HomeMy WebLinkAbout#25 - 2019 Mill and Overlay Change Order 2 STAFF REPORT DATE: December 17, 2019 CONSENT AGENDA ITEM: 2019 Mill and Overlay Project – Approve Compensating Change Order No. 2 SUBMITTED BY: Chad Isakson, Project Engineer REVIEWED BY: Kristina Handt, City Administrator Marty Powers, Public Works Director Jack Griffin, City Engineer ISSUE BEFORE COUNCIL: Should the City Council approve Compensating Change Order No. 2 for the 2019 Mill & Overlay Project? BACKGROUND: T.A. Schifsky & Sons, Inc. was awarded a construction contract on April 16, 2019 to complete the 2019 Mill and Overlay Project. The contractor has completed the work in accordance with the contract, plans, and specifications; and with approval of this change order the contract amount will be adjusted to reflect the actual quantities installed as a part of the project. PROPOSAL DETAILS/ANALYSIS: T.A. Schifsky & Sons, Inc. has submitted a compensating change order to reconcile the estimated and actual quantities installed on the project. A contract reduction is reflected due primarily to managing a tight footprint on the project resulting in lower restoration costs than anticipated. FISCAL IMPACT: $32,544.61 decrease to the final construction contract amount. This compensating change order will decrease the final construction contract amount to $640,888.44, a 4.8% decrease from the contract amount of $673,433.05. RECOMMENDATION: Staff is recommending that the City Council approve, as part of the Consent Agenda, Compensating Change Order No. 2 for the 2019 Mill and Overlay Project, thereby decreasing the final contract amount by $32,544.61. If removed from the consent agenda, the recommended motion for the action is as follows: “Move to approve Compensating Change Order No. 2 for the 2019 Mill and Overlay Project, thereby decreasing the contract amount by $32,544.61”. ATTACHMENTS: 1. Compensating Change Order No. 2. CONTRACT CHANGE ORDER FORM CHANGE ORDER NO.DATE: TO: UNIT Amount of Original Contract $ Sum of Additions/Deductions approved to date (CO No.1)$ Contract Amount to date $ Amount of this Change Order   (ADD)   (DEDUCT)   (NO CHANGE)$ Revised Contract Amount $ The Contract Period for Completion will be   (UNCHANGED)  (INCREASED)  (DECREASED)days APPROVED BY ENGINEER:  FOCUS ENGINEERING APPROVED BY CONTRACTOR DATE DATE APPROVED BY OWNER:  CITY OF LAKE ELMO, MINNESOTA DATE DATE 0 This Document will become a supplement to the Contract and all provisions will apply hereto. The Contract Documents are  modified as follows upon execution of this Change Order.  BYENGINEER 665,293.05 8,140.00 673,433.05 (32,544.61) 640,888.44 INCREASE/(DECREASE) T.A. SCHIFSKY & SONS, INC., 2370 E HWY 36, NORTH ST. PAUL, MN 55109 2019 MILL AND OVERLAY PROJECT NO. 2018.132 2 December 17, 2019 ITEM **See attached itemization NET CONTRACT CHANGE ($32,544.61) CITY OF LAKE ELMO, MINNESOTA BYBY CHANGE ORDER DESCRIPTION / JUSTIFICATION: Per the project Contract Documents the original contract amount and basis of award is established using the estimated quantities  for each item of work listed in the bid schedule and multiplying them by the Contractor’s corresponding unit bid price.  The  Contractor is paid for the actual final quantities installed on the project at the unit bid prices.   At the completion of the project, a compensating change order is prepared to revise the estimated quantities for each work item  listed in the bid schedule to the actual quantities installed and the corresponding Contract Amount is revised accordingly. This compensating change order reflects a net decrease to the contract amount by $32,544.61. Attachments  (list documents supporting change):Itemization of Materials DESCRIPTION OF PAY ITEM QTY UNIT PRICE 11/25/2019 FOCUS Engineering, inc.CHANGE ORDER FORM 11/26/19 CHANGE ORDER NO. 2 2019 MILL AND OVERLAY CITY OF LAKE ELMO, MINNESOTA PROJECT NO. 2018.132 QUANTITY UNIT PRICE AMOUNT QUANTITY AMOUNT NET CHANGE AMOUNT 1 LS 1.00 $24,000.00 $24,000.00 1.00 $24,000.00 0.00 $0.00 2 LS 1.00 $9,000.00 $9,000.00 1.00 $9,000.00 0.00 $0.00 3 EA 19.00 $100.00 $1,900.00 16.00 $1,600.00 ‐3.00 ‐$300.00 4 EA 21.00 $100.00 $2,100.00 5.00 $500.00 ‐16.00 ‐$1,600.00 5 LF 84.00 $4.00 $336.00 816.00 $3,264.00 732.00 $2,928.00 6 SY 27,070.00 $1.25 $33,837.50 28,670.00 $35,837.50 1,600.00 $2,000.00 7 SY 10,000.00 $1.35 $13,500.00 10,000.00 $13,500.00 0.00 $0.00 8 SY 440.00 $7.00 $3,080.00 44.63 $312.41 ‐395.37 ‐$2,767.59 9 SY 2,090.00 $9.00 $18,810.00 3,389.00 $30,501.00 1,299.00 $11,691.00 10 LF 55.00 $12.00 $660.00 55.00 $660.00 0.00 $0.00 11 EA 1.00 $3,350.00 $3,350.00 1.00 $3,350.00 0.00 $0.00 12 LF 1,575.00 $6.50 $10,237.50 1,669.00 $10,848.50 94.00 $611.00 13 TN 10.00 $39.00 $390.00 36.31 $1,416.09 26.31 $1,026.09 14 TN 1,060.00 $8.50 $9,010.00 865.11 $7,353.44 ‐194.89 ‐$1,656.57 15 TN 330.00 $75.00 $24,750.00 345.35 $25,901.25 15.35 $1,151.25 16 TN 4,450.00 $64.89 $288,760.50 3,960.28 $256,982.57 ‐489.72 ‐$31,777.93 17 GAL 2,780.00 $0.01 $27.80 2,620.00 $26.20 ‐160.00 ‐$1.60 18 SY 440.00 $22.50 $9,900.00 101.39 $2,281.28 ‐338.61 ‐$7,618.73 19 LS 1.00 $5,000.00 $5,000.00 1.14 $5,700.00 0.14 $700.00 20 EA 24.00 $775.00 $18,600.00 26.00 $20,150.00 2.00 $1,550.00 21 EA 13.00 $325.00 $4,225.00 11.00 $3,575.00 ‐2.00 ‐$650.00 22 LF 2,310.00 $28.00 $64,680.00 2,292.00 $64,176.00 ‐18.00 ‐$504.00 23 LF 120.00 $40.00 $4,800.00 126.00 $5,040.00 6.00 $240.00 24 LF 1,400.00 $21.00 $29,400.00 1,400.00 $29,400.00 0.00 $0.00 25 EA 6.00 $660.00 $3,960.00 4.00 $2,640.00 ‐2.00 ‐$1,320.00 26 EA 10.00 $414.75 $4,147.50 8.00 $3,318.00 ‐2.00 ‐$829.50 27 EA 2.00 $3,034.50 $6,069.00 2.00 $6,069.00 0.00 $0.00 28 EA 2.00 $3,533.00 $7,066.00 2.00 $7,066.00 0.00 $0.00 29 LF 10.00 $530.00 $5,300.00 10.00 $5,300.00 0.00 $0.00 30 LF 55.00 $55.00 $3,025.00 40.00 $2,200.00 ‐15.00 ‐$825.00 31 EA 2.00 $1,848.00 $3,696.00 2.00 $3,696.00 0.00 $0.00 32 CY 26.00 $94.50 $2,457.00 29.17 $2,756.57 3.17 $299.57 33 LF 50.00 $20.00 $1,000.00 50.00 $1,000.00 0.00 $0.00 34 CY 390.00 $25.00 $9,750.00 184.00 $4,600.00 ‐206.00 ‐$5,150.00 35 SY 2,860.00 $3.00 $8,580.00 3,192.00 $9,576.00 332.00 $996.00 36 SY 1,040.00 $11.00 $11,440.00 277.00 $3,047.00 ‐763.00 ‐$8,393.00 37 LF 5,025.00 $0.35 $1,758.75 29,432.00 $10,301.20 24,407.00 $8,542.45 38 LF 10,050.00 $0.35 $3,517.50 18,947.00 $6,631.45 8,897.00 $3,113.95 SUBTOTAL ‐ SCHEDULE A $652,121.05 $623,576.44 ‐$28,544.61 SCHEDULE B ‐ WATERMAIN 1 EA 1.00 $4,452.00 $4,452.00 1.00 $4,452.00 0.00 $0.00 2 LF 20.00 $61.00 $1,220.00 20.00 $1,220.00 0.00 $0.00 3 EA 1.00 $7,500.00 $7,500.00 1.00 $7,500.00 0.00 $0.00 SUBTOTAL ‐ SCHEDULE B $13,172.00 $13,172.00 $0.00 TOTALS ‐ BASE CONTRACT $665,293.05 $636,748.44 ‐$28,544.61 BITUMINOUS MATERIAL FOR TACK COAT 2360 BITUMINOUS WEAR COURSE, DRIVEWAYS SHOULDERING WITH STOCKPILED MILLINGS ADJUST MANHOLE CASTING REMOVE AND DISPOSE OF CONCRETE CURB (ALL TYPES) CLASS 6 AGGREGATE BASE REMOVE AND REPLACE CLASS 6 AGGREGATE BASE TYPE SP 12.5 BITUMINOUS NON WEARING COURSE MIXTURE (2,B) [SPNW TYPE SP 9.5 BITUMINOUS WEARING COURSE MIXTURE (2,B) [SPWEA230B MILL 1.5" EXIST. BITUMINOUS PAVEMENT MILL 2" EXIST. BITUMINOUS PAVEMENT REMOVE AND DISPOSE OF EXISTING BITUMINOUS PAVEMENT (DRIVEWA REMOVE AND DISPOSE OF EXISTING BITUMINOUS PAVEMENT REMOVE AND REINSTALL STORM FES WITH TIES REMOVE AND DISPOSE OF EXISTING STORM SEWER MOBILIZATION TRAFFIC CONTROL INLET PROTECTION BIOROLL DITCH CHECK SAWCUT PAVEMENT (ALL TYPES) COMPENSATING CHANGE ORDER  NO. 2 ITEM DESCRIPTION OF PAY ITEM UNIT CONTRACT TOTAL TO DATE ADJUST VALVE BOX CONCRETE CURB AND GUTTER (ALL TYPES EXCEPT VALLEY GUTTER) CONCRETE VALLEY GUTTER 4" PVC SCH 40 PERF EDGE DRAIN W/BACKFILL AND WRAP CONNECT TO EXISTING STORM STRUCTURE DRAINTILE CLEANOUT 2'X3' CATCH BASIN WITH CASTING 48" STORM SEWER MANHOLE CATCH BASIN 18" RCP STORM SEWER PIPE 15" RCP STORM SEWER PIPE 15" FLARED END SECTION CLASS 3 RIP RAP WITH FABRIC DITCH GRADING IMPORT AND PLACE TOPSOIL BORROW (LV) SEEDING, FERTILIZER, AND WOOD FIBER BLANKET SODDING STRIPING ‐ 4" YELLOW STRIPING (STYLE VARIES) HYDRANT 6" WET TAP 6" WATERMAIN DIP ‐ CL 52 (POLY ENCASED) STRIPING ‐ 4" WHITE STRIPING CHANGE ORDER NO. 1 CO1‐1 LS 1.00 $2,640.00 $2,640.00 1.00 $2,640.00 0.00 $0.00 CO1‐2 LS 1.00 $3,500.00 $3,500.00 0.00 $0.00 ‐1.00 ‐$3,500.00 CO1‐3 EA 4.00 $500.00 $2,000.00 3.00 $1,500.00 ‐1.00 ‐$500.00 TOTALS ‐ CHANGE ORDER NO. 1 $8,140.00 $4,140.00 ‐$4,000.00 TOTALS ‐ REVISED CONTRACT $673,433.05 $640,888.44 ‐$32,544.61 ADJUST CATCH BASIN CASTING WITH NEW RINGS AND INFI‐SHIELD WATER SERVICE TO PEBBLE PARK KEATS AVE PAVEMENT PATCHING