HomeMy WebLinkAbout#04 - December 2019 Public Works ReportMAYOR AND COUNCIL COMMUNICATION
DATE 1/7/2020
CONSENT
AGENDA ITEM: Public Works Director Report
SUBMITTED BY: Marty Powers, Public Works Director
REVIEWED BY: Kristina Handt, City Administrator
ISSUE BEFORE COUNCIL:
City Council is asked to review and accept, as part of Consent Agenda, a brief description of activities
that have taken place in the Public Works Department in the month of December, 2019.
PROPOSAL DETAILS/ANALYSIS:
STREETS
• Attended to streets, parking lots and city owned sidewalks after multiple winter
weather events
• Wash and clean trucks and equipment after snow event
• Continue tree trimming in ROWs
• Proposed 2020 single axle plow truck to MAC
• List Fire Department surplus items on public auction site
• Enforce winter sidewalk ordinance
• Public Works staff holiday lunch
• Replenish road salt supply
PARKS
• Weekly garbage collection continues
• Clear snow from skating rinks
• Began flooding Lions Park skating rinks. Staff battled the fluctuating temperatures
and the warm air flowing through the floor drain
• Groom Sunfish Lake Park trails after multiple snow events
• Major cleaning of Lions Park warming house, repaired plumbing leak and replaced
bathroom door knobs with locking knobs
• Hammes Park sign was ordered
• I attended monthly Park Commission Meeting
• Repair and maintain snow blowers
City Council Meeting Date Consent/Regular Agenda Item #__
Page 2
WATER
• Continue correcting water meter issues
• Complete monthly bacteria and fluoride sampling
• Complete Monthly Generator and Safety Inspections of Equipment and Facilities
• Continue daily rounds, sampling and locates
• Repair water leak on Lake Elmo Ave
• Reprogram Neptune meter reading equipment
• Complete quarterly meter reading
• Document yearly flushing and valve exercising tasks into Beehive asset
management software
SEWER
• Attended to continuing Legion lift station issues. Repair second pump
• Continue Weekly Proactive Pump downs of all Lift stations & Monthly Float
Cleaning
• Investigate options to reduce solids and grease build up in the Lisbon lift station
• Document yearly jetting tasks into Beehive asset management software
• Replace failed battery tender serving Royal South Generator
• Assist resident with troubleshooting sanitary issue
• Two staff members attended one day continuing education class for sewer license
• The mixing valve on one of the pumps located at the 94 lift station had fell off
recently. It was located, retrieved and will be repaired and reinstalled.
• Vacuumed out the solids and grease from the Lisbon lift station
SURFACE WATER
• Two staff members attended additional MS4 training
• Continue advance training on the Beehive asset management software
• Staff member Jason Monroe and I attended EMWREP partners meeting
• Works with emergency manager, Cimarron and residents to prepare for potential
spring flooding
RECOMMENDATION:
Base on the activities listed above, City Council is respectfully asked to accept the December 2019 Public
Works Report.