HomeMy WebLinkAbout#10 - CSAH 19-Hudson Intersection Award Contract STAFF REPORT DATE: June 4, 2019 REGULAR AGENDA ITEM: CSAH 19 and Hudson Boulevard Intersection Improvements – Accept Bids, Approve Cooperative Agreement and Award Contract SUBMITTED BY: Jack Griffin, City Engineer REVIEWED BY: Kristina Handt, City Administrator Sarah Sonsalla, City Attorney Chad Isakson, Project Engineer ISSUE BEFORE COUNCIL: Should the City Council accept bids, approve a cooperative agreement with Washington County and award a contract for the CSAH-19 and Hudson Boulevard Intersection Improvements? BACKGROUND: On April 16, 2019 the City Council approved the plans and specifications for the CSAH-19 and Hudson Boulevard Intersection Improvements and authorized staff to advertise the Project for bids. The Project was advertised on QuestCDN.com and in the Oakdale-Lake Elmo Review in accordance with the Minnesota Competitive Bidding requirements. The improvements include the installation of a traffic light at CSAH-19 and Hudson Boulevard with dedicated left and right turn lanes constructed along each of the Hudson Boulevard approaches. The turn lane and geometric roadway improvements require the reconstruction of Hudson Boulevard from 1,000 feet west of Keats Avenue to 900 feet east of Keats Avenue. The improvements include the addition of storm sewer improvements and a stormwater infiltration basin. The scope of improvements remains consistent with the preliminary plans that were presented to the City Council on December 4, 2018. PROPOSAL DETAILS/ANALYSIS: Bids were received, publicly opened, and read aloud on Tuesday, May 14, 2019. The City’s design consultant has prepared and attached a Tabulation of Bids and a letter of recommendation for the award of the contract. The City received 4 bids for this project, with Max Steininger, Inc. providing the lowest bid in the amount of $1,790,088.96. Contractor references for Max Steininger, Inc. were reviewed and verified. The City Engineer and his consultant are therefore recommending that the Council award the contract to the lowest responsible bidder, Max Steininger, Inc. as outlined in the attached letter. The project was developed as a joint project with Washington County and includes county improvements. A Cooperative Agreement has been prepared to outline the roles and responsibilities, cost split, and general terms and conditions for the project. The format of the agreement and cost split is based on Washington County’s cost participation policy which includes a 50/50 cost split of the installation of the traffic light and a percentage of soft costs based on a percentage split of city improvements vs county improvements proposed on the project. As a part of this award Staff is requesting Council to provide the City Administrator authorization to enter into a material testing contract in the not-to-exceed amount of $20,000. Additionally, staff is recommending that the City Council approve a supplemental task order with KLJ to provide construction services in an amount not to exceed $78,250. Each of these items are budgeted in the total cost figures presented below and are necessary to complete the project. FISCAL IMPACT: Approval of this resolution commits the council to enter into a construction contract for the project. The estimated total cost for the CSAH-19 and Hudson Boulevard Intersection Improvements is $2,760,100. The City’s share of the improvements is estimated to be $2,251,300 and Washington County’s cost share is estimated to be $508,800. The City intends to finance its share of the improvement costs through a combination of existing state aid funds, in the approximate amount of $917,000, an advance request from future state aid funds, in the approximate amount of $1,070,900, and the general fund, in the approximate amount of $263,400. The City Council passed a resolution requesting the state aid fund advance on April 16, 2019 and the request was granted. RECOMMENDATION: Staff is recommending that the City Council approve a resolution accepting bids and awarding a contract to Max Steininger, Inc. in the amount of $1,790,088.96 and approving the Cooperative Agreement with Washington County for the CSAH-19 and Hudson Boulevard Intersection Improvements. The recommended motions for this action is as follows: “Move to approve Resolution No. 2019–042, accepting bids and awarding a contract to Max Steininger in the amount of $1,790,088.96 and approving the Cooperative Agreement with Washington County for the CSAH 19 and Hudson Boulevard Intersection Improvements.” Staff is also recommending that the City Council authorize the City Administrator to enter into a material testing contract in the not-to-exceed amount of $20,000 and authorize a supplemental task order with KLJ to provide construction services in an amount not to exceed $78,250. The recommended motion for this action is as follows: “Move to authorize the City Administrator to enter into a material testing contract in the not-to-exceed amount of $20,000; and to approve a supplemental task order with KLJ to provide construction services in an amount not to exceed $78,250.” ATTACHMENTS: 1. Resolution Accepting Bids and Awarding a Contract and approving the Cooperative Agreement with Washington County for the CSAH-19 and Hudson Boulevard Intersection Improvements. 2. Engineer’s Letter of Award Recommendation and Tabulation of Bids. 3. Cooperative Agreement. 4. Project Schedule. CITY OF LAKE ELMO WASHINGTON COUNTY STATE OF MINNESOTA RESOLUTION NO. 2019-042 A RESOLUTION ACCEPTING BIDS AND AWARDING A CONTRACT AND APPROVING A COOPERATIVE AGREEMENT WITH WASHINGTON COUNTY FOR THE CSAH-19 AND HUDSON BOULEVARD INTERSECTION IMPROVEMENTS WHEREAS, pursuant to an advertisement for bids for the CSAH-19 and Hudson Boulevard Intersection Improvements, bids were received, opened, and tabulated according to law, and bids were received complying with the advertisement; and WHEREAS, bids were tabulated, checked and summarized to verify that all requirements of the submittal were met; and WHEREAS, the project engineer reviewed the bids and has provided a letter recommending the award of the contract to the lowest responsible bidder, Max Steininger, Inc., for the amount of $1,790,088.96; and WHEREAS, items included in the project will be paid by Washington County consistent with the County’s Cost Participation Policy; and WHEREAS, the City has prepared a Cooperative Agreement with Washington County to address the cost sharing in the project including terms for payment, and this Agreement is made pursuant to statutory authority contained in Minnesota Statute 162.17 sub.1 and Minnesota Statute 471.59. NOW, THEREFORE, BE IT RESOLVED, 1. That the Mayor and City Clerk are hereby authorized and directed to enter into a Contract in the accordance with the above ordered Project, in the amount of the Contractor’s lowest responsible bid, and according to the plans and specifications thereof approved by the City Council. 2. The City Clerk is hereby authorized and directed to return forthwith to all bidders the deposits made with their bids, except that the deposits of the successful bidder and the next two lowest bidders shall be retained until a contract has been signed. 3. That the Cooperative Agreement between the City of Lake Elmo and Washington County is hereby approved, and the Mayor and City Administrator are hereby authorized to execute the agreement on behalf of the City of Lake Elmo. ADOPTED BY THE LAKE ELMO CITY COUNCIL ON THE FOURTH DAY OF JUNE, 2019. CITY OF LAKE ELMO By: __________________________ Mike Pearson (Seal) Mayor ATTEST: ________________________________ Julie Johnson City Clerk Page 1 of 5 COOPERATIVE AGREEMENT BETWEEN THE CITY OF LAKE ELMO AND WASHINGTON COUNTY FOR CONSTRUCTION COST OF COUNTY STATE AID HIGHWAY (CSAH) 19 AND HUDSON BOULEVARD INTERSECTION IMPROVEMENTS THIS AGREEMENT, by and between the City of Lake Elmo, a municipal corporation, herein after referred to as the "City", and Washington County, a political subdivision of the State of Minnesota, hereinafter referred to as the "County.” WITNESSETH: WHEREAS, the City intends to make improvements to Hudson Boulevard from 1,000-feet west of County State Aid Highway (CSAH) 19 to 910-feet east of CSAH 19 and install a traffic signal at the intersection of CSAH 19 and Hudson Boulevard (the “Project”); and WHEREAS, items included in the Project require County cost participation in accordance with the Washington County Cost Participation Policy #8001 for Cooperative Highway Improvement Projects; and WHEREAS, the City desires to use local funds and State Aid for these improvements; and WHEREAS, the County also desires to use local funds and State Aid for these improvements; and WHEREAS, a cooperative effort between the City and County is the appropriate method to facilitate the construction of these transportation improvements; and WHEREAS, this Agreement is made pursuant to statutory authority contained in Minnesota Statutes Section 162.17, subdivision 1 and Minnesota Statutes Section 471.59. NOW THEREFORE, IT IS HEREBY MUTUALLY AGREED AS FOLLOWS: A. PURPOSE The purpose of this Agreement is set forth in the above whereas clauses which are all incorporated by reference as if fully set forth herein and shall consist of this Agreement, Exhibit A (Location Map) and Exhibit B (Estimated Construction Cost and Cost Splits). B. PLANS AND SPECIFICATION PREPARATION 1. The City shall be responsible for the preparation of all the plans and specifications for the Project, including but not limited to, compliance with all applicable standards and policies and obtaining all approvals required in formulating the bid specifications for all County and City components of this Project. 2. The following County project number has been assigned to the Project: SAP 082-619-028 (CSAH 19). 3. The following City project number has been assigned to the Project: SAP 206-120-001. Page 2 of 5 C. RIGHT OF WAY AND EASEMENTS 1. The City shall acquire all permanent rights of way, permanent easements, and temporary slope easements, which will be acquired in the name of the City. 2. Any rights of way, permanent easements, and temporary slope easements that cannot be obtained through negotiation may, at the City’s discretion, be acquired by the City through eminent domain proceedings. D. ADVERTISEMENT AND AWARD OF CONTRACT After plans and specifications have been approved by the City, all permits and approvals obtained, and acquisition of necessary rights-of-way and easements, the City shall advertise for construction bids and, at the sole discretion of the City, award the contract to the lowest responsible bidder. E. CONSTRUCTION ADMINISTRATION, OBSERVATION, AND TESTING The City shall be responsible for the construction administration, inspection, and for the observation and testing for all construction items, except those items provided directly by the County. F. COST PARTICIPATION ITEMS AND ESTIMATED COSTS The County’s cost participation is set forth in Table 1 of this section and is broken down into five categories which are: 1) Construction; 2) Design Engineering; 3) Construction Engineering/Contract Administration; 4) Right of Way; 5) County-Furnished Material. 1. Construction Construction costs shall be the cost to construct the Project. The City has prepared a statement of estimated quantities and cost splits hereto attached as Exhibit B. The County shall pay to the City its share of the total cost as shown in Exhibit B and set forth in Table 1 of this section. 2. Design Engineering Design engineering costs shall be professional design engineering services, project coordination, preparation of plans and specification, stakeholder engagement, geotechnical studies, and other administrative functions necessary for the Project. Based on the County’s share of the construction cost, the County shall pay the prorated cost of design engineering for the entire Project as set forth in Table 1 of this section. 3. Construction Engineering/Contract Administration Construction engineering/contract administration costs shall be construction observation, construction testing, construction administration, staking, conducting and recording the pre-bid, pre-construction and weekly construction meetings, reviewing monthly pay estimates, labor compliance, and other administrative functions necessary for the Project. Based on the County’s share of the construction costs, the County shall pay the prorated cost of construction engineering/contract administration as set forth in Table 1 of this section. 4. Right of Way Right of Way costs shall be permanent right-of-way, permanent utility and/or drainage easements, temporary easements, title work costs, appraisal costs, relocation specialist costs, relocation costs, and condemnation commissioner costs. No right-of-way cost share is required for the County. 5. County-Furnished Material County-furnished material costs shall be items such as light poles, traffic signal control equipment, and street name signs which are separately procured outside of the construction contract and installed within the Project limits. The City shall pay its share of the final County- furnished material cost. The estimated amount is set forth in Table 1 of this section. Page 3 of 5 6. The costs and shares attributable to the County and payable to the City as shown in Table 1 above are merely estimated and a final reconciliation of costs as set forth in paragraph G below shall be done at the end of the Project. Actual County costs and shares are based on the following: a. Construction shall be based on the contractor's unit prices and final quantities at Project completion including all contract changes. b. Design engineering shall be based on the contractor’s unit prices at the time of contract award. c. Construction engineering/contract administration shall be based on the contractor’s unit prices at the time of contract award. d. Right of way shall be based on the final costs to acquire right of way. e. County-furnished material shall be based on the final costs to acquire County-furnished material. G. PAYMENT 1. Construction a. After the City has awarded the construction contract, the City shall update Exhibit B to conform the Exhibit to the amounts in the awarded bid and shall invoice the County 10 percent of the County's estimated construction cost based on the updated Exhibit B. b. During construction, the City shall submit to the County partial estimates of work performed by the contractor. The County shall pay to the City its share of the partial estimate as determined in section F of this Agreement. c. Upon substantial completion of the work the City shall submit to the County a final invoice and final reconciliation of costs. The reconciliation will add or subtract contract amendments to the County’s Project components, adjustments for liquidated damages pursuant to section I of this Agreement, and previous Project cost payments made by the County to the City.  2. The costs set forth in Table 1 in section F above for design engineering, construction engineering/contract administration, right of way, and County-furnished material shall be invoiced separately by the City from the invoice for construction and paid by the County on a reimbursable basis. 3. In the event that the County paid more in advance than the actual cost of the County’s portion of the Project, the City shall refund without interest the amount to the County. 4. The County shall pay 100 percent of an invoice amount within thirty (30) days of receipt. H. CONTRACT CHANGES Any modifications or additions to the final approved plans and/or specifications of the County’s portion of the Project shall be made part of the construction contract through a written TABLE 1 – ESTIMATED COSTS Washington County Cost Summary ITEM TOTAL COST COUNTY SHARE COUNTY COST Construction $1,879,593 18% $335,790 Design Engineering $316,161 18% $63,469 Construction Engineering/Contract Administration $286,200 18% $51,516 Right of Way $162,000 0% $0 County-Furnished Material $116,125 50% $58,062 TOTAL ESTIMATED COST $2,760,079 $508,837 Page 4 of 5 amendment to the construction contract, but only after concurrence by the County’s designated project manager, and the cost for such changes shall be appropriated as set forth in section F of this Agreement. County concurrence shall be received upon request and may not be unreasonably conditioned, withheld, or delayed. I. LIQUIDATED DAMAGES Any liquidated damages assessed the contractor in connection with the work performed on the Project shall be shared by the City and the County in the following proportion: The respective total share of construction work to the total construction cost without any deduction for liquidated damages. J. CONDITIONS The City shall not assess or otherwise recover any portion of its cost for this Project through special assessment of County-owned property. K. CIVIL RIGHTS AND NON-DISCRIMINATION The provisions of Minnesota Statutes Section 181.59 and of any applicable ordinance relating to civil rights and discrimination shall be considered part of this Agreement as if fully set further herein, and shall be part of any Agreement entered into by the parties with any contractor subcontractor, or material suppliers. L. WORKERS COMPENSATION It is hereby understood and agreed that any and all employees of the County and all other persons employed by the County in the performance of construction and/or construction engineering work or services required or provided for under this Agreement shall not be considered employees of the City and that any and all claims that may or might arise under the Worker’s Compensation Act of the State of Minnesota on behalf of said employees while so engaged and any and all claims made by any third parties as a consequence of any act or omission on the part of said County employees while so engaged on any of the construction and/or construction engineering work or services to be rendered herein shall in no way be the obligation or responsibility of the City. M. INDEMNIFICATION 1. The County agrees that it will defend, indemnify and hold harmless the City against any and all liability, loss, damages, costs and expenses which the City may hereafter sustain, incur or be required to pay by reason of any negligent act by the County, its agents, officers or employees during the performance of this Agreement. 2. The City agrees that it will defend, indemnify and hold harmless the County against any and all liability, loss, damages, costs and expenses which the County may hereafter sustain, incur or be required to pay by reason of any negligent act by the City, its agents, officers or employees during the performance of this agreement. 3. To the fullest extent permitted by law, actions by the parties to this Agreement are intended to be and shall be construed as a “cooperative activity” and it is the intent of the parties that they shall be deemed a “single governmental unit” for the purposes of liability, as set forth in Minnesota Statutes Section 471.59, subdivision 1a (b). The parties to this Agreement are not liable for the acts or omissions of another party to this Agreement except to the extent they have agreed in writing to be responsible for the acts or omissions of the other parties as provided for in Minnesota Statutes Section 471.59, subdivision 1a. 4. Each party’s liability shall be governed by the provisions of Minnesota Statutes Chapter 466 and other applicable law. The parties agree that liability under this Agreement is controlled by Minnesota Statutes Section 471.59, subdivision 1a and that the total liability for the parties shall not exceed the limits on governmental liability for a single unit of government as specified in Minnesota Statutes Section 466.04, subdivision 1(a). Page 5 of 5 N. DATA PRACTICES All data collected, created, received, maintained, disseminated, or used for any purposes in the course of this Agreement is governed by the Minnesota Government Data Practices Act, Minnesota Statutes Section 13.01, et seq. or any other applicable state statutes and state rules adopted to implement the Act, as well as state statutes and federal regulations on data privacy. IN TESTIMONY WHEREOF the parties have duly executed this agreement by their duly authorized officers. WASHINGTON COUNTY CITY OF LAKE ELMO Chair Date Mayor Date Board of Commissioners Molly O’Rourke Date City Administrator Date County Administrator Approved as to form: Approved as to form: Assistant County Attorney Date City Attorney Date May 29, 2019 Mr. Jack Griffin City Engineer City of Lake Elmo 3880 Laverne Ave. N. Lake Elmo, MN 55042 Re: Lake Elmo, MN Hudson Boulevard at CSAH 19 Intersection Improvements City Project No. 2017.154 State Aid Project No. 206-120-001 (Hudson Blvd.) State Aid Project No. 082-619-028 (CSAH 19) Dear Mr. Griffin: On Tuesday May 14, 2019, four (4) bids were received for the above-referenced project. The bids ranged from a high of $ 2,819,791.13 to a low of $ 1,790,088.96. The low bid was submitted by Max Steininger, Ind. of Eagan, MN in the amount of $ 1,790,088.96. Contractor Total Bid 1 Max Steininger Inc. $ 1,790,088.96 ** 2 Miller Excavating Inc. $ 1,957,161.60 3 Valley Paving Inc. $ 2,068,025.74 4 Dresel Contracting Inc. $ 2,819,791.13 ** Engineer’s Estimate $ 1,569,686.35 ** Denotes corrected figure Based on Max Steininger’s bond materials provided by the contractor, we have determined that Max Steininger Inc. presently has the financial ability to complete the project as bid. KLJ makes no representation or warranty as to the actual financial viability of the contractor or its ability to complete its work. Max Steininger, Inc. has completed roadway projects including the I-35E & Hwy 36 Exit Ramp for MnDOT, Highway 55 in Rosemount, for Dakota County, South Robert Trail in Dakota County, among many others. KLJ concludes that Max Steininger, Inc. has the experience and ability to complete the CSAH 19 at Hudson Blvd. Project, and recommends the project be awarded to Max Steininger, Inc. in the amount of $1,790,088.96. Please contact me If you need any additional information or wish to discuss further. I can be reached at 651-726-5012, or via email at john.crawford@kljeng.com. Sincerely, KLJ John Crawford Project Manager PROJECT SCHEDULE  CITY OF LAKE ELMO    CSAH 19 & HUDSON BOULEVARD  INTERSECTION IMPROVEMENTS  PROJECT NO. 2017.154 FOCUS ENGINEERING, inc.  Cara Geheren, P.E.   651.300.4261  Jack Griffin, P.E.                651.300.4264  Ryan Stempski, P.E.  651.300.4267  Chad Isakson, P.E.  651.300.4283                   DECEMBER 19, 2017    County retains KLJ to prepare preliminary design.      DECEMBER 4, 2018  Presentation of Preliminary Design. Council approves preliminary geometric  design and authorizes Final Design.       APRIL 17, 2019  Council approves Plans and Specifications and orders Advertisement for Bids      MAY 14, 2019     Receive Contractor Bids.      JUNE 4, 2019  Council Orders Improvements; accepts Bids and awards Contract.       JUNE 26, 2019    Conduct Pre‐Construction Meeting and issue Notice to Proceed.   OCTOBER, 2019  Substantial Completion.   NOVEMBER, 2019  Final Completion.