Loading...
HomeMy WebLinkAbout#07 - DA Amendment for Hammes Estates 3rd Addn STAFF REPORT DATE: April 2, 2019 CONSENT AGENDA ITEM: Approve Development Agreement Amendment for the Hammes Estates 3rd Addition Watermain Oversize Reimbursement Costs SUBMITTED BY: Jack Griffin, City Engineer REVIEWED BY: Kristina Handt, City Administrator Ken Roberts, Planning Director Chad Isakson, Assistant City Engineer ISSUE BEFORE COUNCIL: Should the City Council approve an amendment to the Development Agreement for the Hammes Estates 3rd Addition to adjust the watermain oversize reimbursement by the City to account for the required 12-inch Trunk Pressure Reducing Valve (PRV)? BACKGROUND AND PROPOSAL DETAILS/ANALYSIS: The Hammes Estates 3rd Addition development agreement was approved on March 21, 2018 and the developer began construction in July, 2018. The project includes the extension of 12-inch trunk watermain as required by the City to complete a critical 12-inch watermain loop connection from Keats Avenue to Inwood Avenue. Along this 12-inch extension a pressure reducing valve is required at the interconnect point between the City high pressure zone and south intermediate pressure zone. The 12-inch trunk watermain and 12-inch pressure reducing valve (PRV) were included in the project plans approved for construction on October 3, 2018 (see attached watermain exhibit). When the developer and staff prepared the original development agreement for council approval the agreement accounted for a trunk watermain oversize reimbursement per Section 28 in the amount of $40,055. This amount accounts for the pipe oversizing costs for the 12-inch trunk watermain but did not account of the oversize costs between an 8-inch PRV and a 12-inch PRV. The developer is preparing to initiate construction work on Phase B of the Hammes Estates 3rd Addition which includes the construction of the 12-inch PRV and recently has contacted City staff regarding added costs that were not included in the original development agreement. The developer is requesting the City to amend the development agreement by increasing the watermain oversize reimbursement amount to address the additional oversize costs for the 12-inch PRV. FISCAL IMPACT: The 12-inch pressure reducing valve (by-pass) to be located within the Hammes Estates 3rd Addition is programmed in the City 2019-2023 Capital Improvement Program to be completed in 2019 in the amount of $120,000 (Hammes Estates 12” bypass). Since the developer is required to install an 8-inch PRV at the developer’s cost, the actual City costs for this improvement are reduced by incurring only the incremental oversize costs to a 12-inch PRV. RECOMMENDATION: Staff is recommending that the City Council approve, as part of the Consent Agenda, an amendment to the Development Agreement for the Hammes Estates 3rd Addition, Section 28, to address the additional trunk watermain oversize reimbursement for the required 12-inch PRV in the amount of $90,180. If removed from the consent agenda, the recommended motion for the action is as follows: “Move to approve an amendment to the Development Agreement for the Hammes Estates 3rd Addition, Section 28, to address the additional trunk watermain oversize reimbursement for the required 12-inch PRV in the amount of $90,180.” ATTACHMENTS: 1. Trunk Watermain Exhibit and PRV Plan. 2. 2019-2023 Water Fund Capital Improvement Plan. 3. Oversize Cost Estimates. 4. Hammes Estates 3rd Addition – Section 28 Amended Development Agreement. TotalSourceProject #Priority 2019 2020 2021 2022 2023 2,230,000365,000 460,000 170,000 985,000 250,000Vehicle Replacement Fund Total Water Fund PW-043 50,00050,000Service Truck 1 PW-044 15,00015,000Trac Hoe 2 W-004 120,000120,000Pressure Reduction Valve 3 W-007 120,000120,000Hammes Estates 12" bypass 4 W-008 132,000132,000Village East Trunk Watermain 2 W-010 800,000800,000Paint Water Tank at PW 4 W-013 188,000188,000Watermain Oversizing 3 W-017 50,00050,0002020 Street & Utility Improvements-Water 3 W-018 50,00050,0002021 Street & Utility Improvements-Water 3 W-019 50,00050,000SCADA Upgrade 2 W-022 35,00035,000Utility Truck 3 W-023 200,00050,000 50,000 50,000 50,000Water Meter Change Out 1 W-024 300,000300,000Automated Radio Read System 3 W-026 253,000253,000OV sewer extension Phase 7; water component 3 W-027 132,000132,000Pressure Reduction Station-Connection to WT #3 3 W-030 100,000100,0002023 Street Projects-water component 3 2,595,000408,000 367,000 135,000 400,000 1,285,000Water Fund Total 52,497,9166,488,500 10,232,000 17,112,066 13,265,350 5,400,000GRAND TOTAL Thursday, November 29, 2018Produced Using the Plan-It Capital Planning Software To:Date:3/22/2019 Total Cost 2,737.00$ 1,147.00$ 23,924.00$ 1,438.00$ 29,246.00$ Total Cost 12,939.00$ 6,395.00$ 96,421.00$ 3,671.00$ 119,426.00$ 90,180.00$ Equipment Materials City of Lake Elmo Attn: Jack Griffin 3880 Laverne Ave N TOTAL UPSIZING COST = TOTAL COST 12" PRV STRUCTURE = Lake Elmo, MN 55042 Coating Subcontractor TOTAL COST 8" PRV STRUCTURE = Materials Furnish & Install 8" PRV Structure Labor Coating Subcontractor Labor Furnish & Install 12" PRV Structure Equipment 28.  CITY PAYMENTS.  The City shall reimburse the Developer in the amount of $40,055 for oversizing  costs associated with the installation of 12 inch water main and reimburse the Developer in the amount  of $90,180 for oversizing costs associated with the installation of 12 inch pressure reducing valve (PRV) as  identified on the Plans. City payments shall be made within 30 days of the City’s final acceptance of the  Improvements, but only if the Developer is not in default with respect to any terms of this Agreement.   This  payment  by  the  City  shall  be  the  City’s  only  responsibility with regard to construction of the  Improvements and in no case shall act as a waiver of any other right of the City under this Agreement or  under applicable laws, ordinances or rules.