HomeMy WebLinkAbout#07 - MS4 Annual Report STAFF REPORT
DATE: June 4, 2019
REGULAR
AGENDA ITEM: MS4 Permit Program – Public Meeting and Accept the 2018 Annual Report
SUBMITTED BY: Jack Griffin, City Engineer
REVIEWED BY: Kristina Handt, City Administrator
Marty Powers, Public Works Director Ryan Stempski, Project Engineer
ISSUE BEFORE COUNCIL: Should the City Council approve the Annual Report for the MS4 Permit
Program?
BACKGROUND: The MS4 General Permit is mandated by federal regulations under the Clean Water
Act and administered by the Minnesota Pollution Control Agency. A municipal separate storm sewer
system (MS4) is a system of conveyances (roads with drainage systems, municipal streets, catch basins,
curbs, gutters, ditches, man-made channels, and storm drains) owned by a municipality. The MS4 program
gives owners or operators of MS4’s approval to discharge storm water to lakes, rivers and wetlands in
Minnesota. The MS4 General Permit focuses on reducing the pollution that enters these public systems
and discharges to wetlands, streams and lakes (“waters of the state”). By federal rule, storm water systems
in urban areas are labeled Mandatory MS4s. The City of Lake Elmo is a Mandatory MS4 City.
As a MS4 City, Lake Elmo was required to obtain and comply with a National Pollutant Discharge and
Elimination System (NPDES) storm water permit. To meet these requirements the City prepared and
implemented a five year Storm Water Pollution Prevention Program (SWPPP) beginning in 2006 and
ending in 2010. The MPCA reissued a new five-year program that began August 1, 2013. An updated
permit is expected to be rolled out by the MPCA in 2019. No major changes to the current permit are
expected.
The SWPPP specifies and outlines a series of best management practices intended to satisfy the permit
requirements for each of the six minimum control measures. The six minimum control measures are:
1. Public Education and Outreach
2. Public Involvement and Participation
3. Illicit Discharge Detection and Elimination
4. Construction Site Storm Water Controls
5. Post-Construction Storm Water Management for development and redevelopment
6. Pollution Prevention/Good Housekeeping for Municipal Operations
PROPOSAL DETAILS/ANALYSIS: As part of the on-going permit requirements as a mandatory MS4
City, Staff has prepared the 2018 MS4 Annual Report and will present a summary report to the City Council
and general public. The City must hold an Annual Public Meeting to encourage public discussion and
participation regarding its storm water quality and steps it is taking to address the MS4 Permit requirements.
Notice of this meeting was posted at City Hall and published in the Oakdale-Lake Elmo Review on May 1,
2019 (see attachment). Public input received will be considered for updating the City’s Storm Water
Pollution Prevention Program (SWPPP) and the meeting minutes will be incorporated into the City’s final
report. The 2018 MS4 Annual Report must be submitted to the MPCA by June 30, 2019. A copy of the
City’s Storm Water Pollution Prevention Program (SWPPP) is available on the City website.
RECOMMENDATION: Staff is recommending that the City Council conduct the Annual Public Meeting
required by the MS4 Permit and receive public input and comments. After receiving public comment, it is
recommended that the City Council accept the MS4 Annual Report for 2018 and authorize staff to submit
this report to the MPCA by June 30, 2019. The recommended motion for the action is as follows:
“Move to accept the MS4 Annual Report for 2018 and authorize staff to submit the Report to the MPCA.”
ATTACHMENTS:
1. Notice of MS4 Annual Public Meeting.
2. EMWREP Annual Report – Executive Summary (full report available upon request).
3. City of Lake Elmo 2018 MS4 Annual Report.
CITY OF LAKE ELMO
NOTICE OF ANNUAL PUBLIC MEETING
ON THE CITY STORM WATER POLLUTION PREVENTION PROGRAM
Notice is hereby given that the City Council of Lake Elmo will meet at City Hall at 7:00 p.m. on Tuesday,
June 4, 2019, to conduct a public meeting to encourage public discussion and participation regarding its
storm water quality and Storm Water Pollution Prevention Program (SWPPP).
A 1987 Amendment to the Federal Clean Water Act required implementation of a two-phase
comprehensive national program to reduce pollution from storm water runoff. A National Pollutant
Discharge Elimination System (NPDES) permit from the Minnesota Pollution Control Agency (MPCA) is
required as part of this program. The permit identifies a number of measures that must be met or
implemented by each community. The six minimum measures are:
• Public Education and Outreach
• Public Involvement and Participation
• Illicit Discharge Detection and Elimination
• Construction Site Storm Water Controls
• Post-Construction Storm Water Management for development and redevelopment
• Pollution Prevention/Good Housekeeping for Municipal Operations
The City’s Storm Water Pollution Prevention Program specifies best management practices intended to
satisfy the permit requirements for each of the minimum measures. As part of this program, the City is
required to hold an annual meeting to encourage public discussion and participation regarding its storm
water quality and steps it is taking to address the six minimum control measures. A copy of the SWPPP is
available on the City website or by contacting the City Engineer. An annual report will be submitted to the
MPCA in June 2019. The minutes of the annual public meeting will be incorporated into the City’s annual
report.
The meeting will be held as part of the regular City Council Meeting at City Hall. The agenda for this
meeting will include:
1) A Presentation about implementation of the City's Surface Water Pollution
Prevention Program in 2018,
2) Affording interested persons the opportunity to make oral statements concerning the
Storm Water Pollution Prevention Program,
3) Consideration of relevant written materials that interested persons submit
concerning the Storm Water Pollution Prevention Program; and,
4) Consideration of public input in making adjustments to the 2019 implementation plan
for the Storm Water Pollution Prevention Program.
DATED: April 25, 2019
BY ORDER OF THE LAKE ELMO CITY CLERK
Julie Johnson, City Clerk
(Published in the Oakdale-Lake Elmo Review on May 1, 2019)
Above: (Clockwise from upper left) Washington County Fair; Planting trees with Bobby and
Belinda Jensen at Lake Middle School; Storm drain stenciling in Forest Lake; Workshop for
local leaders on the St. Croix River.
2018 Annual Report
Members of the East Metro Water Resource Education Program:
Brown’s Creek Watershed • Carnelian-Marine-St. Croix Watershed •
Comfort Lake-Forest Lake Watershed • Cottage Grove • Dellwood • Forest Lake
Grant • Hugo • Lake Elmo • Middle St. Croix Watershed • Newport • Oak Park Heights • Oakdale
Ramsey-Washington Metro Watershed • Rice Creek Watershed • South Washington Watershed
Stillwater • St. Paul Park • Valley Branch Watershed • Willernie • West Lakeland
Woodbury • Washington Conservation District • Washington County
2
East Metro Water Resource Education Program
2018 Annual Report
TABLE OF CONTENTS
About the Program ………………………………………..………………………….. 3
2018 Executive Summary….…………………………….…………………………….…... 4
Program Activity Details
Public Education and Engagement…………………………………………….….. 6
Outreach Support for Projects and Programs…………………………………...... 14
Professional Trainings for Business and Local Government …………………….. 17
New Materials and Resources..……………………………………………………. 20
Appendix A: Education Program Budget for 2018 ...…….……………….……….. 24
3
About the East Metro Water Resource Education Program
Background: The East Metro Water Resource Education Program (EMWREP) is a partnership
formed in 2006 to implement a comprehensive water education and outreach program for the east
metro area of St. Paul, MN. Current EMWREP partners include:
• Washington Conservation District (host)
• Washington County
• Watershed management organizations: Brown’s Creek, Carnelian-Marine-St. Croix,
Comfort-Lake Forest Lake, Rice Creek, Ramsey-Washington Metro, South Washington,
and Valley Branch Watershed Districts, and the Middle St. Croix Watershed
Management Organization
• Cities and townships: Cottage Grove, Dellwood, Forest Lake, Grant, Hugo, Lake Elmo,
Newport, Oakdale, Oak Park Heights, Stillwater, St. Paul Park, Willernie, and
Woodbury, West Lakeland Township
Purpose: The purpose of the shared education program is to educate community residents,
businesses, staff and decision-makers about issues affecting local lakes, rivers, streams, wetlands
and groundwater resources and to engage people in projects that will help to protect and improve
the health of these water resources.
Partnership Structure: EMWREP is guided by a steering committee comprised of
representatives from each of the 24 partner organizations. The committee generally meets twice a
year to provide recommendations on the program budget and activities. The EMWREP
coordinator communicates regularly with partner staff, council members and board members;
prepares an annual report on program activities; provides outreach data and statistics for partners’
MS4 Permit reports; and communicates one-on-one with individual partners on projects
throughout the year. All EMWREP reports, plans, and education updates are available on-line at
www.mnwcd.org/emwrep.
Staff: Angie Hong is the EMWREP program coordinator. Additional education support in 2018
was provided by Lauren Haydon and Cameron Blake.
Coordination with Other Regional Education Efforts: The EMWREP partnership helps to
strengthen relationships between Washington Conservation District, Washington County and the
eight watershed management organizations and 14 cities that constitute the partnership. This
translates into better coordination and less overlap in the management of local water resources.
EMWREP staff provide leadership for Watershed Partners (a collaborative of more than 60 non-
profit and public entities in the Twin Cities metro area), participate in the Blue Thumb
partnership and Master Water Stewards programs, and work actively with organizations in the St.
Croix Basin, including partners in the Lower St. Croix “One Watershed” Plan.
Accolades: EMWREP was the 2012 MAWD Watershed Program of the Year.
4
2018 EXECUTIVE SUMMARY
PUBLIC EDUCATION AND ENGAGEMENT
EMWREP continues to lead water education efforts in the East Metro area through outreach,
community engagement, public education, and media communications.
Highlights from 2018 include:
1. Public education:
1. Engaging lake associations and lakeshore residents: Two (2) workshops and a
semi-monthly e-newsletter delivered to 150 lake association leaders
2. Landscaping workshops: Five (5) workshops focusing on prairie maintenance
and invasive species management
3. Dozens of presentations, community events, and educational activities
4. Weekly articles in local newspapers: www.eastmetrowater.org
2. Volunteer engagement:
1. Master Water Stewards:
o Seven stewards completed their capstone projects and were certified in
November 2018.
o Three new stewards are in training to become certified in 2019.
o Volunteers get 50-hours of on-line and in-person training, complete a
capstone project, and volunteer 25-50 hours per year after they are
certified.
2. AIS Detectors:
o One new AIS Detector was trained in 2018 (25hrs of on-line and in-
person classes)
o The nine AIS Detectors that were trained in 2017 provided 163 hours of
volunteer support in 2018.
3. Adopt-a-Raingarden:
o EMWREP launched a pilot “Adopt-a-Raingarden” program in Stillwater
o 40 residents volunteered to adopt raingardens
o 50+ volunteers participated in raingarden clean-up and weeding events in
May and June of 2018
3. Youth education:
1. School programming:
o Groundwater lessons for 4th grade classes at Royal Oaks Elementary
(Woodbury) and River Grove Elementary (May Twp.)
o Outdoor field programs with students from Royal Oaks, Grey Cloud
(Cottage Grove), and Middleton (Woodbury) Elementary Schools
o Groundwater lessons for 4th graders at the Children’s Water Festival
2. Teacher training: Trained 10 local teachers to use Project WET curriculum and
watershed lessons in the classroom
3. Campus Greening: Helped students at Lake and Middleton schools to plant 200
trees as part of their Campus Greening project
5/29/2019 MS4 Annual Report for 2018
https://survey.mn.gov/siam/surveylanding/printerviewer.asp?sid=746D706461616F625F313535393134333533362E3837 1/15
You are currently logged in as:
Lake Elmo City MS4
If this is correct, click the 'Next' button. If this information is incorrect, contact Cole
Landgraf (651-757-2880, cole.landgraf@state.mn.us).
Before you begin...
A fillable Microsoft Word document with all of the questions is available at
https://stormwater.pca.state.mn.us/index.php?title=MS4_Annual_Report (for personal
use only, not for submittal).
The MS4 Annual Report for 2018 will automatically save your answers when you hit the
‘Next’ button at the bottom of each page.
If you wish to leave the MS4 Annual Report for 2018 and complete the document at
another time, you may do so by clicking ‘Next’ at the bottom of your current page to
save your progress before exiting the document. Return to the survey by following the
previously used web link, and again login using your email and assigned password
credentials. Once you successfully log in, your previous answers will appear.
The MPCA will email a PDF of your MS4 Annual Report for 2018 information to you in a
confirmation email within three business days after you submit this form.
You may print a copy of the MS4 Annual Report for 2018 for your records at any time
by pressing the ‘Print’ button at the bottom of the page.
Additionally, it is possible to save a PDF copy of the MS4 Annual Report for 2018 if you
are working on a computer with OneNote (a program often included in Microsoft Office
packages). Detailed saving instructions are available at
stormwater.pca.state.mn.us/index.php/Guidance_for_saving_MS4_annual_reports.
MS4 Annual Report for 2018
Reporting period: January 1, 2018 to December 31, 2018
Due: June 30, 2019
5/29/2019 MS4 Annual Report for 2018
https://survey.mn.gov/siam/surveylanding/printerviewer.asp?sid=746D706461616F625F313535393134333533362E3837 2/15
Instructions: Complete this annual report to provide a summary of your activities under
the 2013 MS4 Permit (Permit) between January 1, 2018 and December 31, 2018.
MPCA staff may contact you for additional information.
Fillable document available at https://stormwater.pca.state.mn.us/index.php?
title=MS4_Annual_Report (for personal use only, not for submittal).
Questions: Contact Cole Landgraf (cole.landgraf@state.mn.us, 651-757-2880)
MS4 General Contact Information
Full name Ryan Stempski
Title Project Manager
Mailing
address 3880 Laverne Ave. N, Suite 100
City Lake Elmo
State MN
Zip code 55042
Phone 6513004267
Email ryan.stempski@focusengineeringinc.com
Preparer Contact Information (if different from the MS4 General Contact)
Full name
Title
Organization
Mailing
address
City
State
Zip code
Phone
Email
MCM 1: Public Education and Outreach
The following questions refer to Part III.D.1. of the Permit.
Q2 Did you select a stormwater-related issue of high priority to be emphasized during this
Permit term? [Part III.D.1.a.(1)]
Yes
No
5/29/2019 MS4 Annual Report for 2018
https://survey.mn.gov/siam/surveylanding/printerviewer.asp?sid=746D706461616F625F313535393134333533362E3837 3/15
Q3 What is your stormwater-related issue(s)? Check all that apply.
TMDL(s)
Local businesses
Residential BMPs
Pet waste
Yard waste
Deicing materials
Household chemicals
Construction activities
Post-construction activities
Other
Q4 Have you distributed educational materials or equivalent outreach to the public focused
on illicit discharge recognition and reporting? [Part III.D.1.a.(2)]
Yes
No
Q5 Do you have an implementation plan as required by the Permit? [Part III.D.1.b.]
Yes
No
Q6 How did you distribute educational materials or equivalent outreach? Check all that
apply and provide circulation/audience associated with each item. [Part III.D.1.a.]
Brochure
Newsletter
Utility bill insert
Newspaper ad
Radio ad
Television ad
Cable access channel
Stormwater-related event
School presentation or project
Website
Other (1)
Other (2)
Other (3)
Q7 Intended audience? Check all that apply.
Residents Local
Businesses Developers Students Employees Other
Newsletter
Website
Q8 Enter the total circulation/audience (if unknown, use best estimate):
Newsletter 8500
Website 52
5/29/2019 MS4 Annual Report for 2018
https://survey.mn.gov/siam/surveylanding/printerviewer.asp?sid=746D706461616F625F313535393134333533362E3837 4/15
Provide a brief description of each activity related to public education and outreach
(e.g. rain garden workshop, school presentation, public works open house) held and
the date each activity was held from January 1, 2018 to December 31, 2018. [Part
III.D.1.c.(4)]
Q9 Date of activity Q10Description of activity
Date
(mm/dd/yyyy)6/1/2018 City Newsletter
Date
(mm/dd/yyyy)12/3/2018 City Newsletter
Date
(mm/dd/yyyy)1/5/2018 Weekly website/internet updates
Date
(mm/dd/yyyy)
Date
(mm/dd/yyyy)
Date
(mm/dd/yyyy)
Date
(mm/dd/yyyy)
Date
(mm/dd/yyyy)
Q11 Between January 1, 2018 and December 31, 2018, did you modify your BMPs,
measurable goals, or future plans for your public education and outreach program?
[Part IV.B.]
Yes
No
MCM 2: Public Participation/Involvement
The following questions refer to Part III.D.2.a. of the Permit.
Q12 You must provide a minimum of one opportunity each year for the public to provide
input on the adequacy of your Stormwater Pollution Prevention Program (SWPPP). Did
you provide this opportunity between January 1, 2018 and December 31, 2018? [Part
III.D.2.a.(1)]
Yes
No
Q13 What was the opportunity that you provided? Check all that apply.
Public meeting
Public event
Other
5/29/2019 MS4 Annual Report for 2018
https://survey.mn.gov/siam/surveylanding/printerviewer.asp?sid=746D706461616F625F313535393134333533362E3837 5/15
Q14 Did you hold a stand-alone meeting or combine it with another event?
Stand-alone
Combined
Enter the date
of the public
meeting
(mm/dd/yyyy):
6/5/2018
Enter the
number of
citizens that
attended and
were
informed
about your
SWPPP:
0
Q17 Between January 1, 2018 and December 31, 2018, did you receive any input regarding
your SWPPP?
Yes
No
Q19 Between January 1, 2018 and December 31, 2018, did you modify your BMPs,
measurable goals, or future plans for your public participation/involvement program?
[Part IV.B.]
Yes
No
MCM 3: Illicit Discharge Detection and Elimination
The following questions refer to Part III.D.3. of the Permit.
Q20 Do you have a regulatory mechanism which prohibits non-stormwater discharges to
your MS4? [Part III.D.3.b.]
Yes
No
Q21 Did you identify any illicit discharges between January 1, 2018 and December 31,
2018? [Part III.D.3.h.(4)]
Yes
No
Q30 Do you have written Enforcement Response Procedures (ERPs) to compel compliance
with your illicit discharge regulatory mechanism(s)? [Part III.B.]
Yes
No
5/29/2019 MS4 Annual Report for 2018
https://survey.mn.gov/siam/surveylanding/printerviewer.asp?sid=746D706461616F625F313535393134333533362E3837 6/15
Q31 Between January 1, 2018 and December 31, 2018, did you train all field staff in illicit
discharge recognition (including conditions which could cause illicit discharges) and
reporting illicit discharges for further investigations? [Part III.D.3.e.]
Yes
No
Q32 How did you train your field staff? Check all that apply.
Email
PowerPoint
Presentation
Video
Field Training
Other
The following questions refer to Part III.C.1. of the Permit.
Q33 Did you update your storm sewer system map between January 1, 2018 and December
31, 2018? [Part III.C.1.]
Yes
No
Q34 Does your storm sewer map include all pipes 12 inches or greater in diameter and the
direction of stormwater flow in those pipes? [Part III.C.1.a.]
Yes
No
Q35 Does your storm sewer map include outfalls, including a unique identification (ID)
number and an associated geographic coordinate? [Part III.C.1.b.]
Yes
No
Q36 Does your storm sewer map include all structural stormwater BMPs that are part of
your MS4? [Part III.C.1.c.]
Yes
No
Q37 Does your storm sewer map include all receiving waters? [Part III.C.1.d.]
Yes
No
Q38 In what format is your storm sewer map available?
Hardcopy only
GIS
CAD
Other
5/29/2019 MS4 Annual Report for 2018
https://survey.mn.gov/siam/surveylanding/printerviewer.asp?sid=746D706461616F625F313535393134333533362E3837 7/15
Q39 Between January 1, 2018 and December 31, 2018, did you modify your BMPs,
measurable goals, or future plans for your illicit discharge detection and elimination
(IDDE) program? [Part IV.B.]
Yes
No
MCM 4: Construction Site Stormwater Runoff Control
The following questions refer to Part III.D.4. of the Permit.
Q40 Do you have a regulatory mechanism that is at least as stringent as the Agency's
general permit to Discharge Stormwater Associated with Construction Activity (CSW
Permit) No. MN R100001 (http://www.pca.state.mn.us/index.php/view-document.html?
gid=18984) for erosion and sediment controls and waste controls? [Part III.D.4.a.]
Yes
No
Q41 Have you developed written procedures for site plan reviews as required by the
Permit? [Part III.D.4.b.]
Yes
No
Q42 Have you documented each site plan review as required by the Permit? [Part III.D.4.f.]
Yes
No
Q43 Enter the number of site plan reviews conducted for sites an acre or greater of soil
disturbance between January 1, 2018 and December 31, 2018:
11
Q44 What types of enforcement actions do you have available to compel compliance with
your regulatory mechanism? Check all that apply and enter the number of each used
from January 1, 2018 to December 31, 2018.
Verbal warnings
Notice of violation
Administrative orders
Stop-work orders
Fines
Forfeit of security of bond money
Withholding of certificate of occupancy
Criminal actions
Civil penalties
Other
5/29/2019 MS4 Annual Report for 2018
https://survey.mn.gov/siam/surveylanding/printerviewer.asp?sid=746D706461616F625F313535393134333533362E3837 8/15
Enter the
number
of verbal
warnings
issued:
1
Enter the
number
of notice
of
violations
issued:
0
Enter the
number
of stop-
work
orders
issued:
0
Enter the
number
of
forfeitures
of
security
bond
money
issued:
0
Q45 Do you have written Enforcement Response Procedures (ERPs) to compel compliance
with your construction site stormwater runoff control regulatory mechanism(s)? [Part
III.B.]
Yes
No
Q46 Enter the number of active construction sites an acre or greater that were in your
jurisdiction between January 1, 2018 and December 31, 2018:
11
Q47 Do you have written procedures for identifying priority sites for inspections? [Part
III.D.4.d.(1)]
Yes
No
Q48 How are sites prioritized for inspections? Check all that apply.
Site topography
Soil characteristics
Types of receiving water(s)
Stage of construction
Compliance history
Weather conditions
Citizen complaints
Project size
Other
5/29/2019 MS4 Annual Report for 2018
https://survey.mn.gov/siam/surveylanding/printerviewer.asp?sid=746D706461616F625F313535393134333533362E3837 9/15
Q49 Do you have a checklist or other written means to document site inspections when
determining compliance? [Part III.D.4.d.(4)]
Yes
No
Q50 Enter the number of site inspections conducted for sites an acre or greater between
January 1, 2018 and December 31, 2018:
25
Q51 Enter the frequency at which site inspections are conducted (e.g. daily, weekly,
monthly): [Part III.D.4.d.(2)]
Weekly
Q52 Enter the number of trained inspectors that were available for construction site
inspections between January 1, 2018 and December 31, 2018:
1
5/29/2019 MS4 Annual Report for 2018
https://survey.mn.gov/siam/surveylanding/printerviewer.asp?sid=746D706461616F625F313535393134333533362E3837 10/15
Q53 Provide the contact information for the inspector(s) and/or organization that conducts
construction stormwater inspections for your MS4. List your primary construction
stormwater contact first if you have multiple inspectors.
(1)
Inspector
name
Dave Klocker
Organization Hyperion Consulting
Phone
(Office)651.300.9302
Phone
(Work Cell)
Email dmklocker@gmail.com
Preferred
contact
method
phone
(2)
Inspector
name
Organization
Phone
(Office)
Phone
(Work Cell)
Email
Preferred
contact
method
(3)
Inspector
name
Organization
Phone
(Office)
Phone
(Work Cell)
Email
Preferred
contact
method
Q54 What training did inspectors receive? Check all that apply.
University of Minnesota Erosion and Stormwater Management Certification Program
Qualified Compliance Inspector of Stormwater (QCIS)
Minnesota Laborers Training Center Stormwater Pollution Prevention Plan Installer or Supervisor
Minnesota Utility Contractors Association Erosion Control Training
Certified Professional in Erosion and Sediment Control (CPESC)
Certified Professional in Stormwater Quality (CPSWQ)
Certified Erosion, Sediment and Storm Water Inspector (CESSWI)
Other
5/29/2019 MS4 Annual Report for 2018
https://survey.mn.gov/siam/surveylanding/printerviewer.asp?sid=746D706461616F625F313535393134333533362E3837 11/15
Q55 Between January 1, 2018 and December 31, 2018, did you modify your BMPs,
measurable goals, or future plans for your construction site stormwater runoff control
program? [Part IV.B.]
Yes
No
MCM 5: Post-Construction Stormwater Management
The following questions refer to Part III.D.5. of the Permit.
Q56 Do you have a regulatory mechanism which meets all requirements as specified in Part
III.D.5.a. of the Permit?
Yes
No
Q57 What approach are you using to meet the performance standard for Volume, Total
Suspended Solids (TSS), and Total Phosphorus (TP) as required by the Permit? [Part
III.D.5.a.(2)] Check all that apply.
Refer to the link http://www.pca.state.mn.us/index.php/view-document.html?gid=17815
for guidance on stormwater management approaches.
Retain a runoff volume equal to one inch times the area of the proposed increase of impervious
surfaces on-site
Retain the post-construction runoff volume on site for the 95th percentile storm
Match the pre-development runoff conditions
Adopt the Minimal Impact Design Standards (MIDS)
An approach has not been selected
Other method (Must be technically defensible--e.g. based on modeling, research and acceptable
engineering practices)
Q58 Do you have written Enforcement Response Procedures (ERPs) to compel compliance
with your post-construction stormwater management regulatory mechanism(s)? [Part
III.B.]
Yes
No
Q59 Between January 1, 2018 and December 31, 2018, did you modify your BMPs,
measurable goals, or future plans for your post-construction stormwater management
program? [Part IV.B.]
Yes
No
MCM 6: Pollution Prevention/Good Housekeeping for Municipal Operations
The following questions refer to Part III.D.6. of the Permit.
5/29/2019 MS4 Annual Report for 2018
https://survey.mn.gov/siam/surveylanding/printerviewer.asp?sid=746D706461616F625F313535393134333533362E3837 12/15
Q60 Enter the total number of structural stormwater BMPs, outfalls (excluding underground
outfalls), and ponds within your MS4 (exclude privately owned).
Structural
stormwater
BMPs
7
Outfalls 118
Ponds 79
Q61 Enter the number of structural stormwater BMPs, outfalls (excluding underground
outfalls), and ponds that were inspected from January 1, 2018 to December 31, 2018
within your MS4 (exclude privately owned). [Part III.D.6.e.]
Structural
stormwater
BMPs
0
Outfalls 10
Ponds 37
Q62 Have you developed an alternative inspection frequency for any structural stormwater
BMPs, as allowed in Part III.D.6.e.(1) of the Permit?
Yes
No
Q63 Based on inspection findings, did you conduct any maintenance on any structural
stormwater BMPs? [Part III.D.6.e.(1)]
Yes
No
Q64 Briefly describe the maintenance that was conducted:
Rebuilding of Lisbon Ave outfall to Downs Lake Repairs to four failed catch basins
Ditch outfall cleaning at six locations
Q65 Do you own or operate any stockpiles, and/or storage and material handling areas?
[Part III.D.6.e.(3)]
Yes
No
Q66 Did you inspect all stockpiles and storage and material handling areas quarterly? [Part
III.D.6.e.(3)]
Yes
No
Q67 Based on inspection findings, did you conduct maintenance at any of the stockpiles
and/or storage and material handling areas?
Yes
No
5/29/2019 MS4 Annual Report for 2018
https://survey.mn.gov/siam/surveylanding/printerviewer.asp?sid=746D706461616F625F313535393134333533362E3837 13/15
Q69 Between January 1, 2018 and December 31, 2018, did you modify your BMPs,
measurable goals, or future plans for your pollution prevention/good housekeeping for
municipal operations program? [Part IV.B.]
Yes
No
Discharges to Impaired Waters with a USEPA-Approved TMDL that Includes an
Applicable WLA
You must complete the TMDL Annual Report Form, available at:
https://stormwater.pca.state.mn.us/index.php?title=Download_page_with_TMDL_forms.
Attach your completed TMDL Annual Report Form to this Annual Report as instructed
below. [Part III.E.]
Q71 Click the "up arrow" icon below to upload your TMDL Annual report form. When it has
uploaded successfully, a unique ID will appear in the box. Only files less than 10 MB in
size will upload.
ref:0000000034:Q71
Partnerships
Q78 Did you rely on any other regulated MS4s to satisfy one or more Permit requirements?
Yes
No
Q79 Describe the agreements you have with other regulated MS4s and which Permit
requirements the other regulated MS4s help satisfy: [Part IV.B.6.]
EMWREP - The City of Lake Elmo continues to extend contract coverage in
partnership with this organization to address MCM 1 & 2. New Development -
Watersheds (VBWD & SWWD) have rules and regulations in place (MIDS) for land
development permitting that is required per City Ordinances.
Additional Information
If you would like to provide any additional files to accompany your annual report, use
the space below to upload those files. For each space, you may attach one file. You
may provide additional explanation and/or information in an email with the subject
YourMS4NameHere_2018AR to ms4permitprogram.pca@state.mn.us.
Q80 Click the "up arrow" icon below to upload a file. When it has uploaded successfully, a
unique ID will appear in the box. Only files less than 10 MB in size will upload.
5/29/2019 MS4 Annual Report for 2018
https://survey.mn.gov/siam/surveylanding/printerviewer.asp?sid=746D706461616F625F313535393134333533362E3837 14/15
Q81 Click the "up arrow" icon below to upload a file. When it has uploaded successfully, a
unique ID will appear in the box. Only files less than 10 MB in size will upload.
Q82 Click the "up arrow" icon below to upload a file. When it has uploaded successfully, a
unique ID will appear in the box. Only files less than 10 MB in size will upload.
Q83 Optional, describe the file(s) uploaded:
Owner or Operator Certification
The person with overall administrative responsibility for SWPPP implementation and
Permit compliance must certify this MS4 Annual Report. This person must be duly
authorized and should be either a principal executive (i.e., Director of Public Works,
City Administrator) or ranking elected official (i.e., Mayor, Township Supervisor).
I certify under penalty of law that this document and all attachments were prepared
under my direction or supervision in accordance with a system designed to assure that
qualified personnel properly gathered and evaluated the information submitted. Based
on my inquiry of the person or persons who manage the system, or those persons
directly responsible for gathering the information, the information submitted is, to the
best of my knowledge and belief, true, accurate, and complete (Minn. R. 7001.0070). I
am aware that there are significant penalties for submitting false information, including
the possibility of fine and imprisonment (Minn. R. 7001.0540).
Yes
By typing my name in the following box, I certify the above statements to be true and
correct, to the best of my knowledge, and that information can be used for the purpose
of processing my MS4 Annual Report.
Name:
Title:
Date:
(mm/dd/yyyy)
5/29/2019 MS4 Annual Report for 2018
https://survey.mn.gov/siam/surveylanding/printerviewer.asp?sid=746D706461616F625F313535393134333533362E3837 15/15
When you are ready to submit, you must click the
'Submit' button at the bottom of this page.
Provide the email(s) of the individual(s) you would like to receive the MS4 Annual
Report for 2018 submittal confirmation email from the MPCA. After you click the Submit
button below, please allow up to three business days to receive this email.
Email
(1)
Email
(2)
Email
(3)
Print or save a copy of your completed MS4 Annual Report for 2018 for your
records. The MPCA will email a PDF of your MS4 Annual Report for 2018
information in a confirmation email within three business days after you submit
this form to the email(s) you provided above.
You may print a copy of the MS4 Annual Report for 2018 for your records by pressing
the ‘Print’ button at the bottom of the page.
Additionally, it is possible to save a PDF copy of the MS4 Annual Report for 2018 if you
are working on a computer with OneNote (a program often included in Microsoft Office
packages). Detailed saving instructions are available at
stormwater.pca.state.mn.us/index.php/Guidance_for_saving_MS4_annual_reports.
If you have any questions, contact MPCA staff Cole Landgraf
(cole.landgraf@state.mn.us, 651-757-2880).