HomeMy WebLinkAbout#05 - Public Works June 2019 Monthly ReportMAYOR AND COUNCIL COMMUNICATION
DATE: 7/16/2019
CONSENT
AGENDA ITEM: Public Works Director Report
SUBMITTED BY: Marty Powers, Public Works Director
REVIEWED BY: Kristina Handt, City Administrator
ISSUE BEFORE COUNCIL:
City Council is asked to review and accept, as part of Consent Agenda, a brief description of
activities that have taken place in the Public Works Department in the month of June, 2019.
PROPOSAL DETAILS/ANALYSIS:
• Pothole Repair Continues As The Weather Allows
• Attend to several afterhours down trees in ROW
• Improved Pebble Park Parking Lot With Overlay
• Bi-weekly ball field grooming, weekly park garbage collection
• Attended monthly Park Commission Meeting
• Reinstalled insulation at old parks building
• Seal Ground Water leak in 94 Pressure Reducing Valve Vault
• Attended weekly Old Village Phase 4 construction meetings
• Disposed of stock piled buckthorn from Sunfish Lake Park
• Completed monthly MDH bacteria and flouride samples
• Public Works Staff Attended Safety Training
• Gathered Proposals for Pebble Park Lighting Improvements
• Repaired Lawn Where Water Main Break Occurred This Spring
• Complete Monthly Safety Inspections of Equipment and Facilities
• Continue With Traffic Count Study
• Attend Precons for crackfill and mill/overlay projects
• Replaced failed well 2 generator batteries and tender
• Weed control and trim city owned landscaping
• Trouble shoot and correct Lisbon South Lift station communication failures
• Walk through Old Village phase 4
• Ditch mowing
• 2019 Crack fill project occurred
• Discussed SCADA improvements with TPC
Page 2
• Repair Fire Hydrant due to car collision
• Royal Golf walkthrough for 2nd addition
• Replaced Failed Pubic Works Printer
• Completed WINS survey and MS4 certification Report
• Precon and weekly meetings for 19/Hudson Intersection
• Work on 2020 Public Works Budget
• Hammes 3A walk through
• Sunfish Lake Park Buckthorn Removal Meeting
• Haul Out Spring Sweepings
• Five Staff members attended Sewer Collection Continuing Ed
• 2019 Mill and Overlay Project began
• Prepped Playground Site by Wild Flower Preserve
• Schedule Hockey Board Install
• Closed off Steps at Discovery Crossing Bridge
• Verify and Inspect Battery Backups in all Telemetry Cabinets
• Wash, ready and list disposal equipment
• Completed Quarterly Water Meter Reading
• Began locating water curb stops for GPS mapping
RECOMMENDATION:
Base on the activities listed above, City Council is respectfully asked to accept the June 2019
Public Works Report.