HomeMy WebLinkAbout#17 - Feasibility Report for 31st St-Stillwater Blvd Watermain STAFF REPORT DATE: November 19, 2019 CONSENT AGENDA ITEM: Authorize Preparation of a Feasibility Report for the 31st Street and Stillwater Blvd Watermain Improvements SUBMITTED BY: Jack Griffin, City Engineer REVIEWED BY: Kristina Handt, City Administrator Chad Isakson, Assistant City Engineer Marty Powers, Public Works Director ISSUE BEFORE COUNCIL: Should the City Council authorize the preparation of a feasibility report for the 31st Street and Stillwater Blvd Watermain Improvements? BACKGROUND: The City of Lake Elmo is extending watermain to 6 homes located just east of 31st Street North and south of Stillwater Boulevard in Lake Elmo as shown on the attached Location Map. The properties reside in an area affected by PFAS contamination and well advisories have been issued. The City approved a grant agreement with the MPCA at the October 1, 2019 council meeting regarding these improvements and approved final design services at the October 15, 2019 council meeting in order the jump start the topographic survey work. The project extends the public watermain south across Stillwater Boulevard (CSAH 14) from the north side, approximately 800 feet east of the intersection at 31st Street North. On the south side of CSAH 14, watermain will be extended approximately 780 feet further south along a shared private driveway. Individual water service stubs will be installed for each of the 6 residential properties. The project will include grant funding and administrative processes for ensuring each property completes the private service connection from the right-of-way to each home, including water meter installation, sealing of the private well, and all permitting and connection fees. PROPOSAL DETAILS/ANALYSIS: Staff is recommending that a Feasibility Report be prepared for this project in accordance with the statutory process for public improvements that are specially assessed. The feasibility report will advise on the scope of recommended improvements; provide estimated project costs; identify easement and right-of-way, permits and other requirements of other local agencies needed to implement the improvements; recommend whether the improvements should be best made as proposed or in connection with some other improvement; and advise if the improvements are necessary, cost effective, and feasible. The report will also provide a proposed preliminary assessment roll for each of the benefitting properties based upon the City’s Special Assessment Policy for Local Improvements. Consistent with the City Assessment Policy and past practices, the watermain improvements will be 100% assessed to the benefitting properties. Assessments will be waived once the property connects to City water and successfully abandons their private well. A project schedule for the 31st Street and Stillwater Blvd Watermain Improvements is attached and outlines the implementation timeframe necessary to ready the improvements for construction in 2020. The proposed schedule provides necessary time to address public involvement, acquire project related easements, acquire field survey before heavy snowfall, and to receive contractor bids early in 2020 to promote a competitive bid environment. FISCAL IMPACT: $4,800. The engineering fees will be funded through the MPCA Grant Agreement approved at the October 1, 2019 City council meeting. RECOMMENDATION: Staff is recommending that the City Council approve, as part of the consent agenda, a Resolution Ordering Preparation of a Feasibility Report for the 31st Street and Stillwater Blvd Watermain Improvements. If removed from the consent agenda, the recommended motion for this action is as follows: “Move to approve Resolution No. 2019-088, Ordering preparation of a Feasibility Report for the 31st Street and Stillwater Blvd Watermain Improvements to be completed by FOCUS Engineering, Inc. in the not to exceed amount of $4,800.” ATTACHMENTS: 1. Resolution Ordering Preparation of a Feasibility Report. 2. 31st Street and Stillwater Blvd Watermain Improvements – Location Map. 3. 31st Street and Stillwater Blvd Watermain Improvements – Project Schedule. CITY OF LAKE ELMO WASHINGTON COUNTY STATE OF MINNESOTA RESOLUTION NO. 2019-088 A RESOLUTION ORDERING THE PREPARATION OF A FEASIBILITY REPORT FOR THE 31ST STREET AND STILLWATER BOULEVARD WATERMAIN IMPROVEMENTS WHEREAS, the city has been awarded grant funds through the 2018 3M Settlement Expedited Project Grant Program to extend clean drinking water to 6 homes located along a private driveway near 31st Street North and Stillwater Boulevard and to reimburse property owners for the costs associated with connecting to city water and sealing their well.; and WHEREAS, the city executed an Agreement with the Minnesota Pollution Control Agency dated October 2, 2019 stating the conditions and terms of the grant funds including the requirement for each property to connect to city water and abandon all private wells, unless identified as a monitoring well by MPCA; and WHEREAS, staff recommends that the city assess properties that do not hook up to city water in the allotted time in order to recoup those project costs that may not be covered by the grant due to non- compliance; and WHEREAS, it is proposed to assess the benefiting properties for all or a portion of the cost of the improvement, pursuant to the city’s Special Assessment Policy and Minnesota Statues, Chapter 429. NOW, THEREFORE, BE IT RESOLVED, That the proposed improvement, called 31st Street and Stillwater Blvd Watermain Improvements, be referred to the City Engineer and FOCUS Engineering, to complete a feasibility report in accordance with Minnesota Statues, Chapter 429 for the proposed improvements, and to report to the council with all convenient speed advising the council in a preliminary way as to whether the proposed improvement is necessary, cost-effective, and feasible; whether it should be best made as proposed or in connection with some other improvement; the estimated cost of the improvement as recommended; and a description of the methodology used to calculate individual assessments for affected parcels. ADOPTED BY THE LAKE ELMO CITY COUNCIL ON THE SEVENTEETH DAY OF NOVEMBER, 2019. CITY OF LAKE ELMO By: __________________________ (Seal) Mike Pearson ATTEST: Mayor ________________________________ Julie Johnson City Clerk LOCATION MAP FIGURE NO. 1 CITY OF LAKE ELMO PRIVATE DRIVE LEGEND 31ST ST N CSAH 14 JO N Q U I L A V E N UPRR RAILROAD ROW PROPERTIES SERVED JONQUIL TRL N PROJECT NO. 2019.124 31ST STREET WATERMAIN IMPROVEMENTS PROJECT SCHEDULE  CITY OF LAKE ELMO    31ST STREET AND STILLWATER BLD WATERMAIN IMPROVEMENTS  PROJECT NO. 2019.124  FOCUS ENGINEERING, inc.  Cara Geheren, P.E.   651.300.4261  Jack Griffin, P.E.                651.300.4264  Ryan Stempski, P.E.  651.300.4267  Chad Isakson, P.E.  651.300.4283                  OCTOBER 1, 2019  Council Approves MPCA Grant Agreement for Stonegate Watermain Project.      OCTOBER 15, 2019  Council Authorizes Topographic Survey and Final Design Services.       NOVEMBER 19, 2019  Council orders preparation of Feasibility Report.      JANUARY 21, 2020  Presentation  of  Feasibility  Report.  Council  accepts  Report  and  calls  for  Improvement Hearing.       FEBRUARY 18, 2019  Public Improvement Hearing. Council Orders the Improvement (4/5th Vote)  and preparation of Plans and Specifications.      MARCH 3, 2020  Council approves Plans and Specifications and orders Advertisement for Bids.      APRIL 2, 2020      Project Bid Date: Receive contractor bids.      APRIL 21, 2020  Council accepts Bids and awards Contract.       MAY 19, 2020    Conduct Pre‐Construction Meeting and issue Notice to Proceed.   SEPTEMEBER 25, 2020  Substantial Completion.   NOVEMBER 13, 2020    Final Completion.      SEPTEMBER 7, 2021  Declares Costs to be Assessed and Calls for Hearing on Assessment.      OCTOBER 5, 2021  Final Assessment Hearing. Council adopts the Final Assessment Roll.