DISCUSSION
TO: City Council
FROM: Marty Powers, Public Works Director
REVIEWED BY: Kristina Handt, City Administrator
BACKGROUND:
As identified in past years,the block retaining walls at the Discovery Crossing Bridge are failing. Earlier
this summer Public Works fenced off and closed the stairways along the bridge. The steps are becoming
a safety hazard and the four block columns on each corner of the bridge are unlocking, leaning and are no
longer secure.
Criterium-Schimnowski Engineering has been involved in investigating the site in the past and revisited
the site recently. In minimizing potential cost their recommendation is to remove the steps and the
majority of the block walls and columns, add shorter boulder walls and regrade the site.
Public Works requested proposals from four contractors to complete the work as described. Only two
submitted bids.
ISSUE BEFORE COUNCIL:
Does the Council have any additional questions about options to improve the Discovery Crossing bridge
site? Should the City move forward with removing and improving the site?
PROPOSAL DETAILS/ANALYSIS:
The City received two proposals to remove the majority of the block retaining walls, create new boulder
walls and landscape the site.
Contractor Project Cost
Miller Excavating $45,058.81
GT Lawns/Genadek Excavating $101,600.00
FISCAL IMPACT:
The cost to accept Miller Excavating's Proposal to improve the Discovery Crossing Retaining Walls should
not exceed$50,000. The extra$5000 would be for unforeseen issues or creating railings should extensions
be needed.
ATTACHMENTS:
• Two proposals
• Site Photos
Page 2
MILLER
MILLER EXCAVATING, INC.
FWAVATING
3741 Stagecoach Trail North
Stillwater,MN 55082
Estimator: Steve St.Claire
Phone/Fax: 651-439-1637/651-351-7210
Email: office@millerexc.com
Quote To: City of Lake Elmo Job Name: Discover Crossing Retaining Wall
3880 Laverne Ave N Job Address:
Lake Elmo,MN 55042 Job Location: Lake Elmo,MN
Attn: Marty Powers
Phone: 651-747-3900 Date: August 27,2019
Email: mpowers@lakeelmo.org Estimate#: 19313
ITEM DESCRIPTION QUANTITY UNIT AMOUNT
100 MOBILIZATION 1.00 LS
110 REMOVE SMALL TREES&BRUSH 1.00 LS
120 REMOVE RETAINING WALL&STEPS 4.00 EA
130 BOULDER RETAINING WALL 161.00 TON
140 COMMON BORROW(IV) 280.00 CY
150 TOPSOIL BORROW(LV) 140.00 CY
160 SEED&BLANKET DISTURBED AREA 4.00 EA
SUBTOTAL RETAINING WALLS $42,471.51
200 SAWCUT CONCRETE CURB 2.00 EA
210 REMOVE&REPLACE CONCRETE CURB 30.00 LF
SUBTOTAL CURB $2,587.30
NOTES:
Quote valid for 30 days.
Proposal based on one(1)mobilization to complete the work. Additional mobilizations to be charged at$300.00 each.
Retainage as withheld by Owner. Not to exceed 5%.
Sales taxes included(if applicable)
No bond included
Payment due within 30 days of initial invoice. Past due accounts will accrue 1.5%per month service charge.
Standard insurance included.
Gopher State One Call locates included 4 business days prior to start of work.
Miller Exc.is not responsible for weather,utility conflicts,other contractors,strikes,lockouts,material shortages,acts of god,
or other circumstances beyond our control that may delay the completion of the work.
All items listed above are tied,unless arrangements are made PRIOR to bid opening.
The information in this proposal is considered confidential between the two parties listed.
All work to be completed during normal business hours.(Monday thru Friday 700 am to 500 pm)
Page 1 of 2
THIS PROPOSAL HAS BEEN PREPARED ACCORDING TO THE FOLLOWING DOCUMENTS:
PLANS:Per site visit
SPECS:Per City standards&direction
GEOTECHNICAL:None
ADDENDA:None
THE FOLLOWING ITEMS ARE EXCLUDED FROM OUR PROPOSAL:
Surveying,staking,blue tops,or project layout
Waiver of Subrogation
Private utility locating
Winter conditions(frost ripping,frost blankets,road restrictions,ground thawing,etc.)
Vapor barrier,foundation insulation,or waterproofing
Contaminated material testing,excavation,abatement,remediation.
Traffic control
Sweeping required for non-Miller Exc work.
Final tolerance of aggregate base prior to concrete and/or asphalt
Sod,hydroseeding,straw mulch
Hand raking,rock removal,final tolerance prior to seeding and/or sod
Soil correction
Dewatering of site
Concrete washout area
Manhole or catch basin adjustments
Rock excavation
Retaining wall excavation or backfill
Fence removal or reinstallation
ROW degradation fees
Downspout connections
Concrete equipment or cleanout pads
Landscaping or irrigation installation and/or repair
Temporary access road grading,gravel,or removal
Soil testing. Gradations for imported materials available upon request.
Electrical or irrigation conduit installation
Concrete or bituminous paving
Wall removal to be directed in field by City
PROPOSAL ACCEPTANCE
We hereby accept the proposal for the work as outlined above and agree to the terms and conditions as listed. Any alteration or
deviation from the work as specified above will become extra work over the estimate and will be paid as a change order to the
original contract.Miller Excavating,Inc.is authorized to proceed with the work.Payment will be made according to the terns
outlined above.
Signed:
Print:
Title:
Date:
Page 2 of 2
13880 Tomahawk Dr. S
� 0 Afton, MN 55001
LAWNS
ESTIMATE
Phone# 612-715-3637 Contact: Tim Wilmes
RETAINING WALLS DEMOLITION EXCAVATION
Incorporating courtesy, dependability and integrity into everything we do.
8/27/2019
Work to be performed: Retaining Wall
Client Name: Lake Elmo
Project description:
Demolish and dispose of portions of the existing retaining walls where needed and leave the rest in place for
structural support. Build new retaining walls based on an engineered plan (prices may change based on type of
material used in wall construction). Import and place fill soil behind proposed walls to create more natural
slopes that resemble the existing grades on either side of the bridge/road.
Proposal includes:
*SE stair side by pond area:
Proposed wall 675 sf+demo and fill $35,000
*NE side:
Proposed wall 360 sf+ demo and fill $18,000
NW side:
Proposed wall 330 sf+ demo and fill $17,600
SW side:
Proposed wall 576 sf+demo and fill $31,000
Proposal does not include: Handling of hazardous materials, permit fees, surveying, dewatering, soil correction,
bridge repair, parking lot, road, driveway or sidewalk repair/replacement, finish landscape plantings, sod, seed,
tree or stump removal, sprinkler repair, fence repair or installation, erosion control or engineering fee.
Notice of Pre-Lien
This notice is to advise you of your rights under the Minnesota Law in connection with the improvement to your property. Any person or company supplying labor or
materials for this improvement may file a lien against your property if that person or company has not been paid for the contributions. Under Minnesota Law,you have
the right to pay persons who supplied labor or materials for this improvement directly and deduct this amount from our contract price or withhold the amounts due them
from us until 120 days after completion of the improvement unless we give you a lien waiver signed by persons who supplied any labor or materials for the
improvement and who gave you a timely notice.
$100 to schedule the project. t/z down at the start of the project and balance due upon completion. If you have
any questions please call Tim at 612-715-3637.
Signature of Acceptance:
f
c-
r t' R d
♦._ � �
4 � �
M
':�
l-
7
-� �. +
i
�' �K
.4, -
y
IL
oe s
c
K` ti
-J * _ •
. •
-��t
�_�y��.�
\�: _
-� �r'�.
�• � �
w .'��
-+ `� �
� ��I
�.
.�
-�
r-
t ' _ � ,
� , �.� ,`_`vi
t
.�
V
sT.
�5��'�
- I!��
_ "i
. ,_"t,
G
--�
�. �-
4 l
! � _ —
a _ i�
s: _ _- �♦t4� � �
��y G, '►�
`.`_
a�
r'
¢t. i
96 _
�w
70
i
-
44
:{ 44 t
w
qp
�t