Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
#05 - I-94 Lift Station Change Order 4
STAFF REPORT DATE: February 5, 2019 CONSENT AGENDA ITEM: I-94 Lift Station (No. 1) and Sanitary Sewer Improvements – Compensating Change Order No. 4 SUBMITTED BY: Jack Griffin, City Engineer REVIEWED BY: Kristina Handt, City Administrator Rob Weldon, Public Works Director Chad Isakson, Project Engineer ISSUE BEFORE COUNCIL: Should the City Council approve Compensating Change Order No. 4 for the I-94 Lift Station (No. 1) and Sanitary Sewer Improvements? BACKGROUND: RL Larson Excavating, Inc. was awarded a construction contract to complete the I-94 Lift Station (No. 1) and Sanitary Sewer Improvements on May 2, 2017. The contractor has completed the work in accordance with the contract, plans, and specifications; and with approval of this change order the contract amount will be adjusted to reflect the actual quantities installed as a part of the project. PROPOSAL DETAILS/ANALYSIS: RL Larson Excavating, Inc. has submitted a compensating change order to reconcile the estimated and actual quantities installed on the project. FISCAL IMPACT: $13,581.35 increase to the final construction contract amount. This compensating change order will increase the final construction contract amount to $902,903.57. The original construction contract amount at the time of award was $809,129.70. The increase is due to additional work items requested by the city including additional pavement and sanitary sewer at the lift station, as well as additional quantities associated with rebuilding the shoulder and turn lane on Hudson Boulevard. RECOMMENDATION: Staff is recommending that the City Council approve, as part of the Consent Agenda, Compensating Change Order No. 4 for the I-94 Lift Station (No. 1) and Sanitary Sewer Improvements. If removed from the consent agenda, the recommended motion for the action is as follows: “Move to approve Compensating Change Order No. 4 for the I-94 Lift Station (No. 1) and Sanitary Sewer Improvements, thereby increasing the contract amount by $13,581.35”. ATTACHMENTS: 1. Compensating Change Order No. 4. CHANGE ORDER NO. 4 I-94 LIFT STATION (NO. 1) AND SANITARY SEWER IMPROVEMENTS CITY OF LAKE ELMO, MINNESOTA PROJECT NO. 2016.134 QUANTITY UNIT PRICE AMOUNT QUANTITY AMOUNT NET CHANGE AMOUNT 1 LS 1.00 $30,000.00 $30,000.00 1.00 $30,000.00 0.00 $0.00 2 LS 1.00 $6,300.00 $6,300.00 1.00 $6,300.00 0.00 $0.00 3 LS 1.00 $33,000.00 $33,000.00 1.00 $33,000.00 0.00 $0.00 4 EA 7.00 $315.00 $2,205.00 7.00 $2,205.00 0.00 $0.00 5 SY 1,510.00 $4.00 $6,040.00 1670.00 $6,680.00 160.00 $640.00 6 SY 9.10 $10.00 $91.00 9.10 $91.00 0.00 $0.00 7 LF 83.00 $10.00 $830.00 83.00 $830.00 0.00 $0.00 8 LF 180.00 $10.00 $1,800.00 180.00 $1,800.00 0.00 $0.00 9 LF 1,767.00 $4.00 $7,068.00 1767.00 $7,068.00 0.00 $0.00 10 REMOVE AND DIPSOSE OF EXISTING STORM SEWER PIPE LF 173.00 $10.00 $1,730.00 173.00 $1,730.00 0.00 $0.00 11 EA 7.00 $500.00 $3,500.00 7.00 $3,500.00 0.00 $0.00 12 LF 0.00 $10.00 $0.00 0.00 $0.00 0.00 $0.00 13 EA 1.00 $55.00 $55.00 1.00 $55.00 0.00 $0.00 14 EA 1.00 $130.00 $130.00 1.00 $130.00 0.00 $0.00 15 EA 4.00 $160.00 $640.00 4.00 $640.00 0.00 $0.00 16 LF 1,747.00 $2.50 $4,367.50 1556.00 $3,890.00 -191.00 -$477.50 17 EA 3.00 $4,200.00 $12,600.00 3.00 $12,600.00 0.00 $0.00 18 EA 5.00 $1,500.00 $7,500.00 5.00 $7,500.00 0.00 $0.00 19 EA 2.00 $1,605.00 $3,210.00 2.00 $3,210.00 0.00 $0.00 20 LF 443.00 $45.00 $19,935.00 443.00 $19,935.00 0.00 $0.00 21 LF 920.00 $46.00 $42,320.00 920.00 $42,320.00 0.00 $0.00 22 LF 55.00 $117.00 $6,435.00 55.00 $6,435.00 0.00 $0.00 23 LF 356.00 $56.00 $19,936.00 356.00 $19,936.00 0.00 $0.00 24 LF 76.00 $93.00 $7,068.00 76.00 $7,068.00 0.00 $0.00 25 EA 1.00 $3,317.00 $3,317.00 1.00 $3,317.00 0.00 $0.00 26 EA 5.00 $1,025.00 $5,125.00 5.00 $5,125.00 0.00 $0.00 27 EA 8.00 $3,500.00 $28,000.00 8.00 $28,000.00 0.00 $0.00 28 VF 20.66 $120.00 $2,479.20 20.66 $2,479.20 0.00 $0.00 29 EA 1.00 $4,200.00 $4,200.00 1.00 $4,200.00 0.00 $0.00 30 CY 70.00 $20.00 $1,400.00 70.00 $1,400.00 0.00 $0.00 31 CY 70.00 $50.00 $3,500.00 70.00 $3,500.00 0.00 $0.00 32 LF 1,792.00 $1.35 $2,419.20 1792.00 $2,419.20 0.00 $0.00 33 LS 1.00 $350,000.00 $350,000.00 1.00 $350,000.00 0.00 $0.00 34 LS 1.00 $53,000.00 $53,000.00 1.00 $53,000.00 0.00 $0.00 35 LS 1.00 $28,000.00 $28,000.00 1.00 $28,000.00 0.00 $0.00 36 EA 3.00 $750.00 $2,250.00 3.00 $2,250.00 0.00 $0.00 37 EA 2.00 $1,650.00 $3,300.00 2.00 $3,300.00 0.00 $0.00 38 LF 46.00 $44.00 $2,024.00 46.00 $2,024.00 0.00 $0.00 39 LF 0.00 $20.00 $0.00 0.00 $0.00 0.00 $0.00 40 LF 32.00 $47.00 $1,504.00 32.00 $1,504.00 0.00 $0.00 41 EA 2.00 $1,064.00 $2,128.00 2.00 $2,128.00 0.00 $0.00 42 LF 60.00 $33.00 $1,980.00 60.00 $1,980.00 0.00 $0.00 43 EA 2.00 $350.00 $700.00 2.00 $700.00 0.00 $0.00 44 CY 6.00 $70.00 $420.00 6.00 $420.00 0.00 $0.00 45 LS 1.00 $5,000.00 $5,000.00 1.00 $5,000.00 0.00 $0.00 46 SY 507.00 $15.75 $7,985.25 598.00 $9,418.50 91.00 $1,433.25 47 CY 562.21 $35.00 $19,677.35 562.21 $19,677.35 0.00 $0.00 48 SY 0.00 $2.00 $0.00 0.00 $0.00 0.00 $0.00 49 CY 89.96 $12.00 $1,079.52 89.96 $1,079.52 0.00 $0.00 50 TON 1,312.00 $20.00 $26,240.00 1312.00 $26,240.00 0.00 $0.00 51 TON 535.00 $89.00 $47,615.00 588.60 $52,385.40 53.60 $4,770.40 52 LF 90.00 $37.00 $3,330.00 90.00 $3,330.00 0.00 $0.00 53 SF 65.00 $10.50 $682.50 65.00 $682.50 0.00 $0.00 54 EA 0.25 $800.00 $200.00 0.25 $200.00 0.00 $0.00 COMPENSATING CHANGE ORDER NO. 4 ITEM DESCRIPTION OF PAY ITEM UNIT CONTRACT TOTAL TO DATE MOBILIZATION TRAFFIC CONTROL PRECAST CONCRETE JERSEY BARRIERS TREE REMOVAL REMOVE AND DISPOSE OF EXISTING BITUMINOUS PAVEMENT REMOVE AND DISPOSE OF EXISTING CONCRETE PAVEMENT REMOVE AND DISPOSE OF EXISTING CONCRETE CURB AND GUTTER REMOVE AND DISPOSE OF EXISTING GUARDRAIL REMOVE AND DISPOSE OF EXISTING SANITARY SEWER PIPE REMOVE AND DISPOSE OF EXISTING SANITARY SEWER MANHOLE REMOVE AND DISPOSE OF EXISTING EDGE DRAIN REMOVE AND DISPOSE OF EXISTING SIGN SALVAGE AND REINSTALL MAILBOX SALVAGE AND REINSTALL SIGN SAWING BITUMINOUS PAVEMENT CORE DRILL CONNECTION TO EXISTING STRUCTURE CONNECT TO EXISTING SANITARY SEWER SERVICE CONNECT EXISTING PIPE TO NEW MANHOLE 15" PVC, SDR 35 SANITARY SEWER PIPE, 0' - 10' DEEP 15" PVC, SDR 35 SANITARY SEWER PIPE, 10' - 15' DEEP 15" PVC, SDR 35 SANITARY SEWER PIPE, 15' - 20' DEEP 16" PVC, C900 SANITARY SEWER PIPE, 0' - 10' DEEP 16" DIP, CL 50 SANITARY SEWER PIPE, 0' - 10' DEEP 16" SANITARY SEWER OUTSIDE DROP 15" X 6" WYE BRANCH 4' DIAMETER SANITARY SEWER MANHOLE 4' DIAMETER EXCESS MANHOLE DEPTH MANHOLE LINER REMOVAL OF UNSTABLE FOUNDATION MATERIAL ROCK FOUNDATION BORROW TELEVISING LIFT STATION STANDBY GENERATOR BYPASS PUMPING SALVAGE AND REINSTALL APRON SALVAGE AND REINSTALL STORM SEWER STRUCTURE SALVAGE AND REINSTALL STORM SEWER PIPE PERFORATED PVC EDGE DRAIN 18" RCP STORM SEWER, CLASS V 18" RCP FLARED END SECTION WITH TRASH GUARD 18" CM DRIVEWAY CULVERT 18" CM APRON RIPRAP CLASS III LIFT STATION SITE GRADING BITUMINOUS DRIVEWAY PAVEMENT (LIFT STATION) COMMON EXCAVATION (DRIVEWAY AND STREET PATCHES) GEOTEXTILE FOR ROAD STABILIZATION SELECT GRANULAR BORROW AGGREGATE BASE, CLASS 6 TYPE SP 9.5 BITUMINOUS WEARING COURSE MIXTURE (2,B) B618 CONCRETE CURB AND GUTTER 4" CONCRETE MEDIAN 6" CONCRETE PEDESTRIAN RAMP 55 SF 0.00 $51.00 $0.00 0.00 $0.00 0.00 $0.00 56 EA 1.00 $500.00 $500.00 1.00 $500.00 0.00 $0.00 57 EA 2.00 $350.00 $700.00 2.00 $700.00 0.00 $0.00 58 LF 1.00 $1,000.00 $1,000.00 1.00 $1,000.00 0.00 $0.00 59 EA 1.00 $360.00 $360.00 1.00 $360.00 0.00 $0.00 60 SF 9.00 $55.00 $495.00 9.00 $495.00 0.00 $0.00 61 EA 6.00 $100.00 $600.00 6.00 $600.00 0.00 $0.00 62 LF 1,553.00 $1.26 $1,956.78 1553.00 $1,956.78 0.00 $0.00 63 EA 2.00 $500.00 $1,000.00 2.00 $1,000.00 0.00 $0.00 64 HR 9.00 $140.00 $1,260.00 9.00 $1,260.00 0.00 $0.00 65 SY 7,090.00 $1.74 $12,336.60 8129.00 $14,144.46 1039.00 $1,807.86 66 SY 0.00 $2.60 $0.00 0.00 $0.00 0.00 $0.00 67 AC 1.36 $210.00 $285.60 1.36 $285.60 0.00 $0.00 68 EA 0.00 $180.00 $0.00 0.00 $0.00 0.00 $0.00 69 EA 6.00 $52.00 $312.00 6.00 $312.00 0.00 $0.00 70 LF 0.00 $3.15 $0.00 0.00 $0.00 0.00 $0.00 TOTALS - BASE CONTRACT $845,122.50 $853,296.51 $8,174.01 CHANGE ORDER NO. 1 CO1-1 EA 3.0 $5,951.24 $17,853.72 3.00 $17,853.72 0.00 $0.00 TOTALS - CHANGE ORDER NO. 1 $17,853.72 $17,853.72 $0.00 CHANGE ORDER NO. 3 CO3-1 LS 1.00 $9,400.00 $9,400.00 1.00 $9,400.00 0.00 $0.00 CO3-2 LS 1.00 $3,900.00 $3,900.00 1.00 $3,900.00 0.00 $0.00 CO3-3 LF 200.00 $4.60 $920.00 200.00 $920.00 0.00 $0.00 CO3-4 TN 14.00 $30.00 $420.00 32.39 $971.70 18.39 $551.70 CO3-5 TN 40.00 $22.00 $880.00 70.62 $1,553.64 30.62 $673.64 CO3-6 CY 10.00 $52.00 $520.00 16.00 $832.00 6.00 $312.00 CO3-7 CY 80.00 $42.00 $3,360.00 60.00 $2,520.00 -20.00 -$840.00 CO3-8 CY 24.00 $34.00 $816.00 144.00 $4,896.00 120.00 $4,080.00 CO3-9 LS 1.00 $1,800.00 $1,800.00 1.00 $1,800.00 0.00 $0.00 CO3-10 AC 0.20 $4,500.00 $900.00 0.34 $1,530.00 0.14 $630.00 CO3-11 LS 1.00 $1,635.00 $1,635.00 1.00 $1,635.00 0.00 $0.00 CO3-12 LS 1.00 $1,795.00 $1,795.00 1.00 $1,795.00 0.00 $0.00 TOTALS - CHANGE ORDER NO. 3 $26,346.00 $31,753.34 $5,407.34 TOTALS - REVISED CONTRACT $889,322.22 $902,903.57 $13,581.35 TRUNCATED DOME PANELS ADJUST MANHOLE CASTING ADJUST GATE VALVE BOX HYDRANT EXTENSION EXTEND VALVE BOX SIGN PANEL, TYPE C OFF ROAD STRUCTURE MARKER 4" SOLID LINE WHITE EPOXY PAVEMENT MESSAGE, RIGHT TURN ARROW THERMOPLASTIC (GROUND IN STREET SWEEPING EROSION CONTROL BLANKET TEMPORARY HYDROMULCH REVISE PUMP DESIGN MOBILIZATION TRAFFIC CONTROL REMOVE PAVEMENT MARKING SEEDING INLET PROTECTION DITCH CHECK SILT FENCE STRIPING SEEDING ADD 1' SECTION ADD 2' SECTION AGGREGATE BASE CLASS 5 (LIFT STATION SITE) AGGREGATE BASE, CLASS 6 (SHOULDER / TURN LANE) COMMON EXCAVATION (LIFT STATION SITE) COMMON EXCAVATION (SHOULDER / TURN LANE) TOPSOIL