HomeMy WebLinkAbout#09 - Well #5 Prelminary Design STAFF REPORT DATE: May 7, 2019 CONSENT AGENDA ITEM: Production Well No. 5 -Authorize Preliminary Design SUBMITTED BY: Jack Griffin, City Engineer REVIEWED BY: Kristina Handt, City Administrator Chad Isakson, Assistant City Engineer ISSUE BEFORE COUNCIL: Should the City Council authorize engineering services to complete the preliminary design for Production Well No. 5? BACKGROUND: The City of Lake Elmo has been working with the MN-DNR and MPCA to replace the lost capacity for Well #1 by pursing the development and construction of Production Well #5 to be located in Tana Ridge Park. The MN-DNR and MPCA have accepted the City’s Feasibility Report to construct Well #5 and is now working on a Joint Powers Agreement to address terms and process for the State’s reimbursement to the City for the project. PROPOSAL DETAILS/ANALYSIS: To initiate the improvements, the City Engineer has developed a scope of work for the preliminary design for Production Well No. 5, which includes site planning and well site location work, and the construction of a test well to verify the water quality and chemistry at the proposed location. Staff is recommending that the City retain Bolton & Menk to assist the City Engineer with the following scope of work: • Topographic and Boundary Survey of the site. • Determination and approval of the location of wetlands at the site. • Quote package for drilling a test well. • Determine water quality and location of a potential well at this site. FISCAL IMPACT: $20,569. RECOMMENDATION: Staff is recommending that the City Council approve engineering services to complete preliminary design for Production Well No. 5. The recommended motion for the action is as follows: “Move to authorize Bolton & Menk to complete engineering services to complete preliminary design for Production Well No. 5 in the amount not to exceed $20,569”. ATTACHMENTS: 1. Task Order No. 12 – Production Well #5 Preliminary Design.     TASK ORDER No. 12 – Production Well No. 5 – Preliminary Design                     Page 1 of 4                                             TASK ORDER              No. 12  CITY OF LAKE ELMO, MINNESOTA – BOLTON AND MENK, INC.  PROFESSIONAL ENGINEERING SERVICES AGREEMENT      In accordance with ARTICLE 1 of the Master AGREEMENT between the City of Lake Elmo (“CITY”) and  Bolton and Menk, Inc. (“ENGINEER”), dated MARCH 20, 2013 (“AGREEMENT”), the ENGINEER agrees  to provide Professional Engineering Support Services as follows:      PRODUCTION WELL #5 – PRELIMINARY DESIGN    PROJECT OVERVIEW:  The Project includes Preliminary Design Engineering Services for Production Well  No. 5. A proposed well site has been identified at Tana Ridge Park (PID 1202921130003). Engineering  services will include a topographic survey, boundary survey and preliminary site plan design for the  purpose of establishing the well site and working with state agencies to approve the well location. Site  planning work will also include wetland delineation and floodplain determination in the area of the  proposed well. Test Well plans and specifications shall be prepared to allow the City to obtain quotes  and award a contract to a licensed well contractor.  The Test Well shall be constructed for the purpose  of testing and confirming the adequate production capacity and drinking water quality for the proposed  Production Well at the Tana Ridge Park location.     Test Well No. 5 Objectives:  1. Determine suitability of the proposed well site at Tana Ridge Park for construction of a new  production well.  2. Determine production capacity of a potential well at this site.  3. Determine water quality of a potential well at this site.    SERVICES  TO  BE  PROVIDED  BY  ENGINEER: Bolton  and  Menk,  Inc.  shall  provide  the  following  Professional Engineering Services:  1. Project Management throughout the course of work and construction phase services, including  submittal of a weekly progress memo and job to date budget form.  2. Design phase services, including preparation of Plans, Specifications, and Contract Documents  to obtain quotes from licensed well contractors.   Project Kick‐off meetings with City staff.   Work with City Staff to develop a project budget for each project.   Site visits to verify and review existing conditions and survey.   Survey: Topographic survey of existing conditions within project limits for the purposes  of preparing site plan and design documents.   Survey: Boundary survey of proposed well site parcel.   Complete the private utility locate request, identify location of the utilities on the plans,  and complete design with location of private utilities in mind.      TASK ORDER No. 12 – Production Well No. 5 – Preliminary Design                     Page 2 of 4                                              Prepare construction plans and specifications to obtain contractor quotes. Plans and  Specifications will incorporate Contract Documents required by the project funding  source, including the MPCA‐3M Settlement funds.   Provide 60% plans and specifications for each project to the City for review.   Provide 90% plans and specifications for each project to City for review.   Revise and prepare final plans and  specifications  for  each  project  based  on  City  comments.   Prepare updated Opinion of Probable Cost for each project based on final plans.     Identify permits required to complete the proposed work. Each design shall incorporate  measures to meet compliance requirements for all permits necessary.   Prepare and submit any necessary permit applications for approval.    DELIVERABLES   Plans in Electronic (PDF) and Hard Copy formats (4 full size and 4 half size).   Specifications  in  electronic  and  hard  copy  formats  (3  copies  for  the  City  and  the  appropriate number for contracts and required permits).   Engineer’s opinion of probable costs at 60% and 100% plan review.   Design memorandum summarizing final design assumptions and performance criteria  incorporated into the project design.   Identification of easements on the plans, if needed for the construction of the project.   Identification of anticipated conflicts with private utilities due to construction.     TEST WELL NO. 5 DELIVERABLES:   Boundary and topographic survey of the property with review to verify site is adequate  for placing a municipal well.   Test well monitoring results.   A report summarizing the monitoring results and suitability of site for construction and  operation of Production Well #5 consistent with Well #5 objectives.    3. Bidding Phase Services   Send out Quote packages to solicit contractor quotes.   Maintain plan holder’s list.    Respond to contractors’ questions and issue addenda as necessary.   Tabulate bids in electronic format.   Prepare contract award recommendation letter.    4. Test Well Construction Phase Services   Attend preconstruction meeting.   Construction administration.      TASK ORDER No. 12 – Production Well No. 5 – Preliminary Design                     Page 3 of 4                                              Construction staking.   Construction observation and periodic site visits to review progress of work and general  compliance of work to the plans and specifications.   Review of test well and recommendations to the City.    CITY’S RESPONSIBILITIES:  The City (or its Consultant) will provide the following:  1. Coordination with the public and conduct public meetings.  2. Presentation(s) to the City Council.   3. Easement acquisition, if needed.  4. Provide answers to specific project questions, provide requested information and make  decisions regarding project direction during the course of the project.  5. Review of 60%, 90%, and 100% Plans and Specifications.    6. Pay all permit and plan review fees for agencies as required for review and approval of Project  components.  7. Attend bid opening.  8. Attend pre‐construction conference and construction progress meetings.    TIMES FOR RENDERING SERVICES:  ENGINEER shall perform its services and provide final deliverables  in a timely and appropriate manner. ENGINEER is responsible for appropriately managing design and  construction tasks for each project so that they may proceed as planned and with minimal delay. The  project schedule is as follows:   Preliminary Site Plan and Final Well Site:  June 7, 2019   Test Well Final Plans and Specifications:  June 14, 2019   Award Test Well Contract:  July 2, 2019   Test Well Complete:  August 23, 2019     CITY’S REPRESENTATIVE AND CONTRACT ADMINISTRATION:  The CITY’s representative with respect  to  services  rendered  by  ENGINEER  under  this  TASK  ORDER  shall  be the City Engineer.  Project  correspondence must be addressed to:    Jack Griffin, P.E., City Engineer   City of Lake Elmo   3800 Laverne Avenue North  Lake Elmo, MN 55042  651.300.4264  Email: Jack.griffin@focusengineeringinc.com        TASK ORDER No. 12 – Production Well No. 5 – Preliminary Design                     Page 4 of 4                                             COMPENSATION:  Invoices shall be submitted once each month and should be sent to the attention of  the City Engineer. Compensation to ENGINEER shall be based on the hourly billing rates for each staff  as assigned and provided in the ENGINEER’s Proposal for the work in the following not to exceed  amounts:   Topographic and Boundary Survey:    $   5,691   Site Planning and Test Well:    $ 14,878  TOTAL ENGINEERING SERVICES     $ 20,569    ADDITIONAL SERVICES:  If authorized by the City, ENGINEER shall furnish or obtain from others  Additional Services which are not considered under this Task Order. Such services shall be compensated  for on an Hourly Rate basis in an amount approved by the City prior to any services being started or as  otherwise mutually agreed. The City is not obligated to compensate ENGINEER for services completed  outside the approved scope of work which are completed prior to ENGINEER submitting a written  request to the City, and receiving written approval of the City.    APPROVAL  AND  ACCEPTANCE:  Approval  and  Acceptance  of  this  Task  Order,  including  the  attachment(s) listed above, shall incorporate this document as part of the AGREEMENT. ENGINEER is  authorized to begin performance of services upon receipt of a copy of this Task Order signed by CITY.    The Effective Date of this Task Order is May 7, 2019.    BOLTON AND MENK, INC.    CITY OF LAKE ELMO, MINNESOTA    By _________________________________   By __________________________________   (Authorized Principal of the Firm)  City Administrator