Loading...
HomeMy WebLinkAbout#20 - Lake Elmo Senior Living1 STAFF REPORT DATE: 11/05/19 REGULAR TO: City Council FROM: Ken Roberts, Planning Director AGENDA ITEM: Preliminary Planned Unit Development (PUD) Request - Lake Elmo Senior Living (39th Street North) REVIEWED BY: Ben Prchal, City Planner BACKGROUND: The City has received a request from Frisbee Properties LLC (c/o Mathew Frisbee) for the approval of the preliminary Planned Unit Development (PUD) Plan for a 60 unit rental senior (for those ages 55 plus) housing development to be known has Lake Elmo Senior Living. This development is proposed for a 5 acre parcel on the north side of 39th Street North, just to the east of Arbor Glen Senior Living facility. On July 16, 2019, the City Council reviewed and approved the Concept PUD plans for this development. This approval was documented in Resolution 2019- 052 and was subject 11 conditions of approval. On October 16, 2019, the Planning Commission held a public hearing and reviewed the proposed preliminary PUD plans for this development. The Commission discussed the proposal, took testimony from two nearby property owners and then voted to recommend approval of the 60-unit senior housing development, subject to conditions. ISSUE BEFORE THE CITY COUNCIL: The City Council is being asked to consider and act on the proposed development stage (preliminary) PUD plans (including possible amenity points) for the Lake Elmo Senior Living Development to be located on 39th Street. PROPOSAL DETAILS/ANALYSIS: General Information. • Property Owner: Lake Elmo Business Park Co., Stillwater Minnesota • Applicant: Frisbee Properties (c/o Mathew Frisbee) • Location: North side of 39th Street N, east of Arbor Glen Senior Housing and Lake Elmo Avenue • Site Area: 5 acres • Land Use Guidance: 2040 Comprehensive Plan – Village Mixed Use • Zoning: VMX – Village Center Mixed Use • Surrounding Land Use Guidance: Vacant Commercial (VMX) to the East, Urban Low Density Residential to the North (Village Preserve), Arbor Glen Senior Housing to the West and vacant commercial and institutionally planned land across 39th Street to the South. • History: The property has been used as vacant land. • Deadline for Action: Application Complete: September 16, 2019 2 60-day timeline: November 14, 2019 • Applicable Code: Article VII – Specific Development Standards Article XI – Village Mixed Use District City of Lake Elmo Design Guidelines and Standards Manual PROPOSAL DETAILS/ANALYSIS: Ownership and Management: The applicant noted that Ebenezer will assist with the marketing and sales (rentals) of the units with the expectation of filling the facility within 2 years. Ebenezer also will be providing the on-site management (with 3 employees) and consulting services for the facility. Site Plan. The proposed site plan includes 10 buildings – 42 units in a 3-story building that would parallel the north property line and 9 patio home buildings with 2 units in each for a total of 60 units on the 5 acre site. The apartment building would include amenities such as community room, multi-purpose rooms, fitness room, management office and a food serving kitchen for serving community room. This building also would have indoor parking for 42 motor vehicles. The detached patio homes would surround the center garden/green area that is shown with gardens, gazebos, bocce ball and pickle ball courts. The patio homes would each have an attached, direct-access garage. Site and Design Changes. Since the concept review by the City earlier this year, the applicant has revised the project plans to address several of the concerns raised by the City during the concept review process. The changes include: 1. Eliminating one of the two driveways onto 39th Street as suggested by the City Engineer. 2. Adding fire access lanes to each end of the 42-unit apartment building. 3. Shifting the 42-unit apartment building further south on the site to achieve a 55-foot setback from the north property line with the footprint of the building. This change also allows for the preservation of all the large existing trees along the north property line to serve as buffer and screen for the single-family home to the north of the site. 4. Moved the location of the sidewalk connection to Arbor Glen to the north to have a safer pedestrian connection between the developments. Site Character. The site is vacant and relatively flat. There is a row of large spruce trees and Amur Maples along the northern property line. Vehicular Access. The concept plan for this development showed two access driveways into the site from 39th Street. As noted above, the applicant has revised the plans to have one driveway into the site to meet the spacing requirement of at least 300 feet from the existing Arbor Glen driveway. The driveway then splits and is shown as 24-foot-wide a loop throughout the site (with parking bays) to provide access to all the buildings. The City Engineer’s review memo (attached) provides more details about streets and access for this site. Trails and Pedestrian Access. There is an existing trail along 39th Street North. The proposed project plans show sidewalks on both sides of the two internal driveways in the site that would connect to the trail along 39th Street. These sidewalks would provide pedestrian access to the one-level patio homes, to the gardens and recreation area in the center of the site. The plans also show a sidewalk going from their site between two of the patio home buildings proceeding west onto the Arbor Glen site. This proposed location is an improvement for pedestrian safety from the Concept Plan that had the proposed sidewalk located farther south. The previous location for the sidewalk would have made it more difficult for pedestrians to cross the Arbor Glen driveway. 3 Setbacks. The proposed site plan shows a variety of building and parking lot setbacks on the site. These include a front setback for the buildings of 20 feet (from 39th Street), a setback of 35 feet for the patio buildings from the west and east property lines and a 35 foot setback from the west property line for the apartment building and a 55 foot rear yard building setback (from the north property line) for the footprint of apartment building. All these setbacks meet or exceed the minimum required by code. Impervious Surfaces. According to the applicant, the proposed site plan has 54. 6 percent of the site as impervious surface (buildings and hardscape) and 45.4 percent of the site with pervious surfaces (green space and landscape areas). The City Code for residential development in the VMX Zoning district requires that at least 25 percent of the site have pervious surfaces (a maximum of 75 percent impervious) so, as proposed, the PUD meets this requirement. Proposed Design. The proposed design of the development is a mix of buildings with a total of 60 units. These include a 42-unit senior living, 3-story building (with a mix of one, two and three bedroom units) with internal parking and the 9 buildings with 2 units in each to create the 18 patio homes. These units will have a mix of 2 and 3 bedrooms and each will have an attached garage space. According the applicant, the exterior of the buildings will complement the adjacent Arbor Glen facility and will have exteriors with brick, stone, cementitious siding (Hardi-plank) with a sloping asphalt shingle roof. All building designs will need to meet the Lake Elmo Design Guidelines and Standards for materials and colors. Proposed Unit Breakdown. The proposed number of units totals 60. The following provides a breakdown of the proposed unit types and the number of units of each: Unit Type Number of Units Number of Units Total Number of Units Apartment Building Detached Buildings Studios 0 0 0 1-Bedroom 5 0 5 2-Bedroom 32 (16 2-bedroom units and 16 1 bedroom plus den units) 15 47 3-Bedroom 5 3 8 Total 42 18 60 Adherence to Lake Elmo Design Guidelines and Standards. The proposed development will need to meet the standards of the Lake Elmo design guidelines. It appears that the project will meet the Lake Elmo Design Guidelines and Standards in that: • The proposed structures are located and oriented in a manner that allows for pedestrian accessibility and provides visual interest from the public right-of-way. • The buildings are located as close to the public street as possible, easily accessible from the street; setbacks are varied slightly; recreational and common spaces are located at the interior or rear of the site. • The parking areas do not account for more than 50% of street frontage. 4 • Examples of past developments adhere to building design requirements. It is a recommended condition of final PUD approval that the applicant include a detailed architectural plan proposal (with a listing of colors, materials, etc) for the all the buildings in the development for City approval. All of the building exterior designs and materials will need to conform to the design standards in the Lake Elmo Design Guidelines and Standards Manual including those regarding building facades, rooflines, colors entries, lighting and exterior building materials. At first review, it appears that all the building styles and materials will meet or exceed the City’s design standards for multiple-family structures. City staff will need to verify the proposed exterior designs and materials will meet the City’s design standards before issuing building permits for the residential buildings. Parking. The City’s Zoning Code requires one off-street parking space per senior housing unit (regardless of size or number of bedrooms) and at least one visitor parking space per every four units. With 60 proposed senior housing units, the Code requires at 75 parking spaces for this development. In this case, the developer is proposing a total of 113 parking spaces – including 42 parking spaces in the proposed apartment building, 25 surface parking spaces near the front entrance of the apartment building and 10 parking stalls along the entrance driveways (next to the center garden/court area). The proposed plans show that each of the 18 patio homes would have an attached garage parking space and a parking space on their driveway (for a total of 36 parking spaces) for these units. The proposed width and length of parking stalls appear compliant with code, and the proposed width (shown to be 24’) is adequate for a 2-way vehicle movement on the two main driveways on the site, according to the Zoning Code. The plans also show two parking spaces proposed to be Americans with Disabilities Act (ADA)-accessible. Engineering Comments. The City Engineer has provided a detailed review memo (dated October 10, 2019) regarding the proposed preliminary PUD Plans. This memo is attached for reference. Staff would like to highlight the following comments in summary: • Streets and Transportation o The site plan has been revised to show only one driveway for access to this property. The location of this proposed driveway meets the acceptable spacing guidelines. o No parking and construction staging, including the loading and unloading of materials and equipment will be allowed at any time on 39th Street during the construction of the site improvements and buildings. All street, curb and boulevard damage caused by the construction activities must be repaired or replaced at no cost to the city and meeting city standards and specifications. o The preliminary plans must be revised to maintain all tree planting outside of the front, side and rear drainage and utility easements. o A traffic impact study was completed and submitted as part of the preliminary PUD and site plan application. The Study findings indicate no additional travel lanes, turn lanes or other improvements are required. • Municipal Sanitary Sewer o Sanitary sewer is readily available to the site. The applicant or developer will be responsible for connecting to the City sanitary sewer system and extending an 8-inch sanitary sewer in to the property at the applicant’s sole cost with private sewer service stubs installed for connection to each individual building. o The sanitary sewer main along the south property line must be realigned to remain outside of the 10-foot drainage and utility easement. • Municipal Water Supply o The existing City water system is readily available to this site. The applicant will be required to connect, at its sole cost, to the existing 8-inch DIP stub that was installed to serve this property. A minimum 8 -inch diameter watermain will be required to be 5 extended internal to the site with private water services stubbed for connection to each individual building. o The applicant will be responsible to place fire hydrants throughout the property at the direction of the Fire Department. All fire hydrants shall be owned and maintained by the City. o Any watermain lines and fire hydrants placed within the development will require 30- foot-wide utility easements centered over the hydrant or pipe. These easements must be dedicated to the City and provided in the City’s standard form of easement agreement. • Stormwater Management o The proposed development is subject the construction of a storm water management plan and system that meets State, Valley Branch Watershed District (VBWD) and City rules. All stormwater facilities need to be designed and installed in accordance with City and Valley Branch Watershed District (VBWD) requirements. o All stormwater facilities constructed for this development are to remain privately owned and maintained. The city will require the applicant or developer to execute and record of a Stormwater Maintenance and Easement Agreement with the City in its standard form. o Even as privately owned and maintained facilities, the City requires the developer to provide maintenance access roads or drives that meet City engineering design standards for all storm water facilities. o The existing downstream drainage basins for the 39th Street storm sewer system do not have available treatment or storage capacity to accommodate new development. Therefore, any storm sewer connections to the 39th Street system must be at both reduced runoff rates and volumes. o Connection to the 39th Street storm sewer system requires verification of existing capacity within all downstream storm sewer systems and availability of downstream storm sewer ponding at the discharge locations. Detailed storm sewer calculations must be submitted to the City demonstrating sufficient capacity and meeting all current city Engineering Design Standards. Valley Branch Watershed District Comments: I have not received comments from John Hanson from the Valley Branch Watershed District about this proposal. This development went to the Watershed District on October 24, 2019 for review and their approval. However, he provided the City with the following comments about another recent development proposal that should be applicable to this site: 1. Once the applicant submits a complete VBWD permit application, they will review it for conformance to the VBWD rules and regulations. 2. I understand the applicant is proposing underground facilities to control stormwater runoff rates and to provide the required stormwater runoff volume treatment. The VBWD will need to see soil borings and/or other infiltration testing results, computations and design details to determine whether the proposed underground facility will conform to the VBWD rules and regulations. Stormwater Management and Storm Sewer System Improvements. The proposed development site is in the Valley Branch Watershed District (VBWD). The design of the storm water management systems must be compliant with the requirements of the State, VBWD, the City of Lake Elmo Storm Water Management Ordinance, and the City of Lake Elmo design standards manual. The applicant is advised to fully read and comprehend the City’s storm water and erosion control ordinance since these standards are different, and in some cases more stringent, than the watershed district. In his project review, the City Engineer noted the following: The storm water facilities will be privately owned and maintained so no outlots will be required for the underground storm water facilities. 6 The City will require drainage and utility easements over all 100-year high water level areas and to protect all overland emergency overflow paths. The City Engineer’s review memo further addresses the stormwater management considerations and requirements for this development. Traffic Study Summary. The applicant completed a traffic impact review for the proposed development. I have attached the study, dated August 30, 2019, for your review. In summary, the traffic study concluded that “it appears that exclusive turn lanes are not needed. Likewise, the very low number of generated site trips in the peak hours (5-10 estimated trips) appear not to add enough traffic volume to the adjacent streets to necessitate any additional travel lanes or other roadway improvements.” Tree Removal and Preservation. The applicant submitted a proposed tree and landscaping plan for this site. The latest plans show the developer preserving all but one of the existing trees along the northern property line of the site. The City’s tree preservation ordinance allows for 30% removal of significant trees on a site and the City requires a tree mitigation plan showing how the developer will replace any removed trees. In this case, the applicant will preserve all the significant trees on the property. Landscaping/Screening: As noted above, there is a row of significant large trees along the north property line of the site. These trees provide screening between the existing single-family homes to the north and this development site. The developer/architect has designed the project to preserve as many of the existing trees as possible. The City Code requires a screening/landscape barrier between a less intense land use and a more intense land use that is at least 90 percent opaque. This standard will apply for the northern property line of this site. To help with the screening, the applicant is proposing to add Black Hills Spruce trees to the areas in the existing tree line where there are gaps or openings between the existing trees. The applicant provided the City with a detailed landscaping plan for the site that shows the installation of a mix of trees, ornamental trees and shrubs and flowering plants throughout the site. The City’s Landscape Architect has reviewed the proposed landscape plans for this PUD and in general he found them in compliance with City Code requirements. He noted that the proposed plans show the planting of more than enough trees (60 proposed, 38 required) but that the proposed mix of trees does not meet code requirements. As proposed, there would be too many ornamental trees planted as a percentage (22 percent proposed, 15 percent maximum) of the total number of trees. However, if the applicant wants the City to approve amenity points for enhanced landscaping, then the City’s Landscape Architect notes that the City should allow the extra ornamental trees within the PUD. He also noted that the locations of 8 of the proposed trees could be in conflict with or would be planted too close to proposed utilities. I have attached his comments (dated October 2, 2019) for your consideration. All tree removal, screening and landscape plans will subject to review and approval by the City’s Landscape Architect before the City releases or approves a grading or building permit for this development. Building Official and Fire Chief Review. The Building Official and Fire Chief have reviewed the proposed concept plan and have provided several comments. Specifically, the Fire Chief noted: • Ensure compliance with all applicable codes in the 2015 MN State Fire Code. • Also, ensure compliance with MN State Fire Code Appendix D, with particular attention to address Section 105 if applicable based on current proposed building height. The applicant has made a change from the original concept drawing to address this. They have proposed a 22’ wide Fire Access Lane on the East end of the building. If the building height meets the criteria of Section D105 AERIAL FIRE APPARATUS ACCESS ROADS, this road will need to be increased to 26’ in width to accommodate Aerial Apparatus. 7 It appears that access to the rear of the building, (using the proposed Fire Access Lane to the East and the Arbor Glen Drive to the West) does not meet the 150’ requirement as stated in Section 503.1.1 of the 2015 MN State Fire Code. I would like to discuss this further with the Building Official and the applicant to determine if there are any possible exceptions in the Code to address this. Moving forward, some of the items we’ll need to address are as follows: • FDC (Fire Department Connection) locations. • Fire hydrant locations, will review Utility Plan w/Engineer. • Ensure proper access and turning radius’s throughout the site, meet Engineering Standards • Lockboxes • Road widths • No Parking areas, will review w/Engineer The City Building Official (Kevin Murphy) also provided me with comments about the concept plan. He noted the following: • Plans shall be prepared an Architect, Structural Engineer and Mechanical Engineer. • The plumbing plans shall be submitted to the State for review. • The elevator requires a permit issued by DOLI (Minnesota Department of Labor and Industry). • All fire suppression plans shall be submitted to the State Fire Marshall’s Division for review. 2040 Comprehensive Plan. The 2040 Comprehensive Plan has designated this site Village Mixed Use (VMX) in the land use plan. The Comprehensive Plan identifies VMX as “an area where a mix of vertically integrated commercial/business and residential uses provide development types that benefit from proximity to each other. Land with this designation is assumed to redevelop or develop with a minimum of 50 percent residential use with a density ranging from 5 to 10 dwelling units per acre.” The proposal is to have 60 units on a 5 acre site – 12 units per acre. The developer is asking the City for amenity points to allow for an increase density to 60 units – 10 more than the 50 units allowed by the Comprehensive Plan. The proposed density and amenity points are discussed in more detail later on this report. Consistency with Village Mixed Use Zoning District. As mentioned, the zoning of the site of the proposed development is VMX (village mixed use). Section 154.500 of the Zoning Code includes the purpose and description of the VMX zoning district. It states in part “the purpose of the VMX district is to provide an area for compact, mixed-use development made mutually compatible through a combination of careful planning and urban design and coordinated public and private investment. Development within areas zoned VMX will occur at a density of 6-10 units per acre. The placement of building edges and treatment of building, parking, landscaping and pedestrian spaces is essential to creating the pedestrian friendly environment envisioned for the VMX district.” For comparison, staff reviewed the proposed Preliminary PUD Plan against the standards including setbacks, impervious coverage, etc. of the Village Mixed Use zoning district, as shown below. Standard Required Proposed Impervious Surface Maximum 75% 54.6% Minimum Lot Width 75 feet 450 feet on 39th Street North Front Yard Setback 20 feet 20 feet Interior Side Yard 10 feet 35 feet Corner Side Yard 10 feet N.A. Rear Yard Setback 10 feet 55 feet Maximum Building Height 45 feet (by PUD) 42 feet (to peak) 8 Parking Not to be located in the front yard or between the front façade and public street. Parking is located in front of the proposed apartment building, though this proposed parking lot would setback about 300 feet from 39th Street and would be screened from the street by buildings and the proposed garden areas. Open space 200 square feet of common open space provided per unit. In this case, at least 12,000 square feet of common open space for the 60 proposed units. It appears there is at least 60,000 square feet of open space provided on site with the garden areas, bocce ball and pickle ball courts and the dog park in the southwest corner of the site. Consistency with Planned Unit Development Regulations. The applicant has requested City approval of a PUD for this development because it will have multiple buildings on one property and to allow for an increase in density through the use of amenity points. Staff has reviewed the proposed plan for its consistency with requirements of Article XVII: Planned Unit Development (PUD) Regulations and has found the following: • Intent. The intent of a PUD is to provide for flexibility in the use of land and the placement and size of buildings in order to better utilize site features and obtain a higher quality of development. A PUD is required for the proposed development, as more than one principal building is proposed to be placed on a platted lot and the proposed residential density would be greater than the 10 units per net acre as allowed by the Comprehensive Plan. • Identified Objectives. When reviewing requests for PUDs, the City is to consider whether one or more objectives as outlined in Section 154.751: Identified Objectives of the Zoning Code will be served or is achieved. Staff has found that the proposed development would meet the following objectives: A. Innovation in land development techniques that may be more suitable for a given parcel than conventional approaches. • The proposed development is in part not a typical, multi-story apartment building and instead proposes some of the units with a one-level townhouse design with private, ground-level entrances and attached garages for each unit. B. Promotion of integrated land use, allowing a mixture of residential, commercial and public facilities. • The proposed development is a mixture of housing types in an area with a variety of land uses including a building for seniors to the west, single-family homes to the north and vacant properties to the east and across 39th Street. C. Provision of a more adequate, usable, and suitably located open space, recreational amenities and other public facilities than would otherwise be provided under conventional land development techniques. • The proposed development is proposing a number of recreational amenities to residents within the PUD including children’s play structure, gardens, gazebos, bocce ball and pickle ball courts. 9 D. Accommodation of housing of all types with convenient access to employment opportunities and/or commercial facilities; and especially to create additional opportunities for senior and affordable housing. • The proposed development will provide additional senior housing opportunities within the City, as there are currently very few multi-family residential or senior housing buildings within the City. G. Coordination of architectural styles and building forms to achieve greater compatibility within the development and surrounding land uses. • The design of the buildings should be compatible with those of the adjacent Arbor Glen and the single-family homes to the north. J. Higher standards of site and building design than would otherwise be provided under conventional land development technique. • The City may impose design guidelines and standards on high density residential development such as this proposal. a. Minimum Requirements. PUDs must meet the following minimum requirements: A. Lot Area. A PUD must include a minimum of 5 acres for undeveloped land or 2 acres for developed land within the approved development. • The proposed development meets this requirement as it is a 5-acre development. B. Open Space: For all PUDs, at least 20% of the project area not within street rights-of-way to be preserved as protected open space. Other public or site amenities may be approved as an alternative to this requirement. Any required open space must be available to the residents, tenants, or customers of the PUD for recreational purposes or similar benefit. Land reserved for storm water detention facilities and other required site improvements may be applied to this requirement. Open space shall be designed to meet the needs of residents of the PUD and the surrounding neighborhoods, to the extent practicable, for parks, playgrounds, playing fields and other recreational facilities. • The applicant indicated in the application materials that about 29 % of the proposed development would be open space (including green spaces, ball courts and landscaped areas). C. Street Layout… In newly developing areas, streets shall be designed to maximize connectivity in each cardinal direction, except where environmental or physical constraints make this infeasible. All streets shall terminate at other streets, at public land, or at a park or other community facility, except that local streets may terminate in stub streets when those will be connected to other streets in future phases of the development or adjacent developments. • The proposed development site has about 450 feet of frontage on 39th Street North. The applicant is not proposing any new public streets but rather one private driveway from 39th Street to serve the development that should meet City spacing and access management standards. It is a recommended condition of approval that the developer address all the comments outlined in the Engineering memo dated October 10, 2019, before submitting plans for a final plat and final PUD approval for this site. Density. The proposed density for this development is 12 residential units per acre – 60 proposed units on a 5 acre site. The VMX land use designation allow up to 10 residential units per acre. For this site, the maximum allowed density, without amenity points, would be 50 residential units. The developer is 10 requesting City approval of amenity points to allow for an increased density of 10 additional units (an additional 20 percent). Proposed Amenities. The City’s PUD ordinance provides that developers may provide amenities with their projects for increased density of up to an additional 20 percent in units. In this case, because the applicant is proposing a housing density of 12 units per gross acre (or 12 units per net acre), the developer will need to provide amenities with the project to justify the increased housing density above the expected allowed density range 6-10 units per acre of the VMX land use designation. In addition, a PUD should offer the City (and future residents) amenities in exchange for the flexibility of allowing more than one building on a parcel. In this case, the developer is proposing several amenities that he believes are worthy of points for increased residential density. They include: • Underground or structure parking. The 18 patio-style units each have an attached, direct-access garage space. The proposed apartment building has 42 indoor parking spaces. It has not been indicated that these designs will reduce the surface parking area outside the footprint of the principal structure by 25%, however, as required by the PUD Code. (10 points possible) The Planning Commission recommended awarding 10 points for this. • Additional Open Space. The Code requires a minimum of 50 percent of the site not occupied by buildings be landscaped outdoor open space. The types of open space that qualify may include natural habitat, neighborhood recreation, trail corridors or open space buffers. (10 points possible). The Planning Commission recommended awarding 5 points for this. • Contained Parking. By proposing 60 garage spaces for its residents, the proposed development limits the amount of visible surface parking and has integrated it away from 39th Street. (5 points possible) The Planning Commission recommended awarding 5 points for this. • Pedestrian Improvements. By having a site and building design that allows for exceptional and accessible pedestrian and/or bicycle access through and/or around the site. (5 points possible) The Planning Commission recommended awarding 2 points for this. • Plaza. The development shall include some form of plaza or public square that is wholly or partly enclosed by a building or buildings. Plazas that are landscaped or paved open areas shall have a minimum area of not less than 1,000 square feet. (5 points possible) The Planning Commission recommended awarding 5 points for this. • Enhanced Landscaping. The Code requires “a landscaping plan of exceptional design that has a variety of native tree, shrub and plan types that provide seasonal interest and that exceeds the requirements of the Lake Elmo Design Standards Manual.” (5 points possible) The Planning Commission recommended awarding 3 points for this. • Enhanced Storm Water Management. The plans are to “provide capacity for infiltrating stormwater generated onsite with artful rain garden design that serves as a visible amenity. Rain garden designs shall be visually compatible with the form and function of the space and shall include long-term maintenance of the design.” (3 points possible). The Planning Commission recommended awarding 3 points for this. 11 • Theming. Significant use of various elements of Theming consistent with the 2013 Lake Elmo Theming Project, including but not limited to signage, fencing, landscaping, lighting and site furnishings. (3 points possible). The Planning Commission recommended awarding 3 points for this. • Additional Amenities? Additionally, the City may also consider the allotment of amenity “points” for site amenities that are not otherwise specified within the ordinance. Based on the above-list, the Planning Commission is recommending that the City award a total of 36 amenity points for the design elements the applicant has included with this proposal. However, the maximum number of points the City may award in this case is 20. I have attached a narrative from the applicant explaining site density, each of the proposed amenities and the points the applicant believes the City should award for each of these project elements for your consideration. They are proposing amenities with a maximum total of 46 potential amenity points. According the City Code, “Increases in density will be awarded through a 1:1 ration with amenity points. For every increase in amenity points, the applicant will be allowed an equivalent amount of density increase, up to a maximum increase of 20 percent.” Or put another way, 5 amenity points equals a 5 percent increase in density, 10 amenity points equals a density increase of 10 percent, etc. (each amenity point equals a density increase of one percent). To have 60 units on the 5 net acre site (12 units per net acre), the City would need to approve enough amenity points to increase the allowed density an additional 2 units an acre (12 – 10 = 2 units per acre). 2.00 divided by 10 equals 0.20 (a 20 percent increase) above the 10 units per acre now allowed by the City. This means the development needs a total of 20 amenity points to meet their density of 60 units. Without any amenity points for increased density, the applicant would need to reduce the number of dwelling units in the development to a maximum of 50 units – a reduction in 10 units from the 60 units they are proposing. In summary, the City Council should consider what design elements in the development from the list above should receive amenity points (and how many points for each). Parkland Dedication. The proposed development does not propose a public park but does provide recreation for its residents through the gardens, play areas and open space. Staff would not recommend a park land dedication with this proposal. The current City Code standard for park dedication for developments in the VMX zoning district is a fee of $4,500 per acre. At $4,500 an acre, the park dedication fee for this 5 acre site will be $22,500. The City will require the developer to pay this fee before issuing a grading or building permit for the site. Easements. The City will require the applicant to dedicate 10-foot-wide drainage and utility easements along all property lines and drainage and utility easements for watermains and fire hydrants as they will become public infrastructure. The City also may require other easements as the applicant refines their project plans – especially around the elements of the stormwater management system. Watering Ban. Due to a shortage of water, the City may need to implement severe watering restrictions in the City in the future. This could include limiting or prohibiting the use water outside including for vehicle washing and for watering grass and landscaping. This could affect future home builders, buyers and renters as there may be a limited supply of water available for outdoor uses. It may be wise for the City to put a condition on this plat to require the owner/developer to inform the renters of the units about the possible outdoor watering restrictions. 12 Recommended Findings. Staff recommends approval of the Preliminary Plat and Preliminary PUD Plan for the proposed Lake Elmo Senior Living development as proposed by Ayers Associates based on the following findings: 1. That the Preliminary PUD Plan meets the general intent of the Village Mixed Use Land Use designation in the Comprehensive Plan and the Village Mixed Use zoning district with PUD modifications. 2. That the Preliminary PUD Plan generally complies with the City’s Subdivision regulations. 3. That the Preliminary PUD Plan is generally consistent with the City’s engineering standards with exceptions as noted in the City Engineer’s memorandum dated October 10, 2019. 4. The Preliminary PUD Plan meets the minimum requirement for a PUD including minimum lot area, open space and street layout. 5. The Preliminary PUD Plan meets more than one of the required PUD objectives identified in Section 154.751 including providing: innovation in land development techniques that may be more suitable for a given parcel than conventional approaches; provision of a more adequate, usable, and suitably located open space, recreational amenities and other public facilities than would otherwise be provided under conventional land development techniques; accommodation of housing of all types with convenient access to employment opportunities and/or commercial facilities; and especially to create additional opportunities for senior and affordable housing; coordination of architectural styles and building forms to achieve greater compatibility within the development and surrounding land uses; and higher standards of site and building design than would otherwise be provided under conventional land development technique. 6. That the preliminary PUD Plan includes several amenities that may be worthy of amenity points to increase the overall housing density in the development. These amenities include: Underground or structure parking, contained parking, pedestrian improvements, a plaza (gathering area), increased landscaping and the use of design elements consistent with the 2013 Lake Elmo Branding and Theming Project. Recommended Conditions of Approval. Staff and the Planning Commission recommend to the City Council approval of the Preliminary PUD Plans for the Lake Elmo Senior Living Development as proposed by Ayers Associates (to be located on the north side of 39th Street) with the following conditions: 1. That the applicant prepare any future final plat and final PUD plans showing all of the site perimeter property lines - including any revisions for any additional right-of-way or easements that may be needed for 39th Street or around the perimeter of the property. 2. That the future final plat and final PUD Plans submittal identify all requests for flexibility from the Zoning Code. 3. That the applicant address all comments in the City Engineer’s Memorandum dated October 10, 2019 with the future final plat and final PUD Plans submittal. These include having only one driveway for the site and managing all storm water on the site. 4. That the final Plat and final PUD Plans submittal include an updated tree inventory and tree preservation/replanting and landscape and screening plans that address all comments in the City’s Landscape Architect’s memo dated October 2, 2019. All revised and final landscape plans shall be reviewed and approved by the City’s Landscape Architect. All tree planting must outside of the front, side and rear drainage and utility easements. 5. That the final Plat and final PUD Plans submittal include accurate open space and impervious surface calculations. 13 6. That the developer provide the City fees in lieu of park land dedication as required by the City Code. 7. That the final plat and final PUD Plans submittal include detailed architectural plans for all the proposed buildings. 8. The applicant receive a permit from the Valley Branch Watershed District for the construction of the proposed development. 9. All storm water facilities internal to the site shall be privately owned and maintained. A storm water maintenance and easement agreement in a form acceptable to the City shall be executed and recorded with the final plat for all 100-year high water level areas and to protect all overland emergency flow paths. 10. The Preliminary Plat/Preliminary PUD approval is conditioned upon the applicant meeting all City standards and design requirements unless specifically addressed otherwise in these conditions. 11. That the PUD overlay zoning allow for the following: a. Setbacks: Lake Elmo Senior Living (39th Street) Minimum Building Setbacks Front (39th Street). 20 ft. Interior Side 20 ft. Rear (north property line) 50 ft. b. Attached Garages: That each of the attached garages for the patio homes shall not exceed 1,000 sq. ft. in area. 12. The Final Plat/Final PUD shall include all necessary public right-of-way and easements for 39th Street North. 13. The Final Plat/Final PUD submittal must include a complete storm water management plan and construction plans that provide all design details for the proposed underground storage systems including details regarding building roof drainage connections. 14. That the applicant shall obtain all necessary permits including but not limited to all applicable City permits (building, grading, sign, etc.), NPDES/SWPPP permits and Valley Branch Watershed District approval before starting any grading or construction activities. 15. That the Final Plat/Final PUD include Valley Branch Watershed District preliminary review comments and that the applicant provide the City evidence that all conditions attached to a Valley Branch Watershed District permit will be met before the starting any grading activity on the site. 16. If necessary, the applicant shall provide the City with a copy of written permission for any off-site grading work and storm sewer discharges to adjacent properties before starting any site work, grading and as part of any final plat or final PUD application. 17. That the applicant or developer address all the comments of the Fire Chief and the Building Official with the final PUD, site and building plans including the placement of buildings and fire hydrants, street and driveway design, parking and emergency vehicle access within the site. 18. That the applicant revise the project plans to show watermain easements and effective maintenance areas with a minimum width of 30 feet with a minimum of 15 feet of clearance from the pipe centerline and easement agreements are included with the final plat and PUD application and plans. 14 19. That there shall be no encroachments into drainage and utility easements and corridors other than those reviewed and approved by the City Engineer and upon execution of an easement encroachment agreement. Prohibited encroachments include, but are not limited to trees, landscaping, fences, retaining walls and buildings. 20. That the developer prepare exhibits for City staff approval that clearly identifies the property lines, easements, proposed locations of retaining walls and fences and the required and proposed setbacks for each building site within the development. 21. The Applicant(s) or developer shall submit a photometric plan for the development for staff review and approval. All lighting must meet the requirements of Sections 150.035-150.038 of the City Code. 22. Before to the installation or construction of any subdivision identification signs or neighborhood markers within the development, the developer shall submit sign plans to the City for review and obtain a sign permit from the City. 23. That the applicant provide the City a detailed construction and staging plan with the construction plans and final plat for the development. These plans are to clearly indicate the phasing of the site grading, the phasing of the construction of each public infrastructure component (trails and sidewalks) and shall address access to that phase of the development for construction purposes and for residents. The City may require temporary cul-de-sacs or turn-arounds at the end the private driveways. 24. Before the execution and recording of a final plat for the development, the developer or applicant shall enter into a Developer’s Agreement or a Site Work Agreement with the City. Such an Agreement must be approved by the City Attorney and by the City Council. The Agreement shall delineate who is responsible for the design, construction and payment for the required improvements with financial guarantees therefore. 25. The applicant or developer shall enter into a separate grading agreement with the City before starting any grading activity in advance of final plat of PUD approval. The City Engineer shall review any grading plan that is submitted in advance of a final plat or final PUD, and said plan shall document extent of any proposed grading on the site. 26. That the maximum density shall not exceed 10 dwelling units per net acre unless the City Council approves specific project design elements and amenity points that increase the allowed density for the proposal. 27. That the applicant/owner notify all renters that the City may impose restrictions or limits on outdoor water use including no vehicle washing and no watering of grass, sod or landscaping. 28. That the applicant shall submit revised preliminary plat and project plans meeting all conditions of approval for City review and approval. The revised applicant/developer project plans shall meet all of the above conditions before the City will accept a final plat or Final PUD application the development and before the start of any clearing or grading activity on the site. 29. That the City’s preliminary plat/preliminary PUD approval is good for one year from the date of City Council action, unless the applicant requests and the City Council approves a time extension. FISCAL IMPACT: There would be no fiscal impact to the City at this time. The Concept Plan approval did not afford the applicant development rights. When the property develops, it will access the existing urban services and will pay sewer and water connection charges, building permit fees and the like that the developer and/or contractors will pay. RECOMMENDATION: Staff and the Planning Commission recommend City Council approval of the proposed preliminary PUD Plan for the Lake Elmo Senior Living development as proposed by Ayers Associates to be located on 39th Street North with the following motion and recommended conditions of approval. 15 “Motion to adopt Resolution 2019 – 083 for the approval of the preliminary PUD Plan as requested by Matt Frisbee (Ayers Associates) for PID# 13.029.21.22.0013 for the project to be known as Lake Elmo Senior Living located on the north side of 39th Street North, east of Arbor Glen, subject to recommended conditions of approval as listed in the staff report.” ATTACHMENTS: • Zoning Map • Address Map • Aerial Photo • Preliminary PUD Site Plan • Project Plans (14 pages) • Apartment Bldg – Floor Plans and Elevations (12 pages) • Patio Home Plans • Applicant’s Project Summary dated September 16, 2019 (2 pages) • Applicant’s Site Calculation Information Sheet dated 9-13-19 • Applicant’s PUD Density and Amenity Points Narrative • City Engineer review memo dated October 10, 2019 (3 pages) • Landscape Architect’s review memo dated October 2, 2019 (8 pages) • Traffic Study dated August 30, 2019 (3 pages) • Combined Overall Site Plans • Neighbor e-mail comments dated 10-6-2019 • Resolution 2019 - 083 Preliminary Plat/Preliminary PUD approval CP 1 CP 2 CP 3 CP 4 BM 1002 BM 1003 1036 1044 1091 1115 WV SAN MH 1166 SAN MH 1177 WV STM MH 1182 WV STM MH 1186 3" 2" 3" 3" ETRAN ETRAN2" WVBM 1242 2" 1254 2" CLUSTER 2" 2" 3" 8" CLUSTER X108" CLUSTER X8 6" CLUSTER X46" CLUSTER X6 IP1/2" RB 4"4"16"16" 4" CLUSTER X4 4" CLUSTER X4 5" 10" 2" CLUSTER X6 8" CLUSTER X6 4"4"4" 4"4"18"18"18"18"18"18"18"18"18"20"18"12"18" 16" 18"18" 18"12"14"24"16" 5"5"8"8"5"5" 8" X4 4"8"6" CLUSTER X84" 4" SAN MH 1366 IP MH IPIP 6" CLUSTER X4 30" 4" CLUSTER X4 4" 4" CLUSTER X4 8" 6"8" 4" CLUSTER X8 4" 4" CLUSTER X8 8" 6" CLUSTER X4 10" CLUSTER X4 9" 6" 22" 6" 8" 24" 6" CLUSTER X46" CLUSTER X6 22" 7" CLUSTER X64" CLUSTER X4 6" CLUSTER X4 8" CLUSTER X88"6" 4" 3" 4" 6"3"4" 4" 6" E E E E SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN STM STM STM STM STM STM STM STM STM STM STM W W W W W W W W W W SA N 940 941 940 939 93 8 937 941 940 939938 940 939 94 0 93 9 938 941 9 4 2 94 3 94 2 94 1 CONTROL / BENCHMARK POINT DATA POINT NO. 1 2 3 4 50 1002 1003 1242 FEATURE CP CP CP CP BM BM BM BM NORTHING 194692.279 194631.866 195020.566 194720.443 194598.047 194692.284 194775.492 194938.493 EASTING 487519.037 487970.221 487577.468 487807.817 488011.517 487504.493 487380.480 487500.909 ELEVATION 938.66 935.34 940.54 938.50 937.52 941.50 946.50 945.51 DESCRIPTION 12" NAIL 12" NAIL 12" NAIL 12" NAIL TNH EXISTING SITE LEGEND NO T F O R C O N S T R U C T I O N - PROJECT No: TH E D E S I G N S A N D P L A N S I N D I C A T E D O N T H E D R A W I N G S A R E T H E P R O P E R T Y OF A Y R E S A S S O C I A T E S . A L L R I G H T S A R E R E S E R V E D . N O D E S I G N S O R P L A N S SH A L L B E U S E D O R R E P R O D U C E D I N A N Y F O R M O R B Y A N Y M E A N S W I T H O U T WR I T T E N P E R M I S S I O N O F A Y R E S A S S O C I A T E S . Ea u C l a i r e O f f i c e 34 3 3 O a k w o o d H i l l s P a r k w a y Ea u C l a i r e , W i s c o n s i n 5 4 7 0 1 (7 1 5 ) 8 3 4 - 3 1 6 1 Ri v e r F a l l s O f f i c e 21 5 N . S e c o n d S t r e e t S u i t e 2 0 4 Ri v e r F a l l s , W i s c o n s i n 5 4 0 2 2 (7 1 5 ) 4 2 6 - 4 9 0 8 Fa x : ( 7 1 5 ) 4 2 6 - 5 8 6 6 NE W I N D E P E N D E N T L I V I N G F A C I L I T Y LA K E E L M O I N D E P E N D E N T L I V I N G , L L C LA K E E L M O , M I N N E S O T A PR E L I M I N A R Y - C I T Y S U B M I T T A L P A C K A G E 08-1893.00 09.12.2019 MARK DATE DESCRIPTION NORTH 0 30 60 C100 EXISTING SITE PLAN CP 1 CP 2 CP 3 CP 4 BM 1002 BM 1003 1036 1044 1091 1115 WV SAN MH 1166 SAN MH 1177 WV STM MH 1182 WV STM MH 1186 3" 2" 3" 3" ETRAN ETRAN2" WVBM 1242 2" 1254 2" CLUSTER 2" 2" 3" 8" CLUSTER X108" CLUSTER X8 6" CLUSTER X46" CLUSTER X6 IP1/2" RB 4"4"16"16" 4" CLUSTER X4 4" CLUSTER X4 5" 10" 2" CLUSTER X6 8" CLUSTER X6 4"4"4" 4"4"18"18"18"18"18"18"18"18"18"20"18"12"18" 16" 18"18" 18"12"14"24"16" 5"5"8"8"5"5" 8" X4 4"8"6" CLUSTER X84" 4" SAN MH 1366 IP MH IPIP 6" CLUSTER X4 30" 4" CLUSTER X4 4" 4" CLUSTER X4 8" 6"8" 4" CLUSTER X8 4" 4" CLUSTER X8 8" 6" CLUSTER X4 10" CLUSTER X4 9" 6" 22" 6" 8" 24" 6" CLUSTER X46" CLUSTER X6 22" 7" CLUSTER X64" CLUSTER X4 6" CLUSTER X4 8" CLUSTER X88"6" 4" 3" 4" 6"3"4" 4" 6" E E E E SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN STM STM STM STM STM STM STM STM STM STM STM W W W W W W W W W W SA N 940 941 940 939 93 8 937 941 940 939938 940 939 94 0 93 9 938 941 9 4 2 94 3 94 2 94 1 1 2 SITE DEMOLITION LEGEND REMOVE EXISTING ASPHALT REMOVE CURB AND GUTTER TO NEAREST JOINT DEMOLITION NOTES CLEAR AND GRUB TREE SAWCUT REMOVE GRASS AND TOPSOIL PROTECTION NOTES PROTECT ALL UNDERGROUND UTILITIES AND UTILITY STRUCTURES THAT ARE NOT SHOWN AS REMOVED OR ABANDONED IN PLACE PROTECT ALL REMAINING TREES. EQUIPMENT AND MATERIALS SHALL NOT BE STORED WITHIN DRIP LINES OF REMAINING TREES 1 2 PROTECT CONCRETE TRANSFORMER PAD PROTECT STORM MANHOLE A. CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVAL OF THE EXISTING STRUCTURES, RELATED UTILITIES, PAVING, UNDERGROUND RETENTION AND INFILTRATION NETWORK AND ANY OTHER EXISTING IMPROVEMENTS AS NOTED: SEE SITE WORK SPECIFICATIONS. B. CONTRACTOR IS TO REMOVE AND DISPOSE OF ALL DEBRIS, RUBBISH AND OTHER MATERIALS RESULTING FROM PREVIOUS AND CURRENT DEMOLITION OPERATIONS. DISPOSAL WILL BE IN ACCORDANCE WITH ALL LOCAL, STATE, AND/OR FEDERAL REGULATIONS GOVERNING SUCH OPERATIONS. C. THE GENERAL CONTRACTOR SHALL TAKE ALL PRECAUTIONS NECESSARY TO AVOID PROPERTY DAMAGE TO ADJACENT PROPERTIES DURING THE CONSTRUCTION PHASES OF THIS PROJECT. THE CONTRACTOR WILL BE HELD SOLELY RESPONSIBLE FOR ANY DAMAGES TO THE ADJACENT PROPERTIES OCCURRING DURING THE CONSTRUCTION PHASES OF THIS PROJECT. D. ENGINEERS NOTICE TO CONTRACTOR THE CONTRACTOR IS SPECIFICALLY CAUTIONED THAT THE LOCATION AND/OR ELEVATION OF EXISTING UTILITIES AS SHOWN ON THESE PLANS IS BASED ON RECORDS OF THE VARIOUS UTILITY COMPANIES, AND WHERE POSSIBLE, MEASUREMENTS TAKEN IN THE FIELD. THE INFORMATION IS NOT TO BE RELIED ON AS BEING EXACT OR COMPLETE. THE CONTRACTOR MUST CALL THE APPROPRIATE UTILITY COMPANY AT LEAST 48 HOURS BEFORE ANY EXCAVATION TO REQUEST EXACT FIELD LOCATION OF UTILITIES. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE ALL EXISTING UTILITIES WHICH CONFLICT WITH THE PROPOSED IMPROVEMENTS SHOWN ON THE PLANS. E. ALL PAVEMENT REMOVALS WITHIN PUBLIC RIGHT OF WAY SHALL BE REPLACED IN-KIND AND REMOVALS SHALL BE ACCOMPANIED BY A FULL DEPTH SAW CUT AND MILLED BITUMINOUS STEP JOINT PER CITY OF LAKE ELMO STANDARD DETAILS. F. ALL EXISTING TREES TO BE PROTECTED PER TREE PROTECTION DETAIL. G. SAWCUTS SHALL BE FULL PAVEMENT DEPTH INSTALL CONSTRUCTION FENCING TO PROTECT TREES NO T F O R C O N S T R U C T I O N - PROJECT No: TH E D E S I G N S A N D P L A N S I N D I C A T E D O N T H E D R A W I N G S A R E T H E P R O P E R T Y OF A Y R E S A S S O C I A T E S . A L L R I G H T S A R E R E S E R V E D . N O D E S I G N S O R P L A N S SH A L L B E U S E D O R R E P R O D U C E D I N A N Y F O R M O R B Y A N Y M E A N S W I T H O U T WR I T T E N P E R M I S S I O N O F A Y R E S A S S O C I A T E S . Ea u C l a i r e O f f i c e 34 3 3 O a k w o o d H i l l s P a r k w a y Ea u C l a i r e , W i s c o n s i n 5 4 7 0 1 (7 1 5 ) 8 3 4 - 3 1 6 1 Ri v e r F a l l s O f f i c e 21 5 N . S e c o n d S t r e e t S u i t e 2 0 4 Ri v e r F a l l s , W i s c o n s i n 5 4 0 2 2 (7 1 5 ) 4 2 6 - 4 9 0 8 Fa x : ( 7 1 5 ) 4 2 6 - 5 8 6 6 NE W I N D E P E N D E N T L I V I N G F A C I L I T Y LA K E E L M O I N D E P E N D E N T L I V I N G , L L C LA K E E L M O , M I N N E S O T A PR E L I M I N A R Y - C I T Y S U B M I T T A L P A C K A G E 08-1893.00 09.12.2019 MARK DATE DESCRIPTION NORTH 0 30 60 C200 SITE DEMOLITION PLAN 1036 1044 1091 1115 WV SAN MH 1166 SAN MH 1177 WV STM MH 1182 WV STM MH 1186 WV 1254 IP1/2" RB SAN MH 1366 IP MH IPIP 35' 33 ' 15 ' 25 ' 20 ' 15 ' 15 ' 15 ' 35' 24 ' 10 ' 13 ' 24'166'24' 55 ' 18 ' 24 ' 18 ' 32'32' 25' (TYP) SS HSHS CW CW FL FL 9' TYPPAVEMENT MARKING 4" WHITE (TYP STALLS) ADA PAVEMENT MARKING, SEE DTL 5/C805 PAVEMENT MARKING 4" WHITE (TYP STALLS) 20 ' T Y P 8' CROSSWALK PAVEMENT MARKING SEE DTL 6/C805 4' T Y P 6' 6' 6' 5' 42 ' 62 ' 8'66'9.34'8'45.66' 39 . 1 7 ' 6' 76 ' 31 . 1 7 ' 31 ' 8' (TYP) 5' (TYP UNO) NP CROSSWALK PAVEMENT MARKING SEE DTL 6/C805 NP NP NP NP PLAYGROUND PERGOLA SITE LAYOUT LEGEND 10'H CHAIN LINK FENCE, SEE DTLS 1/C804 & 2/C804 CROSSWALK SIGNS, SEE DTL 4/C805 STANDARD PLAN NOTES 1.STREET LIGHTING SHALL BE INSTALLED PER CITY STANDARDS 5 FEET BACK OF CURB IN LOCATIONS SHOWN ON PLAN. 2.ALL SIGNS MUST MEET MMUTCD. 3.ALL SIGN SHEATHING TO BE TYPE IX DIAMOND GRADE (DG3). 4.SIGN POSTS TO BE SQUARE TUBE SIGN STANDARD WITH OMNI BASE. 5.DEVELOPER TO FURNISH AND INSTALL STREET SIGNS PER CITY STANDARDS. 6.POLY PREFORMED PAVEMENT MATERIAL SHALL BE USED FOR ALL PAVEMENT SYMBOLS. 7.EPOXY RESIN AND DROP-ON-GLASS BEADS FOR PAVEMENT MARKINGS SHALL MEET THE REQUIREMENTS OF MnDOT "SPECIFICATIONS FOR CONSTRUCTION, 2018 EDITION". CW STOP SIGN, SEE DTL 1/C805 SS NO PARKING / FIRE LANE SIGN, SEE DTL 3/C805 FL HANDICAPPED PARKING SIGN, SEE DTL 2/C805 HS PED LIGHT BOLLARD, SEE ELECTRICAL PLANS LIGHT POLES TO MATCH PHASE 1, SEE ELECTRICAL PLANS NO PARKING SIGN, SEE DTL 7/C805 NP NO T F O R C O N S T R U C T I O N - PROJECT No: TH E D E S I G N S A N D P L A N S I N D I C A T E D O N T H E D R A W I N G S A R E T H E P R O P E R T Y OF A Y R E S A S S O C I A T E S . A L L R I G H T S A R E R E S E R V E D . N O D E S I G N S O R P L A N S SH A L L B E U S E D O R R E P R O D U C E D I N A N Y F O R M O R B Y A N Y M E A N S W I T H O U T WR I T T E N P E R M I S S I O N O F A Y R E S A S S O C I A T E S . Ea u C l a i r e O f f i c e 34 3 3 O a k w o o d H i l l s P a r k w a y Ea u C l a i r e , W i s c o n s i n 5 4 7 0 1 (7 1 5 ) 8 3 4 - 3 1 6 1 Ri v e r F a l l s O f f i c e 21 5 N . S e c o n d S t r e e t S u i t e 2 0 4 Ri v e r F a l l s , W i s c o n s i n 5 4 0 2 2 (7 1 5 ) 4 2 6 - 4 9 0 8 Fa x : ( 7 1 5 ) 4 2 6 - 5 8 6 6 NE W I N D E P E N D E N T L I V I N G F A C I L I T Y LA K E E L M O I N D E P E N D E N T L I V I N G , L L C LA K E E L M O , M I N N E S O T A PR E L I M I N A R Y - C I T Y S U B M I T T A L P A C K A G E 08-1893.00 09.12.2019 MARK DATE DESCRIPTION NORTH 0 30 60 C300 SITE PLAN LAYOUTPARKING DATA SITE APARTMENTS TWIN HOMES TOTAL REQUIRED STANDARD PARKING (9'X18')33 40 42 115 ACCESSIBLE PARKING (9'X18')2 2 4 1036 1044 1091 1115 WV SAN MH 1166 SAN MH 1177 WV STM MH 1182 WV STM MH 1186 WV 1254 IP1/2" RB SAN MH 1366 IP MH IPIP E E E E SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN STM STM STM STM STM STM STM STM STM STM STM W W W W W W W W W W SA N 9.6:1 1. 2 0 % 1. 2 0 % 0. 7 5 % 0. 7 5 % 1. 5 0 % 1.25%1.33% 6. 6 : 1 4 . 5 : 1 1.00% 10 . 5 2 % 4.9:1 3.5:1 5.8:1 FFE: 942.00' FFE: 942.00' FFE: 940.75' FFE: 939.50' FFE: 939.00' FFE: 939.75' FFE: 940.50' FFE: 941.50' FFE: 942.00' 1.05%0.94%1.62% 0. 5 0 % 94 0 9 4 0 937 9 3 8 9 3 9 940 9 3 7 93 7 93 8 93 9 9 4 1 941 940 2.00%2.00%2.00% 2. 0 0 % 2.06% 0.74%1.29 % 4.7:1 3. 0 : 1 3.0:1 9.5:1 7.6:1 6 . 4 % 2. 0 0 % 8.1:1 5.9:1 7.4:1 3.0:1 3.0:1 2.06% 2.00%2.00% 0. 5 0 % 2. 0 0 % 941.90 HP 93 9 . 5 0 L P 94 0 . 3 0 H P 93 7 . 9 0 L P 93 8 . 7 0 H P 94 0 . 4 1 H P OVERLAND EMERGENCY OVERFLOW 936.92 937.15 LP 940.78 HP OVERLAND EMERGENCY OVERFLOW 938.89 4.0:1 4.0:1 0. 9 0 % 93 9 94 0 93 8 93 6 93 5 93 4 93 7 4.0:1 4.0:1 7. 7 : 1 4. 1 : 1 2. 0 0 % 93 6 93 8 93 7 9 3 7 93 8 93 9 94 0 94 1 936 937 938 938 939 939 936937938 939 93 7 93 8 93 9 94 0 94 0 94 1 94 2 94 2 943 94 3 938 939 940 93 9 941 9 4 2 9 4 3 940 940 938 939 939 941 941 94 1 941 940 939 941 937 938 938 939 941 9 4 0 9 4 1 9 3 8 9 3 9 9 4 2 941 940 940 939 94 2 9 4 1 5.00%941.00943. 6 3 943. 3 8 M E 941.44 1.50% 939.09 939.34 939.45 938.46 938.29 M E 939.61 939.88 940.26 940.53 937.04 937. 5 4 937. 8 9 938. 5 0 938. 8 5 939. 4 7 939. 8 2 940. 4 3 940. 7 4 939.55 939. 5 6 939. 5 2 938. 9 3 939. 3 1 939. 3 4 939. 4 5 937.84 938.35 936. 5 3 M E 936.19 M E OVERLAND EMERGENCY OVERFLOW 940.10 BIORETENTION BASIN W/UNDERDRAIN HWL/100 = 936.86 INFILTRATION BASIN HWL/100 = 939.83 BIORETENTION BASIN W/UNDERDRAIN HWL/100 = 937.23 UNDERGRAOUND STORAGE W/INFILTRATION HWL/100 = 936.70 1 2 SITE GRADING LEGEND SPOT ELEVATION (EDGE OF PAVEMENT UNLESS OTHERWISE NOTED) SURFACE SLOPE NEW CONTOURS 0.6% EXISTING CONTOURS 670 670 669 669 MATCH EXISTING SPOT ELEVATION (EDGE OF PAVEMENT UNLESS OTHERWISE NOTED)920.00 ME 920.00 TOP OF CURB ELEVATION TC 920.00 PROTECTION NOTES PROTECT ALL UNDERGROUND UTILITIES AND UTILITY STRUCTURES THAT ARE NOT SHOWN AS REMOVED OR ABANDONED IN PLACE PROTECT ALL REMAINING TREES. EQUIPMENT AND MATERIALS SHALL NOT BE STORED WITHIN DRIP LINES OF REMAINING TREES 1 2 PROTECT CONCRETE TRANSFORMER PAD PROTECT STORM MANHOLE NO T F O R C O N S T R U C T I O N - PROJECT No: TH E D E S I G N S A N D P L A N S I N D I C A T E D O N T H E D R A W I N G S A R E T H E P R O P E R T Y OF A Y R E S A S S O C I A T E S . A L L R I G H T S A R E R E S E R V E D . N O D E S I G N S O R P L A N S SH A L L B E U S E D O R R E P R O D U C E D I N A N Y F O R M O R B Y A N Y M E A N S W I T H O U T WR I T T E N P E R M I S S I O N O F A Y R E S A S S O C I A T E S . Ea u C l a i r e O f f i c e 34 3 3 O a k w o o d H i l l s P a r k w a y Ea u C l a i r e , W i s c o n s i n 5 4 7 0 1 (7 1 5 ) 8 3 4 - 3 1 6 1 Ri v e r F a l l s O f f i c e 21 5 N . S e c o n d S t r e e t S u i t e 2 0 4 Ri v e r F a l l s , W i s c o n s i n 5 4 0 2 2 (7 1 5 ) 4 2 6 - 4 9 0 8 Fa x : ( 7 1 5 ) 4 2 6 - 5 8 6 6 NE W I N D E P E N D E N T L I V I N G F A C I L I T Y LA K E E L M O I N D E P E N D E N T L I V I N G , L L C LA K E E L M O , M I N N E S O T A PR E L I M I N A R Y - C I T Y S U B M I T T A L P A C K A G E 08-1893.00 09.12.2019 MARK DATE DESCRIPTION NORTH 0 30 60 C400 SITE GRADING PLAN 1036 1044 1091 1115 WV SAN MH 1166 SAN MH 1177 WV STM MH 1182 WV STM MH 1186 ETRAN ETRAN WV 1254 IP1/2" RB SAN MH 1366 IP MH IPIP E E E E SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN STM STM STM STM STM STM STM STM STM STM STM W W W W W W W W W W SA N W W W W SA N SA N SA N W W W W W SA N SA N SA N SA N SA N SAN MH SAN SAN W W W SUBSURFACE INFILTRATION SYSTEM (50'x85') SUBSURFACE INFILTRATION SYSTEM (70'x50') DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDS DS W W W S15 S12 S13 S14 S11 S17 S10 S09 AEW1 S08 S06 S07 AEW2 S04 S03 S05 S01 S02 S26 141' - 1 2 " S S @ 0 . 4 0 % 152' - 15" SS @ 0.24% 143' - 15" SS @ 0.10% 46' - 12" SS @ 0.40% 82 ' - 1 5 " S S @ 0 . 2 3 % 58' - 15" SS @ 0.23% 129' - 12" SS @ 0.40% 7 0 ' - 1 2 " S S @ 0 . 4 0 % 108' - 12" SS @ 0.40% 56' - 12" SS @ 5.22% 10' - 12" SS @ 0.40% 52' - 12" SS @ 0.40% 40' - 12" SS @ 1.15% 96' - 12" S S @ 0 . 4 0 % 55' - 15" SS @ 0.23% 18 7 ' - 1 5 " S S @ 0 . 2 3 % 23' - 12" SS @ 0.40% 35' - 12" SS @ 0.40% 39' - 12" SS @ 0.40% S19 S18 CONNECT TO EXISTING CONNECT TO EXISTING CONNECT TO EXISTING SITE UTILITIES LEGEND GENERAL WATERMAIN NOTES GENERAL SANITARY SEWER NOTES GENERAL STORM SEWER NOTES 1.ALL WATERMAIN AND ACCESSORIES MUST BE CONSTRUCTED IN ACCORDANCE WITH THE CITY OF LAKE ELMO STANDARD SPECIFICATIONS AND DETAILS. 2.MANIPULATION OF EXISTING VALVES SHALL BE PERFORMED ONLY BY CITY PERSONNEL. 3.WATERMAIN SHALL BE DUCTILE IRON PIPE, ENCASED IN POLYETHYLENE, CLASS-52. 4.ALL FITTINGS SHALL COMPLY WITH CEAM SPEC. 2611.2.A.1. ALL FITTINGS SHALL BE DUCTILE IRON PIPE WITH POLYETHYLENE ENCASEMENT. ALL CONNECTIONS SHALL BE INSTALLED UTILIZING COR-BLUE NUTS & BOLTS. 5.USE GATE VALVES FOR ALL APPLICATIONS UP THROUGH 12 INCHES. 6.GATE VALVES SHALL BE RESILIENT WEDGE AMERICAN FLOW CONTROL SERIES 2500 OR APPROVED EQUAL. GATE VALVES MUST COMPLY WITH CEAM SPEC 2611.2.C.2. 7.USE BUTTERFLY VALVES FOR ALL APPLICATIONS GREATER THAN 12 INCHES. 8.BUTTERFLY VALVES SHALL BE MUELLER LINSEAL III, OR APPROVED EQUAL. BUTTERFLY VALVES SHALL COMPLY WITH CEAM SPEC. 2611.2.C3. 9.BOLTS AND NUTS ON ALL VALVES AND HYDRANTS SHALL BE STAINLESS STEEL. 10.ALL HYDRANTS SHALL BE INSTALLED 5.0 FEET BACK OF CURB. 11.HYDRANTS SHALL BE WATEROUS "PACER," MODEL WB-67 OR APPROVED EQUAL, FITTED WITH FH 800 SERIES FLEX STAKE AND PAINTED RED. 12.HYDRANTS SHALL HAVE TWO OUTLET NOZZLES FOR 2-1/2 (I.D.) HOSE CONNECTIONS AND ONE 4" STORZ NOZZLE (MODEL WB-67) AND PENTAGON NUT END CAP. 13.THE CURB STOP SERVICE ASSEMBLY SHALL HAVE A MINIMUM 1-FT ADJUSTMENT RANGE AND SHALL EXTEND 6 INCHES ABOVE FINISHED GRADE FULLY EXTENDED. 14.THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING WATER TO HOMES AND BUSINESSES WHOSE WATER SUPPLY IS DISRUPTED DURING THE COURSE OF THE PROJECT. 1.ALL SANITARY SEWER AND ACCESSORIES MUST BE CONSTRUCTED IN ACCORDANCE WITH THE CITY OF LAKE ELMO STANDARD SPECIFICATIONS AND DETAILS. 2. ALL SANITARY SEWER PVC PIPE SHALL BE INSTALLED ACCORDING TO CITY STANDARD DRAWING 103 "GRANULAR MATERIAL BEDDING METHOD (FOR PVC SANITARY SEWER PIPE). 3.UNLESS NOTED OTHERWISE, ALL SMOOTH WALLED SANITARY SEWER PVC PIPE AND FITTINGS SHALL BE SDR 35 WITH ELASTOMERIC GASKETED JOINTS. 4.ALL SANITARY SEWER SERVICES SHALL BE 4-INCH PVC, SCH. 40. 5.SMOOTH WALLED PVC PIPE AND FITTINGS SHALL CONFORM WITH THE REQUIREMENTS OF ASTM D-3034 FOR THE SIZE, STANDARD DIMENSION RATIO (SDR), AND STRENGTH REQUIREMENTS INDICATED ON THE PLANS, SPECIFICATIONS, AND SPECIAL PROVISIONS. 6.REINFORCED CONCRETE PIPE AND FITTINGS SHALL CONFORM WITH THE REQUIREMENTS OF MnDOT SPEC 3236 (REINFORCED CONCRETE PIPE) FOR THE TYPE, SIZE, AND STRENGTH CLASS SPECIFIED HEREIN. 7.JOINTS OF MANHOLE RISER SECTIONS SHALL BE TONGUE AND GROOVE WITH RUBBER "O" RING JOINTS PROVIDED ON ALL SANITARY SEWER MANHOLES. 8.SANITARY SEWER INLET AND OUTLET PIPES SHALL BE JOINED TO THE MANHOLE WITH A GASKETED, FLEXIBLE, WATERTIGHT CONNECTION TO ALLOW DIFFERENTIAL SETTLEMENT OF THE PIPE AND MANHOLE TO TAKE PLACE. 9.A 1'-0" TO 1'-4" MANHOLE SECTION SHALL BE INSTALLED UNDER THE CONE SECTION TO ALLOW FOR HEIGHT ADJUSTMENT WHENEVER POSSIBLE. 10.ALL SERVICE LINE STUBS MUST HAVE A 2"x2" HARDWOOD MARKER WITH METAL SPIKE RUNNING FROM THE END OF PIPE TO FINISHED GRADE ELEVATION. 11.UPON MAKING A CONNECTION TO AN EXISTING SANITARY SEWER STUB OR MANHOLE, DIRT AND DEBRIS SHALL BE PREVENTED FROM ENTERING THE EXISTING SEWER BY IMMEDIATELY INSTALLING WATERTIGHT PLUGS AS NEEDED IN THE EXISTING MANHOLE. 12.ALL MAINLINE SANITARY SEWER AND SERVICES SHALL HAVE TRACER WIRE PER CITY SPECIFICATIONS AND DETAILS. 1.ALL STORM SEWER AND ACCESSORIES MUST BE CONSTRUCTED IN ACCORDANCE WITH THE CITY OF LAKE ELMO STANDARD SPECIFICATIONS AND DETAILS. 2.REINFORCED CONCRETE PIPE AND FITTINGS SHALL CONFORM WITH THE REQUIREMENTS OF MnDOT SPEC 3236 (REINFORCED CONCRETE PIPE) FOR THE TYPE, SIZE, AND STRENGTH CLASS SPECIFIED HEREIN. 3.PRECAST CONCRETE MANHOLE AND CATCH BASIN SECTIONS SHALL CONFORM TO THE REQUIREMENTS OF ASTM C-477. 4.A 1'-0" TO 1'-4" MANHOLE SECTION SHALL BE INSTALLED UNDER THE CONE SECTION TO ALLOW FOR HEIGHT ADJUSTMENT WHENEVER POSSIBLE.. 5.JOINTS OF MANHOLE RISER SECTIONS SHALL BE TONGUE AND GROOVE WITH RUBBER "O" RING JOINTS PROVIDED ON ALL STORM SEWER MANHOLES.. 6.RIP-RAP SHALL BE HAND-PLACED OVER GEOTEXTILE FABRIC AND CONFORM TO MnDOT SPEC. 3601, CLASS III, OR AS SPECIFIED HEREIN. 7.THE GEOTEXTILE FABRIC USED UNDER RIP-RAP SHALL EXTEND 3 FT UNDER THE APRON. 8.FURNISH & INSTALL TRASH GUARDS ON ALL FLARED END SECTIONS. 9.ALL SILT SHALL BE CLEANED OUT FROM THE RIP-RAP AT THE END OF THE PROJECT. 10.STORM SEWER STRUCTURES WITHIN 10 FT OF WATERMAIN ARE TO HAVE WATER TIGHT CONNECTIONS PER MDH REQUIREMENTS. 11.ALL NEW STORM SEWER PIPE SHALL BE FLUSHED AND TELEVISED PRIOR TO SUBSTANTIAL COMPLETION - SEE SPECIFICATION SECTION 1700 - CLOSEOUT REQUIREMENTS. PROPOSED WATER MAIN, SEE DTLS 207A/C800, 210/C800, 201/C800, & 206/C800 PROPOSED SANITARY SEWER, SEE DTLS 1/C803, & 2/C803 PROPOSED STORM SEWER, SEE DTLS 4/C803, 5/C803, 6/C803, 7/C803, & 8/C803 SAN TRACER WIRE ACCESS BOXT CLEANOUT CL O HYDRANT INSULATION REDUCER GATE VALVE & BOX WTR SERVICE & CURB STOP W BEND CS STM MH INL APRON ENDWALL AND RIP RAP SS AREA INL SAN MH DOWNSPOUTDS PED LIGHT BOLLARD, SEE ELECTRICAL PLANS LIGHT POLES TO MATCH PHASE 1, SEE ELECTRICAL PLANS PROPOSED 4" UNDERDRAIN S 932.93 (15") NE 932.93 (15") S19 INL 2.5-FT CASTING - B RIM 939.76 S 936.11 (12") W 936.11 (12") NE 936.11 (12") S15 INL 2X2.5-FT CASTING - S TC 941.15 E 936.54 (12") NW 936.54 (12") S12 INL 2X2.5-FT CASTING - S TC 940.98 SE 936.36 (12") S13 INL 2X2.5-FT CASTING - S TC 940.43 SW 936.32 (12") NW 936.32 (12") E 936.32 (12") S14 INL 2X2.5-FT CASTING - S TC 940.28 SE 936.82 (12") S11 INL 2X2.5-FT CASTING - S TC 939.82 W 936.70 (12") S17 INL 2.5-FT CASTING - B RIM 939.77 W 933.21 (15") S 933.24 (15") N 933.24 (12") S10 INL 2.5-FT CASTING - B RIM 939.44 E 933.79 (15") SW 933.79 (12") S09 INL 2X2.5-FT CASTING - S TC 938.71 S 937.15 SEE DETAIL 7/C803 AEW1, 12" A.E., SEE DETAIL 7/C803 NE 934.35 (12") S08 INL 2.5-FT CASTING - B RIM 938.00 N 933.56 (15") S 933.56 (12") E 933.56 (12") S06 INL 2.5-FT CASTING - B RIM 937.96 N 933.43 (15") S 933.43 (15") W 933.43 (15") S07 INL 2X2.5-FT CASTING - S TC 937.95 N 936.70 AEW2, 12" A.E., SEE DETAIL 7/C803 N 933.74 (12") SE 933.74 (12") SW 933.74 (12") S04 INL 2.5-FT CASTING - B RIM 937.50 NW 933.89 (12") S03 INL 2X3-FT CASTING - H TC 937.02 W 934.07 (12") S05 INL 2.5-FT CASTING - B RIM 937.00 N 933.97 (12") S01 INL 2X3-FT CASTING - H TC 936.39 NE 933.88 (12") S 933.88 (12") S02 INL 2X3-FT CASTING - H TC 935.92 N 932.50 (15") S26 ??? CASTING - ??? RIM 933.73 NEW UTILITY STRUCTURES SW 933.06 (15") E 933.06 (15") S18 INL 2.5-FT CASTING - B RIM 939.83 NO T F O R C O N S T R U C T I O N - PROJECT No: TH E D E S I G N S A N D P L A N S I N D I C A T E D O N T H E D R A W I N G S A R E T H E P R O P E R T Y OF A Y R E S A S S O C I A T E S . A L L R I G H T S A R E R E S E R V E D . N O D E S I G N S O R P L A N S SH A L L B E U S E D O R R E P R O D U C E D I N A N Y F O R M O R B Y A N Y M E A N S W I T H O U T WR I T T E N P E R M I S S I O N O F A Y R E S A S S O C I A T E S . Ea u C l a i r e O f f i c e 34 3 3 O a k w o o d H i l l s P a r k w a y Ea u C l a i r e , W i s c o n s i n 5 4 7 0 1 (7 1 5 ) 8 3 4 - 3 1 6 1 Ri v e r F a l l s O f f i c e 21 5 N . S e c o n d S t r e e t S u i t e 2 0 4 Ri v e r F a l l s , W i s c o n s i n 5 4 0 2 2 (7 1 5 ) 4 2 6 - 4 9 0 8 Fa x : ( 7 1 5 ) 4 2 6 - 5 8 6 6 NE W I N D E P E N D E N T L I V I N G F A C I L I T Y LA K E E L M O I N D E P E N D E N T L I V I N G , L L C LA K E E L M O , M I N N E S O T A PR E L I M I N A R Y - C I T Y S U B M I T T A L P A C K A G E 08-1893.00 09.12.2019 MARK DATE DESCRIPTION NORTH 0 30 60 C500 SITE UTILITIES PLAN 1036 1044 1091 1115 WV SAN MH 1166 SAN MH 1177 WV STM MH 1182 WV STM MH 1186 ETRAN ETRAN WV 1254 IP1/2" RB SAN MH 1366 IP MH IPIP E E E E SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN STM STM STM STM STM STM STM STM STM STM STM W W W W W W W W W W SA N W W W W SA N SA N SA N W W W W W SA N SA N SA N SA N SA N SAN MH SAN SAN W W W 30' 10' CITY OF LAKE ELMO DRAINAGE AND UTILITY EASEMENT DRAINAGE & UTILITY EASEMENT 25 ' VALLEY BRANCH WATERSHED DISTRICT STORM WATER MAINTENANCE EASEMENT 25 ' 30' CITY OF LAKE ELMO DRAINAGE AND UTILITY EASEMENT SUBSURFACE INFILTRATION SYSTEM (50'x85') SUBSURFACE INFILTRATION SYSTEM (70'x50') W W W EASEMENT NOTES A BLANKET EASEMENT FOR STORM WATER MAINTENANCE IS GRANTED TO THE CITY OF LAKE ELMO AND THE VALLEY BRANCH WATERSHED DISTRICT COVERING THE ARBOR GLEN PROPERTY. VALLEY BRANCH WATERSHED DISTRICT STORM WATER MAINTENANCE EASEMENT 10' DRAINAGE AND UTILITY EASEMENT CITY OF LAKE ELMO DRAINAGE AND UTILITY EASEMENT NO T F O R C O N S T R U C T I O N - PROJECT No: TH E D E S I G N S A N D P L A N S I N D I C A T E D O N T H E D R A W I N G S A R E T H E P R O P E R T Y OF A Y R E S A S S O C I A T E S . A L L R I G H T S A R E R E S E R V E D . N O D E S I G N S O R P L A N S SH A L L B E U S E D O R R E P R O D U C E D I N A N Y F O R M O R B Y A N Y M E A N S W I T H O U T WR I T T E N P E R M I S S I O N O F A Y R E S A S S O C I A T E S . Ea u C l a i r e O f f i c e 34 3 3 O a k w o o d H i l l s P a r k w a y Ea u C l a i r e , W i s c o n s i n 5 4 7 0 1 (7 1 5 ) 8 3 4 - 3 1 6 1 Ri v e r F a l l s O f f i c e 21 5 N . S e c o n d S t r e e t S u i t e 2 0 4 Ri v e r F a l l s , W i s c o n s i n 5 4 0 2 2 (7 1 5 ) 4 2 6 - 4 9 0 8 Fa x : ( 7 1 5 ) 4 2 6 - 5 8 6 6 NE W I N D E P E N D E N T L I V I N G F A C I L I T Y LA K E E L M O I N D E P E N D E N T L I V I N G , L L C LA K E E L M O , M I N N E S O T A PR E L I M I N A R Y - C I T Y S U B M I T T A L P A C K A G E 08-1893.00 09.12.2019 MARK DATE DESCRIPTION NORTH 0 30 60 C501 SITE EASEMENTS 1036 1044 1091 1115 WV SAN MH 1166 SAN MH 1177 WV STM MH 1182 WV STM MH 1186 WV 1254 IP1/2" RB SAN MH 1366 IP MH IPIP SITE MATERIALS LEGEND ASPHALT PAVEMENT, SEE DTL 4/C801 ASPHALT SPORTS SURFACE, SEE DTL 4/C804 LIGHT DUTY CONCRETE, SEE DTLS 5/C801 & 5/C802 HEAVY DUTY CONCRETE, SEE DTL 5/C801 GRASS NATIVE SEED MIX MATERIALS NOTES: COORDINATE WITH LANDSCAPE PLAN IRRIGATED SOD WOODCHIPS CRUSHED LIMESTONE NO T F O R C O N S T R U C T I O N - PROJECT No: TH E D E S I G N S A N D P L A N S I N D I C A T E D O N T H E D R A W I N G S A R E T H E P R O P E R T Y OF A Y R E S A S S O C I A T E S . A L L R I G H T S A R E R E S E R V E D . N O D E S I G N S O R P L A N S SH A L L B E U S E D O R R E P R O D U C E D I N A N Y F O R M O R B Y A N Y M E A N S W I T H O U T WR I T T E N P E R M I S S I O N O F A Y R E S A S S O C I A T E S . Ea u C l a i r e O f f i c e 34 3 3 O a k w o o d H i l l s P a r k w a y Ea u C l a i r e , W i s c o n s i n 5 4 7 0 1 (7 1 5 ) 8 3 4 - 3 1 6 1 Ri v e r F a l l s O f f i c e 21 5 N . S e c o n d S t r e e t S u i t e 2 0 4 Ri v e r F a l l s , W i s c o n s i n 5 4 0 2 2 (7 1 5 ) 4 2 6 - 4 9 0 8 Fa x : ( 7 1 5 ) 4 2 6 - 5 8 6 6 NE W I N D E P E N D E N T L I V I N G F A C I L I T Y LA K E E L M O I N D E P E N D E N T L I V I N G , L L C LA K E E L M O , M I N N E S O T A PR E L I M I N A R Y - C I T Y S U B M I T T A L P A C K A G E 08-1893.00 09.12.2019 MARK DATE DESCRIPTION NORTH 0 30 60 C600 SITE MATERIALS PLAN 1036 1044 1091 1115 WV SAN MH 1166 SAN MH 1177 WV STM MH 1182 WV STM MH 1186 WV 1254 IP1/2" RB SAN MH 1366 IP MH IPIP SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SFSF SF SF SF SF EROSION CONTROL LEGEND GRADING & EROSION CONTROL NOTES 1.THE CONTRACTOR SHALL CONDUCT OPERATIONS AND IMPLEMENT MINNESOTA POLLUTION CONTROL AGENCY (MPCA) BEST MANAGEMENT PRACTICES (BMP) TO CONTROL SITE SILTATION AND EROSION INTO DRAINAGE WAYS. THE CONTRACTOR SHALL COMPLY WITH ALL CONDITIONS AND COMPLETION DATES RELATIVE TO ALL PERMITS ISSUED FOR THE WORK TO BE COMPLETED. THE ENGINEER MAY ISSUE A STOP WORK ORDER FOR ALL DEVELOPMENT WORK AND BUILDING CONSTRUCTION FOR NONCOMPLIANCE WITH THESE MEASURES. 2.SEQUENCING. ALL SILT FENCE AND OTHER EROSION CONTROL MEASURES SHALL BE IN PLACE AND APPROVED BY ENGINEER PRIOR TO ANY REMOVALS, EXCAVATION OR CONSTRUCTION AND SHALL BE MAINTAINED UNTIL VIABLE TURF OR GROUND COVER HAS BEEN ESTABLISHED AND APPROVED BY THE ENGINEER. 3.SILT FENCE. THE CONTRACTOR SHALL INSTALL SILT FENCE AT THE LOCATIONS SHOWN ON THE PLANS AND IN ACCORDANCE WITH THE CITY STANDARD DETAILS. SILT FENCE DAMS AND INTERIM SUMPS SHALL BE PLACED TO INTERCEPT SILT FROM CONCENTRATED RUNOFF FROM OPEN GRADED AREAS. ADDITIONAL SILT FENCE SHALL BE REQUIRED AS DIRECTED BY THE ENGINEER. 4.STOCKPILES. ALL STOCKPILE AREAS SHALL HAVE SILT FENCE OR SEDIMENT TRAPPING SYSTEMS PLACED AROUND THE ENTIRE PERIMETER. 5.INLET PROTECTION. THE CONTRACTOR SHALL INSTALL INLET PROTECTION ON ALL EXISTING STORM SEWER INLETS IN ACCORDANCE WITH THE CITY STANDARD DETAILS. INLET PROTECTION SHALL ALSO BE PROVIDED ON ALL PROPOSED STORM SEWER INLETS IMMEDIATELY FOLLOWING CONSTRUCTION OF THE INLET. INLET PROTECTION MUST BE INSTALLED IN A MANNER THAT WILL NOT IMPOUND WATER FOR EXTENDED PERIODS OF TIME OR IN A MANNER THAT PRESENTS A HAZARD TO VEHICULAR OR PEDESTRIAN TRAFFIC. 6.TEMPORARY SEDIMENT BASINS. THE CONTRACTOR SHALL INCORPORATE TEMPORARY SEDIMENT BASINS THROUGHOUT THE CONSTRUCTION SITE TO CAPTURE RUNOFF AND SLOW THE FLOW OF WATER AND ALLOW SEDIMENT TO SETTLE OUT. TEMPORARY SEDIMENT BASINS SHALL BE INSTALLED AS DIRECTED BY THE CITY ENGINEER. 7.ROCK CONSTRUCTION ENTRANCE. A ROCK ENTRANCE SHALL BE CONSTRUCTED AND MAINTAINED AS SHOWN ON THE PLAN TO REDUCE TRACKING OF SILT AND DIRT ONTO THE PUBLIC STREETS. A GEOTEXTILE FABRIC SHALL BE PLACED UNDERNEATH THE ROCK. THE ROCK SHALL BE PERIODICALLY REPLENISHED TO MAINTAIN THE INTENDED PERFORMANCE. MUD AND DEBRIS SHALL BE REMOVED OR SCRAPED FROM TIRES AND VEHICLE UNDERCARRIAGE PRIOR TO LEAVING THE SITE. 8.STREET SWEEPING. ALL STREETS USED FOR ACCESS TO THE SITE AND HAUL ROUTES USED FOR CONSTRUCTION EQUIPMENT AND MATERIAL SUPPLIES SHALL BE CLEANED AT THE END OF EACH WORKING DAY. THE CITY OR ENGINEER MAY ORDER ADDITIONAL SWEEPING OF THE STREETS AS DEEMED REQUIRED AT DEVELOPER/CONTRACTOR EXPENSE. 9.DEWATERING. EACH EXCAVATION SHALL BE KEPT DRY DURING THE COURSE OF ALL WORK HEREIN, INCLUDING SUBGRADE CORRECTION, PIPE INSTALLATION, STRUCTURE CONSTRUCTION AND BACKFILLING, TO THE EXTENT THAT NO DAMAGE FROM HYDROSTATIC PRESSURE, FLOATATION OR OTHER DAMAGE RESULTS. ALL EXCAVATIONS SHALL BE DEWATERED TO A DEPTH OF AT LEAST 3 INCHES BELOW THE BOTTOM OF THE CONCRETE SLAB OR PIPE TO BE INSTALLED THEREIN. THE CONTRACTOR MAY USE ANY METHOD OR COMBINATION OF METHODS FOR FOR DEWATERING HE CHOOSES; HOWEVER, ALL DEWATERING METHODS AND EQUIPMENT WHICH IN THE OPINION OF THE ENGINEER, ARE INEFFECTIVE SHALL BE ABANDONED, IMPROVED, REPLACED OR OTHERWISE ALTERED TO OBTAIN EFFECTIVE DEWATERING. THE CONTRACTOR SHALL PROVIDE ALL POWER, PUMPS, MATERIALS AND APPARATUS NECESSARY, AND SHALL BE RESPONSIBLE FOR DISPOSING OF THE WATER PUMPED FROM THE EXCAVATION IN A MANNER WHICH WILL NOT INTERFERE WITH OTHER WORK WITHIN THE AREA AND NOT TO DAMAGE PUBLIC OR PRIVATE PROPERTY. THE CONTRACTOR WILL BE HELD RESPONSIBLE FOR THE CONDITION OF ANY PIPE, CONDUIT, DITCH, CHANNEL OR NATURAL WATERCOURSE UTILIZED FOR DRAINAGE PURPOSES, AND ALL EROSION, SEDIMENT OR OTHER ADVERSE RESULTS OF THEIR USE SHALL BE REPAIRED. 10.POSITIVE DRAINAGE AND PROTECTION. THE CONTRACTOR SHALL MAINTAIN POSITIVE DRAINAGE THROUGHOUT THE SITE AT ALL TIMES. LOW POINTS WITHIN AND ALONG ROADWAYS ARE EXPRESSLY PROHIBITED. THE CONTRACTOR SHALL BE RESPONSIBLE FOR TEMPORARY DITCHES, PIPING OR OTHER MEANS TO FACILITATE PROPER DRAINAGE DURING CONSTRUCTION. TO PROTECT PREVIOUSLY GRADED AREAS FROM EROSION, WOOD FIBER BLANKET SHALL BE PLACED IMMEDIATELY ON STEEP SLOPES (1:3 OR GREATER) AND EMBANKMENTS, PERMANENT AND TEMPORARY PONDS, AND OUTLETS AND OVERFLOWS TO PROTECT THE COMPLETED GRADE AND MINIMIZE SILT IN THE RUNOFF. 11.DRAINAGE DITCHES. THE NORMAL WETTED PERIMETER OF ANY TEMPORARY OR PERMANENT DRAINAGE DITCH OR SWALE THAT DRAINS WATER FROM ANY PORTION OF THE CONSTRUCTION SITE, OR DIVERTS WATER AROUND THE SITE, MUST BE STABILIZED WITHIN 200 LINEAL FEET FROM THE PROPERTY EDGE, OR FROM THE POINT OF DISCHARGE INTO ANY SURFACE WATER. STABILIZATION OF THE LAST 200 LINEAL FEET MUST BE COMPLETED WITHIN 24 HOURS AFTER CONNECTING TO A SURFACE WATER. STABILIZATION OF THE REMAINING PORTIONS OF ANY TEMPORARY OR PERMANENT DITCHES OR SWALES MUST BE COMPLETE WITHIN 14 DAYS AFTER CONNECTING TO A SURFACE WATER AND CONSTRUCTION IN THAT PORTION OF THE DITCH HAS TEMPORARILY OR PERMANENTLY CEASED. TEMPORARY OR PERMANENT DITCHES OR SWALES THAT ARE BEING USED AS A SEDIMENT CONTAINMENT SYSTEM (WITH PROPERLY DESIGNED ROCK DITCH CHECKS, BIO ROLLS, SILT DIKES, ETC.) DO NOT NEED TO BE STABILIZED. THESE AREAS MUST BE STABILIZED WITHIN 24 HOURS AFTER NO LONGER BEING USED AS A SEDIMENT CONTAINMENT SYSTEM. 12.TURF ESTABLISHMENT. ALL EXPOSED SOIL AREAS MUST BE STABILIZED AS SOON AS POSSIBLE TO LIMIT SOIL EROSION BUT IN NO CASE LATER THAN 14 DAYS AFTER THE CONSTRUCTION ACTIVITY IN THAT PORTION OF THE SITE HAS TEMPORARILY OR PERMANENTLY CEASED. 13.MAINTENANCE AND INSPECTION. EROSION CONTROL MEASURES SHALL BE MAINTAINED THROUGHOUT THE CONSTRUCTION AND UNTIL SATISFACTORY ESTABLISHMENT OF PERMANENT GROUND COVER IS OBTAINED. ALL EROSION AND SEDIMENTATION CONTROL MEASURES, AND STORMWATER OUTFALLS MUST BE INSPECTED WEEKLY, AND WITHIN 24 HOURS OF THE SITE RECEIVING 0.5 INCHES OF RAIN. REPAIRS MUST BE MADE ON THE SAME DAY OR FOLLOWING DAY OF THE INSPECTION. UNSATISFACTORY CONDITIONS NOT REPAIRED OR CLEANED UP WITHIN 48-HOURS OF NOTIFICATION SHALL RESULT IN A STOP WORK ORDER, AND/OR SAID WORK SHALL BE COMPLETED AT CONTRACTOR'S EXPENSE. 14.REMOVAL. THE CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL TEMPORARY EROSION CONTROL MEASURES, STRUCTURES AND DEVICES ONLY AFTER RECEIVING ENGINEER APPROVAL. ALL DEBRIS, STAKES, AND SILTS ALONG SILT FENCES SHALL BE REMOVED AND DISPOSED OFF SITE. THE CONTRACTOR SHALL HAND RAKE SILTED AREAS ALONG THE FENCE LOCATIONS TO PROVIDE A SMOOTH FINAL GRADE AND SHALL RESTORE THE GROUND SURFACE WITH SEED OR SOD, AS REQUIRED, TO MATCH THE FINISHED GRADE TO THE ADJACENT AREA. 15.FINAL STORM SEWER SYSTEM. AT THE COMPLETION OF THE WORK AND BEFORE THE FINAL WALK THROUGH, THE CONTRACTOR SHALL REMOVE STORM SEWER INLET PROTECTION MEASURES AND THOROUGHLY FLUSH THE STORM SEWER SYSTEM. SEDIMENT AND DEBRIS SHALL BE COMPLETELY REMOVED AND CLEANED AT THE INLETS, OUTLETS, AND DOWNSTREAM OF EACH OUTLET. RIPRAP AND GEOTEXTILE FABRIC MAY REQUIRE REPLACEMENT AS DIRECTED BY THE ENGINEER TO OBTAIN A LIKE NEW INSTALLATION ACCEPTABLE TO THE CITY. 16.DITCH CHECK (BIOROLL BLANKET SYSTEM). BIOROLL AND BLANKET SYSTEMS SHALL BE INSTALLED AS DITCH CHECKS ONLY IN SPECIFIED LOCATIONS AS APPROVED BY THE CITY ENGINEER. BIOROLLS ARE NOT TO BE UTILIZED IN AREAS WHERE VEHICLE AND CONSTRUCTION TRAFFIC OCCUR. 17.FLOTATION SILT CURTAIN. FLOTATION SILT CURTAIN SHALL BE UTILIZED WHEN CONSTRUCTION ACTIVITIES OCCUR DIRECTLY ADJACENT TO LAKES, STREAMS OR WETLANDS IN ORDER TO CONTAIN SEDIMENTS NEAR THE BANKS OF WORKING AREAS. THE INSTALLATION OF FLOTATION SILT CURTAINS WILL BE REQUIRED AS DIRECTED BY THE CITY ENGINEER. 18.CONCRETE WASHOUT ONSITE. ALL LIQUID AND SOLID WASTES GENERATED BY CONCRETE WASHOUT OPERATIONS MUST BE CONTAINED IN A LEAK-PROOF CONTAINMENT FACILITY OR IMPERMEABLE LINER. A COMPACTED CLAY LINER THAT DOES NOT ALLOW WASHOUT LIQUIDS TO ENTER GROUND WATER IS CONSIDERED AN IMPERMEABLE LINER. THE LIQUID AND SOLID WASTES MUST NOT CONTACT THE GROUND, AND THERE MUST NOT BE RUNOFF FROM THE CONCRETE WASHOUT OPERATIONS OR AREAS. LIQUID AND SOLID WASTES MUST BE DISPOSED OF PROPERLY AND IN COMPLIANCE WITH MPCA REGULATIONS. A SIGN MUST BE INSTALLED ADJACENT TO EACH WASHOUT FACILITY TO INFORM CONCRETE EQUIPMENT OPERATORS TO UTILIZE THE PROPER FACILITIES. 1.RESTORE ALL DISTURBED AREAS WITH 6 INCHES OF TOPSOIL CONFORMING TO MNDOT 3877. 2.PROTECT ALL STORM SEWER INLETS AS SPECIFIED HEREIN AND MAINTAIN UNTIL STREET CONSTRUCTION IS COMPLETED. 3.MAINTAIN ALL SILT FENCE AND REPAIR OR REPLACE AS NEEDED OR REQUIRED UNTIL TURF HAS BEEN ESTABLISHED. 4.RESTORATION WORK SHALL BEGIN WITHIN 7 DAYS OF FINAL GRADING. 5.BOULEVARD AND DITCH RESTORATION INCLUDES FINE GRADING, WHICH INCLUDES THE REMOVAL OF ROCKS, DEBRIS AND SOIL CHUNKS, WHILE MAINTAINING POSITIVE DRAINAGE. SFSILT FENCE, SEE DTL 3/C801 ROCK CONSTRUCTION ENTRANCE, SEE DTL 605/C801 RIPRAP, SEE DTL 7/C803 EROSION MAT, SEE DTL X/XXXX NO T F O R C O N S T R U C T I O N - PROJECT No: TH E D E S I G N S A N D P L A N S I N D I C A T E D O N T H E D R A W I N G S A R E T H E P R O P E R T Y OF A Y R E S A S S O C I A T E S . A L L R I G H T S A R E R E S E R V E D . N O D E S I G N S O R P L A N S SH A L L B E U S E D O R R E P R O D U C E D I N A N Y F O R M O R B Y A N Y M E A N S W I T H O U T WR I T T E N P E R M I S S I O N O F A Y R E S A S S O C I A T E S . Ea u C l a i r e O f f i c e 34 3 3 O a k w o o d H i l l s P a r k w a y Ea u C l a i r e , W i s c o n s i n 5 4 7 0 1 (7 1 5 ) 8 3 4 - 3 1 6 1 Ri v e r F a l l s O f f i c e 21 5 N . S e c o n d S t r e e t S u i t e 2 0 4 Ri v e r F a l l s , W i s c o n s i n 5 4 0 2 2 (7 1 5 ) 4 2 6 - 4 9 0 8 Fa x : ( 7 1 5 ) 4 2 6 - 5 8 6 6 NE W I N D E P E N D E N T L I V I N G F A C I L I T Y LA K E E L M O I N D E P E N D E N T L I V I N G , L L C LA K E E L M O , M I N N E S O T A PR E L I M I N A R Y - C I T Y S U B M I T T A L P A C K A G E 08-1893.00 09.12.2019 MARK DATE DESCRIPTION NORTH 0 30 60 C700 EROSION CONTROL PLAN NO T F O R C O N S T R U C T I O N - PROJECT No: TH E D E S I G N S A N D P L A N S I N D I C A T E D O N T H E D R A W I N G S A R E T H E P R O P E R T Y OF A Y R E S A S S O C I A T E S . A L L R I G H T S A R E R E S E R V E D . N O D E S I G N S O R P L A N S SH A L L B E U S E D O R R E P R O D U C E D I N A N Y F O R M O R B Y A N Y M E A N S W I T H O U T WR I T T E N P E R M I S S I O N O F A Y R E S A S S O C I A T E S . Ea u C l a i r e O f f i c e 34 3 3 O a k w o o d H i l l s P a r k w a y Ea u C l a i r e , W i s c o n s i n 5 4 7 0 1 (7 1 5 ) 8 3 4 - 3 1 6 1 Ri v e r F a l l s O f f i c e 21 5 N . S e c o n d S t r e e t S u i t e 2 0 4 Ri v e r F a l l s , W i s c o n s i n 5 4 0 2 2 (7 1 5 ) 4 2 6 - 4 9 0 8 Fa x : ( 7 1 5 ) 4 2 6 - 5 8 6 6 NE W I N D E P E N D E N T L I V I N G F A C I L I T Y LA K E E L M O I N D E P E N D E N T L I V I N G , L L C LA K E E L M O , M I N N E S O T A PR E L I M I N A R Y - C I T Y S U B M I T T A L P A C K A G E 08-1893.00 09.12.2019 MARK DATE DESCRIPTION C800 CIVIL DETAILS -------------- --- ---------------------------------- .... . ... .. . ------------- ................................ . - ----------- ..... TRENCH SECTIONS NOT TO SCALE A=O.D. PIPE + 24"(MAX) B=O.D. PIPE + 18"(MAX) FOR ROCK C=6" MIN. WET OR UNSTABLE TRENCH CLAY OR ROCK TRENCH POOR SUBSOIL TRENCH GRANULAR TRENCH A 12" C A OR B 12" D C E 12" D=4" BELOW BARREL FOR CLAY 3" BELOW BELL FOR CLAY 6" BELOW BARREL FOR ROCK E=DETERMINED BY A/E 120°120° 120°120° INITIAL BACK FILL ZONE (GRANULAR BACKFILL) BACKFILL AS SPECIFIED WASHED STONE (1 12") BACKFILL AS SPECIFIED GRANULAR BEDDING GRANULAR BEDDING GRANULAR BASE FOR FLEXIBLE PIPE, BEDDING MATERIAL SHALL EXTEND TO SPRING LINE (MID HEIGHT) OF PIPE. * GRANULAR BEDDING * * * D E D GN 100 ASPHALT PAVEMENTST 301 NOT TO SCALE 6" AGGREGATE BASE COURSE 1 1/2" BINDER COURSE 1 1/2" SURFACE COURSE > SEDIMENT LOGFLOW> FL O W DI T C H B O T T 24 " M I N SEDIMENT LOG WOOD STAKES (SEE DTL) PLACED @ 2' OC MAX WOOD STAKE TO ONLY PENETRATE NETTING, NOT LOG MATERIAL EC 202 NOT TO SCALE SILT FENCE TIE BACK TWIST METHOD SILT FENCE TRENCH DETAIL JOINING 2 LENGTHS OF SILT FENCE HOOK METHOD GENERAL NOTES SILT FENCE WOOD POSTS 2 LENGTH 3'-4" 20" DEPTH IN GROUND GEOTEXTILE FABRIC ONLY BACKFILL & COMPACT TRENCH WITH EXCAVATED SOIL SUPPORT CORD GEOTEXTILE FABRIC TIEBACK BETWEEN FENCE POST AND ANCHOR ANCHOR STAKE MIN 18" LONG SILT FENCE GEOTEXTILE FABRIC EXCESS FABRIC GEOTEXTILE FABRIC WOOD POST GEOTEXTILE FABRIC WOOD POST GEOTEXTILE FABRIC GEOTEXTILE FABRIC WOOD POST WOOD POST GEOTEXTILE FABRIC WOOD POST TRENCH SHALL BE A MIN OF 4" WIDE & 6" DEEP TO BURY AND ANCHOR THE GEOTEXTILE FABRIC, FOLD THE MATERIAL TO FIT TRENCH AND BACKFILL & COMPACT TRENCH WITH EXCAVATED SOIL. WOOD POSTS SHALL BE A MIN SIZE OF 118" x 118" OAK OR HICKORY. CONSTRUCT SILT FENCE FROM A CONTINUOUS ROLL IF POSSIBLE BY CUTTING LENGTHS TO AVOID JOINTS. IF A JOINT IS NECESSARY, USE ONE OF THE FOLLOWING TWO METHODS; A. TWIST METHOD -- OVERLAP THE END POSTS AND TWIST, OR ROTATE, AT LEAST 180 DEGREES. B. HOOK METHOD -- HOOK THE END OF EACH SILT FENCE LENGTH. NOTE: ADDITIONAL POST DEPTH OR TIE BACKS MAY BE REQUIRED IN UNSTABLE SOLS ATTACH FABRIC TO TIE POSTS WITH WIRE STAPLES OR WOODEN LATH AND NAILS *NOTE: 8'-0" POST SPACING ALLOWED IF A WOVEN GEOTEXTILE FABRIC IS USED 1 2 3 FOLD 3" MAX 1'-0" MIN FLOW DIRECTION FLOW DIRECTION 2' MIN (WHEN ADDITIONAL SUPPORT REQUIRED) FLOW FLOW FLO W 3' M A X * 3' M A X * 3' M A X * 3' M A X * EC 200 NOT TO SCALE 1 2 3 4 4" AGGREGATE BASE COURSE LIGHT DUTY HEAVY DUTY 6" AGGREGATE BASE COURSE 5" CONCRETE 8" CONCRETE CONCRETE PAVEMENTST 302 NOT TO SCALE5 NO T F O R C O N S T R U C T I O N - PROJECT No: TH E D E S I G N S A N D P L A N S I N D I C A T E D O N T H E D R A W I N G S A R E T H E P R O P E R T Y OF A Y R E S A S S O C I A T E S . A L L R I G H T S A R E R E S E R V E D . N O D E S I G N S O R P L A N S SH A L L B E U S E D O R R E P R O D U C E D I N A N Y F O R M O R B Y A N Y M E A N S W I T H O U T WR I T T E N P E R M I S S I O N O F A Y R E S A S S O C I A T E S . Ea u C l a i r e O f f i c e 34 3 3 O a k w o o d H i l l s P a r k w a y Ea u C l a i r e , W i s c o n s i n 5 4 7 0 1 (7 1 5 ) 8 3 4 - 3 1 6 1 Ri v e r F a l l s O f f i c e 21 5 N . S e c o n d S t r e e t S u i t e 2 0 4 Ri v e r F a l l s , W i s c o n s i n 5 4 0 2 2 (7 1 5 ) 4 2 6 - 4 9 0 8 Fa x : ( 7 1 5 ) 4 2 6 - 5 8 6 6 NE W I N D E P E N D E N T L I V I N G F A C I L I T Y LA K E E L M O I N D E P E N D E N T L I V I N G , L L C LA K E E L M O , M I N N E S O T A PR E L I M I N A R Y - C I T Y S U B M I T T A L P A C K A G E 08-1893.00 09.12.2019 MARK DATE DESCRIPTION C801 CIVIL DETAILS 30" CONCRETE CURB & GUTTER A B TIPPED OUT CURB & GUTTER STANDARD CURB & GUTTER ST 100 NOT TO SCALE 6" 30" 6" 2" STANDARD CURB HEAD FLOWLINE ELEVATION 4% SLOPE DRIVEWAY CURB C 30" 6" 6" 2% SLOPE 6' TOP OF CURB ELEVATION1 1/2" RAD MAX FLOWLINE ELEVATION 4% SLOPE 1 1/2" RAD MAX 30" 6" 6" 6' TOP OF CURB ELEVATION FLOWLINE ELEVATION RAMPED SIDEWALK NOT TO SCALE CONCRETE CURB 2'TOP OF PAVEMENT 1.5% CONCRETE CURB 6" CURB HEAD CONCRETE RAMP 12H:1 V 12H: 1 V 1 2" EXPANSION JOINT 1 2" EXPANSION JOINT B B SECTION B-B GENERAL NOTES SIDEWALK CROSS SLOPE SHALL NOT EXCEED 2%. INSTALL CURB TRANSITION INCIDENTAL TO OTHER PAY ITEMS DETECTABLE WARNING FIELDS THAT ARE INSTALLED AS A GROUP OR SIDE BY SIDE SHOULD BE FROM THE SAME MANUFACTURER. SLOPE SIDEWALK TOWARD LANDING AS SHOWN WHERE THERE IS NO TERRACE OR WHERE THE TERRACE IS LESS THEN 6 FEET WIDE. +/- 0.5% CONSTRUCTION TOLERANCE IN SIDEWALK CROSS SLOPE SHALL NOT EXCEED 2% WITHOUT PRIOR APPROVAL FROM THE ENGINEER. 1 2 3 1. 5 % 3 3 1 1 SP 600 6" 36 " E N D T A P E R DI R E C T I O N O F T R A F F I C CURB & GUTTER TERMINATOR REFERENCE CURB & GUTTER DETAIL ST 101 NOT TO SCALE CONTRACTION JOINT (AS REQ'D) PLAN VIEW SECTION 6" SIDEWALK EXG OR PROPOSED DRIVEWAY 3' BL V D V A R I E S 1/2" EXPANSION JOINT STD C&G (REF DTL) STD C&G (REF DTL) 6" THK CONCRETE VA R I E S WIDTH VARIES CURB HEAD TRANSITION DETAIL SIDEWALK 6" MIN THICKNESS AT DRIVEWAY 3' SIDEWALK APRON WIDTH VARIES ST 105 NOT TO SCALE CONCRETE DRIVEWAY APRON - 3' TAPER 5' MIN T = CONCRETE THICKNESS FINISHED FLOOR BUILDING ENTRANCE 2% MAX T ENTRY / EXIT ST 901 NOT TO SCALE BLDG OR STRUCTURE W W SL O P E (6' MAX) 12" EXP JT FILLER EXP JT 100' O.C. MAX (P L A N D I M ) CONTRACTION JOINT 14 D E P T H OF S L A B SIDEWALK PLAN-TYPICAL WALK A-EXPANSION JOINT B-CONTRACTION JOINT A B ST 900 NOT TO SCALE 4" BASE COURSE 5" CONCRETE 1 2 3 4 5 6 NO T F O R C O N S T R U C T I O N - PROJECT No: TH E D E S I G N S A N D P L A N S I N D I C A T E D O N T H E D R A W I N G S A R E T H E P R O P E R T Y OF A Y R E S A S S O C I A T E S . A L L R I G H T S A R E R E S E R V E D . N O D E S I G N S O R P L A N S SH A L L B E U S E D O R R E P R O D U C E D I N A N Y F O R M O R B Y A N Y M E A N S W I T H O U T WR I T T E N P E R M I S S I O N O F A Y R E S A S S O C I A T E S . Ea u C l a i r e O f f i c e 34 3 3 O a k w o o d H i l l s P a r k w a y Ea u C l a i r e , W i s c o n s i n 5 4 7 0 1 (7 1 5 ) 8 3 4 - 3 1 6 1 Ri v e r F a l l s O f f i c e 21 5 N . S e c o n d S t r e e t S u i t e 2 0 4 Ri v e r F a l l s , W i s c o n s i n 5 4 0 2 2 (7 1 5 ) 4 2 6 - 4 9 0 8 Fa x : ( 7 1 5 ) 4 2 6 - 5 8 6 6 NE W I N D E P E N D E N T L I V I N G F A C I L I T Y LA K E E L M O I N D E P E N D E N T L I V I N G , L L C LA K E E L M O , M I N N E S O T A PR E L I M I N A R Y - C I T Y S U B M I T T A L P A C K A G E 08-1893.00 09.12.2019 MARK DATE DESCRIPTION C802 CIVIL DETAILS DOWNSPOUT COLLECTOR NOT TO SCALE DOWNSPOUT. SEE ARCH. PLANS FOR SIZE WIRE MESH SCREEN FOR RODENT PROTECTION. SECURE SCREEN WITH STAINLESS STEEL HOSE CLAMP 1" BUILDING 2' MAX. SCH 40 PVC PIPE WITH BELL FITTING RE:SCHEDULE FOR SIZE SCH 40 PVC ADAPTER/REDUCER OR AS NECESSARY TO MAKE CONNECTION SEE NOTE 2 WATER TIGHT CONNECTION SEE GRADING PLAN FOR SIZE OF COLLECTOR NATURAL GRADE MIN 1% SLOPESEE NOTE 1 BY BUILDING CONTRACTOR BY SITE CONTRACTOR SCHEDULE DOWNSPOUT PVC PIPE 8" X 8"12" Ø 10" X 10"15" Ø 4" Ø 8" Ø 6" Ø 10" Ø NOTES: 1.FOR ALL DEPTHS OF COVER LESS THAN TWO (2) FEET, PIPE MUST BE SCHEDULE 40 PVC. FOR DEPTHS OF COVER GREATER THAN TWO (2) FEET, FLEXIBLE PIPE MAY BE USED. REFER TO SPECIFICATIONS FOR ALLOWABLE PIPE TYPES 2.A WATER TIGHT CONNECTION SHALL BE MAINTAINED WITH ANY TRANSITION FROM SCHEDULE 40 PVC TO ANY OTHER PIPE MATERIAL 3.THE DOWNSPOUT COLLECTOR DRAIN SHALL BE INSTALLED BEFORE THE DOWNSPOUTS ARE INSTALLED ON THE BUILDING. SITEWORK CONTRACTOR SHALL BE RESPONSIBLE FOR ALL WORK TO AND INCLUDING THE RODETN SCREEN. BUILDING CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONNECTION AT THE POINT OF THE RODENT SCREEN. 4.INSTALL PIPES CLEAR OF COLUMNS, BOLLARDS, AND OTHER OTHER BUILDING APPURTENANCES. MI N MIN 4" M I N REMOVEABLE WATERTIGHT TOP ON FROST SLEEVE WYE CONCRETE PAD 2" LARGER THAN SEWER MAIN DIA CLEANOUT 9"9" GRADE 6"-12" ABOVE SEWER SA 703 NOT TO SCALE 45° SANITARY SEWER LATERAL PLUG OR CONNECT TO EXISTING VERTICAL SERVICE RISER TRACER WIRE ACCESS BOX TRACER WIRE ACCESS BOX WOOD 4"x4" PLUG OR CONNECT TO EXISTING 45 DEG BEND GRANULAR BEDDING 45 DEG BENDGRANULAR BEDDING 11 14 DEG OR 22 12 DEG BEND SECURE TRACER WIRE TO SERVICE WYE AND ATTACH TO GROUND ROD SECURE TRACER WIRE TO SERVICE WYE AND ATTACH TO GROUND ROD WOOD 4"x4" 45 DEG BEND SLOPE @ 1/4" /FT DESIRABLE 1/8" /FT MIN 1/2" /FT MAX HORIZONTAL PAY DISTANCE FOR LATERALS PROPERTY LINE 6' 2' MA X HORIZONTAL PAY DISTANCE FOR LATERALS STANDARD INSTALLATION PROPERTY LINE 6' 2' MA X INSTALLATION W/ RISER SA 200 NOT TO SCALE B COVER SHALL BE 9' BASED ON PIPE SLOPES. **ONLY USE INSTALLATION W/ RISER WHEN COVER AT PROPERTY LINE EXCEEDS 9 FEET. SLOPE @ 1/8" /FT MIN A. COVER SHALL BE THE MAXIMUM ATTAINABLE BASED ON MINIMUM PIPE SLOPE. B A NOTES NOTES ** STEPS TY P 10 " MI N 27" DIA MIN 8" MIN CASTING: TYPE J-S. 6" STONE CUSHION REQUIRED UNDER BASE ON WET SUBGRADE 36 " M A X RI M T O FI R S T S T E P NOT TO SCALE STANDARD SANITARY MANHOLE 5" FOR 4' DIA 6" FOR 5' DIA 7" FOR 6' DIA BENCH SLOPE TO BE 1"/FT PRECAST CONRETE MANHOLE SECTIONS PIPE SEAL JOINT SEALANT UNLESS OTHERWISE SHOWN OR REQ'D BY PIPE SIZE 16 " O. C . 12" THK (POURED) 6" THK (PRECAST) ADJUST FRAME TO GRADE WITH A MINIMUM OF TWO ADJUSTING RINGS TOTALING 6" TO 12" MAX. TOP CONE SECTION SHALL BE USED ON 4' DIA MANHOLES, UNLESS MINIMUM HEIGHT CONDITIONS REQUIRE A 6" FLAT TOP SLAB. MINIMUM 8" FLAT TOP SLAB SHALL BE USED ON MANHOLES 5' DIA OR LARGER. POSITION HOLE IN CONE OR FLAT SLAB ON UPSTREAM SIDE OF MANHOLE. VA R RIM ELEV - REF PLANS INVERT ELEV - REF PLANS 4' DIA SA 100 44" DIA 6"-12" 18 " M I N INV ELEV - REF PLANS CASTING: TYPE B6 RIM ELEV - REF PLANS 2.5' DIA 2.5-FT AREA INLET (BEEHIVE GRATE) 30"Ø CL II REINF CONC PIPE GROUT REQ'D IF NOT BELL END OF PIPE ADJUST FRAME TO GRADE WITH A MINIMUM OF TWO CONCRETE RINGS OF VARIABLE THICKNESS 6"THK PRECAST CONC BASE OR 8" THK POURED CONC BASE. REF PLANS FOR PIPE DIA SS 303 NOT TO SCALE CASTING: TYPE H ADJUST FRAME TO GRADE WITH A MINIMUM OF TWO CONCRETE RINGS, RINGS SHALL BE OF VARIABLE THICKNESS. SLOTS SHALL BE ORIENTED TO THE DIRECTION OF FLOW INVERT EL 2'X3' OPEN'G 2X3-FT CURB INLET 5" PRECAST CONCRETE INTEGRAL BASE 5" PRECAST CONCRETE INLET SECTIONS SS 300 NOT TO SCALE TOP OF CURB (TC) ELEV - REF PLANS 8" MIN STANDARD STORM MANHOLE INVERT ELEV - REF PLANS 6" STONE CUSHION REQUIRED UNDER BASE ON WET SUBGRADE 5" FOR 4' DIA 6" FOR 5' DIA 7" FOR 6' DIA PIPE SEAL PRECAST CONCRETE MANHOLE SECTIONS 8" THICK PRECAST CONCRETE FLAT TOP JOINT SEALANT ADJUST FRAME TO GRADE WITH A MINIMUM OF TWO ADJUSTING RINGS TOTALING 6" MIN TO 12" MAX BENCH SLOPE TO BE 1"/FT 12" THK (POURED) 6" THK (PRECAST) CASTING: TYPE J UNLESS OTHERWISE SHOWN OR REQ'D BY PIPE SIZE 4' DIA 36 " M A X RI M T O FI R S T S T E P VA R 10 " MI N TY P 16 " O. C . 27" OPEN'G RIM ELEV-REF PLANS SS 100 NOT TO SCALE 1 2 3 4 5 6 8 SECTION NOT TO SCALE 4 1 3 1 PLAN EC 401 5 x"D"3 x"D" "D " "D " "D " 4' 2' M I N 1 1 GEOTEXTILE FABRIC 12" MIN RIPRAP PIPE DIA "D" RIPRAP FLOW APRON END WALL WITH TRASHGUARD AND RIPRAP PROVIDE 3 CLIPS TO FASTEN TRASH GUARD TO FLARED END. HOT-DIP GALVANIZE AFTER FABRICATION. 7 NO T F O R C O N S T R U C T I O N - PROJECT No: TH E D E S I G N S A N D P L A N S I N D I C A T E D O N T H E D R A W I N G S A R E T H E P R O P E R T Y OF A Y R E S A S S O C I A T E S . A L L R I G H T S A R E R E S E R V E D . N O D E S I G N S O R P L A N S SH A L L B E U S E D O R R E P R O D U C E D I N A N Y F O R M O R B Y A N Y M E A N S W I T H O U T WR I T T E N P E R M I S S I O N O F A Y R E S A S S O C I A T E S . Ea u C l a i r e O f f i c e 34 3 3 O a k w o o d H i l l s P a r k w a y Ea u C l a i r e , W i s c o n s i n 5 4 7 0 1 (7 1 5 ) 8 3 4 - 3 1 6 1 Ri v e r F a l l s O f f i c e 21 5 N . S e c o n d S t r e e t S u i t e 2 0 4 Ri v e r F a l l s , W i s c o n s i n 5 4 0 2 2 (7 1 5 ) 4 2 6 - 4 9 0 8 Fa x : ( 7 1 5 ) 4 2 6 - 5 8 6 6 NE W I N D E P E N D E N T L I V I N G F A C I L I T Y LA K E E L M O I N D E P E N D E N T L I V I N G , L L C LA K E E L M O , M I N N E S O T A PR E L I M I N A R Y - C I T Y S U B M I T T A L P A C K A G E 08-1893.00 09.12.2019 MARK DATE DESCRIPTION C803 CIVIL DETAILS PICKLEBALL COURTXX ###NOT TO SCALE 15 ' - 0 " PICKLEBALL STRIPING (YELLOW) NOTES: 1.ALL DIMENSIONS ARE TO THE OUTSIDE EDGE OF LINES. 2.ALL PLAYING LINES ARE 2" IN WIDTH. 3.SEE DETAILS 5/C804 AND 6/C804 FOR NET INSTALLATION. 4.PROVIDE MARKING PLAN AND COLOR SELECTIONS (AS CALLED OUT IN DETAIL BELOW) FOR REVIEW. NET POST 24' FROM CENTER TO CENTER TO EACH POLE. SEE DTLS 5/C804 & 6/C804 NOTE: 1.PROVIDE 2" DEEP SAWCUT SHOWN ON PLAN. 2.SAW CUT PRIOR TO COLOR COATING COURTS. 8" AGGREGATE BASE COURSE 1 3/4" BINDER COURSE 1 3/4" SURFACE COURSE TACK COAT SPORT COURT SURFACING 44 ' - 0 " 4" DIA PERFORATED DRAIN TILE WITH SOCK 4 8" SAND LAYER 12" PEA GRAVEL LAYER (4" MIN AROUND DRAIN TILE) GEOTEXTILE FABRIC 2'-0" (TYP) 7' - 0 " 7' - 0 " 15 ' - 0 " 8' - 0 " 62 ' - 0 " 8'-0"10'-0"10'-0"8'-0"10'-0"10'-0"8'-0" 8' - 0 " 1' - 0 " 1' - 0 " 66'-0" 1'-0" (TYP FENCE BORDER) CHAIN LINK FENCE, SEE DTLS 1/C804 & 2/C804 PICKLEBALL COURT SURFACE (BLUE WITHIN PLAY AREA, GREEN OUTSIDE PLAY AREA) BOCCE BALL SECTIONXX ###NOT TO SCALE 2X8 TRT CAP 7" 5" VA R I E S GRASS NATURAL SOIL COMPACTED PER PROJECT SPECS 6" CRUSHED ROCK GEOTEXTILE FABRIC CRUSHED LIMESTONE BOCCE BALL SURFACING 3" BASE COURSE VA R I E S 2' - 0 " 6X6 TRT LANDSCAPE TIMBERS 1/2" REBAR TIE ADS SYSTEM CLEAN SAND 1' - 0 " M I N . NOT TO SCALE NET POST FOOTING NOT TO SCALE NET TIGHTENER ℄ NET POST (LACING ROD OPTIONAL) TENNIS NET COURT PAVEMENT NET POST SET IN NET POST MANUFACTURER'S SLEEVE CONCRETE FOOTING POUR TO UNDISTURBED EARTH 3'-0" DIA. (TYP) SEE NOTE #1 5' - 6 " ( T Y P ) PE R M A N U F A C T U R E R S RE C O M M E N D A T I O N S 6" B E L O W F R O S T DE P T H SE E N O T E # 1 . NOTE #1: FOUNDATION DEPTH AND WIDTH MAY VARY WITH THE SOIL TYPE AND STRENGTH OF THE NET POST ℄ NET POST SET IN SLEEVE CONCRETE FOOTING (BELOW PAVEMENT) 3' - 0 " SECTION PLAN NOTE: INSTALL PER MANUFACTURER RECOMMENDATIONS. IF MANUFACTURER RECOMMENDATIONS DIFFER FROM THIS DETAIL, MANUFACTURER RECOMMENDATIONS SHALL PREVAIL. NOT TO SCALE NET CENTER STRAP ANCHOR NOT TO SCALE 15" DIA. 24 " - 3 0 " 6" 12" DIA. (T Y P ) COURT PAVEMENT(TYP) CENTER STRAP ANCHOR CONCRETE FOOTING COMPACTED BASE COURSE COMPACTED SUBGRADE (TYP) NET LINE 15 " D I A . (T Y P ) 12 " D I A . (T Y P ) CENTER STRAP ANCHOR ALIGN PIN WITH TENNIS NET CONCRETE FOOTING (BELOW PAVEMENT) NOTE: IN AREAS SUSCEPTIBLE TO FROST HEAVING, INCREASE FOOTING DEPTH TO 24"+ SECTION PLAN (T Y P ) NOTE: INSTALL PER MANUFACTURER RECOMMENDATIONS. IF MANUFACTURER RECOMMENDATIONS DIFFER FROM THIS DETAIL, MANUFACTURER RECOMMENDATIONS SHALL PREVAIL. CORNER POST CONC. FOOTING DIAG. BRACE ROD & TURN BUCKLE TENSION WIRE LINE POST STRETCHER BAR TOP RAIL LINE POST 10 ' - 0 " NOTE: EMBED CORNER POSTS, GATE POSTS AND FIRST LINE POST AFTER CORNER & GATE POSTS IN CONCRETE. LINE POSTS ARE NOT EMBEDDED IN CONCRETE FINISH GRADE 3' - 0 " 1' - 0 " 1'-0" 4' - 0 " 1" 8'-0" O.C. NOMINAL NOTE: CONTRACTOR TO VERIFY LINE POST SIZING FOR WIND LOADS CHAIN LINK FENCESP 501 NOT TO SCALE VERTICAL PRIVACY SLATS SINGLE SWING GATE LATCH PLAN DIM 1'-0" 1' - 0 " 5' - 0 " WELDED 8' HIGH GATE FOR WIDTH SEE PLAN 10 ' - 0 " CHAIN LINK GATESP 501 NOT TO SCALE CONCRETE FOOTING (BELOW PAVEMENT) BOTTOM RAIL TOP RAIL MID RAIL 1 2 3 4 5 6 NO T F O R C O N S T R U C T I O N - PROJECT No: TH E D E S I G N S A N D P L A N S I N D I C A T E D O N T H E D R A W I N G S A R E T H E P R O P E R T Y OF A Y R E S A S S O C I A T E S . A L L R I G H T S A R E R E S E R V E D . N O D E S I G N S O R P L A N S SH A L L B E U S E D O R R E P R O D U C E D I N A N Y F O R M O R B Y A N Y M E A N S W I T H O U T WR I T T E N P E R M I S S I O N O F A Y R E S A S S O C I A T E S . Ea u C l a i r e O f f i c e 34 3 3 O a k w o o d H i l l s P a r k w a y Ea u C l a i r e , W i s c o n s i n 5 4 7 0 1 (7 1 5 ) 8 3 4 - 3 1 6 1 Ri v e r F a l l s O f f i c e 21 5 N . S e c o n d S t r e e t S u i t e 2 0 4 Ri v e r F a l l s , W i s c o n s i n 5 4 0 2 2 (7 1 5 ) 4 2 6 - 4 9 0 8 Fa x : ( 7 1 5 ) 4 2 6 - 5 8 6 6 NE W I N D E P E N D E N T L I V I N G F A C I L I T Y LA K E E L M O I N D E P E N D E N T L I V I N G , L L C LA K E E L M O , M I N N E S O T A PR E L I M I N A R Y - C I T Y S U B M I T T A L P A C K A G E 08-1893.00 09.12.2019 MARK DATE DESCRIPTION C804 CIVIL DETAILS HDCP SIGN POST R7-8-A R7-8-V RESERVED PARKING VEHICLES WITH DIS OR DIS VET PLATES OR STATE DISABLED CARD THIS SPACE ACCESSIBLE VAN 5' - 0 " M I N . TO B O T T O M O F S I G N 2" OD SQUARE STEEL GALVANIZED POSTS TELESCOPING PERFORATED TUBE SP 402 NOT TO SCALE 12" x 6" 12" x 18" FINISHED GRADE SIGN POST 12" DIA. PVC PIPE SECTION (IN LAWN AREAS ONLY) CRUSHED GRANITE (IN LAWN AREAS ONLY) SIGN POST 2' - 6 " 8" 12" SIGN POST ANCHOR ADA STALL PAVEMENT MARKING 6" R 4" 24 " 12 " 8" 18"3" 12" 24"R 20 " R 12" 23° ACCESS AISLE PARKING SPACE BLUE NON-REFLECTIVE PAINT *NOTE: SYMBOL TO BE PAINTED IN ALL ADA PARKING SPACES. 9' 16 ' CURB AND GUTTER 3 ' - 0 " O . C . 4 " SP 403 NOT TO SCALE PAINTED WHITE STRIPE, NON-REFLECTIVE PAINT. SEE SITE LAYOUT PLAN FOR PLACEMENT. C### # NOT TO SCALE CROSSWALK PAVEMENT MARKING 2' - 0 " 6'-0" 2' - 0 " VA R I E S , S E E S I T E S T R I P I N G P L A N 3 STOP SIGN AND INSTALLATION NOT TO SCALE FINISHED GRADE SIGN POST STOP 12" DIA. PVC PIPE SECTION (IN LAWN AREAS ONLY) CRUSHED GRANITE (IN LAWN AREAS ONLY) SIGN POST STOP SIGN ADA PARKING SIGN 7' - 0 " 4' - 0 " 2' - 6 " 8" 12" R1-1 30" x 30" 7'-0" TO PAVEMENT OR TURF SIGN POST ANCHOR FIRE LANE PARKING SIGN POST ‚ WHITE FIELD RED TEXT RED BORDER WHITE FIELD RED TEXT RED BORDER NOT TO SCALE FIRE LANE PARKING SIGNS 1 2 3 4 5 6 CROSSWALK PARKING SIGN POST ‚ NO T F O R C O N S T R U C T I O N - PROJECT No: TH E D E S I G N S A N D P L A N S I N D I C A T E D O N T H E D R A W I N G S A R E T H E P R O P E R T Y OF A Y R E S A S S O C I A T E S . A L L R I G H T S A R E R E S E R V E D . N O D E S I G N S O R P L A N S SH A L L B E U S E D O R R E P R O D U C E D I N A N Y F O R M O R B Y A N Y M E A N S W I T H O U T WR I T T E N P E R M I S S I O N O F A Y R E S A S S O C I A T E S . Ea u C l a i r e O f f i c e 34 3 3 O a k w o o d H i l l s P a r k w a y Ea u C l a i r e , W i s c o n s i n 5 4 7 0 1 (7 1 5 ) 8 3 4 - 3 1 6 1 Ri v e r F a l l s O f f i c e 21 5 N . S e c o n d S t r e e t S u i t e 2 0 4 Ri v e r F a l l s , W i s c o n s i n 5 4 0 2 2 (7 1 5 ) 4 2 6 - 4 9 0 8 Fa x : ( 7 1 5 ) 4 2 6 - 5 8 6 6 NE W I N D E P E N D E N T L I V I N G F A C I L I T Y LA K E E L M O I N D E P E N D E N T L I V I N G , L L C LA K E E L M O , M I N N E S O T A PR E L I M I N A R Y - C I T Y S U B M I T T A L P A C K A G E 08-1893.00 09.12.2019 MARK DATE DESCRIPTION C805 CIVIL DETAILS UP B C 1 2 3 4 5 7 8 121110 9,458.03 SF GARAGE 119 6,222.01 SF GARAGE 123 26 STALLS 16 STALLS TOTAL NUMBER OF STALLS = 42 6 9 320'-0" 98 ' - 0 " / 1 A1 0 1 b / 1 A1 0 1 a AR E A B AR E A A / 1 A1 0 1 b / 1 A1 0 1 a AR E A B AR E A A BOXED SOFFIT ABOVE 64 ' - 0 " 34 ' - 0 " 2' - 0 " 42'-4"23'-4"29'-8"23'-4"51'-0"30'-4"22'-4"31'-0"23'-4"43'-4" 10 ' - 0 " 24 ' - 0 " 169'-8"52'-8"97'-8" 320'-0" STAIR A COMMUNITY ROOM 115 HALL 109 FITNESS/ ACTIVITY 114 MECH. 124 STAIR C MECH. 120 157'-0"14'-4"23'-8 3/4"9'-7 1/2"115'-3 3/4" 10'-0"11'-11" COVERED PORCH HALLWAY 107 HALLWAY 103 ENTRY/LIVING ROOM 116 MECH. 105 STAIR B WOMEN 110 MEN 111 JANITOR CLOSET 112 OFFICE 113 VESTIBULE 117 STOR. 118 TRASH/ RECYCLING 122 ELEV. 106 UNIT D2 101 UNIT D2 100 GUEST UNIT 102 UNIT E2 104 NO T F O R C O N S T R U C T I O N - PROJECT No: TH E D E S I G N S A N D P L A N S I N D I C A T E D O N T H E D R A W I N G S A R E T H E P R O P E R T Y OF A Y R E S A S S O C I A T E S . A L L R I G H T S A R E R E S E R V E D . N O D ES I G N S O R P L A N S SH A L L B E U S E D O R R E P R O D U C E D I N A N Y F O R M O R B Y A N Y M EA N S W I T H O U T WR I T T E N P E R M I S S I O N O F A Y R E S A S S O C I A T E S . Ea u C l a i r e O f f i c e 34 3 3 O a k w o o d H i l l s P a r k w a y Ea u C l a i r e , W i s c o n s i n 5 4 7 0 1 (7 1 5 ) 8 3 4 -31 6 1 Ri v e r F a l l s O f f i c e 21 5 N . S e c o n d S t r e e t S u i t e 2 0 4 Ri v e r F a l l s , W i s c o n s i n 5 4 0 2 2 (7 1 5 ) 4 2 6 -49 0 8 Fa x : ( 7 1 5 ) 4 2 6 -58 6 6 9/ 1 2 / 2 0 1 9 1 0 : 3 3 : 3 2 A M BI M 3 6 0 : / / L a k e E l m o / L a k e _ E l m o _ A r c h . r v t NE W I N D E P E N D E N T L I V I N G F A C I L I T Y LA K E E L M O I N D E P E N D E N T L I V I N G , L L C LA K E E L M O , M I N N E S O T A A101 PR E L I M I N A R Y - CI T Y S U B M I T T A L P A C K A G E FIRST FLOOR PLAN 08-1893.00 09.12.2019 MARK DATE DESCRIPTION SCALE:1/16" = 1'-0"A101 1 FIRST FLOOR NORTH FIRST FLOOR = 22,200 S.F. / TOTAL = 65,552 S.F. UNIT MATRIX NAME COUNT AREA GUEST UNIT 1 363.86 SF UNIT A1 2 1,143.59 SF UNIT B1 4 744.69 SF UNIT B2 4 792.01 SF UNIT C1 8 738.43 SF UNIT D1 12 1,009.26 SF UNIT D2 2 985.32 SF UNIT E1 2 705.24 SF UNIT E2 1 629.11 SF UNIT F1 2 1,125.4 SF UNIT G1 4 1,043.89 SF UNIT H1 1 1,387.28 SF AREA A AREA B KEYPLAN UP B C 8" 18 ' - 0 " 28 ' - 0 " 18 ' - 0 " 1 2 3 4 5 7 9'-4"18'-6 5/8"4'-5 3/8"10'-0"7'-1 1/8"16'-2 7/8"3'-5 5/8"22'-8 3/4"3'-5 5/8"7'-2"16'-2"3'-11 5/8"22'-4 1/2"3'-3 7/8" 28 ' - 8 " 6' - 8 " 28 ' - 8 " 30'-0"28'-4"28'-4"28'-4"19'-8"13'-8" 20 ' - 0 " 6 64 ' - 0 " 148'-4" / 1 A1 0 1 b AR E A B AR E A A / 1 A1 0 1 b AR E A B AR E A A STAIR A 134'-8"13'-8" 14 ' - 4 " 7' - 8 " 20 ' - 0 " 22 ' - 0 " 64 ' - 0 " A201 1 A202 1 A203 1 42'-4"23'-4"29'-8"23'-4"29'-8" TRASH/ RECYCLING 122 MECH. 120 GARAGE 119 3' - 0 " 11 ' - 4 " 26 STALLS NO T F O R C O N S T R U C T I O N - PROJECT No: TH E D E S I G N S A N D P L A N S I N D I C A T E D O N T H E D R A W I N G S A R E T H E P R O P E R T Y OF A Y R E S A S S O C I A T E S . A L L R I G H T S A R E R E S E R V E D . N O D ES I G N S O R P L A N S SH A L L B E U S E D O R R E P R O D U C E D I N A N Y F O R M O R B Y A N Y M EA N S W I T H O U T WR I T T E N P E R M I S S I O N O F A Y R E S A S S O C I A T E S . Ea u C l a i r e O f f i c e 34 3 3 O a k w o o d H i l l s P a r k w a y Ea u C l a i r e , W i s c o n s i n 5 4 7 0 1 (7 1 5 ) 8 3 4 -31 6 1 Ri v e r F a l l s O f f i c e 21 5 N . S e c o n d S t r e e t S u i t e 2 0 4 Ri v e r F a l l s , W i s c o n s i n 5 4 0 2 2 (7 1 5 ) 4 2 6 -49 0 8 Fa x : ( 7 1 5 ) 4 2 6 -58 6 6 9/ 1 2 / 2 0 1 9 1 0 : 3 3 : 3 3 A M BI M 3 6 0 : / / L a k e E l m o / L a k e _ E l m o _ A r c h . r v t NE W I N D E P E N D E N T L I V I N G F A C I L I T Y LA K E E L M O I N D E P E N D E N T L I V I N G , L L C LA K E E L M O , M I N N E S O T A A101a PR E L I M I N A R Y - CI T Y S U B M I T T A L P A C K A G E FIRST FLOOR AREA A PLAN 08-1893.00 09.12.2019 SCALE:1/8" = 1'-0"A101a 1 FIRST FLOOR - AREA A MARK DATE DESCRIPTION AREA A AREA B KEYPLAN NORTH FIRST FLOOR = 22,200 S.F. / TOTAL = 65,552 S.F. D R R D D R UP B C 7 4'-1"7'-5"7'-5"7'-5"4'-0"5'-2 1/4"12'-6 1/4"4'-7 1/2" 8' - 0 " 13 ' - 1 0 " 10 ' - 2 " 2' - 0 " 8 121110 7'-8 3/8"19'-11"3'-4 5/8"16'-2"7'-2"12'-11"24'-3"6'-2" 4'-0" 3'-3 7/8"35'-0" 13'-8" 20 ' - 0 " 4'-9 3/4"14'-1 3/8"12'-8 5/8"3'-7 5/8"6'-6"6'-6"3'-9 3/8"10'-10 1/2"7'-0 3/4"14'-4 3/8"28'-4"28'-4"30'-7 5/8" 9 30'-4"22'-4"31'-0"23'-4"43'-4" 70'-0"101'-8" 32 ' - 0 " 16'-11 3/8"6'-6 5/8"11'-6" AR E A B AR E A A / 1 A1 0 1 a AR E A B AR E A A / 1 A1 0 1 a UNIT D2 101 UNIT D2 100 UNIT E2 104 GUEST UNIT 102 WOMEN 110 MEN 111 ELEV. 106 MECH. 105 MECH. 124 HALLWAY 107 FITNESS/ ACTIVITY 114 HALL 109 JANITOR CLOSET 112 OFFICE 113 VESTIBULE 117 STOR. 118 COMMUNITY ROOM 115 STAIR C STAIR B 14 ' - 4 " 7' - 8 " 20 ' - 0 " 22 ' - 0 " 64 ' - 0 " 6'-3 3/8"12'-9 5/8"12'-0 5/8"3'-10 3/8" 4' - 2 " 5' - 1 0 " 2' - 1 1 " 10 ' - 7 " 10 ' - 6 " BOXED SOFFIT ABOVE 12'-6"10'-0"10'-0"10'-0"10'-0"21'-2" 52'-8"97'-8" A201 2 A203 2 A202 2 28 ' - 8 " 8" 5' - 4 " 8" 28 ' - 8 " 22 ' - 0 " 17 ' - 0 " 64 ' - 0 " 11 ' - 0 " 11 ' - 0 " 72'-8" ENTRY/LIVING ROOM 116 HALLWAY 103 GARAGE 123 11'-8 3/8" 16'-6 1/4"5'-8 3/4"9'-8 3/8"5'-6"13'-6 3/8"5'-0"8'-3 7/8" 16'-6 1/4"5'-8 3/4"9'-7 7/8"8'-4"5'-10" 24 ' - 0 " 10 ' - 0 " 34 ' - 0 " 16 STALLS A501 10 9 11 A50112 NO T F O R C O N S T R U C T I O N - PROJECT No: TH E D E S I G N S A N D P L A N S I N D I C A T E D O N T H E D R A W I N G S A R E T H E P R O P E R T Y OF A Y R E S A S S O C I A T E S . A L L R I G H T S A R E R E S E R V E D . N O D ES I G N S O R P L A N S SH A L L B E U S E D O R R E P R O D U C E D I N A N Y F O R M O R B Y A N Y M EA N S W I T H O U T WR I T T E N P E R M I S S I O N O F A Y R E S A S S O C I A T E S . Ea u C l a i r e O f f i c e 34 3 3 O a k w o o d H i l l s P a r k w a y Ea u C l a i r e , W i s c o n s i n 5 4 7 0 1 (7 1 5 ) 8 3 4 -31 6 1 Ri v e r F a l l s O f f i c e 21 5 N . S e c o n d S t r e e t S u i t e 2 0 4 Ri v e r F a l l s , W i s c o n s i n 5 4 0 2 2 (7 1 5 ) 4 2 6 -49 0 8 Fa x : ( 7 1 5 ) 4 2 6 -58 6 6 9/ 1 2 / 2 0 1 9 1 0 : 3 3 : 3 4 A M BI M 3 6 0 : / / L a k e E l m o / L a k e _ E l m o _ A r c h . r v t NE W I N D E P E N D E N T L I V I N G F A C I L I T Y LA K E E L M O I N D E P E N D E N T L I V I N G , L L C LA K E E L M O , M I N N E S O T A A101b PR E L I M I N A R Y - CI T Y S U B M I T T A L P A C K A G E FIRST FLOOR AREA B PLAN 08-1893.00 09.12.2019 SCALE:1/8" = 1'-0"A101b 1 FIRST FLOOR - AREA B MARK DATE DESCRIPTION AREA A AREA B KEYPLAN NORTH FIRST FLOOR = 22,200 S.F. / TOTAL = 65,552 S.F. 320'-0" 98 ' - 0 " 320'-0" 183'-4"35'-0"101'-8" 64 ' - 0 " 34 ' - 0 " 52'-5"8'-0"12'-3 3/4"8'-0"24'-8 1/4"8'-0"12'-3 3/4"8'-0"24'-1"8'-0"30'-0 3/4"8'-0"26'-3 1/4"8'-0"25'-6"8'-0"27'-0 1/4"8'-0"13'-4" 12'-9"8'-0"21'-7"14'-6"8'-0" 10" 9'-4 1/2"8'-0"12'-3 1/2"14'-6"8'-0" 10" 9'-4 1/2"8'-0"47'-3 1/2" 42'-4"23'-4"29'-8"23'-4"64'-8"16'-8"18'-4"35'-0"23'-4"43'-4" 14'-6 1/2"8'-0"13'-3 1/2"8'-0"14'-6"22'-0"8'-0"13'-4" 2' - 0 " 32 ' - 0 " 5' - 0 " UNIT A1 200 UNIT B1 202 UNIT C1 204 UNIT B1 206 UNIT C1 208 UNTI D1 210 UNIT D1 212 UNIT D1 214 UNIT D1 216 UNIT G1 218 UNIT G1 217 UNIT E1 215 UNIT D1 213 UNIT D1 211 UNIT C1 209 UNIT B2 207 UNIT C1 205 UNIT B2 203 UNIT F1 201 MEMBER STORAGE 227 CRAFT/ ACTIVITY 228 ELEV. 106 MECH. 229 STAIR B LIBRARY/ MEDIA/ GAMES 234 HALLWAY 236 / 1 A1 0 2 b / 1 A1 0 2 a AR E A B AR E A A / 1 A1 0 2 b / 1 A1 0 2 a AR E A B AR E A A STAIR C STAIR A NO T F O R C O N S T R U C T I O N - PROJECT No: TH E D E S I G N S A N D P L A N S I N D I C A T E D O N T H E D R A W I N G S A R E T H E P R O P E R T Y OF A Y R E S A S S O C I A T E S . A L L R I G H T S A R E R E S E R V E D . N O D ES I G N S O R P L A N S SH A L L B E U S E D O R R E P R O D U C E D I N A N Y F O R M O R B Y A N Y M EA N S W I T H O U T WR I T T E N P E R M I S S I O N O F A Y R E S A S S O C I A T E S . Ea u C l a i r e O f f i c e 34 3 3 O a k w o o d H i l l s P a r k w a y Ea u C l a i r e , W i s c o n s i n 5 4 7 0 1 (7 1 5 ) 8 3 4 -31 6 1 Ri v e r F a l l s O f f i c e 21 5 N . S e c o n d S t r e e t S u i t e 2 0 4 Ri v e r F a l l s , W i s c o n s i n 5 4 0 2 2 (7 1 5 ) 4 2 6 -49 0 8 Fa x : ( 7 1 5 ) 4 2 6 -58 6 6 9/ 1 2 / 2 0 1 9 1 0 : 3 3 : 3 7 A M BI M 3 6 0 : / / L a k e E l m o / L a k e _ E l m o _ A r c h . r v t NE W I N D E P E N D E N T L I V I N G F A C I L I T Y LA K E E L M O I N D E P E N D E N T L I V I N G , L L C LA K E E L M O , M I N N E S O T A A102 PR E L I M I N A R Y - CI T Y S U B M I T T A L P A C K A G E SECOND FLOOR PLAN 08-1893.00 09.12.2019 MARK DATE DESCRIPTION SCALE:1/16" = 1'-0"A102 1 SECOND FLOOR UNIT MATRIX NAME COUNT AREA GUEST UNIT 1 363.86 SF UNIT A1 2 1,143.59 SF UNIT B1 4 744.69 SF UNIT B2 4 792.01 SF UNIT C1 8 738.43 SF UNIT D1 12 1,009.26 SF UNIT D2 2 985.32 SF UNIT E1 2 705.24 SF UNIT E2 1 629.11 SF UNIT F1 2 1,125.4 SF UNIT G1 4 1,043.89 SF UNIT H1 1 1,387.28 SF AREA A AREA B KEYPLAN NORTH SECOND FLOOR = 21,776 S.F. / TOTAL = 65,552 S.F. R R R D D D D R D R R D R D R D R D R D 64 ' - 0 " 35 ' - 4 " 28 ' - 8 " 39'-10 3/4"30'-4 1/4"22'-7 3/4"30'-4 1/4"22'-7 3/4" AR E A B AR E A A / 1 A1 0 2 b UNIT A1 200 UNIT B1 202 UNIT C1 204 UNIT B1 206 UNIT C1 208 UNIT F1 201 UNIT B2 203 UNIT C1 205 UNIT B2 207 UNIT C1 209 CLOSET 219 CLOSET 220 5'-6 5/8"11'-2 1/2"11'-1 1/2"5'-3 5/8"9'-1 3/4"7'-1 1/8"11'-4 7/8"4'-10"3'-5 5/8"3'-10"6'-1"12'-9 3/4"3'-5 5/8"7'-2"11'-4"4'-10"3'-11 5/8"3'-4"6'-1"12'-11 1/2" 6'-7 3/4"10'-0"7'-0"12'-7"3'-8"7'-0 1/4"9'-6"10'-0"3'-10"6'-5 3/4"12'-7"3'-7"7'-0 1/4"9'-6"10'-0"3'-10"6'-5 3/4"12'-7"3'-7" 15 ' - 7 " 19 ' - 9 " 17 ' - 1 0 1 / 2 " 10 ' - 9 1 / 2 " 42'-4"23'-4"29'-8"23'-4"29'-11 3/8" 26'-6"4'-11 1/2"8'-5 1/4"10'-5"5'-3 1/2"7'-0 3/4"7'-7"7'-0 3/4"5'-0"10'-7"10'-5"5'-3 1/2"7'-0 3/4"7'-7"7'-0 3/4"5'-2"10'-5" 5'-4 3/4"1'-3 1/2"9'-5 1/8"10'-7"5'-1 1/2"7'-0 3/4"7'-7"7'-0 3/4"5'-0"10'-7"10'-7"5'-1 1/2"7'-0 3/4"7'-7"7'-0 3/4"5'-2"10'-5" MECH. 222 MECH. 223 MECH. 224 MECH. 225 A201 1 A202 1 A203 1 HALLWAY 236 AR E A B AR E A A / 1 A1 0 2 b A501 2 1 3 A501 5 4 NO T F O R C O N S T R U C T I O N - PROJECT No: TH E D E S I G N S A N D P L A N S I N D I C A T E D O N T H E D R A W I N G S A R E T H E P R O P E R T Y OF A Y R E S A S S O C I A T E S . A L L R I G H T S A R E R E S E R V E D . N O D ES I G N S O R P L A N S SH A L L B E U S E D O R R E P R O D U C E D I N A N Y F O R M O R B Y A N Y M EA N S W I T H O U T WR I T T E N P E R M I S S I O N O F A Y R E S A S S O C I A T E S . Ea u C l a i r e O f f i c e 34 3 3 O a k w o o d H i l l s P a r k w a y Ea u C l a i r e , W i s c o n s i n 5 4 7 0 1 (7 1 5 ) 8 3 4 -31 6 1 Ri v e r F a l l s O f f i c e 21 5 N . S e c o n d S t r e e t S u i t e 2 0 4 Ri v e r F a l l s , W i s c o n s i n 5 4 0 2 2 (7 1 5 ) 4 2 6 -49 0 8 Fa x : ( 7 1 5 ) 4 2 6 -58 6 6 9/ 1 2 / 2 0 1 9 1 0 : 3 3 : 3 9 A M BI M 3 6 0 : / / L a k e E l m o / L a k e _ E l m o _ A r c h . r v t NE W I N D E P E N D E N T L I V I N G F A C I L I T Y LA K E E L M O I N D E P E N D E N T L I V I N G , L L C LA K E E L M O , M I N N E S O T A A102a PR E L I M I N A R Y - CI T Y S U B M I T T A L P A C K A G E SECOND FLOOR AREA A PLAN 08-1893.00 09.12.2019 SCALE:1/8" = 1'-0"A102a 1 SECOND FLOOR - AREA A MARK DATE DESCRIPTION NORTH AREA A AREA B KEYPLAN FIRST FLOOR = 21,776 S.F. / TOTAL = 65,552 S.F. D R D R R D D R D R D R D R D R D R UP 35'-0"35'-0"35'-0"35'-0"34'-1 1/4" 32 ' - 0 " 32 ' - 0 " AR E A B AR E A A / 1 A1 0 2 a 64" X 42" STORAGE LOCKERS TOTAL = 19 UNTI D1 210 UNIT D1 212 UNIT D1 214 UNIT D1 216 UNIT G1 218 UNIT G1 217 UNIT E1 215 UNIT D1 213 UNIT D1 211 MECH. 229 CLOSET 230 CLOSET 231 7'-3"8'-8"15'-5"3'-8"3'-8"15'-3 3/4"10'-0 1/4"6'-0"6'-0"12'-3"13'-1"3'-8"3'-8"13'-1"12'-3"6'-0"3'-8 1/4"13'-1"11'-2"6'-2" 6'-0"12'-3"13'-1"3'-4 5/8"4'-10"11'-4"7'-2"9'-2 3/4"3'-8 1/4"13'-1"11'-2"6'-2" 64 ' - 0 " 34'-8 5/8"16'-8"18'-4"35'-0"23'-4"43'-4" 8' - 5 " 23 ' - 7 " 23 ' - 7 " 8' - 5 " 28 ' - 8 " 6' - 8 " 28 ' - 8 " 32 ' - 0 " 2' - 0 " 64 ' - 0 " 34 ' - 0 " 6' - 6 " 21 ' - 0 " 6' - 6 " 171'-4 5/8" 8'-4"8'-4"9'-2"9'-2" 19'-3 3/8"6'-0 1/4"19'-4 3/4"6'-0 1/4"38'-6 3/4"6'-0 1/4"19'-4 3/4"6'-0 1/4"28'-6 1/2"5'-3 3/8"19'-6 3/4" 19'-3 3/8"6'-0 1/4"9'-7 7/8"17'-7 3/8"7'-7 1/2"9'-9 5/8"19'-3 3/8"6'-0 1/4"16'-9 1/8"5'-2 1/2"10'-7"9'-5 1/8"9'-3 1/8"5'-3 3/8" 1' - 0 " 1' - 0 " 1' - 0 " 1' - 0 " 1' - 0 " 1' - 0 " 1' - 0 " 1' - 0 " 1' - 0 " 1' - 5 " MEMBER STORAGE 227 CRAFT/ ACTIVITY 228 A201 2 A203 2 A202 2 6'-0"12'-3"13'-1"3'-4 5/8" LIBRARY/ MEDIA/ GAMES 234 STAIR B ELEV. 106 HALLWAY 236 AR E A B AR E A A / 1 A1 0 2 a / 1 A1 0 2 a A501 7 6 8 A501 14 1315 NO T F O R C O N S T R U C T I O N - PROJECT No: TH E D E S I G N S A N D P L A N S I N D I C A T E D O N T H E D R A W I N G S A R E T H E P R O P E R T Y OF A Y R E S A S S O C I A T E S . A L L R I G H T S A R E R E S E R V E D . N O D ES I G N S O R P L A N S SH A L L B E U S E D O R R E P R O D U C E D I N A N Y F O R M O R B Y A N Y M EA N S W I T H O U T WR I T T E N P E R M I S S I O N O F A Y R E S A S S O C I A T E S . Ea u C l a i r e O f f i c e 34 3 3 O a k w o o d H i l l s P a r k w a y Ea u C l a i r e , W i s c o n s i n 5 4 7 0 1 (7 1 5 ) 8 3 4 -31 6 1 Ri v e r F a l l s O f f i c e 21 5 N . S e c o n d S t r e e t S u i t e 2 0 4 Ri v e r F a l l s , W i s c o n s i n 5 4 0 2 2 (7 1 5 ) 4 2 6 -49 0 8 Fa x : ( 7 1 5 ) 4 2 6 -58 6 6 9/ 1 2 / 2 0 1 9 1 0 : 3 3 : 4 1 A M BI M 3 6 0 : / / L a k e E l m o / L a k e _ E l m o _ A r c h . r v t NE W I N D E P E N D E N T L I V I N G F A C I L I T Y LA K E E L M O I N D E P E N D E N T L I V I N G , L L C LA K E E L M O , M I N N E S O T A A102b PR E L I M I N A R Y - CI T Y S U B M I T T A L P A C K A G E SECOND FLOOR AREA B PLAN 08-1893.00 09.12.2019 SCALE:1/8" = 1'-0"A102b 1 SECOND FLOOR - AREA B MARK DATE DESCRIPTION NORTH AREA A AREA B KEYPLAN SECOND FLOOR = 21,776 S.F. / TOTAL = 65,552 S.F. 1,125.4 SF UNIT F1 301 1,143.59 SF UNIT A1 300 744.69 SF UNIT B1 302 738.43 SF UNIT C1 304 738.43 SF UNIT C1 305 1,009.26 SF UNIT D1 312 1,043.89 SF UNIT G1 319 744.69 SF UNIT B1 306 738.43 SF UNIT C1 308 1,009.26 SF UNIT D1 310 1,009.26 SF UNIT D1 314 1,009.26 SF UNIT D1 316 1,043.89 SF UNIT G1 318 792.01 SF UNIT B2 303 792.01 SF UNIT B2 307 738.43 SF UNIT C1 309 1,009.26 SF UNIT D1 311 1,009.26 SF UNIT D1 315 705.24 SF UNIT E1 317 34 ' - 0 " 64 ' - 0 " 320'-0" 1,387.28 SF UNIT H1 313 98 ' - 0 " 183'-4"35'-0"101'-8" 42'-4"23'-4"29'-8"23'-4"64'-8"16'-8"18'-4"35'-0"23'-4"43'-4" 52'-5"8'-0"12'-3 3/4"8'-0"24'-8 1/4"8'-0"12'-3 3/4"8'-0"24'-1"8'-0"30'-0 3/4"8'-0"26'-3 1/4"8'-0"25'-6"8'-0"27'-0 1/4"8'-0"13'-4" 320'-0" 2' - 0 " 32 ' - 0 " 12'-9"8'-0"21'-7"14'-6"8'-0" 10" 9'-4 1/2"8'-0"12'-3 1/2"14'-6"8'-0" 10" 9'-4 1/2"8'-0"47'-3 1/2"14'-6 1/2"8'-0"12'-5 1/2" 10" 8'-0"14'-6"22'-0"8'-0"13'-4" STAIR B ELEV. 106 MECH. 329 STAFF 330 JAN. 332 / 1 A1 0 3 b / 1 A1 0 3 a AR E A B AR E A A / 1 A1 0 3 b / 1 A1 0 3 a AR E A B AR E A A HALLWAY 331 STAIR A STAIR C NO T F O R C O N S T R U C T I O N - PROJECT No: TH E D E S I G N S A N D P L A N S I N D I C A T E D O N T H E D R A W I N G S A R E T H E P R O P E R T Y OF A Y R E S A S S O C I A T E S . A L L R I G H T S A R E R E S E R V E D . N O D ES I G N S O R P L A N S SH A L L B E U S E D O R R E P R O D U C E D I N A N Y F O R M O R B Y A N Y M EA N S W I T H O U T WR I T T E N P E R M I S S I O N O F A Y R E S A S S O C I A T E S . Ea u C l a i r e O f f i c e 34 3 3 O a k w o o d H i l l s P a r k w a y Ea u C l a i r e , W i s c o n s i n 5 4 7 0 1 (7 1 5 ) 8 3 4 -31 6 1 Ri v e r F a l l s O f f i c e 21 5 N . S e c o n d S t r e e t S u i t e 2 0 4 Ri v e r F a l l s , W i s c o n s i n 5 4 0 2 2 (7 1 5 ) 4 2 6 -49 0 8 Fa x : ( 7 1 5 ) 4 2 6 -58 6 6 9/ 1 2 / 2 0 1 9 1 0 : 3 3 : 4 3 A M BI M 3 6 0 : / / L a k e E l m o / L a k e _ E l m o _ A r c h . r v t NE W I N D E P E N D E N T L I V I N G F A C I L I T Y LA K E E L M O I N D E P E N D E N T L I V I N G , L L C LA K E E L M O , M I N N E S O T A A103 PR E L I M I N A R Y - CI T Y S U B M I T T A L P A C K A G E THIRD FLOOR PLAN 08-1893.00 09.12.2019 MARK DATE DESCRIPTION SCALE:1/16" = 1'-0"A103 1 THIRD FLOOR UNIT MATRIX NAME COUNT AREA GUEST UNIT 1 363.86 SF UNIT A1 2 1,143.59 SF UNIT B1 4 744.69 SF UNIT B2 4 792.01 SF UNIT C1 8 738.43 SF UNIT D1 12 1,009.26 SF UNIT D2 2 985.32 SF UNIT E1 2 705.24 SF UNIT E2 1 629.11 SF UNIT F1 2 1,125.4 SF UNIT G1 4 1,043.89 SF UNIT H1 1 1,387.28 SF AREA A AREA B KEYPLAN NORTH THIRD FLOOR = 21,776 S.F. / TOTAL = 65,552 S.F. UP D R D R R R D D R D R D R D R D R D R D 42'-4"23'-4"29'-8"23'-4"29'-11 3/8" 64 ' - 0 " / 1 A1 0 3 b AR E A B AR E A A UNIT A1 300 UNIT B1 302 UNIT C1 304 UNIT B1 306 UNIT C1 308 UNIT C1 309 UNIT B2 307 UNIT C1 305 UNIT B2 303 UNIT F1 301 39'-10 3/4"30'-4 1/4"22'-7 3/4"30'-4 1/4"22'-7 3/4" 6'-7 3/4"10'-0"7'-0"12'-7"3'-8"7'-0 1/4"9'-6"10'-0"3'-10"6'-5 3/4"12'-7"3'-7"7'-0 1/4"9'-6"10'-0"3'-10"6'-5 3/4"12'-7"3'-7" 35 ' - 4 " 28 ' - 8 " 10 ' - 9 1 / 2 " 17 ' - 1 0 1 / 2 " 19 ' - 8 " 10 ' - 0 " 5' - 8 " 5'-6 5/8"11'-2"11'-2"14'-5 3/8"7'-1 1/8"11'-4 7/8"4'-10"3'-5 5/8"3'-10"6'-1"12'-9 3/4"3'-5 5/8"7'-2"11'-4"4'-10"3'-11 5/8"3'-4"6'-1"12'-11 1/2"3'-7 1/4" 26'-6"4'-11 1/2"8'-5 1/4"10'-5"5'-3 1/2"7'-0 3/4"7'-7"7'-0 3/4"5'-0"10'-7"10'-5"5'-3 1/2"7'-0 3/4"7'-7"7'-0 3/4"5'-2"10'-5" 5'-4 3/4"1'-3 1/2"9'-5 1/8"10'-7"5'-1 1/2"7'-0 3/4"7'-7"7'-0 3/4"5'-0"10'-7"10'-7"5'-1 1/2"7'-0 3/4"7'-7"7'-0 3/4"5'-2"10'-5" MECH. 323 MECH. 324 MECH. 325 MECH. 326 A201 1 A202 1 A203 1 HALLWAY 331 AR E A B AR E A A / 1 A1 0 3 b CLOSET 320 CLOSET 321 NO T F O R C O N S T R U C T I O N - PROJECT No: TH E D E S I G N S A N D P L A N S I N D I C A T E D O N T H E D R A W I N G S A R E T H E P R O P E R T Y OF A Y R E S A S S O C I A T E S . A L L R I G H T S A R E R E S E R V E D . N O D ES I G N S O R P L A N S SH A L L B E U S E D O R R E P R O D U C E D I N A N Y F O R M O R B Y A N Y M EA N S W I T H O U T WR I T T E N P E R M I S S I O N O F A Y R E S A S S O C I A T E S . Ea u C l a i r e O f f i c e 34 3 3 O a k w o o d H i l l s P a r k w a y Ea u C l a i r e , W i s c o n s i n 5 4 7 0 1 (7 1 5 ) 8 3 4 -31 6 1 Ri v e r F a l l s O f f i c e 21 5 N . S e c o n d S t r e e t S u i t e 2 0 4 Ri v e r F a l l s , W i s c o n s i n 5 4 0 2 2 (7 1 5 ) 4 2 6 -49 0 8 Fa x : ( 7 1 5 ) 4 2 6 -58 6 6 9/ 1 2 / 2 0 1 9 1 0 : 3 3 : 4 5 A M BI M 3 6 0 : / / L a k e E l m o / L a k e _ E l m o _ A r c h . r v t NE W I N D E P E N D E N T L I V I N G F A C I L I T Y LA K E E L M O I N D E P E N D E N T L I V I N G , L L C LA K E E L M O , M I N N E S O T A A103a PR E L I M I N A R Y - CI T Y S U B M I T T A L P A C K A G E THIRD FLOOR AREA A PLAN 08-1893.00 09.12.2019 SCALE:1/8" = 1'-0"A103a 1 THIRD FLOOR - AREA A MARK DATE DESCRIPTION AREA A AREA B KEYPLAN NORTH THIRD FLOOR = 21,776 S.F. / TOTAL = 65,552 S.F. D R D RD R D R D R D R R D D R D R DR UP 34'-8 5/8"35'-0"101'-8" 32 ' - 0 " 32 ' - 0 " 64 ' - 0 " 16'-8"18'-4"35'-0"23'-4"43'-4" AR E A B AR E A A / 1 A1 0 3 a UNIT D1 310 UNIT D1 312 UNIT D1 314 UNIT D1 316 UNIT G1 318 UNIT G1 319 UNIT E1 317 UNIT D1 315 UNIT H1 313 UNIT D1 311 STAFF 330 MECH. 329 BENCH 35'-0"35'-0"35'-0"35'-0"34'-1 1/4" 7'-3"8'-8"15'-5"3'-8"3'-8"15'-3 3/4"10'-0 1/4"6'-0"6'-0"12'-3"13'-1"3'-8"3'-8"13'-1"12'-3"6'-0"3'-8 1/4"12'-9"11'-6"6'-2" 8' - 5 " 23 ' - 7 " 23 ' - 7 " 8' - 5 " 8'-4"8'-4"9'-2"9'-2" 3'-7 1/4"6'-0"12'-3"13'-1"3'-4 5/8" 6'-3 3/8"12'-3"13'-1"3'-4 5/8"4'-10"11'-4"7'-2"9'-2 3/4"3'-8 1/4"13'-1"11'-2"6'-2" 19'-3 3/8"6'-0 1/4"9'-8 3/8"9'-8 3/8"6'-0 1/4"19'-3 3/8"19'-3 3/8"6'-0 1/4"9'-8 3/8"9'-8 3/8"6'-0 1/4"19'-3 3/8"9'-3 1/8"5'-3 3/8"19'-6 3/4" 19'-3 3/8"6'-0 1/4"9'-8 3/8"17'-6 7/8"7'-7 1/2"9'-9 5/8"19'-3 3/8"6'-0 1/4"9'-8 3/8"7'-0 3/4"5'-2 1/2"10'-7"9'-5 1/8"9'-3 1/8"5'-3 3/8" 2' - 3 " 8' - 3 " 18 ' - 0 " 5' - 6 " A201 2 A203 2 A202 2 JAN. 332 13 ' - 0 " 19 ' - 0 " 2' - 0 " 32 ' - 0 " STAIR B HALLWAY 331 ELEV. 106 AR E A B AR E A A / 1 A1 0 3 a NO T F O R C O N S T R U C T I O N - PROJECT No: TH E D E S I G N S A N D P L A N S I N D I C A T E D O N T H E D R A W I N G S A R E T H E P R O P E R T Y OF A Y R E S A S S O C I A T E S . A L L R I G H T S A R E R E S E R V E D . N O D ES I G N S O R P L A N S SH A L L B E U S E D O R R E P R O D U C E D I N A N Y F O R M O R B Y A N Y M EA N S W I T H O U T WR I T T E N P E R M I S S I O N O F A Y R E S A S S O C I A T E S . Ea u C l a i r e O f f i c e 34 3 3 O a k w o o d H i l l s P a r k w a y Ea u C l a i r e , W i s c o n s i n 5 4 7 0 1 (7 1 5 ) 8 3 4 -31 6 1 Ri v e r F a l l s O f f i c e 21 5 N . S e c o n d S t r e e t S u i t e 2 0 4 Ri v e r F a l l s , W i s c o n s i n 5 4 0 2 2 (7 1 5 ) 4 2 6 -49 0 8 Fa x : ( 7 1 5 ) 4 2 6 -58 6 6 9/ 1 2 / 2 0 1 9 1 0 : 3 3 : 4 7 A M BI M 3 6 0 : / / L a k e E l m o / L a k e _ E l m o _ A r c h . r v t NE W I N D E P E N D E N T L I V I N G F A C I L I T Y LA K E E L M O I N D E P E N D E N T L I V I N G , L L C LA K E E L M O , M I N N E S O T A A103b PR E L I M I N A R Y - CI T Y S U B M I T T A L P A C K A G E THIRD FLOOR AREA B PLAN 08-1893.00 09.12.2019 SCALE:1/8" = 1'-0"A103b 1 THIRD FLOOR - AREA B MARK DATE DESCRIPTION AREA A AREA B KEYPLAN NORTH THIRD FLOOR = 21,776 S.F. / TOTAL = 65,552 S.F. FIRST FLOOR 100'-0" SECOND FLOOR 110'-10" TRUSS BEARING 131'-1" SEE STRUCTURAL TOP OF FTNG. THIRD FLOOR 122'-0 5/8" 5 12 5 12 9' - 0 3 / 8 " 11 ' - 2 5 / 8 " 10 ' - 1 0 " 31 ' - 1 " 5 12 CULTURED STONE VENEER UTILITY BRICK 5/4"x6" FIBER CEMENT TRIM STEEL BOARD AND BATTEN SIDING STEEL HORIZONTAL SIDING ARCHITECTURAL PRECAST SILL 5/4"x6" FIBER CEMENT TRIM 5/4"x4" FIBER CEMENT TRIM PRE-FINISHED ALUMINUM FASCIA ARCHITECTURAL PRECAST HEADER ARCHITECTURAL PRECAST SILL ASPHALT SHINGLES STEEL SHAKE SIDING FIRST FLOOR 100'-0" SECOND FLOOR 110'-10" TRUSS BEARING 131'-1" SEE STRUCTURAL TOP OF FTNG. THIRD FLOOR 122'-0 5/8" UTILITY BRICK 5 12 9' - 0 3 / 8 " 11 ' - 2 5 / 8 " 10 ' - 1 0 " 31 ' - 1 " 5 12 5/4"x6" FIBER CEMENT TRIM STEEL BOARD AND BATTEN SIDING STEEL HORIZONTAL SIDING ARCHITECTURAL PRECAST SILL 5/4"x6" FIBER CEMENT TRIM 5/4"x4" FIBER CEMENT TRIM PRE-FINISHED ALUMINUM FASCIA POLYMER COMPOSITE COLUMN CULTURED STONE VENEER PORCH BEARING 109'-2 1/2" ASPHALT SHINGLES ARCHITECTURAL PRECAST HEADER ARCHITECTURAL PRECAST SILL STEEL SHAKE SIDING 5 12 NO T F O R C O N S T R U C T I O N - PROJECT No: TH E D E S I G N S A N D P L A N S I N D I C A T E D O N T H E D R A W I N G S A R E T H E P R O P E R T Y OF A Y R E S A S S O C I A T E S . A L L R I G H T S A R E R E S E R V E D . N O D ES I G N S O R P L A N S SH A L L B E U S E D O R R E P R O D U C E D I N A N Y F O R M O R B Y A N Y M EA N S W I T H O U T WR I T T E N P E R M I S S I O N O F A Y R E S A S S O C I A T E S . Ea u C l a i r e O f f i c e 34 3 3 O a k w o o d H i l l s P a r k w a y Ea u C l a i r e , W i s c o n s i n 5 4 7 0 1 (7 1 5 ) 8 3 4 -31 6 1 Ri v e r F a l l s O f f i c e 21 5 N . S e c o n d S t r e e t S u i t e 2 0 4 Ri v e r F a l l s , W i s c o n s i n 5 4 0 2 2 (7 1 5 ) 4 2 6 -49 0 8 Fa x : ( 7 1 5 ) 4 2 6 -58 6 6 9/ 1 2 / 2 0 1 9 1 0 : 3 3 : 4 9 A M BI M 3 6 0 : / / L a k e E l m o / L a k e _ E l m o _ A r c h . r v t NE W I N D E P E N D E N T L I V I N G F A C I L I T Y LA K E E L M O I N D E P E N D E N T L I V I N G , L L C LA K E E L M O , M I N N E S O T A A201 PR E L I M I N A R Y - CI T Y S U B M I T T A L P A C K A G E EXTERIOR ELEVATIONS 08-1893.00 09.12.2019 MARK DATE DESCRIPTION SCALE:1/8" = 1'-0"A201 1 SOUTH ELEVATION - AREA A SCALE:1/8" = 1'-0"A201 2 SOUTH ELEVATION - AREA B AREA A AREA B KEYPLAN AREA A AREA B KEYPLAN FIRST FLOOR 100'-0" SECOND FLOOR 110'-10" TRUSS BEARING 131'-1" SEE STRUCTURAL TOP OF FTNG. THIRD FLOOR 122'-0 5/8" 9' - 0 3 / 8 " 11 ' - 2 5 / 8 " 10 ' - 1 0 " 31 ' - 1 " 5/4"x6" FIBER CEMENT TRIM STEEL BOARD AND BATTEN SIDING ARCHITECTURAL PRECAST SILL 5/4"x4" FIBER CEMENT TRIM STEEL HORIZONTAL SIDING PRE-FINISHED ALUMINUM FASCIA UTILITY BRICK POLYMER COMPOSITE COLUMN 5/4"x6" FIBER CEMENT TRIM CULTURED STONE VENEER 5 12 PORCH BEARING 109'-2 1/2" FIRST FLOOR 100'-0" SECOND FLOOR 110'-10" TRUSS BEARING 131'-1" SEE STRUCTURAL TOP OF FTNG. THIRD FLOOR 122'-0 5/8" 31 ' - 1 " 9' - 0 3 / 8 " 11 ' - 2 5 / 8 " 10 ' - 1 0 " STEEL BOARD AND BATTEN SIDING 5/4"x6" FIBER CEMENT TRIM 5/4"x4" FIBER CEMENT TRIM STEEL HORIZONTAL SIDING PRE-FINISHED ALUMINUM FASCIA UTILITY BRICKPOLYMER COMPOSITE COLUMN 5/4"x6" FIBER CEMENT TRIM CULTURED STONE VENEER ARCHITECTURAL PRECAST SILL 5 12 PORCH BEARING 109'-2 1/2" ASPHALT SHINGLES NO T F O R C O N S T R U C T I O N - PROJECT No: TH E D E S I G N S A N D P L A N S I N D I C A T E D O N T H E D R A W I N G S A R E T H E P R O P E R T Y OF A Y R E S A S S O C I A T E S . A L L R I G H T S A R E R E S E R V E D . N O D ES I G N S O R P L A N S SH A L L B E U S E D O R R E P R O D U C E D I N A N Y F O R M O R B Y A N Y M EA N S W I T H O U T WR I T T E N P E R M I S S I O N O F A Y R E S A S S O C I A T E S . Ea u C l a i r e O f f i c e 34 3 3 O a k w o o d H i l l s P a r k w a y Ea u C l a i r e , W i s c o n s i n 5 4 7 0 1 (7 1 5 ) 8 3 4 -31 6 1 Ri v e r F a l l s O f f i c e 21 5 N . S e c o n d S t r e e t S u i t e 2 0 4 Ri v e r F a l l s , W i s c o n s i n 5 4 0 2 2 (7 1 5 ) 4 2 6 -49 0 8 Fa x : ( 7 1 5 ) 4 2 6 -58 6 6 9/ 1 2 / 2 0 1 9 1 0 : 3 3 : 5 0 A M BI M 3 6 0 : / / L a k e E l m o / L a k e _ E l m o _ A r c h . r v t NE W I N D E P E N D E N T L I V I N G F A C I L I T Y LA K E E L M O I N D E P E N D E N T L I V I N G , L L C LA K E E L M O , M I N N E S O T A A202 PR E L I M I N A R Y - CI T Y S U B M I T T A L P A C K A G E EXTERIOR ELEVATIONS 08-1893.00 09.12.2019 MARK DATE DESCRIPTION SCALE:1/8" = 1'-0"A202 1 WEST ELEVATION SCALE:1/8" = 1'-0"A202 2 EAST ELEVATION FIRST FLOOR 100'-0" SECOND FLOOR 110'-10" TRUSS BEARING 131'-1" SEE STRUCTURAL TOP OF FTNG. THIRD FLOOR 122'-0 5/8" 5/4"x6" FIBER CEMENT TRIM STEEL BOARD AND BATTEN SIDING ARCHITECTURAL PRECAST SILL 5/4"x6" FIBER CEMENT TRIM 5/4"x4" FIBER CEMENT TRIM PRE-FINISHED ALUMINIUM FASCIA 10 ' - 1 0 " 11 ' - 2 5 / 8 " 9' - 0 3 / 8 " 31 ' - 1 " 5 12 5 12 5 12 ASPHALT SHINGLES STEEL SHAKE SIDING FIRST FLOOR 100'-0" SECOND FLOOR 110'-10" TRUSS BEARING 131'-1" SEE STRUCTURAL TOP OF FTNG. THIRD FLOOR 122'-0 5/8" 31 ' - 1 " 10 ' - 1 0 " 11 ' - 2 5 / 8 " 9' - 0 3 / 8 " 5/4"x6" FIBER CEMENT TRIM STEEL BOARD AND BATTEN SIDING STEEL HORIZONTAL SIDING ARCHITECTURAL PRECAST SILL 5/4"x6" FIBER CEMENT TRIM 5/4"x4" FIBER CEMENT TRIM PRE-FINISHED ALUMINIUM FASCIA 5 12 5 12 5 12 ASPHALT SHINGLES STEEL SHAKE SIDING NO T F O R C O N S T R U C T I O N - PROJECT No: TH E D E S I G N S A N D P L A N S I N D I C A T E D O N T H E D R A W I N G S A R E T H E P R O P E R T Y OF A Y R E S A S S O C I A T E S . A L L R I G H T S A R E R E S E R V E D . N O D ES I G N S O R P L A N S SH A L L B E U S E D O R R E P R O D U C E D I N A N Y F O R M O R B Y A N Y M EA N S W I T H O U T WR I T T E N P E R M I S S I O N O F A Y R E S A S S O C I A T E S . Ea u C l a i r e O f f i c e 34 3 3 O a k w o o d H i l l s P a r k w a y Ea u C l a i r e , W i s c o n s i n 5 4 7 0 1 (7 1 5 ) 8 3 4 -31 6 1 Ri v e r F a l l s O f f i c e 21 5 N . S e c o n d S t r e e t S u i t e 2 0 4 Ri v e r F a l l s , W i s c o n s i n 5 4 0 2 2 (7 1 5 ) 4 2 6 -49 0 8 Fa x : ( 7 1 5 ) 4 2 6 -58 6 6 9/ 1 2 / 2 0 1 9 1 0 : 3 3 : 5 2 A M BI M 3 6 0 : / / L a k e E l m o / L a k e _ E l m o _ A r c h . r v t NE W I N D E P E N D E N T L I V I N G F A C I L I T Y LA K E E L M O I N D E P E N D E N T L I V I N G , L L C LA K E E L M O , M I N N E S O T A A203 PR E L I M I N A R Y - CI T Y S U B M I T T A L P A C K A G E EXTERIOR ELEVATIONS 08-1893.00 09.12.2019 MARK DATE DESCRIPTION SCALE:1/8" = 1'-0"A203 1 NORTH ELEVATION - AREA A SCALE:1/8" = 1'-0"A203 2 NORTH ELEVATION - AREA B AREA A AREA B KEYPLAN AREA A AREA B KEYPLAN Lake Elmo Senior Living Project Summary To: City of Lake Elmo, MN 16 September 2019 From: Mathew Frisbie – Ayres Associates Inc The following describes the overall project summary. Lake Elmo Senior Living Project with Ebenezer Management Lake Elmo, MN Layout and Design Changes from Initial Concept Review in August The following items were updated or changed after listening to the various comments from the city staff, the neighbors, the Planning Commission, and the City Council members: · One of the access drives coming off of 39th Street North was eliminated, and the development drive now loops back and connects at one location. · Fire access lanes have been added on both the east and west sides of the 42-unit apartment building. · The 42-unit building was shifted further to the south to achieve a 55-foot buffer to the north property line to the main building footprint and 50 feet for the 5-foot decks (a 10-foot rear yard setback is required per code). · The twin homes will have a 35-foot buffer from the east and west property lines (a 10-foot side yard setback is required per code). · All the existing trees on the site (all on the north property line) will be preserved, protected, and maintained as a good buffer to the residential neighborhood to the north. A tree survey was completed to locate all of the trees. Also, new trees will be added to the north tree line to infill the northwest corner of the site where there are currently some gaps. · A full landscape plan and civil engineering plans are now part of the submittal. · A traffic study was completed and the impact to 39th Street North will be minimal. · The sidewalk connection to the Arbor Glen Senior Living facility was moved slightly to the north to align with the sidewalk access to the main entry of the facility and to the outdoor dining. This location is better for safety while walking a shorter and more direct route. · The village park in the center of the development is more defined with the pickle ball courts, bocce ball courts, and small playground structure, raised gardens, a trellis, and circulation paths with benches. · The parking layout has been adjusted per the changes and the new parking count is 120 stalls and 117 stalls are required per city zoning code. The Location and Demand This proposed independent senior living project is the 5-acre parcel adjacent to Arbor Glen Senior Living (11020 39th Street) in Lake Elmo. Lake Elmo is a suburban community of 9,916 people (2018 estimate) in Washington County. While lower-density, Lake Elmo is surrounded by larger neighbors. To the northeast is Stillwater (population 19,750) and Oak Park Heights (4,740). On the southwest is Woodbury (69,500) and on the west is Oakdale (28,100). Lake Elmo is an appealing residential location as it combines a picturesque rural character with excellent access to shopping and services in the surrounding area. Based on the resident draw pattern of the existing Arbor Glen Senior Living, community orientation, proximity to other senior housing properties in the surrounding area, geographic barriers, and our knowledge of senior housing draw areas, we estimate that a new senior rental housing development on the Site in Lake Elmo would attract approximately 65% of its residents from a draw area (Primary Market Area, or “PMA”) that includes Lake Elmo, West Lakeland Township, and Baytown Township. The remaining portion of the senior housing demand (35%) would come from outside the PMA, particularly parents of adult children living in the PMA. The preliminary senior housing study was completed by Viewpoint Consulting Group, Inc. Based on pent-up demand and the growth in senior households, the Market Study identified an unmet demand for independent senior living units, assisted living units and memory care units. These numbers conservatively reflect a capture rate of 45% of the market area excess demand. The senior population is projected to continue to see an increase for the next five years. This provides for a very healthy and growing senior population. The Project The site development for this project, managed by Ebenezer, is a total 60 units designed around a common park-like green space and site amenities for senior independent living. This would consist of a 42-unit senior living three-story apartment building with larger one-bedroom units, two- bedroom units, and two-bedroom units plus dens and the building will have internal parking. The site plan layout will also include 18 patio homes (9 buildings with either two-bedroom or three- bedroom units). The rent structure is comparable to neighboring facilities and other new campuses that are currently being constructed across the region. The apartment building will incorporate typical senior building amenities such as a community room, multi-purpose rooms, fitness room, management office and a food serving kitchen for serving community room. The exterior of the buildings will complement the adjacent Arbor Glen facility and will incorporate brick, stone and Hardi-type siding (cementitious siding) with a sloping asphalt shingle roof. The building will be set back off the adjacent streets with extensive patios, landscaping, gardens, walks and courtyards. The Management Team – Ebenezer Senior Services: Founded in 1917 by Minneapolis Lutherans to provide community-centered care for homeless older adults and others in need, Ebenezer Society programs and services today include: · Independent Living (including condominiums, cooperatives and senior apartments) · Assisted Living · Memory Care · Transitional and Long-term Care · Adult and Intergenerational Day Programs · Community-based Services · Management and Consulting Services · The Ebenezer Foundation Part of Fairview Health Services since 1995, their combined resources and expertise offer access to a full range of choices for vibrant senior living. In partnership with the University of Minnesota, they are also part of an academic health system improving the patient’s clinical experience, conducting nation-leading research and achieving academic prominence. Ebenezer will assist in analyzing the market, establishing a strategic marketing plan, producing sales collateral, coordinating a public relations plan, and training sales staff. Through Ebenezer’s system for managing leads, maximizing sales, and monitoring programs to reach occupancy projections, this new senior living facility hopes to fill this facility within two years of opening. Ebenezer will provide effective on-site management as well as consulting services in all areas of management. Ebenezer has proven that quality patient care and a positive bottom line can go hand- in-hand. Ebenezer will evaluate the facilities’ strengths and weaknesses and they will assess current programs, any service gaps, as well as opportunities and threats in the external market environment. From this, recommendations for new service options tailored to the needs of seniors will be developed and include an individualized implementation plan. The anticipated number of employees for this independent senior living facility project will be approximately 4 employees. This will include an executive director, a marketing director, staff for activities, and maintenance person. Please contact me if you have any questions or comments. Sincerely, Mathew J. Frisbie, AIA Vice President – Ayres Associates Inc PUD Density Calculations Information Site for Proposed Lake Elmo Senior Living Project Parcel Number: 13.029.21.22.0013 Legal Description: BROOKMAN 3RD ADD LOT 2 BLOCK 2 SUBDIVISIONCD 37102 Summary: The Concept Site Plan shows 60 total units – 42 in the three-story apartment building and 18 in the one-level patio home buildings. The existing zoning of the site, VMX, shows the density for development at 6-10 units per acre. So, the summary of the density of the proposed concept site plan starts with the 10 units/acre = 50 units and then we meet several of the PUD “density increases” to meet the 20% increase which adds another 10 unit for a total of 60 units. Please see our density increase calculations below from the City Zoning Code From the City of Lake Elmo Zoning Code: § 154.754 DENSITY. The PUD may provide for an increase in density of residential development by up to 20% of that allowed in the base zoning district. Applicants seeking increased residential density through a Planned Unit Development are required to provide at least 1 or a combination of site amenities that equal the required amount of amenity points to achieve the desired density bonus. A. Amenity Points and Equivalent Density Increases. Increases in density will be awarded through a 1:1 ratio with amenity points. For every increase in amenity points for a Planned Unit Development, the applicant will be allowed an equivalent amount of density increase, up to a maximum increase of 20%. Table 16-1 outlines the required amount of amenity points to achieve various density increases. Table 16-1: Amenity Points and Equivalent Density Increases Amenity Points Density Increase 5 5% 10 10% 15 15% 20 20% B. Site Amenities. Site amenities that are eligible for amenity points are listed in Table 16-2, including the associated standards of implementation. Some of the amenities may be awarded a range of amenity point based upon the quality and magnitude of the amenity. Where the amenity does not meet all of the standards required in Table 16-2, no points shall be awarded. Partial points for site amenities shall not be awarded, except as otherwise allowed in Table 16-2. C. Site Amenities Not Listed. The city may also consider the allotment of amenity points for site amenities that are not otherwise specified within this ordinance as part of the preliminary plan phase of the planned development. Table 16-2: Site Amenities Points Amenity Standards 5-10 Underground or Structure Parking Proposed underground or structured parking must be integrated into the primary structure. The purpose of this amenity is to better integrate parking into the site, reduce the amount of surface parking stalls, and reduce the amount of impervious surface. Proposed underground or structured parking must reduce the amount of surface parking stalls located outside of the footprint of the principal structure by a minimum of 25%. Amenity points will be awarded based upon the amount of surface parking stalls reduced (between 25-50%). For every additional 5% of surface parking stalls reduced above 25%, the applicant will be awarded 1 additional amenity point, up to a maximum of 10 amenity points. The facade of any underground or structure parking areas must match the architectural design of the principal structure. 10 Historic Preservation Preservation, rehabilitation or restoration of designated historic landmarks in a manner that is consistent with the standards for rehabilitation of the Secretary of the Interior as part of the development. Points Amenity Standards 10 Additional Open Space A minimum of 50% of the site not occupied by buildings shall be landscaped outdoor open space. A minimum of 50% of the provided open space shall be contiguous. Open space classifications that qualify may include natural habitat, neighborhood recreation, trail corridors or open space buffers. 10 Public Right-of-Way Dedication Dedication of land and construction of a public road, trail, pathway, or greenway that is part of an approved city plan, but outside the scope of the immediate project area. Right-of-way improvements should be designed per the specification of the City Engineer. 5 Fire Sprinkler Systems The installation of fire sprinkler systems, per NFPA 13, 13D or 13R, in structures that are not currently required to install these systems under state code. Amenity points will only be awarded in situations where there are a significant proportion of structures in the development that are not required to be sprinkled under State Building Code. In addition, the density bonus calculation shall only be applied to the number of structures that do not require fire sprinkler systems. 5 Contained Parking The purpose of this amenity is to better integrate surface parking into the site and reduce the amount of visible surface parking from the public right-of-way. Parking should be rear-loaded and hidden by the building facade, or integrated into the site in some other fashion that is acceptable to the city. This amenity is separate from underground or structure parking. 5 Leadership in Energy and Environmental Design The proposed development shall meet the minimum standards for LEED Silver certification. The project does not have to achieve actual LEED certification; however, the developer must submit the LEED checklist and documentation to the city, approved by a LEED Accredited Professional (LEED-AP), which shows that the project will comply with LEED Silver requirements. +10 points +0 points +10 points +0 points +0 points +5 points +0 points Points Amenity Standards 5 Pedestrian Improvements A site and building design that allows for exceptional and accessible pedestrian and/or bicycle access through and/or around a site. The improvements shall use a combination of trails, landscaping, decorative materials, access control and lighting to create safe, clear and aesthetically pleasing pedestrian facilities through and /or around the site that comply with the Americans with Disabilities Act accessibility requirements. 5 Adaptive Reuse Significant renovation, rehabilitation and adaptive reuse of an existing building(s), rather than demolition. 5 Plaza The development shall include some form of plaza or public square that is wholly or partly enclosed by a building or buildings. Plazas are landscaped or paved open areas that shall have a minimum area not less than 1,000 square feet. Plazas for commercial or mixed-use development shall be open to the public during daylight hours. Points Amenity Standards 1-5 Enhanced Landscaping A Landscaping Plan of exceptional design that has a variety of native tree, shrub and plan types that provide seasonal interest and that exceeds the requirements of the Lake Elmo Design Standards Manual. The landscaped areas should have a resource efficient irrigation system. The Landscaping Plan shall be prepared by a licensed landscape architect. Amenity points shall be awarded based upon the quality and magnitude of the Landscaping Plan. 3 Enhanced Storm Water Management Provide capacity for infiltrating stormwater generated onsite with artful rain garden design that serves as a visible amenity. Rain garden designs shall be visually compatible with the form and function of the space and shall include long-term maintenance of the design. The design shall conform to the requirements per the Minnesota Stormwater Manual and shall meet the approval of the City Engineer. 1-3 Theming Significant utilization of various elements of Theming consistent with the 2013 Lake Elmo Theming Project, including but not limited to signage, fencing, landscaping, lighting and site furnishings. Amenity points will be awarded based upon the quality and magnitude of Theming elements integrated into the project. 3 Natural Features Site planning that preserves significant natural features or restores ecological functions of a previously damaged natural environment. +5 points +0 points +5 points +5 points +3 points +3 points +0 points Estimated total of +/-46 potential points awarded Max points allowed is 20 points for 20% density increase     PAGE 1 of 2  MEMORANDUM         Date:  October 10, 2019      To:  Ken Roberts, Planning Director  Re:  Lake Elmo Senior Development   Cc:  Chad Isakson, Assistant City Engineer    Preliminary Plan Review   From:  Jack Griffin, P.E., City Engineer          Engineering has reviewed the Preliminary Site Plan for the Lake Elmo Senior Development to be located along 39th  Street North, just east of Arbor Glenn Senior Living. The submittal consisted of the following documentation received  September 30, 2019:   Preliminary Site Plan and PUD dated September 17, 2019, prepared by Ayres Associates.   Storm Water Management Plan dated September 17, 2019 prepared by Ayres Associates.   Traffic Impact Study dated August 30, 2019 prepared by Ayres Associates.      Engineering review comments are as follows:    Final  Construction  Plans  and  Specifications  must  be  prepared  in accordance with the latest version of the City  Engineering Design Standards Manual, using City details, plan notes and specifications and meeting City Engineering  Design Guidelines. A detailed construction plan review will be completed prior to the start of construction of the site  improvements.    STREETS AND TRANSPORTATION     Site Access/Access Management is sufficient. With the potential for many new commercial buildings along  39th Street North, access management will need to be carefully implemented to ensure that 39th Street  continues to function as intended. As parcels develop and subdivide, the access points to 39th Street will need  to be coordinated and minimized. The site plan has been revised to show only one driveway access to the  development. The proposed access meets the acceptable spacing guidelines from the existing driveway at  Arbor Glen and maintains an adequate offset from the south leg of Laverne Avenue.   39th Street North Right‐of‐Way Dedication not required. No additional right‐of‐way dedication appears to be  required  along  39th  Street  North.  The  preliminary  plan  shows  that the existing right‐of‐way provides a  minimum of 40 feet from street centerline along the entire length of the property.   39th Street North Utility Easement Dedication. A 10‐foot utility easement for small utilities has been dedicated  to the City along the entire north boulevard of 39th Street North. The site plans must be prepared in a manner  to preserves the full 10‐feet for small utility installation with no obstructions (e.g. signs, trees, structures, etc.).  The preliminary plan must be revised to show the utility easement graded as boulevard with maximum 4%  slope.   Construction parking and staging (preservation of 39th Street North). As part of any development or site  improvement agreement the developer will be required to manage all construction parking, construction  staging and material deliveries internal to the site. No parking and construction staging, including loading and  unloading materials and equipment will be allowed along 39th Street North at any time during the construction  of the site improvements and buildings. All street and boulevard damage caused by the construction activities  must be repaired or replaced at no cost to the City and meeting City standards and specifications.  FOCUS ENGINEERING, inc.  Cara Geheren, P.E.   651.300.4261  Jack Griffin, P.E.                651.300.4264  Ryan Stempski, P.E.  651.300.4267  Chad Isakson, P.E.  651.300.4285      PAGE 2 of 2   Site easements/landscaping. The preliminary plans must be revised to maintain all tree plantings outside of  the front, side and rear drainage and utility easements.   Traffic Impact Study. A traffic impact study has been submitted as part of the site plan application. The Study  findings indicate no additional travel lanes, turn lanes or other road improvements required.    STORMWATER MANAGEMENT   A State and Valley Branch Watershed District (VBWD) permit will be required. The site plan is subject to a storm  water management plan meeting State, VBWD and City rules and regulations.   Storm water facilities proposed for meeting permitting requirements must be designed and constructed in  accordance with the City Engineering Design Standards Manual available on the City website.   Based on the plans received to date, plan revisions are required to conform the site design to VBWD and City  rules and regulations.   The storm water facilities constructed for this development should remain privately owned and maintained.  The applicant will be required to execute and record a Stormwater Maintenance and Easement Agreement in  the City’s standard form of agreement.   The storm water facility 100‐year HWL must be fully contained within the subject property and must be a  minimum of 2‐feet below all adjacent low floor building elevations.   The existing downstream drainage basins for the 39th Street storm sewer system do not have available  treatment or storage capacity to accommodate new development. Therefore, any storm sewer connections to  the 39th Street system must be at both reduced runoff rates and volumes.   Connection to 39th Street storm sewer requires verification of existing capacity within all downstream storm  sewer systems and availability of downstream storm sewer ponding at the discharge location(s). Detailed  storm sewer calculations must be submitted demonstrating sufficient capacity and meeting all current City  Engineering Design Standards.     MUNICIPAL WATER SUPPLY   The proposed property is located in the Old Village MUSA and intermediate water system pressure zone.   Connection to the municipal water supply is readily available to serve this property. The applicant will be  required to connect, at its sole cost, to the existing 8‐inch DIP stub that was installed to serve this property. A  minimum 8‐inch diameter watermain will be required to be extended internal to the site with private water  services stubbed for connection to each individual building.   The applicant will be responsible to place hydrants and gate valves throughout the property at the direction of  the Fire Department and Public Works Department (see attached hydrant and system valve locations).  All fire  hydrants and connecting watermains shall be owned and maintained by the City.    Any watermain lines and hydrants placed internal to the site will require minimum 30‐foot easements centered  over the hydrant or pipe. Easements must be dedicated to the City and be provided in the City’s standard form  of easement agreement.     Water availability charges and connection charges will apply to the service connections. A Met Council SAC  determination will be required to determine the WAC/Connection charges for each building.    MUNICIPAL SANITARY SEWER   The proposed property is located in the Old Village MUSA current Regional Sewer Staging Plan and would  discharge to the MCES Cottage Grove Ravine Interceptor.   Connection to the municipal sanitary sewer system is readily available to serve this property. The applicant will  be required to connect, at its sole cost, to the existing 8‐inch PVC stub that was installed to serve this property.  An 8‐inch diameter sanitary sewer main will be required to be extended internal to the site with private sewer  service stubs installed for connection to each individual building.   All sanitary sewer mains internal to the site shall remain privately owned and maintain.   The sanitary sewer main along the south property line must be realigned to remain outside of the 10‐foot  drainage and utility easement (see attached sanitary sewer realignment).     Sewer availability charges and connection charges will apply to the service connections. A Met Council SAC  determination will be required to determine the SAC/Connection charges for each building.  1036 1044 1091 1115 WV SAN MH 1166 SAN MH 1177 WV STM MH 1182 WV STM MH 1186 ETRAN ETRAN WV 1254 IP1/2" RB SAN MH 1366 IP MH IPIP G G G G G G G G G E E E E E E E EEEEEEEEE EEE SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN STM STM STM STM STM STM STM STM STM STM STM W W W W W W W W W W SA N W W W W W SA N SA N SA N SA N SA N W W W W W W W SA N SA N SA N SA N SA N SA N SA N SAN MH SAN SAN SAN W W W W SUBSURFACE INFILTRATION SYSTEM (50'x85') SUBSURFACE INFILTRATION SYSTEM (70'x50') DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DS DSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDS DS S15 S12 S13 S14 S11 S17 S10 S09 AEW1 S08 S06 S07 AEW2 S04 S03 S05 S01 S02 S26 107' - 1 2 " S S @ 0 . 5 0 % 152' - 18" SS @ 0.22% 46' - 18" SS @ 0.22% 8 2 ' - 1 8 " S S @ 0 . 2 2 % 58' - 18" SS @ 0.22% 129' - 12" SS @ 0.37% 7 0 ' - 1 2 " S S @ 0 . 5 0 % 107' - 15" SS @ 0.50% 56' - 18" SS @ 0.22% 11' - 12" SS @ 5.00% 52' - 15" SS @ 1.80% 40' - 12" SS @ 1.15% 96' - 12" S S @ 2 . 2 4 % 55' - 15" SS @ 0.28% 18 7 ' - 1 5 " S S @ 0 . 2 8 % 23' - 12" SS @ 0.37% 35' - 15" SS @ 0.37% 39' - 12" SS @ 0.37% S19 S18 CONNECT TO EXISTING CONNECT TO EXISTING CONNECT TO EXISTING CS CS T T CS CS T T CS CS T T CS CS T T T CS CS CS T T CS CS T T CS CS T T CS CS T T 33' - 12" SS @ 0.37% 34' - 15" SS @ 0.28% S30 S31 SITE UTILITIES LEGEND 1.ALL WATERMAIN AND ACCESSORIES MUST BE CONSTRUCTED IN ACCORDANCE WITH THE CITY OF LAKE ELMO STANDARD SPECIFICATIONS AND DETAILS. 2.MANIPULATION OF EXISTING VALVES SHALL BE PERFORMED ONLY BY CITY PERSONNEL. 3.WATERMAIN SHALL BE DUCTILE IRON PIPE, ENCASED IN POLYETHYLENE, CLASS-52. 4.ALL FITTINGS SHALL COMPLY WITH CEAM SPEC. 2611.2.A.1. ALL FITTINGS SHALL BE DUCTILE IRON PIPE WITH POLYETHYLENE ENCASEMENT. ALL CONNECTIONS SHALL BE INSTALLED UTILIZING COR-BLUE NUTS & BOLTS. 5.USE GATE VALVES FOR ALL APPLICATIONS UP THROUGH 12 INCHES. 6.GATE VALVES SHALL BE RESILIENT WEDGE AMERICAN FLOW CONTROL SERIES 2500 OR APPROVED EQUAL. GATE VALVES MUST COMPLY WITH CEAM SPEC 2611.2.C.2. 7.USE BUTTERFLY VALVES FOR ALL APPLICATIONS GREATER THAN 12 INCHES. 8.BUTTERFLY VALVES SHALL BE MUELLER LINSEAL III, OR APPROVED EQUAL. BUTTERFLY VALVES SHALL COMPLY WITH CEAM SPEC. 2611.2.C3. 9.BOLTS AND NUTS ON ALL VALVES AND HYDRANTS SHALL BE STAINLESS STEEL. 10.ALL HYDRANTS SHALL BE INSTALLED 5.0 FEET BACK OF CURB. 11.HYDRANTS SHALL BE WATEROUS "PACER," MODEL WB-67 OR APPROVED EQUAL, FITTED WITH FH 800 SERIES FLEX STAKE AND PAINTED RED. 12.HYDRANTS SHALL HAVE TWO OUTLET NOZZLES FOR 2-1/2 (I.D.) HOSE CONNECTIONS AND ONE 4" STORZ NOZZLE (MODEL WB-67) AND PENTAGON NUT END CAP. 13.THE CURB STOP SERVICE ASSEMBLY SHALL HAVE A MINIMUM 1-FT ADJUSTMENT RANGE AND SHALL EXTEND 6 INCHES ABOVE FINISHED GRADE FULLY EXTENDED. 14.THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING WATER TO HOMES AND BUSINESSES WHOSE WATER SUPPLY IS DISRUPTED DURING THE COURSE OF THE PROJECT. 1.ALL SANITARY SEWER AND ACCESSORIES MUST BE CONSTRUCTED IN ACCORDANCE WITH THE CITY OF LAKE ELMO STANDARD SPECIFICATIONS AND DETAILS. 2. ALL SANITARY SEWER PVC PIPE SHALL BE INSTALLED ACCORDING TO CITY STANDARD DRAWING 103 "GRANULAR MATERIAL BEDDING METHOD (FOR PVC SANITARY SEWER PIPE). 3.UNLESS NOTED OTHERWISE, ALL SMOOTH WALLED SANITARY SEWER PVC PIPE AND FITTINGS SHALL BE SDR 35 WITH ELASTOMERIC GASKETED JOINTS. 4.ALL SANITARY SEWER SERVICES SHALL BE 4-INCH PVC, SCH. 40. 5.SMOOTH WALLED PVC PIPE AND FITTINGS SHALL CONFORM WITH THE REQUIREMENTS OF ASTM D-3034 FOR THE SIZE, STANDARD DIMENSION RATIO (SDR), AND STRENGTH REQUIREMENTS INDICATED ON THE PLANS, SPECIFICATIONS, AND SPECIAL PROVISIONS. 6.REINFORCED CONCRETE PIPE AND FITTINGS SHALL CONFORM WITH THE REQUIREMENTS OF MnDOT SPEC 3236 (REINFORCED CONCRETE PIPE) FOR THE TYPE, SIZE, AND STRENGTH CLASS SPECIFIED HEREIN. 7.JOINTS OF MANHOLE RISER SECTIONS SHALL BE TONGUE AND GROOVE WITH RUBBER "O" RING JOINTS PROVIDED ON ALL SANITARY SEWER MANHOLES. 8.SANITARY SEWER INLET AND OUTLET PIPES SHALL BE JOINED TO THE MANHOLE WITH A GASKETED, FLEXIBLE, WATERTIGHT CONNECTION TO ALLOW DIFFERENTIAL SETTLEMENT OF THE PIPE AND MANHOLE TO TAKE PLACE. 9.A 1'-0" TO 1'-4" MANHOLE SECTION SHALL BE INSTALLED UNDER THE CONE SECTION TO ALLOW FOR HEIGHT ADJUSTMENT WHENEVER POSSIBLE. 10.ALL SERVICE LINE STUBS MUST HAVE A 2"x2" HARDWOOD MARKER WITH METAL SPIKE RUNNING FROM THE END OF PIPE TO FINISHED GRADE ELEVATION. 11.UPON MAKING A CONNECTION TO AN EXISTING SANITARY SEWER STUB OR MANHOLE, DIRT AND DEBRIS SHALL BE PREVENTED FROM ENTERING THE EXISTING SEWER BY IMMEDIATELY INSTALLING WATERTIGHT PLUGS AS NEEDED IN THE EXISTING MANHOLE. 12.ALL MAINLINE SANITARY SEWER AND SERVICES SHALL HAVE TRACER WIRE PER CITY SPECIFICATIONS AND DETAILS. 1.ALL STORM SEWER AND ACCESSORIES MUST BE CONSTRUCTED IN ACCORDANCE WITH THE CITY OF LAKE ELMO STANDARD SPECIFICATIONS AND DETAILS. 2.REINFORCED CONCRETE PIPE AND FITTINGS SHALL CONFORM WITH THE REQUIREMENTS OF MnDOT SPEC 3236 (REINFORCED CONCRETE PIPE) FOR THE TYPE, SIZE, AND STRENGTH CLASS SPECIFIED HEREIN. 3.PRECAST CONCRETE MANHOLE AND CATCH BASIN SECTIONS SHALL CONFORM TO THE REQUIREMENTS OF ASTM C-477. 4.A 1'-0" TO 1'-4" MANHOLE SECTION SHALL BE INSTALLED UNDER THE CONE SECTION TO ALLOW FOR HEIGHT ADJUSTMENT WHENEVER POSSIBLE.. 5.JOINTS OF MANHOLE RISER SECTIONS SHALL BE TONGUE AND GROOVE WITH RUBBER "O" RING JOINTS PROVIDED ON ALL STORM SEWER MANHOLES.. 6.RIP-RAP SHALL BE HAND-PLACED OVER GEOTEXTILE FABRIC AND CONFORM TO MnDOT SPEC. 3601, CLASS III, OR AS SPECIFIED HEREIN. 7.THE GEOTEXTILE FABRIC USED UNDER RIP-RAP SHALL EXTEND 3 FT UNDER THE APRON. 8.FURNISH & INSTALL TRASH GUARDS ON ALL FLARED END SECTIONS. 9.ALL SILT SHALL BE CLEANED OUT FROM THE RIP-RAP AT THE END OF THE PROJECT. 10.STORM SEWER STRUCTURES WITHIN 10 FT OF WATERMAIN ARE TO HAVE WATER TIGHT CONNECTIONS PER MDH REQUIREMENTS. 11.ALL NEW STORM SEWER PIPE SHALL BE FLUSHED AND TELEVISED PRIOR TO SUBSTANTIAL COMPLETION - SEE SPECIFICATION SECTION 1700 - CLOSEOUT REQUIREMENTS. PROPOSED WATER MAIN, SEE DTLS 207A/C800, 210/C800, 201/C800, & 206/C800 PROPOSED SANITARY SEWER, SEE DTLS 1/C803, & 2/C803 PROPOSED STORM SEWER, SEE DTLS 4/C803, 5/C803, 6/C803, 7/C803, & 8/C803 SAN TRACER WIRE ACCESS BOXT CLEANOUT CL O HYDRANT INSULATION REDUCER GATE VALVE & BOX WTR SERVICE & CURB STOP W BEND CS STM MH INL APRON ENDWALL AND RIP RAP SS AREA INL SAN MH DOWNSPOUTDS PED LIGHT BOLLARD, SEE ELECTRICAL PLANS LIGHT POLES, BY OTHERS SEE ELECTRICAL PLANS PROPOSED 4" UNDERDRAIN, SEE DTL 4/C804 LAKE ELMO WATERMAIN STANDARD NOTES LAKE ELMO SANITARY SEWER STANDARD NOTES LAKE ELMO STORM SEWER STANDARD NOTES S 933.02 (15") NE 933.02 (15") S19 MH 4-FT CASTING - J RIM 939.76 S 933.29 (18") W 933.54 (15") NE 933.54 (15") S15 MH 4-FT CASTING - H TC 941.16 E 934.08 (15") NW 934.33 (12") S12 INL 2X3-FT CASTING - H TC 940.98 SE 935.10 (12") S13 INL 2X3-FT CASTING - H TC 940.42 SW 934.47 (15") NW 934.57 (12") E 934.57 (12") S14 MH 4-FT CASTING - H TC 940.30 SE 934.68 (12") S11 INL 2X3-FT CASTING - H TC 939.84 W 936.70 (12") S17 INL 2.5-FT CASTING - B6 RIM 939.77 S 933.17 (18") N 933.17 (18") S10 MH 4-FT CASTING - J RIM 939.44 E 933.68 (18") SW 933.68 (15") S09 INL 2X3-FT CASTING - H TC 938.71 S 937.15 SEE DETAIL 7/C803 AEW1, 12" A.E., SEE DETAIL 7/C803 NE 935.03 (12") S08 INL 2.5-FT CASTING - B6 RIM 938.00 N 933.48 (18") S 933.48 (18") E 933.98 (12") S06 MH 4-FT CASTING - J RIM 937.96 N 933.35 (18") S 933.35 (18") W 933.35 (18") E 933.85 (12") S07 MH 4-FT CASTING - H TC 937.93 N 936.70 AEW2, 12" A.E., SEE DETAIL 7/C803 N 933.58 (18") SE 933.58 (12") SW 933.58 (15") S04 MH 4-FT CASTING - C RIM 937.76 NW 933.72 (12") S03 INL 2X3-FT CASTING - H TC 937.01 W 934.46 (12") S05 INL 2.5-FT CASTING - B6 RIM 937.00 N 933.80 (12") S01 INL 2X3-FT CASTING - H TC 935.88 NE 933.71 (15") S 933.71 (12") S02 INL 2X3-FT CASTING - H TC 935.91 N 932.50 (15") S26 CONNECT TO EX SS CASTING - 939.09 NEW UTILITY STRUCTURES SW 933.17 (15") S18 MH 4-FT CASTING - J RIM 939.83 W 933.97 (12") S30 INL 2X3-FT CASTING - H TC 938.20 NE 933.77 (15") SW 934.50 (12") S31 INL 2X3-FT CASTING - H TC 938.74 NO T F O R C O N S T R U C T I O N - PROJECT No: TH E D E S I G N S A N D P L A N S I N D I C A T E D O N T H E D R A W I N G S A R E T H E P R O P E R T Y OF A Y R E S A S S O C I A T E S . A L L R I G H T S A R E R E S E R V E D . N O D E S I G N S O R P L A N S SH A L L B E U S E D O R R E P R O D U C E D I N A N Y F O R M O R B Y A N Y M E A N S W I T H O U T WR I T T E N P E R M I S S I O N O F A Y R E S A S S O C I A T E S . Ea u C l a i r e O f f i c e 34 3 3 O a k w o o d H i l l s P a r k w a y Ea u C l a i r e , W i s c o n s i n 5 4 7 0 1 (7 1 5 ) 8 3 4 - 3 1 6 1 Ri v e r F a l l s O f f i c e 21 5 N . S e c o n d S t r e e t S u i t e 2 0 4 Ri v e r F a l l s , W i s c o n s i n 5 4 0 2 2 (7 1 5 ) 4 2 6 - 4 9 0 8 Fa x : ( 7 1 5 ) 4 2 6 - 5 8 6 6 NE W I N D E P E N D E N T L I V I N G F A C I L I T Y LA K E E L M O I N D E P E N D E N T L I V I N G , L L C LA K E E L M O , M I N N E S O T A PR E L I M I N A R Y - C I T Y S U B M I T T A L P A C K A G E 08-1893.00 09.17.2019 MARK DATE DESCRIPTION NORTH 0 30 60 C500 SITE UTILITIES PLAN Wenck | Colorado | Georgia | Minnesota | North Dakota | Wyoming Toll Free 800-472-2232 Web wenck.com To: Ken Roberts, City of Lake Elmo Planning Director From: Lucius Jonett, Wenck Landscape Architect Date: October 2, 2019 Subject: City of Lake Elmo Landscape Plan Review Lake Elmo Independent Living Review #1_Revised (10-18-2019) Submittals  Site Demolition (Tree Preservation) Plan, dated September 12, 2019, received September 25, 2019.  Landscape Plans, dated September 12, 2019, received September 25, 2019. Location: East of Arbor Glen Senior Living (11020 39th Street) in Lake Elmo, MN Land Use Category: Village Mixed Use Surrounding Land Use Concerns: N/A Special landscape provisions in addition to the zoning code: Screening is required along the north property line per City code. Ken Roberts Planning Director City of Lake Elmo October 2, 2019 2 T:\6443 Lake Elmo\26 Lake Elmo Senior Living\01 Preliminary Plat\01 Plan Review\2019-09-19\2019-10-18 Lake Elmo Independent Living Landscape Plan Review_Revised.docx Tree Preservation: An existing conditions and site demolition plan showing tree survey, removal and preservation plan has been submitted, including a tree inventory showing individual trees that are exempt, removed and saved. The allowable tree removal limit is not exceeded; therefore no mitigation plan or replacement trees are required. Entire Site Total Caliper Inches of Significant Trees On-Site: 1364.0 Cal Inches Common Trees 1364 Conifer/Evergreen Trees 0 Hardwood Trees 0 Nuisance Trees 0 Significant Inches Removed On-Site 35 Cal Inches Common Trees 35 Conifer/Evergreen Trees 0 Hardwood Trees 0 Nuisance Trees 0 30% Tree Removal Limits (Cal. Inches) Allowed Proposed Subtract Common Tree Removals 409.2 35 Subtract Conifer/Evergreen Tree Removals 0 0.00 Subtract Hardwood Tree Removals 0 0 Removals in excess of 30% allowances Removals in excess of 30% allowances 0.0 Cal Inches Common Removals in Excess of 30% Allowance 0.0 Conifer Removals in Excess of 30% Allowance 0.0 Hardwood Removals in Excess of 30% Allowance 0.0 Common Tree Replacement Needed (1/4 the dia inches removed) 0.0 Cal Inches Conifer Tree Replacement Needed (1/2 the dia inches removed) 0.0 Cal Inches Hardwood Tree Replacement Needed (1/2 the dia inches removed) 0.0 Cal Inches Common Tree Replacement Required @ 2.5" per Tree 0 # Trees Conifer Tree Replacement Required @ 3" per 6' Tall Tree 0 # Trees Hardwood Tree Replacement Required @ 2.5" per Tree 0 # Trees A. Tree replacement is not required because less than thirty (30) percent of the diameter inches of significant trees surveyed will be removed. B. Tree replacement calculations follow the required procedure and are correct. Ken Roberts Planning Director City of Lake Elmo October 2, 2019 3 T:\6443 Lake Elmo\26 Lake Elmo Senior Living\01 Preliminary Plat\01 Plan Review\2019-09-19\2019-10-18 Lake Elmo Independent Living Landscape Plan Review_Revised.docx Landscape Requirements: The landscape plans meet the code required number of trees. The proposed landscape plans show more than the code required tree quantities. *Residential development - mitigation replacement trees are in addition to landscape required tree counts. ** Commercial, mixed-use development - mitigation replacement trees can be included toward landscape required tree counts. 1. A minimum one (1) tree is proposed for every fifty (50) feet of street frontage. 2. A minimum of five (5) trees are proposed to be planted for every one (1) acre of land that is developed or disturbed by development activity. Because the applicant is proposing to provide more trees than is required by code, the landscape plans do not appear to meet the minimum compositions of required trees (up to 15% of the required number of trees may be ornamental). The proposed planting species, quantity and composition all exceed City requirements. Master Plan Qty % Composition Deciduous Shade Trees 27 45% >25% required Coniferous Trees 20 33% >25% required Ornamental Trees 13 22% <15% required Tree Count 60 Master Plan Master Plan (Code Required) Proposed Street frontage 430 430 Lineal Feet Lake Shore 0 0 Lineal Feet Stream Frontage 0 0 Lineal Feet Total Linear Feet 430 430 Lineal Feet /50 Feet = Required Frontage Trees 9 9 Trees Development or Disturbed Area 223600 223600 SF Development or Disturbed Area 5 5 Acres *5 = Required Development Trees 25 25 Trees Interior Parking Lot Spaces* 35 35 Spaces /10 = Required Parking Lot Trees 4 4 Trees Perimeter Parking Lot Frontage Length 0 0 Lineal Feet /50 = Required Frontage Strip Trees 0 0 Trees Required Mitigation Trees 0 0 Required Number of Trees 38 Total Trees to Date 60 Ken Roberts Planning Director City of Lake Elmo October 2, 2019 4 T:\6443 Lake Elmo\26 Lake Elmo Senior Living\01 Preliminary Plat\01 Plan Review\2019-09-19\2019-10-18 Lake Elmo Independent Living Landscape Plan Review_Revised.docx A. A landscape plan has been submitted that does not include all requirements. 1. All utilities and pavements are not shown on the landscape plan to review for tree placement conflicts. B. The landscape plan does not include the landscape layout requirements: • No utility conflicts with proposed tree locations; Prefer that the trunk of trees shall be 10 feet from the nearest utility, including water and sewer service stubs to each lot. Current ordinance is 5 feet minimum from nearest utility. C. Interior Parking Lot Landscaping – The development does include interior parking lots. 1. At least 5% of the interior area of parking lots with more than 30 parking spaces is devoted to landscape planting areas. The parking lot is measured at approximatively 5,521 square feet and a planting bed measuring approximately 6,578 square feet separates the parking lot from the northern building. The planting area is approximately 119% of the interior of the parking lot area. 2. The planting area includes 8 shade trees satisfying the minimum required tree planting requirements for interior parking lots. D. Perimeter Parking Lot Landscaping – The development does not include perimeter parking lots. E. Screening – Screening is required along the north property line per City code. The landscape plan utilizes existing trees on the north edge of the property, preserves existing trees on site as a buffer to the north property line and proposes additional tree plantings to enhance the screening. The landscape plan meets screening requirements. F. PUD Amenity Points Requested 1. Additional Open Space standards have not been met. Approximately 44% of the site not occupied by buildings is landscape outdoor open space (50% minimum required). Approximately 44% of the landscape outdoor open space is contiguous (50% minimum required). 2. Pedestrian Improvement standards have been met. A site and building design has been provided that allows for accessible pedestrian and/or bicycle access through and/or around the site. Addition detail on any decorative materials, access control or lighting should be provided. 3. Plaza standards have been met The development has included a public square that is wholly enclosed by buildings, is 14,555 square feet (1,000 square foot minimum required). Ken Roberts Planning Director City of Lake Elmo October 2, 2019 5 T:\6443 Lake Elmo\26 Lake Elmo Senior Living\01 Preliminary Plat\01 Plan Review\2019-09-19\2019-10-18 Lake Elmo Independent Living Landscape Plan Review_Revised.docx 4. Enhanced Landscaping standards have not been met • An enhanced Landscaping Plan has been provided that exceeds the requirements of the Lake Elmo Design Standards Manual. • The Landscaping Plan does not detail a resource efficient irrigation system. • The Landscaping Plan has not been signed by a licensed landscape architect. 5. Theming standards have not been met • Theming elements consistent with the 2013 Lake Elmo Theming Project, including but not limited to signage, fencing, landscaping, lighting and site furnishings, have not been shown on the landscape plans or in the details. Findings: • Up to 15% of the required number of trees may be ornamental tree per city code. Currently, the percentage of ornamental trees is too high. But the applicant has elected to use Enhanced Landscaping amenity points as part of their PUD submittal and has provided landscaping above and beyond City minimum requirements. Having a higher percentage of ornamental trees should be allowed for this development. • All utilities and pavements are not shown on the landscape plan to review for tree placement conflicts. We marked 8 trees on the attached figure that have potential of having a utility conflict. • The standard for the Pedestrian Improvement amenity requires trails, landscaping, decorative materials, access control and lighting to create safe, clear and aesthetically pleasing pedestrian facilities. A plan or details on any decorative materials, access control or lighting should be provided. • The standard for the Enhanced Landscaping amenity requires that the landscaped areas should have a resource efficient irrigation system. A plan or details on how the irrigation system will be designed to be resource efficient should be provided. • The standard for the Theming amenity requires elements consistent with the 2013 Lake Elmo Theming Project. Addition detail on proposed signage, fencing, landscaping, lighting and site furnishings, should be provided. Ken Roberts Planning Director City of Lake Elmo October 2, 2019 6 T:\6443 Lake Elmo\26 Lake Elmo Senior Living\01 Preliminary Plat\01 Plan Review\2019-09-19\2019-10-18 Lake Elmo Independent Living Landscape Plan Review_Revised.docx Recommendation: It is recommended that conditions of approval include: 1. Submit a revised landscape plan including the following: a. Plans signed by a licensed landscape architect. b. Utility lines shown to ensure that trees are not planted on top of or too close (within 10’) to proposed utilities. c. Provide additional detail on any decorative materials, access control or lighting used for Pedestrian Improvements. d. Provide a plan or additional detail on the resource efficient irrigation system used for Enhanced Landscaping. e. Provide a plan or additional detail on the theming elements (signage, fencing, landscaping, lighting and site furnishings) used for Theming amenity points. Sincerely, Lucius Jonett, PLA (MN) Wenck Associates, Inc. City of Lake Elmo Municipal Landscape Architect WV (1) Tb (3) HL (3) Dl (1) ARM (3) HL (1) ARM (3) Dl (3) HL (3) Dl (3) HL (3) Dl Pt (2) Sp (1)(1) MP (7) PVN (3) Dl (4) PA (5) HG (1) HL (1) MA (1) HL CG (1) (1) HL (1) Tb (1) MS (3) PA (4) HG (5) SH (4) Rd Jm (3) PA (5) HG (8) (3) RG Dl (3) (4) CAK (6) Rd (1) ARM CSA (1) MS (1) Tb (1) (3) Pd2 QA (1) SI (1)SI (1) (1) HL (1) PA (1) Jm (3) HG (1) HL (5) SH (4) Rd HG (3) (1) MDS (3) CAK Rd (4) (1) HL Tb (1) HL (1)Rd (9) CAK (6) SH (5) Hb2 (5) Pd2 (3) (1) Gd (1) GS (1) Gd GS (1) (1) GS (4) TT (3) Hp Hb2 (4) PVN (3) (4) EPP Rd (7) Gk (4) (4) SH SA (4) Hb2 (2) (1) Jm (1) ARM (1) Jm (1) POS (1) CSA (3) Jm (5) Rd (9) SH (5) PVN (4) EPP SA (7) Rd (7) (4) Gk (4) TT (3) Hp (1) ARM (3) PVN (4) EPP (1) POS SA (7) Rd (7) (4) Gk (1) Jm SH (5) Hp (14)(6) HBC (2) HL (2) Dl (4) HA (5) Hb2 SH (4) (4) SA Gk (4) Rd (7) Dl (14) (4) Dl VCA (1) HL (1) Gk (4) Rd (7) SH (4) (1) Jm (4) SA Hb2 (5) HBC (6) POS (1) Tb (1) (3) HA (3) HA (3) HA (6) SH (5) Rd MATCH LINE MATCH LINE NO T F O R C O N S T R U C T I O N - PROJECT No: TH E D E S I G N S A N D P L A N S I N D I C A T E D O N T H E D R A W I N G S A R E T H E P R O P E R T Y OF A Y R E S A S S O C I A T E S . A L L R I G H T S A R E R E S E R V E D . N O D E S I G N S O R P L A N S SH A L L B E U S E D O R R E P R O D U C E D I N A N Y F O R M O R B Y A N Y M E A N S W I T H O U T WR I T T E N P E R M I S S I O N O F A Y R E S A S S O C I A T E S . Ea u C l a i r e O f f i c e 34 3 3 O a k w o o d H i l l s P a r k w a y Ea u C l a i r e , W i s c o n s i n 5 4 7 0 1 (7 1 5 ) 8 3 4 - 3 1 6 1 Ri v e r F a l l s O f f i c e 21 5 N . S e c o n d S t r e e t S u i t e 2 0 4 Ri v e r F a l l s , W i s c o n s i n 5 4 0 2 2 (7 1 5 ) 4 2 6 - 4 9 0 8 Fa x : ( 7 1 5 ) 4 2 6 - 5 8 6 6 NE W I N D E P E N D E N T L I V I N G F A C I L I T Y LA K E E L M O I N D E P E N D E N T L I V I N G , L L C LA K E E L M O , M I N N E S O T A PR E L I M I N A R Y - C I T Y S U B M I T T A L P A C K A G E 08-1893.00 09.12.2019 MARK DATE DESCRIPTION NORTH 0 10 30 L101 LANDSCAPE PLAN 1036 1091 SAN MH 1177 WV STM MH 1182 WV Pd2 (1) (1) Gd Gd (1) Pd2 (1) MP (1) GS (1) (1) Gd GS (1) (1) MP (1) Gd GS (1) (1) GS (1) QB (1) UP (1) UP (1) Aa2 (1) UP (2) SI (1) QB (1) Aa2 (1) PC Pt (1) Pt (1) (1) PC Sp (1) Pd2 (1) HA (4) (2) Dl Dl (17) (3) Dl (4) Pl HBC (6) Hb2 (5) SH (4) (4) SA HL (1)(1) HL (7) Rd Gk (4) Jm (1) Jm (1) POS (1)HL (1) (1) VCA Tb (1)HBC (6) Gk (4) Rd (7) (4) SA (5) Hb2 SH (4) (5) Rd (4) Gk (1) Jm SA (4) (4) SH Hb2 (8) (1) POS (4) EPP (3) PVN (4) Hb2 (1) ARM (1) ARM POS (1) Jm (1) Jm (1) POS (1) CSA (1) (1) CSA (1) POS (1) Jm (2) Dl (3) Dl (4) Pl HBC (6) Hb2 (5) SH (4) (4) SA HL (1) (1) HL (7) Rd Gk (4) Jm (1) Jm (1) POS (1)HL (1) (1) VCA Tb (1) HBC (6) Gk (4) Rd (7) (4) SA (5) Hb2 SH (4) (14) Dl (4) HA (3) Hp (9) TT Hp (3) Hb2 (4) PVN (3)Hb2 (8)(4) SA SH (4) Gk (4) Rd (5) Rd (7) Gk (4) SH (4)(4) SA (8) Hb2 (4) EPP (8) SH (3) Jm (5) Rd (6) SH (9) PVN (5) Rd (6) SH (2) Jm (1) Jm (2) SH (4) EPP (8) Hb2 (4) Gk (7) Rd (4) TT (3) Hp (1) ARM (3) PVN (4) EPP (1) POS SA (7) Rd (7) (4) Gk (1) Jm SH (5) (4) TT (3) Hp (1) ARM (3) PVN (4) EPP (1) POS SA (7) Rd (7) (4) Gk (1) Jm SH (5) (1) Jm (1) POS (1) CSA (3) Jm (5) Rd (9) SH (5) PVN (4) EPP SA (7) Rd (7)(4) Gk (1) Jm (1) POS (1) CSA (3) Jm (5) Rd (9) SH (4) EPP SA (7) Rd (7) (4) Gk (1) Jm (1) POS (1) CSA (3) Jm (5) Rd (9) SH (5) PVN (4) EPP SA (7) Rd (7) (4) Gk (4) CAK (7) Rd RB (1) PA (1) (3) HA (3) HA (3) HA (3) HA (3) HA MATCH LINE (3) MP(16) Rg2 Rg2 (16) 39TH STREET NORTH (9) SH SH (9) MATCH LINE PVN (5) Pt (1) NO T F O R C O N S T R U C T I O N - PROJECT No: TH E D E S I G N S A N D P L A N S I N D I C A T E D O N T H E D R A W I N G S A R E T H E P R O P E R T Y OF A Y R E S A S S O C I A T E S . A L L R I G H T S A R E R E S E R V E D . N O D E S I G N S O R P L A N S SH A L L B E U S E D O R R E P R O D U C E D I N A N Y F O R M O R B Y A N Y M E A N S W I T H O U T WR I T T E N P E R M I S S I O N O F A Y R E S A S S O C I A T E S . Ea u C l a i r e O f f i c e 34 3 3 O a k w o o d H i l l s P a r k w a y Ea u C l a i r e , W i s c o n s i n 5 4 7 0 1 (7 1 5 ) 8 3 4 - 3 1 6 1 Ri v e r F a l l s O f f i c e 21 5 N . S e c o n d S t r e e t S u i t e 2 0 4 Ri v e r F a l l s , W i s c o n s i n 5 4 0 2 2 (7 1 5 ) 4 2 6 - 4 9 0 8 Fa x : ( 7 1 5 ) 4 2 6 - 5 8 6 6 NE W I N D E P E N D E N T L I V I N G F A C I L I T Y LA K E E L M O I N D E P E N D E N T L I V I N G , L L C LA K E E L M O , M I N N E S O T A PR E L I M I N A R Y - C I T Y S U B M I T T A L P A C K A G E 08-1893.00 09.12.2019 MARK DATE DESCRIPTION L102 LANDSCAPE PLAN NORTH 0 10 30 From:Crain, Lisa To:Ken Roberts Cc:Mike Pearson; Christine Nelson; Justin Bloyer; Dale Dorschner; Lisa McGinn Subject:Planning Commission Meeting Oct 16 Date:Sunday, October 6, 2019 9:28:25 PM Attachments:image001.jpg Caution: This email originated outside our organization; please use caution. Hi Ken – I am a resident that lives at 4040 Lady Slipper Road directly behind the Preliminary PUD plan for the 60 unit senior rental housing. I do have several comments and concerns and would appreciate if these can be expressed at the public hearing on October 16. I am not able to attend due to out of town traveling for work. I would appreciate feedback from the planning commission on the following: 1)      The building is directly in homeowner’s sight line, please ensure all building lights are properly shielded and maintain minimum foot candles. Can you provide the lighting plan for the north side of the building and the photo metric plan they have submitted. 2)      I do appreciate the effort of the non-effective 55’ buffer added between our property lines and the development. We measured the distance from our property line south and it is approximately 10’ from the tree line. I am not sure of what concessions were made by the developer to push the buffer since the building patio decks with be approximately 5’ from the existing tree line. It would be equitable to have the buffer start from the south side of the tree line. By moving it 55’ or more, moves it away from our homes, it would parallel with the Arbor Glenn building (aesthetically pleasing) and leaves space for improvements to the buffer (fence, trees, noise, etc.,). 3)      The layout for entrance/exit to internal parking will allow vehicle headlights to sweep onto our homes 24/7. When the trees leaves drop, there is no barrier to prevent this light pollution into our homes. A privacy fence should be required between the tree line and rental building running the full length of the development. This will aid in light and noise mitigation. 4)      To stay compliant with Lake Elmo ordinance, 96.03, what noise mitigation will be made for internal parking exhaust fans, trash collection, snow plowing and weekly landscaping. It is my understanding, that loud exhaust fans must be used in the internal parking to maintain air quality standards. We don’t want to be inside or outside of our homes and have a constant barrage of noise pollution. 5)      The planning commission needs to require the developer to go beyond filling tree gaps on the property lines. I have a significant issue with how this will affect our home values and the ability to sell in future. There are large spruce evergreens that provide a year-round barrier. We don’t want leaf barring trees since they only provide 5 months of sight line protection. The current large Blue Spruce evergreens need to be supplemented with additional Blue Spruce as the main sight line barrier. Leaf barring trees should be considered as seasonal blockage at most. 6)      I invite the planning commission to come view the site lines on our side of the property line. To appreciate the impact that this development will have on our day to day living. You can sit in my living room or bedrooms and see the visual concerns we all share. 7)      Noise – this is imperative for the commission to address since we are backing up to all this commercial development. Currently, garbage haulers start collecting at 4:30 am at National Repo Graphics and continues through the early morning at Arbor Glen. This requires us to have our windows closed during the weekdays so our family is not startled and waking up from disruptive noises. If you can imagine, dumpsters are being raised in the air by 30 ft and as its contents tumbles into a steel garbage truck. I have spoken to Arbor Glen and National Repo Graphics to have asked them change their garbage hauling times and they stated they are not required to by ordinance. Also, I have sent written correspondence and verbal contact with City of Lake Elmo expressing my frustration as a resident with continued obtrusive noises. Per Ken Roberts there is nothing the city can do to enforce sound and recommended we discuss this with our local city council members. The developer needs to submit a trash hauling policy that should be reviewed by planning commission. It needs to ensure it does not affect the homeowners “quiet enjoyment rights”. The following is our concerns as homeowner’s: 1.       Placement of trash containers. Collection points should not be adjacent to any property lines to minimize sound intrusions. 2.       Garbage collection times need to be determined, enforced and with appropriate penalties. Typical ordinance time restrictions for trash haulers in neighboring communities start at 7 am. This ordinance should integrated into the existing city ordinance for everyone. 8)      Are there height restrictions with buildings? At 3 stories this would make this one of the tallest buildings in Lake Elmo. Furthermore, the 3rd floor will have clear line of sight to my living room, bedroom and bathroom. Arbor Glen seems to be only 2 level structure. I would appreciate these comments be shared with the planning commission and look forward to a response to these concerns. Lisa Crain 4040 Lady Slipper Road Lake Elmo 612-790-1968 cell Lisa Crain Senior General Manager Rosedale Center 10 Rosedale Center Roseville, MN 55113 T 651.746.5301, M 612.790.1968 lisa.crain@am.jll.com   One of the 2019 World’s Most Ethical Companies®  Jones Lang LaSalle  For more information about how JLL processes your personal data, please click here. This email is for the use of the intended recipient(s) only. If you have received this email in error, please notify the sender immediately and then delete it. If you are not the intended recipient, you must not keep, use, disclose, copy or distribute this email without the author's prior permission. We have taken precautions to minimize the risk of transmitting software viruses, but we advise you to carry out your own virus checks on any attachment to this message. We cannot accept liability for any loss or damage caused by software viruses. The information contained in this communication may be confidential and may be subject to the attorney-client privilege. If you are the intended recipient and you do not wish to receive similar electronic messages from us in the future then please respond to the sender to this effect. CITY OF LAKE ELMO WASHINGTON COUNTY STATE OF MINNESOTA RESOLUTION NO. 2019-083 RESOLUTION APPROVING THE FRISBEE PROPERTIES LAKE ELMO SENIOR HOUSING PRELIMINARY PLAT AND PRELIMINARY PUD PLANS WHEREAS, the City of Lake Elmo is a municipal corporation organized and existing under the laws of the State of Minnesota; and WHEREAS, Mathew Frisbee, representing Ayers and Associates, submitted an application to the City of Lake Elmo (City) for a Preliminary PUD Plan for a 60 unit, senior rental housing residential planned unit development on a 5 acre site on the north side of 39th Street North to be known as the Lake Elmo Senior Housing, a copy of which is on file in the City of Lake Elmo Planning Department; and WHEREAS, notice was published, mailed and posted pursuant to the Lake Elmo Zoning Ordinance, Section 154.102; and WHEREAS, the Lake Elmo Planning Commission held public hearing on October 16, 2019 to review and consider the Preliminary PUD approval request; and WHEREAS, the Lake Elmo Planning Commission adopted a motion recommending to the City Council approval of the Preliminary PUD subject to 29 conditions of approval; and WHEREAS, the Lake Elmo Planning Director submitted a report and recommendation about the Preliminary PUD as part of a memorandum to the City Council for the November 5, 2019 City C ouncil Meeting; and WHEREAS, the City Council reviewed the Preliminary PUD application for the Lake Elmo Senior Housing at its meeting held on November 5, 2019 and made the following findings of fact: 1. That the Preliminary PUD Plan meets the general intent of the Village Mixed Use Land Use designation in the Comprehensive Plan and the Village Mixed Use zoning district with PUD modifications. 2. That the Preliminary PUD Plan generally complies with the City’s Subdivision regulations. 3. That the Preliminary PUD Plan is generally consistent with the City’s engineering standards with exceptions as noted in the City Engineer’s memorandum dated October 10, 2019. 4. The Preliminary PUD Plan meets the minimum requirement for a PUD including minimum lot area, open space and street layout. 5. The Preliminary PUD Plan meets more than one of the required PUD objectives identified in Section 154.751 including providing: innovation in land development techniques that may be more suitable for a given parcel than conventional approaches; provision of a more adequate, usable, and suitably located open space, recreational amenities and other public facilities than would otherwise be provided under conventional land development techniques; accommodation of housing of all types with convenient access to employment opportunities and/or commercial facilities; and especially to create additional opportunities for senior and affordable housing; coordination of architectural styles and building forms to achieve greater compatibility within the development and surrounding land uses; and higher standards of site and building design than would otherwise be provided under conventional land development technique. NOW, THEREFORE, BE IT RESOLVED THAT the City Council does hereby approve the Preliminary PUD Plans for the Lake Elmo Senior Housing development as prepared by Mathew Frisbee for Ayers and Associates (to be located on the north side of 39th Street) subject to the following conditions: 1. That the applicant prepare any future final plat and final PUD plans showing all of the site perimeter property lines - including any revisions for any additional right-of-way or easements that may be needed for 39th Street or around the perimeter of the property. 2. That the future final plat and final PUD Plans submittal identify all requests for flexibility from the Zoning Code. 3. That the applicant address all comments in the City Engineer’s Memorandum dated October 10, 2019 with the future final plat and final PUD Plans submittal. These include having only one driveway for the site and managing all storm water on the site. 4. That the final Plat and final PUD Plans submittal include an updated tree inventory and tree preservation/replanting and landscape and screening plans that address all comments in the City’s Landscape Architect’s memo dated October 2, 2019. All revised and final landscape plans shall be reviewed and approved by the City’s Landscape Architect. All tree planting must outside of the front, side and rear drainage and utility easements. 5. That the final Plat and final PUD Plans submittal include accurate open space and impervious surface calculations. 6. That the developer provide the City fees in lieu of park land dedication as required by the City Code. 7. That the final plat and final PUD Plans submittal include detailed architectural plans for all the proposed buildings. 8. The applicant receive a permit from the Valley Branch Watershed District for the construction of the proposed development. 9. All storm water facilities internal to the site shall be privately owned and maintained. A storm water maintenance and easement agreement in a form acceptable to the City shall be executed and recorded with the final plat for all 100-year high water level areas and to protect all overland emergency flow paths. 10. The Preliminary Plat/Preliminary PUD approval is conditioned upon the applicant meeting all City standards and design requirements unless specifically addressed otherwise in these conditions. 11. That the PUD overlay zoning allow for the following: a. Setbacks: Lake Elmo Senior Living (39th Street) Minimum Building Setbacks Front (39th Street). 20 ft. Interior Side 20 ft. Rear (north property line) 50 ft. b. Attached Garages: That each of the attached garages for the patio homes shall not exceed 1,000 sq. ft. in area. 12. The Final Plat/Final PUD shall include all necessary public right-of-way and easements for 39th Street North. 13. The Final Plat/Final PUD submittal must include a complete storm water management plan and construction plans that provide all design details for the proposed underground storage systems including details regarding building roof drainage connections. 14. That the applicant shall obtain all necessary permits including but not limited to all applicable City permits (building, grading, sign, etc.), NPDES/SWPPP permits and Valley Branch Watershed District approval before starting any grading or construction activities. 15. That the Final Plat/Final PUD include Valley Branch Watershed District preliminary review comments and that the applicant provide the City evidence that all conditions attached to a Valley Branch Watershed District permit will be met before the starting any grading activity on the site. 16. If necessary, the applicant shall provide the City with a copy of written permission for any off-site grading work and storm sewer discharges to adjacent properties before starting any site work, grading and as part of any final plat or final PUD application. 17. That the applicant or developer address all the comments of the Fire Chief and the Building Official with the final PUD, site and building plans including the placement of buildings and fire hydrants, street and driveway design, parking and emergency vehicle access within the site. 18. That the applicant revise the project plans to show watermain easements and effective maintenance areas with a minimum width of 30 feet with a minimum of 15 feet of clearance from the pipe centerline and easement agreements are included with the final plat and PUD application and plans. 19. That there shall be no encroachments into drainage and utility easements and corridors other than those reviewed and approved by the City Engineer and upon execution of an easement encroachment agreement. Prohibited encroachments include, but are not limited to trees, landscaping, fences, retaining walls and buildings. 20. That the developer prepare exhibits for City staff approval that clearly identifies the property lines, easements, proposed locations of retaining walls and fences and the required and proposed setbacks for each building site within the development. 21. The Applicant(s) or developer shall submit a photometric plan for the development for staff review and approval. All lighting must meet the requirements of Sections 150.035-150.038 of the City Code. 22. Before to the installation or construction of any subdivision identification signs or neighborhood markers within the development, the developer shall submit sign plans to the City for review and obtain a sign permit from the City. 23. That the applicant provide the City a detailed construction and staging plan with the construction plans and final plat for the development. These plans are to clearly indicate the phasing of the site grading, the phasing of the construction of each public infrastructure component (trails and sidewalks) and shall address access to that phase of the development for construction purposes and for residents. The City may require temporary cul-de-sacs or turn-arounds at the end the private driveways. 24. Before the execution and recording of a final plat for the development, the developer or applicant shall enter into a Developer’s Agreement or a Site Work Agreement with the City. Such an Agreement must be approved by the City Attorney and by the City Council. The Agreement shall delineate who is responsible for the design, construction and payment for the required improvements with financial guarantees therefore. 25. The applicant or developer shall enter into a separate grading agreement with the City before starting any grading activity in advance of final plat of PUD approval. The City Engineer shall review any grading plan that is submitted in advance of a final plat or final PUD, and said plan shall document extent of any proposed grading on the site. 26. That the maximum density shall not exceed 10 dwelling units per net acre unless the City Council approves specific project design elements and amenity points that increase the allowed density for the proposal. 27. That the applicant/owner notify all renters that the City may impose restrictions or limits on outdoor water use including no vehicle washing and no watering of grass, sod or landscaping. 28. That the applicant shall submit revised preliminary plat and project plans meeting all conditions of approval for City review and approval. The revised applicant/developer project plans shall meet all of the above conditions before the City will accept a final plat or Final PUD application the development and before the start of any clearing or grading activity on the site. 29. That the City’s preliminary plat/preliminary PUD approval is good for one year from the date of City Council action, unless the applicant requests and the City Council approves a time extension. Passed and duly adopted this 5th day of November, 2019 by the Lake Elmo Minnesota City Council. ____________________________________ Mike Pearson, Mayor ATTEST: ____________________________________ Julie Johnson, City Clerk