HomeMy WebLinkAbout#11 - Well 5 Engineering Task Order STAFF REPORT DATE: September 17, 2019 CONSENT AGENDA ITEM: Approve Engineering Task Order for Production Well No. 5, Pumphouse and 50th Street Trunk Watermain SUBMITTED BY: Jack Griffin, City Engineer REVIEWED BY: Kristina Handt, City Administrator Marty Powers, Public Works Director Chad Isakson, Assistant City Engineer ISSUE BEFORE COUNCIL: Should the City Council authorize design and construction phase engineering services for Production Well No. 5, Pumphouse and 50th Street Trunk Watermain? BACKGROUND: The City of Lake Elmo has been working with the MN-DNR and MPCA to replace the lost capacity for Well No. 1 by pursing the development and construction of Production Well No. 5 to be located in Tana Ridge Park. The MN-DNR and MPCA have accepted the City’s Feasibility Report to construct Production Well No. 5 and has entered into a Joint Powers Agreement to address terms and process for the State to reimburse the City for 90% of the total project costs. On May 7, 2019, The City retained Bolton and Menk to provide engineering services for the construction and development of Test Well No. 5 to determine the adequacy of the proposed well location, aquifer capacity and water quality. The test well has now been constructed and the City is awaiting a final report and test results. PROPOSAL DETAILS/ANALYSIS: Assuming all test results are favorable and the proposed site is recommended for the placement for Production Well No. 5, the City must begin the engineering services for the Production Well, Pumphouse and 50th Street Connecting Watermain. The City Engineer, in conjunction with Bolton and Menk, has developed a scope of work for the design and construction phase engineering services for Production Well No. 5, the Pumphouse and 50th Street Connecting Watermain. The scope of services, schedule and fees are outlined in the attached Task Order. FISCAL IMPACT: $215,944. Total Project Costs are funded 90% through a Minnesota-3M 2018 Settlement Fund grant. The remaining 10% city cost share is funded through the Water Core Fund. RECOMMENDATION: Staff is recommending that the City Council approve a task order to authorize design and construction phase services for Production Well No. 5, Pumphouse and 50th Street Trunk Watermain. The recommended motion for the action is as follows: “Move to authorize Bolton & Menk to complete design and construction phase engineering services for Production Well No. 5, Pumphouse and 50th Street Trunk Watermain in the amount not to exceed $215,944”. ATTACHMENTS: 1. Task Order No. 13 – Production Well #5, Pumphouse and 50 Street Trunk Watermain.     TASK ORDER No. 13 – PRODUCTION WELL #5, PUMPHOUSE, AND 50TH STREET TRUNK WATERMAIN         Page 1 of 6                                             TASK ORDER              No. 13  CITY OF LAKE ELMO, MINNESOTA – BOLTON AND MENK, INC.  PROFESSIONAL ENGINEERING SERVICES AGREEMENT      In accordance with ARTICLE 1 of the Master AGREEMENT between the City of Lake Elmo (“CITY”) and  Bolton and Menk, Inc. (“ENGINEER”), dated MARCH 20, 2013 (“AGREEMENT”), the ENGINEER agrees  to provide Professional Engineering Support Services as follows:      PRODUCTION WELL #5, PUMPHOUSE, AND 50TH STREET TRUNK WATERMAIN      PROJECT OVERVIEW: The Project includes Engineering Services for Production Well No. 5, Pumphouse  No.  5,  and  the  50th  Street  Trunk  Connecting  Watermain  improvements.  The  Project  includes  preparation of plans and specifications and contract documents; construction staking; construction  administration support services to the City Engineer; and construction observation services; all as  detailed within this Task Order and subsequent amendments. The Production Well, Pumphouse, and  Connecting Watermain projects shall be prepared, bid, and constructed as individual separate bid  packages with separate construction schedules.    A proposed well site has been identified at Tana Ridge Park (PID 1202921130003). Engineering Services  for Test Well #5 will be completed through a separate task order including a topographic survey and  preliminary site plan design for the purpose of establishing the well site and working with state  agencies to approve the well location. The Test Well is being constructed for the purpose of testing and  confirming the adequate production capacity and drinking water quality for the proposed Production  Well at the Tana Ridge Park location.     This  Task  Order  will  include  Engineering  services  for  the  plans  and  specification,  bidding,  and  construction administration services for Production Well No. 5, Pumphouse No. 5 and the Trunk  Connecting Watermain. The Trunk Connecting Watermain improvements include the extension of  trunk watermain along 50th Street from Lily Avenue North to the west approximately 2,300 feet.  Construction observation services for the Well and Pumphouse will be performed as critical point site  visits. Schedule is a critical success factor for this project and services will be performed on an overlap  basis as deemed appropriate to maintain an accelerated schedule while avoiding duplicative work  efforts.     Production Well No. 5 Objectives:  1. High Capacity Production Well in excess of 1,250 gpm.  2. Production Well that produces, without treatment, a safe drinking water supply meeting all  State water quality drinking standards, including safe standards for perflourochemicals (PFCs).  3. Production Well that produces a drinking water that will not require secondary treatment such  as filtration (acceptable concentration levels of iron and manganese).        TASK ORDER No. 13 – PRODUCTION WELL #5, PUMPHOUSE, AND 50TH STREET TRUNK WATERMAIN         Page 2 of 6                                             Pumphouse No. 5 Objectives:  1. A functional building for housing a municipal well that contains pipe and space for chemical  treatment for iron and manganese as well as fluoride and chlorine injection.  2. It is anticipated that the Pumphouse will be of similar size and building materials as the existing  Pumphouse No. 4.   3. Work shall include one rendering and one revision of the proposed building for presentation  and approval by the city council.    Trunk Watermain Extension Objectives:  1. Install a new trunk watermain (size to be determined) along 50th Street from Lily Avenue North  west 2,300 feet to connect to an existing trunk watermain near Well #4.  2. Proposed watermain to be installed via trenchless technologies.   SERVICES  TO  BE  PROVIDED  BY  ENGINEER: Bolton  and  Menk,  Inc.  shall  provide  the  following  Professional Engineering Services:  1. Project Management throughout the course of work for all bid packages and construction phase  services, including submittal of a weekly progress memo and job to date budget form.  2. Design phase services, including preparation of Plans, Specifications, and Contract Documents  for each bid package   Project Kick‐off meetings with City staff.   Work with City Staff to develop a project budget for each project.   Site visits to verify and review existing conditions and survey.   Survey: Topographic survey of existing conditions within project limits for the purposes  of preparing site plan and design documents.   Survey: Boundary survey of proposed well site parcel.   Rendering,  and  one  revision,  of  proposed  pumphouse  building  appearance  and  construction materials for council approval.   Complete the private utility locate request, identify location of the utilities on the plans,  and complete design with location of private utilities in mind.   Prepare construction plans and specifications of each project f or bidding purposes. Plans  and Specifications will incorporate Contract Documents required by the project funding  source, including the MPCA‐3M Settlement funds.   Provide 60% plans and specifications for each project to the City for review.   Provide 90% plans and specifications for each project to City for review.   Revise and prepare final plans and  specifications  for  each  project  based  on  City  comments.   Prepare updated Opinion of Probable Cost for each project based on final plans.     Identify permits required to complete the proposed work. Each design shall incorporate  measures to meet compliance requirements for all permits necessary.   Prepare and submit any necessary permit applications for approval.      TASK ORDER No. 13 – PRODUCTION WELL #5, PUMPHOUSE, AND 50TH STREET TRUNK WATERMAIN         Page 3 of 6                                               DELIVERABLES   Plans for each bid package in Electronic (PDF) and Hard Copy formats (4 full size and 4  half size).   Specifications for each bid package in electronic and hard copy formats (3 copies for the  City and the appropriate number for contracts and required permits).   Engineer’s opinion of probable costs for each bid package and at 60% and 90% plan  review.   Design memorandum summarizing final design assumptions and performance criteria  incorporated into the project design   Identification of easements on the plans, if needed for the construction of the project.   Identification of anticipated conflicts with private utilities due to construction.     PUMPHOUSE NO. 5 SPECIFIC DELIVERABLES   Rendering of the proposed building (and one revision) for presentation to the City  Council for approval.    3. Bidding Phase Services   Submit “Advertisement for Bids” for each project to Oakdale‐Lake Elmo Review and  Quest CDN.   Distribute plans and specifications for each project as requested by bidders.   Maintain plan holder’s list.    Respond to bidders’ questions and issue addenda as necessary.   Tabulate bids in electronic format.   Prepare contract award recommendation letter.    4. Production Well #5 Construction Phase Services   Organize, coordinate, and jointly lead pre‐construction conference and regular monthly  progress meetings during construction.  Provide and distribute meeting minutes.   Assist the City in procuring testing services as defined in the Contract Documents.   Provide construction staking for the well.   Review Contractor submittals (shop drawings) for products and equipment.   Issue contract document clarifications as required.   Process contract change order requests, if required.   Review contractor‐submitted construction progress schedules.   Review contractor pay requests.   Provide periodic construction observation by design team members during construction  of the well and during test pumping operations.      TASK ORDER No. 13 – PRODUCTION WELL #5, PUMPHOUSE, AND 50TH STREET TRUNK WATERMAIN         Page 4 of 6                                              Provide  Substantial  Completion  inspection  and  punch  list  for  Contractor  and  issue  Certificate of Substantial Completion when appropriate.   Provide  Final  Completion  inspection  for  Contractor  and  issue  Certificate  of  Final  Completion when appropriate.   Review final submittal from Contractor with respect to conformance with the contract  documents.   Provide  final  inspection  of  the  work  and  make  recommendation  regarding  final  acceptance of the work.   Complete one‐year warranty inspection.   Prepare and submit record drawings in electronic format (AutoCAD, GIS and PDF) and  hard copy format (1 full size and three half‐size).  5. Pumphouse Construction Phase Services   Attend preconstruction meeting.   Construction administration.   Construction staking.   Provide review of shop drawings and make recommendations regarding acceptability of  submittals.   Construction Observation and periodic site visits to review the progress of work and  general compliance of the work to the plans and specifications.   Provide  final  inspection  of  the  work  and  make  recommendation  regarding  final  acceptance of the work.   Complete one‐year warranty inspection.   Prepare and submit record drawings in electronic format (AutoCAD, GIS and PDF) and  hard copy format (1 full size and three half‐size).  6. Connecting Watermain Construction Phase Services   Construction staking.   Attendance at preconstruction meeting.   Provide additional technical support to City Engineer during construction.   Prepare and submit record drawings in electronic format (AutoCAD, GIS and PDF) and  hard copy format (1 full size and three half‐size).    CITY’S RESPONSIBILITIES:  The City (or its Consultant) will provide the following:  1. Coordination with the public and conduct public meetings.  2. Presentation(s) to the City Council.   3. Easement acquisition, if needed.  4. Provide answers to specific project questions, provide requested information and make  decisions regarding project direction during the course of the project.  5. Review of 60% and 90% Plans and Specifications.        TASK ORDER No. 13 – PRODUCTION WELL #5, PUMPHOUSE, AND 50TH STREET TRUNK WATERMAIN         Page 5 of 6                                             6. Pay all permit and plan review fees for agencies as required for review and approval of Project  components.  7. Pay all costs associated with Advertisement for Construction Bids.  8. Attend bid opening.  9. Attend pre‐construction conference and construction progress meetings.  10. Construction  Administration  and  observation  services  for  the  Connecting  Watermain  Improvements.  11. One‐year warranty inspections for the Connecting Watermain Improvements.    TIMES FOR RENDERING SERVICES:  ENGINEER shall perform its services and provide final deliverables  in a timely and appropriate manner. ENGINEER is responsible for appropriately managing design and  construction tasks for each project so that they may proceed as planned and with minimal delay. The  project schedule is as follows:   Production Well No. 5 Final Plans and Specifications:  October 15, 2019   Award Production Well No. 5:  November 19, 2019   Production Well No. 5 Complete:  April 1, 2020       Pumphouse #5 and Connecting Watermain Final Design:   May 5, 2020    Award Pumphouse #5 and Connecting Watermain:  June 2, 2020   Trunk Watermain Complete:  September 18, 2020   Pumphouse #5 Complete; Well #5 Operational:  March 1, 2021     CITY’S REPRESENTATIVE AND CONTRACT ADMINISTRATION:  The CITY’s representative with respect  to  services  rendered  by  ENGINEER  under  this  TASK  ORDER  shall  be the City Engineer.  Project  correspondence must be addressed to:    Jack Griffin, P.E., City Engineer   City of Lake Elmo   3800 Laverne Avenue North  Lake Elmo, MN 55042  651.300.4264  Email: Jack.griffin@focusengineeringinc.com              TASK ORDER No. 13 – PRODUCTION WELL #5, PUMPHOUSE, AND 50TH STREET TRUNK WATERMAIN         Page 6 of 6                                             COMPENSATION:  Invoices shall be submitted once each month and should be sent to the attention of  the City Engineer. Compensation to ENGINEER shall be based on the hourly billing rates for each staff  as assigned and provided in the ENGINEER’s Proposal for the work in the following not to exceed  amounts:   Production Well No. 5 Final Plans and Specifications:    $    20,259   Production Well No. 5 Construction Services:      $    20,085     Pumphouse #5 Final Design:      $    95,597   Pumphouse #5 Construction Services:    $    44,061     Connecting Watermain Final Design:     $    25,413   Connecting Watermain Construction Services:      $    10,529  TOTAL ENGINEERING SERVICES     $ 215,944    ADDITIONAL SERVICES:  If authorized by the City, ENGINEER shall furnish or obtain from others  Additional Services which are not considered under this Task Order. Such services shall be compensated  for on an Hourly Rate basis in an amount approved by the City prior to any services being started or as  otherwise mutually agreed. The City is not obligated to compensate ENGINEER for services completed  outside the approved scope of work which are completed prior to ENGINEER submitting a written  request to the City, and receiving written approval of the City.   An additional rendering with alternative materials or building style can be provided for an  additional estimated fee of $2,000.    APPROVAL  AND  ACCEPTANCE:  Approval  and  Acceptance  of  this  Task  Order,  including  the  attachment(s) listed above, shall incorporate this document as part of the AGREEMENT. ENGINEER is  authorized to begin performance of services upon receipt of a copy of this Task Order signed by CITY.    The Effective Date of this Task Order is September 17, 2019.    BOLTON AND MENK, INC.    CITY OF LAKE ELMO, MINNESOTA    By _________________________________   By __________________________________   (Authorized Principal of the Firm)  City Administrator