HomeMy WebLinkAbout#10 - Legacy at Northstar Final Plat & PUD
563986V1 SJS LA515-61
STAFF REPORT
DATE: 4/16/2019
ITEM #:
TO: City Council
FROM: Ken Roberts, Planning Director
AGENDA ITEM: The Legacy at North Star Second Addition – Easement Vacations and
Final Plat and PUD Plan Approval
REVIEWED BY: Jack Griffin, City Engineer
Sarah Sonsalla – City Attorney
BACKGROUND:
GWSA Land Development is requesting City approval of easement vacations and the Final Plat and PUD
Plans to create lots for 74 single family detached homes located on 22.8 acres. This proposed final plat is
the second phase of a 266 single family residential development on +/- 98.93 acres known as Legacy at
North Star.
The City approved the PUD Concept Plan on June 6, 2017 and approved the Preliminary Plat and PUD
Plans on February 20, 2018 for the Legacy at North Star development. A part of the overall development
in the southwest corner of the site is within the shoreland of Sunfish Lake. This triggers the need for a
Planned Unit Development because the proposed lots do not meet the lot width and impervious
requirements for Natural Environment lakes; because the density exceeds the allowable density with the
Village Urban Low Density Residential land use category, and because the Applicant is proposed various
other deviations from some zoning standards.
On August 8, 2018, the City Council approved a Final Plat and Planned Unit Development (PUD) Plans
for 59 single family detached homes located on 23.26 acres. This approval was for the 1st phase of the
Legacy at North Star development.
On March 25, 2019, the Planning Commission held a public hearing to review this request. There was no
public comment about the proposed final plat and the Planning Commission recommended approval,
subject to conditions.
ISSUE(S) BEFORE THE CITY COUNCIL:
Is the proposed Legacy at North Star Second Addition Final Plat generally consistent with the City-
approved Legacy at North Star preliminary plat and PUD and has the applicant met all the required
conditions of approval? Should the City vacate the easements over Outlots E, F and G to allow the
recording of the Legacy at North Star Second Addition final plat?
GENERAL INFORMATION:
Applicant: GWSA Land Development, 10850 Old County Road 15, Suite 200, Plymouth, MN
55441
City Council Meeting
April 16, 2019
Page 2
563986V1 SJS LA515-61
Property Owner: GWSA Land Development, Plymouth, MN 55441
Location: Outlot F and Outlot G, Legacy at North Star, Washington County, Minnesota.
PID#s: 14-029-21-11-0039 and 14-029-21-12-0014
Request: Easement Vacations, Final Plat and Development Stage PUD Plans
Site Area: 22.8 acres (total for two PIDs)
Res. Dev. Area: 97.25 acres (overall)
Land Use: Village Urban Low Density
Current Zoning: V-LDR/PUD
Proposed Zoning: V-LDR/PUD
Surrounding: RR (north)/ LDR and VMX (east)/Agriculture (south)/ OP and RR (west).
History: The City approved the PUD Concept Plan on June 6, 2017 and approved the
Preliminary Plat and PUD Plans on February 20, 2018 for the Legacy at North Star
development.
Deadline: Application Complete – 2/25/2019
60 Day Deadline – 4/24/2019
Extension Letter Mailed – No
120 Day Deadline – N/A
Applicable Code: Article 13 – Village Mixed Use District
Article 18 – Planned Unit Development Regulations
Chapter 153 – Subdivision Regulations
§150.270 Storm Water, Erosion, and Sediment Control
PROPOSAL DETAILS/ANALYSIS:
PUD Flexibility. The City approved this Village-Low Density Residential (V-LDR)/PUD development for
the northern portion of the Schiltgen Farm at the northwest corner of CSAH 14 and CSAH 17. The
development is a PUD because the City afforded the developer a higher density than is allowed within the
V-LDR land use category and the City is allowing flexibility from the zoning regulations of the Shoreland
Ordinance and the V-LDR zoning regulations.
Changes since Preliminary Plat Reviewed by the Planning Commission. The Preliminary Plans
approved by City staff consisted of 266 lots. The Legacy at Lake Elmo 2nd Addition has been submitted
consistent with the approved Preliminary Plans dated June 29, 2018. Ultimately the density within the entire
development was approved at 2.75 units per acre but has been reduced to 2.72 units per acre with required
changes. I have noted other changes to the Second Addition plat since this version throughout the report.
FINAL PLAT AND PUD PLANS
Final Plat Approval Procedure. The City’s subdivision ordinance establishes the procedure for
obtaining final subdivision approval, in which case a final plat may only be reviewed after the City
takes action on a preliminary plat. As long as the final plat is consistent with the preliminary
City Council Meeting
April 16, 2019
Page 3
563986V1 SJS LA515-61
approval, it must be approved by the City. The City’s approval of the Legacy at North Star
Preliminary Plat included a series of conditions that must be met by the applicant, which are
addressed in the sections below.
Consistency with Preliminary Plat. Staff has reviewed the proposed final plat and found that it is
generally consistent with the preliminary plat that was approved by the City. The developer updated
the preliminary plan submissions to meet the conditions of approval before submitting the 2nd
Addition Final Plat, and the final plat application incorporates these updates as well. The applicant
has submitted detailed construction plans related to sanitary sewer, water main, storm sewer, grading,
drainage, landscaping, and other details that have been reviewed by the City.
For this phase of the development, the applicant is proposing to plat 74 single family lots instead of the 76
lots approved with the preliminary plat. The change increased the lot widths and sizes for lots in Block 1
and Block 4 by decreasing the number of lots from 9 to 8 in each block. The applicant stated they made this
change to have larger lots in response to a request from builders. In reviewing the proposed final plat, Lot
8, Block 4, which is shown next to Outlot F, has a trapezoid shape with the front being 64.94 feet in width
and the rear of the lot being 57.93 feet in width. The developer has proposed this layout to accommodate
Outlot F which will have a trail and for storm sewer facilities including catch basins and underground pipes
to provide storm water drainage to the area.
Lot Sizes and Widths. The minimum lot width for lots in the shoreland of Sunfish Lake is 125 feet and
70 feet in the V-LDR District. The minimum lot size for lots in the shoreland of Sunfish Lake is 40,000
sq. ft. and in the V-LDR District, 9,000 sq. ft. The City granted the developer the following deviations
from setbacks and lot area/width, shown in the table below. Changes since preliminary plat approval include
a slight decrease in minimum lot width for exterior single family; a significant decrease in minimum lot
area for the villa lots and a slight decrease in minimum lot area for interior and exterior single family lots.
None of the lots in this phase of the development, however, are in the shoreland area of Sunfish Lake.
Shoreland
Standard
V-LDR
Standard
Villa Lots –
Preliminary
Approval
Villa Lots -
Proposed
Interior
Single
Family –
Preliminary
Approval
Interior
Single
Family -
Proposed
Exterior
Single
Family –
Preliminary
Approval
Exterior
Single
Family -
Proposed
Minimum
Lot Width
125 ft. 70 ft. 55 ft. 55 ft. 55 ft. 55 ft. 66 ft. 65 ft.
Minimum
Lot Area
40,000 sq.
ft.
9,000 sq.
ft.
7,900 sq. ft. 6,600 sq. ft. 6,900 sq. ft. 6,840 sq.
ft.
8,500 sq. ft. 8,090 sq.
ft.
Minimum
Front Yard
Setback
N/A 25 ft. 15 ft. 15 ft. 25 ft. 25 ft. 25 ft. 25 ft.
Minimum
Side Yard
Setback
N/A 10 ft./5 ft.
or 7.5
ft./7.5 ft.
7 ft./8 ft. 7 ft./8 ft. 7 ft./8 ft. 7 ft./8 ft. 10 ft./5 ft. or
7.5 ft./7.5 ft.
10 ft./5
ft. or 7.5
ft./7.5 ft.
Maximum
Impervious
Surface
N/A 35% 50% 50% 40% 45% 45% 45%
City Council Meeting
April 16, 2019
Page 4
563986V1 SJS LA515-61
Landscaping and Tree Preservation. Staff submitted the proposed project landscape plans to the City’s
Landscape Architect for review. It is a recommended condition of approval that the landscape plans be
approved before recording of final plat.
The applicant also provided the City with a tree preservation plan. The preliminary landscape plans
indicated that there were no trees on the site and therefore no removal. However, trees were removed on
the western edge of the property during grading. The tree preservation plan shows that three significant
trees were removed. The applicant will be required to replace these trees per the tree preservation ordinance
and has indicated that conversations have been had with adjacent property owners indicating that larger
trees will be planted along this western edge to screen these properties as much as possible.
Outlots. Outlots A and C will be owned by the City for storm water management purposes. The plans
indicate that Outlot B will be developer owned but eventually the HOA will own and maintain it. Outlots
A and C will be dedicated to the city for storm water ponding purposes. Existing Outlots G and F are
developer-owned and are the site of the Second Addition final plat. Outlot H (owned by Schiltgen Family)
will be developed in the future and Outlots D and E are developer owned and used for private trail purposes,
protected by a drainage and utility easement. Outlot F also will be owned by the HOA as it is for a private
trail running between 39th Street North and 38th Trail North.
Parkland Dedication. The total required parkland dedication for the development is 10% of the total
98.93 (9.893 acres). The City approved a partial parkland dedication for the entire development with
dedication of Outlot D of the Northport plat to the City. This outlot is 6.51 acres, and so the developer is
only responsible for the remaining 3.473 acres of parkland dedication. With the first addition, the developer
platted 27.2 acres of land which required a parkland dedication of 2.72 acres. By subtracting 2.72 acres
from the 6.51 acres of land the city accepted from Outlot D of Northport, the developer has a “credit’ 3.79
acres of parkland dedication with the City.
For second phase, with a development area of 22.8 acres, the City would normally require a parkland
dedication of the equivalent of at least 2.28 acres (10 percent of this phase of the project.) With the 3.79
acres of parkland “credit’ available, the City will not be requiring the developer to dedicated land or pay
park dedication fees with this phase of the development. By subtracting 2.28 acres from the 3.79 acres, the
developer will have 1.51 acres of parkland credit remaining after the Second Addition to apply toward
parkland dedication requirements in future phases. In addition, the developer will eventually be responsible
for paying the City a cash contribution of $278,668 for park dedication purposes. This cash contribution
for park dedication will be due after the remaining 1.51 acres of “credit” has been applied to future phases
of the development. The City calculated the $278,668 cash contribution by determining 10 percent of the
value of the 98.93 acres within the entire preliminary plat area ($816,173) less the value of Outlot D of
Northport 1st Addition ($537,505).
The development also will have an HOA-owned and maintained playfield on the west side of the
development along with a playground, pool, pool house, and recreation area near the eastern side of the
development on the south side of 39th Street.
Trails. It was a condition of preliminary plat approval that the applicant provide a trail connection to the
Hamlet on Sunfish Lake trails plat, as shown below. This trail connection runs along 39th Street and will
connect the Hamlet on Sunfish Lake trails to Lake Elmo Avenue. The applicant and City have worked with
the Hamlet on Sunfish Lake residents to determine this connection point.
City Council Meeting
April 16, 2019
Page 5
563986V1 SJS LA515-61
Another condition was that a trail be provided from 39th Street to the southern limits of the plat and that the
future County right-of-way area along Lake Elmo Avenue of the parcel to the south of the plat be graded
for a future bituminous trail extension (grade ready trail) along the storm sewer outfall pipe location.
City Council Meeting
April 16, 2019
Page 6
563986V1 SJS LA515-61
Private Trails. Private trails are shown below in red.
City Council Meeting
April 16, 2019
Page 7
563986V1 SJS LA515-61
Subdivision Signs. The developer has proposed to install two subdivision signs within the medians of 41st
Street North and 39th Street North. This is allowed per an amendment to the Sign Regulations ordinance
adopted by the City in December of 2017. One subdivision sign of up to 32 square feet is allowed with
additional signs of up to 24 square feet for each entrance. The developer is not proposing any additional
signs with this phase of the development.
Streets and Access. With the First Addition final plat, the developer proposed a modified street grid with
60 foot wide public rights-of-ways with 28’ wide streets (back to back), allowing parking on both sides of
the street, except where center island exist, such as at the entrance roads off of Lake Elmo Avenue. The
developer provided right-of-way and street stubs from the First Addition to allow for vehicle connectivity
to the north and south of that phase. They also provided two access points to the Schiltgen parcel to the
south of the project site in the event this property develops in the future and also to accommodate the land
locked Chavez parcel. The First Addition also included a street stub to the property to the north of the
development to accommodate future development.
For the Second Addition, the proposed street connection points and designs are consistent with the approved
overall preliminary plat and with the approved First Addition final plat.
Village Parkway Design. When reviewing the Concept Plan, the Planning Commission recommended and
the Council adopted a condition of approval that the developer carry the Village Parkway design through
in the development with the southern road (39th Street) to at least to the first street stub providing access to
the south. The developer met this design with the First Addition, with a trail on the north side and sidewalk
on the south side to match up with existing configuration of 39th Street to the east.
Street Names. The proposed street names are consistent with the City street naming policy.
Fire Chief and Building Official Comments. Planning staff provided the Fire Chief and Building Official
copies of the proposed Second Addition final plat. They offered the following comments:
City Council Meeting
April 16, 2019
Page 8
563986V1 SJS LA515-61
Fire Chief Malmquist:
1. Street naming and numbering to be consistent with City guidelines.
2. Hydrant locations to be reviewed and approved (by City staff).
Building Official Bent:
1. Fire hydrant spacing/locations, street signage, etc. shall be in accordance with City regulations and
should be the same as the First Addition approvals.
2. Provide temporary turn-arounds or temporary cul-de-sac and street ends where necessary.
3. Street signs shall be installed before any (home) construction may be begin in this addition.
Washington County Review. City staff sent the proposed final plat to Washington County for review.
The developer provided enough right-of-way for County Road 17 (Lake Elmo Avenue) with the recording
of the First addition final plat. Before construction, the developer or contractor must obtain any applicable
Washington County right-of-way permits, submit drainage report and calculations to the City and access
control shall be dedicated to Washington County along CSAH 17/Lake Elmo Avenue frontage.
City Engineer Comments. The City Engineer memo dated March 19, 2019 is attached to this report. He
had several comments about the ownership and platting of the various outlots within the development.
Other Concerns.
Watering Ban. Due to a possible shortage of water, the City may need to implement severe
watering restrictions in the City for this summer and into the future. This could include limiting or
prohibiting the use water outside including for car washing and for watering grass. This could
affect future home builders and buyers as there may be a limited supply of water available for
outdoor uses. It may be wise for the City to put a condition on this phase of the plat to require the
home builders to inform the buyers about the possible watering restrictions.
Finishing Streets in the First Addition. The developer started construction of the First Addition in
2018 but did not finish the streets to City standards before winter. They installed the utilities and
the gravel base but did not install the concrete curb and gutter or the bituminous pavement. The
City allowed the developer to install a temporary bituminous driving surface over the center of the
roads in the First Addition in the fall of 2018. This is to allow access to the house sites (to allow
for their construction) with the requirement that the developer remove the temporary road surface
and finish the streets (with curb and gutter and permanent bituminous) this spring. The City made
it a condition of this temporary street approval that the City would not issue certificates of
occupancy for any new house on a temporary street until after the contractor installed the permanent
street to the satisfaction of the City.
The streets for the Second Addition intersect with 39th Street (to the north and south). The City
Engineer indicated to me that the construction of the utilities and new streets for the Second
Addition should not be impacted by the condition of the streets in the First Addition. It would be
prudent for the developer to finish the streets in the First Addition as quickly as possible to
minimize conflicts and problems this year. Staff is recommending the City require the developer
finish the streets in the First Addition (with at least the installation of curb and gutter and the base
course of bituminous) before the City issues any building permits in the Second Addition.
City Council Meeting
April 16, 2019
Page 9
563986V1 SJS LA515-61
Conditions of Concept Preliminary Plat and PUD Plan Approval. The following indicates how this
phase of the development will meet the conditions of Preliminary Plat and PUD Plan Approval.
1. That PID# 11.029.21.44.0001 is subdivided to create Parcel 3 as indicated on the Preliminary
Plat and that a Zoning Map Amendment is approved to rezone Parcels 1, 2, and 3 from Rural
Development Transitional to Village Urban Low Density Residential.
This condition has been met.
2. That the future preliminary plat and PUD Plans include parcels with PID# 14.029.21.11.0001,
11.029.21.43.0001, and a portion of 11.029.21.44.0001.
This condition has been met.
3. That the future preliminary plat and preliminary PUD Plans submittal identify all requests for
flexibility from the V-LDR zoning district.
The Applicant indicates in the narrative that PUD Flexibility is being requested on minimum lot
width, lot area, front yard setback, side yard setback and maximum impervious coverage.
4. That all comments of the City Engineer’s Memorandum dated May 8, 2017 be addressed with the
future preliminary plat and preliminary PUD Plans submittal.
It is a recommended condition of approval for the Second Addition that the applicant address all
items outlined in the City Engineer’s memo for the Final Plat and PUD Plans dated March 19,
2019.
5. That the Applicant submit additional details on the proposed stormwater reuse system and ongoing
operations for City review and consideration. Ownership, maintenance and ongoing operational
responsibilities must be clearly defined, and City acceptance of stormwater reuse must be
contingent upon the City agreeing to the ongoing ownership, maintenance and operation plan,
including the execution of a stormwater maintenance and easement agreement that addresses
stormwater reuse.
The Applicant has chosen to not pursue stormwater reuse on this time. While the Council did grant
amenity points for this feature, there are still enough amenity points granted to reach the increased
density. The applicant has indicated within the narrative that it was decided that this site would be
better served with infiltration basins and that the stormwater reuse was not necessary due to the
decrease in lot count and increase in open space.
6. That the Applicant provide a detailed phasing plan with the Final Plat 1st Addition application
that clearly indicates the phasing of the construction for each public infrastructure component
and addresses both construction access to the site and public access for new residents.
Temporary cul-de-sacs should be part of the phasing plans and are required for any street with a
platted lot with driveway access.
The applicant provided this with the construction plans.
City Council Meeting
April 16, 2019
Page 10
563986V1 SJS LA515-61
7. That the developer provide a trail connecting the trail in the middle of the development to Hamlet
on Sunfish Lake trails along with a trail corridor of at least 30 feet in width. The developer shall
not receive parkland dedication credit for the trail corridor nor cost of construction of the trail.
The developer provided this trail and will not receive parkland dedication credit for the
construction of this trail.
8. That any approval be contingent on complying with Washington County’s requirements and
requests pertaining to right-of-way, turn lanes and trail needs as noted in the Washington County
Memo dated June 1, 2017.
Washington County submitted preliminary plat comments to the City in a memo dated June 1,
2018. This memo indicated that sufficient right-of-way has been provided as per the Washington
County Comprehensive Plan on the preliminary plat and that a sufficient right-of-way easement is
provided to the south of the development. The applicant will be installing the required turn lanes
this year as part of completing the construction of the 1st Addition.
9. Sufficient right-of-way along Lake Elmo Avenue N (CSAH-17) for both the Legacy at North Star
Plat and PID# 14.02.921.11.0001 must be provided. Verification from Washington County that
sufficient right-of-way along Lake Elmo Avenue N (CSAH-17) has been provided must be received
by the City.
This condition has been met.
10. The Applicant shall be solely responsible for all construction costs associated with the intersection
improvements as recommended by Washington County.
The developer started the construction of the First Addition in 2018 including the intersection of
County Road 17 and 39th Street. It is not clear if they have completed all the construction at this
intersection but any costs and responsibilities for those improvements would covered by the
Developer’s Agreement for the First Addition.
11. That the Applicant provide a minimum 30 foot buffer from the northern edges and 50 foot buffer
from the western edges of the plat. This buffer shall average 170 feet on the western edge of the
plat and 86 feet on the northern edge of the plat and include sufficient landscaping and/or berming
as deemed adequate by the City.
The applicant provided the City with the preliminary plat application an exhibit showing that the
plans will meet this requirement. The exhibit shows that the buffer on the western edge averages
170 feet and that the buffer on the northern edge averages 90 feet. This condition is not applicable
to the Second Addition Final Plat.
12. That the Landscape Plans receive approval from the City’s Landscape Architect and include
revisions as mentioned in the Staff Report dated to the Planning Commission dated December 11,
2017.
The overall landscape plans have been approved by the City’s Landscape Architect, and it is a
condition of approval that the City approve the landscape plans for this phase of the development.
City Council Meeting
April 16, 2019
Page 11
563986V1 SJS LA515-61
13. That wetlands and wetland buffer areas be contained within outlots outside of lot areas and
dedicated to the City.
The preliminary plat shows that with buffer averaging this wetland buffer has been contained
within Outlot N of the preliminary plat. This condition is not applicable to the Second Addition.
14. That the Applicant provide a detailed sanitary sewer phasing plan must be provided with Final
Plat 1st Addition application to address timely connection to sewer for the wastewater treatment
system that includes, at a minimum, dedicated right-of-way or utility easement extended to the
westerly side of the plat.
The applicant provided a drainage and utility easement over all of Outlot H, which may be used
by the City as a permanent drainage and utility easement for the installation of a trunk sanitary
sewer pipe to serve the Hamlet on Sunfish Lake development before any future Legacy at North
Star additions.
15. That the Final Plat and PUD Plans include a parking area for the HOA pool/playground recreation
area that meets all applicable standards.
The parking area has been removed from the originally proposed preliminary plat that the Planning
Commission reviewed in December of 2017 but has been replaced with approximately 13 parking
spaces along Kokanee Avenue North as shown below. This was due to the new design and increases
open space within the park and provides more parking than what would be provided with the
parking lot. This condition is not applicable to the Second Addition.
City Council Meeting
April 16, 2019
Page 12
563986V1 SJS LA515-61
16. That the proposed 15 foot front yard setback for Villa Lots be approved provided the HOA
documents include architectural requirements that require 4-sided architecture and garages
facing the public right-of-ways to have windows and/or other architectural features.
The applicant has indicated that they would prefer to have this requirement within the
architectural guidelines, which is requested to be a separate document from the HOA documents.
The applicant has indicated that this would provide greater control over the building designs. This
change is a recommended condition of Final Plat and PUD Plans approval to have the applicant
provide the City with this documentation before the recording of the final plat.
17. That the Landscape Plans receive approval from the City’s Landscape Architect and include
revisions as mentioned in the Staff Report dated to the Planning Commission dated December 11,
2017.
It is a recommended condition of Second Addition Final Plat and PUD Plans approval that the
City’s Landscape Architect approve the landscape plans for this phase of the development.
18. That the developer comply with any comments provided by the MnDNR.
The applicant has provided with the Preliminary Plat and PUD Plans application a shoreland tier
analysis that shows the applicant has provided sufficient open space and has proposed the allowed
number of lots within the shoreland area. This condition is not applicable to the Second Addition.
City Council Meeting
April 16, 2019
Page 13
563986V1 SJS LA515-61
19. That the developer provide deed restrictions, covenants, permanent easements or other instruments
for open space that prohibit future vegetative and topographic alterations other than routine
maintenance, construction of buildings or storage of vehicles and other materials; and ensure
preservation and maintenance of open space.
The outlot that will serve as open space within the shoreland will be owned by the City and
therefore will not require a protective covenant preserving the open space. It is a recommended
condition of approval that the Applicant enter in to an open space easement with the City over
homeowners’ association-owned outlots on the northern and western edges of the development.
20. That all Fire Chief and Building Official comments be addressed.
Planning staff submitted the proposed Second Addition Final Plat and PUD Plans to the Building
Official and Fire Chief. It is a recommended condition of approval of the Final Plat and PUD Plans
that the developer address all these comments.
21. That street names comply with City’s Street Naming Policy.
The applicant has changed the street names since preliminary plat approval to adhere to the City’s
current street naming policy.
22. That the Applicant provide specific examples of proposed development signage, fencing,
landscaping, lighting and site furnishings, including the clubhouse, that will adhere to the Lake
Elmo Branding and Theming Study with the Final Plat and PUD Plans submittal.
The applicant provided the City with this information with the Final Plat for the First Addition.
23. That the Applicant submit and the City approve updated Preliminary Plat and PUD Plans prior to
submission of Final Plat and PUD Plans.
The preliminary plat and PUD plans were approved before the applicant submitted the proposed
Second Addition Final Plat and PUD application.
24. The proposed 7’/8’sideyard setbacks shall be approved by the City Engineer.
The Engineer does not have issue with this side yard setback.
25. That the Applicant construct a bituminous trail extending south along the County right-of-way from
30th Way to the southerly plat limits (along the east side of Outlot C) and the future County right-
of-way area along Lake Elmo Avenue of the parcel to the south of the plat should be graded for a
future bituminous trail extension (grade ready trail) along the storm sewer outfall pipe location.
This trail was shown on the construction plans for the First Addition and is covered by the
developer’s agreement for that phase of the project.
26. That the Applicant pay a cash contribution in an amount equal to the fair market value of 3.383
acres of land to satisfy the development’s park land dedication requirement pursuant to Section
154.14 of the City Code.
City Council Meeting
April 16, 2019
Page 14
563986V1 SJS LA515-61
This will be addressed in the development agreement.
EASEMENT VACATIONS
Easement Vacations. The applicant is requesting the City vacate the drainage and utility easements that
are now over Outlot E, Outlot F and Outlot G. (Please see that attached exhibit showing these areas.) The
developer dedicated these easements with the Fist Addition final plat but the City will not need these
easements as the developer will be dedicating new easements with the Second Addition final plat. In
addition, the developer could not record a new final plat (or replat) these existing Outlots into Lots and
Blocks with the existing easements in place.
Minnesota Statue outlines the provisions for vacating a public right-of-way or easement. It states in part
that “Council may, by resolution, vacate any street, alley, public grounds, public way, or any part thereof,
on its own motion or on petition of a majority of the owners of land abutting said property. Easement
vacations require a public hearing and 4/5 vote by Council only if there has been no petition.”
Recommended Findings. Staff recommends approval of the Legacy at North Star Second Addition Final
Plat and PUD Plans based on the following findings:
1. That the applicant has met all the requirements of City Code Section 153.10 related to the Final Plan
and Final Plat.
2. That the proposed Final Plat and PUD Plans for Legacy at North Star Second Addition will create 74
lots for single-family detached residential structures.
3. That the Legacy at North Star Second Addition Final Plat and PUD Plans are generally consistent
with the Preliminary Plat and PUD Plans as approved by the City of Lake Elmo on February 20,
2018 by Resolution 2018-013.
4. That the Legacy at North Star Second Addition Final Plat and PUD Plans are consistent with the
Lake Elmo Comprehensive Plan and the Future Land Use Map for this area with an allowed increase
in density as a Planned Unit Development and with the exception of the Village Open Space Overlay
District Greenbelt Corridor.
5. That the Legacy at North Star Second Addition Final Plat and PUD Plans comply with general intent
of the City’s Village Low Density Residential zoning district regulations with PUD Modifications.
6. That the Legacy at North Star Second Addition Final Plat and PUD Plans comply with all other
applicable zoning requirements, including the City’s landscaping, storm water, sediment and erosion
control and other ordinances with the exception of issues identified in the July 27, 2018 Staff report
to the Planning Commission.
7. That the Legacy at North Star Second Addition Final Plat and PUD Plans comply with the City’s
subdivision ordinance with PUD modifications.
8. That the Legacy at North Star Second Addition Final Plat and PUD Plans are generally consistent
with the City’s engineering standards with the exception of necessary plan revisions outlined by the
City Council Meeting
April 16, 2019
Page 15
563986V1 SJS LA515-61
City Engineer in his review comments to the City about Legacy at North Star Second Addition Final
Plat and PUD Plans dated March 14, 2019.
9. That the Legacy at North Star Second Addition Final Plat and PUD Plans meet the minimum
requirement for a PUD including minimum lot area, open space and street layout.
10. That the Legacy at North Star Second Addition Final Plat and PUD Plans meet more than one of the
required PUD objectives identified in Section 154.751 including providing: 1) more adequate, usable,
and suitably located open space and recreational amenities and other public facility than would
otherwise be provided under conventional development techniques, 2) Preservation and enhancement
of important environmental features through careful and sensitive placement of buildings and
facilities, and 3) Allowing the development to operate in concern with a redevelopment plan in certain
areas of the City and to ensure the redevelopment goas and objective will be achieved.
11. That the Legacy at North Star Second Addition Final Plat and PUD Plans meet the allowed density
requirements allowed with PUD flexibility.
12. That the Applicant is providing the following amenities, for which the City shall award amenity points:
a. Pedestrian improvements including construction of a trail along the County right-of-way
from 30th Way to the southerly plat limits; grading along the storm sewer outfall pipe
location within the future right-of-way area along Lake Elmo Avenue of the property to
the south of the proposed development along with dedication of County right-of-way to
facilitate a future trail; and dedication of a 30-foot wide trail corridor along with
construction of a trail connecting the trail within the development from Lak Elmo Avenue
to the trail within the Hamlet on Sunfish Lake development (10 points).
b. Theming elements from the Lake Elmo Theming Study (1 point).
c. Additional open space above 20% (2 points).
d. Connection of sewer to Hamlet on Sunfish Lake Development (5 points).
e. Provision of private park amenities including a clubhouse, tot lot, and pool (5 points).
13. That the proposed PUD will allow a more flexible, creative, and efficient approach to the use of the
land, and will specifically relate to existing zoning district standards in the following manner (with
exceptions as noted):
a. Lot Dimensions and Bulk Building Requirements
Villa Lots Interior Single
Family
Exterior Single
Family
Minimum Lot
Width
55 ft. 55 ft. 65 ft.
Minimum Lot
Area
6,600 sq. ft. 6,840 sq. ft. 8,090 sq. ft.
Minimum Front
Yard
Setback
15 ft. 25 ft. 25 ft.
Minimum Side
Yard
Setback
7 ft./8 ft. 7 ft./8 ft. 10 ft./5 ft. or
7.5 ft./7.5 ft.
City Council Meeting
April 16, 2019
Page 16
563986V1 SJS LA515-61
Maximum
Impervious
Surface
50% 45% 45%
Recommended Conditions of Approval. Staff and the Planning Commission recommend approval of the
requested Legacy at North Star Second Addition Final Plat and PUD Plans with the following conditions:
1. Final grading, drainage, and erosion control plans, sanitary and storm water management plans,
landscape plans, and street and utility construction plans shall be reviewed and approved by the
City Engineer and applicable Staff before the recording of the Final Plat. All changes and
modifications to the plans requested by the City Engineer in the memorandum addressing Legacy
at North Star Second Addition Final Plat and PUD Plans dated March 19, 2019 shall be
incorporated into these documents before the City will review and approve the plans.
2. All easements as requested by the City Engineer and Public Works Department shall be
documented on the Final Plat before its execution by City Officials.
3. Final Plat approval is contingent upon the temporary cul-de-sac along 38th Trail North extending
fully beyond Lot 3, Block 6 for the 2nd Addition, or that Lot 3, Block 6 is removed from the 2nd
Addition Plat. The temporary cul-de-sac cannot encroach on a lot proposed for platting.
4. If applicable, the Final Plat must be contingent upon the City receiving separate drainage and utility
easements in the City’s standard form of easement agreement for all off-site development
improvements (beyond the plat limits). All off-site easements must be clearly shown on the street,
grading and utility plans, with all dimensions labeled. The easements must be obtained before the
start of construction.
5. Before the execution of the Final Plat by City officials, the Developer shall enter into a
Development Agreement acceptable to the City Attorney and approved by the City Council that
delineates who is responsible for the design, construction, and payment of the required
improvements and shall include the payment of required park dedication fees for the Legacy at
North Star Second Addition Final Plat with financial guarantees therefore.
6. A Landscape License Agreement shall be executed for the maintenance of commonly held
homeowners’ association-owned and City-owned outlots, right-of-ways, and medians before the
release of the final plat by City Officials.
7. That the developer provide a trail connecting to the trails of Hamlet on Sunfish Lake. The Applicant
shall not receive parkland dedication credit for the trail outlot or easement or construction of the
trial. (Not applicable with this phase of the development).
8. That before construction and if applicable, any Washington County right-of-way permits that may
be required must be obtained, drainage report and calculations must be submitted and access control
shall be dedicated to Washington County along CSAH 17/Lake Elmo Avenue frontage.
9. That the applicant provide a Roadway, Drainage and Utility Easement in City standard form of
roadway easement agreement, along Lake Elmo Avenue (CSAH 17) from the southern boundary
City Council Meeting
April 16, 2019
Page 17
563986V1 SJS LA515-61
to Stillwater Boulevard North (CSAH 14), and consistent with the requirements of the preliminary
plat approval. (Completed with the First Addition).
10. That the Landscape Plans for this phase of the development be approved by the City’s Landscape
Architect before the recording of final plat.
11. That the applicant include in the Architectural Control guidelines (included in the Covenants for
the development) the requirements that villa lots utilize 4-sided architecture and garages facing the
public right-of-ways to have windows and/or other architectural features. These guidelines and
covenants shall be subject to review and approval by the City before the plat is recorded.
12. That the applicant address all Fire Chief and Building Official comments.
13. That street names shall comply with City’s Street Naming Policy.
14. That the applicant notify all home builders about possible City outdoor watering restrictions unless
notified by the City that notices are no longer needed and that the home builders notify all home
buyers that the City may impose limits on outdoor water use including no watering of grass or sod,
unless the applicant is notified by the City that this notice is no longer required. Said decision
about whether or not this notice is no longer required shall be made at the sole discretion of the
City. The applicant shall have the City approve the notification message before recording the final
plat.[CA1]
15. That the developer finish the streets in the First Addition (with at least the installation of curb and
gutter and the base course of bituminous) before the City issues any building permits in the Second
Addition.
16. That the development utilize Traditionaire LED Downlights from Xcel Energy for the development
in lieu of the Street Light Type/Pole of Acorn with aluminum pole (all black) indicated in the City’s
Engineering Standards and that streetlights be located only at intersections and ends of cul-de-sacs.
RECOMMENDATION:
Staff and the Planning Commission recommend approval of the Legacy at North Star Second Addition
Final Plat and PUD Plans with recommended findings and conditions of approval as outlined in the staff
report.
“Move to recommend approval of the Legacy at North Star Second Addition Final Plat and PUD Plans
with recommended findings and conditions of approval.”
Staff and the Planning Commission recommend approval of the proposed vacation of the drainage and
utility easements on Outlot E, Outlot F and Outlot G of Legacy at North Star First Addition as shown on
the easement vacation Exhibit dated October 31, 2018.
“Move to recommend approval of the request for the vacation of the drainage and utility easements
over Outlot E, Outlot F and Outlot G, Legacy at North Star as shown an the easement vacation exhibit
dated October 31, 2018.”
City Council Meeting
April 16, 2019
Page 18
563986V1 SJS LA515-61
ATTACHMENTS:
1. Application Narrative dated 2-26-2019
2. 2 City Maps
3. Proposed Final Plat (3 pages)
4. Easement Vacation Exhibit dated October 31, 2018
5. Sheet 1 of Construction Plans (Title Sheet)
6. Sheet 27 of Construction Plans (Phasing Plan)
7. Sheet 2 of Project Plans (Outlot Map)
8. Approved Preliminary Plat (2 sheets)
9. City Engineer Report dated March 19, 2019
10. Resolution 2019 – XXX approving the Final Plat and PUD plans
11. Resolution 2019 – XXX approving easement vacations
Document comparison by Workshare Compare on Monday, April 15, 2019
12:11:13 PM
Input:
Document 1 ID file://C:\Users\sjs\Desktop\Staff Report - Legacy at North
Star 2nd Addition.docx
Description Staff Report - Legacy at North Star 2nd Addition
Document 2 ID PowerDocs://DOCSOPEN/563986/1
Description DOCSOPEN-#563986-v1-Revised_Staff_Report
Rendering set Standard
Legend:
Insertion
Deletion
Moved from
Moved to
Style change
Format change
Moved deletion
Inserted cell
Deleted cell
Moved cell
Split/Merged cell
Padding cell
Statistics:
Count
Insertions 9
Deletions 4
Moved from 1
Moved to 1
Style change 0
Format changed 0
Total changes 15
1
CITY OF LAKE ELMO
WASHINGTON COUNTY
STATE OF MINNESOTA
RESOLUTION NO. 2019 - 026
RESOLUTION APPROVING THE LEGACY AT NORTH STAR 2ND ADDITION FINAL
PLAT AND PLANNED UNIT DEVELOPMENT (PUD) PLANS
WHEREAS, the City of Lake Elmo is a municipal corporation organized and existing
under the laws of the State of Minnesota; and
WHEREAS, GWSA Land Development, 10850 Old County Road 15, Suite 200
Plymouth, MN 55441 submitted an application to the City of Lake Elmo (City) for a Final Plat
and Planned Unit Development Plan for 74 detached single family lots as the second phase of a
266 detached single family residential planned unit development on 98.93 acres, a copy of which
is on file in the City of Lake Elmo Planning and Zoning Department; and
WHEREAS, notice has been published, mailed and posted pursuant to the Lake Elmo
Zoning Ordinance, Section 154.102; and
WHEREAS, the Lake Elmo Planning Commission held public hearing on March 25,
2019 to consider the Final Plat and PUD Plans; and
WHEREAS, the Lake Elmo Planning Commission adopted a motion recommending
approval of the Final Plat and PUD Plans subject to conditions of approval; and
WHEREAS, the Lake Elmo Planning Commission has submitted its report and
recommendation concerning the Final Plat and PUD Plans as part of a memorandum to the City
Council from the Planning Director for the April 16, 2019 City Council Meeting; and
WHEREAS, the City Council reviewed the application at its meeting held on April 16,
2019 and made the following findings:
1.That the applicant has met all the requirements of City Code Section 153.10 related to the Final
Plan and Final Plat.
2. That the proposed Final Plat and PUD Plans for Legacy at North Star 2nd Addition consist of the
creation of 74 single-family detached residential structures.
3.That the Legacy at North Star 2nd Addition Final Plat and PUD Plans are generally consistent
with the Preliminary Plat and PUD Plans as approved by the City of Lake Elmo on February 20,
2018 by Resolution 2018-013.
4.That the Legacy at North Star 2nd Addition Final Plat and PUD Plans are consistent with the
Lake Elmo Comprehensive Plan and the Future Land Use Map for this area with an allowed
2
increase in density as a Planned Unit Development and with the exception of the Village Open
Space Overlay District Greenbelt Corridor.
5. That the Legacy at North Star 2nd Addition Final Plat and PUD Plans comply with general intent
of the City’s Village Low Density Residential zoning district regulations with PUD
Modifications.
6. That the Legacy at North Star 2nd Addition Final Plat and PUD Plans comply with all other
applicable zoning requirements, including the City’s landscaping, storm water, sediment and
erosion control and other ordinances with the exception of issues identified in the April 16, 2019
Staff report to the City Council.
7. That the Legacy at North Star 2nd Addition Final Plat and PUD Plans comply with the City’s
subdivision ordinance with PUD modifications.
8. That the Legacy at North Star 2nd Addition Final Plat and PUD Plans are generally consistent
with the City’s engineering standards with the exception of necessary plan revisions outlined by
the City Engineer in his review comments to the City about the Legacy at North Star 2nd
Addition Final Plat and PUD Plans dated March ___, 2019.
9. That the Legacy at North Star 2nd Addition Final Plat and PUD Plans meet the minimum
requirement for a PUD including minimum lot area, open space and street layout.
10. That the Legacy at North Star 2nd Addition Final Plat and PUD Plans meet more than one of
the required PUD objectives identified in Section 154.751 including providing: 1) more
adequate, usable, and suitably located open space and recreational amenities and other public
facility than would otherwise be provided under conventional development techniques, 2)
Preservation and enhancement of important environmental features through careful and
sensitive placement of buildings and facilities, and 3) Allowing the development to operate
in concern with a redevelopment plan in certain areas of the City and to ensure the
redevelopment goas and objective will be achieved.
11. That the Legacy at North Star 2nd Addition Final Plat and PUD Plans meet the allowed density
requirements allowed with PUD flexibility.
12. That the Applicant is providing the following amenities in the Legacy at North Star
development, for which the City shall award amenity points:
a. Pedestrian improvements including construction of a trail along the County right-
of-way from 30th Way to the southerly plat limits; grading along the storm sewer
outfall pipe location within the future right-of-way area along Lake Elmo Avenue
of the property to the south of the proposed development along with dedication of
County right-of-way to facilitate a future trail; and dedication of a 30-foot wide
trail corridor along with construction of a trail connecting the trail within the
development from Lak Elmo Avenue to the trail within the Hamlet on Sunfish Lake
development (10 points).
b. Theming elements from the Lake Elmo Theming Study (1 point).
c. Additional open space above 20% (2 points).
3
d. Connection of sewer to Hamlet on Sunfish Lake Development (5 points).
e. Provision of private park amenities including a clubhouse, tot lot, and pool (5
points).
13. That the proposed PUD will allow a more flexible, creative, and efficient approach to the use
of the land, and will specifically relate to existing zoning district standards in the following
manner (with exceptions as noted):
a. Lot Dimensions and Bulk Building Requirements
Villa Lots Interior
Single
Family
Exterior
Single
Family
Minimum Lot
Width
55 ft. 55 ft. 65 ft.
Minimum Lot
Area
6,600 sq. ft. 6,840 sq. ft. 8,090 sq. ft.
Minimum Front
Yard
Setback
15 ft. 25 ft. 25 ft.
Minimum Side
Yard
Setback
7 ft./8 ft. 7 ft./8 ft. 10 ft./5 ft. or
7.5 ft./7.5 ft.
Maximum
Impervious
Surface
50% 45% 45%
NOW, THEREFORE, BE IT RESOLVED THAT the City Council does hereby
approve the Legacy at North Star 2nd Addition Final Plat and PUD Plans subject to the following
conditions:
1. Final grading, drainage, and erosion control plans, sanitary and storm water management plans,
landscape plans, and street and utility construction plans shall be reviewed and approved by the
City Engineer and applicable Staff before the recording of the Final Plat. All changes and
modifications to the plans requested by the City Engineer in the memorandum addressing Legacy
at North Star Second Addition Final Plat and PUD Plans dated March 19, 2019 shall be
incorporated into these documents before the City will review and approve the plans.
2. All easements as requested by the City Engineer and Public Works Department shall be
documented on the Final Plat before its execution by City Officials.
3. Final Plat approval is contingent upon the temporary cul-de-sac along 38th Trail North extending
fully beyond Lot 3, Block 6 for the 2nd Addition, or that Lot 3, Block 6 is removed from the 2nd
Addition Plat. The temporary cul-de-sac cannot encroach on a lot proposed for platting.
4. If applicable, the Final Plat be contingent upon the City receiving separate drainage and utility
easements in the City’s standard form of easement agreement for all off-site development
improvements (beyond the plat limits). All off-site easements must be clearly shown on the street,
4
grading and utility plans, with all dimensions labeled. The easements must be obtained before the
start of construction.
5. Before the execution of the Final Plat by City officials, the Developer shall enter into a
Development Agreement acceptable to the City Attorney and approved by the City Council that
delineates who is responsible for the design, construction, and payment of the required
improvements and shall include the payment of required park dedication fees for the Legacy at
North Star Second Addition Final Plat with financial guarantees therefore.
6. A Landscape License Agreement shall be executed for the maintenance of commonly held
homeowners’ association-owned and City-owned outlots, right-of-ways, and medians before the
release of the final plat by City Officials.
7. That the developer provide a trail connecting to the trails of Hamlet on Sunfish Lake. The Applicant
shall not receive parkland dedication credit for the trail outlot or easement or construction of the
trial. (Not applicable with this phase of the development).
8. That before construction and if applicable, any Washington County right-of-way permits that may
be required must be obtained, drainage report and calculations must be submitted and access control
shall be dedicated to Washington County along CSAH 17/Lake Elmo Avenue frontage.
9. That the applicant provide a Roadway, Drainage and Utility Easement in City standard form of
roadway easement agreement, along Lake Elmo Avenue (CSAH 17) from the southern boundary
to Stillwater Boulevard North (CSAH 14), and consistent with the requirements of the preliminary
plat approval. (Completed with the First Addition).
10. That the Landscape Plans for this phase of the development be approved by the City’s Landscape
Architect before the recording of final plat.
11. That the applicant include in the Architectural Control guidelines the requirements that villa lots
utilize 4-sided architecture and garages facing the public right-of-ways to have windows and/or
other architectural features. These guidelines shall be subject to review and approval by the City
before the plat is recorded.
12. That the applicant address all Fire Chief and Building Official comments.
13. That street names shall comply with City’s Street Naming Policy.
14. That the applicant notify all home builders about possible City outdoor watering restrictions and
that the home builders notify all home buyers that the City may impose limits on outdoor water use
including no watering of grass or sod, unless the applicant is notified by the City that this notice is
no longer required. Said decision about whether or not this notice is no longer required shall be
made at the sole discretion of the City. The applicant shall have the City approve the notification
message before recording the final plat.
15. That the developer finish the streets in the First Addition (with at least the installation of curb and
gutter and the base course of bituminous) before the City issues any building permits in the Second
Addition.
5
16. That the development utilize Traditionaire LED Downlights from Xcel Energy for the development
in lieu of the Street Light Type/Pole of Acorn with aluminum pole (all black) indicated in the City’s
Engineering Standards and that streetlights be located only at intersections and ends of cul-de-sacs.
Passed and duly adopted this 16th day of April, 2019 by the City Council of Lake Elmo,
Minnesota.
___________________________________
Mike Pearson, Mayor
ATTEST:
____________________________________
Julie Johnson, City Clerk
STATE OF MINNESOTA
COUNTY OF WASHINGTON
CITY OF LAKE ELMO
RESOLUTION NO. 2019-027
A RESOLUTION VACATING DRAINAGE AND UTILITY EASEMENT OVER OUTLOTS
E, F, AND G, LEGACY AT NORTH STAR 1ST ADDITION
WHEREAS, the City of Lake Elmo (City) is a municipal corporation organized and existing
under the laws of the State of Minnesota; and
WHEREAS, the City Council approved a Preliminary Plat and for the Legacy at North
Star development in Lake Elmo on February 20, 2018 through adoption of Resolution 2018-013;
and
WHEREAS, the City Council approved the Legacy at North Star First Addition Final
Plat on August 21, 2018 through adoption of Resolution 2018-090, which includes PID#s 14-
029-21-12-0013, 14-029-21-12-004 and PID# 14-029-21-11-0039; and
WHEREAS, PID#s 14-029-21-12-0013, 14-029-21-12-004 and PID# 14-029-21-11-
0039 are owned by GWSA Land Development, LLC, Plymouth, MN 55441 (Owner); and
WHEREAS, the City of Lake Elmo was granted a Drainage and Utility Easement over
portions of PID#s 14-029-21-12-0013, 14-029-21-12-004 and PID# 14-029-21-11-0039 and
these easements were recorded with the Legacy at North Star First Addition Plat by the Office of
the Registrar of Titles of Washington County on September 17, 2018; and
WHEREAS, a request has been made to the City Council pursuant to Minnesota Statute
§412.851 to vacate the Drainage and Utility Easements recorded with the Legacy at North Star
First Addition by the Office of the Registrar of Titles of Washington County, Minnesota over
PID#s 14-029-21-12-0013, 14-029-21-12-004 and PID# 14-029-21-11-0039, legally described as
follows:
All of the drainage and utility easements, as created and dedicated over, under, and across
Outlot E, Outlot F, and Outlot G, Legacy at North Star First Addition, according to the
plat thereof, Washington County, Minnesota.
WHEREAS, the City Clerk reviewed and examined the signatures on said request and
determined the signatures constituted all of the landowners abutting upon the portion of
easement to be vacated and rededicated; and
WHEREAS, the Lake Elmo Planning Commission held a public hearing to consider the
vacation of the Drainage and Utility Easements on the March 25, 2019 before the Planning
Commission in the Lake Elmo City Hall located at 3800 Laverne Avenue North after due
published and posted notice had been given and all interested and affected persons were given an
opportunity to voice their concerns and be heard; and
WHEREAS, the City Council in its discretion has determined that the vacation of the
easements will benefit the public interest because:
1) The City has granted Final Plat Approval for Legacy at North Star 2nd Addition, which
includes PID#s 14-029-21-12-0013, 14-029-21-12-004 and PID# 14-029-21-11-0039;
which will grant the City more appropriate easements for similar purposes.
WHEREAS, the City Council, at its meeting on April 16, 2019, considered the easement
vacation request.
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF LAKE ELMO, COUNTY OF WASHINGTON MINNESOTA, that such request
for vacation of an existing Drainage and Utility Easements is hereby granted in accordance with
the property descriptions provided above, subject to the following condition of approval:
1) New easements as requested by the City Engineer and Public Works Director shall be
recorded with the Legacy at North Star 2nd Addition Final Plat.
BE IT FURTHER RESOLVED, that the Mayor and City Clerk are hereby authorized to
sign all documents necessary to effectuate the intent of this resolution.
Adopted by the Council this 16th day of April, 2019.
Effective Date: ______________________
Approved:
________________________________
Mike Pearson, Mayor
Attested by:
________________________________
Julie Johnson, City Clerk
Date: February 26, 2019
Subject: Legacy at North Star 2nd Addition – 74 Lots – Final Plat Narrative
Prepared For: GW SA LAND DEVELOPMENT, LLC.
Contact: Craig Allen
Narrative:
The proposed final plat for Legacy at North Star 2nd Addition will consist of 74 single family
residential lots. The 2nd addition area was platted as 76 lots however Block 1 and Block 4
now consist of 8 lots as builders are wanting larger lots and 2 lots have been removed to
accommodate. The site is located to the west of Lake Elmo Ave and north of Stillwater
Boulevard. The site is a total of +/- 22.8 Acres. (Please see the final plat application
package). The project is proposed as PUD zoning.
SATHRE-BERGQUIST, INC.
1 5 0 S O U T H B R O A D W A Y , W A Y Z A T A , M I N N E S O T A ,
5 5 3 9 1 ( 9 5 2 ) 4 7 6 -6000 F A X ( 9 5 2 ) 4 7 6 -0104
PAGE 1 of 2
MEMORANDUM
Date: March 19, 2019
To: Ken Roberts, Planning Director Re: Legacy at Northstar 2nd Addition – Final Plat
Cc: Chad Isakson, P.E., Assistant City Engineer Engineering Review Comments
From: Jack Griffin, P.E., City Engineer
An engineering review has been completed for the Legacy at Northstar 2nd Addition. Final Plat/Final Construction
Plans were received on February 26, 2018. The submittal consisted of the following documentation:
Legacy at Northstar 2nd Addition Final Plat, Sheets 1‐3, received February 26, 2019.
Legacy at Northstar 2nd Addition Construction Plans, Sheets 1‐31, dated February 20, 2019.
Legacy at Northstar 2nd Addition Specifications dated November 6, 2018.
Legacy at Northstar Tree Survey, Sheets TS1‐TS2, dated July 18, 2018.
Legacy at Northstar Preliminary Landscape Plan, Sheets LP1‐LP7, dated June 26, 2018.
STATUS/FINDINGS: Engineering review comments have been provided in two separate memos; one for Final Plat
approval, and one to assist with the completion of the final Construction Plans. Please see the following review
comments relating to the Final Plat application.
FINAL PLAT/PLANS: LEGACY AT NORTHSTAR 2ND ADDITION
The Final Construction Plans must be revised so that Outlots and ownership are consistent throughout the
Final Plat and Final Construction Plans.
Outlot A is identified to be dedicated to the City as required by the preliminary plat. The Outlot includes
both storm water pond #2 and storm water pond #3, including the 100‐year HWL and maintenance access
roads. The reference to the drainage and utility easement over all of Outlot A should be removed.
The construction plans must be revised to identify Outlot B as HOA owned with a drainage and utility
easement over all of Outlot B to be consistent with the preliminary plat. Update the Outlot ownership
table accordingly.
Outlot C is identified to be dedicated to the City as required by the preliminary plat. The Outlot includes
storm water pond #6 including the 100‐year HWL and maintenance access road. The reference to the
drainage and utility easement over all of Outlot C should be removed.
The construction plans must be revised to show Outlot D as part of the Legacy at North Star 2nd Addition.
The construction plans must be revised to show Outlot F as part of the Legacy at North Star 2nd Addition.
Outlot F must be shown in the Outlot Ownership table as HOA owned with drainage and utility easement
over all of Outlot F.
Final Plat approval must be contingent upon City approval for the proposed changes to Outlot F from the
approved preliminary plat. Outlot F has been reduced in width. Additional plan review is needed to
determine if this change is acceptable.
Remove sheet 2 from the construction plans to avoid conflicts, or correct plan sheet to be consistent with
1st and 2nd Addition Plats.
FOCUS ENGINEERING, inc.
Cara Geheren, P.E. 651.300.4261
Jack Griffin, P.E. 651.300.4264
Ryan Stempski, P.E. 651.300.4267
Chad Isakson, P.E. 651.300.4283
PAGE 2 of 2
Drainage and utility easements have been provided on the Final Plat over all of Outlots B, D, E, and F. These
easements are consistent with the preliminary plat.
All easements as requested by the City Engineer and Public Works department shall be documented on the
Final Plat prior to the release of the Final Plat for recording.
No trunk watermain or trunk sanitary sewer oversizing is anticipated for this development. All watermains
should be 8‐inch diameter pipe.
Final Construction Plans and Specifications must be prepared in accordance with the City Engineering
Design Standards Manual dated February 2019, using City details, plan notes and specifications and
meeting City Engineering Design Guidelines.
Final Construction Plans and Specifications must be revised in accordance with the Construction Plan
engineering review memorandum dated March 19, 2019.
The Final Plat shall not be recorded until final construction plan approval is granted.
No construction for Legacy at Northstar 2nd Addition may begin until the applicant has received City
Engineer approval for the Final Construction Plans; the applicant has obtained and submitted to the City all
applicable permits, easements and permissions needed for the project; and a preconstruction meeting has
been held by the City’s engineering department.