HomeMy WebLinkAbout#12 - Easton Village 5th Addition Final Plat and Easement Vacation STAFF REPORT DATE: 5/07/2019 REGULAR MOTION TO: City Council FROM: Ken Roberts, Planning Director SUBJECT: Easton Village 5th Addition – Easement Vacations and Final Plat REVIEWED BY: Jack Griffin, City Engineer Sarah Sonsalla, City Attorney BACKGROUND: The City Council is being asked to consider the vacation of easements and a Final Plat request from Chase Development for the 5th Addition of Easton Village, a planned 217 unit residential development. The 5th Addition includes 48 single family home lots that are located on 17.57 acres to the north of Easton Village 4th Addition. Staff is recommending approval of the request subject to compliance with the conditions listed in this report. On April 8, 2019, the Planning Commission reviewed the proposed final plat and recommended approval. ISSUE(S) BEFORE THE CITY COUNCIL: Is the proposed Easton Village 5th Addition Final Plat generally consistent with the City-approved Easton Village preliminary plat (revised on 6/21/2017) and has the applicant met all the required conditions of approval? Should the City vacate existing utility easements to allow the recording of the Easton Village 5th Addition final plat? PROPOSAL DETAILS/ANALYSIS: General Information. Applicant: Chase Development, 2140 West County Road 42, Burnsville, MN Property Owners: Easton Village, LLC (Tom Wolter) 2140 West County Road 42, Burnsville, MN Location: Outlots D, E, F, G and H, Easton Village 3rd Addition Request: Application for final plat approval of a 48 unit residential subdivision to be named Easton Village 5th Addition. Zoning: LDR – Limited Density Residential Surrounding: North – vacant/agricultural land (RT – Rural Transitional) across the Union Pacific Railroad; West – single family home, City park, natural vegetation (PF – Public and Quasi Public Open Space; South – Easton Village 4th Addition (under 2 construction) (LDR – Limited Density Residential); East – Outlots D, G and J, Easton Village (east of Village Parkway) (LDR – Limited Density Residential) and Lake Elmo Airport across Manning Avenue (Baytown Township). Comp. Plan: Village Urban Low Density Residential (1.5 - 2.49 units per acre) History: The property for the Easton Village development was included in Village Planning Area boundary and municipal sewer service area as defined in the 2013 Village Land Use Plan. The site had been used for faming activities, including the growing of agricultural crops. Sketch Plan review by Planning Commission on 1/27/14 with Preliminary Plat approval on July 15, 2014. 1st An AUAR for the Village Planning area was approved by the City in May of 2009. 1st Addition approval on March 3, 2015, 2nd Addition approval on May 2, 2017, and 3rd Addition approval on July 18, 2017. Preliminary Plat revised approved on 6/21/2017. 4th Addition final plat approval occurred on May 15, 2018. Action Deadline: Application Complete – March 12, 2019 60 Day Deadline – May 10, 2019 Extension Letter Mailed – No 120 Day Deadline – NA Regulations: Chapter 153 – Subdivision Regulations Article 10 – Urban Residential Districts (LDR) §150.270 Storm Water, Erosion, and Sediment Control FINAL PLAT REVIEW: Final Plat Approval Procedure. The City’s subdivision ordinance establishes the procedure for obtaining final subdivision approval, in which case a final plat may only be reviewed after the City takes action on a preliminary plat. As long as the final plat is consistent with the preliminary approval, it must be approved by the City. The City’s approval of the Easton Village Preliminary Plat included a series of conditions that must be met by the applicant, which are addressed in the sections below. Consistency with Preliminary Plat. • Revised Preliminary Plat. Before the 1st Addition Final Plat approval, the developer revised the approved Preliminary Plat in December of 2014 to address the following: o The need to reconfigure the temporary access into the subdivision. o Revisions to the grading plan. o Adjustments to the property boundaries adjacent to the gas line that bisects the site. o The provision of a slightly larger buffer from the railroad tracks. o Revisions to the storm water management plan. o With the 2nd Addition, the developer again revised the preliminary plat. A condition of 2nd Addition approval was that the revised Preliminary Plat and Plans be approved before submittal of the 3rd Addition. • Lot Sizes. The proposed lot areas and widths in the 5th Addition are generally consistent with the revised and approved preliminary plat. The smallest proposed lot size is 8,114 square feet, meeting the required minimum lot size of 8,000 square feet and all the lots meet or exceed the minimum requirement of 60 feet of width at the setback line. Outlots. The applicant is not proposing any new outlots within the 5th Addition. Outlot A will be HOA owned and maintained. The City will require a drainage and utility easement over all of Outlot A. 3 Parkland. The Applicant platted outlots with 3rd Addition to indicate phasing for the rest of the development. Outlots I and J were dedicated to the City with the 3rd Addition for stormwater management purposes and parkland. The dedication of these outlots as parkland satisfied the remaining parkland dedication requirements for the entire development. Engineering Comments. The City Engineer has reviewed the proposed Final Plat, and these comments can be reviewed in the attached Easton Village 5th Addition Final Plat Engineering comments review memo dated April 3, 2019. It is a recommended condition of approval that the developer incorporate all the requested changes and conditions of the City Engineer in their final project plans. Temporary Cul-de-Sac and Road Connection. The Applicant has proposed a temporary cul-de-sac at the north end of Village Parkway where the new road meets the railroad tracks. The City will require the applicant to construct Village Parkway in accordance with the Village Parkway typical section and design standards (including a trail and a sidewalk) without a temporary cul-de-sac. The City will require the contractor to install Type III barricades to prohibit traffic on this stretch of street until the City can complete the UPRR crossing. In addition, the City will require the developer to connect the private driveway for 11361 Upper 33rd Street and the Northern Natural Gas property at 11371 Upper 33rd Street to the proposed 34th Street cul- de-sac, immediately following the placement of bituminous base course along 34th Street North. The project engineer must revise the construction plans to address the construction details for the private driveway connections and the construction phasing. Landscape Plans. The landscape plans have been reviewed by the City’s Landscape Architect. He is recommending changes to plans to meet the original conditions of approval for Easton Village. I have included his comments for your consideration. Street Naming. All the proposed street names are consistent with the approved preliminary plat and with City’s Street Naming Policy. Fire Chief Review. The City’s Fire Chief reviewed the proposed final plat and offered two comments. They were: • Review final hydrant placement with Engineering. • Ensure appropriate parking signage for road width. Watering Ban. Due to a possible shortage of water, the City may need to implement severe watering restrictions in the City for this summer and into the future. This could include limiting or prohibiting the use water outside including for car washing and for watering grass. This could affect future home builders and buyers as there may be a limited supply of water available for outdoor uses. It may be wise for the City to put a condition on this phase of the plat to require the home builders to inform the buyers about the possible watering restrictions. Final Plat Approval Process. The City’s subdivision ordinance establishes the procedure for obtaining final subdivision approval, in which case a final plat may only be reviewed after the City takes action on a preliminary plat. As long as the final plat is consistent with the preliminary approval, it must be approved by the City. Please note that the City’s approval of the Easton Village Preliminary Plat did include a series of conditions that must be met by the applicant, which are addressed in the “Review and Analysis” section below. In order to provide the City Council with an update concerning the conditions associated with the preliminary plat for Easton Village, staff has prepared the following: 4 Preliminary Plat Conditions – With Staff Update Comments (updated information in bold italics): 1) Within six months of preliminary plat approval, the applicant shall complete the following: a) the applicant shall provide adequate title evidence satisfactory to the City Attorney; and b) the applicant shall pay all fees associated with the preliminary plat. The above conditions shall be met prior to the City accepting an application for final plat and prior to the commencement of any grading activity on the site. Comments: a) all title work will need to be submitted and reviewed by the City Attorney before City officials sign the final plat; b) the applicant has submitted an escrow payment with Final Plat application that is being used to cover Staff and consultant expenses related to the City’s review. 2) The grading plan shall be updated to include the protective tree fencing necessary to preserve all vegetative areas identified for protection around the 5.15 acre residential parcel to the west of the subdivision. Comments: The applicant updated the grading plan accordingly. All disturbed areas are shown on the plan, and the applicant will need to replace disturbed trees in accordance with the City’s tree replacement schedule. There is no tree protection or removal in the 5th Addition. 3) The applicant shall work with the City and Washington County to identify and reserve sufficient space for a future trail corridor along the western right-of-way line of Manning Avenue. Comments: The proposed Manning Avenue right-of-way is consistent with County requirements, as the planned roadway segment includes room for trails on one or both sides of the right-of-way. The County’s future plans for Manning Avenue include a trail along the western side of this road. This condition is not applicable to 5th Addition. 4) The applicant shall submit a landscape plan prepared by landscape architect for review and approval by the City. The landscape plan submittal will include a tree protection and replacement plan consistent with City ordinances. Comments: The applicant submitted updated Preliminary Landscape Plans dated 12/17/2014 with the application for 1st Addition Final Plat. Revised landscape plans were submitted with the 2017 Preliminary Plat revisions. The applicant submitted landscape plans for 5th Addition that the City’s Landscape Architect will be reviewing. 5) The final plat will incorporate all review comments from the City’s landscape architect, including the selection and mix of plantings within storm water basins and infiltration areas. Comments: Please see above condition. 6) The landscape plan shall include additional plantings around the Northern Natural Gas utility site. Comments: This condition applies to 5th Addition as the utility site is north of the west end of 34th Street North and west of Lots 6-10, Block 2. The City’s Landscape Architect will need to approve the planting plans for this part of the development. 7) The proposed access to Manning Avenue will be permitted as a temporary access until such time that the Village Parkway is connected to 30th Street. The construction plans will be updated to reflect the temporary nature of this street. Comments: The applicant asked during the 1st Addition Final Plat that this provision be updated to state that the temporary access will be allowed for a minimum of five years. Staff was supportive of this revision and has updated the 5 proposed conditions the 1st Addition Final Plat approval to reflect the change. This condition is not relevant to the 5th Addition Final Plat. 8) The applicant shall be responsible for the construction of all improvements within the Manning Avenue (CSAH 15) right-of-way as required by Washington County and further described in the review letter received from the County dated June 24, 2014. The final construction plans for the 1st Addition were updated to incorporate the required improvements to Manning Avenue. This condition is not relevant to the 5th Addition final plat. 9) The developer shall follow all of the rules and regulations spelled out in the Wetland Conservation Act, and shall acquire the needed permits from the appropriate watershed districts for the storm water management system prior to the commencement of any grading or development activity on the site. Comments: The Applicant has been granted a Valley Branch Watershed District permit. 10) The applicant shall enter into a maintenance agreement with the City that clarifies the individuals or entities responsible for any landscaping installed in areas outside of land dedicated as public park and open space on the final plat. Comment: A Landscape License Agreement was executed for the 1st, 2nd, 3rd and 4th Additions and will be for the 5th Addition. 11) The developer shall provide an updated accounting of the land to be dedicated for park purposes prior to submission of a final plat. If required, the developer shall be required to pay a fee in lieu of park land dedication equivalent to the fair market value for the amount of land that is required to be dedicated for such purposes in the City’s Subdivision Ordinance less the amount of land that is accepted for park purposes by the City. Any cash payment in lieu of land dedication shall be paid by the applicant prior to the release of the final plat for recording. Comments: The park dedication requirements for the entire Easton Village development is 9.84 acres of land, representing 10% of the development area. The dedication of Outlots I and J with the 3rd Addition Final Plat satisfied the park dedication requirements for the entire development. 12) Any land under which public trails are located will be accepted as park land provided the developer constructs said trails as part of the public improvements for the subdivision. Comments: There is a public trail with this phase of the development. It will run from the west end (at the cul-de-sac on 34th Street North) to the east and north behind the lots and on the north side of Lilac Avenue Alcove to Village Parkway. The City will need to determine the final end and connection points of the trail on the west end. 13) All required modifications to the plans as requested by the City Engineer in a review letter dated June 26, 2014 shall be incorporated into the plans prior to consideration of a final plat. Comments: The applicant submitted revised preliminary plans that were approved by the City dated February 22, 2019. The City will require the final plat/plans to be consistent with the approved preliminary plans and the review comments of the City Engineer from his review memo dated April 3, 2019. 14) The City and developer will determine the appropriate distribution of future costs associated with the Village Parkway railroad crossing improvements as part of a developer’s agreement for any portion of Easton Village. Comments: Staff will be drafting a developer’s agreement for consideration by the Council that will incorporate a section dealing with this provision. 6 15) The developer shall address any comments from Metropolitan Airport Commission as part of a final plat submission for any portion of Easton Village. MAC will be asked to comment on the landscape plan, and the plan shall be revised to address any specific comments concerning the appropriate vegetation to be planted within storm water facilities. Comments: MAC has provided a review of the updated plans and provided comments to the developer in a letter dated December 8, 2015. This letter contains recommended mitigation strategies to reduce the attractiveness of the storm water retention and infiltration areas for waterfowl. Other recommendations from MAC have been incorporated into the applicant’s landscape plans. Mac’s comments about noise mitigation and notification about the airport are relevant to the 5th Addition Final Plat. 16) The landscape plan shall be revised to eliminate all trees planted within the Lake Elmo Airport Regulatory Protection Zone. Comments. The Preliminary and 1st Addition landscape plans have been updated accordingly. MAC’s comments are not relevant to the 5th Addition. 17) The final plat shall include a paved trail connection between Lots 13 and 14 of Block 3. Comments: This condition is not relevant to the 5th Addition Final Plat. This trail was removed with 2nd Addition approval. 18) The applicant shall submit written acknowledgement from the property owner of the parcel immediately to the south of Easton Village concerning the storm water being outlet running into their property. Comments: Since the approval of the preliminary plat, the applicant has met with the watershed district, county, and Gonyea Homes to discuss the proposed storm water management system along Manning Avenue. This condition is not relevant to the 5th Addition Final Plat. 19) The applicant is encouraged to incorporate elements from the Lake Elmo Theming Study into the open space areas within the subdivision. Comments: This was Staff recommendation at the time of Preliminary Plat to encourage the applicant to utilize a white “horse fence” with landscaping in order to address the comments from MAC to provide a barrier around the storm water ponds. This fence was not erected, but instead additional landscaping was installed to provide screening. The applicant’s landscape plan for the 1st Addition incorporated elements from the theming study, including the proposed entrance monument sign. This condition is not relevant to the 5th Addition Final Plat. 20) The developer shall obtain all required permits from Northern Natural Gas to perform construction work over the gas line that runs from north to south across this site. Comments. Northern Natural Gas provided review comments to the developer in has submitted final construction plans to the gas company for review, and will need to abide by any conditions imposed by Northern Natural Gas. The applicant has not yet provided copies of these permits for the 5th Addition, and so it has been added as a recommended condition of approval that this be done. 21) The developer shall be required to extend sewer to the northernmost boundary of the site. Comments. The Easton Village Trunk Sewer Line project has been completed and has extended sanitary sewer service to the northern boundary of the plat, connecting to the sewer line recently installed by the City of Lake Elmo under the railroad tracks that continues further north (and connects to the 39th Street line installed by the City). 7 Based on the above Staff report and analysis, staff is recommending approval of the Easton Village 5th Addition final plat with several conditions intended to address the outstanding issues noted above and to further clarify the City’s expectations in order for the developer to proceed with the recording of the final plat. EASEMENT VACATIONS Easement Vacations. The applicant is requesting the City vacate three existing drainage and utility easements that are now on the site. (Please see that attached exhibit showing these areas.) The developer dedicated these easements with the First and Fourth Addition final plats but the City will not need these easements as the developer will be dedicating new easements with the Fifth Addition final plat. In addition, the developer could not record a new final plat (or replat) these existing Outlots into Lots and Blocks with the existing easements in place. Minnesota Statue outlines the provisions for vacating a public right-of-way or easement. It states in part that “Council may, by resolution, vacate any street, alley, public grounds, public way, or any part thereof, on its own motion or on petition of a majority of the owners of land abutting said property. Easement vacations require a public hearing and 4/5 vote by Council only if there has been no petition.” DRAFT FINDINGS Staff and the Planning Commission are recommending approval of the requested Easton Village 5th Addition Final Plat based on the following findings: 1) That all the requirements of City Code Section 153.07 related to the Final Plan and Final Plat have been met by the Applicant. 2) That the proposed Final Plat for Easton Village 5th Addition consists of the creation of 48 lots for detached single-family homes. 3) That the Easton Village 5th Addition Final Plat is generally consistent with the Preliminary Plat and Plans as approved by the City of Lake Elmo on July 15, 2014 and as amended to comply with conditions of preliminary plat approval with the exceptions of issues identified in the March 31, 2019 Staff report to the Planning Commission. 4) That the Easton Village 5th Addition Final Plat is consistent with the Lake Elmo Comprehensive Plan and the Future Land Use Map for this area. 5) That the Easton Village 5th Addition Final Plat complies with the City’s Urban Low Density Residential zoning district regulations. 6) That the Easton Village 5th Addition Final Plat complies with all other applicable zoning requirements, including the City’s landscaping, storm water, sediment and erosion control and other ordinances with the exception of the issues identified in this staff report to the Planning Commission. 7) That the Easton Village 5th Addition Final Plat complies with the City’s subdivision ordinance. 8) That the Easton Village 5th Addition Final Plat is generally consistent with the City’s engineering standards with the exception of necessary plan revisions outlined by the City Engineer in his review comments to the City dated April 3, 2019. 8 Recommended Conditions of Approval. Staff and the Planning Commission recommend approval of the requested Easton Village 5th Addition Final Plat with the following conditions: 1) Final grading, drainage, and erosion control plans, sanitary and storm water management plans, landscape plans, and street and utility construction plans shall be reviewed and approved by the City Engineer and applicable staff before the recording of the Final Plat. All changes and modifications to the plans requested by the City Engineer in the memorandum addressing Easton Village 5th Addition Final Plat and Construction Plan Review dated April 3, 2019 and those of the City’s Landscape Architect dated March 29, 2019 shall be incorporated into these documents and plans before the City will approve the plans. 2) Before the execution of the Final Plat by City officials, the Developer shall enter into a Developer’s Agreement acceptable to the City Attorney and approved by the City Council that delineates who is responsible for the design, construction, and payment of the required improvements for the Easton Village 5th Addition Final Plat with financial guarantees therefore. Payment for pipe oversizing from the City standard 8-inch watermain to the required 12-inch watermain shall be addressed in the developer’s agreement. 3) All easements as requested by the City Engineer and Public Works Department shall be documented on the Final Plat before its execution by City Officials. 4) The final grading plans must provide a sufficient emergency overland flow path that is adequately protected by lot easements from the Outlot A drainage area to prevent this area from being landlocked and thereby becoming a flood threat to adjacent properties. The extent of the required easement for this purpose over Lot 1, Block 3 may render this lot unbuildable unless an improved design can be worked out and approved by the City Engineer. 5) A Landscape License Agreement shall be executed for the maintenance of commonly held HOA and City outlots and right-of-ways before release of the final plat by City Officials. 6) The applicant shall provide a disclosure statement to all first homeowners in the development advising of the location of the Lake Elmo Airport and associated over-flights. 7) All builders shall be encouraged to incorporate interior noise reduction measures into single family residential structures within the subdivision based on the Metropolitan Council’s Builder Guide. 8) The developer shall provide copies of the Northern Natural Gas permits to the City and shall abide by any conditions of approval as listed in permits issued by Northern Natural Gas to perform construction work over the gas line that runs from north to south across this site. 9) The developer shall maintain the temporary secondary access to Village Parkway in the 4th Addition until a permanent 35th Street North is constructed to connect to Village Parkway and the contractor has placed the wear course of bituminous on the streets within the 5th Addition. Lot 13, Block 3 of the Easton Village 4th Addition shall remain platted as outlots (Outlots A and B) owned by the developer with a temporary road access granted to the City until such time as the City accepts 35th Street North. 9 10) That the development improvements include the connection of the private driveways from 11361 Upper 33rd Street and the Northern Natural Gas property at 11371 Upper 33rd Street to the proposed 34th Street cul-de-sac, immediately following the placement of bituminous base course along 34th Street North. 11) Final Plat approval shall be contingent upon the development improvements including the installation of bituminous trail and a concrete sidewalk along Village Parkway (with barriers at the railroad tracks) and the developer extending a 12-inch watermain to the northerly plat limits along Village Parkway. 12) The applicant/developer shall revise the landscape plans to meet the conditions of approval of the preliminary plat and the changes required by the City’s Landscape Architect as outlined in his memo dated March 29, 2019. 13) That the applicant notify all home builders about possible City outdoor watering restrictions and that the home builders notify all home buyers that the City may impose limits on outdoor water use including no watering of grass or sod unless the applicant is notified by the City that this notice is no longer required. Said decision about whether or not this notice is no longer required shall be made at the sole discretion of the City. The applicant shall have the city approve the notification message before recording the final plat. RECOMMENDATIONS: Staff and the Planning Commission recommend approval of the Easton Village 5th Addition Final Plat with the conditions of approval as listed in the staff report. Suggested motion: “Move to adopt resolution 2019-034 approving the Easton Village 5th Addition Final Plat with the recommended findings and conditions of approval as listed in the staff report.” Staff and the Planning Commission recommend approval of the proposed vacation of three drainage and utility easements of Easton Village First Addition as shown on the attached easement vacation Exhibit. “Move to adopt resolution 2019-035 approving the request for the vacation of three drainage and utility easements in Easton Village as shown an the easement vacation exhibit attached to the staff report.” ATTACHMENTS: 1. Narrative dated March 12, 2019 2. 2 City Maps 3. Easton Village Final Plat (4 pages) 4. City Engineer Review Memo dated April 3, 2019. 5. Landscape Architect review memo dated March 29, 2019. 6. Easement Vacation Exhibit 7. Resolution 2019 - 034 approving the Final Plat 8. Resolution 2019 - 035 approving the easement vacations EASTON VILLAGE 5 th Addition Final Plat Narrative March 12, 2019 The Easton Village 5th Addition, by Chase Development, consists of 17.57 acres and with a total of 48 new single family lots. This project is located within Outlots E, F, H and the westerly 80 feet of Outlots D and G of Easton Village 3rd Addition. Per City Resolution No. 2014-058 and No. 2015-07, all conditions of approval were met with the first addition of Easton Village. There have been four approved final plats for the Easton Village Project to date. After this 48 unit subdivision is completed a total of 26 units will remain to complete the entire Easton Village Project. The proposed layout and lot design follow the latest approved preliminary plat that took into account adjustments to road profiles of the two northerly cul de sacs. With the completion of the North Port project to the south of Easton Village the normal water level of our ponding system is now at the final design which lowers the high water level to the final condition. No variances are proposed for this project. The setbacks will remain as required, with rear setbacks at 20 feet, front setbacks at 25 feet and side yard setbacks at 7.5 feet. City street right of way and street and sidewalk sections are proposed per City standards. The proposed storm sewer will be connected to the existing pond storm sewer constructed with Easton Village 3rd and 4th Additions. The water main and sanitary sewer will be extended from the constructed water and EASTON VILLAGE 5th ADDITION FINAL PLAT NARATIVE Page 2 of 3 Block Lot Area (Sq. Ft.) Avg. Width of Lot Avg. Depth of Lot 1 1 8,114 102 80 1 2 8,600 65 132 1 3 10,666 65 164 1 4 10,969 65 169 1 5 11,026 65 170 1 6 11,083 65 171 1 7 11,107 65 171 1 8 12,785 99 129 2 1 9,213 137 67 2 2 8,119 71 114 2 3 9,171 71 129 2 4 9,170 70 131 2 5 11,394 111 103 2 6 11,997 71 169 2 7 10,801 65 166 2 8 10,547 65 162 2 9 10,294 65 158 2 10 10,037 65 154 3 1 11,384 88 129 3 2 15,394 88 175 3 3 13,551 104 130 3 4 8,965 65 138 3 5 8,450 65 130 3 6 8,449 65 130 3 7 9,754 77 127 Block Lot Area (Sq. Ft.) Avg. Width of Lot Avg. Depth of Lot 3 8 20,028 113 177 3 9 12,528 65 193 3 10 14,484 75 193 3 11 10,973 89 123 3 12 8,544 65 131 3 13 9,837 75 131 3 14 9,950 75 133 3 15 9,972 70 142 3 16 11,277 75 150 3 17 12,130 75 162 3 18 13,672 100 137 4 1 14,574 75 194 4 2 18,039 93 194 4 3 9,919 78 127 4 4 9,381 72 130 4 5 9,706 72 135 4 6 9,179 65 141 4 7 9,331 65 144 4 8 10,167 72 141 4 9 9,657 72 134 4 10 8,518 65 131 4 11 9,672 65 149 4 12 15,129 83 182 Outlot A 11,338 sewer of Easton Village 4th Addition. All utilities will be constructed per city standards. The storm water ponding has been finalized per the original design and is at the final normal water level and high water level per the preliminary plat analysis. One outlot is planned for this subdivision as previously identified on the preliminary plat. There will be a temporary cul de sac provided at the end of the proposed extension of Village Parkway. An easement will not be required for this cul de sac such that it resides entirely within Outlot I and J and the proposed right of way. The existing cut through from 33rd Street North to the Village Parkway is proposed to remain until the connection of 34th Street is completed as part of this project. Following is a list of the proposed lots and size of the lots in square feet: There are no parks being proposed with this subdivision. However, the trail through the previously platted park outlot will be constructed as part of this project. The total right of way dedication for this project is 226,139 sq. ft. or 5.19 Acres. EASTON VILLAGE 5th ADDITION FINAL PLAT NARATIVE Page 3 of 3 No know issues have arisen since the last addition to Easton Village. There are four existing easements that were created with the previous development that are requested to be vacated: 1) Temporary easement at the end of the cul de sac of Village Parkway 2) Temporary easement at the end of the cul de sac of the 4th Addition 3) Drainage and utility easement created for the trunk sewer for the 1st Addition. 4) Drainage and utility easement created for the storm sewer connection for the 4th Addition. The final density of this addition is as depicted on the approved preliminary plat with no additional lots being created or removed. The project is proposed to start as soon as possible in the spring.     PAGE 1 of 2  MEMORANDUM           Date:  April 3, 2019      To:  Ken Roberts, Planning Director  Re:  Easton Village 5th Addition Final Plat   Cc:  Chad Isakson, P.E., Assistant City Engineer    Engineering Review Comments  From:  Jack Griffin, P.E., City Engineer          An engineering review has been completed for the Easton Village 5th Addition Final Plans consisting of the following  documentation received on March 12, 2019, and prepared by Erickson Engineering:     Easton Village 5th Addition Construction Plans, C1‐C28 & L1‐L3, dated March 6, 2019.   Easton Village 5th Addition Project Manual dated March 6, 2019.   Easton Village 5th Addition Final Plat, Sheets 1‐4, not dated.   Easton Village 5th Addition Final Plat Narrative, dated March 6, 2019.      STATUS/FINDINGS:   Engineering review comments have been provided in two separate memos; one for Final Plat  approval, and one to assist with the completion of the final Construction Plans.  Please see the following review  comments relating to the Final Plat application.      FINAL PLAT: EASTON VILLAGE 5TH ADDITION   Outlot A will be HOA owned and maintained. HOA ownership of the Outlot must be noted on the final  construction plans. A drainage and utility easement must be provided to the City over all of Outlot A.   Final  Plat  should  be  contingent  upon  the  applicant  revising  the  grading  plans  to  match  the  approved  preliminary grading plans dated February 22, 2019, including all building pad elevations, all 100‐year HWL  elevations and HWL contours, all emergency overflow elevations (EOFs), and to include all as‐built existing  grading information adjacent to the 5th Addition improvements, including culvert inverts, gas easement weir  details, emergency overflow elevations and locations, and existing 100‐year HWL elevations.   Final Plat must be contingent upon grading plan revisions to provide a clear protected drainage path for the  917.5 EOF to Outlot A. Easements must be expanded for Lots 1 and 2, Block 3 on the final plat to facilitate  protection and drainage over this emergency overflow pathway. Adequate drainage and protection across Lot  1 may render Lot 1, Block 3 unbuildable?    Final Plat should be contingent upon the development improvements including the construction of Village  Parkway to the south right‐of‐way line for the UPRR with no temporary cul‐de‐sac, including the east and west  boulevards, sidewalks, trails, street lighting and landscaping. Type III Barricades should be installed at the  north leg of Village Parkway and 35th Street intersection until the UPRR crossing is constructed.    It is required that the temporary secondary access to Village Parkway (constructed as part of Easton Village  3rd Addition) be kept in use and maintained by the developer, until a permanent secondary access street is  constructed to Village Parkway via 35th Street North. Once the 35th Street North connection is completed the  temporary  secondary  access  must  be  removed.  The  construction  plans  must  be  revised  to  address  this  construction phasing.  FOCUS ENGINEERING, inc.  Cara Geheren, P.E.   651.300.4261  Jack Griffin, P.E.                651.300.4264  Ryan Stempski, P.E.  651.300.4267  Chad Isakson, P.E.  651.300.4283      PAGE 2 of 2   It is required that the developer connect the private driveways for 11361 Upper 33rd Street and the Northern  Natural  Gas  property  at  11371  Upper  33rd  Street  to  the  proposed  34th  Street  cul‐de‐sac,  immediately  following the placement of bituminous base course along 34th Street North. The construction plans must be  revised to address the construction details for the private driveway connections and the construction phasing.   Final Plat should be contingent upon  the  development improvements including 12‐inch watermain  being  extended to the northerly plat limits along Village Parkway.   Easton Village 5th Addition includes or will include trunk watermain (12‐inch diameter) pipe oversizing along  Lilac Avenue North to 35th Street, along 35th Street from Lilac Avenue to Village Parkway, and along Village  Parkway from 35th Street to the north plat limits. Trunk watermain (12‐inch diameter) pipe oversizing is also  included along 34th Street to the end of cul‐de‐sac. Payment for pipe oversizing from the City standard 8‐inch  pipe should be addressed as part of the development agreement.   All easements as requested by the City Engineer and Public Works department shall be documented on the  Final Plat prior to the release of the Final Plat for recording.   Final  Construction  Plans  and  Specifications  must  be  revised  in accordance  with  the  Construction  Plan  engineering review memorandum dated April 3, 2019 and approved by the City Engineer. Final Construction  Plans and Specifications must be prepared in accordance with the City Engineering Design Standards Manual  dated  March  2017  using  City  details,  plan  notes  and  specifications  and  meeting  City  Engineering  Design  Guidelines.   The Final Plat shall not be recorded until final construction plan approval is granted.   No construction for Easton Village 5th Addition may begin until the applicant has received City Engineer  approval for the Final Construction Plans; the applicant has obtained and submitted to the City all applicable  permits, easements and permissions needed for the project; and a preconstruction meeting has been held by  the City’s engineering department.  Wenck | Colorado | Georgia | Minnesota | North Dakota | Wyoming Toll Free 800-472-2232 Web wenck.com To: Ken Roberts, City of Lake Elmo Planning Director From: Lucius Jonett, Wenck Landscape Architect Date: March 29, 2019 Subject: City of Lake Elmo Landscape Plan Review Easton Village 5th Addition, Review #1 Submittals  5th Addition Landscape Plans, dated 03/06/2019, received 03/13/2019. Location: Southwest quadrant of the intersection of Manning Avenue North & Union Pacific Railroad, Lake Elmo, MN Land Use Category: Low Density Residential Surrounding Land Use Concerns: None Special landscape provisions in addition to the zoning code: None Tree Preservation: A tree survey/preservation plan has been previously submitted, including a tree inventory showing individual trees that are to be saved. This plan was approved as part of the original Preliminary Plat. A tree preservation plan has been provided and previously approved allowing the replacement caliper inches to include the use of ornamental trees, deciduous and coniferous shrubs. Landscape Requirements: The landscape plans are generally consistent with the previously approved preliminary plat and phases 1 – 4. There have been some changes to the locations and species of street trees along the roads, a reduction of plantings around the perimeter of the gas distribution station, and an increase of plantings along the railroad tracks. 5th Addition Qty % Composition Deciduous Shade Tree 88 55% >25% required Coniferous Tree 56 35% >25% required Ornamental Trees* 16 10% <15% required Tree Count 160 *Ornamental Trees, Deciduous shrubs and Coniferous shrubs were included in totals Ken Roberts Planning Director City of Lake Elmo March 29, 2019 2 T:\6443 Lake Elmo\09 Easton Village\06 5th Addition\2019-03-13\Easton Village 5th Addition Landscape Plan Review 2019-03-29.docx The landscape plans do meet the minimum compositions of required trees: • At least 25% of the required number of trees shall be deciduous shade trees • At least 25% of the required number of trees shall be coniferous trees • Up to 15% of the required number of trees may be ornamental tree A. A landscape plan has been submitted that does not include all requirements. 1. The landscape plan does not include required City standard notes and details. 2. All utilities and pavements are not shown on the landscape plan to review for tree placement conflicts. B. The landscape plan does not consistently meet the landscape layout requirements: 1. Per typical Right of Way layout, place boulevard trees 5’ from back of curb when sidewalk or trail is present, 8’ from back of curb when no sidewalk or trail is present. C. Interior Parking Lot Landscaping – The development does not include interior parking lots. D. Perimeter Parking Lot Landscaping – The development does not include perimeter parking lots. E. Screening – The landscape plan does provide noise separation and screening from the railroad. Findings: 1. The increase of plantings along the railroad tracks is encouraged. 2. The reduction of plantings shown around the perimeter of the gas distribution station will not create open views from the homes on those lots to the distribution station. There are many existing trees on the Natural Gas Company property, not shown on the Easton Village plans. Reviewing Washington County GIS, the chain link fence and distribution station footprint is central on the property and surrounded by several rows of trees; all on the Northern Natural Gas Company property. 3. Several trees are shown over driveway pavement and need to be relocated. See attached figure highlighting the conflicts. 4. A few trees are placed within 10’ of storm sewer utilities and need to be relocated to provide 10’ from tree trunk to utility pipes. 5. Water and sanitary sewer utilities to the homes are not shown on the landscape plans and need to be included to show any tree placement conflicts. 6. Tree layout does not consistently match the typical ROW layout with boulevard trees 5’ from back of curb when sidewalk is present and 8’ from back of curb when no sidewalk is present. 7. City standard details are not used for planting details. Ken Roberts Planning Director City of Lake Elmo March 29, 2019 3 T:\6443 Lake Elmo\09 Easton Village\06 5th Addition\2019-03-13\Easton Village 5th Addition Landscape Plan Review 2019-03-29.docx Recommendation: It is recommended that the conditions of approval include submitting a revised landscape plan showing the water and sanitary sewer utilities, including City standard details, and adjusting the tree layouts to resolve the conflicts noted in the findings above. Sincerely, Lucius Jonett, PLA (MN) Wenck Associates, Inc. City of Lake Elmo Municipal Landscape Architect CITY OF LAKE ELMO WASHINGTON COUNTY STATE OF MINNESOTA RESOLUTION NO. 2019-034 A RESOLUTION APPROVING A FINAL PLAT FOR EASTON VILLAGE 5TH ADDITION WHEREAS, the City of Lake Elmo is a municipal corporation organized and existing under the laws of the State of Minnesota; and WHEREAS, Chase Development, 2140 West County Road 42, Burnsville, MN has submitted an application to the City of Lake Elmo (“City”) for a Final Plat for Easton Village 5th Addition Final Plat, a copy of which is on file in the City of Lake Elmo Planning Department; and WHEREAS, the Easton Village Sketch Plan was reviewed by the Planning Commission on January 7, 2014 and approved by City Council on February 5, 2014; and WHEREAS, the City approved the Easton Village Preliminary Plat on July 15, 2014, subject to 21 conditions; and WHEREAS, the proposed Easton Village 5th Addition includes 48 single family residential lots within the Easton Village 217 unit residential development; and WHEREAS, the Lake Elmo Planning Commission reviewed the Easton Village 5th Addition Final plat at its April 8, 2019 meeting; and WHEREAS, the Lake Elmo Planning Commission adopted a motion recommending approval of the Final Plat subject to 12 conditions of approval; and WHEREAS, the Lake Elmo Planning Commission has submitted its report and recommendation concerning the Final Plat as part of a memorandum to the City Council for its May 7, 2019 meeting; and WHEREAS, the City Council reviewed the Easton Village 5th Addition Final Plat at its meeting held on May 7, 2019 and made the following findings: 1) That all the requirements of City Code Section 153.07 related to the Final Plan and Final Plat have been met by the Applicant. 2) That the proposed Final Plat for Easton Village 5th Addition consists of the creation of 48 lots for detached single-family homes. 3) That the Easton Village 5th Addition Final Plat is generally consistent with the Preliminary Plat and Plans as approved by the City of Lake Elmo on July 15, 2014 and as amended to comply with conditions of preliminary plat approval with the exceptions of issues identified in the March 31, 2019 Staff report to the Planning Commission. 4) That the Easton Village 5th Addition Final Plat is consistent with the Lake Elmo Comprehensive Plan and the Future Land Use Map for this area. 5) That the Easton Village 5th Addition Final Plat complies with the City’s Urban Low Density Residential zoning district regulations. 6) That the Easton Village 5th Addition Final Plat complies with all other applicable zoning requirements, including the City’s landscaping, storm water, sediment and erosion control and other ordinances with the exception of the issues identified in this staff report to the Planning Commission. 7) That the Easton Village 5th Addition Final Plat complies with the City’s subdivision ordinance. 8) That the Easton Village 5th Addition Final Plat is generally consistent with the City’s engineering standards with the exception of necessary plan revisions outlined by the City Engineer in his review comments to the City dated April 3, 2019. NOW, THEREFORE, BE IT RESOLVED THAT the City Council does hereby approve the Easton Village 5th Addition Final Plat subject to the following conditions: 1) Final grading, drainage, and erosion control plans, sanitary and storm water management plans, landscape plans, and street and utility construction plans shall be reviewed and approved by the City Engineer and applicable staff before the recording of the Final Plat. All changes and modifications to the plans requested by the City Engineer in the memorandum addressing Easton Village 5th Addition Final Plat and Construction Plan Review dated April 3, 2019 and those of the City’s Landscape Architect dated March 29, 2019 shall be incorporated into these documents and plans before the City will approve the plans. 2) Before the execution of the Final Plat by City officials, the Developer shall enter into a Developer’s Agreement acceptable to the City Attorney and approved by the City Council that delineates who is responsible for the design, construction, and payment of the required improvements for the Easton Village 5th Addition Final Plat with financial guarantees therefore. Payment for pipe oversizing from the City standard 8-inch watermain to the required 12-inch watermain shall be addressed in the developer’s agreement. 3) All easements as requested by the City Engineer and Public Works Department shall be documented on the Final Plat before its execution by City Officials. 4) The final grading plans must provide a sufficient emergency overland flow path that is adequately protected by lot easements from the Outlot A drainage area to prevent this area from being landlocked and thereby becoming a flood threat to adjacent properties. The extent of the required easement for this purpose over Lot 1, Block 3 may render this lot unbuildable unless an improved design can be worked out and approved by the City Engineer. 5) A Landscape License Agreement shall be executed for the maintenance of commonly held HOA and City outlots and right-of-ways before release of the final plat by City Officials. 6) The applicant shall provide a disclosure statement to all first homeowners in the development advising of the location of the Lake Elmo Airport and associated over-flights. 7) All builders shall be encouraged to incorporate interior noise reduction measures into single family residential structures within the subdivision based on the Metropolitan Council’s Builder Guide. 8) The developer shall provide copies of the Northern Natural Gas permits to the City and shall abide by any conditions of approval as listed in permits issued by Northern Natural Gas to perform construction work over the gas line that runs from north to south across this site. 9) The developer shall maintain the temporary secondary access to Village Parkway in the 4th Addition until a permanent 35th Street North is constructed to connect to Village Parkway and the contractor has placed the wear course of bituminous on the streets within the 5th Addition. Lot 13, Block 3 of the Easton Village 4th Addition shall remain platted as outlots (Outlots A and B) owned by the developer with a temporary road access granted to the City until such time as the City accepts 35th Street North. 10) That the development improvements include the connection of the private driveways from 11361 Upper 33rd Street and the Northern Natural Gas property at 11371 Upper 33rd Street to the proposed 34th Street cul-de-sac, immediately following the placement of bituminous base course along 34th Street North. 11) Final Plat approval shall be contingent upon the development improvements including the installation of bituminous trail and a concrete sidewalk along Village Parkway (with barriers at the railroad tracks) and the developer extending a 12-inch watermain to the northerly plat limits along Village Parkway. 12) The applicant/developer shall revise the landscape plans to meet the conditions of approval of the preliminary plat and the changes required by the City’s Landscape Architect as outlined in his memo dated March 29, 2019. 13) That the applicant notify all home builders about possible City outdoor watering restrictions and that the home builders notify all home buyers that the City may impose limits on outdoor water use including no watering of grass or sod unless the applicant is notified by the City that this notice is no longer required. Said decision about whether or not this notice is no longer required shall be made at the sole discretion of the City. The applicant shall have the city approve the notification message before recording the final plat. Passed and duly adopted this 7th day of May, 2019 by the City Council of the City of Lake Elmo, Minnesota. ___________________________________ Mike Pearson, Mayor ATTEST: ____________________________________ Julie Johnson, City Clerk STATE OF MINNESOTA COUNTY OF WASHINGTON CITY OF LAKE ELMO RESOLUTION NO. 2019-035 A RESOLUTION VACATING DRAINAGE AND UTILITY EASEMENTS IN EASTON VILLAGE WHEREAS, the City of Lake Elmo (City) is a municipal corporation organized and existing under the laws of the State of Minnesota; and WHEREAS, the City Council approved a Preliminary Plat the Easton Village development in Lake Elmo on July 15, 2014 through adoption of Resolution 2014-58; and WHEREAS, the City Council approved the Easton Village First Addition Final Plat on March 3, 2015 through adoption of Resolution 2015-07; and WHEREAS, the City of Lake Elmo was granted Drainage and Utility Easements over portions of Lilac Avenue North and parts of PID#s 13-029-21-42-0049 and PID# 13-029-21-13-0003 and these easements were recorded with the Easton Village First and Third Addition Plats by the Office of the Registrar of Titles of Washington County; and WHEREAS, a request has been made to the City Council pursuant to Minnesota Statute §412.851 to vacate three Drainage and Utility Easements recorded with the Easton Village First and Third Additions by the Office of the Registrar of Titles of Washington County, Minnesota over parts of Lilac Avenue North and over parts of PID#s 13-029-21-42-0049 and PID# 13-029-21-13-0003, legally described as follows: 1. Drainage and Utility Easement per Document Number 4037027 2. Drainage and Utility Easement per Document Number 4168436 3. An existing drainage and utility easement of EASTON VILLAGE, Washington County, Minnesota, according to the recorded plat, in favor of the City of Lake Elmo to be vacated in its entirety is described as follows: Beginning at the Northwest corner of Lot 1, Block 7, EASTON VILLAGE, Washington County, Minnesota; thence easterly along the northerly lot line of said Lot 1, Block 7, EASTON VILLAGE, North 89 degrees 32 minutes 47 seconds East a distance of 9.67 feet; thence North 00 degrees 55 minutes 27 seconds West, a distance of 452.52 feet; thence South 89 degrees 32 minutes 47 seconds West, a distance of 125.92 feet; thence North 64 degrees 52 minutes 26 seconds West, a distance of 592.35 feet more or less to the west boundary of said EASTON VILLAGE; thence southerly along the west property line of said EASTON VILLAGE, South 00 degrees 00 minutes 58 seconds East, a distance of 167.05 feet; thence North 86 degrees 02 minutes 31 seconds East, a distance of 146.60 feet; thence South 64 degrees 52 minutes 26 seconds East, a distance of 394.73 feet; thence South 87 degrees 03 minutes 26 seconds East, a distance of 79.99 feet; thence South 00 degrees 55 minutes 27 seconds East, a distance of 387.27 feet more or less to the northerly lot line of Lot 1, Block 6, EASTON VILLAGE; thence easterly along said Lot 1, Block 6, EASTON VILLAGE, North 89 degrees 32 minutes 47 seconds East, a distance of 10.18 feet; thence North 00 degrees 13 minutes 05 seconds East a distance of 4.75; thence North 89 degrees 32 minutes 47 seconds East a distance of 60.00 feet more or less to the western boundary of Lot 1, Block 7, EASTON VILLAGE; thence North 00 degrees 13 minutes 05 seconds West, along the west boundary of Lot 1, Block 7 EASTON VILLAGE, a distance of 7.50 feet more or less to the point of beginning. WHEREAS, the City Clerk reviewed and examined the signatures on said request and determined the signatures constituted all of the landowners abutting upon the portion of easement to be vacated and rededicated; and WHEREAS, the Lake Elmo Planning Commission held a public hearing to consider the vacation of the Drainage and Utility Easements on the April 8, 2019 before the Planning Commission in the Lake Elmo City Hall lafter due published and posted notice had been given and all interested and affected persons were given an opportunity to voice their concerns and be heard; and WHEREAS, the City Council in its discretion has determined that the vacation of the easements will benefit the public interest because: 1) The City has granted Final Plat Approval for Easton Village 5th Addition, which includes parts of Lilac Avenue North and parts of PID#s 13-029-21-42-0049 and PID# 13-029-21-13-00003; which will grant the City more appropriate easements for similar purposes. WHEREAS, the City Council, at its meeting on May 7, 2019, considered the easement vacation request. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LAKE ELMO, COUNTY OF WASHINGTON MINNESOTA, that such request for vacation of three existing Drainage and Utility Easements in Easton Village is hereby granted in accordance with the property descriptions provided above, subject to the following condition of approval: 1) New easements as requested by the City Engineer and Public Works Director shall be recorded with the Easton Village 5th Addition Final Plat. BE IT FURTHER RESOLVED, that the Mayor and City Clerk are hereby authorized to sign all documents necessary to effectuate the intent of this resolution. Adopted by the Council this 7th day of May, 2019. Effective Date: ______________________ Approved: ________________________________ Mike Pearson, Mayor Attested by: ________________________________ Julie Johnson, City Clerk