Water Sampling
• Two water leaks were found, dug up and repaired the week of 9/19/2019
• Improve records and gps map for known development and city owned irrigation
systems
• Dealt with water theft
SEWER
• Continue Daily Locates and Rounds
• Continue Weekly Proactive Pump downs of all Lift stations & Monthly Float Cleaning
• Implemented the City’s first annual Sewer Main Jetting Program. The League of MN
cities Insurance requires 1/3 of the city’s sewer mains be jetted each year.
Proposals were collected and a contactor selected. The selected contracted cleaned
14,000’ in approximately three days.
• Installed surge protector at the Royal South Lift station to eliminate electrical surge
issues
SURFACE WATER
• Repaired and Clean Multiple Storm Sewer Pipes/Culverts
• Improve drainage in several ditch location
• Continue Mandated Surface Water Inspections for the City’s Storm Sewer System
• Repair wash out on shoulders, gravel roads and spill ways after several heavy rain
events
• Erosion control devices were put in place On Lake Jane Rd to minimize mud slides
• Staff attended a monthly OSHA safety training on confined spaces
• Update beehive asset management software with surface water assets and began
an identification numbering system
• Complete quarterly facility stockpile MS4 inspections
RECOMMENDATION:
Base on the activities listed above, City Council is respectfully asked to accept the September 2019
Public Works Report.