STAFF REPORT
DATE: 06/18/19
REGULAR
TO: City Council
FROM: Ken Roberts, Planning Director
AGENDA ITEM: Zoning Map Amendment and Preliminary Plat and Preliminary
Planned Unit Development (PUD) Plans – Springs Apartments
REVIEWED BY: Ben Prchal, City Planner
Jack Griffin, City Engineer
BACKGROUND:
The City has received land use requests from Continental 483 Fund LLC (c/o Gwyn Wheeler) for
approval of:
1. A Zoning Map Amendment (rezoning) from RT (rural development transitional) to HDR (urban
high density residential); and
2. Preliminary Plat and Preliminary Planned Unit Development (PUD) Plans for a 300 unit multi-
family residential development on a 17.01-acre parcel to be called Springs Apartments.
The City Council reviewed and approved the concept plans for this PUD on March 5, 2019. This
approval was documented in Resolution 2019-017 and was subject to 13 conditions of approval.
On May 13, 2019, the Planning Commission reviewed the proposal, held a public hearing and
recommended approval of the land use requests (including an increase in project density because of
the proposed development amenities) for the Springs Apartments.
ISSUE BEFORE THE CITY COUNCIL:
The City Council is being asked to consider the proposed zoning map amendment, preliminary plat and
development stage (preliminary) planned unit development (PUD) plans for the development to known as
the Springs Apartments.
GENERAL INFORMATION:
• Property Owner: DPS-Lake Elmo, LLC of 6007 Culligan Way, Minnetonka, MN 55345
• Applicant: Continental 483 Fund LLC (c/o Gwyn Wheeler)
• Location: North of Hudson Blvd. N, west of Keats Avenue
• Site Area: 17.57 gross acres, 17.33 net acres
• Land Use Guidance: 2030 Comprehensive Plan – Commercial, 2040 Comprehensive Plan –
Mixed Use Commercial
• Existing Zoning: Rural Development Transitional
• Proposed Zoning: Urban High Density Residential
2
• Surrounding Land Use Guidance: Commercial to the East, Urban Medium Density Residential to
the North, Commercial to the West, and Hudson Boulevard and I-94 to South.
• History: The property has been used as rural vacant land and as a homestead. There is a wetland
on the site that staff is estimating is about 0.3 acres in size. It is located along the north side of
Hudson Blvd about 240 feet west of the east property line of the site. A large portion of the
eastern part of the site is covered in trees.
• Deadline for Action: Application Complete: 4-12-2019
60-day timeline: 6-10-2019
120-day timeline: 8-9-2019 (time extension letter sent)
PROPOSAL DETAILS/ANALYSIS:
Project Overview/Site Plan. The proposed site plan includes 15 buildings with 20 units each. The
buildings are a townhouse design, two stories tall with a mix of studio, 1-bedroom, 2-bedroom and 3-
bedroom units. Many units provide attached, direct-access garages for a total of 120 attached garage
spaces for the 300 units. The applicant also is planning to have seven detached garage buildings (with a
total of 42 spaces), 399 surface parking spaces, an approximately 4,300 square foot club house (including
a large gathering room, fitness center, kitchen area, coffee bar and office space), pool with sun deck, trash
enclosure, mail kiosk, and one pet playground all within a fenced, controlled access community.
The site plan shows the primary entrance to the development would be off of Hudson Boulevard and there
would be an emergency access drive connecting to the north/south road (Julia Avenue) to the west of the
site. The applicant also is proposing to preserve much of an existing wetland on the site that is near
Hudson Boulevard.
About the Applicant. Continental 483 Fund LLC. (Applicant) desires to develop a Class A, market-rate
apartment community within the City. The company, started in 1979, is based out of Menomonee Falls,
WI, and as of 2019 has broken ground on 22,000 apartment homes in 18 states. 65 Springs Apartment
communities, similar to this proposed development, have been developed, including three in Minnesota
(Apple Valley, Rochester, and Savage). The applicant has indicated in meetings with City that
Continental owns and operates all Springs developments and they do not have third party management of
their properties.
2040 Comprehensive Plan Update. As the City Council is aware, the City has been working to
complete its required 2040 Comprehensive Plan update. The City Council approved the proposed Plan
update at its February 5, 2019 meeting and authorized City staff to submit the updated Comprehensive
Plan to the Metropolitan Council for their approval. Since then, City staff and the City Planning
consultant have been working with the Metropolitan Council to clarify information in the proposed plan
and we have submitted additional information to ensure the 2040 Comprehensive Plan will be complete
and will meet all the requirements of the Metropolitan Council. This review and approval process by the
Metropolitan Council may take up to 120 days. However, staff has been working closely with
Metropolitan Council staff and we are hopeful they will approve the 2040 Comprehensive Plan by
September. Once the Metropolitan Council approves the proposed Plan, the City must give the proposed
2040 Comprehensive Plan final approval and then start using and implementing the updated Plan.
Land Use. The proposed land use map in the 2040 Comprehensive Plan update shows this site
designated as MU-C (mixed use commercial). The proposed 2040 Plan notes “this designation is a new
land use and identifies where a mix of commercial and residential uses may be integrated to benefit from
proximity and adjacencies to each other. Commercial uses in this category include service and retail uses
such as, but not limited to, restaurants, shops, convenience stores, salons, studios and dry cleaners. Land
with this designation is assumed to develop with a minimum of 50 percent residential use with a density
ranging from 10-15 dwelling units per acre.”
3
In this case, the applicant is proposing a development with 300 dwelling units on 17.33 net acres. This
calculates to 17.31 dwelling units per net acre thus exceeding the density limits set for this area in the
2040 Comprehensive Plan (without any credit for density bonuses that the City may grant through the
PUD process). At 15 dwelling units per net acre, this site could accommodate 260 units. (Please see the
Density Analysis below for more information about this.)
With the pending land use designation (MU-C) for this site, the City will not be able to give final
approval to the proposal until after the Metropolitan Council and the City Council have finalized the 2040
Comprehensive Plan. The City could require the applicant to wait to submit the final plat and final PUD
plans for this project after the City has given the 2040 Comprehensive Plan final approval. This timing
will ensure that what is proposed for this site is consistent with the 2040 Comprehensive Plan and that the
City will get credit for the residential density that the project would bring to this part of Lake Elmo.
Another option would be for the City to require the applicant to wait to submit applications for final PUD
and final plat approval until the City has notification from the Metropolitan Council that the proposed
Comprehensive Plan is complete for their review. City staff has been working closely with the
Metropolitan Council staff since February to submit and resubmit all required data and information to
them to ensure the proposed Comprehensive Plan update is complete. Once the City knows the proposed
Comprehensive Plan update is complete, staff is confident that the Metropolitan Council will approve the
proposed Comprehensive Plan in a timely manner.
The developer may choose to submit an application to the City for final PUD approval before they City
has conformation from the Metropolitan Council about the completeness of the Lake Elmo
Comprehensive Plan update. The City’s review process for the final PUD plans should take about 50-60
days. If the developer makes such an application to the City, it would be at their own risk and the City
could not give any final project approvals until after the 2040 Comprehensive Plan has received all final
approvals. It is possible that the City’s review of the final project plans would be occurring while the
Metropolitan Council is processing and reviewing the City’s 2040 Comprehensive Plan update.
No matter when the applicant submits applications for final plat and final PUD approval, the City will
need to make any and all final project approvals contingent upon final approvals of the 2040
Comprehensive Plan by the Metropolitan Council and by the City Council.
Zoning Map Amendment. In order for this development to proceed, the City also will need to approve a
zoning map amendment (rezoning) for the property from RT (rural development transitional) to HDR
(urban high density residential). According the Lake Elmo Zoning Code, the HDR district is to provide
for moderate to high density attached and multi-family housing, designed to present an attractive
appearance to neighboring street and adjacent uses, to include sufficient private and semi-private outdoor
space and to be well-integrated into their surroundings. Development in this district may occur at
densities in excess of seven dwelling units per acre, provided the overall densities are consistent with the
net densities specified in the Comprehensive Plan.
As drafted by staff, the Ordinance to amend the Zoning Map for this site, if approved by the City Council,
would only become effective after the Metropolitan Council approves the 2040 Comprehensive Plan.
Preliminary Plat/PUD Plans
Preliminary Plat. The proposed preliminary plat shows one parcel for the project site. This site will be
on one lot within the proposed final plat for the former Bentley Village (now Union Park) development. I
have attached a copy of the proposed Union Park final plat for your reference. This proposed final plat
creates several lots and outlots for development and would dedicate the right-of-way for Julia Avenue and
for 5th Street North. The original project plans did not show the required 100-foot-wide street right-of-way
4
for the north/south street (Julia Avenue) and any additional right-of-way along Hudson Boulevard that
might be needed to accommodate the required turn lanes and public trail. The City should require the
developer to include all necessary street right-of-way on the final plat as a condition of approval.
Density Analysis. The City calculates the site density for this site as follows: Site – 17.01 acres plus
0.56 acres (1/2 right-of-way for north/south road) – 0.24 acres (wetland) = 17.33 net acres. 300 units
divided by 17.33 acres = 17.31 units per net acre. As noted above, this density would exceed the City’s
density requirements for residential development in the mixed use commercial land use designation of 15
unit units per acre. This is the maximum allowed density without any credit for an increase in density
through bonuses the City may grant through the PUD process.
Proposed Unit Breakdown. The proposed number of dwelling units totals 300. The following table
provides a breakdown of the proposed unit types and the number of units of each:
Unit Type Number of Units
Studios 30
1-Bedroom 120
2-Bedroom 120
3-Bedroom 30
PUD – Overlay and Minimum Requirements.
Consistency with Planned Unit Development Regulations. Staff has reviewed the proposed plan for its
consistency with requirements of Article XVII: Planned Unit Development (PUD) Regulations and has
found the following:
• Intent. The intent of a PUD is to provide for flexibility in the use of land and the placement and
size of buildings in order to better utilize site features and obtain a higher quality of development.
A PUD is required for the proposed development, as more than one principal building is proposed
to be placed on a platted lot, there is a proposed reduce building setback from the west property
line and the proposed detached garage buildings are larger than the maximum-allowed 1,000
square feet in size.
• Identified Objectives. When reviewing requests for PUDs, the City is to consider whether one or
more objectives as outlined in Section 154.751: Identified Objectives of the Zoning Code will be
served or is achieved. Staff has found that the proposed development would meet the following
objectives:
A. Innovation in land development techniques that may be more suitable for a given
parcel than conventional approaches.
• The proposed development is not a typical, multi-story apartment building and instead
proposes a townhouse design two stories in height with private, ground-level entrances
to each unit.
C. Provision of a more adequate, usable, and suitably located open space, recreational
amenities and other public facilities than would otherwise be provided under
conventional land development techniques.
5
• The proposed development is proposing a number of recreational amenities to residents
within the PUD including a pet playground, clubhouse and a swimming pool.
D. Accommodation of housing of all types with convenient access to employment
opportunities and/or commercial facilities; and especially to create additional
opportunities for senior and affordable housing.
• The proposed development will provide additional housing opportunities within the City,
as there are currently very few multi-family residential buildings within the City.
G. Coordination of architectural styles and building forms to achieve greater
compatibility within the development and surrounding land uses.
• The townhouse design will be compatible in design those of the nearby Savona
townhomes and with the future Pulte townhomes to the north of the site.
H. Higher standards of site and building design than would otherwise be provided under
conventional land development technique.
• The City may impose such guidelines on high density residential development such as
this proposal.
• Minimum Requirements. PUDs must meet the following minimum requirements:
A. Lot Area. A PUD must include a minimum of 5 acres for undeveloped land or 2 acres for
developed land within the approved development.
• The proposed development exceeds this requirement with a proposed 20.36 acre
development.
B. Open Space: For all PUDs, at least 20% of the project area not within street rights-of-
way to be preserved as protected open space. Other public or site amenities may be
approved as an alternative to this requirement. Any required open space must be
available to the residents, tenants, or customers of the PUD for recreational purposes or
similar benefit. Land reserved for storm water detention facilities and other required
site improvements may be applied to this requirement. Open space shall be designed to
meet the needs of residents of the PUD and the surrounding neighborhoods, to the
extent practicable, for parks, playgrounds, playing fields and other recreational
facilities.
• The applicant indicated in their project narrative that there will be 5.77 acres of open
space with this development. This is 28 percent of the gross project site area
including the pet area, green spaces and landscaped areas.
C. Street Layout… In newly developing areas, streets shall be designed to maximize
connectivity in each cardinal direction, except where environmental or physical constraints
make this infeasible. All streets shall terminate at other streets, at public land, or at a park
or other community facility, except that local streets may terminate in stub streets when
those will be connected to other streets in future phases of the development or adjacent
developments.
• The new north/south road connecting 5th Street to Hudson Blvd (Julia Avenue)
meets this requirement. It is a recommended condition of approval that the
developer address all the comments outlined in the Engineering memo dated May 8,
2019 before submitting plans for a final plat and final PUD approval for this site.
6
Proposed PUD Amenities. The City’s PUD ordinance provides that if developers provide amenities with
their projects the City may increase density by up to 20 percent. In this case, because the applicant is
proposing a housing density of 17.31 units per net acre, the developer will need to provide amenities with
the project to justify the increased housing density above the expected allowed density range of 10-15
units per acre of the future MU-C land use designation. In addition, a PUD should include features or
elements that meet the one or more of the City’s identified objectives (as noted above). The PUD also
should offer the City (and future residents) amenities in exchange for the flexibility of allowing a reduced
setback to the westerly property line, having more than one building on a parcel as well as allowing
detached garages larger than 1,000 square feet.
In this case, the developer noted on Pages 5 and 6 of their narrative the following site amenities they
believe qualify for amenity points:
• Public Right-of-Way Dedication. The dedication of land and construction of a public road, trail,
pathway or greenway that is part of an approved city plan, but outside the scope of the immediate
project area. Right-of-way improvements should be designed per the specifications of the City
Engineer. (10 points possible)
For this development, the staff-recommended right-of-way dedications are typical for any
subdivision or development and are a part of the project area as they are directly adjacent to their
site. The proposed right-of-way dedications are not outside the scope of the immediate project
area. (PC recommended - 10 points) (Staff recommended - 0 points)
• Contained Parking. The purpose of this amenity is to better integrate surface parking into the site
and reduce the amount of visible surface parking from the public right-of-way. Parking should be
rear-loaded and hidden by the building façade or integrated into the site in some other fashion that
is acceptable to the City. (5 points possible)
By proposing 162 garage spaces for its residents, the proposed development limits the amount of
visible surface parking. The plans show some vehicle surface parking that would be visible from
Hudson Boulevard and Julia Avenue, but much of the surface parking would be set behind the
proposed buildings. This design reduces the amount of the surface parking that would be visible
from the public rights-of-way adjacent to the site. (PC recommended - 5 points) (Staff
recommended – 5 points)
• Pedestrian Improvements. By proposing a site and building design that allows for exceptional
and accessible pedestrian and/or bicycle access through and /or around the site. The
improvements shall use a combination of trails, landscaping, decorative materials, access control
and lighting to create safe, clear and aesthetically pleasing pedestrian facilities through and/or
around the site that comply with ADA accessibility requirements. (5 points possible)
In this case, the developer is proposing a series of trails and sidewalks in and around their site that
will provide many places for pedestrians to move about without having to walk on the streets or
on the driveways. Many of the proposed sidewalks provide access to the entrances to the
individual units while other sidewalks allow for safer and easier pedestrian movement throughout
the site. The City should require the developer to add a 5-foot-wide concrete sidewalk with ADA
ramps at driveway crossings along the west side of the main entrance driveway. This sidewalk
should run from the club house to Hudson Boulevard to help facilitate pedestrian movement to
and from their site to the trail along Hudson Boulevard. However, if the City wants to award
amenity points for these trails and sidewalks, then the City should not give the developer credit
toward their park dedication fees for these same items. (PC recommended - 0 points) (Staff
recommended – 5 points)
• Plaza. The applicant is proposing a pool, an approximately 4,300 square foot club house
(including a large gathering room, fitness center, a kitchen area, coffee bar and office space) and
the pet play area (dog park) within the development. The clubhouse/pool area could serve as a
7
plaza within this development as the PUD ordinance indicates that plazas are landscaped or paved
open areas of a minimum of 1,000 square feet and wholly or partially enclosed by a building or
buildings. The PUD ordinance requires that plazas within commercial or mixed-use development
shall be open to the public during daylight hours. The PUD ordinance does not require that
plazas within residential PUDs be open to the public. It also should also be noted that the
proposed development is providing a dog park that Staff believes in and of itself warrants
amenity points. (5 points possible) (PC recommended - 5 points) (Staff recommended – 5 points)
• Natural features. Site planning that preserves significant natural features or restores ecological
functions of a previously damaged natural environment.
In this case, the latest plans for the Springs show the preservation of much of the existing wetland
along Hudson Boulevard. The applicant made this change after the Concept Plan review and after
input from the Watershed District that included their requirements for wetland protection and
preservation. (3 points possible) (PC recommended – 0 points) (Staff recommended – 0 points)
In addition to the site amenities listed above, the PUD ordinance also lists other possible amenities the
City could approve to grant an increase in project density. They are:
• Providing theming. Significant use of various elements of theming consistent with the 2013 Lake
Elmo Branding and Theming Project, including but not limited to signage, fencing, landscaping
lighting and site furnishings. The City will award amenity points based upon the quality and
magnitude of the Theming elements integrated into the project. (1-3 points possible)
In this case, the City could award the developer amenity points for the use vehicular and
pedestrian lighting in and around their site, increasing their landscaping and tree planting well
above the minimums set by the Code, (especially along Hudson Boulevard), adding several
benches within their site and using a white, ornamental-style fence around their site.
It is a recommended condition of approval that if the applicant wants credit for using theming in
their design to gain amenity points that they provide the City specific examples of proposed
development fencing, landscaping, lighting and site furnishings, including the clubhouse that will
meet the standards outlined in the Lake Elmo Branding and Theming Study.
• Additional Amenities? Additionally, the City also may consider the allotment of amenity “points”
for site amenities that are not otherwise specified within the ordinance.
For this site, with a maximum of 15 dwelling units per acre, a 20 percent increase in density would bring
the maximum density to 18 dwelling units per acre. At 17.33 net acres, the site could have up to 312
dwelling units if the City approved the maximum amount amenity points to increase the project density.
To have 300 units on their site, the City will need to approve at least 17 amenity points. Without any
amenity points for increased density, the applicant would need to reduce the number of dwelling units in
the development to a maximum of 260 units – a reduction in 40 units from the 300 proposed units.
AMENITY POINTS SUMMARY
The Planning Commission, during their review of the proposal on May 13, 2019, considered the various
proposed amenities and made recommendations about the points they thought the City should award for
the amenities to justify increasing the project density. Their recommendations for amenity points were:
Right-of-way dedication – 10 points
Contained parking – 5 points
Plaza – 5 points
PC recommended total – 20 Points
8
The applicant, on Pages 5 and 6 in their latest project narrative, suggests the City should award the
proposal the following amenity points:
Right-of-way dedication – 10 points
Contained parking – 5 points
Pedestrian Improvements – 5 points
Plaza – 5 points
Natural features – 3 points
Applicant suggested total – 28 points
Staff is recommending the City Council approve the following amenity points for this proposal:
Contained parking – 5 points
Plaza – 5 points
Pedestrian Improvements – 5 points (with no park dedication credits for these)
Other (possible theming)?? (1-2 points possible)
Staff Recommended Total – 15 points
Staff did not agree with the Planning Commission’s recommendation nor the applicant’s request of
awarding amenity point for the public right-of-way dedication. This is because the requested right-of-
way is adjacent to the development and not outside the scope of the immediate project area as required by
the City Code.
The City Council will need to finalize what design elements in the development should receive amenity
points (and how many points for each) so Staff can memorialize these amenities within the findings of
fact (on pages 15 and 16) and in the Resolution.
Consistency with Proposed Urban High Density Zoning District. As noted earlier, the proposed
development will require City approval of a Zoning Map Amendment to rezone the property to Urban
High Density Residential (from the current RT (rural development transition)) zoning designation. As
such, staff reviewed the proposed PUD Plans against the standards including setbacks, impervious
coverage, etc. of the Urban High Density Residential zoning district, as shown below.
Standard Required Proposed
Impervious Surface Maximum 75 percent 66 percent
Minimum Lot Area 1,800 square feet per unit 2,469 square feet per unit
(average)
Minimum Lot Width 60 feet 1,085 feet on Hudson Blvd.
Front Yard Setback (Hudson
Blvd)
20 feet 20 feet
Interior Side Yard 10 feet 55 feet
Corner Side Yard 15 feet 10 feet (to north/south road)
Rear Yard Setback 20 feet 20 feet
Accessory Building Setbacks 10 feet 15 feet
Maximum Building Height 50 feet 35 feet (to roof peak)
Detached Structures 1,000 square feet maximum 3,000 square feet
Parking Not to be located in the front
yard or between the front façade
and street.
Parking is located in front of the
proposed club house, though
this parking lot design is
consistent the design of parking
9
lots for commercial/office
buildings and would not be
parking for the residential
buildings on the site.
Open space 200 square feet of common open
space provided per unit. In this
case, at least 60,000 square feet.
251,449 square feet = 5.77 acres
(830 square feet per unit)
Site Plan Review
Streets and Access. The proposed site plan shows a primary access driveway into the site from Hudson
Boulevard. After their initial submittal, the applicant submitted a revised site plan showing the secondary
site access (at least for emergency vehicles) moved from Hudson Boulevard to the planned north/south
street (Julia Avenue) on the west side of the site. They made this change to the access based on early staff
comments about the proposal. The new north/south street is a planned public street connection between
5th Street North and Hudson Boulevard North. The developer should either construct the portion of the
north/south street adjacent to the development with a temporary turnaround on the north end or work with
the proposed development to the north to construct the entire planned north/south street to make a
continuous street connection from 5th Street North to Hudson Boulevard North.
Issues with the proposed setbacks. The applicant is asking the City to approve a 10-foot side yard
setback (instead of the required 15-foot setback) from the west property line for the buildings along the
north/south road. As a condition of approval, the City is requiring the developer to dedicate a 100-foot-
wide right-of-way for this road, consistent with the requirements the City made for the Bentley Village
development to the north. The applicant notes that because of this right-of-way requirement, they need
the reduce setback to make their proposed site plan work.
Impervious Surfaces. As noted by the applicant in the project narrative and in the table above, the
proposed plan is 66 percent impervious, well below the maximum impervious surface standard in the
HDR zoning district of 75 percent.
Streets, Sidewalks and Trails. The City will be requiring the applicant to reconstruct Hudson Boulevard
along the frontage of their site to an “Urban Section” (with curb and gutter, turn lanes and a bituminous
trail along the north side of the road). The City also will be requiring the applicant to design and
construct the north/south road (Julia Avenue) adjacent to their western property line from Hudson
Boulevard north to Bentley Village. This road section will be in a 100-foot-wide right-of-way to
accommodate drive lanes, a center turn lane, turn lanes, a bituminous trail on one side of the road and a
concrete sidewalk on the other side. This right-of-way width and design is consistent with the City
requirements for the new north/south road in the Bentley Village development to the north of the site.
(Please see the attached design cross section for Road G (now known as Julia Avenue)).
The Comprehensive Plan’s Trail Plan shows a planned trail along the proposed north/south street that will
be on the west side of the development. The latest proposed project plans show the future road with a trail
and a sidewalk along the future north/south road. The City should require the developer to show the
north/south road on all project plans and to install the planned trail(s) along Hudson Boulevard and along
the north/south street and crosswalks with pedestrian ramps where needed as part of this development.
10
Within the development site itself, the developer will be constructing 4 and 5-foot-wide concrete
sidewalks along the private driveways and between the buildings to provide pedestrian access throughout
the site. As noted above, the City should require the applicant to extend the concrete side along the west
side of their entrance drive to the trail along Hudson Boulevard.
Easements. The City will require the applicant to dedicate 10-foot-wide drainage and utility easements
along all property lines and drainage and utility easements for watermains and fire hydrants as they will
become public infrastructure. The City also may require other easements as the applicant refines their
project plans – especially around the wetland and the wetland buffer and in regards to the stormwater
management system.
Architecture/Proposed Design. The proposed design of the development is a townhouse design with the
residential buildings being two stories in height with private, ground-level entrances to each unit. The
building elevations provide architectural interest with use of exterior accents, a large percentage of
windows, and high quality materials including fiber cement board siding and stone masonry. The
buildings create additional high architectural value with use of varied roof lines, and vertical and
horizontal articulation. These features will give the buildings a more attractive appearance than buildings
with flat facades and consistent or straight facades and roof lines. The proposed color pallets for the
buildings include slate, gray, beige and browns. I have included several images of the proposed building
elevations for your review.
The typical interiors of the units include dark wood colored cabinets, stainless steel appliances, granite
countertops in all kitchens and wood laminate flooring. Select units will be upgraded to include enhanced
finishes, painted access walls, granite countertops throughout, among other features.
Adherence to Lake Elmo Design Guidelines and Standards.
The proposed development adheres to the Lake Elmo Design Guidelines and Standards in that:
• The proposed structures are located and oriented in a manner that allows for pedestrian
accessibility and provides visual interest from the public right-of-way.
11
• The buildings are located as close to the public street as possible, easily accessible from the
street; setbacks are varied slightly; recreational and common spaces are located at the interior or
rear of the site.
• The parking areas do not account for more than 50% of street frontage.
• The trash enclosure is located away from most of the residential buildings.
• Examples of past developments adhere to building design requirements. It is a recommended
condition of final PUD approval that the applicant include a detailed architectural plan proposal
(with a listing of colors, materials, etc) for the all the buildings in the development for City
approval.
All of the building exterior designs and materials will need to conform to the design standards in the Lake
Elmo Design Guidelines and Standards Manual including those regarding building facades, rooflines,
colors entries, lighting and exterior building materials. At first review, it appears that all the building
styles and materials will meet or exceed the City’s design standards for multiple-family structures. City
staff will need to verify the proposed exterior designs and materials will meet the City’s design standards
before the City issues building permits for the clubhouse or for the residential buildings.
Garages. The proposed plans include 120 attached garages and 7 detached garage buildings with 6
garage stalls in each building. There also is a proposed maintenance garage building for the residents to
perform minor service to their vehicles and to wash their vehicles.
Wetland and Buffers. The site has a 0.4 acre wetland on the south side of the property along Hudson
Boulevard. The applicant had proposed with the Concept Plan for the site to fill the entire wetland. After
review and approval by the Watershed District, the latest project plans show the applicant preserving
much of the wetland and providing a 25-foot-wide buffer around the wetland on their site. The only
filling of the wetland is the part along Hudson Boulevard to accommodate the City- required turn lane and
trail on the north side of the road. The City requires the applicant to put easements on the final plat to
accommodate the wetland and the wetland buffer.
Tree Removal, Preservation and Replacement. There is an area of about 300,000 square feet (6.9
acres) of tree cover on the site. The applicant provided a tree inventory that documented the significant or
specimen trees on the property. They include several large spruce trees in the southeast corner of the site,
along with elms, oaks, maples and aspen trees on the property. The proposed project would remove all
the existing trees on the site.
Landscaping. The applicant has provided the City with a landscaping plan for the site. The City’s
Landscape Architect has reviewed these plans and has found that they do not meet all City requirements. I
have attached his review comments for your review. He noted that the applicant is not proposing to plant
enough trees (184 versus 233) and the proposed composition or types of trees do not meet the City
requirements. He also noted that the applicant is proposing to plant trees near proposed utility lines where
the City wants to have new trees placed at least 10 feet from the nearest utility. In addition, he noted that
the proposed screening along the north side of the site (with a proposed single, row of evergreen trees), is
inadequate to meet the City’s screening requirements. The City will require the applicant to revise the
landscaping and screening plans to meet or exceed the City’s Landscape Requirements for the replanting
of trees and for screening.
Landscape Walls. The applicant is proposing several landscape (retaining) walls around much of the
perimeter of the site. The proposed grading plans show these walls ranging in height from 3 feet to 12
feet. Any such wall that is taller than 4 feet requires a separate building permit from the City and must be
designed by a licensed Minnesota engineer or architect. The walls will be the responsibility of the
developer/owner to maintain in perpetuity.
12
Parkland Dedication. The Parks Commission reviewed the proposed development at its February 20,
2019 meeting. At that meeting they recommended that the developer pay the City cash in lieu of land
dedication to meet the City’s park dedication requirements. The proposed development does not propose
a public park but does provide recreation for its residents through the club house, pool and open space.
This area of Lake Elmo is already served by Savona Park.
The proposed development site (include road right-of-ways) consists of 17.57 acres, and the required
parkland dedication for the Urban High Density Residential zoning district is 10%. The required amount
of fees would be 10% of the fair market value of the property. This value is usually determined by the
purchase price of the property, which has yet to be revealed to the City. If the purchase price is not
available, then the City would consider using the appraised value of the property to determine the dollar
amount of the contribution for parks as created by this development.
The developer may meet some of the City’s park dedication requirements with the construction of the
new trails. However, the City should not grant the developer amenity points for density purposes for
installing the trails if the City gives the developer park dedication credit for the same trails.
Subdivision Signs. Section 154.212(G) (1) (c) of the Zoning Code allows each residential subdivision to
have one subdivision identification sign per entrance. The maximum size for subdivision identification
sign is 32 square feet in area for the main entrance and a maximum sign area of 24 square feet per sign for
all other locations.
The developer submitted a drawing for an entrance monument sign with the PUD plans that has 52.1
square feet of sign face. They will need to reduce the size of this sign to a maximum of 32 square feet of
sign face to meet the City Code standards. Any signs would require a permit from the City.
Parking. The City’s Zoning Code requires one parking space per studio and 1 bedroom unit, two parking
spaces per 2 and 3 bedroom units and at least one visitor space per four units. With the proposed mix of
300 units, the City Zoning Code requires the developer to provide at least 525 parking spaces on site. In
this case, the developer is proposing a total of 562 parking spaces – including attached garage and
detached garage spaces (163 total) and 399 surface parking spaces. The proposed plans include 17
13
parking spaces to the west of the main entrance drive aisle near the clubhouse that are intended for
employees and visitors. The clubhouse, with 4,000 square feet of space, would require 15 off-street
parking spaces.
The total proposed parking computes to a unit parking ratio of 1.87 spaces per unit – above the 1.75
parking spaces per unit required by the City Code.
The proposed width and length of parking stalls is compliant with code, and the proposed width
(estimated to be 24’) is adequate for a 2-way drive aisle width according to the Zoning Code. Of these
parking spaces, a total of 22 spaces are proposed to be Americans with Disabilities Act (ADA)-accessible.
The ADA requires 2% of parking spaces totaling over 501 to be ADA-accessible, and so the proposed
number of ADA parking spaces is compliant, provided they are built with adequate width and access aisle
spacing.
Engineering Comments. The City Engineer has provided a detailed review memo (dated May 8, 2019)
regarding the proposed General Preliminary Plat/Plans. I have attached this memo for reference. Staff
would like to highlight the following comments in summary:
• Streets and Transportation
o Hudson Boulevard Right-of-Way. Additional right-of-way on Hudson Blvd must be
dedicated to the City as needed to accommodate the Hudson Boulevard improvements,
including turn lanes and a 10-foot-wide utility easement.
o Hudson Boulevard Improvements. Hudson Boulevard must be improved along the
frontage of the proposed development in accordance with the Hudson Boulevard Design
Standards, with and Urban Section along the north boulevard and a bituminous trail. The
developer will be required to construct right turn lanes at both the entrance to the
proposed development and at the intersection with the new north-south collector street,
and a left turn lane at the development entrance.
o New North-South Collector Street Improvements. The developer must construct new
north-south collector street along the west side of the development, from Hudson
Boulevard to the northerly plat line of the Springs of Lake Elmo. The new street shall be
designed and constructed as an urban collector street consistent with City design
standards and within a 100-foot-wide right-of-way, including a bituminous trail along one
side and a concrete sidewalk along the other side.
o New North-South Collector Street Right-of-Way Dedication. The property owner or
developer must dedicate a 100-foot-wide right-of-way/roadway easement to the city for
the new north-south collector street. The proposed perimeter fencing must be located
outside of the 10-foot-wide drainage and utility easement.
o Site Access. The proposed site plan proposes a single primary access to the site on
Hudson Boulevard approximately 660 feet east of the proposed new north-south collector
street. This proposed access spacing from the new collector street meets the City
minimum spacing of 660 feet.
o Secondary/Emergency Access. The latest site plan shows a secondary access to the new
north-south collector street and is called out a proposed emergency access point.
o Perimeter Decorative Fence. As shown, this fence encroaches the 10 foot utility
easement, and so the fence location must be revised to preserve the City standard 10-foot-
wide drainage and utility easement.
o Private Streets. Private streets are proposed within the development that would remain
privately owned and maintained. The interior street and driveway design may require
revisions to ensure the adequacy of fire lanes and for emergency vehicle access.
• Municipal Sanitary Sewer
o The plans include a sanitary sewer utility plan that proposes 300 REC units plus
additional facilities such as a fitness center, swimming pool and a car care center.
14
o Sanitary sewer is available to the site. The applicant or developer will be responsible for
connecting to the city’s 10-inch sanitary sewer system and extend sanitary sewer in to the
property at the applicant’s sole cost.
• Municipal Water Supply
o The existing water system has sufficient capacity for domestic service for the proposed
300 REC units and additional facilities.
o The applicant will be responsible to place fire hydrants throughout the property at the
direction of the Fire Department. All fire hydrants shall be owned and maintained by the
City.
o Any watermain lines and fire hydrants placed within the development will require 30-
foot-wide utility easements centered over the pipe. These easements must be dedicated to
the city and provided in the city’s standard form of easement agreement.
• Stormwater Management
o The storm water management plan is not complete. The proposed development is subject
the construction of a storm water management plan and system that meets State, Valley
Branch Watershed District (VBWD) and City rules. All stormwater facilities need to be
designed and installed in accordance with City and Valley Branch Watershed District
(VBWD) requirements. The storm water management plan must be revised to incorporate
storm water management for the Hudson Boulevard and Julia Avenue Street
improvements.
o All stormwater facilities constructed for this development and are internal to the site are
to remain privately owned and maintained. The City will require the applicant or
developer to execute and record of a Stormwater Maintenance and Easement Agreement
with the City in its standard form.
o Even as privately owned and maintained facilities, the City requires the developer to
provide maintenance access roads or drives that meet City engineering design standards
for all storm water facilities.
North/South Road (Julia Avenue) Design. The City Engineer noted the City standards for this road in
his comments. I have attached the typical cross-section for this road for your review.
Development Phasing/Grading Phasing. The project narrative notes that the developer intends to grade
the entire site and install the public improvements in a single phase with each building gaining occupancy
in sequential order starting with the Clubhouse. Their hope is start site work this fall (pending City
approvals) with final completion of the entire development by the fall of 2021.
Valley Branch Watershed District Review. The City has not yet seen any comments from the
Watershed District about this proposal other than those early one about the proposal to fill the wetland.
Stormwater Management and Storm Sewer System Improvements. The proposed development
site is in the Valley Branch Watershed District (VBWD). The design of the storm water management
systems must be compliant with the requirements of the State, VBWD, the City of Lake Elmo Storm
Water Management Ordinance, and the City of Lake Elmo design standards manual. The applicant is
advised to fully read and comprehend the City’s storm water and erosion control ordinance since these
standards are different, and in some cases more stringent, than the watershed district.
In his project review, the City Engineer noted the following:
The storm water facilities will be privately owned and maintained so no outlots will be required for the
underground storm water facilities. The storm water management plan must incorporate storm water
management for the Hudson Boulevard and Julia Avenue Street improvements.
The City will require drainage and utility easements over all 100-year high water level areas and
to protect all overland emergency overflow paths.
15
The City Engineer’s review memo further addresses the stormwater management considerations
and requirements for this development.
Utilities – Municipal Water Supply and Municipal Sanitary Sewer. The City Engineer’s review
memo provides a review of the municipal sewer and water considerations for this development. Public
water and sanitary sewer service are available in this area of Lake Elmo and the developer will be
extending them into and through the site. He noted the following:
The applicant will be responsible for extending municipal water into the development at its sole
cost and will be required to construct a looped watermain network with multiple connection points. This
includes a connection to the future watermain in the Bentley Village development to the north.
The applicant will be responsible to place hydrants throughout the property at the direction of the
Fire Department. All fire hydrants shall be owned and maintained by the City.
All utility plans will be subject to the final approval of the City Engineer.
Staff has reviewed the plans based on the assumption that the sanitary sewer extended internal to
the site will be privately owned and maintained by the applicant.
Fire Chief Comments. The Fire Chief reviewed and commented on the preliminary project plans. He
notes the developer will need to space and place fire hydrants in the development according to code and
that access to the buildings must be maintained in all weather conditions. I have attached his comments
for your reference.
RECOMMENDED FINDINGS:
Recommended Finding for Rezoning:
That the proposed rezoning will be consistent with the proposed land use classification for the site as
designated in the 2040 Comprehensive Plan.
Recommended Findings for Preliminary Plat/Preliminary PUD. Staff recommends approval of the
Preliminary Plat and Preliminary PUD Plan for the Springs Apartments based on the following findings:
1. That if the 2040 Lake Elmo Comprehensive Plan Update and updated Land Use Map are
approved in 2019, that the new land use designation for the site of the proposed planned
development will be MU-C (mixed use commercial); and that the preliminary PUD Plan would
be consistent with the intent of the 2040 Lake Elmo Comprehensive Plan and the 2040 Land Use
Map for this area.
2. That the preliminary PUD Plan complies with the general intent of the Urban High Density
Residential zoning district with PUD modifications.
3. That the preliminary PUD Plan generally complies with the City’s Subdivision regulations.
4. That the preliminary PUD Plan must be revised to be consistent with the City’s engineering
standards as noted in the City Engineer’s memorandum dated May 8, 2019.
5. That the preliminary PUD Plan meets the minimum requirements for a PUD including minimum
lot area, open space and street layout.
6. That the preliminary PUD Plan meets more than one of the required PUD objectives identified in
Section 154.751 including providing: innovation in land development techniques that may be more
suitable for a given parcel than conventional approaches; provision of a more adequate, usable,
and suitably located open space, recreational amenities and other public facilities than would
otherwise be provided under conventional land development techniques; accommodation of
housing of all types with convenient access to employment opportunities and/or commercial
16
facilities; and especially to create additional opportunities for senior and affordable housing;
coordination of architectural styles and building forms to achieve greater compatibility within the
development and surrounding land uses; and higher standards of site and building design than
would otherwise be provided under conventional land development technique.
7. That the preliminary PUD Plan includes several amenities that may be worthy of amenity points to
increase the overall housing density in the development. These amenities may include: right-of-
way dedication, contained parking, pedestrian improvements, a plaza (gathering area) and the use
of design elements consistent with the 2013 Lake Elmo Branding and Theming project.
8. That the Applicant’s preliminary PUD plan provides the following amenities, for which the City
may award amenity points:
a. Pedestrian improvements. (5 points)
b. Theming elements from the Lake Elmo Theming Study (2 points).
c. Plaza/gathering location (5 points).
d. Contained Parking (5 points)
FISCAL IMPACT:
There would be no fiscal impact to the City at this time, as the developer will be required to pay for any
amendments needed to accommodate the increase in REC units. The Concept Plan approval did not afford
the applicant development rights. When the property develops, it will have urban services and will pay
sewer and water connection charges, building permit fees and the like that the developer and/or contractors
will pay.
RECOMMENDATIONS:
Recommended Conditions of Approval. Staff and the Planning Commission recommend the City
Council approve the requested Preliminary Plat and Preliminary PUD plans for the Springs Apartments
on Hudson Boulevard subject to the following conditions:
1. That the Metropolitan Council give final approval of the City’s 2040 Comprehensive Plan Update
and adoption of the final version of the 2040 Comprehensive Plan by the Lake Elmo City
Council. The City’s final plat approval will be good for 120 days after the Met Council’s
approval of the City’s 2040 Comprehensive Plan update or for 120 days after the City Council’s
approval of the final plat, whichever comes later.
2. That the City approves a Zoning Map Amendment to rezone the site from RT (Rural
Development Transitional) to HDR (Urban High Density Residential).
3. That the applicant prepare the final plat and final PUD plans showing all of the site perimeter
property lines - including any revisions necessary for including the right-of-way for the north-
south street and all additional right-of-way needed for Hudson Boulevard as the proposal only
includes a portion of the parcel with the PID# 34.029.21.43.0003.
4. That the final plat and final PUD Plans submittal identify all requests for flexibility from the
Zoning Code.
5. That the applicant address all comments and conditions of approval in the City Engineer’s
Memorandum dated May 8, 2019 with revised project plans for the future final plat and final
PUD Plans submittal.
6. That the final Plat and final PUD Plans submittal include a revised tree preservation/replanting
and revised landscape plans to address all the comments and changes noted in the memo from
the City’s Landscape Architect dated May 7, 2019. These final plans must be reviewed and
approved by the City’s Landscape Architect before the applicant submits applications for final
plat and final PUD approval.
17
7. That the final Plat and final PUD Plans submittal include updated open space and impervious
surface calculations.
8. That the final plat show a drainage and utility easement over the wetland and the wetland buffers,
including the 100-year high water level.
9. That a bituminous trail be installed along Hudson Boulevard and along the future north/south road
(Julia Avenue) as part of this development.
10. That the applicant provide the City fees in lieu of park land dedication as required by Section
153.14 with future final plat.
11. That if the applicant wants amenity points for theming, that they provide the City for staff
approval specific examples of proposed development fencing, landscaping, lighting and site
furnishings, including the clubhouse, that will meet the standards outlined in the Lake Elmo
Branding and Theming Study.
12. That the final plat and final PUD Plans submittal include detailed architectural plans for the exterior
of the buildings (including colors and a listing of all exterior materials) for staff review and
approval.
13. That the applicant receive a permit from the Valley Branch Watershed District for the construction
of the proposed development.
14. All storm water facilities internal to the site shall be privately owned and maintained. A storm
water maintenance and easement agreement in a form acceptable to the City shall be executed and
recorded with the final plat for all 100-year high water level areas and to protect all overland
emergency flow paths.
15. The Preliminary Plat approval is conditioned upon the applicant meeting all City standards and
design requirements unless specifically addressed otherwise in these conditions.
16. That the PUD overlay zoning allow for the following:
a. Setbacks:
Springs Apartments at Lake Elmo Minimum Building Setbacks
Front (Hudson Blvd). 20 ft.
Interior Side 10 ft.
Corner Side (Julia Avenue) 10 ft.
Rear (north property line) 20 ft.
b. Attached Garages: That the attached garages shall not exceed 1,000 sq. ft. in area at the
ground floor level except by conditional use permit.
c. Detached Garages: That the detached garages shall not exceed 3,000 sq. ft. in area at the
ground floor level.
17. The Final Plat shall include all necessary public right-of-way and easements for Hudson Boulevard
and for the new north/south road (Julia Avenue North).
18. The Final Plat submittal must include a complete storm water management plan and construction
plans that provide all design details for the proposed underground storage systems including details
regarding building roof drainage connections. These plans also must incorporate storm water
management for the Hudson Boulevard and Julia Avenue Street improvements including the future
18
east bound left turn lane along Hudson Boulevard at Julia Avenue and must meet all VBWD
requirements.
19. Before the City issues any building permits, the developer shall delineate and identify all wetland
buffers via staking, fencing and/or signage that is acceptable to the City.
20. The developer shall follow all of the rules and regulations spelled out in the Wetland
Conservation Act, and shall acquire the needed permits from the appropriate watershed districts
before the commencement of any grading or development activity on the site.
21. That the applicant shall obtain all necessary permits including but not limited to all applicable
City permits (building, grading, sign, etc.), NPDES/SWPPP permits and Valley Branch
Watershed District approval before starting any site grading or construction activities.
22. That the Final Plat include Valley Branch Watershed District preliminary review comments and
that the applicant provide the City evidence that all conditions attached to a Valley Branch
Watershed District permit will be met before the starting any grading activity on the site.
23. The applicant shall provide the City with a copy of written permission for any off-site grading work
and storm sewer discharges to adjacent properties before starting any site work, grading and as part
of any final plat application.
24. That the applicant or developer address all the comments of the Fire Chief and the Building Official
with final PUD, site and building plans including the placement of buildings and fire hydrants,
street and driveway design, parking and emergency vehicle access within the site.
25. That the applicant revise the project plans to show watermain easements and effective maintenance
areas with a minimum width of 30 feet with a minimum of 15 feet of clearance from the pipe
centerline and easement agreements are included with the final plat application and plans.
26. That there shall be no encroachments into drainage and utility easements and corridors other than
those reviewed and approved by the City Engineer and upon execution of an easement
encroachment agreement. Prohibited encroachments include, but are not limited to trees,
landscaping, fences, retaining walls, buildings and storm water retention, except the City will allow
limited tree planting and landscaping in the drainage and utility easement along the north property
line of the site, subject to City staff approval
27. That the developer prepare exhibits for City staff approval that clearly identifies the property lines,
easements, proposed locations of retaining walls, fences and accessory buildings and the required
and proposed setbacks for each building site within the development.
28. The Applicant(s) or developer shall submit a photometric plan for the development for staff review
and approval. All lighting must meet the requirements of Sections 150.035-150.038 of the City
Code.
29. Before the installation or construction of any subdivision identification signs or neighborhood
markers within the development, the developer shall submit sign plans to the City for review and
obtain a sign permit from the City. The proposed monument entrance sign submitted with the
preliminary PUD plans is not approved as it exceeds the City size limit of 32 square feet.
30. That the applicant provide the City a detailed construction and staging plan with the construction
plans and final plat for the development. These plans are to clearly indicate the phasing of the site
grading, the phasing of the construction of each public infrastructure component (including
required streets, turn lanes, trails and sidewalks) and shall address access to that phase of the
development for construction purposes and for residents. The City may require temporary cul-de-
sacs at the end of streets or driveways.
31. Before the execution and recording of a final plat for the development, the developer or applicant
shall enter into a Developer’s Agreement with the City. The Developer’s Agreement must be
approved by the City Attorney and by the City Council. Such Developer’s Agreement shall
delineate who is responsible for the design, construction and payment for the required
improvements with financial guarantees therefore.
32. The applicant or developer shall enter into a separate grading agreement with the City before
starting any grading activity in advance of final plat approval. The City Engineer shall review any
grading plan that is submitted in advance of a final plat, and said plan shall document extent of any
proposed grading on the site.
19
33. That the applicant revise the site and project plans to show a five-foot-wide concrete sidewalk along
the west side of the entrance driveway (with the necessary pedestrian ramps) connecting the
Clubhouse to the trail along Hudson Boulevard.
34. That the applicant shall submit revised preliminary plat and project plans meeting all conditions of
approval for City review and approval. The revised applicant/developer project plans shall meet
all of the above conditions before the City will accept a final plat application for any phase of the
development and before the start of any clearing or grading activity on the site.
35. That the City’s preliminary plat approval is good for one year from the date of City Council action,
unless the applicant requests and the City Council approves a time extension.
36. That the maximum density shall not exceed 15 dwelling units per net acre unless the City Council
approves specific project amenity points that increase the allowed density for the proposal.
RECOMMENDATIONS:
Staff and the Planning Commission recommend approval of the Preliminary Plat and Preliminary PUD
Plans for the Springs Apartments to be located on Hudson Boulevard with the following motion (the City
Council cannot give this development final approval until the Metropolitan Council approves the Lake
Elmo 2040 Comprehensive Plan update):
“Move to adopt Resolution 2019 - 043 approving the preliminary plat and preliminary PUD Plans as
requested by Continental 483 Fund LLC for PID# 34.029.21.43.0003 for the project to be known as the
Springs Apartments located on the north side of Hudson Boulevard, subject to recommended findings
and conditions of approval as listed in the staff report.”
Staff and the Planning Commission recommend approval of the Zoning Map Amendment (rezoning) of
the site of the proposed Springs Apartments from RT (rural development transitional) to HDR (urban
high-density residential) after final approval of the 2040 Comprehensive Plan with the following motion:
“Move to adopt Ordinance 08- 223 approving the zoning map amendment (rezoning) of site of the
Springs Apartments on Hudson Boulevard from RT (rural development transitional) to HDR (urban
high density residential) after final approval of the 2040 Comprehensive Plan based on the findings
listed in the Staff report.”
ATTACHMENTS:
1. Updated Project Narrative dated June 6, 2019
2. 2 City Maps
3. Aerial Photo 2
4. Overall Plan and Revised Site Plan
5. Proposed Union Park Final Plat
6. Density Exhibit
7. Project Plans (#21654)
8. N/S Road Typical Section
9. Building Elevations
10. Fire Chief comments
11. City Engineer’s comments dated May 8, 2019
12. Landscape Architect comments dated May 7, 2019
13. Neighbor comments dated May 4, 2019
14. May 13, 2019 Planning Commission minutes
15. Resolution 2019 - ___ Preliminary Plat/Preliminary PUD approval
16. Ordinance 08-XXX - Zoning Map Amendment
20
CITY OF LAKE ELMO
WASHINGTON COUNTY
STATE OF MINNESOTA
RESOLUTION NO. 2019-043
RESOLUTION APPROVING THE CONTINENTAL 483 FUND LLC – SPRINGS
APARTMENTS PRELIMINARY PLAT AND PRELIMINARY PUD PLANS
WHEREAS, the City of Lake Elmo is a municipal corporation organized and existing
under the laws of the State of Minnesota; and
WHEREAS, Continental 483 Fund LLC, c/o Gwyn Wheeler, W134 N8675 Executive
Parkway, Menomonee Falls, Wisconsin 53051, submitted an application to the City of Lake
Elmo (City) for a Preliminary Plat and Preliminary PUD Plan for a 300 unit, attached housing
residential planned unit development on a 17.33 acre site to be known as the Springs
Apartments, a copy of which is on file in the City of Lake Elmo Planning Department; and
WHEREAS, notice was published, mailed and posted pursuant to the Lake Elmo
Zoning Ordinance, Section 154.102; and
WHEREAS, the Lake Elmo Planning Commission held public hearing on May 13, 2019
to review and consider the Preliminary Plat and Preliminary PUD plans; and
WHEREAS, the Lake Elmo Planning Commission adopted a motion recommending to
the City Council approval of the Preliminary Plat and Preliminary PUD plans subject to
conditions of approval; and
WHEREAS, the Lake Elmo Planning Director submitted a report and recommendation
regarding the Preliminary Plat and Preliminary PUD plans as part of a memorandum to the City
Council for the June 18, 2019 City Council Meeting; and
WHEREAS, the City Council reviewed the Preliminary Plat and Preliminary PUD
application and plans for the Springs Apartments at its meeting held on June 18, 2019 and made
the following findings of fact:
1. That if the 2040 Lake Elmo Comprehensive Plan Update and updated Land Use Map are
approved in 2019, that the new land use designation for the site of the proposed planned
development will be MU-C (mixed use commercial); and that the Preliminary Plat and
Preliminary PUD Plan would be consistent with the intent of the 2040 Lake Elmo
Comprehensive Plan and the 2040 Land Use Map for this area.
2. That the Preliminary Plat and Preliminary PUD Plan complies with the general intent of
the Urban High Density Residential zoning district with PUD modifications.
3. That the Preliminary Plat and Preliminary PUD Plan generally complies with the City’s
Subdivision regulations.
21
4. That the Preliminary Plat and Preliminary PUD Plan are generally consistent with the
City’s engineering standards with exceptions as noted in the City Engineer’s
memorandum dated May 8, 2019.
5. The Preliminary PUD Plan meets the minimum requirement for a PUD including minimum
lot area, open space and street layout.
6. The Preliminary PUD Plan meets more than one of the required PUD objectives identified
in Section 154.751 including providing: innovation in land development techniques that
may be more suitable for a given parcel than conventional approaches; provision of a more
adequate, usable, and suitably located open space, recreational amenities and other public
facilities than would otherwise be provided under conventional land development
techniques; accommodation of housing of all types with convenient access to employment
opportunities and/or commercial facilities; and especially to create additional opportunities
for senior and affordable housing; coordination of architectural styles and building forms
to achieve greater compatibility within the development and surrounding land uses; and
higher standards of site and building design than would otherwise be provided under
conventional land development technique.
7. The Preliminary PUD Plan meets the expected residential density requirements provided
by the 2040 Comprehensive Plan’s Land Use Map designation (mixed-use commercial)
for this site.
8. That the preliminary PUD Plan includes several amenities that may be worthy of amenity
points to increase the overall housing density in the development. These amenities may
include: right-of-way dedication, contained parking, pedestrian improvements, a plaza
(gathering area) and the use of design elements consistent with the 2013 Lake Elmo
Branding and Theming project.
9. That the Applicant’s preliminary PUD plan provides the following amenities, for which
the City may award amenity points:
b. Theming elements from the Lake Elmo Theming Study (2 points).
c. Plaza/gathering location (5 points).
d. Contained Parking (5 points)
e. Pedestrian improvements (5 points)
NOW, THEREFORE, BE IT RESOLVED THAT the City Council does hereby
approve the Preliminary Plat and Preliminary PUD Plans for the Springs Apartments on Hudson
Boulevard as prepared by Continental 483 Fund LLC subject to the following conditions:
1. That the Metropolitan Council give final approval of the City’s 2040 Comprehensive
Plan Update and adoption of the final version of the 2040 Comprehensive Plan by the
Lake Elmo City Council. The City’s final plat approval will be good for 120 days after
the Met Council’s approval of the City’s 2040 Comprehensive Plan update or for 120
days after the City Council’s approval of the final plat, whichever comes later.
2. That the City approves a Zoning Map Amendment to rezone the site from RT (Rural
Development Transitional) to HDR (Urban High Density Residential).
22
3. That the applicant prepare the final plat and final PUD plans showing all of the site
perimeter property lines - including any revisions necessary for including the right-of-
way for the north-south street and all additional right-of-way needed for Hudson
Boulevard as the proposal only includes a portion of the parcel with the PID#
34.029.21.43.0003.
4. That the final plat and final PUD Plans submittal identify all requests for flexibility from
the Zoning Code.
5. That the applicant address all comments and conditions of approval in the City
Engineer’s Memorandum dated May 8, 2019 with revised project plans for the future
final plat and final PUD Plans submittal.
6. That the final Plat and final PUD Plans submittal include a revised tree
preservation/replanting and revised landscape plans to address all the comments and
changes noted in the memo from the City’s Landscape Architect dated May 7, 2019.
These final plans must be reviewed and approved by the City’s Landscape Architect
before the applicant submits applications for final plat and final PUD approval.
7. That the final Plat and final PUD Plans submittal include updated open space and
impervious surface calculations.
8. That the final plat show a drainage and utility easement over the wetland and the wetland
buffers, including the 100-year high water level.
9. That a bituminous trail be installed along Hudson Boulevard and along the future
north/south (Julia Avenue) road as part of this development.
10. That the applicant provide the City fees in lieu of park land dedication as required by
Section 153.14 with future final plat.
11. That if the applicant wants amenity points for theming, that they provide the City for staff
approval specific examples of proposed development fencing, landscaping, lighting and
site furnishings, including the clubhouse that will meet the standards outlined in the Lake
Elmo Branding and Theming Study.
12. That the final plat and final PUD Plans submittal include detailed architectural plans for
the exterior of the buildings (including colors and a listing of all exterior materials) for
staff review and approval.
13. That the applicant receive a permit from the Valley Branch Watershed District for the
construction of the proposed development.
14. All storm water facilities internal to the site shall be privately owned and maintained. A
storm water maintenance and easement agreement in a form acceptable to the City shall
be executed and recorded with the final plat for all 100-year high water level areas and to
protect all overland emergency flow paths.
15. The Preliminary Plat approval is conditioned upon the applicant meeting all City standards
and design requirements unless specifically addressed otherwise in these conditions.
16. That the PUD overlay zoning allow for the following:
d. Setbacks:
Springs Apartments at Lake Elmo Minimum Building Setbacks
Front (Hudson Blvd). 20 ft.
Interior Side 10 ft.
23
Corner Side (Julia
Avenue)
10 ft.
Rear (north property line) 20 ft.
e. Attached Garages: That the attached garages shall not exceed 1,000 sq. ft. in area
at the ground floor level except by conditional use permit.
f. Detached Garages: That the detached garages shall not exceed 3,000 sq. ft. in area
at the ground floor level.
17. The Final Plat shall include all necessary public right-of-way and easements for
Hudson Boulevard and for the new north/south road (Julia Avenue North).
18. The Final Plat submittal must include a complete storm water management plan and
construction plans that provide all design details for the proposed underground storage
systems including details regarding building roof drainage connections. These plans
also must incorporate storm water management for the Hudson Boulevard and Julia
Avenue Street improvements including the future east bound left turn lane along
Hudson Boulevard at Julia Avenue and must meet all VBWD requirements.
19. Before the City issues any building permits, the developer shall delineate and identify all
wetland buffers via staking, fencing and/or signage that is acceptable to the City.
20. The developer shall follow all of the rules and regulations spelled out in the Wetland
Conservation Act, and shall acquire the needed permits from the appropriate watershed
districts before the commencement of any grading or development activity on the site.
21. That the applicant shall obtain all necessary permits including but not limited to all
applicable City permits (building, grading, sign, etc.), NPDES/SWPPP permits and
Valley Branch Watershed District approval before starting any site grading or
construction activities.
22. That the Final Plat include Valley Branch Watershed District preliminary review
comments and that the applicant provide the City evidence that all conditions attached
to a Valley Branch Watershed District permit will be met before the starting any
grading activity on the site.
23. The applicant shall provide the City with a copy of written permission for any off-site
grading work and storm sewer discharges to adjacent properties before starting any site
work, grading and as part of any final plat application.
24. That the applicant or developer address all the comments of the Fire Chief and the
Building Official with final PUD, site and building plans including the placement of
buildings and fire hydrants, street and driveway design, parking and emergency vehicle
access within the site.
25. That the applicant revise the project plans to show watermain easements and effective
maintenance areas with a minimum width of 30 feet with a minimum of 15 feet of
clearance from the pipe centerline and easement agreements are included with the final
plat application and plans.
26. That there shall be no encroachments into drainage and utility easements and corridors
other than those reviewed and approved by the City Engineer and upon execution of an
easement encroachment agreement. Prohibited encroachments include, but are not
limited to trees, landscaping, fences, retaining walls, buildings and storm water
24
retention, except the City will allow limited tree planting and landscaping in the
drainage and utility easement along the north property line, subject to City staff
approval.
27. That the developer prepare exhibits for City staff approval that clearly identifies the
property lines, easements, proposed locations of retaining walls, fences and accessory
buildings and the required and proposed setbacks for each building site within the
development.
28. The Applicant(s) or developer shall submit a photometric plan for the development for
staff review and approval. All lighting must meet the requirements of Sections 150.035-
150.038 of the City Code.
29. Before the installation or construction of any subdivision identification signs or
neighborhood markers within the development, the developer shall submit sign plans to
the City for review and obtain a sign permit from the City. The proposed monument
entrance sign submitted with the preliminary PUD plans is not approved as it exceeds
the City size limit of 32 square feet.
30. That the applicant provide the City a detailed construction and staging plan with the
construction plans and final plat for the development. These plans are to clearly
indicate the phasing of the site grading, the phasing of the construction of each public
infrastructure component (including required streets, turn lanes, trails and sidewalks)
and shall address access to that phase of the development for construction purposes and
for residents. The City may require temporary cul-de-sacs at the end of streets or
driveways.
31. Before the execution and recording of a final plat for the development, the developer or
applicant shall enter into a Developer’s Agreement with the City. The Developer’s
Agreement must be approved by the City Attorney and by the City Council. Such
Developer’s Agreement shall delineate who is responsible for the design, construction
and payment for the required improvements with financial guarantees therefore.
32. The applicant or developer shall enter into a separate grading agreement with the City
before starting any grading activity in advance of final plat approval. The City
Engineer shall review any grading plan that is submitted in advance of a final plat, and
said plan shall document extent of any proposed grading on the site.
33. That the applicant revise the site and project plans to show a five-foot-wide concrete
sidewalk along the west side of the entrance driveway (with the necessary pedestrian
ramps) connecting the Clubhouse to the trail along Hudson Boulevard.
34. That the applicant shall submit revised preliminary plat and project plans meeting all
conditions of approval for City review and approval. The revised applicant/developer
project plans shall meet all of the above conditions before the City will accept a final
plat application for any phase of the development and before the start of any clearing or
grading activity on the site.
35. That the City’s preliminary plat approval is good for one year from the date of City
Council action, unless the applicant requests and the City Council approves a time
extension.
36. That the maximum density shall not exceed 15 dwelling units per net acre unless the
City Council approves specific project amenity points that increase the allowed density
for the proposal.
25
Passed and duly adopted this 18th day of June, 2019 by the Lake Elmo Minnesota City Council.
___________________________________
Mike Pearson, Mayor
ATTEST:
____________________________________
Julie Johnson, City Clerk
26
CITY OF LAKE ELMO
COUNTY OF WASHINGTON
STATE OF MINNESOTA
ORDINANCE NO. 08-223
AN ORDINANCE AMENDING THE LAKE ELMO CITY CODE OF ORDINANCES BY
AMENDING THE OFFICIAL ZONING MAP OF THE CITY OF LAKE ELMO
SECTION 1. The Lake Elmo City Council hereby ordains the following property to be
rezoned from RT– Rural Development Transitional to HDR – High Density Residential:
Proposed Springs Apartments Development Legal Description
That part of the Southwest Quarter of the Southeast Quarter, Section 34, Township 29, Range 21,
Washington County, Minnesota described as follows:
Commencing at the southwest corner of said Southwest Quarter of the Southeast Quarter; thence
North 00 degrees 06 minutes 31 seconds East, assumed bearing, along the west line of said
Southwest Quarter of the Southeast Quarter, a distance of 82.86 feet to the north line of Parcel
29C of Minnesota Department of Transportation Right of Way Plat No. 82-43; thence North 89
degrees 18 minutes 27 seconds East, along said north line, a distance of 40.00 to the point of
beginning; thence North 00 degrees 06 minutes 31 seconds East, a distance of 607.73 feet;
thence North 89 degrees 40 minutes 54 seconds East, a distance of 1284.76 feet to the east line of
said Southwest Quarter of the Southeast Quarter; thence South 00 degrees 01 minutes 13 seconds
West, along said east line, a distance of 428.20 feet to a point 267.8 feet north of the southeast
corner of said Southwest Quarter of the Southeast Quarter; thence South 89 degrees 54 minutes
16 seconds West, parallel to the south line of said Southwest Quarter of the Southeast Quarter, a
distance of 200.00 feet; thence South 00 degrees 01 minutes 13 seconds West, parallel to the east
line of said Southwest Quarter of the Southeast Quarter, a distance of 173.21 feet to said north
line of Parcel 29C; thence South 89 degrees 18 minutes 27 seconds West, along said north line, a
distance of 1085.76 feet to the point of beginning.
Also known as Outlot H, Union Park Addition
All situated in the County of Washington, State of Minnesota.
SECTION 2. The Lake Elmo City Council also hereby ordains that the Zoning
Administrator shall make the applicable changes to the official Zoning Map of the City of
Lake Elmo.
SECTION 3. Effective Date. This ordinance shall become effective only after the Metropolitan
Council approves the Lake Elmo 2040 Comprehensive Plan and immediately upon adoption and
publication in the official newspaper of the City of Lake Elmo.
27
SECTION 4. Adoption Date. This Ordinance 08-223 was adopted on this 18th day of June, 2019,
by a vote of ___ Ayes and ___ Nays.
LAKE ELMO CITY COUNCIL
_________________________________
Mike Pearson, Mayor
ATTEST:
_________________________________
Julie Johnson, City Clerk
This Ordinance 08-223 was published on the ____ day of ___________________, 2019.
1
W134 N8675 Executive Parkway • Menomonee Falls, WI 53051-3310 • Telephone: 262.502.5500 • Facsimile: 262.502.5522
LAND USE REQUEST
_____________________________________________________________________________________
Continental 483 Fund LLC ("Continental") formally requests consideration of a Zoning District
Amendment as well as a Preliminary Plat/PUD application for its proposed Springs at Lake Elmo (the
“Springs”) from the City of Lake Elmo. The proposed site for the Springs apartment community is
generally located west of Keats Avenue on the north side of Hudson Boulevard, as shown on the
enclosed site plan. Continental proposes an up-scale, market-rate apartment community on the 17.63-
acre site (17.01 acres excluding right of way), see enclosed Density Exhibit.
The Springs includes 300 homes within 15 residential buildings. The
buildings will offer a townhouse design featuring two stories with
private, ground-level entrances to each unit. Residents will have a
choice between attached, direct-access garages, detached garages
and ample surface parking to best fit their needs. There will be a mix
of studio, 1-bedroom, 2-bedroom, and 3-bedroom units, as broken
down in the chart to the right.
The proposed land use is consistent with the 2040 Comprehensive Plan Future Land Use designation of
Mixed Use-Commercial (MU-C). The subject site requires a rezoning from Rural Development
Transitional (RT) to Urban High Density Planned Unit Development (HDR-PUD). The Future Land Use
designation of MU-C allows for residential densities up to 15 units per acre; with greater densities
allowed through the PUD process. Continental’s request proposes a density of 17.02 du/acre gross and
17.34 du/acre net (excluding onsite predevelopment wetland area). The proposed project density will
require the incorporation of site amenity points
to achieve a density increase from the base MU-
C density maximum. The proposed density bonus
amenity points are outlined in detail on Page 5.
The existing RT district zoning is an interim
holding zone. Rezoning to HDR is required for
the proposed density and a PUD is necessary to
have more than one principal building per parcel
of land. Continental’s proposal meets or exceeds
the criteria of the base HDR zoning district, with
the exception of the interior corner building
setback and the size of the detached garages
(see Dimensional Standards on page 4).
Additionally, the Springs will be a high-quality
apartment community that is compatible in
architecture and scale to existing land uses.
Continental would like the opportunity to provide a
unique, upscale rental housing option in this very
fitting location to support Lake Elmo's growth.
2
W134 N8675 Executive Parkway • Menomonee Falls, WI 53051-3310 • Telephone: 262.502.5500 • Facsimile: 262.502.5522
Continental has reached a private agreement with the current land owner to design and construct June
Avenue North. The new connector road will be complete prior to completion of the Springs community.
The City of Lake Elmo has determined the necessary width of the June Avenue right of way is to be 100’
instead of the originally planned 80’. Continental requires a reduced setback on that frontage in order to
accommodate the City’s requirement for the additional right of way area.
Continental has received approval for a partial fill of the existing wetland from the Valley Branch
Watershed District. The project has gone through a number of site plan revisions in order to minimize
the impact to the wetland. However, a portion of the wetland will need to be impacted in order to
provide the multiuse bituminous trail required by the City. The existing wetland is approximately 0.4
acres and the remaining area after the impact is 0.24 acres. A 25’ minimum wetland buffer will be
maintained around the remaining portion of the wetland, apart from the required trail on the south side
along Hudson Blvd.
The proposed Springs community is anticipated to break ground in late summer of 2019, pending
municipal approvals. Construction is to be completed in a single phase with each building gaining
occupancy in sequential order starting with the Clubhouse. All public improvements will occur with
initial sitework early in the project. Occupancy of the Clubhouse is expected in Spring of 2020, with the
residential buildings coming online every 2-3 weeks thereafter and final completion of the community to
be achieved by late summer of 2021.
Along with the submitted site plan, elevations, sign package and associated documents, the following is
a list of the project standards to be considered as a part of the PUD:
• Architectural Standards:
o Maximum 2 stories or 35’ to top of roof peak
o Minimum 25’ principal building separation
o Exterior Materials:
Mix of stone masonry and fiber cement siding on all four facades of the primary
buildings.
The percentage of each material will be provided as shown in the enclosed
elevations.
3
W134 N8675 Executive Parkway • Menomonee Falls, WI 53051-3310 • Telephone: 262.502.5500 • Facsimile: 262.502.5522
o Resident amenities to include:
Minimum 4,000 sf clubhouse
Pool with outdoor seating
Grill area
Fitness center
Pet playground
Car care center with
Pet Spa
• Signage:
o 3 illuminated clubhouse tower building signs
Maximum of 20 SF each
o 1 illuminated double faced monument sign with electronic reader board
Sign to be setback from property line a minimum of 5’
Gross sign area may be 60 SF per side maximum (sign area plus electronic
reader board)
Maximum 12’ tall from adjacent grade
• Accessory Structures:
o The design and construction of any garage, carport, or storage building shall be similar
to or compatible with the design and construction of the main building. The exterior
building materials, roof style, and colors shall be similar to and compatible with the
main building.
o The structure shall meet the required yard setbacks for a principal structures.
o Detached garages shall not exceed 3,000 square feet at ground floor level and shall not
exceed a height of 22 feet.
• Overall Parking Standards:
o Parking will meet the City Ordinance.
4
W134 N8675 Executive Parkway • Menomonee Falls, WI 53051-3310 • Telephone: 262.502.5500 • Facsimile: 262.502.5522
• Dimensional Standards:
ZONING CODE COMPARISON
URBAN HDR
ZONING DISTRICT
PROPOSED SPRINGS
DEVELOPMENT
MINIMUM LOT AREA 1,800 sf / unit 17.01 acres
(2,469 sf/unit)
OPEN SPACE REQUIREMENT 200 sf / unit 830 sf / unit
(251,449 sf = 5.772 ac)
BUILDING SETBACK- FRONT (Hudson
Blvd) 20' 20'
BUILDING SETBACK- REAR 20' 20'
BUILDING SETBACK- CORNER SIDE
(June Ave N) 15' 10'
BUILDING SETBACK- INTERIOR SIDE 10' 10'
BUILDING HEIGHT stories n/a - 50' 2 stories - 32'
BUILDING HEIGHT-CLUBHOUSE 50' 32'
LOT COVERAGE 75% 66%
(489,765 sf = 11.243 ac)
DENSITY 7.5 du/ac - 15.0 du/ac 14.91 du/ac (net)
14.73 du/ac (gross)
BUILDING SEPARATION N/A 30' min.
PARKING 1.75 spaces / unit 1.75 spaces / unit
GARAGE PARKING N/A 163 spaces (.54 / unit)
DETACHED STRUCTURES Max. 1,000 SF 3,000 SF
LANDSCAPING 154.258 of Zoning
Code Meets
LIGHTING 150.035 - 150.038 of
Zoning Code Meets
5
W134 N8675 Executive Parkway • Menomonee Falls, WI 53051-3310 • Telephone: 262.502.5500 • Facsimile: 262.502.5522
Density Bonus Calculation
The Planned Unit Development (PUD) being prepared by Continental 483 Fund LLC is formally seeking
the maximum increase of 20% in the Amenity Points and Equivalent Density Increase system for its
proposed residential development. The increased density will be achieved through a variety of site
amenities that include a combination of: public right-of-way dedication/construction, contained parking,
pedestrian improvements, a plaza and an array of natural features.
Public Right-of-Way Dedication (10 Points)
The Springs at Lake Elmo is facilitating the dedication of land for Julia Avenue North. The new right-of-
way will be roughly 100’ wide and feature a trail that will expand the City’s planned trail system per the
2040 Comprehensive Land Use Plan goals. Additionally, Hudson Avenue will feature several
improvements that include two right turn deceleration lanes, curb, gutter, storm system, and trail on
the right-of-way to connect Hudson and Julia to the existing trail system to the north. Both right-of-way
improvement projects are part of a wider plan to enhance the City’s connectivity, and will be designed
to the specifications of the City Engineer.
Contained Parking (5 Points)
The Springs at Lake Elmo has made a conscience effort to creatively integrate parking into the site and
reduce the number of visible surface parking stalls from the public right-of-way. This has been achieved
by rear-loading the parking stalls throughout the project and by using the principal and accessory
structures to block the public’s view of those stalls.
Pedestrian Improvements (5 Points)
The Springs at Lake Elmo will serve as a critical component in expanding the Lake Elmo trail system,
ultimately contributing to a greater quality of life in Lake Elmo. The project will offer improvements on
Hudson Boulevard and the future Julia Avenue North. Beyond resident amenities and high-quality
finishes, a sense of place is created for the community through a thoughtfully designed site plan. Ample
open space, landscaping, courtyards, and pedestrian connectivity throughout will foster neighbor
interaction and contribute to place making in Lake Elmo. The development will support pedestrian and
bicycle access by connecting and constructing a new 8’ wide trail, and will provide ADA connection to
the right-of-way designed to the specifications of the Hudson Boulevard and Julia Avenue North design
guidelines.
Plaza (5 Points)
The Springs at Lake Elmo understands the importance of connecting communities, which is why the
4,340 square foot clubhouse and pool (“plaza”) will serve as a gathering space for Springs residents and
provide opportunities for community outreach events hosted by the onsite operations team.
6
W134 N8675 Executive Parkway • Menomonee Falls, WI 53051-3310 • Telephone: 262.502.5500 • Facsimile: 262.502.5522
Natural Features (3 Points)
The Springs at Lake Elmo has held multiple meetings with the City of Lake Elmo staff and Valley Branch
Watershed District to find a creative solution to accommodate all stakeholders’ requirements. Through
this joint effort, the least amount of wetland will be impacted, while complying with the City’s required
improvements along Hudson Boulevard. Ultimately, the project will preserve a natural feature while
restoring ecological functions through the project’s stormwater collection system.
Conclusion
The Springs at Lake Elmo is requesting a density increase through the Amenity Points and Equivalent
Density Increase system for the maximum allowable points (20%). The project meets the standards for
the following site amenities: public right-of-way dedication/construction, contained parking, pedestrian
improvements, a plaza and preservation of natural features. The Springs at Lake Elmo will support a
population of roughly 500 people with significant disposable income. Continental estimates that the
total annual expenditures for the average Springs household is $50,000 and will thereby contribute
roughly $14 million each year in the local economy. The development will provide a smooth transition
from existing multifamily residential development to the east and higher intensity retail corridor along I-
94 with two-story and the Pulte townhomes to the North. Ultimately, the project will serve as an
important community destination and connector for the City’s planned improvements and overall
future. In order to achieve all the benefits listed herein, the project first needs to achieve a density
bonus increase of 20%. The high quality, amenity-driven Springs at Lake Elmo project will set a
precedent for multifamily developments for years to come and will produce a significant public benefit
in Lake Elmo.
Washington County, MN
January 24, 2019 0 375 750187.5 ft
0 110 22055 m
1:4,000
Disclaimer: Map and parcel data are believed to be accurate, but accuracy is not guaranteed. This is not a legal document and should not be substituted for a title search,appraisal, survey, or for zoning verification.
HUDSON BLVD N
J
U
N
C
O
R
D
N
5TH
S
T
R
E
E
T
N
5
T
H
S
T
R
E
E
T
L
N
N
5TH STR
E
E
T
N
HUDSON BLVD N
5TH
S
T
R
E
E
T
N
JU
N
E
A
V
E
N
.
PULTE DEVELOPMENT
PULTE
DEVELOPMENT
CONTINENTAL DEVELOPMENT12.85 AC
SCALE IN FEET
0 200100
NORTH
Project
Location
Date Submittal / RevisionNo.
Certification
Sheet Title
Summary
Revision History
Sheet No.Revision
Project No.
By
Designed:Drawn:
Approved:Book / Page:
Phase:Initial Issue:
Client
CONTINENTAL
483 FUND LLC
W134 N8675 EXECUTIVE PARKWAY
MENOMONEE FALLS, WI 53051
SPRINGS AT
LAKE ELMO
LAKE ELMO,
MINNESOTA
9955 HUDSON BOULEVARD NORTH
EAV CJL
EAV
PRELIMINARY 4/12/2019
21654
PREL
I
M
I
N
A
R
Y
4/12/2019 CITY SUBMITTAL
5/1/2019 CITY PRELIMINARY
RESUBMITTAL
May 01, 2019 - 10:02am - User:mlarson L:\PROJECTS\20355\CAD\Civil\Exhibit\20355 Dale Properties Exhibit.dwg
C2.06
OVERALL
DEVELOPMENT
PLAN
HUDSON BLVD N
B20E
BLDG 5B
FFE=1006.35
GFE=1006.02
B20E
BLDG 6A
FFE=XXX.X
GFE=XXX.X
B20E
BLDG 8A
FFE=1004.85
GFE=1004.52
B20E
BLDG 7B
FFE=1004.60
GFE=1004.27
B20E
BLDG 4B
FFE=1006.65
GFE=1006.32
B20E
BLDG 3A
FFE=1006.20
GFE=1005.87
B20E
BLDG 2B
FFE=1005.47
GFE=1005.14
B20E
BLDG 1A
FFE=1005.50
GFE=1005.17
B20E
BLDG 14A
FFE=1001.75
GFE=1001.42
B20E
BLDG 9B
FFE=1003.00
GFE=1002.67
B20E
BLDG 11B
FFE=1003.00
GFE=1002.67
B20E
BLDG 10A
FFE=1002.50
GFE=1002.17
B20E
BLDG 12A
FFE=1003.00
GFE=1002.67
B20E
BLDG 13B
FFE=1002.50
GFE=1002.17
6G
GFE=1004.95
6G
GFE=1004.05
6G
GFE=1001.90
6G
GFE=1001.85
6G
GFE=1001.85
6GS-2
GFE=1000.50
MG-P
GFE=1000.90
CLUBHOUSE
FFE=1005.00
B20E
BLDG 6B
FFE=1006.10
GFE=1005.77
ADA
B20E
BLDG 15B
FFE=1002.20
GFE=1001.87
D
E
F
F
B
A
TYP
A
TYP
A
TYP
A
TYP
A
TYP
A
TYP A
TYP
A
TYP
A
TYP
A
TYP
A
TYP
A
TYP
A
TYP
A
TYP
A
TYP
01
01 01 01
01
010101
111111111111
9
10
9
10
7 7
11 11
6 6 6
9 10
11
12
8
9
6 7
7
10
9
10
10
10
10
9
7 6
2
04 04
04
04
04
04 04
04
05
050505
05
05
05
05
22
'
22'
22
'
R
1
8
'
R18
'
R1
8
'
05
05
04 04
05
20'12'
F
23
'
9'
TYP18
'
TY
P
9'
TYP
9'
TYP
9'
TYP
9'
TYP
9'
TYP
9'
TYP
9'
TYP
9'
TYP
9'
TYP9'
TYP
9'
TYP
9'
TYP
9'
TYP
9'
TY
P
18
'
TY
P
18
'
TY
P
18
'
TY
P
18
'
TY
P
18
'
TY
P
18
'
TY
P
18
'
TY
P
18
'
TY
P
08 08 08
08
08
08
08
08
08
0808
08
I
I
H
TY
P
TYP
9'
TY
P
18'
TYP
07
07
07
07
07
07
04 04 040404
R4'
R18'
R4'
R4
0
'
R1
8
'
22
'
R
1
8
'
R18
'
09
06 06
01
04
04
04 04
04
9'
18
'
04 04 04
22'
C
07
07
29
.
4
'
22'
07
07
07
J J
J
A
TYP
07
08
07
07
09
09
09
09
09
09
09 09 09 09
09
09
08
H H H HH
I
I
H
10'
J
J
24'18'22'
20'
2'
6'12.2'13.8'12'13.8'10.2'8'
2'
4.
5
'
8'
14
'
12
'
12
'
12
'
5.
9
'
Project
Location
Date Submittal / RevisionNo.
Certification
Sheet Title
Summary
Revision History
Sheet No.Revision
Project No.
By
Designed:Drawn:
Approved:Book / Page:
Phase:Initial Issue:
Client
CONTINENTAL
483 FUND LLC
W134 N8675 EXECUTIVE PARKWAY
MENOMONEE FALLS, WI 53051
SPRINGS AT
LAKE ELMO
LAKE ELMO,
MINNESOTA
9955 HUDSON BOULEVARD NORTH
EAV CJL
EAV
PRELIMINARY 4/12/2019
21654
Registration No.Date:
I hereby certify that this plan, specification or
report was prepared by me or under my direct
supervision and that I am a duly licensed
professional ENGINEER under the laws of the state
of Minnesota.
If applicable, contact us for a wet signed copy of this
plan which is available upon request at Sambatek's,
Minnetonka, MN office.
4/12/201954914
Eric A. Vogel
PREL
I
M
I
N
A
R
Y
4/12/2019 CITY SUBMITTAL
5/1/2019 CITY PRELIMINARY
RESUBMITTAL
SCALE IN FEET
0 10050
NORTH
May 01, 2019 - 10:02am - User:mlarson L:\PROJECTS\21654\CAD\Civil\Sheets\21654-C3-SITE.dwg
C3.01
SITE PLAN
AREA
GROSS SITE AREA
BUILDING INFORMATION
B20E (20 DU/BUILDING)
TOTAL RESIDENT BUILDINGS
GENERAL HOME MIX
STUDIO
1-BEDROOM
2-BEDROOM
3-BEDROOM
TOTAL HOMES
ZONING
EXISTING ZONING
PROPOSED ZONING
PARKING INFORMATION
GARAGE TOTALS:
NUMBER OF ATTACHED
MAINTENANCE GARAGES
NUMBER OF STAND ALONE
TOTAL GARAGE
PARKING REQUIRED PER CODE
SURFACE PARKING AMOUNT
TOTAL PARKING PROVIDED
UNIT PARKING RATIO
COVERED PARKING RATIO
CLUBHOUSE PARKING
*INCLUDED IN PARKING CALCS
1.ALL DIMENSIONS ARE ROUNDED TO THE NEAREST TENTH FOOT.
2.ALL DIMENSIONS SHOWN ARE TO THE FACE OF CURB TO FACE OF CURB UNLESS OTHERWISE NOTED.
3.CONTRACTOR SHALL REVIEW PAVEMENT GRADIENT AND CONSTRUCT “GUTTER OUT” WHERE WATER
DRAINS AWAY FROM CURB. ALL OTHER AREAS SHALL BE CONSTRUCTED AS “GUTTER IN” CURB.
COORDINATE WITH GRADING CONTRACTOR.
4.ALL AREAS ARE ROUNDED TO THE NEAREST SQUARE FOOT.
5.ALL PARKING STALLS TO BE 9' IN WIDTH AND 18' IN LENGTH UNLESS OTHERWISE INDICATED.
6.CONTRACTOR SHALL REFER TO ARCHITECTURAL PLANS FOR EXACT LOCATIONS AND DIMENSIONS OF
EXIT PORCHES, RAMPS, PRECISE BUILDING DIMENSIONS AND EXACT BUILDING UTILITY ENTRANCE
LOCATIONS.
7.SEE ARCHITECTURAL PLANS FOR LIGHT POLE FOUNDATION DETAIL AND FOR EXACT LOCATIONS OF LIGHT
POLE.
8.REFER TO FINAL PLAT FOR LOT BOUNDARIES, LOT NUMBERS, LOT AREAS, AND LOT DIMENSIONS.
9.ALL GRADIENTS ON SIDEWALKS ALONG THE ADA ROUTE SHALL HAVE A MAXIMUM LONGITUDINAL SLOPE
OF 5% (1:20), EXCEPT AT CURB RAMPS (1:12), AND A MAXIMUM CROSS SLOPE OF 2.08% (1:48). THE
MAXIMUM SLOPE IN ANY DIRECTION ON AN ADA PARKING STALL OR ACCESS AISLE SHALL BE 2.08%
(1:48). THE CONTRACTOR SHALL REVIEW AND VERIFY THE GRADIENT IN THE FIELD ALONG THE ADA
ROUTES PRIOR TO PLACING CONCRETE OR BITUMINOUS PAVEMENT. THE CONTRACTOR SHALL NOTIFY
THE ENGINEER IMMEDIATELY IF THERE IS A DISCREPANCY BETWEEN THE GRADIENT IN THE FIELD VERSUS
THE DESIGN GRADIENT AND COORDINATE WITH GRADING CONTRACTOR.
10."NO PARKING" SIGNS SHALL BE PLACED ALONG ALL DRIVEWAYS AS REQUIRED BY CITY.
LEGEND
EASEMENT
CURB & GUTTER
BUILDING
RETAINING WALL
SAWCUT LINE
NUMBER OF PARKING
STALLS PER ROW
SIGN
PIPE BOLLARD
STANDARD DUTY
ASPHALT PAVING
CONCRETE PAVING
PROPERTY LIMIT
EXISTINGPROPOSED
KEY NOTE
DEVELOPMENT SUMMARY DEVELOPMENT NOTES KEY NOTES
WETLAND LIMITS
TREELINE
BUILDING, STOOPS, STAIRS SEE ARCHITECTURAL PLANS
TRASH/RECYCLING PICKUP AREA - SEE ARCHITECTURAL PLANS
MAIL KIOSK - SEE ARCHITECTURAL PLANS
POOL - SEE ARCHITECTURAL PLANS
MONUMENT SIGN - SEE ARCHITECTURAL PLANS
VEHICLE GATE - SEE ARCHITECTURAL PLANS
TRANSFORMER - LOCATION TBD
741,214 SF 17.02 AC
QUANTITY HEIGHT
15 UNITS 2-STORY / 35'
15 UNITS
HOMES PERCENTAGE
30 10%
120 40%
120 40%
30 10%
300 100%
RURAL DEVELOPMENT TRANSITIONAL
URBAN HIGH-DENSITY PLANNED UNIT (HDR.PUD)
120 GARAGES
1
42 GARAGES
163 GARAGES
525 SPACES
399 SPACES
562 SPACES
1.87
0.29
17 SPACES
(24 ADA)
XX
XX
THE SUBSURFACE UTILITY INFORMATION SHOWN ON THESE PLANS IS A UTILITY QUALITY LEVEL D. THIS QUALITY LEVEL WAS DETERMINED
ACCORDING TO THE GUIDELINES OF ASCE/CI 38-02, TITLED "STANDARD GUIDELINES FOR THE COLLECTION AND DEPICTION OF EXISTING
SUBSURFACE UTILITY DATA." THE CONTRACTOR AND/OR SUBCONTRACTORS SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING
UTILITIES BEFORE COMMENCING WORK, BY CONTACTING THE NOTIFICATION CENTER (GOPHER STATE ONE FOR MINNESOTA). THE
CONTRACTOR AND/OR SUBCONTRACTOR AGREE TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES, WHICH MIGHT BE OCCASIONED BY
HIS OR HER FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UTILITIES (UNDERGROUND AND OVERHEAD).
IF THE CONTRACTOR ENCOUNTERS ANY DRAIN TILE WITHIN THE SITE, HE OR SHE SHALL NOTIFY THE ENGINEER WITH THE LOCATION, SIZE,
INVERT AND IF THE TILE LINE IS ACTIVE. NO DRAIN TILE SHALL BE BACKFILLED WITHOUT APPROVAL FROM THE PROJECT ENGINEER.
IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE ALL EXISTING UTILITIES WHICH CONFLICT WITH THE PROPOSED
IMPROVEMENTS SHOWN ON THE PLANS.
CONCRETE SIDEWALK
DETAILS
A
B
C
D
E
F
G
B-612 CONCRETE CURB AND GUTTER - SEE SHEET C9.0101
B-618 CONCRETE CURB AND GUTTER - SEE SHEET C9.0102
TAPERED CURB - SEE SHEET C9.0103
4' SIDEWALK - SEE SHEET C9.0104
5' SIDEWALK - SEE SHEET C9.0105
STOP SIGN - SEE SHEET C9.0106
ACCESSIBLE PARKING SIGN - SEE SHEET C9.0107
ACCESSIBLE PARKING STALL - SEE SHEET C9.0108
ARCHITECTURAL
CONCRETE
DETAIL XX
CHAIN LINK FENCE - SEE ARCHITECTURAL PLANSH
DECORATIVE WOODEN FENCE - SEE ARCHITECTURAL PLANSI
CHAIN LINK FENCE
DECORATIVE
WOODEN FENCE
AIR CONDITIONING
UNIT
VALLEY GUTTER - SEE SHEET C9.0109
BITUMINOUS PATHJ
Project
Location
Date Submittal / RevisionNo.
Certification
Sheet Title
Summary
Revision History
Sheet No.Revision
Project No.
By
Designed:Drawn:
Approved:Book / Page:
Phase:Initial Issue:
Client
CONTINENTAL
483 FUND LLC
W134 N8675 EXECUTIVE PARKWAY
MENOMONEE FALLS, WI 53051
SPRINGS AT
LAKE ELMO
LAKE ELMO,
MINNESOTA
9955 HUDSON BOULEVARD NORTH
EAV CJL
EAV
PRELIMINARY 4/12/2019
21654
Registration No.Date:
I hereby certify that this plan, specification or
report was prepared by me or under my direct
supervision and that I am a duly licensed
professional ENGINEER under the laws of the state
of Minnesota.
If applicable, contact us for a wet signed copy of this
plan which is available upon request at Sambatek's,
Minnetonka, MN office.
4/12/201954914
Eric A. Vogel
PREL
I
M
I
N
A
R
Y
4/12/2019 CITY SUBMITTAL
Apr 12, 2019 - 3:10pm - User:clichty L:\PROJECTS\21654\CAD\Civil\Sheets\21654-C1-TITLE.dwg
C1.01
TITLE SHEET
GEOTECHNICAL
PROFESSIONAL SERVICE INDUSTRIES, INC.
2915 WATERS ROAD, SUITE 112
EAGAN, MN 55121
TEL 651-646-8148
CONTACT: JOSEPH ROZMIAREK
DEVELOPER/OWNER
CONTINENTAL 483 FUND LLC
W134 N8675 EXECUTIVE PARKWAY
MENOMONEE FALLS, WI 53051
TEL 262-653-9352
CONTACT: GWYN WHEELER
ARCHITECT
KHALER SLATER
111 W WISCONSIN AVE
MILWAUKEE, WI 53203
TEL 414-373-2000
FAX 414-272-2001
CONTACT: DENNIS POHLMAN
CIVIL ENGINEER
SAMBATEK
12800 WHITEWATER DRIVE, SUITE 300
MINNETONKA, MN 55343
TEL 763-476-6010
FAX 763-476-8532
CONTACT: ERIC VOGEL, PE
LANDSCAPE ARCHITECT
SAMBATEK
12800 WHITEWATER DRIVE, SUITE 300
MINNETONKA, MN 55343
TEL 763-476-6010
FAX 763-476-8532
CONTACT: WILLIAM DELANEY, PLA
SURVEYOR
SAMBATEK
12800 WHITEWATER DRIVE, SUITE 300
MINNETONKA, MN 55343
TEL 763-476-6010
FAX 763-476-8532
CONTACT: CRAIG JOHNSON, LS
SHEET INDEX
SHEET DESCRIPTION
C1.01 TITLE SHEET
C2.01 ALTA SURVEY
C2.02 FINAL PLAT (1 OF 2)
C2.03 FINAL PLAT (2 OF 2)
C2.04 EXSTING CONDITIONS
C2.05 DEMOLITION PLAN
C3.01 SITE PLAN
C4.01 GRADING PLAN
C5.01 EROSION CONTROL PHASE I
C5.02 EROSION CONTROL PHASE II
C5.03 EROSION CONTROL NOTES AND DETAILS
C6.01 SANITARY SEWER AND WATERMAIN PLAN
C6.02 STORM SEWER PLAN
C9.01 DETAILS
L1.01 LANDSCAPE PLAN
L1.02 SHRUB PLAN WEST
L1.03 SHRUB PLAN EAST
L1.04 LANDSCAPE NOTE AND DETAILS
L1.05 TREE INVENTORY
for
Preliminary Site Development Plans
Springs at Lake Elmo
Continental Properties
Lake Elmo, Minnesota
Presented by:
NO SCALE
VICINITY MAP
SITE
CONSULTANT CONTACT LIST:
BENCHMARKS
N.T.S.
CITY OF LAKE ELMO ENGINEERING DESIGN STANDARDS (MARCH 2017)
CITY ENGINEER'S ASSOCIATION OF MINNESOTA STANDARD SPECIFICATIONS (2013)
MNDOT STANDARD SPECIFICATIONS FOR CONSTRUCTION (2016 EDITION)
GOVERNING SPECIFICATIONS
COMMERCE DR
94
19
TAMARACK RD
WO
O
D
B
U
R
Y
D
R
HUD
S
O
N
R
D
10
BENCHMARK #1 = MNDOT Disc "8282 AX" - Elev=938.31
Located at NE Quad. of Int. Hwy. 94 & Keats Ave.
BENCHMARK #2 = TNH - ELEV=1001.01
South property line of subject property @ midpoint of line.
HUDSON BLVD N
SCALE IN FEET
0 12060
NORTH
To Continental 483 Fund LLC, DPS-Lake Elmo, LLC, a Minnesota limited liability company and First American Title Insurance Company:
This is to certify that this map or plat and the survey on which it is based were made in accordance with the 2016 Minimum Standard Detail Requirements for
ALTA/NSPS Land Title Surveys, jointly established and adopted by ALTA and NSPS, and includes Items 1, 2, 3, 4, 5, 6(b), 7(a), 7(b)(1), 7(c), 8, 9, 10, 11, 13, 14, 16, 17,
18, 19, and 20 of Table A thereof. The field work was completed on 01/21/2019.
Dated this 12th day of March, 2019
Sambatek, Inc.
Craig E. Johnson, LS
Minnesota License No. 44530
cjohnson@sambatek.com
1. Referencing Title Commitment No. NCS-938972-MKE, dated December 17, 2018, First American Title Insurance Company.
2. The bearing system is based on the Washington County coordinate system, NAD83 (1986 Adjust). With an assumed bearing of South 00
degrees 01 minutes 13 seconds West for the east line of the Southwest Quarter of the Southeast Quarter, Section 34, Township 29, Range 21.
3. The vertical datum is based on NAVD88.
BENCHMARK #1 = MNDOT Disc "8282 AX" - Elev=938.31
Located at NE Quad. of Int. Hwy. 94 & Keats Ave.
BENCHMARK #2 = TNH - ELEV=1001.01
South property line of subject property @ midpoint of line.
VICINITY MAP
SURVEY NOTES
Proposed Description
That part of the Southwest Quarter of the Southeast Quarter, Section 34, Township 29, Range 21, Washington County, Minnesota described as follows:
Commencing at the southwest corner of said Southwest Quarter of the Southeast Quarter; thence North 00 degrees 06 minutes 31 seconds East, assumed bearing,
along the west line of said Southwest Quarter of the Southeast Quarter, a distance of 82.86 feet to the north line of Parcel 29C of Minnesota Department of
Transportation Right of Way Plat No. 82-43; thence North 89 degrees 18 minutes 27 seconds East, along said north line, a distance of 40.00 to the point of beginning;
thence North 00 degrees 06 minutes 31 seconds East, a distance of 607.73 feet; thence North 89 degrees 40 minutes 54 seconds East, a distance of 1284.76 feet to the
east line of said Southwest Quarter of the Southeast Quarter; thence South 00 degrees 01 minutes 13 seconds West, along said east line, a distance of 428.20 feet to a
point 267.8 feet north of the southeast corner of said Southwest Quarter of the Southeast Quarter; thence South 89 degrees 54 minutes 16 seconds West, parallel to
the south line of said Southwest Quarter of the Southeast Quarter, a distance of 200.00 feet; thence South 00 degrees 01 minutes 13 seconds West, parallel to the east
line of said Southwest Quarter of the Southeast Quarter, a distance of 173.21 feet to said north line of Parcel 29C; thence South 89 degrees 18 minutes 27 seconds
West, along said north line, a distance of 1085.76 feet to the point of beginning.
The following notes correspond to the reference numbers listed in Schedule B, Section 2 of the title commitment.
SUBJECT PROPERTY
1.The surveyor has depicted the property corner monuments, or the witness to the corner that were found during the field work, and set property corner
monuments, or witnesses to the corner, at the locations where there did not appear to be any evidence of an existing monument.
2.The property does not have an assigned address.
3.The subject property lies within Flood Plain Zone X – 'Area Of Minimal Flood Hazard', according to FEMA per FIRM Map No. 27163C0245E dated 2/3/2010.
4.The gross area information of subject property 17.0159 Acres or 741,214 Square Feet.
5. The vertical relief is shown on the graphical portion of the survey.
6b. The zoning information has not been provided by the client.
7a.There are no buildings on the subject property.
7b.There is a building foundation on the subject property as shown and dimensioned.
7c.There are no buildings or heights to measure on subject property. The building foundations as shown, are at ground level.
8.Visible substantial features observed in the process of conducting the fieldwork are shown hereon.
9.There are no parking areas on the subject property.
10a.There were no division or party walls designated by the client to be shown on the survey.
11.A Gopher State One Call (GSOC) request was placed on 12/26/2018 for utility locates on this site and assigned GSOC Ticket No. 183600280. The surveyor makes no
guarantees that the underground utilities shown hereon comprise all such utilities in the area, either in service or abandoned. Utility suppliers often do not
respond to these requests in the field but may provide maps, plans, and drawings in lieu of physical location. Utility information shown hereon is a compilation of
the provided map information and those visible utilities and marked utilities which were located during the survey field work. The surveyor further does not
warrant that the underground utilities shown hereon are in the exact location as indicated, although they are located as accurately as possible from the available
information. The surveyor has not physically located the underground utilities. Pursuant to MS 216.D contact Gopher State One Call at (651-454-0002) prior to any
excavation.
13.The names of adjoining land owners according to the current county tax records are shown on the survey.
14.The distance to the nearest intersecting street is 1000 feet to 5th St. N. & Keats Av.
16.There is no evidence of recent earth moving work, building construction or building additions observed in the process of conducting the fieldwork.
17.No changes in street right of ways are proposed per City of Lake Elmo Bay. There is no observable evidence of recent street or sidewalk construction or repair.
18.There were wetland delineation markers observed in the process of conducting the field work.See survey. Per a Letter by the Department of the Navy, dated
February 8, 2019, File No. MVP-2018-03459-MMW, the wetland was delineated by Kjolhaug Environmental. The Department of the Navy agrees with the
delineated location per said Letter. A permit from the Department of the Navy must be obtained prior to any fill or dredging of the wetland.
19.Plottable off site easements and servitudes disclosed in the provided title documents and/or observed during the field work that appear to benefit and/or affect
the subject property are shown hereon.
20.A Sambatek Professional Liability Insurance Certificate of Insurance will be provided upon request.
"TABLE A" NOTES
CERTIFICATION
N.T.S.
KE
A
T
S
A
V
E
SITE
10TH STREET N
OVERHEAD ELECTRICAL WIRE
LIGHT
SANITARY SEWER
STORM SEWER
WATERMAIN
UNDERGROUND ELECTRIC
GUY ANCHOR
UTILITY POLE
GUARD POST
UNDERGROUND TELEPHONE
UNDERGROUND GAS
CHAIN LINK FENCE
WOOD FENCE
CONCRETE SURFACE
SIGN
FOUND MONUMENT
FOUND CAST IRON
MONUMENT
FOUND RIGHT-OF-WAY
MONUMENT
SET MONUMENT
MARKED LS 43933
SECTION LINE
UNDERLYING / ADJACENT LOT
TIE LINE
BOUNDARY LINE
DEED DISTANCE(100.00)
TRANSFORMER
GAS METER
COMMUNICATIONS MANHOLE
ELECTRIC MANHOLE
GAS MANHOLE
ELECTRIC METER
TELEPHONE PEDESTAL
CABLE TV BOX
GATE VALVE / HYDRANT
SANITARY MANHOLE
CLEAN OUT
STORM MANHOLE
STORM CATCH BASIN
FLARED END SECTION
RIGHT-OF-WAY LINE
WIRE FENCE
DECIDUOUS TREE
LEGEND
REGISTERED LAND SURVEYORRLS
FOUNDFD
FIBER OPTIC
IN
W
O
O
D
A
V
E
INT HWY 94
5TH STREET N
A.01/11/19 TITLE COMMITMENT
11.The right to erect and to maintain temporary on land adjoining Trunk Highway 12 and Interstate Highway 94, and also limitations on access to said highways, as
contained or shown in the following:
(a) Highway Easement, dated January 17, 1927, recorded February 18, 1927, in Book 111 of Deeds, at page 1; (Easement does not affect subject property)
(b) Highway Easement, dated January 19, 1927, recorded June 23, 1927, in Book 111 of Deeds, at page 206; (Easement does not affect subject property - lies
within existing R.O.W.)
(c) Final Certificate by the State of Minnesota, recorded April 30, 1959, in Book 220 of Deeds, at page 11; (Easement does not affect subject property - lies within
existing R.O.W.)
(d) Minnesota Department of Transportation Right of Way Plat No. 82-43 recorded March 22, 1882 as Doc. No. 429592; (Affects property and is depicted hereon)
(e) Warranty Deed, to the State of Minnesota, recorded September 30, 1983, as Doc. No. 452990 conveying Parcel 29G in the above Right of Way Plat No. 82-43;
(does not affect subject property)
(f) Final Certificate by the State of Minnesota, recorded August 17, 1987, as Doc. No. 548829 (acquiring Parcel 29C in the above Right of Way Plat No. 82-43); and
(R.O.W. Plat shown on survey)
(g) Quitclaim Deed, from the State of Minnesota, to the City of Lake Elmo, dated November 13, 2013, recorded December 30, 2013, as Doc. No. 3975938 (R.O.W.
Plat shown on survey)
12.Reservation of 50% of all minerals and mineral rights in the East Half of the Southwest Quarter of Section 34, as reserved in the following:
(a) Limited Warranty Deed, from the Federal Farm Mortgage Corporation, as grantor, to Lawrence Fehlen and Marie A. Fehlen, as grantees, dated November 8,
1939, recorded November 21, 1939, in Book 135 of Deeds, at page 632; and (does not affect subject property)
(b) Quit Claim Deed, from the Federal Farm Mortgage Corporation, to the United States of America, dated September 6, 1957, recorded November 22, 1957, in
Book 209 of Deeds, at page 493. (Does not affect subject property)
13.Terms and conditions, including an easement for pipeline purposes, as contained in the following:
(a) Right of Way Conveyance in favor of Standard Oil Company, dated August 7, 1946, recorded August 26, 1946, in Book 150 of Deeds, at page 219; (does not
affect subject property)
(b) Assignment of Rights of Way, from Standard Oil Company, to The American Oil Company, dated December 31, 1960, recorded January 25, 1961, in Book 236
of Deeds, at page 240; (does not affect subject property)
(c) Partial Release of Right of Way Conveyance, dated May 5, 1972, recorded May 8, 1972, as Doc. No. 298638; (does not affect subject property)
(d) Quit Claim Deed, from Amoco Oil Company, to the State of Minnesota, dated October 25, 1983, recorded December 29, 1983, as Doc. No. 457465; (does not
affect subject property).
(e)Agreement Limiting Right of Way Easement, dated July 19, 2001, recorded August 3, 2001, as Doc. No. 3172091; (does not affect subject property)
(f)Non Fee Property Assignment Agreement, from BP Products North America Inc., to BP Pipelines (North America) Inc., dated January 1, 2015, recorded
April 10, 2015, as Doc. No. 4021457; and (affects subject property-blanket in nature therefor not shown)
(g)Agreement and Acknowledgement, between BP Pipelines (North America) Inc., the City of Lake Elmo, and U.S. Home Corporation, dated June 15, 2016,
recorded July 28, 2016, as Doc. No. 4076835. (Does not affect subject property)
14.Easement for power line purposes as contained in the following:
(A)Final Decree, recorded April 13, 1972, in Book 316 of Deeds, at page 69; and (does not affect subject property)
(B)Assignment and Assumption of Easements, from XCEL Energy Inc., to Northern States Power Company, dated February 7, 2001, recorded March 8, 2001,
as Doc. No. 3145752. (Affects property - no easements to depict on survey)
15.Terms and conditions of the Petition and Waiver Agreement, dated September 4, 2013, recorded September 12, 2013, as Doc. No. 3964045. (Affects property -
no easements to depict on survey)
16.Terms and conditions of the Petition and Waiver Agreement, dated September 4, 2013, recorded September 12, 2013, as Doc. No. 3964046. (Affects property -
no easements to depict on survey)
17.Terms and conditions, including an easement for drainage and utility purposes in favor of the City of Lake Elmo, as contained in the Public Drainage & Utility
Easement, dated September 4, 2013, recorded September 12, 2013, as Doc. No. 3964047. (Affects property and easement is depicted hereon)
18.Terms and conditions, including an easement for public and drainage purposes in favor of the City of Lake Elmo, as contained in the Public Drainage & Utility
Easement, dated September 4, 2013, recorded September 12, 2013, as Doc. No. 3964048. (Does not affect subject property)
19.Terms and conditions, including an easement for public and drainage purposes in favor of the City of Lake Elmo, as contained in the Public Drainage and Utility
Easement, dated September __, 2013, recorded September 12, 2013, as Doc. No. 3964049. (Does not affect subject property)
20.Terms and conditions, including an easement for street purposes in favor of the City of Lake Elmo, as contained in the Permanent Public Street Easement
Agreement, recorded November 20, 2014, as Doc. No. 4007702. (Does not affect subject property)
21.Terms and conditions, including easements for drainage and utility purposes in favor of the City of Lake Elmo, as contained in the Drainage and Utility Easement
Agreement, recorded November 20, 2014, as Doc. No. 4007703. (Does not affect subject property)
22.Terms and conditions, including an easement for utility purposes in favor of the City of Lake Elmo, as contained in the Utility Easement, recorded November 20,
2014, as Doc. No. 4007704. (Easement affects property as shown - falls within proposed R.O.W.)
23.Terms and conditions of the Memorandum of Understanding, between U.S. Home Corporation, and DPS-Lake Elmo, LLC, dated October 3, 2014, which is
unrecorded, and of the Notice of Lien Rights by DPS-Lake Elmo, LLC, recorded November 20, 2014, as Doc. No. 4007705, which refers to said Memorandum of
Understanding. (Affects property - no easements to depict on survey).
24.Possible overlap of the Land with the parcel to the southeast, said parcel is described in the Warranty Deed, recorded September 21, 2015, as Doc. No. 4041879.
The legal description prepared by Sambatek, shown as proposed on this survey is contiguous to, and creates no gaps or overlaps with the southeast parcel as
described in said document.
B.01/24/19 WELLS LOCATED
Apr 12, 2019 - 3:10pm - User:clichty L:\PROJECTS\21654.01\CAD\Survey\Sheets\2165401-ALTA.dwg
C1.02
ALTA/NSPS
LAND TITLE
SURVEY
C.03/12/19 ATTORNEY COMMENTS
WELL
Project
Location
Date Submittal / RevisionNo.
Certification
Sheet Title
Summary
Revision History
Sheet No.Revision
Project No.
By
Designed:Drawn:
Approved:Book / Page:
Phase:Initial Issue:
Client
CONTINENTAL
483 FUND LLC
W134 N8675 EXECUTIVE PARKWAY
MENOMONEE FALLS, WI 53051
SPRINGS AT
LAKE ELMO
LAKE ELMO,
MINNESOTA
9955 HUDSON BOULEVARD NORTH
EAV CJL
EAV
PRELIMINARY 4/12/2019
21654
PREL
I
M
I
N
A
R
Y
4/12/2019 CITY SUBMITTAL
Know all persons by these presents: That Continental 483 Fund LLC, a Minnesota limited liability company, owner, of the following described property situated in the County of Washington, State of Minnesota,
to wit:
That part of the Southwest Quarter of the Southeast Quarter, Section 34, Township 29, Range 21, Washington County, Minnesota described as follows:
Commencing at the southwest corner of said Southwest Quarter of the Southeast Quarter; thence North 00 degrees 06 minutes 31 seconds East, assumed bearing, along the west line of said
Southwest Quarter of the Southeast Quarter, a distance of 82.86 feet to the north line of Parcel 29C of Minnesota Department of Transportation Right of Way Plat No. 82-43; thence North 89 degrees
18 minutes 27 seconds East, along said north line, a distance of 40.00 to the point of beginning; thence North 00 degrees 06 minutes 31 seconds East, a distance of 607.73 feet; thence North 89
degrees 40 minutes 54 seconds East, a distance of 1284.76 feet to the east line of said Southwest Quarter of the Southeast Quarter; thence South 00 degrees 01 minutes 13 seconds West, along said
east line, a distance of 428.20 feet to a point 267.8 feet north of the southeast corner of said Southwest Quarter of the Southeast Quarter; thence South 89 degrees 54 minutes 16 seconds West,
parallel to the south line of said Southwest Quarter of the Southeast Quarter, a distance of 200.00 feet; thence South 00 degrees 01 minutes 13 seconds West, parallel to the east line of said
Southwest Quarter of the Southeast Quarter, a distance of 173.21 feet to said north line of Parcel 29C; thence South 89 degrees 18 minutes 27 seconds West, along said north line, a distance of
1085.76 feet to the point of beginning.
Has caused the same to be surveyed and platted as SPRINGS AT LAKE ELMO and does hereby dedicate to the public for public use the public way, and the drainage and utility easements as created by this plat.
In witness whereof said Continental 483 Fund LLC, a Minnesota limited liability company, has caused these presents to be signed by its proper officer this
day of , 20 .
Signed: Continental 483 Fund LLC, a Minnesota limited liability company
By:, its
STATE OF
COUNTY OF
The foregoing instrument was acknowledged before me on this day of , 20 , by
, , of Continental 483 Fund LLC, a Minnesota limited liability company, on behalf of the company.
Notary Public, County, Minnesota Notary Printed Name
My Commission Expires
I Craig E. Johnson do hereby certify that this plat was prepared by me or under my direct supervision; that I am a duly Licensed Land Surveyor in the State of Minnesota; that this plat is a correct representation
of the boundary survey; that all mathematical data and labels are correctly designated on this plat; that all monuments depicted on this plat have been, or will be correctly set within one year; that all water
boundaries and wet lands, as defined in Minnesota Statutes, Section 505.01, Subd. 3, existing as of the date of this certificate are shown and labeled on this Plat; and all public ways are shown and labeled on
this plat.
Dated this day of , 20 .
Craig E. Johnson, Licensed Land Surveyor,
Minnesota License No. 44530
STATE OF MINNESOTA
COUNTY OF
The foregoing instrument was acknowledged before me on this day of , 20 , by
Craig E. Johnson, a Licensed Land Surveyor.
Notary Public, County, Minnesota Notary Printed Name
My Commission Expires
CITY COUNCIL, Lake Elmo, Minnesota
This plat was approved by the City Council of Lake Elmo, Minnesota, this day of , 20 , and hereby certifies compliance with all requirements as set forth in the
Minnesota Statutes, Section 505.03, Subdivision 2.
Signed: Attest:
Mayor Clerk
COUNTY SURVEYOR, Washington County, Minnesota
Pursuant to Chapter 820, Laws of Minnesota, 1971, and in accordance with Minnesota Statutes, Section 505.021, Subd. 11, this plat has been reviewed and approved this day of
, 20 .
By By
Washington County Surveyor
COUNTY AUDITOR/TREASURER, Washington County, Minnesota
Pursuant to Minnesota Statutes, Section 505.021, Subd.9 and Section 272.12, taxes payable in the year 20 , on real estate hereinbefore described, have been paid; and there are no delinquent taxes and
transfer has been entered, on this day of , 20 .
By By
Washington County Auditor / Treasurer Deputy
COUNTY RECORDER, Washington County, Minnesota
Document Number
I hereby certify that this instrument was filed in the office of the County Recorder for record on this day of , 20 ,
at o'clock .M. and was duly recorded in Washington County Records.
By: By:
Washington County Recorder Deputy
SAMBATEK, INC.
ENGINEERING, PLANNING
AND LAND SURVEYING
SHEET 1 OF 2 SHEETS
SPRINGS AT LAKE ELMO
LOT 1
BLOCK 1
JUNE AVENUE
NORTH
SAMBATEK, INC.
ENGINEERING, PLANNING
AND LAND SURVEYING
DENOTES 1/2 INCH BY 14 INCH IRON PIPE SET AND
MARKED BY LICENSE NO. 44530.
DENOTES 1/2 INCH OPEN END IRON MONUMENT
FOUND UNLESS NOTED OTHERWISE.
SECTION 34, TOWNSHIP 29 N, RANGE 21 W,
WASHINGTON COUNTY, MINNESOTA
NORTH
NOT TO SCALE
VICINITY MAP
SITE0
NORTH
SCALE IN FEET
1 INCH = 120 FEET
60 120
SEC 34
SHEET 2 OF 2 SHEETS
HUDSON BLVD. N.
SPRINGS AT LAKE ELMO
BEING 10 FEET IN WIDTH, UNLESS OTHERWISE
INDICATED, AND ADJOINING RIGHT-OF-WAY
LINES, FRONT, REAR AND SIDE LOT LINES AS
SHOWN ON THE PLAT.
10
10
DRAINAGE AND UTILITY EASEMENTS ARE SHOWN THUS:
(NOT TO SCALE)
10
THE EAST LINE OF THE OF THE SW 1/4 OF THE SE 1/4 IS
ASSUMED TO HAVE A BEARING OF NORTH 00 DEGREES
10 MINUTES 13 SECONDS WEST.
HUDSON BLVD N
SCALE IN FEET
0 12060
NORTH
That part of the Southwest Quarter of the Southeast Quarter, Section 34, Township 29, Range 21, Washington County, Minnesota
described as follows:
Commencing at the southwest corner of said Southwest Quarter of the Southeast Quarter; thence North 00 degrees 06 minutes
31 seconds East, assumed bearing, along the west line of said Southwest Quarter of the Southeast Quarter, a distance of 82.86
feet to the north line of Parcel 29C of Minnesota Department of Transportation Right of Way Plat No. 82-43; thence North 89
degrees 18 minutes 27 seconds East, along said north line, a distance of 40.00 to the point of beginning; thence North 00 degrees
06 minutes 31 seconds East, a distance of 607.73 feet; thence North 89 degrees 40 minutes 54 seconds East, a distance of 1284.76
feet to the east line of said Southwest Quarter of the Southeast Quarter; thence South 00 degrees 01 minutes 13 seconds West,
along said east line, a distance of 428.20 feet to a point 267.8 feet north of the southeast corner of said Southwest Quarter of the
Southeast Quarter; thence South 89 degrees 54 minutes 16 seconds West, parallel to the south line of said Southwest Quarter of
the Southeast Quarter, a distance of 200.00 feet; thence South 00 degrees 01 minutes 13 seconds West, parallel to the east line of
said Southwest Quarter of the Southeast Quarter, a distance of 173.21 feet to said north line of Parcel 29C; thence South 89
degrees 18 minutes 27 seconds West, along said north line, a distance of 1085.76 feet to the point of beginning.
SUBJECT PROPERTY
OVERHEAD ELECTRICAL WIRE
LIGHT
SANITARY SEWER
STORM SEWER
WATERMAIN
UNDERGROUND ELECTRIC
GUY ANCHOR
UTILITY POLE
GUARD POST
UNDERGROUND TELEPHONE
UNDERGROUND GAS
CHAIN LINK FENCE
WOOD FENCE
CONCRETE SURFACE
SIGN
FOUND MONUMENT
FOUND CAST IRON
MONUMENT
FOUND RIGHT-OF-WAY
MONUMENT
SET MONUMENT
MARKED LS 43933
SECTION LINE
UNDERLYING / ADJACENT LOT
TIE LINE
BOUNDARY LINE
DEED DISTANCE(100.00)
TRANSFORMER
GAS METER
COMMUNICATIONS MANHOLE
ELECTRIC MANHOLE
GAS MANHOLE
ELECTRIC METER
TELEPHONE PEDESTAL
CABLE TV BOX
GATE VALVE / HYDRANT
SANITARY MANHOLE
CLEAN OUT
STORM MANHOLE
STORM CATCH BASIN
FLARED END SECTION
RIGHT-OF-WAY LINE
WIRE FENCE
DECIDUOUS TREE
LEGEND
REGISTERED LAND SURVEYORRLS
FOUNDFD
FIBER OPTIC
Project
Location
Date Submittal / RevisionNo.
Certification
Sheet Title
Summary
Revision History
Sheet No.Revision
Project No.
By
Designed:Drawn:
Approved:Book / Page:
Phase:Initial Issue:
Client
CONTINENTAL
483 FUND LLC
W134 N8675 EXECUTIVE PARKWAY
MENOMONEE FALLS, WI 53051
SPRINGS AT
LAKE ELMO
LAKE ELMO,
MINNESOTA
9955 HUDSON BOULEVARD NORTH
EAV CJL
EAV
PRELIMINARY 4/12/2019
21654
PREL
I
M
I
N
A
R
Y
4/12/2019 CITY SUBMITTAL
1.SUBJECT PROPERTY IDENTIFICATION NUMBER IS 3402921430003.
2.THE GROSS AREA OF THE SUBJECT PROPERTY IS 17.0159 ACRES OR 741,214 SQUARE FEET.
1.SURVEY COORDINATE BASIS: WASHINGTON COUNTY COORDINATE SYATEM NAD 83 (1986)
2.FIELD WORK WAS COMPLETED ON 01/21/2019.
3.THE VERTICAL DATUM IS BASED ON NAVD88.
BENCHMARK #1 = MNDOT DISC "8282 AX" - ELEV=938.31,
LOCATED AT NE QUAD. OF INT. HWY. 94 & KEATS AVE.
BENCHMARK #2 = TNH - ELEV=1001.01,
SOUTH PROPERTY LINE OF SUBJECT PROPERTY @ MIDPOINT OF LINE.
PROPERTY SUMMARY
SURVEY NOTES
WELL
Apr 12, 2019 - 3:11pm - User:clichty L:\PROJECTS\21654\CAD\Civil\Sheets\21654-C2-2-EXCND.dwg
C2.04
EXSTING
CONDITIONS
HUDSON BLVD N
LEGEND DEMOLITION NOTES
1. DEMOLITION NOTES ARE NOT COMPREHENSIVE. CONTRACTOR SHALL VISIT THE SITE PRIOR
TO CONSTRUCTION TO OBTAIN A CLEAR UNDERSTANDING OF THE INTENDED SCOPE OF
WORK.
2. THE DESIGN SHOWN IS BASED ON ENGINEER'S UNDERSTANDING OF EXISTING CONDITIONS.
THE EXISTING CONDITIONS SHOWN ON THIS PLAN ARE BASED UPON ALTA AND TOPOGRAPHIC
MAPPING PREPARED BY XXXX DATED XX-XX-XXXX. IF CONTRACTOR DOES NOT ACCEPT
EXISTING TOPOGRAPHY AS SHOWN ON THE PLANS WITHOUT EXCEPTION, CONTRACTOR SHALL
HAVE MADE, AT OWN EXPENSE, A TOPOGRAPHIC SURVEY BY A REGISTERED LAND SURVEYOR
AND SUBMIT IT TO THE OWNER FOR REVIEW.
3. THE CONTRACTOR IS RESPONSIBLE FOR DEMOLITION, REMOVAL, AND DISPOSING IN A
LOCATION APPROVED BY ALL GOVERNING AUTHORITIES AND IN ACCORDANCE WITH
APPLICABLE CODES, OF ALL STRUCTURES, PADS, WALLS, FLUMES, FOUNDATIONS, PARKING,
DRIVES, DRAINAGE STRUCTURES, UTILITIES, ETC., SUCH THAT THE IMPROVEMENTS SHOWN
ON THE PLANS CAN BE CONSTRUCTED. ALL FACILITIES TO BE REMOVED SHALL BE UNDERCUT
TO SUITABLE MATERIAL AND BROUGHT TO GRADE WITH SUITABLE COMPACTED FILL
MATERIAL PER THE GEOTECHNICAL REPORT AND/OR GEOTECHNICAL ENGINEER.
4. CLEARING AND GRUBBING: CONTRACTOR IS RESPONSIBLE FOR REMOVING ALL DEBRIS FROM
THE SITE AND DISPOSING THE DEBRIS IN A LAWFUL MANNER. CONTRACTOR IS RESPONSIBLE
FOR OBTAINING ALL PERMITS REQUIRED FOR DEMOLITION AND DISPOSAL.
6. CONTRACTOR IS RESPONSIBLE FOR THE DISCONNECTION OF UTILITY SERVICES TO EXISTING
BUILDINGS PRIOR TO DEMOLITION OF THE BUILDINGS.
7. CONTRACTOR SHALL COORDINATE WITH RESPECTIVE UTILITY COMPANIES PRIOR TO REMOVAL
AND/OR RELOCATION OF UTILITIES. CONTRACTOR SHALL COORDINATE WITH UTILITY
COMPANIES CONCERNING PORTIONS OF WORK WHICH MAY BE PERFORMED BY THE UTILITY
COMPANIES' FORCES AND ANY FEES WHICH ARE TO BE PAID TO UTILITY COMPANIES FOR
SERVICES. CONTRACTOR IS RESPONSIBLE FOR PAYING ALL FEES AND CHARGES.
8. CONTRACTOR IS SPECIFICALLY CAUTIONED THAT LOCATIONS OF EXISTING UTILITIES SHOWN
ON THIS PLAN HAVE BEEN DETERMINED FROM INFORMATION AVAILABLE. ENGINEER
ASSUMES NO RESPONSIBILITY FOR THE UTILITY MAPPING ACCURACY. PRIOR TO START OF
ANY DEMOLITION ACTIVITY, THE CONTRACTOR SHALL NOTIFY UTILITY COMPANIES 48 HOURS
PRIOR TO ANY EXCAVATION FOR ON-SITE LOCATIONS OF EXISTING UTILITIES. THE LOCATIONS
OF UTILITIES SHALL BE OBTAINED BY THE CONTRACTOR BY CALLING MINNESOTA GOPHER
STATE ONE CALL AT 800-252-1166 OR 651-454-0002.
9. THE MAPPING LOCATION OF ALL EXISTING SEWERS, PIPING, AND UTILITIES SHOWN ARE NOT
TO BE INTERPRETED AS THE EXACT LOCATION, OR AS THE ONLY OBSTACLES THAT MAY OCCUR
ON THE SITE. VERIFY EXISTING CONDITIONS AND PROCEED WITH CAUTION AROUND ANY
ANTICIPATED FEATURES. GIVE NOTICE TO ALL UTILITY COMPANIES REGARDING DESTRUCTION
AND REMOVAL OF ALL SERVICE LINES AND CAP ALL LINES BEFORE PROCEEDING WITH WORK.
UTILITIES DETERMINED TO BE ABANDONED SHALL BE REMOVED IF UNDER THE BUILDING
INCLUDING 10' BEYOND FOUNDATIONS.
10. ELECTRICAL, TELEPHONE, CABLE, WATER, FIBER OPTIC CABLE AND/OR GAS LINES NEEDING TO
BE REMOVED OR RELOCATED SHALL BE COORDINATED WITH THE AFFECTED UTILITY
COMPANY. ADEQUATE TIME SHALL BE PROVIDED FOR RELOCATION AND CLOSE
COORDINATION WITH THE UTILITY COMPANY IS NECESSARY TO PROVIDE A SMOOTH
TRANSITION IN UTILITY SERVICE. CONTRACTOR SHALL PAY CLOSE ATTENTION TO EXISTING
UTILITIES WITHIN THE ROAD RIGHT OF WAY DURING CONSTRUCTION.
11. CONTRACTOR MUST PROTECT THE PUBLIC AT ALL TIMES WITH FENCING, BARRICADES,
ENCLOSURES, ETC., TO THE BEST PRACTICES.
12. CONTINUOUS ACCESS SHALL BE MAINTAINED FOR THE SURROUNDING PROPERTIES AT ALL
TIMES DURING DEMOLITION OF THE EXISTING FACILITIES.
13. PRIOR TO DEMOLITION OCCURRING, ALL EROSION CONTROL DEVICES ARE TO BE INSTALLED
AND APPROVED BY THE LOCAL AUTHORITY.
14. CONTRACTOR SHALL LIMIT SAW-CUT & PAVEMENT REMOVAL TO ONLY THOSE AREAS WHERE
IT IS REQUIRED AS SHOWN ON THESE CONSTRUCTION PLANS BUT IF ANY DAMAGE IS
INCURRED ON ANY OF THE SURROUNDING PAVEMENT, ETC. THE CONTRACTOR SHALL BE
RESPONSIBLE FOR ITS REMOVAL AND REPAIR.
15. CONTRACTOR TO PROTECT EXISTING FEATURES WHICH ARE TO REMAIN. DAMAGE TO ANY
EXISTING CONDITIONS TO REMAIN WILL BE REPLACED AT CONTRACTOR'S EXPENSE.
16. ABANDON OR REMOVE ALL SANITARY, WATER AND STORM SERVICES PER CITY STANDARDS.
COORDINATE ALL WORK WITH CITY. ALL STREET RESTORATION SHALL BE COMPLETED IN
COMPLIANCE WITH LOCAL STANDARDS.
17. CONTRACTOR SHALL PREPARE AND SUBMIT TO THE GOVERNING AUTHORITY A TRAFFIC
AND/OR PEDESTRIAN TRAFFIC PLAN PER CITY/COUNTY/STATE STANDARDS TO BE APPROVED
BY THE LOCAL GOVERNING AUTHORITY.
UNDERGROUND GAS
STONE RETAINING WALL
CHAIN LINK FENCE
UNDERGROUND ELECTRIC
UNDERGROUND CABLE TV
UNDERGROUND TELEPHONE
OVERHEAD ELECTRIC
SANITARY SEWER
WATERMAIN
STORM SEWER
LIGHT
HYDRANT
GAS METER
SPRINKLER HEAD
SPRINKLER VALVE
EDGE OF TREES
TREES / SHRUBS
CONCRETE
CONCRETE CURB
BITUMINOUS CURB REMOVE EXISTING CHAIN LINK FENCE
REMOVE EXISTING UTILITY
REMOVE EXISTING
REMOVE EXISTING TREE
REMOVE EXISTING BUILDING
REMOVE EXISTING CONCRETE PAVEMENT
REMOVE EXISTING BITUMINOUS PAVEMENT
SAW CUT EXIST BITUMINOUS PAVEMENT
REMOVE EXIST CONCRETE CURB
REMOVE EXISTING UTILITY LINE
EXISTING
REMOVE EXISTING LIGHT FIXTURE
REMOVE EXISTING GRAVEL DRIVE
REMOVE EXISTING LANDSCAPING
THE SUBSURFACE UTILITY INFORMATION SHOWN ON THESE PLANS IS A UTILITY QUALITY LEVEL XX. THIS QUALITY LEVEL WAS DETERMINED
ACCORDING TO THE GUIDELINES OF ASCE/CI 38-02, TITLED "STANDARD GUIDELINES FOR THE COLLECTION AND DEPICTION OF EXISTING
SUBSURFACE UTILITY DATA." THE CONTRACTOR AND/OR SUBCONTRACTORS SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING
UTILITIES BEFORE COMMENCING WORK, BY CONTACTING THE NOTIFICATION CENTER (GOPHER STATE ONE FOR MINNESOTA). THE
CONTRACTOR AND/OR SUBCONTRACTOR AGREE TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES, WHICH MIGHT BE OCCASIONED BY
HIS OR HER FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UTILITIES (UNDERGROUND AND OVERHEAD).
IF THE CONTRACTOR ENCOUNTERS ANY DRAIN TILE WITHIN THE SITE, HE OR SHE SHALL NOTIFY THE ENGINEER WITH THE LOCATION, SIZE,
INVERT AND IF THE TILE LINE IS ACTIVE. NO DRAIN TILE SHALL BE BACKFILLED WITHOUT APPROVAL FROM THE PROJECT ENGINEER.
IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE ALL EXISTING UTILITIES WHICH CONFLICT WITH THE PROPOSED
IMPROVEMENTS SHOWN ON THE PLANS.
Project
Location
Date Submittal / RevisionNo.
Certification
Sheet Title
Summary
Revision History
Sheet No.Revision
Project No.
By
Designed:Drawn:
Approved:Book / Page:
Phase:Initial Issue:
Client
CONTINENTAL
483 FUND LLC
W134 N8675 EXECUTIVE PARKWAY
MENOMONEE FALLS, WI 53051
SPRINGS AT
LAKE ELMO
LAKE ELMO,
MINNESOTA
9955 HUDSON BOULEVARD NORTH
EAV CJL
EAV
PRELIMINARY 4/12/2019
21654
Registration No.Date:
I hereby certify that this plan, specification or
report was prepared by me or under my direct
supervision and that I am a duly licensed
professional ENGINEER under the laws of the state
of Minnesota.
If applicable, contact us for a wet signed copy of this
plan which is available upon request at Sambatek's,
Minnetonka, MN office.
4/12/201954914
Eric A. Vogel
PREL
I
M
I
N
A
R
Y
4/12/2019 CITY SUBMITTAL
SCALE IN FEET
0 10050
NORTH
Apr 12, 2019 - 3:11pm - User:clichty L:\PROJECTS\21654\CAD\Civil\Sheets\21654-C2-DEMO.dwg
C2.05
DEMOLITION
PLAN
REMOVE TREE LINE
HUDSON BLVD N
B20E
BLDG 5B
FFE=1006.35
GFE=1006.02
B20E
BLDG 6A
FFE=XXX.X
GFE=XXX.X
B20E
BLDG 8A
FFE=1004.85
GFE=1004.52
B20E
BLDG 7B
FFE=1004.60
GFE=1004.27
B20E
BLDG 4B
FFE=1006.65
GFE=1006.32
B20E
BLDG 3A
FFE=1006.20
GFE=1005.87
B20E
BLDG 2B
FFE=1005.47
GFE=1005.14
B20E
BLDG 1A
FFE=1005.50
GFE=1005.17
B20E
BLDG 14A
FFE=1001.75
GFE=1001.42
B20E
BLDG 9B
FFE=1003.00
GFE=1002.67
B20E
BLDG 11B
FFE=1003.00
GFE=1002.67
B20E
BLDG 10A
FFE=1002.50
GFE=1002.17
B20E
BLDG 12A
FFE=1003.00
GFE=1002.67
B20E
BLDG 13B
FFE=1002.50
GFE=1002.17
6G
GFE=1004.95
6G
GFE=1004.05
6G
GFE=1001.90
6G
GFE=1001.85
6G
GFE=1001.85
6GS-2
GFE=1000.50
MG-P
GFE=1000.90
CLUBHOUSE
FFE=1005.00
B20E
BLDG 6B
FFE=1006.10
GFE=1005.77
ADA
B20E
BLDG 15B
FFE=1002.20
GFE=1001.87
25' B
U
F
F
E
R
50' B
U
F
F
E
R
D
E
F
F
B
A
TYP
A
TYP
A
TYP
A
TYP
A
TYP
A
TYP A
TYP
A
TYP
A
TYP
A
TYP
A
TYP
A
TYP
A
TYP
A
TYP
A
TYP
01
01 01 01
01
010101
111111111111
9
10
9
10
7 7
11 11
6 6 6
9 10
11
12
8
9
6 7
7
10
9
10
10
3
10
10
9
7 6
2
04 04
04
04
04
04 04
04
05
050505
05
05
05
05
22
'
22'
22
'
R
1
8
'
R18
'
R1
8
'
05
05
04 04
05
20'12'20'
F
22'
23
'
9'
TYP18
'
TY
P
9'
TYP
9'
TYP
9'
TYP
9'
TYP
9'
TYP
9'
TYP
9'
TYP
9'
TYP
9'
TYP9'
TYP
9'
TYP
9'
TYP
9'
TYP
9'
TY
P
18
'
TY
P
18
'
TY
P
18
'
TY
P
18
'
TY
P
18
'
TY
P
18
'
TY
P
18
'
TY
P
18
'
TY
P
08 08 08
08
08
08
08
08
08
08
08
08
I
I
H
TY
P
TYP
9'
TY
P
18'
TYP
07
07
07
07
07
07
04 04 040404
R4'
R18'
R4'
R4
0
'
R1
8
'
22
'
R
1
8
'
R18
'
09
06 06
01
04
04
04 04
04
9'
18
'
04 04 04
22'
C
07
07
29
.
4
'
22'
07
07
07
J J
J
A
TYP
07
08
07
07
09
09
09
09
09
09
09 09 09 09
09
09
08
H H H HH
I
I
H
10'
Project
Location
Date Submittal / RevisionNo.
Certification
Sheet Title
Summary
Revision History
Sheet No.Revision
Project No.
By
Designed:Drawn:
Approved:Book / Page:
Phase:Initial Issue:
Client
CONTINENTAL
483 FUND LLC
W134 N8675 EXECUTIVE PARKWAY
MENOMONEE FALLS, WI 53051
SPRINGS AT
LAKE ELMO
LAKE ELMO,
MINNESOTA
9955 HUDSON BOULEVARD NORTH
EAV CJL
EAV
PRELIMINARY 4/12/2019
21654
Registration No.Date:
I hereby certify that this plan, specification or
report was prepared by me or under my direct
supervision and that I am a duly licensed
professional ENGINEER under the laws of the state
of Minnesota.
If applicable, contact us for a wet signed copy of this
plan which is available upon request at Sambatek's,
Minnetonka, MN office.
4/12/201954914
Eric A. Vogel
PREL
I
M
I
N
A
R
Y
4/12/2019 CITY SUBMITTAL
SCALE IN FEET
0 10050
NORTH
Apr 12, 2019 - 3:12pm - User:clichty L:\PROJECTS\21654\CAD\Civil\Sheets\21654-C3-SITE.dwg
C3.01
SITE PLAN
AREA
GROSS SITE AREA
BUILDING INFORMATION
B20E (20 DU/BUILDING)
TOTAL RESIDENT BUILDINGS
GENERAL HOME MIX
STUDIO
1-BEDROOM
2-BEDROOM
3-BEDROOM
TOTAL HOMES
ZONING
EXISTING ZONING
PROPOSED ZONING
PARKING INFORMATION
GARAGE TOTALS:
NUMBER OF ATTACHED
MAINTENANCE GARAGES
NUMBER OF STAND ALONE
TOTAL GARAGE
PARKING REQUIRED PER CODE
SURFACE PARKING AMOUNT
TOTAL PARKING PROVIDED
UNIT PARKING RATIO
COVERED PARKING RATIO
CLUBHOUSE PARKING
*INCLUDED IN PARKING CALCS
1.ALL DIMENSIONS ARE ROUNDED TO THE NEAREST TENTH FOOT.
2.ALL DIMENSIONS SHOWN ARE TO THE FACE OF CURB TO FACE OF CURB UNLESS OTHERWISE NOTED.
3.CONTRACTOR SHALL REVIEW PAVEMENT GRADIENT AND CONSTRUCT “GUTTER OUT” WHERE WATER
DRAINS AWAY FROM CURB. ALL OTHER AREAS SHALL BE CONSTRUCTED AS “GUTTER IN” CURB.
COORDINATE WITH GRADING CONTRACTOR.
4.ALL AREAS ARE ROUNDED TO THE NEAREST SQUARE FOOT.
5.ALL PARKING STALLS TO BE 9' IN WIDTH AND 18' IN LENGTH UNLESS OTHERWISE INDICATED.
6.CONTRACTOR SHALL REFER TO ARCHITECTURAL PLANS FOR EXACT LOCATIONS AND DIMENSIONS OF
EXIT PORCHES, RAMPS, PRECISE BUILDING DIMENSIONS AND EXACT BUILDING UTILITY ENTRANCE
LOCATIONS.
7.SEE ARCHITECTURAL PLANS FOR LIGHT POLE FOUNDATION DETAIL AND FOR EXACT LOCATIONS OF LIGHT
POLE.
8.REFER TO FINAL PLAT FOR LOT BOUNDARIES, LOT NUMBERS, LOT AREAS, AND LOT DIMENSIONS.
9.ALL GRADIENTS ON SIDEWALKS ALONG THE ADA ROUTE SHALL HAVE A MAXIMUM LONGITUDINAL SLOPE
OF 5% (1:20), EXCEPT AT CURB RAMPS (1:12), AND A MAXIMUM CROSS SLOPE OF 2.08% (1:48). THE
MAXIMUM SLOPE IN ANY DIRECTION ON AN ADA PARKING STALL OR ACCESS AISLE SHALL BE 2.08%
(1:48). THE CONTRACTOR SHALL REVIEW AND VERIFY THE GRADIENT IN THE FIELD ALONG THE ADA
ROUTES PRIOR TO PLACING CONCRETE OR BITUMINOUS PAVEMENT. THE CONTRACTOR SHALL NOTIFY
THE ENGINEER IMMEDIATELY IF THERE IS A DISCREPANCY BETWEEN THE GRADIENT IN THE FIELD VERSUS
THE DESIGN GRADIENT AND COORDINATE WITH GRADING CONTRACTOR.
10."NO PARKING" SIGNS SHALL BE PLACED ALONG ALL DRIVEWAYS AS REQUIRED BY CITY.
LEGEND
EASEMENT
CURB & GUTTER
BUILDING
RETAINING WALL
SAWCUT LINE
NUMBER OF PARKING
STALLS PER ROW
SIGN
PIPE BOLLARD
STANDARD DUTY
ASPHALT PAVING
CONCRETE PAVING
PROPERTY LIMIT
EXISTINGPROPOSED
KEY NOTE
DEVELOPMENT SUMMARY DEVELOPMENT NOTES KEY NOTES
WETLAND LIMITS
TREELINE
BUILDING, STOOPS, STAIRS SEE ARCHITECTURAL PLANS
TRASH/RECYCLING PICKUP AREA - SEE ARCHITECTURAL PLANS
MAIL KIOSK - SEE ARCHITECTURAL PLANS
POOL - SEE ARCHITECTURAL PLANS
MONUMENT SIGN - SEE ARCHITECTURAL PLANS
VEHICLE GATE - SEE ARCHITECTURAL PLANS
TRANSFORMER - LOCATION TBD
741,214 SF 17.02 AC
QUANTITY HEIGHT
15 UNITS 2-STORY / 35'
15 UNITS
HOMES PERCENTAGE
30 10%
120 40%
120 40%
30 10%
300 100%
RURAL DEVELOPMENT TRANSITIONAL
URBAN HIGH-DENSITY PLANNED UNIT (HDR.PUD)
120 GARAGES
1
42 GARAGES
163 GARAGES
525 SPACES
399 SPACES
562 SPACES
1.87
0.29
17 SPACES
(24 ADA)
XX
XX
THE SUBSURFACE UTILITY INFORMATION SHOWN ON THESE PLANS IS A UTILITY QUALITY LEVEL D. THIS QUALITY LEVEL WAS DETERMINED
ACCORDING TO THE GUIDELINES OF ASCE/CI 38-02, TITLED "STANDARD GUIDELINES FOR THE COLLECTION AND DEPICTION OF EXISTING
SUBSURFACE UTILITY DATA." THE CONTRACTOR AND/OR SUBCONTRACTORS SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING
UTILITIES BEFORE COMMENCING WORK, BY CONTACTING THE NOTIFICATION CENTER (GOPHER STATE ONE FOR MINNESOTA). THE
CONTRACTOR AND/OR SUBCONTRACTOR AGREE TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES, WHICH MIGHT BE OCCASIONED BY
HIS OR HER FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UTILITIES (UNDERGROUND AND OVERHEAD).
IF THE CONTRACTOR ENCOUNTERS ANY DRAIN TILE WITHIN THE SITE, HE OR SHE SHALL NOTIFY THE ENGINEER WITH THE LOCATION, SIZE,
INVERT AND IF THE TILE LINE IS ACTIVE. NO DRAIN TILE SHALL BE BACKFILLED WITHOUT APPROVAL FROM THE PROJECT ENGINEER.
IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE ALL EXISTING UTILITIES WHICH CONFLICT WITH THE PROPOSED
IMPROVEMENTS SHOWN ON THE PLANS.
CONCRETE SIDEWALK
DETAILS
A
B
C
D
E
F
G
B-612 CONCRETE CURB AND GUTTER - SEE SHEET C9.0101
B-618 CONCRETE CURB AND GUTTER - SEE SHEET C9.0102
TAPERED CURB - SEE SHEET C9.0103
4' SIDEWALK - SEE SHEET C9.0104
5' SIDEWALK - SEE SHEET C9.0105
STOP SIGN - SEE SHEET C9.0106
ACCESSIBLE PARKING SIGN - SEE SHEET C9.0107
ACCESSIBLE PARKING STALL - SEE SHEET C9.0108
ARCHITECTURAL
CONCRETE
DETAIL XX
CHAIN LINK FENCE - SEE ARCHITECTURAL PLANSH
DECORATIVE WOODEN FENCE - SEE ARCHITECTURAL PLANSI
CHAIN LINK FENCE
DECORATIVE
WOODEN FENCE
AIR CONDITIONING
UNIT
VALLEY GUTTER - SEE SHEET C9.0109
BITUMINOUS PATHJ
HUDSON BLVD N
B20E
BLDG 5B
FFE=1006.35
GFE=1006.02
B20E
BLDG 6A
FFE=XXX.X
GFE=XXX.X
B20E
BLDG 8A
FFE=1004.85
GFE=1004.52
B20E
BLDG 7B
FFE=1004.60
GFE=1004.27
B20E
BLDG 4B
FFE=1006.65
GFE=1006.32
B20E
BLDG 3A
FFE=1006.20
GFE=1005.87
B20E
BLDG 2B
FFE=1005.47
GFE=1005.14
B20E
BLDG 1A
FFE=1005.50
GFE=1005.17
B20E
BLDG 14A
FFE=1001.75
GFE=1001.42
B20E
BLDG 9B
FFE=1003.00
GFE=1002.67
B20E
BLDG 11B
FFE=1003.00
GFE=1002.67
B20E
BLDG 10A
FFE=1002.50
GFE=1002.17
B20E
BLDG 12A
FFE=1003.00
GFE=1002.67
B20E
BLDG 13B
FFE=1002.50
GFE=1002.17
6G
GFE=1004.95
6G
GFE=1004.05
6G
GFE=1001.90
6G
GFE=1001.85
6G
GFE=1001.85
6GS-2
GFE=1000.50
MG-P
GFE=1000.90
CLUBHOUSE
FFE=1005.00
B20E
BLDG 6B
FFE=1006.10
GFE=1005.77
ADA
B20E
BLDG 15B
FFE=1002.20
GFE=1001.87
1004.85
1004.85
1006.351006.35
1006.35
1006.35 1006.35
1006.65
1006.65
1006.65
1006.65
1006.65
1004.60
1004.60
1004.85
1004.85
1006.021006.02
1006.32
1006.32
1006.101006.10
1006.10 1006.10
1006.10 1005.771005.77
1004.60
1004.60 1004.60
1004.271004.27
1004.85
1004.521004.52
1006.20
1006.20
1006.20
1006.20
1006.20
1005.87
1005.87
1003.00
1003.00
1003.00
1003.00
1002.501002.50
1002.50
1002.50
1002.50
1002.501002.50
1002.50
1002.50
1002.50
1003.00
1003.00
1003.00 1003.00
1003.00
1003.00 1002.671002.67
1003.00
1003.00 1003.00
1003.00
1003.00 1002.671002.67
1002.171002.17
1002.67
1002.67
1002.171002.17
1005.50
1005.50
1005.50
1005.50
1005.50
1005.17
1005.17
1002.20
1002.20 1002.20
1002.20
1002.20 1001.871001.87
1005.47
1005.47
1005.47
1005.47
1005.47
1005.14
1005.14
1005.00
1005.00
1005.00
1005.00
1001.42
1001.42
1001.75
1001.75
1001.75
1001.75
1001.75
1000.901000.90 1000.501000.50
1000.70
1001.851001.851001.851001.901001.901004.051004.051004.951004.95
T W:1005.00
BW:1005.00
T W:1007.5
BW:1006.98
TW:1006.38
BW:1006.26
T W:1005.97
BW:1005.57
T W:1007.06
BW:1005.77
TW:1007.86
BW:1004.29
TW:1005.86
BW:1005.20
T W:1009.77
BW:1005.30
T W:1011.91
BW:1004.94
TW:1013.38
BW:1005.31
TW:1013.93
BW:1005.59
TW:1015.14
BW:1005.65
TW:1016.52
BW:1005.65
TW:1014.01
BW:1005.65
T W:1013.75
BW:1005.66
T W:1014.15
BW:1006.47
T W:1012.17
BW:1008.99
T W:1011.32
BW:1011.19
TW:1000.00
BW:999.88
T W:998.78
BW:995.98
T W:998.64
BW:995.45 TW:995.05
BW:994.95
TW:999.89
BW:992.57
T W:1000.22
BW:990.26
T W:1000.12
BW:989.36
T W:998.45
BW:987.00
T W:999.23
BW:990.00
T W:1000.00
BW:993.00
TW:1000.03
BW:993.38
T W:997.87
BW:993.96
25' B
U
F
F
E
R
50' B
U
F
F
E
R
Project
Location
Date Submittal / RevisionNo.
Certification
Sheet Title
Summary
Revision History
Sheet No.Revision
Project No.
By
Designed:Drawn:
Approved:Book / Page:
Phase:Initial Issue:
Client
CONTINENTAL
483 FUND LLC
W134 N8675 EXECUTIVE PARKWAY
MENOMONEE FALLS, WI 53051
SPRINGS AT
LAKE ELMO
LAKE ELMO,
MINNESOTA
9955 HUDSON BOULEVARD NORTH
EAV CJL
EAV
PRELIMINARY 4/12/2019
21654
Registration No.Date:
I hereby certify that this plan, specification or
report was prepared by me or under my direct
supervision and that I am a duly licensed
professional ENGINEER under the laws of the state
of Minnesota.
If applicable, contact us for a wet signed copy of this
plan which is available upon request at Sambatek's,
Minnetonka, MN office.
4/12/201954914
Eric A. Vogel
PREL
I
M
I
N
A
R
Y
4/12/2019 CITY SUBMITTAL
SCALE IN FEET
0 10050
NORTH
Apr 12, 2019 - 3:12pm - User:clichty L:\PROJECTS\21654\CAD\Civil\Sheets\21654-C4-GRAD.dwg
C4.01
GRADING PLAN
1.PROPOSED CONTOURS ARE TO FINISHED SURFACE ELEVATION. SPOT ELEVATIONS ALONG PROPOSED CURB DENOTE GUTTER GRADE.
2.CONTRACTOR SHALL REVIEW PAVEMENT GRADIENT AND CONSTRUCT “GUTTER OUT” WHERE WATER DRAINS AWAY FROM CURB. ALL
OTHER AREAS SHALL BE CONSTRUCTED AS “GUTTER IN” CURB.
3.ALL GRADIENT ON SIDEWALKS ALONG THE ADA ROUTE SHALL HAVE A MAXIMUM LONGITUDINAL SLOPE OF 5% (1:20), EXCEPT AT CURB
RAMPS (1:12), AND A MAXIMUM CROSS SLOPE OF 2.08% (1:48). MAXIMUM SLOPE IN ANY DIRECTION ON AN ADA PARKING STALL OR
ACCESS AISLE SHALL BE IN 2.08% (1:48). CONTRACTOR SHALL REVIEW AND VERIFY THE GRADIENT IN THE FIELD ALONG THE ADA
ROUTES PRIOR TO PLACING CONCRETE OR BITUMINOUS. CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY IF THERE IS A
DISCREPANCY BETWEEN THE GRADIENT IN THE FIELD VERSUS THE DESIGN GRADIENT. COORDINATE ALL WORK WITH PAVING
CONTRACTOR.
4.CONTRACTOR SHALL TAKE ALL PRECAUTIONS NECESSARY TO AVOID PROPERTY DAMAGE TO ADJACENT PROPERTIES DURING THE
CONSTRUCTION PHASES OF THIS PROJECT. CONTRACTOR WILL BE HELD SOLELY RESPONSIBLE FOR ANY DAMAGES TO THE ADJACENT
PROPERTIES OCCURRING DURING THE CONSTRUCTION PHASES OF THIS PROJECT.
5.SAFETY NOTICE TO CONTRACTORS: IN ACCORDANCE WITH GENERALLY ACCEPTED CONSTRUCTION PRACTICES, CONTRACTOR WILL BE
SOLELY AND COMPLETELY RESPONSIBLE FOR CONDITIONS ON THE JOB SITE, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY
DURING PERFORMANCE OF THE WORK. THIS REQUIREMENT WILL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING
HOURS. THE DUTY OF THE ENGINEER OR THE DEVELOPER TO CONDUCT CONSTRUCTION REVIEW OF THE CONTRACTOR'S
PERFORMANCE IS NOT INTENDED TO INCLUDE REVIEW OF THE ADEQUACY OF THE CONTRACTOR'S SAFETY MEASURES IN, ON OR NEAR
THE CONSTRUCTION SITE.
6.CONTRACTOR SHALL COMPLETE THE SITE GRADING CONSTRUCTION IN ACCORDANCE WITH THE REQUIREMENTS OF THE OWNER'S
SOILS ENGINEER. ALL SOIL TESTING SHALL BE COMPLETED BY THE OWNER'S SOILS ENGINEER. CONTRACTOR SHALL BE RESPONSIBLE
FOR COORDINATING ALL REQUIRED SOIL TESTS AND INSPECTIONS WITH THE SOILS ENGINEER.
A GEOTECHNICAL ENGINEERING SOILS REPORT HAS BEEN COMPLETED BY:
COMPANY: INTERTEK-PSI
ADDRESS: 2915 WATERS ROAD, SUITE 112 EAGAN, MN 55121
PHONE: 651-646-8148
DATED: FEBRUARY 11, 2019
CONTRACTOR SHALL OBTAIN A COPY OF THE SOILS REPORT.
7.CONTRACTOR SHALL COMPLETE DEWATERING AS REQUIRED TO COMPLETE THE SITE GRADING CONSTRUCTION.
8.PRIOR TO PLACEMENT OF THE AGGREGATE BASE, A TEST ROLL SHALL BE PERFORMED ON THE STREET AND PARKING AREA SUBGRADE.
CONTRACTOR SHALL PROVIDE A LOADED TANDEM AXLE TRUCK WITH A GROSS WEIGHT OF 25 TONS. THE TEST ROLLING SHALL BE AT
THE DIRECTION OF THE SOILS ENGINEER AND SHALL BE COMPLETED IN AREAS AS DIRECTED BY THE SOILS ENGINEER. CORRECTION OF
THE SUBGRADE SOILS SHALL BE COMPLETED IN ACCORDANCE WITH THE REQUIREMENTS OF THE SOILS ENGINEER.
9.REPLACE ALL SUBGRADE SOIL DISTURBED DURING THE CONSTRUCTION THAT HAVE BECOME UNSUITABLE AND WILL NOT PASS A TEST
ROLL. REMOVE UNSUITABLE SOIL FROM THE SITE AND IMPORT SUITABLE SOIL AT NO ADDITIONAL COST TO THE OWNER.
10.CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING AND MAINTAINING VEHICULAR AND PEDESTRIAN TRAFFIC CONTROL DEVICES
SUCH AS BARRICADES, WARNING SIGNS, DIRECTIONAL SIGNS, FLAGMEN AND LIGHTS TO CONTROL THE MOVEMENT OF TRAFFIC
WHERE NECESSARY. TRAFFIC CONTROL DEVICES SHALL CONFORM TO APPROPRIATE MINNESOTA DEPARTMENT OF TRANSPORTATION
STANDARDS.
11.EXCAVATE TOPSOIL FROM AREAS TO BE FURTHER EXCAVATED OR REGRADED AND STOCKPILE IN AREAS DESIGNATED ON THE SITE.
CONTRACTOR SHALL SALVAGE ENOUGH TOPSOIL FOR RESPREADING ON THE SITE AS SPECIFIED. EXCESS TOPSOIL SHALL BE PLACED IN
EMBANKMENT AREAS, OUTSIDE OF BUILDING PADS, ROADWAYS AND PARKING AREAS. CONTRACTOR SHALL SUBCUT CUT AREAS,
WHERE TURF IS TO BE ESTABLISHED, TO A DEPTH OF 6 INCHES. RESPREAD TOPSOIL IN AREAS WHERE TURF IS TO BE ESTABLISHED TO A
MINIMUM DEPTH OF 6 INCHES.
12.TRENCH BORROW CONSTRUCTION: IF ALLOWED BY THE OWNER, CONTRACTOR SHALL COMPLETE “TRENCH BORROW” EXCAVATION IN
AREAS DIRECTED BY THE ENGINEER IN ORDER TO OBTAIN STRUCTURAL MATERIAL. TREES SHALL NOT BE REMOVED OR DAMAGED AS A
RESULT OF THE EXCAVATION, UNLESS APPROVED BY THE ENGINEER. THE EXCAVATION SHALL COMMENCE A MINIMUM OF 10 FEET
FROM THE LIMIT OF THE BUILDING PAD. THE EXCAVATION FROM THIS LIMIT SHALL EXTEND AT A MINIMUM SLOPE OF 1 FOOT
HORIZONTAL TO 1 FOOT VERTICAL (1:1) DOWNWARD AND OUTWARD FROM THE FINISHED SURFACE GRADE ELEVATION. THE TRENCH
BORROW EXCAVATION SHALL BE BACKFILLED TO THE PROPOSED FINISHED GRADE ELEVATION, AND SHALL BE COMPACTED IN
ACCORDANCE WITH REQUIREMENTS OF THE QUALITY COMPACTION METHOD AS OUTLINED IN MN/DOT SPECIFICATION 2105.3F2.
SNOW FENCE SHALL BE FURNISHED AND PLACED ALONG THE PERIMETER OF THE TRENCH BORROW AREA WHERE THE SLOPES EXCEED
2 FOOT HORIZONTAL TO 1 FOOT VERTICAL (2:1).
13.FINISHED GRADING SHALL BE COMPLETED, CONTRACTOR SHALL UNIFORMLY GRADE AREAS WITHIN LIMITS OF GRADING, INCLUDING
ADJACENT TRANSITION AREAS. PROVIDE A SMOOTH FINISHED SURFACE WITHIN SPECIFIED TOLERANCES, WITH UNIFORM LEVELS OR
SLOPES BETWEEN POINTS WHERE ELEVATIONS ARE SHOWN, OR BETWEEN SUCH POINTS AND EXISTING GRADES. AREAS THAT HAVE
BEEN FINISHED GRADED SHALL BE PROTECTED FROM SUBSEQUENT CONSTRUCTION OPERATIONS, TRAFFIC AND EROSION. REPAIR ALL
AREAS THAT HAVE BECOME RUTTED, ERODED OR HAS SETTLED BELOW THE CORRECT GRADE. ALL AREAS DISTURBED BY THE
CONTRACTOR'S OPERATIONS SHALL BE RESTORED TO EQUAL OR BETTER THAN ORIGINAL CONDITION OR TO THE REQUIREMENTS OF
THE NEW WORK.
14.TOLERANCES
14.a.THE RESIDENTIAL BUILDING SUBGRADE FINISHED SURFACE ELEVATION SHALL NOT VARY BY MORE THAN 0.30 FOOT ABOVE, OR
0.30 FOOT BELOW, THE PRESCRIBED ELEVATION AT ANY POINT WHERE MEASUREMENT IS MADE.
14.b.THE COMMERCIAL BUILDING SUBGRADE FINISHED SURFACE ELEVATION SHALL NOT VARY BY MORE THAN 0.10 FOOT ABOVE,
OR 0.10 FOOT BELOW, THE PRESCRIBED ELEVATION AT ANY POINT WHERE MEASUREMENT IS MADE.
14.c.THE STREET OR PARKING AREA SUBGRADE FINISHED SURFACE ELEVATION SHALL NOT VARY BY MORE THAN 0.05 FOOT ABOVE,
OR 0.10 FOOT BELOW, THE PRESCRIBED ELEVATION OF ANY POINT WHERE MEASUREMENT IS MADE.
14.d.AREAS WHICH ARE TO RECEIVE TOPSOIL SHALL BE GRADED TO WITHIN 0.30 FOOT ABOVE OR BELOW THE REQUIRED
ELEVATION, UNLESS DIRECTED OTHERWISE BY THE ENGINEER.
14.e.TOPSOIL SHALL BE GRADED TO PLUS OR MINUS 1/2 INCH OF THE SPECIFIED THICKNESS.
15.AFTER THE SITE GRADING IS COMPLETED, IF EXCESS OR SHORTAGE OF SOIL MATERIAL EXISTS, CONTRACTOR SHALL TRANSPORT ALL
EXCESS SOIL MATERIAL OFF THE SITE TO AN AREA SELECTED BY THE CONTRACTOR, OR IMPORT SUITABLE MATERIAL TO THE SITE.
16.CONTRACTOR SHALL DETERMINE THE LOCATION OF ANY HAUL ROADS THAT MAY BE REQUIRED TO COMPLETE THE SITE GRADING
CONSTRUCTION AND SHALL INDICATE HAUL ROADS ON EROSION AND SEDIMENT CONTROL “SITE MAP”. CONTRACTOR SHALL COMPLY
WITH THE REQUIREMENTS OF THE GOVERNING AUTHORITY OF EACH ROADWAY. CONTRACTOR SHALL POST WHATEVER SECURITY,
AND COMPLY WITH ALL CONDITIONS WHICH ARE REQUIRED BY EACH GOVERNING AUTHORITY OF EACH ROADWAY.
17.DISTURBED AREAS WITHIN WETLAND MITIGATION SITE AND ANY DISTURBED AREAS WITHIN THE WETLAND SHALL BE RESTORED WITH
6 TO 12 INCHES OF ORGANIC SOILS, PREFERABLY SOILS THAT WERE PREVIOUSLY REMOVED FROM WETLAND AREAS. SEEDING IN THE
WETLAND MITIGATION AREAS ABOVE THE NORMAL WATER LEVEL SHALL BE MN STATE SEED MIX 34-271, WET MEADOW SOUTH AND
WEST, OR APPROVED EQUAL. FOR STATE SEED MIXES, OATS AND WINTER WHEAT SHOULD BE SELECTED BASED ON THE TIME OF YEAR
THAT THE MIX IS BEING USED. OATS SHOULD BE INCLUDED IN MIXES IF BEING USED BETWEEN OCTOBER 15TH AND AUGUST 1ST.
WINTER WHEAT SHOULD BE USED BETWEEN AUGUST 1ST AND OCTOBER 15TH. THE SEEDING RATE IS THE SAME FOR OATS AND
WINTER WHEAT. MIX 34-271 SHOULD BE APPLIED AT 12 POUNDS PER ACRE. SEED SHALL BE WATERED UNTIL A HEALTHY STAND OF
VEGETATION IS OBTAINED.
18.FILL PLACED WITHIN THE BUILDING PAD AREAS SHALL BE IN CONFORMANCE WITH HUD/FHA PROCEDURES AND DATA SHEET 79G.
19.RETAINING WALL(S) SHALL BE CONSTRUCTED OF _________________ (MODULAR BLOCK, TREATED TIMBER, BOULDER, ETC.)
MATERIAL. CONTRACTOR SHALL SUBMIT TO THE ENGINEER AND LOCAL AUTHORITY CERTIFIED ENGINEERING DRAWINGS, DESIGN
CALCULATIONS AND SOIL BORINGS. THE CERTIFIED ENGINEER FOR THE RETAINING WALL(S) SHALL PROVIDE CONSTRUCTION
OBSERVATIONS OF THE RETAINING WALL IMPROVEMENT, AND A LETTER CERTIFYING THE INSTALLATION OF THE WALL(S) WAS
CONSTRUCTED IN CONFORMANCE WITH THE PLANS AND SPECIFICATIONS.
902.5
X
902
SPOT ELEVATION
CONTOUR
RIP RAP
OVERFLOW ELEV.
CURB & GUTTER
BUILDING
RETAINING WALL
PROPERTY LIMIT
EXISTINGPROPOSED
LEGEND
WETLAND LIMITS
TREELINE
STORM SEWER
SOIL BORINGS
GRADING NOTES
DRAINTILE
EOF
902.5
D
THE SUBSURFACE UTILITY INFORMATION SHOWN ON THESE PLANS IS A UTILITY QUALITY LEVEL D. THIS QUALITY LEVEL WAS DETERMINED
ACCORDING TO THE GUIDELINES OF ASCE/CI 38-02, TITLED "STANDARD GUIDELINES FOR THE COLLECTION AND DEPICTION OF EXISTING
SUBSURFACE UTILITY DATA." THE CONTRACTOR AND/OR SUBCONTRACTORS SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING
UTILITIES BEFORE COMMENCING WORK, BY CONTACTING THE NOTIFICATION CENTER (GOPHER STATE ONE FOR MINNESOTA). THE
CONTRACTOR AND/OR SUBCONTRACTOR AGREE TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES, WHICH MIGHT BE OCCASIONED BY
HIS OR HER FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UTILITIES (UNDERGROUND AND OVERHEAD).
IF THE CONTRACTOR ENCOUNTERS ANY DRAIN TILE WITHIN THE SITE, HE OR SHE SHALL NOTIFY THE ENGINEER WITH THE LOCATION, SIZE,
INVERT AND IF THE TILE LINE IS ACTIVE. NO DRAIN TILE SHALL BE BACKFILLED WITHOUT APPROVAL FROM THE PROJECT ENGINEER.
IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE ALL EXISTING UTILITIES WHICH CONFLICT WITH THE PROPOSED
IMPROVEMENTS SHOWN ON THE PLANS.
25' B
U
F
F
E
R
50' B
U
F
F
E
R
HUDSON BLVD N
Project
Location
Date Submittal / RevisionNo.
Certification
Sheet Title
Summary
Revision History
Sheet No.Revision
Project No.
By
Designed:Drawn:
Approved:Book / Page:
Phase:Initial Issue:
Client
CONTINENTAL
483 FUND LLC
W134 N8675 EXECUTIVE PARKWAY
MENOMONEE FALLS, WI 53051
SPRINGS AT
LAKE ELMO
LAKE ELMO,
MINNESOTA
9955 HUDSON BOULEVARD NORTH
EAV CJL
EAV
PRELIMINARY 4/12/2019
21654
Registration No.Date:
I hereby certify that this plan, specification or
report was prepared by me or under my direct
supervision and that I am a duly licensed
professional ENGINEER under the laws of the state
of Minnesota.
If applicable, contact us for a wet signed copy of this
plan which is available upon request at Sambatek's,
Minnetonka, MN office.
4/12/201954914
Eric A. Vogel
PREL
I
M
I
N
A
R
Y
4/12/2019 CITY SUBMITTAL
SCALE IN FEET
0 10050
NORTH
Apr 12, 2019 - 3:12pm - User:clichty L:\PROJECTS\21654\CAD\Civil\Sheets\21654-C5-EROS.dwg
C5.01
EROSION
CONTROL
PHASE I
THE EROSION CONTROL PLAN SHEETS ALONG WITH THE REST OF THE SWPPP MUST BE KEPT ONSITE UNTIL
THE NOTICE OF TERMINATION IS FILED WITH THE MPCA, THE CONTRACTOR MUST UPDATE THE SWPPP,
INCLUDING THE EROSION CONTROL PLAN SHEETS AS NECESSARY TO INCLUDE ADDITIONAL REQUIREMENTS,
SUCH AS ADDITIONAL OR MODIFIED BMPS DESIGNED TO CORRECT PROBLEMS IDENTIFIED. AFTER FILING THE
NOTICE OF TERMINATION, THE SWPPP, INCLUDING THE EROSION CONTROL PLAN SHEETS, AND ALL
REVISIONS TO IT MUST BE SUBMITTED TO THE OWNER, TO BE KEPT ON FILE IN ACCORDANCE WITH THE
RECORD RETENTION REQUIREMENTS DESCRIBED IN THE SWPPP NARRATIVE.
EROSION CONTROL MATERIALS
QUANTITIES
ITEM UNIT QUANTITY
SILT FENCE LINEAR FEET 4183
SILT DIKE LINEAR FEET 0
BIO-ROLL LINEAR FEET 6
CONSTRUCTION ENTRANCE UNIT 1
NOTE TO CONTRACTOR
THE SUBSURFACE UTILITY INFORMATION SHOWN ON THESE PLANS IS A UTILITY QUALITY LEVEL D. THIS QUALITY LEVEL WAS DETERMINED
ACCORDING TO THE GUIDELINES OF ASCE/CI 38-02, TITLED "STANDARD GUIDELINES FOR THE COLLECTION AND DEPICTION OF EXISTING
SUBSURFACE UTILITY DATA." THE CONTRACTOR AND/OR SUBCONTRACTORS SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING
UTILITIES BEFORE COMMENCING WORK, BY CONTACTING THE NOTIFICATION CENTER (GOPHER STATE ONE FOR MINNESOTA). THE
CONTRACTOR AND/OR SUBCONTRACTOR AGREE TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES, WHICH MIGHT BE OCCASIONED BY
HIS OR HER FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UTILITIES (UNDERGROUND AND OVERHEAD).
IF THE CONTRACTOR ENCOUNTERS ANY DRAIN TILE WITHIN THE SITE, HE OR SHE SHALL NOTIFY THE ENGINEER WITH THE LOCATION, SIZE,
INVERT AND IF THE TILE LINE IS ACTIVE. NO DRAIN TILE SHALL BE BACKFILLED WITHOUT APPROVAL FROM THE PROJECT ENGINEER.
IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE ALL EXISTING UTILITIES WHICH CONFLICT WITH THE PROPOSED
IMPROVEMENTS SHOWN ON THE PLANS.
* REFER TO SHEET C5.03 FOR GENERAL NOTES, MAINTENANCE
NOTES, LOCATION MAPS, AND STANDARD DETAILS
TEMPORARY STABILIZATION MEASURES
(SEED, MULCH, MATS OR BLANKETS AS
OUTLINED IN THE SWPPP)
TEMPORARY STORAGE AND PARKING AREA
DIRECTION OF
OVERLAND FLOW
TEMPORARY DIVERSION
DITCH
LIMITS OF DRAINAGE
SUB-BASIN
INLET PROTECTION DEVICE 1
INLET PROTECTION DEVICE 2
TEMPORARY STONE
CONSTRUCTION ENTRANCE
TEMPORARY SEDIMENT BASIN
LIMITS OF DISTURBANCE
OVERFLOW ELEV.
CONTOUR
CHECK DAM
SILT FENCE
SOIL BORINGS
EXISTINGPROPOSED
STORM SEWER
CURB & GUTTER
DRAINTILE
TSM
TS
SB
SILT DIKE
BIO-ROLL
LEGEND
IP-1
EOF
902.5
D
902
SOIL EROSION / SEDIMENTATION CONTROL OPERATION TIME SCHEDULE
CONSTRUCTION SEQUENCE JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN
TEMPORARY CONTROL MEASURES
STRIP & STOCKPILE TOPSOIL
ROUGH GRADE / SEDIMENT CONTROL
TEMPORARY CONSTRUCTION ROADS
FOUNDATION / BUILDING CONSTRUCTION
SITE CONSTRUCTION
PERMANENT CONTROL STRUCTURES
FINISH GRADING
LANDSCAPING / SEED / FINAL STABILIZATION
STORM FACILITIES
NOTE: CONTRACTOR OR GENERAL CONTRACTOR TO COMPLETE TABLE WITH THEIR SPECIFIC PROJECT SCHEDULE
B20E
BLDG 5B
FFE=1006.35
GFE=1006.02
B20E
BLDG 6A
FFE=XXX.X
GFE=XXX.X
B20E
BLDG 8A
FFE=1004.85
GFE=1004.52
B20E
BLDG 7B
FFE=1004.60
GFE=1004.27
B20E
BLDG 4B
FFE=1006.65
GFE=1006.32
B20E
BLDG 3A
FFE=1006.20
GFE=1005.87
B20E
BLDG 2B
FFE=1005.47
GFE=1005.14
B20E
BLDG 1A
FFE=1005.50
GFE=1005.17
B20E
BLDG 14A
FFE=1001.75
GFE=1001.42
B20E
BLDG 9B
FFE=1003.00
GFE=1002.67
B20E
BLDG 11B
FFE=1003.00
GFE=1002.67
B20E
BLDG 10A
FFE=1002.50
GFE=1002.17
B20E
BLDG 12A
FFE=1003.00
GFE=1002.67
B20E
BLDG 13B
FFE=1002.50
GFE=1002.17
6G
GFE=1004.95
6G
GFE=1004.05
6G
GFE=1001.90
6G
GFE=1001.85
6G
GFE=1001.85
6GS-2
GFE=1000.50
MG-P
GFE=1000.90
CLUBHOUSE
FFE=1005.00
B20E
BLDG 6B
FFE=1006.10
GFE=1005.77
ADA
B20E
BLDG 15B
FFE=1002.20
GFE=1001.87
1004.85
1004.85
1006.351006.35
1006.35
1006.35 1006.35
1006.65
1006.65
1006.65
1006.65
1006.65
1004.60
1004.60
1004.85
1004.85
1006.021006.02
1006.32
1006.32
1006.101006.10
1006.10 1006.10
1006.10 1005.771005.77
1004.60
1004.60 1004.60
1004.271004.27
1004.85
1004.521004.52
1006.20
1006.20
1006.20
1006.20
1006.20
1005.87
1005.87
1003.00
1003.00
1003.00
1003.00
1002.501002.50
1002.50
1002.50
1002.50
1002.501002.50
1002.50
1002.50
1002.50
1003.00
1003.00
1003.00 1003.00
1003.00
1003.00 1002.671002.67
1003.00
1003.00 1003.00
1003.00
1003.00 1002.671002.67
1002.171002.17
1002.67
1002.67
1002.171002.17
1005.50
1005.50
1005.50
1005.50
1005.50
1005.17
1005.17
1002.20
1002.20 1002.20
1002.20
1002.20 1001.871001.87
1005.47
1005.47
1005.47
1005.47
1005.47
1005.14
1005.14
1005.00
1005.00
1005.00
1005.00
1001.42
1001.42
1001.75
1001.75
1001.75
1001.75
1001.75
1000.901000.90 1000.501000.50
1000.70
1001.851001.851001.851001.901001.901004.051004.051004.951004.95
25' B
U
F
F
E
R
50' B
U
F
F
E
R
HUDSON BLVD N
Project
Location
Date Submittal / RevisionNo.
Certification
Sheet Title
Summary
Revision History
Sheet No.Revision
Project No.
By
Designed:Drawn:
Approved:Book / Page:
Phase:Initial Issue:
Client
CONTINENTAL
483 FUND LLC
W134 N8675 EXECUTIVE PARKWAY
MENOMONEE FALLS, WI 53051
SPRINGS AT
LAKE ELMO
LAKE ELMO,
MINNESOTA
9955 HUDSON BOULEVARD NORTH
EAV CJL
EAV
PRELIMINARY 4/12/2019
21654
Registration No.Date:
I hereby certify that this plan, specification or
report was prepared by me or under my direct
supervision and that I am a duly licensed
professional ENGINEER under the laws of the state
of Minnesota.
If applicable, contact us for a wet signed copy of this
plan which is available upon request at Sambatek's,
Minnetonka, MN office.
4/12/201954914
Eric A. Vogel
PREL
I
M
I
N
A
R
Y
4/12/2019 CITY SUBMITTAL
SCALE IN FEET
0 10050
NORTH
Apr 12, 2019 - 3:13pm - User:clichty L:\PROJECTS\21654\CAD\Civil\Sheets\21654-C5-EROS.dwg
C5.02
EROSION
CONTROL
PHASE II
TEMPORARY STABILIZATION MEASURES
(SEED, MULCH, MATS OR BLANKETS AS
OUTLINED IN THE SWPPP)
TEMPORARY STORAGE AND PARKING AREA
DIRECTION OF
OVERLAND FLOW
TEMPORARY DIVERSION
DITCH
LIMITS OF DRAINAGE
SUB-BASIN
INLET PROTECTION DEVICE 1
INLET PROTECTION DEVICE 2
TEMPORARY STONE
CONSTRUCTION ENTRANCE
TEMPORARY SEDIMENT BASIN
LIMITS OF DISTURBANCE
OVERFLOW ELEV.
CONTOUR
CHECK DAM
SILT FENCE
SOIL BORINGS
EXISTINGPROPOSED
STORM SEWER
CURB & GUTTER
DRAINTILE SOIL EROSION / SEDIMENTATION CONTROL OPERATION TIME SCHEDULE
CONSTRUCTION SEQUENCE JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN
TEMPORARY CONTROL MEASURES
STRIP & STOCKPILE TOPSOIL
ROUGH GRADE / SEDIMENT CONTROL
TEMPORARY CONSTRUCTION ROADS
FOUNDATION / BUILDING CONSTRUCTION
SITE CONSTRUCTION
PERMANENT CONTROL STRUCTURES
FINISH GRADING
LANDSCAPING / SEED / FINAL STABILIZATION
STORM FACILITIES
NOTE: CONTRACTOR OR GENERAL CONTRACTOR TO COMPLETE TABLE WITH THEIR SPECIFIC PROJECT SCHEDULE
THE EROSION CONTROL PLAN SHEETS ALONG WITH THE REST OF THE SWPPP MUST BE KEPT ONSITE UNTIL
THE NOTICE OF TERMINATION IS FILED WITH THE MPCA, THE CONTRACTOR MUST UPDATE THE SWPPP,
INCLUDING THE EROSION CONTROL PLAN SHEETS AS NECESSARY TO INCLUDE ADDITIONAL REQUIREMENTS,
SUCH AS ADDITIONAL OR MODIFIED BMPS DESIGNED TO CORRECT PROBLEMS IDENTIFIED. AFTER FILING THE
NOTICE OF TERMINATION, THE SWPPP, INCLUDING THE EROSION CONTROL PLAN SHEETS, AND ALL
REVISIONS TO IT MUST BE SUBMITTED TO THE OWNER, TO BE KEPT ON FILE IN ACCORDANCE WITH THE
RECORD RETENTION REQUIREMENTS DESCRIBED IN THE SWPPP NARRATIVE.
TSM
TS
SB
EROSION CONTROL MATERIALS
QUANTITIES
ITEM UNIT QUANTITY
SILT FENCE LINEAR FEET 2360
SILT DIKE LINEAR FEET 493
CONSTRUCTION ENTRANCE UNIT 1
INLET PROTECTION DEVICE (IP-1)UNIT 51
INLET PROTECTION DEVICE (IP-2)UNIT 51
SILT DIKE
BIO-ROLL
LEGENDNOTE TO CONTRACTOR
IP-1
EOF
902.5
D
THE SUBSURFACE UTILITY INFORMATION SHOWN ON THESE PLANS IS A UTILITY QUALITY LEVEL D. THIS QUALITY LEVEL WAS DETERMINED
ACCORDING TO THE GUIDELINES OF ASCE/CI 38-02, TITLED "STANDARD GUIDELINES FOR THE COLLECTION AND DEPICTION OF EXISTING
SUBSURFACE UTILITY DATA." THE CONTRACTOR AND/OR SUBCONTRACTORS SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING
UTILITIES BEFORE COMMENCING WORK, BY CONTACTING THE NOTIFICATION CENTER (GOPHER STATE ONE FOR MINNESOTA). THE
CONTRACTOR AND/OR SUBCONTRACTOR AGREE TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES, WHICH MIGHT BE OCCASIONED BY
HIS OR HER FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UTILITIES (UNDERGROUND AND OVERHEAD).
IF THE CONTRACTOR ENCOUNTERS ANY DRAIN TILE WITHIN THE SITE, HE OR SHE SHALL NOTIFY THE ENGINEER WITH THE LOCATION, SIZE,
INVERT AND IF THE TILE LINE IS ACTIVE. NO DRAIN TILE SHALL BE BACKFILLED WITHOUT APPROVAL FROM THE PROJECT ENGINEER.
IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE ALL EXISTING UTILITIES WHICH CONFLICT WITH THE PROPOSED
IMPROVEMENTS SHOWN ON THE PLANS.
902
* REFER TO SHEET C5.03 FOR GENERAL NOTES, MAINTENANCE
NOTES, LOCATION MAPS, AND STANDARD DETAILS
UNDERGROUND
STORM SEWER
SYSTEM
IP1 IP2
IP1 IP2
IP1 IP2
IP1 IP2
IP1 IP2 IP1 IP2IP1IP2
IP1 IP2
IP1 IP2
IP1 IP2
IP1 IP2
IP1 IP2
IP1 IP2
IP1 IP2
IP1 IP2 IP1 IP2 IP1 IP2 IP1 IP2IP1IP2 IP1 IP2
IP1 IP2
IP1 IP2
IP1 IP2
IP1 IP2
IP1 IP2
IP1 IP2
IP1 IP2
IP1 IP2 IP1 IP2
IP1 IP2IP1IP2
IP1 IP2
IP1 IP2IP1IP2
IP1 IP2
IP1 IP2IP1IP2
IP1 IP2IP1IP2IP1IP2
IP1 IP2
IP1 IP2
IP1 IP2
IP1 IP2
IP1 IP2
IP1 IP2
IP1 IP2
IP1 IP2
IP1 IP2
IP1 IP2
IP1 IP2
Project
Location
Date Submittal / RevisionNo.
Certification
Sheet Title
Summary
Revision History
Sheet No.Revision
Project No.
By
Designed:Drawn:
Approved:Book / Page:
Phase:Initial Issue:
Client
CONTINENTAL
483 FUND LLC
W134 N8675 EXECUTIVE PARKWAY
MENOMONEE FALLS, WI 53051
SPRINGS AT
LAKE ELMO
LAKE ELMO,
MINNESOTA
9955 HUDSON BOULEVARD NORTH
EAV CJL
EAV
PRELIMINARY 4/12/2019
21654
Registration No.Date:
I hereby certify that this plan, specification or
report was prepared by me or under my direct
supervision and that I am a duly licensed
professional ENGINEER under the laws of the state
of Minnesota.
If applicable, contact us for a wet signed copy of this
plan which is available upon request at Sambatek's,
Minnetonka, MN office.
4/12/201954914
Eric A. Vogel
PREL
I
M
I
N
A
R
Y
4/12/2019 CITY SUBMITTAL
Apr 12, 2019 - 3:13pm - User:clichty L:\PROJECTS\21654\CAD\Civil\Sheets\21654-C5-EROS.dwg
C5.03
EROSION
CONTROL
NOTES AND
DETAILS
ALL MEASURES STATED ON THIS EROSION AND SEDIMENT CONTROL PLAN, AND IN THE STORM WATER POLLUTION PREVENTION PLAN SHALL BE MAINTAINED IN FULLY FUNCTIONAL CONDITION UNTIL NO
LONGER REQUIRED FOR A COMPLETED PHASE OF WORK OR FINAL STABILIZATION OF THE SITE. THE DESIGNATED CONTACT PERSON NOTED ON THIS PLAN MUST ROUTINELY INSPECT THE CONSTRUCTION
ON SITE ONCE EVERY SEVEN DAYS DURING ACTIVE CONSTRUCTION AND WITHIN 24 HOURS AFTER A RAINFALL EVENT GREATER THAN 0.5 INCHES IN 24 HOURS. ALL EROSION AND SEDIMENTATION
CONTROL MEASURES SHALL BE CLEANED AND REPAIRED IN ACCORDANCE WITH THE FOLLOWING:
1.ALL SILT FENCES MUST BE REPAIRED, REPLACED, OR SUPPLEMENTED WHEN THEY BECOME NONFUNCTIONAL OR THE SEDIMENT REACHES 1/2 OF THE HEIGHT OF THE FENCE. THESE REPAIRS MUST BE
MADE WITHIN 24 HOURS OF DISCOVERY, OR AS SOON AS FIELD CONDITIONS ALLOW ACCESS.
2.TEMPORARY AND PERMANENT SEDIMENTATION BASINS MUST BE DRAINED AND THE SEDIMENT REMOVED WHEN THE DEPTH OF SEDIMENT COLLECTED IN THE BASIN REACHES 1/2 THE STORAGE
VOLUME. DRAINAGE AND REMOVAL MUST BE COMPLETED WITHIN 72 HOURS OF DISCOVERY, OR AS SOON AS FIELD CONDITIONS ALLOW ACCESS (SEE PART 10.1-10.5 OF THE GENERAL PERMIT).
3.SURFACE WATERS, INCLUDING DRAINAGE DITCHES AND CONVEYANCE SYSTEMS, MUST BE INSPECTED FOR EVIDENCE OF SEDIMENT BEING DEPOSITED BY EROSION. CONTRACTOR MUST REMOVE ALL
DELTAS AND SEDIMENT DEPOSITED IN SURFACE WATERS, INCLUDING DRAINAGE WAYS, CATCH BASINS, AND OTHER DRAINAGE SYSTEMS, AND RESTABILIZE THE AREAS WHERE SEDIMENT REMOVAL
RESULTS IN EXPOSED SOIL. THE REMOVAL AND STABILIZATION MUST TAKE PLACE WITHIN SEVEN (7) DAYS OF DISCOVERY UNLESS PRECLUDED BY LEGAL, REGULATORY, OR PHYSICAL ACCESS
CONSTRAINTS. CONTRACTOR SHALL USE ALL REASONABLE EFFORTS TO OBTAIN ACCESS. IF PRECLUDED, REMOVAL AND STABILIZATION MUST TAKE PLACE WITHIN SEVEN (7) CALENDAR DAYS OF
OBTAINING ACCESS. CONTRACTOR IS RESPONSIBLE FOR CONTACTING ALL LOCAL, REGIONAL, STATE AND FEDERAL AUTHORITIES AND RECEIVING ANY APPLICABLE PERMITS, PRIOR TO CONDUCTING
ANY WORK.
4.CONSTRUCTION SITE VEHICLE EXIT LOCATIONS MUST BE INSPECTED FOR EVIDENCE OF OFF-SITE SEDIMENT TRACKING ONTO PAVED SURFACES. TRACKED SEDIMENT MUST BE REMOVED FROM ALL
OFF-SITE PAVED SURFACES, WITHIN 24 HOURS OF DISCOVERY, OR IF APPLICABLE, WITHIN A SHORTER TIME TO COMPLY WITH PART 9.11-9.12 OF THE GENERAL PERMIT.
5.CONTRACTOR IS RESPONSIBLE FOR THE OPERATION AND MAINTENANCE OF TEMPORARY AND PERMANENT WATER QUALITY MANAGEMENT BMPS, AS WELL AS ALL EROSION PREVENTION AND
SEDIMENT CONTROL BMPS, FOR THE DURATION OF THE CONSTRUCTION WORK AT THE SITE. THE PERMITTEE(S) ARE RESPONSIBLE UNTIL ANOTHER PERMITTEE HAS ASSUMED CONTROL (ACCORDING
TO PART 3.1 TO 3.8 OF THE MPCA GENERAL PERMIT) OVER ALL AREAS OF THE SITE THAT HAVE NOT BEEN FINALLY STABILIZED OR THE SITE HAS UNDERGONE FINAL STABILIZATION, AND A (N.O.T.)
HAS BEEN SUBMITTED TO THE MPCA.
6.IF SEDIMENT ESCAPES THE CONSTRUCTION SITE, OFF-SITE ACCUMULATIONS OF SEDIMENT MUST BE REMOVED IN A MANNER AND AT A FREQUENCY SUFFICIENT TO MINIMIZE OFF-SITE IMPACTS
(E.G., FUGITIVE SEDIMENT IN STREETS COULD BE WASHED INTO STORM SEWERS BY THE NEXT RAIN AND/OR POSE A SAFETY HAZARD TO USERS OF PUBLIC STREETS).
7.ALL INFILTRATION AREAS MUST BE INSPECTED TO ENSURE THAT NO SEDIMENT FROM ONGOING CONSTRUCTION ACTIVITIES IS REACHING THE INFILTRATION AREA AND THESE AREAS ARE PROTECTED
FROM COMPACTION DUE TO CONSTRUCTION EQUIPMENT DRIVING ACROSS THE INFILTRATION AREA.
1.CONSTRUCTION SHALL COMPLY WITH ALL APPLICABLE GOVERNING CODES AND BE CONSTRUCTED TO SAME. WHERE A CONFLICT EXISTS BETWEEN LOCAL JURISDICTIONAL STANDARD SPECIFICATIONS
AND SAMBATEK STANDARD SPECIFICATIONS, THE MORE STRINGENT SPECIFICATION SHALL APPLY.
2.THE STORMWATER POLLUTION PREVENTION PLAN (SWPPP) IS COMPRISED OF THIS DRAWING (EROSION & SEDIMENTATION CONTROL PLAN-ESC PLAN), THE STANDARD DETAILS, THE PLAN
NARRATIVE, AND ITS APPENDICES, PLUS THE PERMIT AND ALL SUBSEQUENT REPORTS AND RELATED DOCUMENTS.
3.CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLETING & SUBMITTING THE APPLICATION FOR THE MPCA GENERAL STORMWATER PERMIT FOR CONSTRUCTION ACTIVITY. ALL CONTRACTORS AND
SUBCONTRACTORS INVOLVED WITH STORM WATER POLLUTION PREVENTION SHALL OBTAIN A COPY OF THE SWPPP AND THE STATE OF MINNESOTA NATIONAL POLLUTANT DISCHARGE ELIMINATION
SYSTEM GENERAL PERMIT (NPDES PERMIT, ISSUED AUGUST 1, 2018) AND BECOME FAMILIAR WITH THE CONTENTS. THE SWPPP AND ALL OTHER RELATED DOCUMENTS MUST BE KEPT AT THE SITE
DURING CONSTRUCTION. (NOTE TO THE PREPARER: EDIT APPLICATION PROCESS PER PROJECT REQUIREMENTS)
4.CONTRACTOR SHALL IMPLEMENT BEST MANAGEMENT PRACTICES (BMP'S) AS REQUIRED BY THE SWPPP & PERMITS. CONTRACTOR SHALL OVERSEE THE INSPECTION & MAINTENANCE OF THE BMP'S
AND EROSION PREVENTION FROM BEGINNING OF CONSTRUCTION AND UNTIL CONSTRUCTION IS COMPLETED, IS APPROVED BY ALL AUTHORITIES, AND THE NOTICE OF TERMINATION (NOT) HAS BEEN
FILED WITH THE MPCA BY EITHER THE OWNER OR OPERATOR AS APPROVED ON PERMIT. ADDITIONAL BMP'S SHALL BE IMPLEMENTED AS DICTATED BY CONDITIONS AT NO ADDITIONAL COST TO
OWNER THROUGHOUT ALL PHASES OF CONSTRUCTION. (NOTE TO THE PREPARER: REVISE INSPECTION RESPONSIBILITY PER OPTIONS IN SWPPP NARRATIVE (SECTION 02370))
5.CONTRACTOR SHALL COMPLY WITH TRAINING REQUIREMENTS IN PART 21.1-21.3 OF THE GENERAL PERMIT.
6.BMP'S AND CONTROLS SHALL CONFORM TO FEDERAL, STATE, OR LOCAL REQUIREMENTS OR MANUAL OF PRACTICE, AS APPLICABLE. CONTRACTOR SHALL IMPLEMENT ADDITIONAL CONTROLS AS
DIRECTED BY PERMITTING AGENCY OR OWNER.
7.ESC PLAN MUST CLEARLY DELINEATE ALL STATE WATERS. PERMITS FOR ANY CONSTRUCTION ACTIVITY IMPACTING STATE WATERS OR REGULATED WETLANDS MUST BE MAINTAINED ON SITE AT ALL
TIMES.
8.CONTRACTOR SHALL MINIMIZE CLEARING TO THE MAXIMUM EXTENT PRACTICAL OR AS REQUIRED BY THE GENERAL PERMIT. THE BOUNDARIES OF THE CLEARING LIMITS SHOWN ON THE ESC PLANS
SHALL BE CLEARLY DELINEATED (E.G. WITH FLAGS, STAKES, SIGNS, SILT FENCE, ETC.) ON THE DEVELOPMENT SITE BEFORE WORK BEGINS. GROUND DISTURBING ACTIVITIES MUST NOT OCCUR OUTSIDE
THE LIMITS OF DISTURBANCE.
9.GENERAL CONTRACTOR SHALL DENOTE ON PLAN THE TEMPORARY PARKING AND STORAGE AREA WHICH SHALL ALSO BE USED AS THE EQUIPMENT MAINTENANCE AND CLEANING AREA, EMPLOYEE
PARKING AREA, AND AREA FOR LOCATING PORTABLE FACILITIES, OFFICE TRAILERS, AND TOILET FACILITIES.
10.ALL WASH WATER (CONCRETE TRUCKS, VEHICLE CLEANING, EQUIPMENT CLEANING, ETC.) MUST BE LIMITED TO A DEFINED AREA OF THE SITE AND SHALL BE CONTAINED AND PROPERLY TREATED OR
DISPOSED. NO ENGINE DEGREASING IS ALLOWED ON SITE.
11.ALL LIQUID AND SOLID WASTES GENERATED BY CONCRETE WASHOUT OPERATIONS MUST BE CONTAINED IN A LEAK-PROOF CONTAINMENT FACILITY OR IMPERMEABLE LINER. A COMPACTED CLAY
LINER IS NOT ACCEPTABLE. THE LIQUID AND SOLID WASTES MUST NOT CONTACT THE GROUND, AND THERE MUST NOT BE RUNOFF FROM THE CONCRETE WASHOUT OPERATIONS OR AREAS. LIQUID
AND SOLID WASTES MUST BE DISPOSED OF PROPERLY AND IN COMPLIANCE WITH MPCA REGULATIONS. A SIGN MUST BE INSTALLED ADJACENT TO EACH WASHOUT FACILITY TO INFORM CONCRETE
EQUIPMENT OPERATORS TO UTILIZE THE PROPER FACILITIES. SELF-CONTAINED CONCRETE WASHOUTS ON CONCRETE DELIVERY TRUCKS ARE ALLOWED.
12.SUFFICIENT OIL AND GREASE ABSORBING MATERIALS AND FLOTATION BOOMS SHALL BE MAINTAINED ON SITE OR READILY AVAILABLE TO CONTAIN AND CLEAN-UP FUEL OR CHEMICAL SPILLS AND
LEAKS.
13.DUST ON THE SITE SHALL BE CONTROLLED. THE USE OF MOTOR OILS AND OTHER PETROLEUM BASED OR TOXIC LIQUIDS FOR DUST SUPPRESSION OPERATIONS IS PROHIBITED.
14.SOLID WASTE: COLLECTED SEDIMENT, ASPHALT & CONCRETE MILLINGS, FLOATING DEBRIS, PAPER, PLASTIC, FABRIC, CONSTRUCTION & DEMOLITION DEBRIS & OTHER WASTES MUST BE DISPOSED OF
PROPERLY & MUST COMPLY WITH MPCA DISPOSAL REQUIREMENTS.
15.HAZARDOUS MATERIALS: OIL, GASOLINE, PAINT & ANY HAZARDOUS SUBSTANCES MUST BE PROPERLY STORED, INCLUDING SECONDARY CONTAINMENT, TO PREVENT SPILLS, LEAKS OR OTHER
DISCHARGE. RESTRICTED ACCESS TO STORAGE AREAS MUST BE PROVIDED TO PREVENT VANDALISM. STORAGE & DISPOSAL OF HAZARDOUS WASTE MUST BE IN COMPLIANCE WITH MPCA
REGULATIONS.
16.ALL STORM WATER POLLUTION PREVENTION MEASURES PRESENTED ON THIS PLAN, AND IN THE SWPPP, SHALL BE INITIATED AS SOON AS PRACTICABLE AND PRIOR TO SOIL DISTURBING ACTIVITIES
UPSLOPE.
17.DISTURBED PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITY HAS STOPPED SHALL BE TEMPORARILY SEEDED, WITHIN 14 DAYS OF INACTIVITY. SEEDING SHALL BE IN ACCORDANCE WITH
MN/DOT SEED MIXTURE NUMBER 21-111 OR 21-112 DEPENDING ON THE SEASON OF PLANTING ( SEE MN/DOT SPECIFICATION SECTION 2575.3) SEEDING METHOD AND APPLICATION RATE SHALL
CONFORM TO MN/DOT SPECIFICATION SECTION 2575.3. TEMPORARY MULCH SHALL BE APPLIED IN ACCORDANCE WITH MN/DOT SPECIFICATION SECTION 2575.3F1 AND 2575.3G. ALTERNATIVELY,
HYDRAULIC SOIL STABILIZER IN ACCORDANCE WITH MN/DOT SPECIFICATION SECTION 2575.3H MAY BE USED IN PLACE OF TEMPORARY MULCH.
18.DISTURBED PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITY HAS PERMANENTLY STOPPED SHALL BE PERMANENTLY STABILIZED. THESE AREAS SHALL BE STABILIZED IN ACCORDANCE WITH
THE TIME TABLE DESCRIBED ABOVE. REFER TO THE GRADING PLAN AND/OR LANDSCAPE PLAN FOR VEGETATIVE COVER. (NOTE TO THE PREPARER: WHERE PERMANENT SEEDING IS NOT CALLED OUT
IN THE GRADING AND/ OR LANDSCAPE PLAN, REPLACE THE LAST SENTENCE IN THIS ITEM WITH THE FOLLOWING: SEED WET PONDS WITH MN/DOT SEED MIXTURE 310 "NATIVE WET TALL" BELOW THE
HWL. SEED ALL OTHER AREAS WITH SEED MIXTURE 260 "COMMERCIAL TURF". SEEDING METHOD AND APPLICATION RATE SHALL CONFORM TO MN/DOT SPECIFICATION SECTION 2573.3.)
19.CONTRACTORS OR SUBCONTRACTORS WILL BE RESPONSIBLE FOR REMOVING SEDIMENT FROM CONVEYANCES & FROM TEMPORARY SEDIMENTATION BASINS THAT ARE TO BE USED AS PERMANENT
WATER QUALITY MANAGEMENT BASINS. SEDIMENT MUST BE STABILIZED TO PREVENT IT FROM BEING WASHED BACK INTO THE BASIN, CONVEYANCES, OR DRAINAGEWAYS DISCHARGING OFF-SITE OR
TO SURFACE WATERS. THE CLEANOUT OF PERMANENT BASINS MUST BE SUFFICIENT TO RETURN THE BASIN TO DESIGN CAPACITY.
20.ON-SITE & OFF-SITE SOIL STOCKPILE AND BORROW AREAS SHALL BE PROTECTED FROM EROSION AND SEDIMENTATION THROUGH IMPLEMENTATION OF BMP'S. STOCKPILE AND BORROW AREA
LOCATIONS SHALL BE NOTED ON THE SITE MAP AND PERMITTED IN ACCORDANCE WITH GENERAL PERMIT REQUIREMENTS.
21.TEMPORARY SOIL STOCKPILES MUST HAVE SILT FENCE OR OTHER EFFECTIVE SEDIMENT CONTROLS & CANNOT BE PLACED IN SURFACE WATERS, INCLUDING STORMWATER CONVEYANCES SUCH AS
CURB & GUTTER SYSTEMS OR CONDUITS & DITCHES.
22.SLOPES SHALL BE LEFT IN A ROUGHENED CONDITION DURING THE GRADING PHASE TO REDUCE RUNOFF VELOCITIES AND EROSION.
23.DUE TO THE GRADE CHANGES DURING THE DEVELOPMENT OF THE PROJECT, CONTRACTOR SHALL BE RESPONSIBLE FOR ADJUSTING THE EROSION CONTROL MEASURES (SILT FENCES, CHECK DAMS,
INLET PROTECTION DEVICES, ETC.) TO PREVENT EROSION.
24.ALL CONSTRUCTION SHALL BE STABILIZED AT THE END OF EACH WORKING DAY, THIS INCLUDES BACKFILLING OF TRENCHES FOR UTILITY CONSTRUCTION AND PLACEMENT OF GRAVEL OR BITUMINOUS
PAVING FOR ROAD CONSTRUCTION.
DEVELOPER/OWNER:
INTERTEK-PSI
2915 WATERS ROAD, SUITE 112
EAGAN, MN 55121
651-646-8148
SITE OPERATOR / GENERAL CONTRACTOR
SUPERINTENDENT:
CROSS BRACE
MI
N
.
15
"
18
"
MA
X
.
2" X 4" STAKE
3'
M
I
N
.
DROP INLET
WITH GRATE
2" X 4" WOOD
(TYP.)
5' MIN.
SECURELY FASTEN OVERLAPPING
ENDS OF SILT FENCE MATERIAL
TO ADJACENT STAKES WITH
THREE WIRE TIES OR OTHER
FASTENERS
ATTACH THE WOVEN WIRE
FENCE TO EACH POST WITH
THREE WIRE TIES OR OTHER
FASTENERS (SEE NOTE 1)
1. ATTACH THE WOVEN WIRE FENCE TO EACH POST AND THE GEOTEXTILE TO THE WOVEN WIRE FENCE
(SPACED EVERY 30") WITH THREE WIRE TIES OR OTHER FASTENERS, ALL SPACED WITHIN THE TOP 8" OF
THE FABRIC. ATTACH EACH TIE DIAGONALLY 45 DEGREES THROUGH THE FABRIC, WITH EACH PUNCTURE
AT LEAST 1" VERTICALLY APART.
2. WHEN TWO SECTIONS OF SILT FENCE MATERIAL ADJOIN EACH OTHER, THEY SHALL BE OVERLAPPED
ACROSS TWO POSTS.
3. MAINTENANCE SHALL BE PERFORMED AS NOTED IN THE SWPPP. DEPTH OF ACCUMULATED SEDIMENTS
MAY NOT EXCEED ONE-HALF THE HEIGHT OF THE FABRIC. MAINTENANCE CLEANOUT MUST BE
CONDUCTED REGULARLY TO PREVENT ACCUMULATED SEDIMENTS FROM REACHING ONE-HALF THE
HEIGHT OF THE SILT FENCE MATERIAL ABOVE GRADE.
4. ALL SILT FENCE INLETS SHALL INCLUDE WIRE SUPPORT.
OVERLAP
5' MIN.
SILT FENCE MATERIAL TO BE
FASTENED SECURELY TO WOVEN
WIRE FENCE WITH THREE TIES
SPACED AT 30" ON CENTER (SEE
NOTE 1)
DEFLECTOR PLATE
OVERFLOW 2 - TOP OF CURB BOX
OVERFLOW 1 - CENTER OF FILTER ASSEMBLY
10" FILTER ASSEMBLY
CURB
CG 3067
HIGH-FLOW FABRIC
MIRAFI FF101
ROAD DRAIN CASTING APPLICABILTY
·NEENAH R-3067
·NEENAH R-3512
NOT TO SCALE
5
0
'
M
I
N
.
ROAD
6"
M
I
N
.
CONSTRUCT 2' HIGH BERM WITH
MAXIMUM SIDE SLOPE OF 4:1
2" TO 3" GRAVEL
NOTE: ROCK EXITS SHALL BE INSTALLED PRIOR TO THE
START OF ANY SITE WORK. ROCK EXITS SHALL BE
INSPECTED FOLLOWING EACH RAINFALL.
MAINTENANCE OF ROCK EXITS SHALL INCLUDE A TOP
DRESSING OF NEW GRAVEL, OR REMOVAL AND
REPLACEMENT OF THE GRAVEL AS NEEDED, TO KEEP
THE EXITS FREE FROM COLLECTED MUD.
AS
REQU
I
R
E
D
M
I
N
0
.
5
%
G
R
A
D
E
8' X 8' MIN OR AS
REQUIRED TO
CONTAIN WASTE
CONCRETE
SIGN TO INDICATE THE LOCATION OF
THE CONCRETE WASHOUT AREA
2'-0" MIN
BERM AROUND PERIMETER
GROUND SURFACE
12" MIN
12" MIN
COMPACTED EMBANKMENT
MATERIAL (TYP.)3:1 OR FLATTER
SIDE SLOPES
NOTES:
1.CONCRETE WASHOUT AREA SHALL BE INSTALLED PRIOR TO ANY CONCRETE PLACEMENT
ON SITE.
2.CONCRETE WASHOUT AREA SHALL BE LINED WITH MINIMUM 10 MIL THICK PLASTIC
LINER.
3.VEHICLE TRACKING CONTROL IS REQUIRED IF ACCESS TO CONCRETE WASHOUT AREA IS
OFF PAVEMENT.
4.SIGNS SHALL BE PLACED AT THE CONSTRUCTION ENTRANCE, AT THE WASHOUT AREA,
AND ELSEWHERE AS NECESSARY TO CLEARLY INDICATE THE LOCATION OF THE
CONCRETE WASHOUT AREA TO OPERATORS OF CONCRETE TRUCKS AND PUMP RIGS.
5.THE CONCRETE WASHOUT AREA SHALL BE REPAIRED AND ENLARGED OR CLEANED OUT
AS NECESSARY TO MAINTAIN CAPACITY FOR WASTED CONCRETE.
6.AT THE END OF CONSTRUCTION, ALL CONCRETE SHALL BE REMOVED FROM THE SITE
AND DISPOSED OF AT AN ACCEPTED WASTE SITE.
7.WHEN THE CONCRETE WASHOUT AREA IS REMOVED, THE DISTURBED AREA SHALL BE
SEEDED AND MULCHED OR OTHERWISE STABILIZED IN A MANNER ACCEPTED BY THE
CITY.
WOVEN WIRE
FENCE WITH SILT
FENCE MATERIAL
COVER
EXTEND WIRE FENCE
A MIN. OF 3" INTO
GROUND
EXTEND SILT FENCE
MATERIAL A MIN. OF
1'-0" INTO GROUND
EROSION & SEDIMENTATION CONTROL NOTES & DETAILS / "SITE MAP"
SITE LOCATION MAP
NOT TO SCALE
USGS MAP
GENERAL EROSION NOTES:
NOT TO SCALE
ROCK EXIT DRIVE
NOT TO SCALE
CONCRETE WASHOUT AREA
ROAD DRAIN INLET PROTECTION (IP-2)SILT FENCE INLET PROTECTION (IP-1)
NOT TO SCALE
POSTS: 2 X 4 WOODEN STAKE FENCE:
WOVEN WIRE, 14-1/2 GA., 6" MAX. MESH
OPENING FABRIC: IN ACCORDANCE WITH
ASTM D 6461 LATEST EDITION.
NOT TO SCALE
PHASE I:
1.INSTALL STABILIZED CONSTRUCTION ENTRANCES.
2.PREPARE TEMPORARY PARKING AND STORAGE AREA.
3.CONSTRUCT THE SILT FENCES ON THE SITE.
4. INSTALL INLET PROTECTION DEVICES ON EXISTING STORM STRUCTURES, AS SHOWN ON THE PLAN.
5.CONSTRUCT THE SEDIMENTATION AND SEDIMENT TRAP BASINS, AS REQUIRED.
6. HALT ALL ACTIVITIES AND CONTACT THE CIVIL ENGINEERING CONSULTANT TO PERFORM INSPECTION OF BMPs. GENERAL CONTRACTOR SHALL SCHEDULE
AND CONDUCT STORM WATER PRE-CONSTRUCTION MEETING WITH ENGINEER AND ALL GROUND DISTURBING CONTRACTORS BEFORE PROCEEDING WITH
CONSTRUCTION.
7. CLEAR AND GRUB THE SITE.
8. BEGIN GRADING THE SITE.
9. START CONSTRUCTION OF BUILDING PAD AND STRUCTURES.
PHASE II:
1.TEMPORARILY SEED DENUDED AREAS.
2.INSTALL UTILITIES, UNDERDRAINS, STORM SEWERS, CURBS AND GUTTERS.
3.INSTALL RIP RAP AROUND OUTLET STRUCTURES.
4.INSTALL INLET PROTECTION AROUND ALL STORM SEWER STRUCTURES.
5.PREPARE SITE FOR PAVING.
6.PAVE SITE.
7.INSTALL INLET PROTECTION DEVICES.
8.COMPLETE GRADING AND INSTALL PERMANENT SEEDING AND PLANTING.
9.REMOVE ALL TEMPORARY EROSION AND SEDIMENT CONTROL DEVICES (ONLY IF SITE IS STABILIZED), IF REQUIRED BY THE CONTRACT
AREA SUMMARY IN ACRES
PAVEMENT AREA 6.56 AC±
BUILDING AREA 4.67 AC±
SEEDED AREA 5.79 AC±
TOTAL DISTURBED 17.02 AC±
PRE - CONSTRUCTION IMPERVIOUS 0.05 AC±
POST - CONSTRUCTION IMPERVIOUS 11.23 AC±
SEQUENCE OF CONSTRUCTION
FRAME
MAINTENANCE NOTES:
SITE
COMMERCE DR
94
19
TAMARACK RD
WO
O
D
B
U
R
Y
D
R
HUD
S
O
N
R
D
10
SITE
HUDSON BLVD N
B20E
BLDG 5B
FFE=1006.35
GFE=1006.02
B20E
BLDG 6A
FFE=XXX.X
GFE=XXX.X
B20E
BLDG 8A
FFE=1004.85
GFE=1004.52
B20E
BLDG 7B
FFE=1004.60
GFE=1004.27
B20E
BLDG 4B
FFE=1006.65
GFE=1006.32
B20E
BLDG 3A
FFE=1006.20
GFE=1005.87
B20E
BLDG 2B
FFE=1005.47
GFE=1005.14
B20E
BLDG 1A
FFE=1005.50
GFE=1005.17
B20E
BLDG 14A
FFE=1001.75
GFE=1001.42
B20E
BLDG 9B
FFE=1003.00
GFE=1002.67
B20E
BLDG 11B
FFE=1003.00
GFE=1002.67
B20E
BLDG 10A
FFE=1002.50
GFE=1002.17
B20E
BLDG 12A
FFE=1003.00
GFE=1002.67
B20E
BLDG 13B
FFE=1002.50
GFE=1002.17
6G
GFE=1004.95
6G
GFE=1004.05
6G
GFE=1001.90
6G
GFE=1001.85
6G
GFE=1001.85
6GS-2
GFE=1000.50
MG-P
GFE=1000.90
CLUBHOUSE
FFE=1005.00
B20E
BLDG 6B
FFE=1006.10
GFE=1005.77
ADA
B20E
BLDG 15B
FFE=1002.20
GFE=1001.87
25' B
U
F
F
E
R
50' B
U
F
F
E
R
MH 02
RE=1013.90
IE=987.40
MH 03
RE=1002.41
IE=987.74
MH 04-A
RE=1002.53
IE=988.42
MH 04
RE=1002.82
IE=987.99
MH 05
RE=1002.32
IE=988.09
MH 07
RE=1001.54
IE=988.63
MH 09-C
RE=XXX.XX
IE=990.39
MH 11
RE=998.25
IE=991.12
85 LF - 8" PVC
SDR 26 @ 0.40%
26 LF - 8" PVC
SDR 26 @ 0.04%
62 LF - 8" PVC
SDR 26 @ 0.04%
148 LF - 8" PVC
SDR 26 @ 0.04%
109 LF - 8" PVC
SDR 26 @ 0.04%
138 LF - 8" PVC
SDR 26 @ 0.04%
143 LF - 8" PVC
SDR 26 @ 0.04%
216 LF - 8" PVC
SDR 26 @ 0.04%
108 LF - 8" PVC
SDR 26 @ 0.04%
MH 01
RE=1012.40
IE=986.76
161 LF - 8" PVC
SDR 26 @ 0.40%
8" CLEANOUT
RE=1002.21
IE=988.61
48 LF - 8" PVC
SDR 26 @ 0.04%
MH 06
RE=1002.07
IE=988.20
MH 08
RE=1000.51
IE=989.14126 LF - 8" PVC
SDR 26 @ 0.04%
MH 09
RE=999.21
IE=989.69
MH 09-A
RE=1000.22
IE=890.25
141 LF - 8" PVC
SDR 26 @ 0.04%
MH 09-B
RE=XXX.XX
IE=990.16
118 LF - 8" PVC
SDR 26 @ 0.04%
57 LF - 8" PVC
SDR 26 @ 0.04%
MH 10
RE=998.83
IE=990.26
63 LF - 8" PVC
SDR 26 @ 0.04%
MH 11-A
RE=999.25
IE=991.38
MH 11-B
RE=999.50
IE=991.82
112 LF - 8" PVC
SDR 26 @ 0.04%
HYDRANT
6" GATE VALVE
8" x 6" TEE
HYDRANT
6" GATE VALVE
8" x 6" TEE
HYDRANT
6" GATE VALVE
8" x 6" TEE
HYDRANT
6" GATE VALVE
8" x 6" TEE
HYDRANT
6" GATE VALVE
8" x 6" TEE
HYDRANT
6" GATE VALVE
8" x 6" TEE
HYDRANT
6" GATE VALVE
8" x 6" TEE
HYDRANT
6" GATE VALVE
8" x 6" TEE
HYDRANT
6" GATE VALVE
8" x 6" TEE
HYDRANT
6" GATE VALVE
8" x 6" TEE
HYDRANT
6" GATE VALVE
8" x 6" TEE
8"
W
A
T
E
R
M
A
I
N
8" WATERMAIN
8" WATERMAIN8" WATERMAIN
8" WATERMAIN
8" WATERMAIN
8" WATERMAIN
8"
W
A
T
E
R
M
A
I
N
CONNECT TO EXISTING 12"
WATERMAIN WITH 12" x 8"
TEE WITH GATE VALVE
CONNECT TO EXISTING 12"
WATERMAIN WITH 12" x 8"
TEE WITH GATE VALVE
Project
Location
Date Submittal / RevisionNo.
Certification
Sheet Title
Summary
Revision History
Sheet No.Revision
Project No.
By
Designed:Drawn:
Approved:Book / Page:
Phase:Initial Issue:
Client
CONTINENTAL
483 FUND LLC
W134 N8675 EXECUTIVE PARKWAY
MENOMONEE FALLS, WI 53051
SPRINGS AT
LAKE ELMO
LAKE ELMO,
MINNESOTA
9955 HUDSON BOULEVARD NORTH
EAV CJL
EAV
PRELIMINARY 4/12/2019
21654
Registration No.Date:
I hereby certify that this plan, specification or
report was prepared by me or under my direct
supervision and that I am a duly licensed
professional ENGINEER under the laws of the state
of Minnesota.
If applicable, contact us for a wet signed copy of this
plan which is available upon request at Sambatek's,
Minnetonka, MN office.
4/12/201954914
Eric A. Vogel
PREL
I
M
I
N
A
R
Y
4/12/2019 CITY SUBMITTAL
SCALE IN FEET
0 10050
NORTH
1. THE UTILITY IMPROVEMENTS FOR THIS PROJECT SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE
"STANDARD UTILITIES SPECIFICATIONS" AS PUBLISHED BY THE CITY ENGINEERS ASSOCIATION OF
MINNESOTA (CEAM), EXCEPT AS MODIFIED HEREIN. CONTRACTOR SHALL OBTAIN A COPY OF THESE
SPECIFICATIONS.
1.1. ALL UTILITIES SHALL BE CONSTRUCTED IN ACCORDANCE WITH CITY REQUIREMENTS.
1.2. CONTRACTOR SHALL NOT OPEN, TURN OFF, INTERFERE WITH, OR ATTACH ANY PIPE OR HOSE TO
OR TAP WATERMAIN BELONGING TO THE CITY UNLESS DULY AUTHORIZED TO DO SO BY THE CITY.
ANY ADVERSE CONSEQUENCES OF ANY SCHEDULED OR UNSCHEDULED DISRUPTIONS OF SERVICE
TO THE PUBLIC ARE THE LIABILITY OF CONTRACTOR.
1.3. A MINIMUM VERTICAL SEPARATION OF 18 INCHES AND HORIZONTAL SEPARATION OF 10-FEET
BETWEEN OUTSIDE PIPE DIAMETERS IS REQUIRED AT ALL WATERMAIN AND SEWER MAIN
(BUILDING, STORM AND SANITARY) CROSSINGS.
2. ALL MATERIALS SHALL BE AS SPECIFIED IN CEAM SPECIFICATIONS EXCEPT AS MODIFIED HEREIN.
2.1. ALL MATERIALS SHALL COMPLY WITH THE REQUIREMENTS OF THE CITY.
2.2. ALL SANITARY SEWER TO BE PVC SDR-35, UNLESS NOTED OTHERWISE.
2.2.1. ALL SANITARY SEWER SERVICES TO BUILDING SHALL BE PVC SCH 40 CONFORMING TO ASTM
D2665.
2.3. ALL WATERMAIN TO BE DUCTILE IRON - CLASS 52, UNLESS NOTED OTHERWISE.
2.3.1. ALL WATERMAIN TO HAVE 7.5-FEET OF COVER OVER TOP OF WATERMAIN.
2.3.2. PROVIDE THRUST BLOCKING AND MECHANICAL JOINT RESTRAINTS ON ALL WATERMAIN
JOINTS PER CITY STANDARDS.
2.4. ALL STORM SEWER PIPE TO BE SMOOTH INTERIOR DUAL WALL HDPE PIPE WITH WATER TIGHT
GASKETS, UNLESS NOTED OTHERWISE.
2.4.1. ALL STORM SEWER PIPE FOR ROOF DRAIN SERVICES TO BUILDING SHALL BE PVC SCH 40
CONFORMING TO ASTM D2665.
2.5. RIP RAP SHALL BE Mn/DOT CLASS 3.
3. COORDINATE ALL BUILDING SERVICE CONNECTION LOCATIONS AND INVERT ELEVATIONS WITH
MECHANICAL CONTRACTOR PRIOR TO CONSTRUCTION.
4. ALL BUILDING SERVICE CONNECTIONS (STORM, SANITARY, WATER) WITH FIVE FEET OR LESS COVER ARE
TO BE INSULATED FROM BUILDING TO POINT WHERE 5-FEET OF COVER IS ACHIEVED.
5. CONTRACTOR SHALL TAKE ALL PRECAUTIONS NECESSARY TO AVOID PROPERTY DAMAGE TO ADJACENT
PROPERTIES DURING THE CONSTRUCTION PHASES OF THIS PROJECT. CONTRACTOR WILL BE HELD SOLELY
RESPONSIBLE FOR ANY DAMAGES TO THE ADJACENT PROPERTIES OCCURRING DURING THE
CONSTRUCTION PHASES OF THIS PROJECT.
6. SAFETY NOTICE TO CONTRACTORS: IN ACCORDANCE WITH GENERALLY ACCEPTED CONSTRUCTION
PRACTICES, CONTRACTOR WILL BE SOLELY AND COMPLETELY RESPONSIBLE FOR CONDITIONS ON THE JOB
SITE, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY DURING PERFORMANCE OF THE WORK. THIS
REQUIREMENT WILL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS. THE
DUTY OF THE ENGINEER OR THE DEVELOPER TO CONDUCT CONSTRUCTION REVIEW OF CONTRACTOR'S
PERFORMANCE IS NOT INTENDED TO INCLUDE REVIEW OF THE ADEQUACY OF CONTRACTOR'S SAFETY
MEASURES IN, ON OR NEAR THE CONSTRUCTION SITE.
7. ALL AREAS OUTSIDE THE PROPERTY BOUNDARIES THAT ARE DISTURBED BY UTILITY CONSTRUCTION SHALL
BE RESTORED IN KIND. SODDED AREAS SHALL BE RESTORED WITH 6 INCHES OF TOPSOIL PLACED BENEATH
THE SOD.
8. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING AND MAINTAINING TRAFFIC CONTROL DEVICES
SUCH AS BARRICADES, WARNING SIGNS, DIRECTIONAL SIGNS, FLAGMEN AND LIGHTS TO CONTROL THE
MOVEMENT OF TRAFFIC WHERE NECESSARY. TRAFFIC CONTROL DEVICES SHALL CONFORM TO
APPROPRIATE MINNESOTA DEPARTMENT OF TRANSPORTATION STANDARDS.
9. ALL SOILS TESTING SHALL BE COMPLETED BY AN INDEPENDENT SOILS ENGINEER. EXCAVATION FOR THE
PURPOSE OF REMOVING UNSTABLE OR UNSUITABLE SOILS SHALL BE COMPLETED AS REQUIRED BY THE
SOILS ENGINEER. THE UTILITY BACKFILL CONSTRUCTION SHALL COMPLY WITH THE REQUIREMENTS OF THE
SOILS ENGINEER. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING ALL REQUIRED SOILS TESTS
AND SOIL INSPECTIONS WITH THE SOILS ENGINEER.
A GEOTECHNICAL ENGINEERING REPORT HAS BEEN COMPLETED BY:
COMPANY: INTERTEK-PSI
ADDRESS: 2915 WATERS ROAD, SUITE 112 EAGAN, MN 55121
PHONE: 651-646-8148
DATED: FEBRUARY 11, 2019
CONTRACTOR SHALL OBTAIN A COPY OF THIS SOILS REPORT.
11. CONTRACTOR SHALL SUBMIT 2 COPIES OF SHOP DRAWINGS FOR MANHOLE AND CATCH BASIN
STRUCTURES TO ENGINEER. CONTRACTOR SHALL ALLOW 5 WORKING DAYS FOR SHOP DRAWING
REVIEW.
12. CONTRACTOR AND MATERIAL SUPPLIER SHALL DETERMINE THE MINIMUM DIAMETER REQUIRED FOR
EACH STORM SEWER STRUCTURE.
13. (REMOVE IF THERE IS NO UNDERGROUND SYSTEM)
THE UNDERGROUND STORMWATER SYSTEM SHOWN ON THE UTILITY PLAN AND THE DETAIL SHEETS IS
FOR INFORMATIONAL PURPOSES ONLY AND DEPICTS THE MINIMUM STORAGE REQUIREMENTS AND THE
SYSTEM ELEVATIONS. THE CONTRACTOR (WITH THEIR SUPPLIER OR DESIGNER) SHALL SUBMIT DESIGN
DRAWINGS TO THE ENGINEER FOR REVIEW AND APPROVAL PRIOR TO CONSTRUCTION. THE DESIGN
DRAWINGS SHALL DEPICT THE FINAL LAYOUT AND DETAILS FOR CONSTRUCTION. THE DRAWINGS SHALL BE
CERTIFIED BY A LICENSED ENGINEER FOR THE STATE IN WHICH THE PROJECT IS CONSTRUCTED. THE
SUBMITTAL SHALL INCLUDE ALL NECESSARY PRODUCT INFORMATION, DESIGN CALCULATIONS AND
BEDDING REQUIREMENTS FOR THE PROPOSED STORMWATER SYSTEM. FOLLOWING CONSTRUCTION, THE
CERTIFYING ENGINEER SHALL SUBMIT A LETTER TO THE OWNER AND ENGINEER INDICATING THEY
OBSERVED THE INSTALLATION AND THE INSTALLATION OF THE STORMWATER SYSTEM WAS IN
CONFORMANCE WITH THE CERTIFIED DRAWINGS.
TELEPHONE
ELECTRIC
GAS LINE
FORCEMAIN (SAN.)
EASEMENT
WATERMAIN
SANITARY SEWER
EXISTINGPROPOSED
STORM SEWER
CURB & GUTTER
DRAINTILE
D
S S
SLS
LEGEND UTILITY CONSTRUCTION NOTES
THE SUBSURFACE UTILITY INFORMATION SHOWN ON THESE PLANS IS A UTILITY QUALITY LEVEL D. THIS QUALITY LEVEL WAS DETERMINED
ACCORDING TO THE GUIDELINES OF ASCE/CI 38-02, TITLED "STANDARD GUIDELINES FOR THE COLLECTION AND DEPICTION OF EXISTING
SUBSURFACE UTILITY DATA." THE CONTRACTOR AND/OR SUBCONTRACTORS SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING
UTILITIES BEFORE COMMENCING WORK, BY CONTACTING THE NOTIFICATION CENTER (GOPHER STATE ONE FOR MINNESOTA). THE
CONTRACTOR AND/OR SUBCONTRACTOR AGREE TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES, WHICH MIGHT BE OCCASIONED BY
HIS OR HER FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UTILITIES (UNDERGROUND AND OVERHEAD).
IF THE CONTRACTOR ENCOUNTERS ANY DRAIN TILE WITHIN THE SITE, HE OR SHE SHALL NOTIFY THE ENGINEER WITH THE LOCATION, SIZE,
INVERT AND IF THE TILE LINE IS ACTIVE. NO DRAIN TILE SHALL BE BACKFILLED WITHOUT APPROVAL FROM THE PROJECT ENGINEER.
IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE ALL EXISTING UTILITIES WHICH CONFLICT WITH THE PROPOSED
IMPROVEMENTS SHOWN ON THE PLANS.
Apr 12, 2019 - 3:13pm - User:clichty L:\PROJECTS\21654\CAD\Civil\Sheets\21654-C6-UTIL.dwg
C6.01
SANITARY
SEWER AND
WATERMAIN
PLAN
HUDSON BLVD N
B20E
BLDG 5B
FFE=1006.35
GFE=1006.02
B20E
BLDG 6A
FFE=XXX.X
GFE=XXX.X
B20E
BLDG 8A
FFE=1004.85
GFE=1004.52
B20E
BLDG 7B
FFE=1004.60
GFE=1004.27
B20E
BLDG 4B
FFE=1006.65
GFE=1006.32
B20E
BLDG 3A
FFE=1006.20
GFE=1005.87
B20E
BLDG 2B
FFE=1005.47
GFE=1005.14
B20E
BLDG 1A
FFE=1005.50
GFE=1005.17
B20E
BLDG 14A
FFE=1001.75
GFE=1001.42
B20E
BLDG 9B
FFE=1003.00
GFE=1002.67
B20E
BLDG 11B
FFE=1003.00
GFE=1002.67
B20E
BLDG 10A
FFE=1002.50
GFE=1002.17
B20E
BLDG 12A
FFE=1003.00
GFE=1002.67
B20E
BLDG 13B
FFE=1002.50
GFE=1002.17
6G
GFE=1004.95
6G
GFE=1004.05
6G
GFE=1001.90
6G
GFE=1001.85
6G
GFE=1001.85
6GS-2
GFE=1000.50
MG-P
GFE=1000.90
CLUBHOUSE
FFE=1005.00
B20E
BLDG 6B
FFE=1006.10
GFE=1005.77
ADA
B20E
BLDG 15B
FFE=1002.20
GFE=1001.87
25' B
U
F
F
E
R
50' B
U
F
F
E
R
UNDERGROUND STORAGE 7
7,885 CF STORAGE
1,360 LF 24" PERFORATED PIPE
340 CY CLEAR STONE
UNDERGROUND FILTRATION 1
8,205 CF STORAGE
600 LF 36" PERFORATED PIPE
365 CY CLEAR STONE
UNDERGROUND FILTRATION 6
20,430 CF STORAGE
1,440 LF 36" PERFORATED PIPE
892 CY CLEAR STONE
106 LF - 12"
STORM @ 0.44%
90 LF - 15"
STORM @ 0.40%
80 LF - XX"
STORM @ 0.50%
73 LF - XX"
STORM @ 0.50%
62 LF - 18"
STORM @ 0.40%
57 LF - 15"
STORM @ 0.40%
69 LF - 15"
STORM @ 0.40%
70 LF - 40"
STORM @ 0.40%
36 LF - XX"
STORM @ 0.50%90 LF - 15"
STORM @ 0.40%
68 LF - 15"
STORM @ 0.40%
88 LF - 15"
STORM @ 0.40%
100 LF - 21"
STORM @ 0.25%
149 LF - 24"
STORM @ 0.25%
35 LF - 24"
STORM @ 0.25%
76 LF - 36"
STORM @ 0.25%
35 LF - 36"
STORM @ 0.40%
162 LF - 24"
STORM @ 0.40%
65 LF - 21"
STORM @ 0.40%
133 LF - 18"
STORM @ 0.40%
106 LF - 15"
STORM @ 0.50%
74 LF - 15"
STORM @ 0.50%
57 LF - 12"
STORM @ 0.50%
67 LF - 12"
STORM @ 0.50%
78 LF - 18"
STORM @ 0.40%
76 LF - 15"
STORM @ 0.40%
65 LF - 15"
STORM @ 0.40%
9 LF - 36"
STORM @ 0.25%
20 LF - 21"
STORM @ 0.40%
40 LF - 21"
STORM @ 0.40%
56 LF - 21"
STORM @ 0.30%
83 LF - 21"
STORM @ 0.30%
37 LF - 21"
STORM @ 0.30%
44 LF - 36"
STORM @ 0.30%
CBMH 200
RE=1000.49
IE=992.50
CBMH 300
RE=1000.45
IE=992.63
CBMH 301
RE=1000.43
IE=992.74
CBMH 302
RE=1000.38
IE=992.99
CBMH 303
RE=1000.62
IE=993.16
CBMH 303A
RE=1001.14
IE=992.87
CBMH 303B
RE=1000.57
IE=993.12
CBMH 303C
RE=995.82
IE=993.59
CBMH 303B1
RE=999.96
IE=993.52
CBMH 304
RE=1001.17
IE=993.41
CBMH 305
RE=1001.11
IE=993.64
CBMH 306
RE=1001.00
IE=993.91
CBMH 307
RE=1001.05
IE=994.19
CBMH 400F
RE=1000.82
IE=996.94
CBMH 308A
RE=1000.98
IE=996.85
CBMH 400E
RE=1003.02
IE=996.58
CBMH 400D
RE=1003.44
IE=996.31
CBMH 400C
RE=1003.89
IE=995.96
CBMH 400B
RE=1004.13
IE=995.71
CBMH 400A
RE=1003.01
IE=995.34
CBMH 400
RE=1002.15
IE=996.31
STMH 401
RE=1003.40
IE=995.27
CBMH 402
RE=1004.13
IE=995.46
CBMH 403
RE=1004.21
IE=995.55
CBMH 404
RE=1004.49
IE=996.20
CBMH 405
RE=1004.30
IE=996.73
CBMH 406
RE=1004.31
IE=997.10
CBMH 407
RE=1004.50
IE=997.38
CBMH 408
RE=1004.30
IE=997.72
STMH 500
RE=1004.81
IE=996.46
CBMH 501
RE=1004.27
IE=996.62
CBMH 502
RE=1005.01
IE=997.15
CBMH 503
RE=1005.01
IE=997.46
CBMH 504
RE=1005.15
IE=997.77
CBMH 505
RE=1005.06
IE=998.03
44 LF - 36"
STORM @ 0.30%
CBMH 201
RE=1000.50
IE=992.68
CBMH 202
RE=1000.50
IE=992.68
CBMH 203
RE=998.49
IE=992.76
CBMH 204
RE=1000.78
IE=992.95
CBMH 205
RE=1000.90
IE=993.22
CBMH 206
RE=1000.60
IE=993.39
STMH 207
RE=1001.45
IE=993.52
STMH 208
RE=1001.48
IE=993.87
STMH 209
RE=1001.52
IE=994.31
CBMH 210C
RE=1001.85
IE=995.52
CBMH 210B
RE=1001.83
IE=995.23
STMH 210A
RE=1002.67
IE=994.98
STMH 210
RE=1002.23
IE=994.85
STMH 211
RE=1003.51
IE=995.02
STMH 212
RE=1004.15
IE=996.12
STMH 213
RE=1004.90
IE=996.84
CBMH 214
RE=1004.69
IE=997.16
CBMH 215
RE=1005.62
IE=997.72
30 LF - 36"
STORM @ 0.25%
40 LF - XX"
STORM @ 0.50%
33 LF - 36"
STORM @ 0.25%
75 LF - 36"
STORM @ 0.25%
110 LF - 36"
STORM @ 0.25%
66 LF - 36"
STORM @ 0.25%
53 LF - 36"
STORM @ 0.25%
140 LF - 36"
STORM @ 0.25%177 LF - 36"
STORM @ 0.25%
214 LF - 36"
STORM @ 0.25%
70 LF - 36"
STORM @ 0.25%
33 LF - 18"
STORM @ 0.40%
64 LF - 15"
STORM @ 0.40%
72 LF - 18"
STORM @ 0.40%
276 LF - 24"
STORM @ 0.40%
180 LF - 18"
STORM @ 0.50%
78 LF - 15"
STORM @ 0.40%
142 LF - 15"
STORM @ 0.40%
CBMH 101
RE=1001.33
IE=990.00
FES
IE=988.61
202 LF - 36"
STORM @ 0.69%
FES
IE=994.94
71 LF - 12"
STORM @ 0.74%
105 LF - 12"
STORM @ 1.25%
UNDERGROUND FILTRATION 2
17,036 CF STORAGE
1200 LF 36" PERFORATED PIPE
749 CY CLEAR STONE
UNDERGROUND FILTRATION 3
17,036 CF STORAGE
1200 LF 36" PERFORATED PIPE
749 CY CLEAR STONE
UNDERGROUND INFILTRATION 4
11,071 CF STORAGE
500 LF 48" PERFORATED PIPE
440 CY CLEAR STONE
UNDERGROUND INFILTRATION 5
7,242 CF STORAGE
300 LF 48" PERFORATED PIPE
292 CY CLEAR STONE
UNDERGROUND FILTRATION 8
13,005 CF STORAGE
560 LF 48" PERFORATED PIPE
515 CY CLEAR STONE
Project
Location
Date Submittal / RevisionNo.
Certification
Sheet Title
Summary
Revision History
Sheet No.Revision
Project No.
By
Designed:Drawn:
Approved:Book / Page:
Phase:Initial Issue:
Client
CONTINENTAL
483 FUND LLC
W134 N8675 EXECUTIVE PARKWAY
MENOMONEE FALLS, WI 53051
SPRINGS AT
LAKE ELMO
LAKE ELMO,
MINNESOTA
9955 HUDSON BOULEVARD NORTH
EAV CJL
EAV
PRELIMINARY 4/12/2019
21654
Registration No.Date:
I hereby certify that this plan, specification or
report was prepared by me or under my direct
supervision and that I am a duly licensed
professional ENGINEER under the laws of the state
of Minnesota.
If applicable, contact us for a wet signed copy of this
plan which is available upon request at Sambatek's,
Minnetonka, MN office.
4/12/201954914
Eric A. Vogel
PREL
I
M
I
N
A
R
Y
4/12/2019 CITY SUBMITTAL
Apr 12, 2019 - 3:13pm - User:clichty L:\PROJECTS\21654\CAD\Civil\Sheets\21654-C6-UTIL.dwg
C6.02
STORM SEWER
PLAN
SCALE IN FEET
0 10050
NORTH
1. THE UTILITY IMPROVEMENTS FOR THIS PROJECT SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE
"STANDARD UTILITIES SPECIFICATIONS" AS PUBLISHED BY THE CITY ENGINEERS ASSOCIATION OF
MINNESOTA (CEAM), EXCEPT AS MODIFIED HEREIN. CONTRACTOR SHALL OBTAIN A COPY OF THESE
SPECIFICATIONS.
1.1. ALL UTILITIES SHALL BE CONSTRUCTED IN ACCORDANCE WITH CITY REQUIREMENTS.
1.2. CONTRACTOR SHALL NOT OPEN, TURN OFF, INTERFERE WITH, OR ATTACH ANY PIPE OR HOSE TO
OR TAP WATERMAIN BELONGING TO THE CITY UNLESS DULY AUTHORIZED TO DO SO BY THE CITY.
ANY ADVERSE CONSEQUENCES OF ANY SCHEDULED OR UNSCHEDULED DISRUPTIONS OF SERVICE
TO THE PUBLIC ARE THE LIABILITY OF CONTRACTOR.
1.3. A MINIMUM VERTICAL SEPARATION OF 18 INCHES AND HORIZONTAL SEPARATION OF 10-FEET
BETWEEN OUTSIDE PIPE DIAMETERS IS REQUIRED AT ALL WATERMAIN AND SEWER MAIN
(BUILDING, STORM AND SANITARY) CROSSINGS.
2. ALL MATERIALS SHALL BE AS SPECIFIED IN CEAM SPECIFICATIONS EXCEPT AS MODIFIED HEREIN.
2.1. ALL MATERIALS SHALL COMPLY WITH THE REQUIREMENTS OF THE CITY.
2.2. ALL SANITARY SEWER TO BE PVC SDR-35, UNLESS NOTED OTHERWISE.
2.2.1. ALL SANITARY SEWER SERVICES TO BUILDING SHALL BE PVC SCH 40 CONFORMING TO ASTM
D2665.
2.3. ALL WATERMAIN TO BE DUCTILE IRON - CLASS 52, UNLESS NOTED OTHERWISE.
2.3.1. ALL WATERMAIN TO HAVE 7.5-FEET OF COVER OVER TOP OF WATERMAIN.
2.3.2. PROVIDE THRUST BLOCKING AND MECHANICAL JOINT RESTRAINTS ON ALL WATERMAIN
JOINTS PER CITY STANDARDS.
2.4. ALL STORM SEWER PIPE TO BE SMOOTH INTERIOR DUAL WALL HDPE PIPE WITH WATER TIGHT
GASKETS, UNLESS NOTED OTHERWISE.
2.4.1. ALL STORM SEWER PIPE FOR ROOF DRAIN SERVICES TO BUILDING SHALL BE PVC SCH 40
CONFORMING TO ASTM D2665.
2.5. RIP RAP SHALL BE Mn/DOT CLASS 3.
3. COORDINATE ALL BUILDING SERVICE CONNECTION LOCATIONS AND INVERT ELEVATIONS WITH
MECHANICAL CONTRACTOR PRIOR TO CONSTRUCTION.
4. ALL BUILDING SERVICE CONNECTIONS (STORM, SANITARY, WATER) WITH FIVE FEET OR LESS COVER ARE
TO BE INSULATED FROM BUILDING TO POINT WHERE 5-FEET OF COVER IS ACHIEVED.
5. CONTRACTOR SHALL TAKE ALL PRECAUTIONS NECESSARY TO AVOID PROPERTY DAMAGE TO ADJACENT
PROPERTIES DURING THE CONSTRUCTION PHASES OF THIS PROJECT. CONTRACTOR WILL BE HELD SOLELY
RESPONSIBLE FOR ANY DAMAGES TO THE ADJACENT PROPERTIES OCCURRING DURING THE
CONSTRUCTION PHASES OF THIS PROJECT.
6. SAFETY NOTICE TO CONTRACTORS: IN ACCORDANCE WITH GENERALLY ACCEPTED CONSTRUCTION
PRACTICES, CONTRACTOR WILL BE SOLELY AND COMPLETELY RESPONSIBLE FOR CONDITIONS ON THE JOB
SITE, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY DURING PERFORMANCE OF THE WORK. THIS
REQUIREMENT WILL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS. THE
DUTY OF THE ENGINEER OR THE DEVELOPER TO CONDUCT CONSTRUCTION REVIEW OF CONTRACTOR'S
PERFORMANCE IS NOT INTENDED TO INCLUDE REVIEW OF THE ADEQUACY OF CONTRACTOR'S SAFETY
MEASURES IN, ON OR NEAR THE CONSTRUCTION SITE.
7. ALL AREAS OUTSIDE THE PROPERTY BOUNDARIES THAT ARE DISTURBED BY UTILITY CONSTRUCTION SHALL
BE RESTORED IN KIND. SODDED AREAS SHALL BE RESTORED WITH 6 INCHES OF TOPSOIL PLACED BENEATH
THE SOD.
8. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING AND MAINTAINING TRAFFIC CONTROL DEVICES
SUCH AS BARRICADES, WARNING SIGNS, DIRECTIONAL SIGNS, FLAGMEN AND LIGHTS TO CONTROL THE
MOVEMENT OF TRAFFIC WHERE NECESSARY. TRAFFIC CONTROL DEVICES SHALL CONFORM TO
APPROPRIATE MINNESOTA DEPARTMENT OF TRANSPORTATION STANDARDS.
9. ALL SOILS TESTING SHALL BE COMPLETED BY AN INDEPENDENT SOILS ENGINEER. EXCAVATION FOR THE
PURPOSE OF REMOVING UNSTABLE OR UNSUITABLE SOILS SHALL BE COMPLETED AS REQUIRED BY THE
SOILS ENGINEER. THE UTILITY BACKFILL CONSTRUCTION SHALL COMPLY WITH THE REQUIREMENTS OF THE
SOILS ENGINEER. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING ALL REQUIRED SOILS TESTS
AND SOIL INSPECTIONS WITH THE SOILS ENGINEER.
A GEOTECHNICAL ENGINEERING REPORT HAS BEEN COMPLETED BY:
COMPANY: INTERTEK-PSI
ADDRESS: 2915 WATERS ROAD, SUITE 112 EAGAN, MN 55121
PHONE: 651-646-8148
DATED: FEBRUARY 11, 2019
CONTRACTOR SHALL OBTAIN A COPY OF THIS SOILS REPORT.
11. CONTRACTOR SHALL SUBMIT 2 COPIES OF SHOP DRAWINGS FOR MANHOLE AND CATCH BASIN
STRUCTURES TO ENGINEER. CONTRACTOR SHALL ALLOW 5 WORKING DAYS FOR SHOP DRAWING
REVIEW.
12. CONTRACTOR AND MATERIAL SUPPLIER SHALL DETERMINE THE MINIMUM DIAMETER REQUIRED FOR
EACH STORM SEWER STRUCTURE.
13. (REMOVE IF THERE IS NO UNDERGROUND SYSTEM)
THE UNDERGROUND STORMWATER SYSTEM SHOWN ON THE UTILITY PLAN AND THE DETAIL SHEETS IS
FOR INFORMATIONAL PURPOSES ONLY AND DEPICTS THE MINIMUM STORAGE REQUIREMENTS AND THE
SYSTEM ELEVATIONS. THE CONTRACTOR (WITH THEIR SUPPLIER OR DESIGNER) SHALL SUBMIT DESIGN
DRAWINGS TO THE ENGINEER FOR REVIEW AND APPROVAL PRIOR TO CONSTRUCTION. THE DESIGN
DRAWINGS SHALL DEPICT THE FINAL LAYOUT AND DETAILS FOR CONSTRUCTION. THE DRAWINGS SHALL BE
CERTIFIED BY A LICENSED ENGINEER FOR THE STATE IN WHICH THE PROJECT IS CONSTRUCTED. THE
SUBMITTAL SHALL INCLUDE ALL NECESSARY PRODUCT INFORMATION, DESIGN CALCULATIONS AND
BEDDING REQUIREMENTS FOR THE PROPOSED STORMWATER SYSTEM. FOLLOWING CONSTRUCTION, THE
CERTIFYING ENGINEER SHALL SUBMIT A LETTER TO THE OWNER AND ENGINEER INDICATING THEY
OBSERVED THE INSTALLATION AND THE INSTALLATION OF THE STORMWATER SYSTEM WAS IN
CONFORMANCE WITH THE CERTIFIED DRAWINGS.
TELEPHONE
ELECTRIC
GAS LINE
FORCEMAIN (SAN.)
EASEMENT
WATERMAIN
SANITARY SEWER
EXISTINGPROPOSED
STORM SEWER
CURB & GUTTER
DRAINTILE
D
S S
SLS
THE SUBSURFACE UTILITY INFORMATION SHOWN ON THESE PLANS IS A UTILITY QUALITY LEVEL D. THIS QUALITY LEVEL WAS DETERMINED
ACCORDING TO THE GUIDELINES OF ASCE/CI 38-02, TITLED "STANDARD GUIDELINES FOR THE COLLECTION AND DEPICTION OF EXISTING
SUBSURFACE UTILITY DATA." THE CONTRACTOR AND/OR SUBCONTRACTORS SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING
UTILITIES BEFORE COMMENCING WORK, BY CONTACTING THE NOTIFICATION CENTER (GOPHER STATE ONE FOR MINNESOTA). THE
CONTRACTOR AND/OR SUBCONTRACTOR AGREE TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES, WHICH MIGHT BE OCCASIONED BY
HIS OR HER FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UTILITIES (UNDERGROUND AND OVERHEAD).
IF THE CONTRACTOR ENCOUNTERS ANY DRAIN TILE WITHIN THE SITE, HE OR SHE SHALL NOTIFY THE ENGINEER WITH THE LOCATION, SIZE,
INVERT AND IF THE TILE LINE IS ACTIVE. NO DRAIN TILE SHALL BE BACKFILLED WITHOUT APPROVAL FROM THE PROJECT ENGINEER.
IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE ALL EXISTING UTILITIES WHICH CONFLICT WITH THE PROPOSED
IMPROVEMENTS SHOWN ON THE PLANS.
UNDERGROUND
STORM SEWER
SYSTEM
UTILITY CONSTRUCTION NOTESLEGEND
Project
Location
Date Submittal / RevisionNo.
Certification
Sheet Title
Summary
Revision History
Sheet No.Revision
Project No.
By
Designed:Drawn:
Approved:Book / Page:
Phase:Initial Issue:
Client
CONTINENTAL
483 FUND LLC
W134 N8675 EXECUTIVE PARKWAY
MENOMONEE FALLS, WI 53051
SPRINGS AT
LAKE ELMO
LAKE ELMO,
MINNESOTA
9955 HUDSON BOULEVARD NORTH
EAV CJL
EAV
PRELIMINARY 4/12/2019
21654
Registration No.Date:
I hereby certify that this plan, specification or
report was prepared by me or under my direct
supervision and that I am a duly licensed
professional ENGINEER under the laws of the state
of Minnesota.
If applicable, contact us for a wet signed copy of this
plan which is available upon request at Sambatek's,
Minnetonka, MN office.
4/12/201954914
Eric A. Vogel
PREL
I
M
I
N
A
R
Y
4/12/2019 CITY SUBMITTAL
Apr 12, 2019 - 3:14pm - User:clichty L:\PROJECTS\21654\CAD\Civil\Sheets\21654-C9-DETL.dwg
C9.01
DETAILS
N.T.S.
SLOPE 3/4" PER FT.
1
3
13
-
1
/
2
"
1/2" R
6"
6"
6"8"12"
3" R
1/2" R
7"
A MINIMUM OF 4" OF CLASS 5
SHALL BE PLACED BELOW THE CURB
2 - #4 REINFORCING RODS AT CATCH BASINS
20 FEET IN LENGTH, CENTERED ON THE STRUCTURE
2"2"
2"
01 B612 CONCRETE CURB & GUTTER
13
-
1
/
2
"
1/2" R
6"
6"
6" MIN 8"18"
3" R
1/2" R
7"
A MINIMUM OF 4" OF CLASS 5
SHALL BE PLACED BELOW THE CURB
2 - #4 REINFORCING RODS AT CATCH BASINS
20 FEET IN LENGTH, CENTERED ON THE STRUCTURE
2"2"
2"
SLOPE 3/4" PER FT.
1
3
N.T.S.
02 B618 CONCRETE CURB & GUTTER
BITUMINOUS
6' MI
N
N.T.S.
03 CURB TRANSITION
BASE COURSE
WEAR COURSE
A
A
4" P.C. CONCRETE*
*THE THICKNESS SHALL BE INCREASED TO A
MINIMUM DEPTH OF __ INCHES AT DRIVEWAY
CROSSINGS.
GENERAL NOTES FOR CONCRETE CONSTRUCTION:
1.THE CONCRETE SIDEWALKS SHALL BE CONSTRUCTED IN ACCORDANCE WITH
THE REQUIREMENTS OF MN/DOT "STANDARD SPECIFICATIONS FOR
CONSTRUCTION".
2.SIDEWALK CONTROL JOINTS SHALL BE LOCATED AT 5 FEET ON CENTER.
SIDEWALK EXPANSION JOINTS SHALL BE LOCATED AT A MAXIMUM OF 100
FEET ON CENTER, AND WHERE SIDEWALK ABUTS CURB, STRUCTURES, AND
OTHER FIXED OBJECTS. SEAL ALL EXPANSION JOINTS. BROOM FINISH SHALL BE
PERPENDICULAR TO THE LINE OF TRAFFIC.
SECTION
A-A
4" CLASS 5
4" P.C. CONCRETE
4'-0" WIDTH
2.00% MAX
N.T.S.
A
A
5" P.C. CONCRETE*
*THE THICKNESS SHALL BE INCREASED TO A
MINIMUM DEPTH OF __ INCHES AT DRIVEWAY
CROSSINGS.
GENERAL NOTES FOR CONCRETE CONSTRUCTION:
1.THE CONCRETE SIDEWALKS SHALL BE CONSTRUCTED IN ACCORDANCE WITH
THE REQUIREMENTS OF MN/DOT "STANDARD SPECIFICATIONS FOR
CONSTRUCTION".
2.SIDEWALK CONTROL JOINTS SHALL BE LOCATED AT 5 FEET ON CENTER.
SIDEWALK EXPANSION JOINTS SHALL BE LOCATED AT A MAXIMUM OF 100
FEET ON CENTER, AND WHERE SIDEWALK ABUTS CURB, STRUCTURES, AND
OTHER FIXED OBJECTS. SEAL ALL EXPANSION JOINTS. BROOM FINISH SHALL BE
PERPENDICULAR TO THE LINE OF TRAFFIC.
SECTION
A-A
4" CLASS 5
4" P.C. CONCRETE
5' WIDTH
2.00% MAX
N.T.S.
05 CONCRETE SIDEWALK
04
WHITE LEGEND RED BACKGROUND
R1-1
N.T.S.
36" x 36" "STOP" SIGN
36"
36
"
N.T.S.
STOP SIGN DETAIL06
N.T.S.
12
"
3.
5
'
3'
1.
5
'
3'
3"
1'
VEHICLE IDREQUIRED
PARKINGNOTE: ANY SIGN FREE
STANDING IN
ASPHALT PARKING
LOT SHALL BE
MOUNTED AS
SHOWN.FOR VIOLATION
UP TO $200 FINE
5.
0
'
M
I
N
.
5
.
5
'
M
A
X
.
CONCRETE
GRANULAR BASE
PAVING
ONE WRAP OF #30
ROOFING FELT
6"Ø SCH. 40 STEEL
PIPE-FILL WITH CONC.
4" x 4" STEEL TUBE
(SEE SIGN DETAILS
THIS SHEET)
STANDARD MNDOT
SIGN NO. R7.8A
1.5'
ACCESSIBLE
VAN
PROVIDE VAN
ACCESSIBLE SIGN AT
RIGHT HAND
DISCHARGE PARKING
SPACES
07 ACCESSIBLE PARKING SIGN
STANDARD
STALL ADA STALL
ACCESS
ISLE ADA STALL
STANDARD
STALL
6"
TRANSITION
PAVEMENT TO FLUSH
WITH SIDEWALK
INTEGRAL
SIDEWALK CURB
SEE DETAIL
ACCESSIBLE
PARKING SIGN
WITH BOLLARD
SEE DETAIL
2'
STRIPING - 4"
TRAFFIC WHITE
INTEGRAL
SIDEWALK CURB
SEE DETAIL
INTEGRAL
SIDEWALK CURB
SEE DETAIL
1.8% (2% MAX.)
PLAN VIEW OF ADA PARKING
SECTION A-A
SECTION B-B
B
B
AA
N.T.S.
NO
P
A
R
K
I
N
G
08 ADA PARKING
3/4" PER FT.
AT ALL UTILITY TRENCH CROSSINGS, 2 #4 REINFORCING
RODS SHALL BE PLACED IN THE LOWER PORTION OF
THE GUTTER; RODS TO BE 20 FEET IN LENGTH.
1'-6"1'-6"
7"
N.T.S.
09 CONCRETE VALLEY GUTTER
4' CONCRETE SIDEWALK
HUDSON BLVD N
B20E
BLDG 5B
FFE=1006.35
GFE=1006.02
B20E
BLDG 6A
FFE=XXX.X
GFE=XXX.X
B20E
BLDG 8A
FFE=1004.85
GFE=1004.52
B20E
BLDG 7B
FFE=1004.60
GFE=1004.27
B20E
BLDG 4B
FFE=1006.65
GFE=1006.32
B20E
BLDG 3A
FFE=1006.20
GFE=1005.87
B20E
BLDG 2B
FFE=1005.47
GFE=1005.14
B20E
BLDG 1A
FFE=1005.50
GFE=1005.17
B20E
BLDG 14A
FFE=1001.75
GFE=1001.42
B20E
BLDG 9B
FFE=1003.00
GFE=1002.67
B20E
BLDG 11B
FFE=1003.00
GFE=1002.67
B20E
BLDG 10A
FFE=1002.50
GFE=1002.17
B20E
BLDG 12A
FFE=1003.00
GFE=1002.67
B20E
BLDG 13B
FFE=1002.50
GFE=1002.17
6G
GFE=1004.95
6G
GFE=1004.05
6G
GFE=1001.90
6G
GFE=1001.85
6G
GFE=1001.85
6GS-2
GFE=1000.50
MG-P
GFE=1000.90
CLUBHOUSE
FFE=1005.00
B20E
BLDG 6B
FFE=1006.10
GFE=1005.77
ADA
B20E
BLDG 15B
FFE=1002.20
GFE=1001.87
25' B
U
F
F
E
R
50' B
U
F
F
E
R
Project
Location
Date Submittal / RevisionNo.
Certification
Sheet Title
Summary
Revision History
Sheet No.Revision
Project No.
By
Designed:Drawn:
Approved:Book / Page:
Phase:Initial Issue:
Client
CONTINENTAL
483 FUND LLC
W134 N8675 EXECUTIVE PARKWAY
MENOMONEE FALLS, WI 53051
SPRINGS AT
LAKE ELMO
LAKE ELMO,
MINNESOTA
9955 HUDSON BOULEVARD NORTH
EAV CJL
EAV
PRELIMINARY 4/12/2019
21654
Registration No.Date:
I hereby certify that this survey, plan or report was
prepared by me or under my direct supervision
and that I am a duly Licensed LANDSCAPE
ARCHITECT under the laws of the State of
Minnesota.
This certification is not valid unless wet signed in blue
ink. If applicable, contact us for a wet signed copy of
this survey which is available upon request at
Sambatek, Minnetonka, MN office.
4/12/201940252
William L Delaney
PREL
I
M
I
N
A
R
Y
4/12/2019 CITY SUBMITTAL
SCALE IN FEET
0 10050
NORTH
Apr 12, 2019 - 3:14pm - User:clichty L:\PROJECTS\21654\CAD\Civil\Sheets\21654-L1-LAND.dwg
L1.01
LANDSCAPE
PLAN
LEGEND
EASEMENT
CURB & GUTTER
BUILDING
RETAINING WALL
NUMBER OF PARKING
STALLS PER ROW
SIGN
PIPE BOLLARD
STANDARD DUTY
ASPHALT PAVING
HEAVY DUTY
ASPHALT PAVING
CONCRETE PAVING
PROPERTY LIMIT
EXISTINGPROPOSED
KEY NOTE
WETLAND LIMITS
TREELINE
XX
XX
CONCRETE SIDEWALK
ARCHITECTURAL
CONCRETE
DETAIL XX
CHAIN LINK FENCE
DECORATIVE
WOODEN FENCE
AIR CONDITIONING
UNIT
TREES CODE BOTANICAL NAME / COMMON NAME CONT CAL SIZE QTY
CM Acer x freemanii `Armstrong` / Armstrong Freeman Maple B & B 3"Cal.21
HB Celtis occidentalis / Common Hackberry B & B 3"Cal.15
GB Ginkgo biloba `Autumn Gold` TM / Maidenhair Tree B & B 3"Cal.13
IH Gleditsia triacanthos `Imperial` / Imperial Honeylocust B & B 3"Cal.11
KC Gymnocladus dioica `Espresso` / Kentucky Coffeetree B & B 3"Cal.11
SO Quercus bicolor / Swamp White Oak B & B 3"Cal.14
RP Quercus robur x warei`Long` / Regal Prince Oak B & B 3"Cal.15
BL Tilia americana `Boulevard` / Boulevard Linden B & B 3"Cal.9
PE Ulmus americana `Princeton` / American Elm B & B 3"Cal.16
CONIFERS CODE BOTANICAL NAME / COMMON NAME CONT CAL SIZE QTY
NS Picea abies / Norway Spruce B & B 6`18
AP Pinus nigra / Austrian Black Pine B & B 6`15
WP Pinus strobus / White Pine B & B 6`11
ORN. TREES CODE BOTANICAL NAME / COMMON NAME CONT CAL SIZE QTY
SB Amelanchier canadensis `Autumn Brilliance` / Autumn Brilliance Serviceberry B & B 2"Cal 9
JL Syringa reticulata / Japanese Tree Lilac B & B 2"Cal 6
TREE SCHEDULE
MITIGATION FROM TREE PRESERVATION PLAN
REQUIRED
COMMON TREES (46" @ 3" TREES)15 TREES
CONIFER TREES (149" @ 6' TREES) 50 TREES
HARDWOOD TREES (129" @ 3" TREES)43 TREES
TOTAL 108 TREES
SETBACK AREA LANDSCAPE REQUIREMENTS
REQUIRED
STREET FRONTAGE (1100 FT / 50 = 22 TREES @ 2.5")
(22 X 2.5" = 55" @ 3" TREES)18 TREES
DISTURBED AREA (17 ACRES X 5 = 85 TREES @ 2.5")
(85 X 2.5" = 213" @ 3" TREES)71 TREES
TOTAL 89 TREES
PROPOSED PLANTINGS
REQUIRED PROPOSED PERCENTAGE
OVERSTORY TREES 125 TREES 74%
CONIFEROUS TREES 44 TREES 26%
ORNAMENTAL TREES*15 TREES
TOTAL 197 TREES 169 TREES
SHRUBS AND PERENNIALS 1,449 UNITS
*DOES NOT COUNT TOWARDS REPLACEMENT TREE TOTALS.
LAKE ELMO, MN LANDSCAPE CODE
NON-STEEL EDGER
GROUND COVERS CODE BOTANICAL NAME / COMMON NAME CONT QTY
TUR HIG Turf Sod Highland Sod / Sod Sod 76,939 sf
SOD SCHEDULE
B20E
BLDG 5B
FFE=1006.35
GFE=1006.02
B20E
BLDG 6A
FFE=XXX.X
GFE=XXX.X
B20E
BLDG 8A
FFE=1004.85
GFE=1004.52
B20E
BLDG 7B
FFE=1004.60
GFE=1004.27
B20E
BLDG 4B
FFE=1006.65
GFE=1006.32
B20E
BLDG 3A
FFE=1006.20
GFE=1005.87
B20E
BLDG 2B
FFE=1005.47
GFE=1005.14
B20E
BLDG 1A
FFE=1005.50
GFE=1005.17
6G
GFE=1004.95
6G
GFE=1004.05
CLUBHOUSE
FFE=1005.00
B20E
BLDG 6B
FFE=1006.10
GFE=1005.77
SCALE IN FEET
0 6030
NORTH
Apr 12, 2019 - 3:14pm - User:clichty L:\PROJECTS\21654\CAD\Civil\Sheets\21654-L1-LAND.dwg
L1.02
SHRUB PLAN
WEST
Project
Location
Date Submittal / RevisionNo.
Certification
Sheet Title
Summary
Revision History
Sheet No.Revision
Project No.
By
Designed:Drawn:
Approved:Book / Page:
Phase:Initial Issue:
Client
CONTINENTAL
483 FUND LLC
W134 N8675 EXECUTIVE PARKWAY
MENOMONEE FALLS, WI 53051
SPRINGS AT
LAKE ELMO
LAKE ELMO,
MINNESOTA
9955 HUDSON BOULEVARD NORTH
EAV CJL
EAV
PRELIMINARY 4/12/2019
21654
Registration No.Date:
I hereby certify that this survey, plan or report was
prepared by me or under my direct supervision
and that I am a duly Licensed LANDSCAPE
ARCHITECT under the laws of the State of
Minnesota.
This certification is not valid unless wet signed in blue
ink. If applicable, contact us for a wet signed copy of
this survey which is available upon request at
Sambatek, Minnetonka, MN office.
4/12/201940252
William L Delaney
PREL
I
M
I
N
A
R
Y
4/12/2019 CITY SUBMITTAL
SHRUBS CODE BOTANICAL NAME / COMMON NAME CONT QTY
CD Cornus sericea `Alleman`s Compact` / Dwarf Red Twig Dogwood 5 gal 188
CE Euonymus alatus `Compactus` / Compact Burning Bush 5 gal 55
LH Hydrangea paniculata `Jane` / Little Lime Hydrangea 5 gal 92
BJ Juniperus sabina `Broadmoor` / Broadmoor Juniper 5 gal 31
MK Syringa patula `Miss Kim` / Miss Kim Lilac 5 gal 16
HA Thuja occidentalis `Holmstrup` / Holmstrup Cedar 10 gal 210
TA Thuja occidentalis `Techny` / Techny Arborvitae B&B-6`8
GRASSES CODE BOTANICAL NAME / COMMON NAME CONT QTY
KFG Calamagrostis x acutiflora `Karl Foerster` / Feather Reed Grass 2 gal.161
PERENNIALS CODE BOTANICAL NAME / COMMON NAME CONT QTY
RRD Hemerocallis x `Rosy Returns` / Daylily 1 gal 58
LRS Perovskia atriplicifolia `Little Spire` TM / Little Spire Russian Sage 1 gal 128
PLANT SCHEDULE SHRUBS WEST
LEGEND
EASEMENT
CURB & GUTTER
BUILDING
RETAINING WALL
NUMBER OF PARKING
STALLS PER ROW
SIGN
PIPE BOLLARD
STANDARD DUTY
ASPHALT PAVING
HEAVY DUTY
ASPHALT PAVING
CONCRETE PAVING
PROPERTY LIMIT
EXISTINGPROPOSED
KEY NOTE
WETLAND LIMITS
TREELINE
XX
XX
CONCRETE SIDEWALK
ARCHITECTURAL
CONCRETE
DETAIL XX
CHAIN LINK FENCE
DECORATIVE
WOODEN FENCE
AIR CONDITIONING
UNIT
NON-STEEL EDGER
B20E
BLDG 14A
FFE=1001.75
GFE=1001.42
B20E
BLDG 9B
FFE=1003.00
GFE=1002.67
B20E
BLDG 11B
FFE=1003.00
GFE=1002.67
B20E
BLDG 10A
FFE=1002.50
GFE=1002.17
B20E
BLDG 12A
FFE=1003.00
GFE=1002.67
B20E
BLDG 13B
FFE=1002.50
GFE=1002.17
6G
GFE=1001.90
6G
GFE=1001.85
6G
GFE=1001.85
6GS-2
GFE=1000.50
MG-P
GFE=1000.90ADA
B20E
BLDG 15B
FFE=1002.20
GFE=1001.87
25' B
U
F
F
E
R
50' B
U
F
F
E
R
SCALE IN FEET
0 6030
NORTH
Apr 12, 2019 - 3:14pm - User:clichty L:\PROJECTS\21654\CAD\Civil\Sheets\21654-L1-LAND.dwg
L1.03
SHRUB PLAN
EAST
Project
Location
Date Submittal / RevisionNo.
Certification
Sheet Title
Summary
Revision History
Sheet No.Revision
Project No.
By
Designed:Drawn:
Approved:Book / Page:
Phase:Initial Issue:
Client
CONTINENTAL
483 FUND LLC
W134 N8675 EXECUTIVE PARKWAY
MENOMONEE FALLS, WI 53051
SPRINGS AT
LAKE ELMO
LAKE ELMO,
MINNESOTA
9955 HUDSON BOULEVARD NORTH
EAV CJL
EAV
PRELIMINARY 4/12/2019
21654
Registration No.Date:
I hereby certify that this survey, plan or report was
prepared by me or under my direct supervision
and that I am a duly Licensed LANDSCAPE
ARCHITECT under the laws of the State of
Minnesota.
This certification is not valid unless wet signed in blue
ink. If applicable, contact us for a wet signed copy of
this survey which is available upon request at
Sambatek, Minnetonka, MN office.
4/12/201940252
William L Delaney
PREL
I
M
I
N
A
R
Y
4/12/2019 CITY SUBMITTAL
SHRUBS CODE BOTANICAL NAME / COMMON NAME CONT QTY
CD Cornus sericea `Alleman`s Compact` / Dwarf Red Twig Dogwood 5 gal 114
CE Euonymus alatus `Compactus` / Compact Burning Bush 5 gal 16
LH Hydrangea paniculata `Jane` / Little Lime Hydrangea 5 gal 72
MK Syringa patula `Miss Kim` / Miss Kim Lilac 5 gal 17
HA Thuja occidentalis `Holmstrup` / Holmstrup Cedar 10 gal 184
GRASSES CODE BOTANICAL NAME / COMMON NAME CONT QTY
KFG Calamagrostis x acutiflora `Karl Foerster` / Feather Reed Grass 2 gal.99
PLANT SCHEDULE SHRUBS EAST
LEGEND
EASEMENT
CURB & GUTTER
BUILDING
RETAINING WALL
NUMBER OF PARKING
STALLS PER ROW
SIGN
PIPE BOLLARD
STANDARD DUTY
ASPHALT PAVING
HEAVY DUTY
ASPHALT PAVING
CONCRETE PAVING
PROPERTY LIMIT
EXISTINGPROPOSED
KEY NOTE
WETLAND LIMITS
TREELINE
XX
XX
CONCRETE SIDEWALK
ARCHITECTURAL
CONCRETE
DETAIL XX
CHAIN LINK FENCE
DECORATIVE
WOODEN FENCE
AIR CONDITIONING
UNIT
NON-STEEL EDGER
Apr 12, 2019 - 3:14pm - User:clichty L:\PROJECTS\21654\CAD\Civil\Sheets\21654-L1-LAND.dwg
L1.04
LANDSCAPE
NOTE AND
DETAILS
Project
Location
Date Submittal / RevisionNo.
Certification
Sheet Title
Summary
Revision History
Sheet No.Revision
Project No.
By
Designed:Drawn:
Approved:Book / Page:
Phase:Initial Issue:
Client
CONTINENTAL
483 FUND LLC
W134 N8675 EXECUTIVE PARKWAY
MENOMONEE FALLS, WI 53051
SPRINGS AT
LAKE ELMO
LAKE ELMO,
MINNESOTA
9955 HUDSON BOULEVARD NORTH
EAV CJL
EAV
PRELIMINARY 4/12/2019
21654
Registration No.Date:
I hereby certify that this survey, plan or report was
prepared by me or under my direct supervision
and that I am a duly Licensed LANDSCAPE
ARCHITECT under the laws of the State of
Minnesota.
This certification is not valid unless wet signed in blue
ink. If applicable, contact us for a wet signed copy of
this survey which is available upon request at
Sambatek, Minnetonka, MN office.
4/12/201940252
William L Delaney
PREL
I
M
I
N
A
R
Y
4/12/2019 CITY SUBMITTAL
GENERAL NOTES:
1.THE CONTRACTOR SHALL INSPECT THE SITE AND BECOME FAMILIAR WITH THE EXISTING
CONDITIONS RELATING TO THE NATURE AND SCOPE OF THE WORK.
2.THE CONTRACTOR SHALL VERIFY PLAN LAYOUT AND BRING TO THE ATTENTION OF THE LANDSCAPE
ARCHITECT DISCREPANCIES WHICH MAY COMPROMISE THE DESIGN OR INTENT OF THE LAYOUT.
3.THE CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLYING WITH ALL APPLICABLE CODES,
REGULATIONS, AND PERMITS GOVERNING THE WORK.
4.THE CONTRACTOR SHALL PROTECT EXISTING ROADS, CURBS/GUTTERS, TRAILS, TREES, LAWNS AND
SITE ELEMENTS DURING CONSTRUCTION. DAMAGE TO SAME SHALL BE REPAIRED AND/OR
REPLACED AT NO ADDITIONAL COST TO THE OWNER.
5.LOCATE AND VERIFY ALL UTILITIES, INCLUDING IRRIGATION LINES, WITH THE OWNER FOR
PROPRIETARY UTILITIES AND GOPHER STATE ONE CALL 48 HOURS BEFORE DIGGING. CONTRACTOR
SHALL BE RESPONSIBLE FOR THE PROTECTION AND REPAIR OF ANY DAMAGES TO SAME. NOTIFY
THE LANDSCAPE ARCHITECT OF ANY CONFLICTS TO FACILITATE PLANT RELOCATION.
6.THE LANDSCAPE CONTRACTOR SHALL COORDINATE THE PHASES OF CONSTRUCTION AND
PLANTING INSTALLATION WITH OTHER CONTRACTORS WORKING ON SITE.
7.THE CONTRACTOR SHALL REVIEW THE SITE FOR DEFICIENCIES IN SITE CONDITIONS WHICH MIGHT
NEGATIVELY AFFECT PLANT ESTABLISHMENT, SURVIVAL OR WARRANTY. UNDESIRABLE SITE
CONDITIONS SHALL BE BROUGHT TO THE ATTENTION OF THE LANDSCAPE ARCHITECT PRIOR TO
BEGINNING OF WORK.
8.THE PLAN TAKES PRECEDENCE OVER THE LANDSCAPE LEGEND IF DISCREPANCIES EXIST.
QUANTITIES SHOWN IN THE PLANTING SCHEDULE ARE FOR THE CONTRACTOR'S CONVENIENCE.
CONTRACTOR TO VERIFY QUANTITIES SHOWN ON THE PLAN.
9.THE SPECIFICATIONS TAKE PRECEDENCE OVER THE PLANTING NOTES AND GENERAL NOTES.
10.EXISTING TREES AND SHRUBS TO REMAIN SHALL BE PROTECTED TO THE DRIP LINE FROM ALL
CONSTRUCTION TRAFFIC, STORAGE OF MATERIALS ETC. WITH 4' HT. ORANGE PLASTIC SAFETY
FENCING ADEQUATELY SUPPORTED BY STEEL FENCE POSTS 6' O.C. MAXIMUM SPACING.
11.LONG-TERM STORAGE OF MATERIALS OR SUPPLIES ON-SITE WILL NOT BE ALLOWED.
12.CONTRACTOR SHALL REQUEST IN WRITING, A FINAL ACCEPTANCE INSPECTION.
PLANTING NOTES:
1.NO PLANTS SHALL BE INSTALLED UNTIL FINAL GRADING AND CONSTRUCTION HAS BEEN
COMPLETED IN THE IMMEDIATE AREA.
2.A GRANULAR PRE-EMERGENT HERBICIDE SHALL BE APPLIED TO ALL PLANT BEDS AT THE
MANUFACTURERS RECOMMENDED RATE PRIOR TO PLANT INSTALLATION.
3.ALL PLANTING STOCK SHALL CONFORM TO THE "AMERICAN STANDARD FOR NURSERY STOCK,"
ANSI-Z60, LATEST EDITION, OF THE AMERICAN ASSOCIATION OF NURSERYMEN, INC. AND SHALL
CONSTITUTE MINIMUM QUALITY REQUIREMENTS FOR PLANT MATERIALS.
4.OVERSTORY TREES SHALL BEGIN BRANCHING NO LOWER THAN 6' ABOVE PAVED SURFACES.
5.ALL PLANTS MUST BE HEALTHY, VIGOROUS MATERIAL, FREE OF PESTS AND DISEASE AND BE
CONTAINER GROWN OR BALLED AND BURLAPPED AS INDICATED IN THE LANDSCAPE LEGEND.
6.PLANT MATERIALS TO BE INSTALLED PER PLANTING DETAILS.
7.ALL TREES MUST BE STRAIGHT TRUNKED AND FULL HEADED AND MEET ALL REQUIREMENTS
SPECIFIED.
8.THE LANDSCAPE ARCHITECT RESERVES THE RIGHT TO REJECT ANY PLANTS WHICH ARE DEEMED
UNSATISFACTORY BEFORE, DURING, OR AFTER INSTALLATION.
9.NO SUBSTITUTIONS OF PLANT MATERIAL SHALL BE ACCEPTED UNLESS APPROVED IN WRITING BY
THE LANDSCAPE ARCHITECT.
10.ALL PLANT MATERIAL QUANTITIES, SHAPES OF BEDS AND LOCATIONS SHOWN ARE APPROXIMATE.
CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLETE COVERAGE OF ALL PLANTING BEDS AT
SPACING SHOWN AND ADJUSTED TO CONFORM TO THE EXACT CONDITIONS OF THE SITE. THE
LANDSCAPE ARCHITECT SHALL APPROVE THE STAKING LOCATION OF ALL PLANT MATERIALS PRIOR
TO INSTALLATION.
11.ALL PLANTING AREAS MUST BE COMPLETELY MULCHED AS SPECIFIED.
12.MULCH: SHREDDED HARDWOOD MULCH, COLOR: DARK CHOCOLATE BROWN, CLEAN AND FREE OF
NOXIOUS WEEDS OR OTHER DELETERIOUS MATERIAL, IN ALL MASS PLANTING BEDS AND FOR
TREES, UNLESS INDICATED AS ROCK MULCH ON DRAWINGS. SUBMIT SAMPLE TO LANDSCAPE
ARCHITECT PRIOR TO DELIVERY ON-SITE FOR APPROVAL. DELIVER MULCH ON DAY OF
INSTALLATION. USE 3" FOR SHRUB BEDS, TREE RINGS, AND 3" FOR PERENNIAL/GROUND COVER
BEDS, UNLESS OTHERWISE DIRECTED.
13.THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL MULCHES AND PLANTING SOIL QUANTITIES TO
COMPLETE THE WORK SHOWN ON THE PLAN.
14.USE ANTI-DESICCANT (WILTPRUF OR APPROVED EQUAL) ON DECIDUOUS PLANTS MOVED IN LEAF
AND FOR EVERGREENS MOVED ANYTIME. APPLY AS PER MANUFACTURER'S INSTRUCTION. ALL
EVERGREENS SHALL BE SPRAYED IN THE LATE FALL FOR WINTER PROTECTION DURING WARRANTY
PERIOD.
15.WRAP ALL SMOOTH-BARKED DECIDUOUS TREES PLANTED IN THE FALL PRIOR TO DECEMBER 1 AND
REMOVE WRAPPING AFTER MAY 1. TREE WRAPPING MATERIAL SHALL BE WHITE TWO-WALLED
PLASTIC SHEETING APPLIED FROM TRUNK FLARE TO THE FIRST BRANCH.
16.ALL DECIDUOUS, PINE, AND LARCH PLANTINGS SHALL RECEIVE RODENT PROTECTION PER MNDOT
2571.31.2
14.PLANTING SOIL FOR TREES, SHRUBS AND GROUND COVERS: FERTILE FRIABLE LOAM
CONTAINING A LIBERAL AMOUNT (4% MIN.) OF HUMUS AND CAPABLE OF SUSTAINING
VIGOROUS PLANT GROWTH. IT SHALL COMPLY WITH MNDOT SPECIFICATION 3877 TYPE B
SELECT TOPSOIL. MIXTURE SHALL BE FREE FROM HARDPACK SUBSOIL, STONES,
CHEMICALS, NOXIOUS WEEDS, ETC. SOIL MIXTURE SHALL HAVE A PH BETWEEN 6.1 AND 7.5
AND 10-0-10 FERTILIZER AT THE RATE OF 3 POUNDS PER CUBIC YARD. IN PLANTING BEDS
INCORPORATE THIS MIXTURE THROUGHOUT THE ENTIRE BED IN A 6" LAYER AND
ROTO-TILLING IT INTO THE TOP 12" OF SOIL AT A 1:1 RATIO.ANY PLANT STOCK NOT PLANTED
ON DAY OF DELIVERY SHALL BE HEELED IN AND WATERED UNTIL INSTALLATION. PLANTS NOT
MAINTAINED IN THIS MANNER WILL BE REJECTED.
15.CONTRACTOR SHALL BE RESPONSIBLE TO VERIFY THAT EACH EXCAVATED TREE AND SHRUB PIT
WILL PERCOLATE PRIOR TO INSTALLING PLANTING MEDIUM AND PLANTS. THE CONTRACTOR
SHALL FILL THE BOTTOM OF SELECTED HOLES WITH SIX INCHES OF WATER AND CONFIRM THAT
THIS WATER WILL PERCOLATE WITHIN A 24-HOUR PERIOD. IF THE SOIL AT A GIVEN AREA DOES
NOT DRAIN PROPERLY, A PVC DRAIN OR GRAVEL SUMP SHALL BE INSTALLED OR THE PLANTING
SHALL BE RELOCATED IF DIRECTED BY THE LANDSCAPE ARCHITECT.
16.ALL PLANTS SHALL BE GUARANTEED FOR TWO COMPLETE GROWING SEASONS (APRIL 1 -
NOVEMBER 1), UNLESS OTHERWISE SPECIFIED. THE GUARANTEE SHALL COVER THE FULL COST OF
REPLACEMENT INCLUDING LABOR AND PLANTS.
17.CONTRACTOR SHALL NOTIFY THE LANDSCAPE ARCHITECT AT LEAST 3 DAYS PRIOR TO PLANNED
DELIVERY. THE CONTRACTOR SHALL NOTIFY THE LANDSCAPE ARCHITECT AT LEAST 24 HOURS IN
ADVANCE OF BEGINNING PLANT INSTALLATION.
18.SEASONS/TIME OF PLANTING AND SEEDING: NOTE: THE CONTRACTOR MAY ELECT TO PLANT IN
OFF-SEASONS ENTIRELY AT HIS/HER RISK. DECIDUOUS
18.1.POTTED PLANTS: 4/1 - 6/1; 9/21 - 11/1
18.2.DECIDUOUS /B&B: 4/1 - 6/1; 9/21 - 11/1
18.3.EVERGREEN POTTED PLANTS: 4/1 - 6/1; 9/21-11/1
18.4.EVERGREEN B&B: 4/1 - 5/1; 9/21 - 11/1
18.5.TURF/LAWN SEEDING: 4/1 - 6/1; 7/20 - 9/20
18.6.NATIVE MIX SEEDING: 4/15 - 7/20; 9/20-10/20
19.MAINTENANCE SHALL BEGIN IMMEDIATELY AFTER EACH PORTION OF THE WORK IS IN PLACE.
PLANT MATERIAL SHALL BE PROTECTED AND MAINTAINED UNTIL THE INSTALLATION OF THE
PLANTS IS COMPLETE, INSPECTION HAS BEEN MADE, AND PLANTINGS ARE ACCEPTED EXCLUSIVE
OF THE GUARANTEE. MAINTENANCE SHALL INCLUDE WATERING, CULTIVATING, MULCHING,
REMOVAL OF DEAD MATERIALS, RE-SETTING PLANTS TO PROPER GRADE AND KEEPING PLANTS IN
A PLUMB POSITION. AFTER ACCEPTANCE, THE OWNER SHALL ASSUME MAINTENANCE
RESPONSIBILITIES. HOWEVER, THE CONTRACTOR SHALL CONTINUE TO BE RESPONSIBLE FOR
KEEPING THE TREES PLUMB THROUGHOUT THE GUARANTEE PERIOD.
20.ANY PLANT MATERIAL WHICH DIES, TURNS BROWN, OR DEFOLIATES (PRIOR TO TOTAL
ACCEPTANCE OF THE WORK) SHALL BE PROMPTLY REMOVED FROM THE SITE AND REPLACED WITH
MATERIAL OF THE SAME SPECIES, QUANTITY, AND SIZE AND MEETING ALL LANDSCAPE LEGEND
SPECIFICATIONS.
21.WATERING: MAINTAIN A WATERING SCHEDULE WHICH WILL THOROUGHLY WATER ALL PLANTS
ONCE A WEEK. IN EXTREMELY HOT, DRY WEATHER, WATER MORE OFTEN AS REQUIRED BY
INDICATIONS OF HEAT STRESS SUCH AS WILTING LEAVES. CHECK MOISTURE UNDER MULCH PRIOR
TO WATERING TO DETERMINE NEED. CONTRACTOR SHALL MAKE THE NECESSARY
ARRANGEMENTS FOR WATER.
22.WEED PRE-EMERGENT TREATMENTS SHALL BE SPREAD IN ALL LANDSCAPE BEDS
TURF NOTES:
TURF ESTABLISHMENT SHALL BE ACCOMPLISHED IN ACCORDANCE WITH THE PROVISIONS OF THE
MN/DOT 2105 AND 2575 EXCEPT AS MODIFIED BELOW:
1.ALL AREAS TO RECEIVE SOD SHALL ALSO RECEIVE 6" OF TOPSOIL PRIOR TO INSTALLING SOD.
TOPSOIL SHALL BE FREE OF TREE ROOTS, STUMPS, BUILDING MATERIAL, AND TRASH, AND SHALL
BE FREE OF STONES LARGER THAN 1 1
2" INCHES IN ANY DIMENSION.
2.WHERE SOD ABUTS PAVED SURFACES, FINISHED GRADE OF SOD/SEED SHALL BE HELD 1" BELOW
SURFACE ELEVATION OF TRAIL, SLAB, CURB, ETC.
3.SOD SHALL BE LAID PARALLEL TO THE CONTOURS AND SHALL HAVE STAGGERED JOINTS. ON
SLOPES STEEPER THAN 3:1 OR IN DRAINAGE SWALES, SOD SHALL BE STAKED SECURELY.
4.TURF ON ALL OTHER AREAS DISTURBED BY CONSTRUCTION SHALL BE RESTORED BY SEEDING,
MULCHING AND FERTILIZING. SEED MIXTURE NO. 25-151 WILL BE PLACED AT THE RATE OF 120
POUNDS PER ACRE.
5.ALL DISTURBED AREAS TO BE TURF SEEDED, ARE TO RECEIVE 6" TOP SOIL, SEED, MULCH, AND
WATER UNTIL A HEALTHY STAND OF GRASS IS OBTAINED. FOR SLOPES STEEPER THAN 3:1 OR IN
DRAINAGE SWALES INSTALL EROSION CONTROL BLANKET.
6.ALL DISTURBED AREAS TO RECEIVE NATIVE SEED, ARE TO RECEIVE PLANTING SOIL, SEED, MULCH,
AND WATER UNTIL A HEALTHY STAND OF GRASS IS OBTAINED. FOR SLOPES STEEPER THAN 3:1 OR
IN DRAINAGE SWALES INSTALL EROSION CONTROL BLANKET.
GENERAL TREE SPECIFICATIONS:
1.ALL STREET AND PARKING LOT TREES SHALL BE LIMBED UP TO THE FOLLOWING HEIGHTS:
1.1.2" CAL. TREES: LOWEST BRANCH 6' HT.
1.2.3" CAL.+ TREES: LOWEST BRANCH 7' HT.
2.TREE CANOPY WIDTH SHALL BE RELATIVE TO HEIGHT/CALIPER OF TREE AND TYPE OF TREE.
2.1.1" CALIPER/6-8' HT: 3-4' WIDTH MIN.
2.2.2" CALIPER/12-14' HT: 4-5' WIDTH MIN.
2.3.3" CALIPER/14-16' HT: 6-7' WIDTH MIN.
3.CANOPY TREES SHALL NOT HAVE CO-DOMINATE LEADERS IN LOWER HALF OF TREE CROWN.
4.ALL TREES SHALL HAVE SYMMETRICAL OR BALANCED BRANCHING ON ALL SIDES OF THE TREE.
5.TREES SHALL NOT BE TIPPED PRUNED.
6.TREES SHALL BE FREE OF PHYSICAL DAMAGE FROM SHIPPING AND HANDLING. DAMAGED TREES
SHALL BE REJECTED.
7.SUMMER DUG TREES SHALL HAVE ROOTBALL SIZE INCREASED BY 20%
8.TREES WHICH EXCEED RECOMMENDED CALIPER TO HEIGHT RELATIONSHIP SHALL BE REJECTED.
IRRIGATION NOTES:
1.IRRIGATION SYSTEM TO BE DESIGN/BUILD. CONTRACTOR TO SUBMIT SHOP DRAWINGS FOR
APPROVAL OF SYSTEM LAYOUT PRIOR TO INSTALLATION.
2.ALL SOD TO RECEIVE SPRAY OR ROTOR IRRIGATION HEADS WITH MINIMUM DESIGN OF 1"
IRRIGATION PER WEEK.
3.ALL PLANT BEDS TO RECEIVE DRIP LINE IRRIGATION , WITH A MINIMUM DESIGN OF .25"
IRRIGATION PER WEEK.
4.CONTRACTOR TO INSTALL A TOTAL OF 4 QUICK COUPLERS AT THE CORNERS OF THE PROPERTY.
A 2.5" TYPE K SOURCE PIPE IS PROVIDED BY MECHANICAL.
NOTES
PROVIDE & INSTALL RODENT PROTECTION
1/2" HARDWIRE CLOTH, MESH CYLINDER, 8" DIA OR
GREATER X 24" HT.. STAKE IN PLACE
INSTALL TREE WITH ROOT FLARE VISIBLE AT TOP OF
THE ROOT BALL. REMOVE SOIL IN LEVEL MANNER FROM
TOP OF ROOT BALL TO EXPOSE 1ST 1/2" OR LARGER MAIN
ORDER ROOT IF NEEDED. SET ROOT BALL WITH MAIN
ORDER ROOT 1" ABOVE ADJACENT GRADE. DO NOT
COVER TOP OF ROOT BALL WITH SOIL.
INSTALL 3" LAYER OF SHREDDED HARDWOOD MULCH.
PLACE NO MULCH IN CONTACT WITH TREE TRUNK
REMOVE BURLAP, TWINE, ROPE AND WIRE FROM
TOP HALF OF ROOT BALL
BUILD 4" HIGH EARTH SAUCER BEYOND EDGE OF
ROOT BALL
EDGE CONDITION VARIES
PLACE ROOT BALL ON UNDISTURBED OR
COMPACTED SOIL
SCARIFY SIDES OF TREE PIT WITH SPADE BY HAND
TO BIND WITH PREPARED SOIL
PLANTING SOIL, REFER TO SPECIFICATIONS, COMPACT TO 85%
OF MAX. DRY UNIT WEIGHT ACCORDING TO ASTM D 698
TAMP SOIL AROUND ROOT BALL BASE FIRMLY WITH FOOT
PRESSURE SO THAT ROOT BALL DOES NOT SHIFT
DIG PLANTING PIT 4" TO 6"
DEEPER THAN ROOT BALL
UNDISTURBED
SUBGRADE
NOTE:
CONTRACTOR SHALL MAINTAIN TREES IN A PLUMB
POSITION THROUGHOUT THE WARRANTY PERIOD. IF
STAKING IS REQUIRED BY SITE CONDITIONS,
CONTRACTOR TO USE 2 OR 3 STAKE METHOD WITH 1"
WEBBING AROUND TRUNK OF THREE (NO WIRE OR
CABLING TO BE USED)
WRAP TREE TRUNKS PER NOTES.
30" RADIUS MULCH RING
A1.5 X A
MIN.
1
1
TREE PLANTING DETAIL
1/4" = 1'-0"
L1.04 P-01
1
INSTALL 3" LAYER OF MULCH, DO NOT PLACE IN
CONTACT W/ SHRUB STEM
APPLY PRE-EMERGENT HERBICIDE
EDGE CONDITION VARIES
EDGER, REFER TO PLAN AND SPECIFICATION
LOOSEN ROOTS OF CONTAINER GROWN PLANTS
EXCAVATE PLANT BED MIN. 4" DEEPER THAN
ROOT BALL HT.
SCARIFY SIDES AND BOTTOM OF PLANTING BED
WITH SPADE
UNDISTURBED SUBGRADE
PREPARE SOIL FOR
THE ENTIRE BED
SEE PLAN12"
MIN
4"
SHRUB PLANTING DETAIL
3/8" = 1'-0"
L1.04 P-02
2
INSTALL 3" LAYER OF SHREDDED HARDWOOD MULCH. DO NOT
PLACE IN CONTACT WITH PLANT
EDGE CONDITION VARIES
EDGER, REFER TO PLAN AND SPECIFICATION
LOOSEN ROOTS OF CONTAINER GROWN PLANTS
PLANTING SOIL
SCARIFY SIDES AND BOTTOM OF PLANTING BED WITH SPADE
UNDISTURBED SUBGRADE
PREPARE SOIL FOR
THE ENTIRE BED
18
"
MI
N
.
6"
REFER
TO PLAN
NOTE:
REFER TO EXTERIOR PLANTING SPECIFICATION
PERENNIAL PLANTING DETAIL
1/2" = 1'-0"
L1.04 P-03
3
HUDSON BLVD N
5TH STR
E
E
T
N
SCALE IN FEET
0 12060
NORTH
Project
Location
Date Submittal / RevisionNo.
Certification
Sheet Title
Summary
Revision History
Sheet No.Revision
Project No.
By
Designed:Drawn:
Approved:Book / Page:
Phase:Initial Issue:
Client
CONTINENTAL
483 FUND, LLC
SPRINGS AT
LAKE ELMO
9955 HUDSON
BLVD. N.
LAKE ELMO, MN
LCC
CEJ
01/09/19
21654.01
1.The bearing system is based on the Washington County coordinate system,
NAD83 (1986 Adjust). With an assumed bearing of South 00 degrees 01
minutes 13 seconds West for the east line of the Southwest Quarter of the
Southeast Quarter, Section 34, Township 29, Range 21.
TREE INVENTORY
SURVEY NOTES
Apr 12, 2019 - 3:15pm - User:clichty L:\PROJECTS\21654.01\CAD\Survey\Sheets\2165401-TREE.dwg
L1.05
TREE
INVENTORY
Board and Batten
"Phantom"
PPG 1036-6
Door
"Phantom"
PPG 1036-6
Lap
"Sharkskin"
PPG 1025-4
Stone
"Texas Rubble"
Coronado CT501
Flat Panel
"Sharkskin"
PPG 1025-4
Trim
"Crushed Silk"
PPG 1024-3
"Slate Tile"
SW 7624
"Slate Tile"
SW 7624
"Gray Area"
SW 7052
"Gray Area"
SW 7052
"Accessible Beige"
SW 7052
Right Elevation
SCALE: 1/16":1'0'
Left Elevation
SCALE: 1/16":1'0'
vqu ARE HERE
Board and Batten
"Clam Shell"
PPG 1023-6
Door
"Clam Shell"
PPG 1023-6
Lap
"Rock Cliffs"
PPG 1101-4
Stone
"Texas Rubble"
Coronado CT501
Flat Panel
"Rock Cliffs"
PPG 1101-4
Trim
"Crushed Silk"
PPG 1024-3
12-112-15-201610/17/2017
"Foothills"
SW 7514
"Foothills"
SW 7514
"Basket Beige"
SW 6143
"Basket Beige"
SW 6143
"Accessible Beige"
SW 7036
Right Elevation
SCALE: 1/16":1'0'
Left Elevation
SCALE: 1/16":1'0'
vqu ARE HERE
Front Elevation
I �
Right Side Elevation
SCAl.£. l/ll'":l"O" _,
LJ\ J
J
[ I CLUBHOUSE
vqu ARE HERE
L __ I
Rear Elevation
Left Side Elevation
SCALE: 3/32":1'0"
CLUBHOUSE
vqu ARE HERE
:nm ii-------
1nm nm
KITCHEN
!11'-4"CLG!
MUL Tl-PURPOSE
!14'-0" CLG!
FILES/IT
!10'-0"CLG!
CONFERENCE ROOM !10'-0" CLG!
OFFICE !10'-0" CLG!
( _J
,,.-- -
VESTIBULE
125'-0" CLG!
Clubhouse Floor Plan
SCALE, 3/32",l'O"
nm: --------mnm nm1
POOL EQ. STORAGE
!10'-0" CLG!
MEP
!10'-0" CLG!
OFFICE
!10'-0"CLG!
24-HR
ENTRY
!10'-0" CLG!
YOGNWARM
UP
L _________ __J
FITNESS
CENTER
!13'-0" CLG!
D D D
CLUBHOUSE FLOOR PLAN
vqu ARE HERE
“Proudly Serving Neighbors & Friends”
May 3, 2019
This is a follow up review, based on the limited drawings provided, for the revised plans of the SPRINGS
APARTMENTS dated 5/1/19. The applicant has addressed some of the items from the previous review dated
April 17, 2019. I have also added items, more specific, under the final bullet based on the revised drawing.
• FDC (Fire Department Connection) locations for each building to be approved by Fire Chief.
Incomplete.
• Locations and spacing of fire hydrants to meet requirements of 300’ spacing by road.
Incomplete.
• Clubhouse lockbox location to be approved.
Incomplete.
• Ensure roads are built to current standards with proper turning radius.
Engineering to confirm.
• Revise current secondary Fire Apparatus Access Road to meet requirements of MN State Fire Code
Appendix D 104.3 Remoteness. Per code spacing between access points should be approximately 700’.
Addressed.
• Address Section D105 AERIAL ACCESS ROADS, which is determined by the height of the buildings.
Incomplete.
• Chemical storage for pool.
Incomplete.
• All applicable codes from the MN State Fire Code 2015.
o Meet requirements for security gates pertaining to width and emergency access.
o Ensure year around, maintained access to all sides of structures.
Greg Malmquist, Fire Chief
LAKE ELMO FIRE DEPARTMENT
Station #1
3510 Laverne Ave. No.
Lake Elmo, MN 55042
651-770-5006
________________________
Station #2
4259 Jamaca Ave. No.
Lake Elmo, MN. 55042
651-779-8882
________________________
PAGE 1 of 4
MEMORANDUM
Date: May 8, 2019
To: Ken Roberts, Planner Director Re: Springs at Lake Elmo (Continental Properties)
Cc: Chad Isakson, Assistant City Engineer Preliminary Plat/Plan Review
From: Jack Griffin, P.E., City Engineer
We have reviewed the Springs at Lake Elmo Preliminary Plat/Plans received April 12, 2019 and revised plans
received May 1, 2019 consisting of the following documentation:
Preliminary Site Development Plans, Sheets C1.01 – C9.01, dated March 21, 2019.
Revised Preliminary Site Development Plans, Sheets C2.06 and C3.01, dated May 1, 2019.
Land Use Request Narrative dated April 12, 2019
Supplemental Narrative and application memorandum, undated, received May 1, 2019.
Stormwater Management Plan dated March 22, 2019.
Traffic Impact Study dated and received April 26, 2019.
STATUS/FINDINGS: Engineering has prepared the following review comments based on the plans submitted.
PRELIMINARY PLAT AND EASEMENTS
The Preliminary Plat creates one lot (Lot 1, Block 1) with 10‐foot drainage and utility easements on all
sides of the lot, except no easement is proposed along the west property line. The City is requiring a 100‐
foot right‐of‐way along the proposed North‐South Collector Road along this west property line and has
agreed that the small utility corridor may be placed within the road right‐of‐way.
The preliminary plans show several retaining wall and fencing encroachments to the Lot 1 Block 1, 10‐foot
drainage and utility easements.
The plat must be revised to include a drainage and utility easement over the wetland and wetland buffers,
and must include the 100‐year high water level.
North‐South Collector Street (Julia Avenue) Right‐of‐Way Dedication. A 100‐foot Right‐of‐way/Roadway
Easement must be dedicated to the City along Julia Avenue to allow for the construction of this
improvement as part of this development project. The dedicated right‐of‐way must be identified and
made a part of the Final Plat. If roadway easement is proposed along the west half of Julia Avenue the
easement must be provided in the City standard form of easement agreement and a fully signed and
executed easement agreement must be submitted with the final plat application. The 100‐foot right‐of‐
way/easement must be centered over the existing sanitary sewer pipe and aligned with the right‐of‐way
provided in the Bentley Village preliminary plat.
Hudson Boulevard Right‐of‐Way Dedication. Additional right‐of‐way may need to be dedicated to the City
along Hudson Boulevard to accommodate the Hudson Boulevard Improvements, including turn lanes and
trail. The existing conditions plan and preliminary plans/plat are incomplete in regards to showing the
existing Hudson Boulevard roadway centerline and right‐of‐way. A minimum right‐of‐way of 50 feet to the
north from existing centerline is required. Additional right‐of‐way may be needed at turn lanes to meet
the Hudson Boulevard design standards.
FOCUS ENGINEERING, inc.
Cara Geheren, P.E. 651.300.4261
Jack Griffin, P.E. 651.300.4264
Ryan Stempski, P.E. 651.300.4267
Chad Isakson, P.E. 651.300.4285
PAGE 2 of 4
There are no Outlots proposed or needed for the privately owned and maintained underground storm
water facilities. Drainage and utility easements will be required over all 100‐year high water level areas
and to protect all overland emergency overflow paths. For any privately owned and maintained storm
water facilities, the applicant will be required to execute and record a Stormwater Maintenance and
Easement Agreement in the City’s standard form of agreement.
The storm water management plan was incomplete. Stormwater management is required for all project
improvements including Julia Avenue and Hudson Boulevard. Additional storm water facilities must be
located in Outlots or easements that are part of the Final Plat or within drainage and utility easements
provided in the City standard form of easement agreement. Fully signed and executed easement
agreements must be submitted with the final plat application.
Watermain utility easements. The proposed watermain interior to the site will be owned and maintained
by the City. Drainage and utility easements are required over the watermain and hydrants, 30‐feet in
width, centered over the watermain/hydrant. The easements must be shown on the grading, watermain,
storm sewer and site plans, and must be provided on the Final Plat.
Sanitary sewer utility easements. The proposed sanitary sewer interior to the site will be privately owned
and maintained. Drainage and utility easements are NOT required.
Written landowner permission must be submitted as part of the final plat applications for any off‐site
grading work and storm water discharges to adjacent properties. The proposed off‐site easements must
be shown on the preliminary site plans, grading plans, and utility plans. Fully signed and executed
easement agreements must be submitted with the final plat application.
STORMWATER MANAGEMENT PLAN
The Stormwater Management Plan is incomplete. Preliminary Plat approval must be contingent upon a
complete storm water management plan meeting State, VBWD and City rules. Storm water facilities
proposed as part of the site plan to meet State and VBWD permitting requirements must be constructed
in accordance with the City Engineering Design Standards Manual.
The storm water management plan must be revised to incorporate storm water management for the
Hudson Boulevard and Julia Avenue Street improvements.
Permitting requirements will require rate control from all points of discharge from the site and will
require volume control. Overland emergency overflows or outlets are required as part of the site plan
for flood protection. The storm water management plan must be revised to demonstrate that the pre
and post discharges are reduced at ALL site locations rather than one combined location.
The storm water management must be revised to relocate the outfall pipe to avoid conflicting with the
urbanization of the north boulevard of Hudson Boulevard and must be redesigned to control outfall
velocities and erosion.
The Final Plat submittal must include a complete storm water management plan and construction
plans that provide all design details for the proposed underground storage systems including details
regarding building roof drainage connections.
Preliminary plan review and comments from the VBWD must be submitted with the Final Plat
application.
Maintenance access roads meeting the City engineering design standards must be provided for all
storm water facilities, including privately owned and maintained facilities.
To the extent adjacent properties are impacted by storm water management discharges, written
permission from those properties must be submitted as part of the Final Plat application.
The storm water management plan must be certified by a MN registered professional engineer.
PRELIMINARY SITE PLANS
Hudson Boulevard Improvements. Hudson Boulevard must be improved along the frontage of the
proposed development in accordance with the Hudson Boulevard Design Standards, with an Urban
section along the north boulevard and bituminous trail. An east bound right turn lane and must be
PAGE 3 of 4
constructed along Hudson Boulevard at both the entrance to the proposed development and at the
intersection with Julia Avenue. Storm water management for a future west bound left turn lane at Julia
Avenue must be accommodated or it must be demonstrated that storm water management can be
readily addressed with a future project. These improvements must be submitted as part of the Final Plat
and construction plans.
North‐South Collector Street (Julia Avenue) Improvements. Julia Avenue must be constructed along the
west side of the development, from Hudson Boulevard to the northly plat line of the Springs at Lake Elmo.
Julia Avenue shall be designed as an urban collector street consistent with City design standards and
within a 100‐foot right‐of‐way, including a bituminous trail along one side and a sidewalk along the other
side. The street alignment must accommodate the existing sanitary sewer and trunk watermain such that
manholes are not within wheel paths. These improvements must be submitted as part of the Final Plat
and construction plans.
The vertical profile for Julia Avenue and its relation to the existing sanitary sewer and watermain facilities
must be submitted and approved by the City Engineer prior to the development of Final Plat Construction
Plans and submittal of Final Plat. The profile plan must extend the full length from 5th Street North to
Hudson Boulevard, and show existing grade, existing utilities and proposed street profile with vertical
curve design data.
Sheet C3.01 Revised Site Plan. A revised site plan was received that among other changes, relocates the
secondary (emergency) access to Julia Avenue. This new location is a requirement for City approval.
Design details for the emergency access will need to be further reviewed once the remaining grading and
utility plan revisions are received.
Sheet C3.01 Revised Site Plan. The typical section dimensions shown for Hudson Boulevard are not
consistent with the Hudson Boulevard design standards and appear to create a centerline shift to the
south. This design/alignment may not be an approvable design. Information provided is incomplete to
facilitate a full review. The Final Plat application must include a revised Hudson Boulevard design that is
consistent with the City design standards.
Sheet C3.01 Revised Site Plan. Perimeter Fence. A perimeter decorative fence is shown around most of
the proposed site and often encroaches the easement or right‐of‐way by 1‐2 feet. The fence locations
must be revised to reside 1‐foot inside the property lines or easement lines as applicable.
Sheet C3.01 Revised Site Plan. Retaining walls are shown around the perimeters for most of the site. The
retaining wall locations must be revised to reside on or inside of the property lines or easements as
measured at the wall footing to preserve the full use of the easement or right‐of‐way.
Sheet C4.01 Grading Plan. The grading plan is incomplete.
All localized 100‐year HWL elevations and HWL contours must be shown on the grading plans.
The wetland NWL and HWL must be shown on the plans.
The overland emergency overflow path must be shown on the plans.
Building pad elevations must be a minimum of 2‐feet above all adjacent 100‐year HWL elevations
and at least 1‐foot above all adjacent emergency overflow elevations.
Proposed grading contours must be labeled more frequently to facilitate plan review.
All 100‐year HWL areas and EOFs must be fully protected by drainage and utility easements.
The wetland and wetland buffers must be fully protected by drainage and utility easements.
All easements must be shown on the Preliminary Plat, site plan, grading and utility plans.
Sheets C5.01 – C5.03 Erosion Control Plans. The erosion control plans must be revised to be consistent
with the City of Lake Elmo Design Standards manual including use of City Standard erosion control plan
notes and details. Conflicting or redundant plan notes and details should be removed from the plans.
Sheet C6.01. Sanitary Sewer and Watermain Plan. This plan is incomplete.
The utility plan must include the minimum 30‐foot utility easements centered over all watermain
and hydrants. The easements must also be shown on the grading, storm sewer and site plans.
PAGE 4 of 4
The existing utilities along Hudson Boulevard have been shown incorrectly and are not complete.
A field survey must be completed to verify utility locations along Hudson Boulevard and Julia
Avenue and the plans revised accordingly. The existing pressure reduction valve (PRV) located
along Hudson Boulevard is a critical component of the City’s infrastructure and must be accurately
shown on the plans to facilitate staff review and to demonstrate no encroachments.
The proposed watermain plans must be revised to connect to the City’s existing high‐pressure
zone in three locations. 1) Connect to the existing 12‐inch watermain along Julia Avenue as shown
on the plans along the emergency secondary access. 2) Connect to the existing 12‐inch high
pressure zone watermain in Hudson Boulevard with the connection located west of the existing
PRV station. 3) Coordinate 12‐inch watermain loop connection with Bentley Village located
approximately 1,050 feet east from the Julia Avenue centerline. Remove the 12‐inch watermain
connection to the low pressure zone along Hudson Boulevard, east of the wetland.
The sanitary sewer plans must be revised to replace approximately 160 feet of existing 8‐inch
sanitary sewer located in the Julia Avenue right‐of‐way with 10‐inch sanitary sewer with a new
manhole directly west of the Springs sewer connection location. A public 8‐inch sewer stub must
then extend east to a second manhole placed at the right‐of‐way edge to terminate the public
sanitary sewer. The private sanitary sewer will then extend east into the site from this manhole.
The plans must clearly identify utilities to be owned by the City and to be owned by Springs.
No watermain pipe oversizing is anticipated at this time. Further review will be completed with
the Final Plat application.
The applicant will be responsible to place hydrants throughout the property at the direction of
the Fire Department. All fire hydrants shall be owned and maintained by the City.
Sheet C6.02. Storm Sewer Plan. The storm sewer plan is incomplete.
The storm sewer improvements along Hudson Boulevard and Julia Avenue must be incorporated
into the construction plans for City review.
The plans must clearly identify storm sewer to be owned by the City and to be owned by Springs.
All storm sewer to be owned and maintained by the City and all storm sewer located in City right‐
of‐way must be design and constructed in accordance with the City Design Standards Manual.
The plans must include a storm sewer structure chart showing structure type, number, build, rim,
invert, pipe cover and structure casting.
Storm sewer calculations must be submitted with the storm sewer plans to show pipe velocities
meeting City design standards.
Sheet C9.01. Civil Details. Civil details and construction plans must be revised to include the City Standard
Plan Notes and Details for all infrastructure components that are to be owned and maintained by the City
and for grading and erosion control. City Standard Plan Notes are to be placed on the applicable plan
sheet depicting City owned infrastructure and the City Standard Details are to be shown on a detail sheet
and identified for use with public owned infrastructure (see City standard plan format requirements).
Private Streets. The streets interior to the development are proposed to remain privately owned and
maintained. Interior street design is required to provide adequate fire lanes and safety access. The plans
must include turning templates to demonstrate adequate turning radius for fire safety apparatus.
Due to the high density of this development it is strongly recommended that plan details for grading and
utility plans be submitted using a 1” = 20 scale.
TRAFFIC IMPACT STUDY, prepared by Swing Traffic Solutions, dated April 26, 2019
The Traffic Impact Study concludes that the proposed development has appropriate access to the site and
surrounding roadway network and the roadway network will function well with the project. However, this
conclusion assumes that the CSAH19‐Hudson Boulevard Traffic Signal is constructed as planned by the
City prior to the completion of the development and that dedicated left and right turn lanes are
constructed at both the Hudson Boulevard and Julia Avenue intersection and at the development
entrance.
Wenck | Colorado | Georgia | Minnesota | North Dakota | Wyoming
Toll Free 800-472-2232 Web wenck.com
To: Ken Roberts, City of Lake Elmo Planning Director
From: Lucius Jonett, Wenck Landscape Architect
Date: May 7, 2019
Subject: City of Lake Elmo Landscape Plan Review
Springs at Lake Elmo, Review #1
Submittals
Tree Preservation Plan, dated April 12, 2019, received April 12, 2019.
Landscape Plans, dated April 12, 2019, received April 12, 2019.
Location: North of Hudson Boulevard North, West of Keats Avenue North in Lake Elmo, MN
Land Use Category: Rural Development Transitional being rezoned to Urban High Density
Planned Unit Development
Surrounding Land Use Concerns:
The property to the north (Bentley Village) is Urban Medium Density Residential and is less
intensive land use than the proposed Urban High Density Residential. Screening is required
on the north boundary.
The property’s use to the west (Rural Development Transitional) is unknown at the moment
and east (Commercial) is a zone that is more intensive land use than this proposed Urban
High Density Residential. Screening is not required on the east or west boundaries. To the
south is Interstate 94 where screening is suggested to help with noise abatement.
Special landscape provisions in addition to the zoning code:
None.
Ken Roberts
Planning Director
City of Lake Elmo May 7, 2019
2
T:\6443 Lake Elmo\22 Springs of Lake Elmo\01 Preliminary Plans\2019-05-06\2019-05-06 Development Name Landscape Plan Review.docx
Tree Preservation:
A. A tree preservation plan has been submitted that does meet all requirements.
Entire Site
Total Caliper Inches of Significant Trees On-Site: 1050 Cal Inches
Common Trees 489
Conifer/Evergreen Trees 303
Hardwood Trees 258
Nuisance Trees 0
Significant Inches Removed On-Site 1050 Cal Inches
Common Trees 489
Conifer/Evergreen Trees 303
Hardwood Trees 258
Nuisance Trees 0
30% Tree Removal Limits (Cal. Inches) Allowed Proposed
Subtract Common Tree Removals 146.7 489
Subtract Conifer/Evergreen Tree Removals 90.9 303
Subtract Hardwood Tree Removals 77.4 258
Removals in excess of 30% allowances
Removals in excess of 30% allowances 142.0 Cal Inches
Common Removals in Excess of 30% Allowance 342.3
Conifer Removals in Excess of 30% Allowance 212.1
Hardwood Removals in Excess of 30% Allowance 180.6
Common Tree Replacement Needed (1/4 the dia inches removed) 85.6 Cal Inches
Conifer Tree Replacement Needed (1/2 the dia inches removed) 106.1 Cal Inches
Hardwood Tree Replacement Needed (1/2 the dia inches removed) 90.3 Cal Inches
Common Tree Replacement Required @ 3" per Tree 29 # Trees
Conifer Tree Replacement Required @ 3" per 6' Tall Tree 36 # Trees
Hardwood Tree Replacement Required @ 3" per Tree 31 # Trees
B. There are 37 specimen trees identified in the tree inventory. The following tree ID
numbers are defined as specimen, 3501-3534, 3557, 3561, and 3563. All specimen
trees are proposed for removal.
C. Tree replacement is required because more than thirty (30) percent of the diameter
inches of significant trees surveyed will be removed.
D. Tree replacement calculations does follow the required procedure.
E. This project is residential development; therefore, mitigation replacement trees shall be
in addition to landscape required tree counts.
Ken Roberts
Planning Director
City of Lake Elmo May 7, 2019
3
T:\6443 Lake Elmo\22 Springs of Lake Elmo\01 Preliminary Plans\2019-05-06\2019-05-06 Development Name Landscape Plan Review.docx
Landscape Requirements:
The preliminary landscape plans do not meet the code required number of trees. The
preliminary plans show fewer than the code required tree quantities.
Master Plan Master Plan
(Code Required) Proposed
Street frontage 1100 Lineal Feet
Lake Shore 0 Lineal Feet
Stream Frontage 0 Lineal Feet
Total Linear Feet 1100 Lineal Feet
/50 Feet = Required Frontage Trees 22 Trees
Development or Disturbed Area - SF
Development or Disturbed Area 17 Acres
*5 = Required Development Trees 85 Trees
Interior Parking Lot Spaces* 36 Spaces
/10 = Required Parking Lot Trees 4 Trees
Perimeter Parking Lot Frontage Length* 1286 Lineal Feet
/50 = Required Frontage Strip Trees 26 Trees
Required Mitigation Trees 96
Required Number of Trees 233
Total Trees to Date 184
* Residential development - mitigation replacement trees are in addition to landscape required tree counts.
1. A minimum one (1) tree is proposed for every fifty (50) feet of street frontage.
2. A minimum of five (5) trees are proposed to be planted for every one (1) acre of
land that is developed or disturbed by development activity.
The landscape plans do meet the minimum compositions of required trees:
• At least 25% of the required number of trees shall be deciduous shade trees
• At least 25% of the required number of trees shall be coniferous trees
• Up to 15% of the required number of trees may be ornamental tree
Master Plan Qty % Composition
Deciduous Shade Trees 125 74% >25% required
Coniferous Trees 44 26% >25% required
Ornamental Trees 15 9% <15% required
Tree Count 169
A. A landscape plan has been submitted that does not include all requirements.
1. The landscape plan does not include required City standard notes and details.
Ken Roberts
Planning Director
City of Lake Elmo May 7, 2019
4
T:\6443 Lake Elmo\22 Springs of Lake Elmo\01 Preliminary Plans\2019-05-06\2019-05-06 Development Name Landscape Plan Review.docx
B. The landscape plan does not meet the landscape layout requirements.
• No utility conflicts; Prefer that the trunk of trees shall be 10 feet from the nearest
utility, including water and sewer service stubs to each lot.
C. Interior Parking Lot Landscaping – The development does include several interior
parking lots. Only one meets the threshold of 30 parking spaces and does not meet the
following landscape requirements.
1. At least 5% of the interior area of parking lots with more than 30 parking spaces
is devoted to landscape planting areas. The parking lot is measured at
approximatively 8,650 square feet and a planting bed measuring approximately 0
square feet separates the parking lot from the circle drive/drop-off area. The
planting area is approximately 0% of the interior of the parking lot area.
2. The planting area includes 1 shade tree and does not satisfy the minimum
required 4 tree planted to meet the requirements for this interior parking lot.
D. Perimeter Parking Lot Landscaping – The development does include perimeter parking
lots and does not meet the following landscape requirements.
1. Alongside and rear property lines abutting residential properties or districts,
screening shall be provided, consisting of either a masonry wall, fence or berm in
combination with landscape material that forms a screen a minimum of four (4)
feet in height, a maximum of six (6) feet in height, and not less than ninety
percent (90%) opaque on a year-round basis. Landscape material shall include
trees, planted at a minimum of one deciduous or coniferous tree per forty (40)
linear feet along the property line.
E. Screening – The landscape plan does not meet screening requirements.
Screening is required by City code. Screening shall be used to provide visual and noise
separation of intensive uses from less intensive uses. Where screening is required in the
City Code between uses or districts, it shall consist of either a masonry wall (chain link
will not suffice) or fence in combination with landscape material that forms a screen at
least six (6) feet in height, and not less than ninety percent (90%) opaque on a year-
round basis. Landscape material shall include trees, planted at a minimum of one
deciduous or coniferous tree per forty (40) linear feet along the property line. Additional
landscape material such as shade trees or trellises may be required to partially screen
views from above.
A single, straight row of evergreen trees is inadequate for screening. Vegetative
screening should consist of more than one row of evergreen trees and include a row of
other trees or native shrubs in front of the evergreens to soften the “development wall”
effect.
Ken Roberts
Planning Director
City of Lake Elmo May 7, 2019
5
T:\6443 Lake Elmo\22 Springs of Lake Elmo\01 Preliminary Plans\2019-05-06\2019-05-06 Development Name Landscape Plan Review.docx
Findings:
1. Tree calculations for mitigation and landscape requirements are based on 3” DBH trees.
This diameter exceeds the minimum size required and provides fewer trees at a larger
diameter.
2. Tree replacement calculations do not follow the required procedure. We are not able to
follow the math of how the common, conifer, and nuisance species were tabulated.
Please provide tabulations.
3. Preliminary landscape sheets do not include required City standard notes and details.
Update details using City standard notes and details.
4. There are some landscape conflicts with utility lines. Please refer to attached document
for problem areas. Please correct tree spacing so the trunk of trees shall be 10 feet from
the nearest utility, including water and sewer service stubs to each lot.
5. The preliminary landscape plans do not calculate interior parking lot and perimeter
parking lot tree plantings. Please refer to attached document for identified issues. Please
update landscape plan to provide the required plantings.
6. The north side of the property will need to satisfy both screening and perimeter parking
lot requirements.
Recommendation:
It is recommended that a condition of approval include submitting a revised landscape plan
addressing findings 2-6 listed above.
Sincerely,
Lucius Jonett, PLA (MN)
Wenck Associates, Inc.
City of Lake Elmo Municipal Landscape Architect
Project
Location
Date Submittal / RevisionNo.
Certification
Sheet Title
Summary
Revision History
Sheet No.Revision
Project No.
By
Designed:Drawn:
Approved: Book / Page:
Phase: Initial Issue:
Client
CONTINENTAL
483 FUND LLC
W134 N8675 EXECUTIVE PARKWAY
MENOMONEE FALLS, WI 53051
SPRINGS AT
LAKE ELMO
LAKE ELMO,
MINNESOTA
9955 HUDSON BOULEVARD NORTH
EAV CJL
EAV
PRELIMINARY 4/12/2019
21654
Registration No.Date:
I hereby certify that this survey, plan or report was
prepared by me or under my direct supervision
and that I am a duly Licensed LANDSCAPE
ARCHITECT under the laws of the State of
Minnesota.
This certification is not valid unless wet signed in blue
ink. If applicable, contact us for a wet signed copy of
this survey which is available upon request at
Sambatek, Minnetonka, MN office.
4/12/201940252
William L Delaney
PREL
I
M
I
N
A
R
Y
4/12/2019 CITY SUBMITTAL
SCALE IN FEET
0 10050
Apr 12, 2019 - 3:14pm - User:clichty L:\PROJECTS\21654\CAD\Civil\Sheets\21654-L1-LAND.dwg
L1.01
LANDSCAPE
PLAN
LEGEND
EASEMENT
CURB & GUTTER
BUILDING
RETAINING WALL
NUMBER OF PARKING
STALLS PER ROW
SIGN
PIPE BOLLARD
STANDARD DUTY
ASPHALT PAVING
HEAVY DUTY
ASPHALT PAVING
CONCRETE PAVING
PROPERTY LIMIT
EXISTINGPROPOSED
KEY NOTE
WETLAND LIMITS
TREELINE
CONCRETE SIDEWALK
ARCHITECTURAL
CONCRETE
DETAIL
CHAIN LINK FENCE
DECORATIVE
WOODEN FENCE
AIR CONDITIONING
UNIT
TREES CODE BOTANICAL NAME / COMMON NAME CONT CAL SIZE QTY
CM Acer x freemanii `Armstrong` / Armstrong Freeman Maple B & B 3"Cal.21
HB Celtis occidentalis / Common Hackberry B & B 3"Cal.15
GB Ginkgo biloba `Autumn Gold` TM / Maidenhair Tree B & B 3"Cal.13
IH Gleditsia triacanthos `Imperial` / Imperial Honeylocust B & B 3"Cal.11
KC Gymnocladus dioica `Espresso` / Kentucky Coffeetree B & B 3"Cal.11
SO Quercus bicolor / Swamp White Oak B & B 3"Cal.14
RP Quercus robur x warei`Long` / Regal Prince Oak B & B 3"Cal.15
BL Tilia americana `Boulevard` / Boulevard Linden B & B 3"Cal.9
PE Ulmus americana `Princeton` / American Elm B & B 3"Cal.16
CONIFERS CODE BOTANICAL NAME / COMMON NAME CONT CAL SIZE QTY
NS Picea abies / Norway Spruce B & B 6` 18
AP Pinus nigra / Austrian Black Pine B & B 6`15
WP Pinus strobus / White Pine B & B 6`11
ORN. TREES CODE BOTANICAL NAME / COMMON NAME CONT CAL SIZE QTY
SB Amelanchier canadensis `Autumn Brilliance` / Autumn Brilliance Serviceberry B & B 2"Cal 9
JL Syringa reticulata / Japanese Tree Lilac B & B 2"Cal 6
TREE SCHEDULE
MITIGATION FROM TREE PRESERVATION PLAN
REQUIRED
COMMON TREES (46" @ 3" TREES) 15 TREES
CONIFER TREES (149" @ 6' TREES) 50 TREES
HARDWOOD TREES (129" @ 3" TREES) 43 TREES
TOTAL 108 TREES
SETBACK AREA LANDSCAPE REQUIREMENTS
REQUIRED
STREET FRONTAGE (1100 FT / 50 = 22 TREES @ 2.5")
(22 X 2.5" = 55" @ 3" TREES) 18 TREES
DISTURBED AREA (17 ACRES X 5 = 85 TREES @ 2.5")
(85 X 2.5" = 213" @ 3" TREES) 71 TREES
TOTAL 89 TREES
PROPOSED PLANTINGS
REQUIRED PROPOSED PERCENTAGE
OVERSTORY TREES 125 TREES 74%
CONIFEROUS TREES 44 TREES 26%
ORNAMENTAL TREES* 15 TREES
TOTAL 197 TREES 169 TREES
SHRUBS AND PERENNIALS 1,449 UNITS
*DOES NOT COUNT TOWARDS REPLACEMENT TREE TOTALS.
LAKE ELMO, MN LANDSCAPE CODE
NON-STEEL EDGER
GROUND COVERS CODE BOTANICAL NAME / COMMON NAME CONT QTY
TUR HIG Turf Sod Highland Sod / Sod Sod 76,939 sf
SOD SCHEDULE
Saturday May 4, 2019
Good Evening Lake Elmo Planning Commission,
My family and I have lived in the Savona Neighborhood for a year now. I’ve seen the videos of
past Council meetings of my neighbors fighting to stop Continental from building apartments
along this entire stretch of 5th St. & Hudson Road. Here are a few key points from what I
brought to the discussion at the February meeting where I spoke up.
If these are going to truly be marketed as “high end” apartments, then the standard for the
inside, outside, and surrounding landscapes should be required to look “high end”.
A few key points that the Planning Commision and City should request Continental revise in
their plan before making a firm consideration:
1.No Chain Link Fences - We as a Savona Neighborhood are required to have aluminum
fences - Please keep a higher standard for design. Require that Continental have a 6 to
8 foot metal/split rail fence. This will keep the area looking aesthetically pleasing and
hold a higher standard for design on future apartments that want to build in Lake Elmo
a.From their plans they have “decorative fencing” in certain areas
b.The entire property should be surrounded by 6 to 8 foot metal fencing
c.Nicer townhomes will be built behind these apartments, I bet those residents
would appreciate nicer fencing when they have to look out at these apartments
2. Green Space - why is there no designated green space for kids and families? For this
large of a complex, there should be a section for people and not just pets.
3. Have an emergency exit for residents - I know in the February meeting there was
yet to be a decision on a 2nd exit for residents. Has this been determined and figured out?
Please hold Continental to a higher standard as Lake Elmo’s first apartment complex.
Thank You for your time and consideration.
Sincerely,
Annie Daugherty
553 6th St. Ln N.
Lake Elmo, MN 55042
Lake Elmo Planning Commission Minutes; 5-13-19
City of Lake Elmo
Planning Commission Meeting
Minutes of May 13, 2019
Chairman Johnson called to order the meeting of the Lake Elmo Planning Commission at
7:00 p.m.
COMMISSIONERS PRESENT: Johnson, Weeks, Hartley, Holtz, and Steil
COMMISSIONERS ABSENT: Risner, Cadenhead
STAFF PRESENT: Planning Director Roberts
Approve Agenda:
M/S/P: Hartley/Weeks move to approve the agenda as presented, Vote: 5-0, motion
carried unanimously.
Approve Minutes: None
Public Hearing – Preliminary Planned Unit Development (PUD) Plan, Preliminary Plat
and Zoning Map Change – Springs Apartments
Roberts gave a presentation regarding the requests for the proposed Springs
Apartments. The proposed site plan includes 15 buildings with 20 units each. The
buildings are a townhouse design, two stories tall with a mix of studio, 1-bedroom, 2-
bedroom and 3-bedroom units. Many units provide attached, direct-access garages for
a total of 120 attached garage spaces for the 300 units. The applicant also is planning to
have seven detached garage buildings (with a total of 42 spaces), 399 surface parking
spaces, an approximately 4,300 square foot club house (including a large gathering
room, fitness center, kitchen area, coffee bar and office space), pool with sun deck,
trash enclosure, mail kiosk, and one pet playground all within a fenced, controlled
access community.
The proposed site plan shows the primary entrance to the development would be off of
Hudson Boulevard and there would be an emergency access drive connecting to the
north/south road (Julia Avenue) to the west of the site. The applicant also is proposing
to preserve much of an existing wetland on the site that is near Hudson Boulevard.
2
Lake Elmo Planning Commission Minutes; 5-13-19
This request would create 300 apartment units on a site that is about 17.3 net acres for
a proposed density of 17.31 dwelling units per net acre thus exceeding the density limits
set for this area in the 2040 Comprehensive Plan (without any credit for density bonuses
that the City may grant through the PUD process). At 15 dwelling units per net acre, this
site could accommodate 260 units.
Roberts also noted that the pending land use designation is (MU-C) for this site and the
City will not be able to give final approval the proposal until after the Metropolitan
Council and the City Council have finalized the 2040 Comprehensive Plan. The City could
require the applicant to wait to submit the final plat and final PUD plans for this project
after the City has given the 2040 Comprehensive Plan final approval. This timing will
ensure that what is proposed for this site is consistent with the 2040 Comprehensive
Plan and that the City will get credit for the residential density that the project would
bring to this part of Lake Elmo. He also noted that no matter when the applicant
submits applications for final plat and final PUD approval, the City will need to make any
and all final project approvals contingent upon final approvals of the 2040
Comprehensive Plan by the Metropolitan Council and by the City Council.
Director Roberts explained that in order for this development to proceed, the City will
need to approve a zoning map amendment (rezoning) for the property from RT (rural
development transitional) to HDR (urban high density residential). Staff is
recommending approval of the proposed zoning map change for this site.
The Commission discussed the proposed project density and the differences in how the
applicant is measuring the site size and calculating the proposed density versus how
staff calculated the project density.
Gwen Wheeler, representing the applicant, (Continental 483 Fund LLC) spoke to the
Commission about some of the information in the staff report including the history of
the Company and the proposed project density. She also answered several questions
from the Commission about the proposal.
The Chair opened the Public Hearing at 8:23 PM and noted the comments from one
Lake Elmo resident in an e-mail submitted to the City. She noted in her e-mail concerns
about the design of the fence around the development site, the amount of green space
within the development and the need for an emergency exit from the development.
Brian Zeller, realtor, representing the owner of a commercial property east of the
proposed development site, spoke in favor of the proposed development. He stated
that the commercial-land owners want more roof tops in the area (thus more residents)
to support the existing and future commercial developments.
The Chair closed the public hearing at 8:31 PM.
3
Lake Elmo Planning Commission Minutes; 5-13-19
After more review and discussion by the Commission, they made the following motions:
M/S/P: Hartley/Weeks, move to recommend approval of the preliminary plat and
preliminary PUD Plans as requested by Continental 483 Fund LLC for PID#
34.029.21.43.0003 for the project to be known as the Springs Apartments located on
the north side of Hudson Boulevard, subject to recommended conditions of approval.
Vote: 5-0, motion carried unanimously.
M/S/P: Hartley/Weeks, move to recommend approval of the rezoning of site of the
Springs Apartments on Hudson Boulevard from RT (rural development transitional) to
HDR (urban high density residential) after final approval of the 2040 Comprehensive
Plan based on the findings listed in the Staff report. Vote: 5-0, motion carried
unanimously.
City Council Updates – May 7, 2019
1. Easton Village 5th Addition – Final Plat
Staff Updates
1. Upcoming Meetings
a. May 29, 2019
b. June 10, 2019
Meeting adjourned at 8:49 pm
Respectfully submitted,
Ken Roberts
Planning Director