HomeMy WebLinkAbout#16 - 31st St.-Stillwater Blvd Watermain Extension STAFF REPORT DATE: October 15, 2019 CONSENT AGENDA ITEM: Authorize Topographic Survey and Final Design for the 31st St and Stillwater Blvd Watermain Improvements SUBMITTED BY: Jack Griffin, City Engineer REVIEWED BY: Kristina Handt, City Administrator Chad Isakson, Assistant City Engineer ISSUE BEFORE COUNCIL: Should the City Council authorize a topographic survey and final design for the 31st Street and Stillwater Blvd Watermain Improvements? BACKGROUND: The City of Lake Elmo is extending watermain to 6 homes located just east of 31st Street North and south of Stillwater Boulevard in Lake Elmo. The properties reside in an area affected by PFAS contamination and well advisories have been issued. The City approved a grant agreement with the MPCA at the October 1, 2019 Council meeting regarding these improvements. The project extends the public watermain south across Stillwater Boulevard (CSAH 14) from the north side, approximately 800 feet east of the intersection at 31st Street North. On the south side of CSAH 14, watermain will be extended approximately 780 feet further south along a shared private driveway. Individual water service stubs will be installed for each of the 6 residential properties. PROPOSAL DETAILS/ANALYSIS: Staff is recommending that a detailed topographic survey and final design be authorized to ready the improvements for construction in 2020. The City Engineer has met with Bolton and Menk, Inc. to prepare an engineering design scope of work and associated fee to provide support services to FOCUS Engineering for this project. BMI will provide engineering and surveying services that include topographic survey and mapping of existing conditions, preparation of plans and specifications and construction support services. The 31st Street and Stillwater Blvd Watermain Improvements will extend the municipal water supply as shown on the attached Location Map. FISCAL IMPACT: $46,326. If authorized, Bolton and Menk, Inc. will initiate the topographic survey and final design services in a not to exceed amount of $46,326. The engineering fees will be funded as a part of the project costs paid by the MPCA grant. RECOMMENDATION: Staff is recommending that the City Council authorize Bolton and Menk, Inc. to complete the topographic survey and final design services for the 31st Street and Stillwater Blvd Watermain Improvements. The recommended motion for this action is as follows: “Move to authorize Bolton and Menk, Inc. to complete the Topographic Survey and Final Design for the 31st Street and Stillwater Blvd Watermain Improvements in the not to exceed amount of $46,326.” ATTACHMENTS: 1. Project Location Map. 2. Bolton and Menk. Task Order No. 15 – 31st Street and Stillwater Blvd Watermain Improvements. LOCATION MAP FIGURE NO. 1 CITY OF LAKE ELMO PRIVATE DRIVE LEGEND 31ST ST N CSAH 14 JO N Q U I L A V E N UPRR RAILROAD ROW PROPERTIES SERVED JONQUIL TRL N PROJECT NO. 2019.124 31ST STREET WATERMAIN IMPROVEMENTS     TASK ORDER No. 15 – 31ST STREET‐STILLWATER BOULEVARD: EXTENSION OF MUNICIPAL WATER SUPPLY    Page 1 of 4                                             TASK ORDER               No. 15  CITY OF LAKE ELMO, MINNESOTA – BOLTON AND MENK, INC.  PROFESSIONAL ENGINEERING SERVICES AGREEMENT      In accordance with ARTICLE 1 of the Master AGREEMENT between the City of Lake Elmo (“CITY”) and  Bolton and Menk, Inc. (“ENGINEER”), dated MARCH 20, 2013 (“AGREEMENT”), the ENGINEER agrees  to provide Professional Engineering Support Services as follows:      31ST STREET‐STILLWATER BLOUEVARD: EXTENSION OF MUNICIPAL WATER SUPPLY      PROJECT OVERVIEW:  The City of Lake Elmo is extending watermain to 6 homes located just east of  31st Street North and south of Stillwater Boulevard in Lake Elmo. The properties reside in an area  affected by PFAS contamination and well advisories have been issued. The project extends the public  watermain south across Stillwater Boulevard (CSAH 14) from the north side, approximately 800 feet  east  of  the  intersection  at  31st  Street  North.  On  the  south  side  of  CSAH  14,  watermain  will  be  extended approximately 780 feet further south along a shared private driveway. Individual water  service stubs will be installed for each of the 6 residential properties.    The  Project  includes  Engineering  Services  for  the  31 st  Street‐Stillwater  Boulevard:  Extension  of  Municipal  Water  Supply,  including  the  preparation  of  Plans  and Specifications  and  Contract  Documents; Bidding Phase Services; Construction Staking; and Construction Administration support  services to the City Engineer; all as detailed within this Task Order.      SERVICES TO BE PROVIDED BY ENGINEER: Bolton  and  Menk,  Inc. shall  provide  the  following  Professional Engineering Services:     1. Project Management throughout the course of the work for preparation of design documents  and construction phase services including submittal of a weekly progress memo and job to  date budget form.    2. Preparation of Plans and Specifications, and Contract Documents.   Project kick‐off meeting with city staff.   Work with city staff to develop critical success criteria for the project, obtain project  information and formalize the budget and schedule.   Site visit to verify and review existing conditions and survey.   Topographic  Survey:  Coordinate  gopher  state  one  utility  locates  and  perform  topographic  survey  of  existing  conditions  within  project  limits  for  the  purposes  of  preparing design documents.   Prepare construction plans and specifications for bidding purposes.      TASK ORDER No. 15 – 31ST STREET‐STILLWATER BOULEVARD: EXTENSION OF MUNICIPAL WATER SUPPLY    Page 2 of 4                                              Identify  small  utility  conflicts  related  to  the  proposed  design  to  the  City’s  Project  Manager.  The  City  will  coordinate  necessary  relocation  efforts with the respective  small utility company as needed.   Provide recommendation on the amount and location of soil borings for geotechnical  investigation.   Provide 60% plans and specifications to city for review, including design criteria and  assumptions  memorandum  detailing  the  design  decisions  made  in  the  plan  preparation.   Provide 90% plans and specifications to city for review, including  updated  design  criteria and assumptions memorandum detailing the design decisions made in the plan  preparation.   Revise and final plans and specifications based on city comments.   Prepare opinion of probable cost based on final plans.   Identify permits required to complete the proposed work. The design shall incorporate  measures to meet compliance requirements for all permits necessary.   Prepare and submit any necessary permit applications for approval.  DELIVERABLES:   Plans for each bid package in electronic format (PDF) and hard copy format (4 full size  and 4 half size).   Specifications for each bid package in electronic format and hard copy format (3 copies  for the City and the appropriate number for contracts and required permits).   Opinion of Total Probable Project Costs for each bid package.    Design Memorandum summarizing final design assumptions and performance criteria  incorporated into the project design.   Identification of easements needed for the construction of the project. Easements  shall be placed on the final plans.    3. Bidding Phase Services for each bid package.    Submit “Advertisement for Bids” to Stillwater Gazette and Quest CDN.   Distribute plans and specifications as requested by bidders.   Maintain planholders list.   Respond to bidders’ questions and issue addenda as necessary.   Attend bid opening and tabulate bids received in electronic format.   Prepare contract award recommendation letter.    4. Construction Phase Services.     Assist the city to prepare for the preconstruction meeting and attend meeting.   Provide construction administration support throughout the project as requested by  the City’s Project Manager (assume 40 hours from the design engineer of record).   Coordinate and provide construction staking.       TASK ORDER No. 15 – 31ST STREET‐STILLWATER BOULEVARD: EXTENSION OF MUNICIPAL WATER SUPPLY    Page 3 of 4                                              Provide review of shop drawings and make recommendations regarding acceptability  of submittals.   Prepare and submit record drawings in electronic format (AutoCAD and PDF) and hard  copy  format  (1  full  size  and  three  half‐size)  based  upon  staking  information  and  information provided by the contractor and city.    5. City Responsibilities – The city (or its consultants) will provide the following:   Coordination with the public and conduct public meetings.   Preparation of Feasibility Report, if needed.   Presentation(s) to the City Council.    Easement negotiations and acquisition, if needed.   Review of 60% and 90% plans and specifications.     Coordination with small utility companies if conflicts are identified.   Hire geotechnical firm for geotechnical investigation.    Construction Administration.   Construction Observation.   One year warranty inspections.    TIMES FOR RENDERING SERVICES:  ENGINEER shall perform its services and provide deliverables in  accordance with the following schedule:  STONEGATE ADDITION: STREET AND UTILITY IMPROVEMENTS SCHEDULE    1. February 28, 2020   Deliver final Plans and Specifications, and Post‐Design EOC to city.  2. March 17, 2020  City Engineer presents Plans and Specifications for Council approval.  3. April 23, 2020   Receive Contractor Bids.  4. May 5, 2020    City Council accepts bids and awards Contract.  5. May 26, 2020    Issue Notice to Proceed. Contractor begins Work.  6. October 23, 2020  Substantial Completion.  7. December 4, 2020  Final Completion.    CITY’S REPRESENTATIVE AND CONTRACT ADMINISTRATION:  The CITY’s representative with respect  to  services  rendered  by  ENGINEER  under  this  TASK  ORDER  shall  be the City Engineer.  Project  correspondence must be addressed to:  Jack Griffin, P.E., City Engineer   City of Lake Elmo   3800 Laverne Avenue North  Lake Elmo, MN 55042  651.300.4264  Email: Jack.griffin@focusengineeringinc.com      TASK ORDER No. 15 – 31ST STREET‐STILLWATER BOULEVARD: EXTENSION OF MUNICIPAL WATER SUPPLY    Page 4 of 4                                               COMPENSATION:  Compensation to ENGINEER shall be based on the hourly billing rates for each staff  as assigned and provided in the ENGINEER’s Proposal for the work. Invoices shall be submitted once  each month and should be sent to the attention of the City Engineer.  Compensation to ENGINEER for Project Management, the Preparation of Plans and Specifications,  Contract Documents, and Bidding Phase Services for the 31st Street‐Stillwater Boulevard: Extension of  Municipal Water Supply shall be on an hourly rate basis in a not to exceed amount of $35,398.  Compensation to the ENGINEER for the Construction Phase Services  for  the  Stonegate  Addition:  Street  and  Utility  Improvements  shall  be  on  an  hourly  rate  basis in a not to exceed amount of  $10,928.  ADDITIONAL  SERVICES:   If authorized by the City, ENGINEER shall furnish or obtain from others  Additional  Services  which  are  not  considered  under  this  Task  Order.  Such  services  shall  be  compensated for on an Hourly Rate basis in an amount approved by the City prior to any services  being started or as otherwise mutually agreed. The City is not obligated to compensate ENGINEER for  services completed outside the approved scope of work which are completed prior to ENGINEER  submitting a written request to the City, and receiving written approval of the City.    ATTACHMENTS:  This agreement supersedes and replaces all previous understandings, agreements  or  contracts,  written  or  verbal,  between  ENGINEER  and  City,  regarding  the  31 st  Street‐Stillwater  Boulevard: Watermain Improvements. The following documents are attached for reference:    1. ENGINEER’s Proposal to the CITY dated October 7, 2019.    APPROVAL  AND  ACCEPTANCE:  Approval  and  Acceptance  of  this  Task  Order,  including  the  attachment(s) listed above, shall incorporate this document as part of the AGREEMENT. ENGINEER is  authorized to begin performance of services upon receipt of a copy of this Task Order signed by CITY.    The Effective Date of this Task Order is October 15, 2019.    BOLTON AND MENK, INC.    CITY OF LAKE ELMO, MINNESOTA      By _________________________________   By  _______________________________ __  (Authorized Principal of the Firm)  City Administrator      October 7, 2019 Mr. Jack Griffin, P.E., City Engineer City of Lake Elmo 3880 Laverne Avenue North, Suite 100 Lake Elmo, MN 55042 RE: 31st Street Watermain Improvements City of Lake Elmo Dear Mr. Griffin, Water service is proposed into the 31st Street area neighborhood to service six homes located south of Stillwater Boulevard (CSAH 14) and east of 31st Street N. The project area is near the northwest corner of the Lake Elmo Park Reserve in the central part of the City. The homes in the neighborhood receive access from Stillwater Blvd via a shared private gravel driveway which crosses the Union Pacific Railroad (UPRR) tracks. Funding for the project is assumed to be from a grant agreement between the City and the State, like the agreement in place for the construction of well #5. The main requirements of the agreement consist of applicable prevailing wages and insurance criteria for the contractor. A connection to the existing watermain located on the north side of Stillwater Blvd is proposed. It is assumed watermain would need to be installed in a casing under both Stillwater Blvd and the UPRR property. Watermain extension along the driveway is proposed to be directionally drilled to minimize disturbance areas and maintain access for residents. Hydrants and valving would be installed along the route and individual 1-inch water services would be extended to each lot. The scope of engineering and surveying services include project management, topographic survey, preparation of plans and specifications, bidding, and construction phase services similar to past RFP’s received from the City. The construction phase services include construction administration from the project engineer, construction staking, record drawings and GIS shape files. Included in our estimated fee, we assume permits will be required from MN Department of Health for the watermain extension, Washington County, and UPRR. We will prepare and provide sketch and descriptions for the city to obtain easements which encompass the proposed infrastructure. We anticipate the project schedule will be to perform design and prepare plans and specifications this winter, with bidding occurring in late winter or early spring. Construction would follow in summer 2020. We will work with you and your staff to meet all required deadlines. We propose to complete the work identified in the previous paragraphs for a fee of $46,326. We propose to work on an hourly basis with a not-to-exceed amount. The attached Detailed Cost Estimate identifies our estimated hours, billing rates, and tasks. Name: Mr. Griffin Date: October 7, 2019 Page: 2 of 2 Thank you for the opportunity to submit this proposal for the 31st Street Watermain Improvements. Please call me at (651) 728-3172 if you have any questions. Sincerely, Bolton & Menk, Inc. Mike Warner, P.E. Project Manager Attachment – Fee Proposal Client:City of Lake Elmo Project:31st Street WM Improvements TASK NO.WORK TASK DESCRIPTION Pr o j e c t M a n a g e r Mi k e W a r n e r De s i g n E n g i n e e r Co l e t o n N e l s o n Tr e n c h l e s s Te c h n o l o g i e s Mi t c h H o e f t RL S u r v e y o r Ru s s H a l v e r s o n Su r v e y T e c h n i c i a n Ar r o n E d e r Su r v e y C r e w C h i e f TB D Cl e r i c a l Co u r t n e y M a u l Totals 1.0 Project Management 1.1 Project Management 12 12 SUBTOTAL HOURS - TASK 1 12 0 0 0 0 0 0 12 2.0 Preparation of Plans and Specs and Contract Documents 2.1 Project Kick-Off Meeting 3 3 2.2 Critical Success Criteria 0 2.3 Site Visit to Review Existing Conditions 2 2 4 2.4 Topographic Survey 1 2 2 3 25 2 35 2.5 Identify Small Utility Conflicts 2 2 4 2.6 Recommend Soil Boring Locations 1 2 3 2.7 Provide 60% Plans, Specs, and Design Criteria Memo 20 40 16 76 2.8 Provide 90% Plans, Specs, and Design Criteria Memo 10 20 6 36 2.9 Provide Final Plans and Specs 8 4 4 4 20 3.0 Easement Sketch and Descriptions 1 7 17 25 3.1 Opinion of Probable Construction Costs 8 8 3.2 Prepare and Submit Necessary Permits 6 16 2 24 SUBTOTAL HOURS - TASK 2 62 88 26 9 20 25 8 238 3.0 Bidding 3.1 Submit Ad for Bid 1 1 2 3.2 Distribute Plans and Specs 1 1 3.3 Maintain Planholder List 2 2 3.4 Respond to Bidders' Questions and Issue Addenda 8 1 9 3.5 Bid Tabulation 1 4 5 3.6 Prepare Contract Award Recommendation Letter 2 2 SUBTOTAL HOURS - TASK 3 12 0 0 0 0 0 9 21 4.0 Construction Services 4.1 Attend Preconstruction Meeting 4 4 4.2 Construction Administration from Project Manager 20 20 4.3 Construction Staking 6 2 4 16 28 4.4 Prepare and Submit Record Drawings 4 8 6 2 20 4.5 Prepare and Submit GIS Shapefiles 2 8 10 SUBTOTAL HOURS - TASK 4 30 22 0 2 4 22 2 82 BOLTON & MENK, INC. DETAILED COST ESTIMATE 31st Street Watermain Improvements City of Lake Elmo, Minnesota Client: City of Lake Elmo Project: 31st Street WM Improvements TASK NO.WORK TASK DESCRIPTION Pr o j e c t M a n a g e r Mi k e W a r n e r De s i g n E n g i n e e r Co l e t o n N e l s o n Tr e n c h l e s s Te c h n o l o g i e s Mi t c h H o e f t RL S u r v e y o r Ru s s H a l v e r s o n Su r v e y T e c h n i c i a n Ar r o n E d e r Su r v e y C r e w C h i e f TB D Cl e r i c a l Co u r t n e y M a u l Total Hours Total Cost 1.0 Project Management 12 0 0 0 0 0 0 12 $1,764 2.0 Preparation of Plans and Specs and Contract Documents 62 88 26 9 20 25 8 238 $31,015 3.0 Bidding 12 0 0 0 0 0 9 21 $2,619 4.0 Construction Services 30 22 0 2 4 22 2 82 $10,928 TOTAL HOURS 116 110 26 11 24 47 19 353 AVERAGE HOURLY RATE $147.00 $105.00 $165.00 $154.00 $130.00 $145.00 $95.00 SUBTOTAL $17,052 $11,550 $4,290 $1,694 $3,120 $6,815 $1,805 $46,326 DETAILED COST ESTIMATE TOTAL FEE BOLTON & MENK, INC. 31st Street Watermain Improvements City of Lake Elmo, Minnesota