HomeMy WebLinkAbout#23 - Goldridge Group PUD Concept Plan Approval1
STAFF REPORT
CITY COUNCIL
DATE: 10/06/2020
AGENDA ITEM: ___
TO: City Council
FROM: Ken Roberts, Planning Director
AGENDA ITEM: Goldridge Group PUD Concept Plan (Hudson Boulevard and Julia
Avenue)
REVIEWED BY: Ken Roberts, Planning Director
Sarah Sonsalla, City Attorney
Ben Prchal, City Planner
Jack Griffin, City Engineer
BACKGROUND:
Mr. Brad Coats, representing the Goldridge Group, is requesting approval of a concept planned unit
development (PUD) for the 14.15 acre property located on the north side of Hudson Boulevard, west of
Julia Avenue (9400 Hudson Boulevard). Concept PUD review requires a public hearing.
The proposed concept PUD would have 3 apartment buildings with a total of 189 units on 11.69 acres
with a density of about 16.17 dwelling units per acre (D.U.A). The Concept PUD Plan also shows a 1.88
acre parcel in the southeast corner of the site for preschool/childcare center known as the Goddard
School. (Please refer to the attached narratives and maps for more information about this proposal).
The Planning Commission held a public hearing and reviewed the concept PUD plans for the proposal on
September 14, 2020. After the staff presentation and discussion, the Planning Commission made a
recommendation of approval of the Concept PUD plan with the staff-proposed conditions based on
findings. No one from the public (other than the applicant) spoke at this meeting.
ISSUE BEFORE THE CITY COUNCIL:
The City Council is respectfully being requested to review and provide feedback to the developer about
the planned unit development concept plan for the proposed mixed use development for property on the
north side Hudson Boulevard, west of Julia Avenue as proposed by the Goldridge Group.
GENERAL INFORMATION:
Applicant: Goldridge Group (Brad Coats), 310 Pinnacle Way, Suite 300, Eau Claire,
Wisconsin 54701
2
Property Owner: DPS-Lake Elmo, LLC of 6007 Culligan Way, Minnetonka, MN 55345
Location: North of Hudson Boulevard, west of Julia Avenue
PID#: 3402921340012
Request: Concept PUD Plans approval
Total Site Area: 14.15 acres
Residential Development Area: 11.69 acres
Commercial Development Area: 1.88 acres
Julia Avenue ROW dedication: 0.58 acres
Land Use Guidance: 2040 Comprehensive Plan – Mixed Use Commercial
Zoning: RT - Rural Development Transitional
Proposed Zoning: MU-C PUD (Mixed Use Commercial/PUD)
Surrounding Land Use Guidance: Commercial to the west, Urban Medium Density Residential (future
townhouses) to the North, High-density residential (The Springs) across Julia Avenue to the east, and
Hudson Boulevard and I-94 to South.
History: The property has been used as rural vacant land with a pole building used for storage and
possibly as a homestead. A large portion of the eastern part of the site is covered in trees.
Deadline for Action: Application Complete – 8/14/2020
60 Day Deadline – 10/12/2020
Extension Letter Mailed – No
120 Day Deadline –
Applicable Code:
Article 19 – Planned Unit Development Regulations
Chapter 153 – Subdivision Regulations
§150.270 Storm Water, Erosion, and Sediment Control
City of Lake Elmo Design Guidelines and Standards Manual
CONCEPT PUD PLAN REVIEW
PUD Review Process. The City Code for PUD’s requires several steps in the project review and
approval process. Section 154.758 of the City Code (below) provides all the details about the review
process and steps. As noted subsection in E2, the Planning Commission is to hold a public hearing about
the concept plan and report its findings and recommendations to the City Council. Subsection E5 outlines
the City Council step in the review process of a Concept PUD Plan.
Note: The City Council approved a Code Amendment on August 18, 2020 that changed the PUD review
process to drop the requirement for Concept Review of PUDs by the Planning Commission and City
Council. This application was complete on August 14, 2020, so the City is reviewing and processing this
request following the Code standards that were in effect at that time.
3
§ 154.758 PROCEDURES FOR PROCESSING A PLANNED UNIT DEVELOPMENT.
There are four stages to the PUD process: application conference, general concept plan, preliminary plan
and final plan, as described below.
A. Application Conference. Upon filing of an application for PUD, the applicant of the proposed
PUD shall arrange for and attend a conference with the Planning Director. The primary purpose
of the conference shall be to provide the applicant with an opportunity to gather information and
obtain guidance as to the general suitability of his or her proposal for the area for which it is
proposed and its conformity to the provisions of this subchapter before incurring substantial
expense in the preparation of plans, surveys and other data.
B. General Concept Plan. The general concept plan provides an opportunity for the applicant to
submit a plan to the city showing his or her basic intent and the general nature of the entire
development without incurring substantial cost. The plan should include the following: overall
density ranges, general location of residential and nonresidential land uses, their types and
intensities, general location of streets, paths and open space, and approximate phasing of the
development.
C. Preliminary Plan. Following approval of the general concept plan, the applicant shall submit a
preliminary plan application and preliminary plat, in accordance with the requirements described
in § 153.07. The application shall proceed and be acted upon in accordance with the procedures in
this subchapter for zoning changes.
D. Final Plan. Following approval of the preliminary plan, the applicant shall submit a final plan
application and final plat, in accordance with the requirements described in § 153.08. The
application shall proceed and be acted upon in accordance with the procedures in this ordinance
for zoning changes. If appropriate because of the limited scale of the proposal, the preliminary
plan and final plan may proceed simultaneously.
E. Schedule for Plan Approval
1. Developer presents the general concept plan to the Planning Commission for their review
and comment.
2. After verification by the Planning Director that the required plan and supporting data are
adequate, the Planning Commission shall hold a public hearing, with public notice.
3. The Planning Commission shall conduct the hearing and report its findings and make
recommendations to the City Council.
4. The City may request additional information from the applicant concerning operational
factors or retain expert testimony at the expense of the applicant concerning operational
factors.
5. The Council may hold a public hearing after the receipt of the report and
recommendations from the Planning Commission. If the Planning Commission fails to
make a report within 60 days after receipt of the application, then the City Council may
proceed without the report. The Council may approve the general concept plan and attach
such conditions as it deems reasonable.
6. Following approval of the General Concept Plan, the application may proceed to the
preliminary plan phase.
4
PROPOSAL DETAILS/ANALYSIS:
The proposed mixed-use development will be located on the 14.15 acre property located on the northwest
corner of the intersection of Hudson Boulevard and Julia Avenue. The proposed development would have
a mix of land uses including 3 apartment buildings (with a total of 189 market rate rental units) on 11.7
acres (with overall average density of 16.17 units per acre) and preschool/child care center located on about
1.88 acres in the southeast corner of the site. The development is proposed as a PUD because the developer
is requesting flexibility from the strict zoning regulations of the MU-C zoning district by having a mix of
land uses, by having 3 residential buildings on one lot, by having reduced setback for parking areas and to
increase the allowed residential density through the use of amenity points.
The applicant’s submission to the City includes the following components:
Concept Plan Overview. The two attached narratives include a general overview of each of the
elements in the project with additional details concerning some of the unique aspects of the proposed
PUD.
Concept Plan. The PUD Concept Plan includes a proposed configuration of roads, sidewalks,
trails, amenities, recreation areas and other public spaces on the applicant’s site. While the Concept Plan
provides initial dimensions for many of the various lots, amenities and streets, some details are still
missing and will need to be further reviewed for compliance with the City’s standards and regulations.
Staff completed an internal review of the concept plan, and general comments from Staff and
recommended conditions of approval are included in this memorandum. The Staff review comments that
follow are all based on conducting a high level review of the concept plan since there is not a lot of
detailed information that is required at this stage in the development process. Staff has instead focused on
the bigger picture items and those things that would otherwise not allow the development to move
forward if they contrasted with elements from the Comprehensive Plan, the Zoning Code, or the City
Code.
Review Note: The applicant recently revised the proposed concept plan for this PUD. The developer
made changes to the plans to address some of the staff and Planning Commission review comments and
to provide more clarity to the proposal. Staff will note the proposed changes to the PUD Concept Plans in
this updated report.
STAFF REVIEW COMMENTS:
Members of the Planning Staff, Public Works, Engineering, and Fire Departments reviewed the original
PUD concept plan, while the City Engineer has provided an additional review of the PUD Concept Plans.
The Staff comments for this project are as follows:
Comprehensive Plan: The land use map in the Comprehensive Plan shows this site designated as MU-C
(mixed use commercial). The 2040 Comprehensive Plan notes “this designation is a new land use and
identifies where a mix of commercial and residential uses may be integrated to benefit from proximity
and adjacencies to each other. Commercial uses in this category include service and retail uses such as,
but not limited to, restaurants, shops, convenience stores, salons, studios and dry cleaners. Land with this
designation is assumed to develop with a minimum of 50 percent residential use with a density ranging
from 10-15 dwelling units per acre.”
Zoning Map Amendment. The existing zoning of the property is RT (rural development transitional).
In order to develop the site, the City will be required to rezone the development to MU-C with PUD
overlay to be consistent with the City’s Comprehensive Plan guidance for the area. The purpose of the
5
mixed use commercial district “is to provide areas in the city for and promote mixed use development that
supports a sustainable mix of retail, commercial and residential uses that will benefit from proximity and
adjacency to one another.”
The mixed use commercial (MU-C) zoning code also states that the “mixed use commercial district will
serve as a transitional district between more intense highway-oriented development and less intense rural
or medium density residential uses. The intent of the mixed use commercial district is to permit flexibility
in the use of the land, while providing a set of minimum development standards in site design, spatial
relationships, building architecture and landscape design that will allow property owners to design and
construct development projects that respond both to market needs and to City goals and policies.” In
addition, the MU-C code requires at least 50 percent of the net developable area of a proposed mixed use
commercial development is to be residential, and residential development within these areas shall occur at
a density range of 10-15 units per acre.
Consistency with Proposed MU-C District. As mentioned, the proposed development will require City
approval of a Zoning Map Amendment to rezone the property to Mixed Use Commercial (MU-C) (from
the current RT (rural transition)) zoning designation. As such, staff reviewed the proposed General PUD
Concept Plan against the standards including setbacks, impervious coverage, etc. of the Mixed Use
Commercial zoning district, as shown below.
Standard MU-C Required Proposed
Impervious Surface Maximum 75% 41%
Minimum Lot Width 60 feet 1,000 feet on Hudson Blvd.
Minimum Lot Area (per Unit) 1,500 square feet 2,619 square feet
Front Yard Setback 20 feet 49 feet
Interior Side Yard 10 feet 100 feet
Corner Side Yard 10 feet 49 feet
Rear Yard Setback (Building) 20 feet 75 feet
Parking Setback (from
residential zones) (rear yard)
35 feet 25 feet (was shown at 19 feet)
Parking Not to be located in the front
yard or between the front façade
and street.
Parking is located in front of the
proposed child care center,
though this parking lot design is
consistent the design of parking
lots for commercial/office
buildings and would not be
parking for the residential
buildings on the site.
Open space 300 square feet of common open
space provided per unit. In this
case, at least 53,100 square feet.
Undetermined – but it appears
there is at least 55,000 square
feet of open space is provided
on site with the playgrounds,
recreation areas, gardens and
common areas between
buildings.
Site Data. The entire subdivision/PUD area is 14.15 acres. Of the 14.15 acres, the developer is proposing
to develop 11.69 acres with 189 apartment units (an increase in 12 units on 1 additional acre from the
original concept plan) (in three 3-story buildings) with associated amenities and recreation facilities. The
6
proposed residential element of the PUD would have with a density of 16.17 du/acre (was originally at
16.64 du/acre).
The revised PUD also includes a private preschool/child care center called the Goddard School that would
be on 1.88 acres (was 2.24 acres) located on the southeast corner of the site. This plan includes an 11,500
square foot building designed for up to 188 children and staff, outdoor play grounds, 52 parking spaces
and room for another 52 parking spaces near Julia Avenue if needed.
The project plans also show the required 100-foot-wide right-of-way for Julia Avenue along the eastern
side of the property.
Site Plan Details. The proposed site plan includes 3 apartment buildings with a total of 189 units (was
177 units) and underground (structure) parking for a total of 184 vehicles, 157 surface parking space (was
137 surface parking spaces), an approximately 1,300 square foot amenity building (including bathrooms,
changing rooms, lounging area, a kitchen area and office space for onsite management) and an outdoor
pool with patio area. The plans also show an outdoor grilling area, a children’s playground, recreation
areas for basketball, soccer, pickle ball and tennis and garden plots for the residents.
Streets and Access. The developer is proposing all private driveways/roads with widths of 24 feet or 32
feet within the development site. The proposed concept plan shows a primary access driveway into the site
from Julia Avenue on the east and another access on to Hudson Boulevard. The driveway entrance on Julia
Avenue should be in alignment with the driveway into the Springs development to the east. These two
access points are consistent with City standards.
The developer of the Springs Apartments to the east of this site recently completed improvements to Julia
Avenue adjacent to this PUD including the installation of curb and gutter and the first lift of asphalt. The
City expects the developer of the town houses to the north and east of this site (Pulte) to complete their
portion of Julia Avenue this year. When they finish their portion of Julia Avenue it becomes a continuous
public street connection from 5th Street North to Hudson Boulevard.
PUD Minimum Requirements. A PUD is a negotiated zoning district, and according to the Lake Elmo
Zoning Code Article 19, Planned Unit Development Regulations, the City may grant zoning flexibility in
order to better utilize site features and to obtain a higher quality of development. Or put another way,
through the PUD review and approval process the City may grant development and zoning flexibility in
order to better protect and use site features to obtain a higher quality of development than would occur by
following the City’s subdivision standards.
When evaluating a PUD proposal, a PUD must meet one or more objectives contained in Section 154.751
and meet the minimum requirements of Section 154.753 which include a minimum of 20% protected
open space.
Consistency with Planned Unit Development Regulations. The applicant has requested City approval
of a PUD for this development because it will have multiple buildings on one property, to have decreased
setback for parking areas and to allow for an increase in residential density through the use of amenity
points. Staff has reviewed the proposed plan for its consistency with requirements of Article XVII:
Planned Unit Development (PUD) Regulations and has found the following:
• Intent. The intent of a PUD is to provide for flexibility in the use of land and the placement and
size of buildings in order to better utilize site features and obtain a higher quality of development.
A PUD is required for the proposed development, as more than one principal building is proposed
to be placed on a platted lot, the developer is proposing reduced setbacks for a parking area and
7
the proposed residential density would be greater than the 15 units per net acre as allowed by the
2040 Comprehensive Plan.
• Identified Objectives. When reviewing requests for PUDs, the City is to consider whether one or
more objectives as outlined in Section 154.751: Identified Objectives of the Zoning Code will be
served or is achieved. Staff has found that the proposed development would meet the following
objectives:
A. Innovation in land development techniques that may be more suitable for a given parcel than
conventional approaches.
• The proposed development is a mixed use plan with 3 three-story apartment buildings
(with amenities) and a preschool/child care center integrated all in one site.
B. Promotion of integrated land uses, allowing for a mixture of residential, commercial and
public facilities.
• The proposed development would have a mixture of land uses in an area with a variety
of land uses including townhouses to the north, the Springs rental housing to the east
across Julia Avenue and commercial development to the west.
C. Provision of a more adequate, usable, and suitably located open space, recreational
amenities and other public facilities than would otherwise be provided under conventional
land development techniques.
• The proposed development is proposing a number of recreational amenities to residents
within the PUD including garden areas, playgrounds, play fields, amenity building, and
pool.
D. Accommodation of housing of all types with convenient access to employment opportunities
and/or commercial facilities; and especially to create additional opportunities for senior and
affordable housing.
• The proposed development will provide additional housing opportunities within the City,
as there are currently very few multi-family buildings within the City. This location is
close to commercial districts and would create housing opportunities for local employees.
The proposed development site offers easy access transportation access via Hudson
Boulevard to area highways and freeways.
G. Coordination of architectural styles and building forms to achieve greater compatibility
within the development and surrounding land uses.
• The design of the proposed buildings will be compatible in design with those in the area.
H. Creation of more efficient provision of public utilities and services, lessened demand on
transportation and the promotion of energy resource conservation.
• This development is located at a main street intersection in Lake Elmo and would be
within walking and biking distance of retail and office facilities. This would allow the
residents to access the facilities and services without the need to drive, lessening the
impact to traffic and roads.
J. Higher standards of site and building design than would otherwise be provided under
conventional land development techniques.
8
• The proposed PUD would add a housing type not common in Lake Elmo and would be
providing an interesting and unique development, both visually and meeting the housing
needs for a broader demographic in Lake Elmo as identified in the 2040 Comprehensive
Plan. From an architectural standard, the City will impose the guidelines and standards
set forth with the Lake Elmo Design Guidelines & Standards Manual for the buildings
and outdoor features (landscaping, fencing, etc.) in this development.
a. Minimum Requirements. PUDs must meet the following minimum requirements:
A. Lot Area. A PUD must include a minimum of 5 acres for undeveloped land or 2 acres for
developed land within the approved development.
• The proposed development exceeds this requirement with a 14.16 acre site.
B. Open Space: For all PUDs, at least 20% of the project area not within street rights-of-way
to be preserved as protected open space. Other public or site amenities may be approved as
an alternative to this requirement. Any required open space must be available to the
residents, tenants, or customers of the PUD for recreational purposes or similar benefit.
Land reserved for storm water detention facilities and other required site improvements may
be applied to this requirement. Open space shall be designed to meet the needs of residents
of the PUD and the surrounding neighborhoods, to the extent practicable, for parks,
playgrounds, playing fields and other recreational facilities.
• The applicant has not yet indicated the amount of open space with the proposed
plan. However, staff estimates that at least 35% of the proposed development would
be open space (including recreation areas, garden plots, green spaces, storm water
ponding areas and landscaped areas).
C. Street Layout… In newly developing areas, streets shall be designed to maximize
connectivity in each cardinal direction, except where environmental or physical constraints
make this infeasible. All streets shall terminate at other streets, at public land, or at a park
or other community facility, except that local streets may terminate in stub streets when
those will be connected to other streets in future phases of the development or adjacent
developments.
• The proposed development is adjacent to a new north/south road (Julia Avenue)
connecting 5th Street to Hudson Boulevard thus meeting this requirement. This
proposal shows private roads and driveways connecting the buildings and parking
lots to Julia Avenue and Hudson Boulevard. It is a recommended condition of
approval that the developer address all the comments outlined in the Engineering
memo dated September 3, 2020 before submitting an application and plans to the
City for a preliminary plat and PUD for this site.
Density. The proposed residential element of this development shows 189 units (an increase of 12 units
from the 177 units in the original concept plan) on an 11.69 acre site for a proposed density of 16.17
residential units per acre. The MU-C land use designation allows up to 15 residential units per acre. For
11.69 acre site, the maximum allowed density, without amenity points, would be 175 residential units.
The developer will be requesting City approval of amenity points to allow for an increase of 14 additional
residential units.
9
For the residential portion of this PUD, with a maximum of 15 dwelling units per acre, a 20 percent
increase in density would bring the maximum density to 18 dwelling units per acre. At 11.69 acres, the
residential site could have up to 210 dwelling units (or 35 additional units) if the City approved the
maximum amount amenity points to increase the project density.
Proposed Amenities. The City’s PUD ordinance provides that developers may provide amenities with
their projects for increased density. In this case, because the applicant is proposing a housing density of
16.17 units per acre, the developer will need to provide amenities with the project to justify the increased
housing density above the allowed density range 10-15 units per acre of the MU-C land use designation.
In addition, a PUD should offer the City (and future residents) amenities in exchange for the flexibility of
allowing more than one building on a parcel and reduced parking lot setbacks to the north property line.
In this case, the developer outlined in his narrative the following amenities they would be including in
this PUD and the suggested points for each:
• Underground or structure parking. The narrative of the application indicates that there will be a
total of 184 indoor or underground parking stalls for the 189 apartment units. It has not been
indicated that this will reduce the surface parking area outside the footprint of the principal
structure by 25%, however, as required by the PUD Code. (10 points requested)
• Contained Parking. By proposing 184 garage (structure) spaces for its residents, the proposed
development limits the amount of visible surface parking.
• Additional Amenities? Additionally, the City also may consider the allotment of amenity “points”
for site amenities that are not otherwise specified within the ordinance. The applicant notes the
development will offer the following amenities:
1. An approximately 1,300 square-foot amenity building (that will have bathrooms, changing
rooms, kitchen area, lounging area and office space for onsite management).
2. An outdoor pool with a patio area
3. An 1,868 square-foot grilling plaza (5 points requested)
4. Children’s playground (10 points requested)
5. Play areas for basketball, pickle ball and soccer and urban gardens (10 points requested)
6. Sidewalks connecting the elements throughout the site (5 points requested)
The original concept plan for the PUD had the proposed neighborhood recreation area (including the
basketball and pickle ball courts) located in the northwest corner of the site – west of the western
apartment building. The latest site plan for the PUD shows the proposed neighborhood recreation area in
the center of the site, west of the proposed day care building. This should be a better location for these
amenities has they will be more centrally located on the site and they will be farther away from the future
residential development (townhouses) the City expecting to the north of the apartment buildings.
It appears from this list of proposed amenities and the project plans the developer is proposing more than
enough amenities to have the City approve the proposed increase in density (14 additional units for a total
of 189 units) for the residential element of this PUD. The City will review and consider the possible
project amenities, the respective amenity points and the increased density in more detail during the review
and consideration of the preliminary PUD and preliminary plat plans.
10
Setbacks. The building and parking setbacks in the MU-C Zoning District are:
Residential Building Setbacks:
Front yard setback – 20 feet
Side yard setback – 10 feet
Corner side yard setback -10 feet
Rear yard setback – 20 feet
Non-residential Building Setbacks:
Front yard setback – 30 feet
Corner side yard setback – 25 feet
Rear yard setback – 30 feet
From residential zones – 50 feet
Parking setback requirements:
Front yard – 15 feet
Interior side yard – 10 feet
Corner side yard – 15 feet
Rear yard - 10 feet
From residential zones – 35 feet
Setbacks - proposed. The latest proposed concept site plan shows a variety of building and parking lot
setbacks on the site. These include a front setback for the buildings of at least 49 feet (from Julia Avenue
and from Hudson Boulevard), a parking setback of 25 feet from the north property line (was 19 feet on
the original plan) and 9.5 feet from Hudson Boulevard and Julia Avenue, a setback of at least 100 feet for
the buildings from the west property line, a 75-foot rear yard building setback (from the north property
line).
All these setbacks meet or exceed the minimum required by MU-C zoning code except for the proposed
parking lot setback of 25 feet from the north property line (35 feet required). If additional public street
right-of-way is needed for Hudson Boulevard or for Julia Avenue on the east side of the site that might
affect the proposed setback for the parking areas of the Goddard School. (Please see the City Engineer’s
comments for additional information about the streets and access).
Proposed Unit Breakdown. The proposed number of apartment units totals 189. The following provides
a breakdown of the proposed unit types and the number of units of each:
Unit Type Total Number of Units
Studios 9
1-Bedroom 75
2-Bedroom 105
3-Bedroom 0
Proposed Design. The apartment buildings are each 3 stories tall with a mix of studio, one bedroom and
two bedroom units. One of the buildings has internal parking for 58 vehicles and the other two buildings
have internal parking for 63 vehicles for a total of 184 indoor parking spaces in the three buildings. The
apartment building elevations provide architectural interest with use of exterior accents, a large
11
percentage of windows, and high quality materials including fiber cement board lap siding, fiber cement
shingle siding, an asphalt shingle roof and manufactured stone masonry. The buildings create additional
high architectural value with use of varied roof lines and vertical and horizontal articulation.
The proposed plans for the Goddard School building do not identify the exterior building materials but
they appear to include a mix of stone or stone veneer near the bottom with vertical man-made siding, a
large percentage of windows and a sloping asphalt shingle or standing seam metal roof.
The City will require a more robust architectural plan for all the buildings in the entire development with
the preliminary plat and preliminary PUD Plans submittal. All building designs will need to meet the
Lake Elmo Design Guidelines and Standards for materials and colors.
Adherence to Lake Elmo Design Guidelines and Standards.
The proposed development adheres to the Lake Elmo Design Guidelines and Standards in that:
• The proposed structures are located and oriented in a manner that allows for pedestrian
accessibility and provides visual interest from the public right-of-way.
• The buildings are located as close to the public street as possible, easily accessible from the
street; recreational and common spaces are located at the interior or rear of the site.
• The parking areas do not account for more than 50% of street frontage.
• Examples of past developments adhere to building design requirements. It is a recommended
condition of approval that the applicant include a detailed architectural plan proposal for the
development.
Parking. The City’s Zoning Code requires one parking space per studio and 1 bedroom unit, two parking
spaces per 2 and 3 bedroom unit and at least one visitor parking space per four units. With the proposed
mix of 189 apartment units, the City Zoning Code requires the developer to provide at least 338 parking
spaces on site for the apartments. In this case, the developer is proposing a total of 341 parking spaces –
including 184 attached (interior) garage spaces and 157 surface parking spaces adjacent to the apartment
buildings.
The Lake Elmo Zoning Code requires day care and child care centers to have at least 1 off-street parking
space per employee on the largest shift plus 1 parking space per 7 students based on capacity of the
building. The developer/applicant has not yet provided City staff with the number of staff persons that
are expected to be working in the center so a final parking requirement for the center cannot yet be made.
The proposed Concept Plan shows 52 parking spaces along the east side of the building and an area
shown for future parking that could accommodate an additional 52 parking spaces. This amount of
parking should be more than enough for the Goddard School. The City should require the developer to
verify the parking needs of the Goddard School as part of their preliminary plat and PUD application.
The proposed width and length of parking stalls is compliant with code, and the proposed width of the
private driveways of 24 feet or 32 feet should be adequate for a 2-way drive aisle width according to the
Zoning Code. Of these parking spaces, a total of six spaces are proposed to be Americans with
Disabilities Act (ADA)-accessible.
Impervious Surfaces. The maximum allowed impervious surface residential development in the MU-C
zone is 75 percent. According to the applicant, the proposed concept plan has 5.77 acres (45 percent) of
the site as impermeable (impervious) surface and 7.78 acres (55 percent) of the site with permeable
(pervious) surfaces. The City Code requires that at least 25 percent of the site have pervious surfaces so,
as proposed, the PUD meets this requirement.
12
Easements. The City requires 10-foot-wide easements along all public rights-of-ways and rear property
lines, 5-foot-wide easements alongside property lines, and easements for stormwater management and
public utilities as needed. The City should require the applicant to show all required and necessary
easements on the preliminary and final PUD plans.
Sidewalks. The City’s standard street detail requires a 6 foot wide public sidewalk be constructed on one
side of any public street. The proposed concept plan shows private driveways and roads internal to the site
with a series of sidewalks connecting the buildings to the site amenities, to a sidewalk along Julia Avenue
and to the trail along Hudson Boulevard.
Trails. The Comprehensive Plan’s Trail Plan shows a planned trail and sidewalk along Julia Avenue along
the east side of the development. The proposed site plan for this PUD shows a six-foot-wide concrete
sidewalk along Julia Avenue. The trail construction and connection requirements at and along Hudson
Boulevard will need to be reviewed and verified as part of the City’s final plan approval. The City should
require the developer to install the planned trail(s), sidewalks and a crosswalk with pedestrian ramps where
needed as part of this development.
Parkland Dedication. The Lake Elmo Parks Commission reviewed the proposed development at its
September 21, 2020 meeting. The proposed development does not propose a public park but does provide
recreation for its residents through the proposed play fields, amenity building, pool and open space. This
area is already served by Savona Park.
The proposed development consists of 14.15 acres, and the required parkland dedication for the Mixed
Use – Commercial zoning district is 10%. The required amount of the fees would be 10% of the purchase
price of the property, which has yet to be determined. The park dedication requirement for a 14.15 acre
development is 1.42 acres of parkland, or a combination of parkland or fees in lieu of parkland.
The developer has not identified any areas for park land dedication within the development but has
identified open space areas for play, recreation and gardening on the Concept PUD totaling about 0.75
acres. These include the recreation and playground areas and the urban garden. These areas/amenities
are part of the proposed open space as required by the PUD Ordinance. It would not be a
recommendation of City staff that the City consider any of these private amenities for public park land
dedication.
The Park Commission recommended the following for this PUD:
• That all trails and sidewalks (public and private) be located outside of storm water ponding areas
and wetland buffer zones.
• That a bituminous trail be installed along Hudson Boulevard and a six-foot-wide concrete
sidewalk along the Julia Avenue as part of this development.
• That the Preliminary Plat and PUD Plans submittal include accurate open space and impervious
surface calculations.
• That the Preliminary Plat and PUD Plans submittal include a complete tree inventory and tree
preservation/replanting and landscape plans to be reviewed and approved by the City’s Landscape
Architect.
13
• That the developer provide the City fees in lieu of park land dedication as required by Section
153.14 with future final plat.
I have included these conditions in the proposed conditions for approval.
Subdivision Signs. Section 154.212 allows a maximum of 2 subdivisions signs per residential development
with a maximum sign area of 24 sq. ft. per sign. No signs have been proposed.
Tree Removal and Preservation. There is an area of about 90,000 square feet (2.1 acres) of tree cover
on the site. Most of the trees on this site are around the existing buildings. The proposed project would
remove all the existing trees on the site. The applicant has not yet submitted a proposed tree and
landscaping plan for this site.
The City will require the applicant to provide a complete tree inventory and tree preservation/replanting
and landscaping plans as part of any site development applications going forward. The City’s tree
preservation ordinance allows for 30% removal of significant trees on a site and the City requires a tree
mitigation plan showing how the developer will replace any and all removed trees.
Landscaping. The applicant has not yet provided the City with any details about landscaping for the site
(nor are they required to at this point of the review). The City will require the applicant to submit detailed
landscape plans with their preliminary PUD application and those plans will need to meet or exceed the
City’s Landscape Requirements for the replanting of trees and for screening. All tree removal, screening
and landscape plans will subject to review and approval by the City’s Landscape Architect.
The landscape ordinance requirements are as follows:
1 tree per 50 lineal feet of street frontage, plus
5 trees for every 1 acre of development.
The required trees must be 25% deciduous, and 25% coniferous.
Landscape requirements for the site are as follows:
1,600 lin. Ft. of street frontage/50 = 32 trees + 14.15 acres x 5 = 71 trees = for a total of 103 trees.
Additional tree and landscaping requirements include the planting of replacement trees for mitigation, the
planting of trees required in and around interior parking areas and the trees needed for screening along the
northern property line.
All tree removal, screening and landscape plans will subject to review by the City’s Landscape Architect.
City Engineer Review. The City Engineer has submitted comments as outlined in the attached letter
dated September 3, 2020. The Engineer noted that the existing conditions plan is incomplete and does not
provide enough information for a more detailed review of the PUD. As such, City staff is recommending
the developer revise the concept plans for City staff review to address the key design issues before the
submittal of preliminary plat and preliminary PUD application and plans to the City as this next design
step might result in significant changes to the plan layout.
Stormwater Management. No stormwater management plan has been prepared for the project at this
time. The proposed concept plan shows two areas for storm water ponding totaling about 5 acres in area.
14
The western most ponding area also serves to manage stormwater from Julia Avenue via an underground
pipe in the easement along Hudson Boulevard. The City Engineer’s review memorandum addresses
general stormwater management considerations that the City will require as part of this development. He
will need to see additional details before commenting in any detail on any proposed storm water
management plan, and in particular, how the storm water ponds or basins would be connected and how
the storm water system would allow emergency overflow or outlets from the ponds. He also noted that the
storm water facilities for this development should remain privately owned and maintained with
maintenance access roads meeting the City engineering design standards.
Municipal Sewer and Water. The City Engineer’s memorandum provides a review of municipal sewer
and water considerations. City staff is expecting the developer to extend public water and sanitary sewer
service to the site. Future development plans for the project will need to include detailed accounting of
the proposed maximum sewer usage, domestic and fire suppression demands for the water system and
utility construction plans that meet City engineering standards.
Municipal Sanitary Sewer. The sanitary sewer available to the site. The developer shall be responsible
to connect to the City sanitary sewer system by connecting to the existing 12-inch sanitary located along
Hudson Boulevard and extend sanitary sewer into the development.
Municipal Water. The developer should extend City water into this site from the existing 12-inch
watermain located along Hudson Boulevard and extend a minimum 8-inch watermain into the development.
The City Engineer will require the watermain system to be a looped network internal to the site to prevent
long dead stretches of public watermain. This will require a connection to the watermain in Julia Avenue
and stubbing the watermain between the apartment buildings to the north property line to allow for a
watermain connection to the future townhouses in Union Park to the north of the site.
Fire Chief Review. Dustin Kalis, the Lake Elmo Fire Chief, reviewed the concept plans. I have attached
his review comments for reference.
South Washington Watershed District Comments: I have not received comments from the South
Washington Watershed District about this proposal. However, they provided the City with the following
comments about another recent development proposal that should be applicable to this site:
1. The project will require a South Washington Watershed District (SWWD) permit. Once
the applicant submits a complete SWWD permit application, they will review it for
conformance to the SWWD rules and regulations.
2. If the applicant is proposing storm water ponds and facilities to control stormwater runoff
rates and to provide the required stormwater runoff volume treatment, then the SWWD
will need to see soil borings and/or other infiltration testing results, computations and
design details to determine whether the proposed storm water improvements will
conform to the SWWD rules and regulations.
Subdivision Review Process. In order to proceed with the subdivision of the land included in the
concept plan the applicant will need to prepare a preliminary plat/PUD application. At this stage there is
much more information the City requires as part of that submission process, which also requires a public
hearing. The preliminary plat will need to include all the required right-of-way for Julia Avenue, any
additional right-of-way for Hudson Boulevard and all required drainage and utility easements.
15
RECOMMENDED FINDINGS:
Based on the above comments and analysis, Staff and the Planning Commission recommend approval of
the PUD Concept Plan as described above. Staff is making this recommendation based on the following
findings:
1. That the 2040 Lake Elmo Comprehensive Plan and Land Use Map shows the site of the proposed
planned development designated as MU-C (mixed use commercial); and that the PUD Concept
Plan would be consistent with the goals, objectives and intent of the 2040 Lake Elmo
Comprehensive Plan and the 2040 Land Use Map for this area.
2. That the PUD Concept Plan complies with the general intent of the Mixed Use Commercial
zoning district with PUD modifications.
3. That the PUD Concept Plan generally complies with the City’s Subdivision regulations.
4. That the PUD Concept Plan is generally consistent with the City’s engineering standards with
exceptions as noted in the City Engineer’s memorandum dated September 3, 2020.
5. The PUD Concept Plan meets the minimum requirement for a PUD including minimum lot area,
open space and street layout.
6. The PUD Concept Plan meets more than one of the required PUD objectives identified in Section
154.751 including providing: 1) Innovation in land development techniques that may be more
suitable for a given parcel than conventional approaches. 2) Promotion of integrated land uses,
allowing for a mixture of residential and commercial land uses. 3) More adequate, usable, and
suitably located open space and recreational amenities and other public facility than would
otherwise be provided under conventional development techniques. 4) Accommodation of housing
of all types with convenient access to employment opportunities and/or commercial facilities. 5)
Coordination of architectural styles and building forms to achieve greater compatibility within the
development and surrounding land uses. 6) Creation of more efficient provision of public utilities
and services, lessened demand on transportation and the promotion of energy resource conservation
and 7) Higher standards of site and building design than would otherwise be provided under
conventional land development technique.
7. The PUD Concept Plan meets and could exceed the residential density requirements provided in
the 2040 Comprehensive Plan’s Land Use Map designation (mixed-use commercial) for this site.
RECOMMENDATION:
The Planning Commission recommended approval of the original PUD Concept Plan for this site subject
to 17 conditions of approval. City staff is recommending City Council approval of the revised PUD
Concept Plan (dated September 29, 2020) as proposed by the Goldridge Group for the property located on
the north side of Hudson Boulevard, west of Julia Avenue subject to the following conditions:
1. That the future preliminary plat and preliminary PUD Plans includes the parcel with the PID#
3402921340012.
2. That the applicant prepare any future preliminary plat and preliminary PUD plans showing all of
the site perimeter property lines - including any site plan revisions necessary for the right-of-way
16
required for Julia Avenue, for any additional right-of-way needed for Hudson Boulevard and to
include all required drainage and utility easements.
3. That before submitting an application and plans to the City for preliminary PUD plan/plat
approval, the developer revise the PUD concept plans to address the staff comments and
recommended changes and to allow for additional City review.
4. That the developer submit a PUD plan as part of any future preliminary development plans. The
PUD Plan shall include a detailed listing of all requested departures or modifications from City
ordinances and development standards including having reduce parking lot setbacks and having
fewer off-street parking spaces on the site than required by the City Code.
5. That all comments of the City Engineer’s Memorandum dated September 3, 2020 be addressed
with the future preliminary plat and preliminary PUD Plans submittal. In particular, the
preliminary development plans shall address all public utility designs, storm water management
and Hudson Boulevard and trail designs.
6. That all storm water retention and infiltration areas must be dedicated to the City and platted as
outlots on the preliminary plat unless otherwise directed by the City Engineer.
7. That all trails and sidewalks (public and private) be located outside of storm water ponding areas
and wetland buffer zones.
8. That an eight-foot-wide bituminous trail be installed along Hudson Boulevard and a six-foot-wide
concrete sidewalk along the Julia Avenue as part of this development.
9. That the Preliminary Plat and PUD Plans submittal include accurate open space and impervious
surface calculations.
10. That the Preliminary Plat and PUD Plans submittal include a complete tree inventory and tree
preservation/replanting and landscape plans to be reviewed and approved by the City’s Landscape
Architect.
11. That 6 foot-wide sidewalks be provided along Julia Avenue and along the private driveways/roads
within the site as shown on the project plans.
12. That the developer provide the City fees in lieu of park land dedication as recommended by the
Parks Commission and as required by Section 153.14 with the future final plat.
13. That the preliminary plat and preliminary PUD Plans submittal include a detailed subdivision
phasing plan.
14. That the preliminary plat and preliminary PUD Plans submittal include a detailed architectural
plans that clearly identifies the various architecture styles and exterior materials for all the
proposed buildings.
15. The applicant receive a permit from the South Washington Watershed District for the construction
of the proposed development.
17
16. That the developer shall prepare a plan for the ownership and management of the open space and
recreation areas as part of preliminary PUD plans.
17. That all comments of the Fire Chief be addressed with any future preliminary plat plans and
preliminary PUD plan submittal.
18. That all comments of the Building Official be addressed with any future preliminary plat plans and
preliminary PUD plan submittal.
19. That the developer verify the parking needs of the Goddard School as part of their preliminary plat
and PUD application and submittal.
FISCAL IMPACT:
There would be no fiscal impact to the City at this time. Concept Plan approval does not afford the applicant
development rights. When the property develops, it will have urban services and will pay sewer and water
connection charges, building permit fees and the like that the developer and/or contractors will pay.
RECOMMENDATION:
Staff and the Planning Commission recommend City Council approval of the proposed PUD Concept
Plan (dated 9-29-2020) for the proposed mixed use development of the property located at the
intersection of Hudson Boulevard and Julia Avenue as proposed by the Goldridge Group with the
following motion and the recommended conditions of approval.
“Motion to adopt Resolution 2020 – 087 approving PUD Concept Plan (dated 9-29-2020) as requested
by Brad Coats of the Goldridge Group for the mixed use development proposed for PID #
34.029.21.34.0012 (the property located at the intersection of Hudson Boulevard and Julia Avenue),
subject to recommended conditions of approval as outlined in the staff report.”
ATTACHMENTS:
1. Project Narratives dated September 29, 2020 and August 12, 2020 (3 pages)
2. Land Use Plan Map
3. Location Map
4. Property Line Map
5. Address Map
6. Aerial Photo
7. Topographic Maps (2 pages)
8. PUD Concept Apartment Plans (15 pages)
9. Goddard School Plans (3 pages)
10. City Engineer Report dated September 3, 2020
11. Fire Chief review comments dated September 24, 2020
12. Resolution 2020 - 087
RIDGE
apartments
PUD / CONCEPT PLAN REQUEST – August 12, 2020 Updated September 29, 2020
The proposed site for Ridge Apartment Community is located on Julia Ave & Hudson Blvd between
Inwood and Keats Avenues on the north side of I-94. Goldridge Companies proposes a 189-unit
market rate apartment community on the 11.68 Acre Site. After further research since our initial
concept plan submittal, data shows us a need for more 1 bedroom units. As such, we added 6
more 1 bedroom units in both the NW & NE Buildings for a total of 12 additional units.
Site: 11.68 Acres
189 Apartments – (Market Place Rentals)
Three 3 story Buildings
(84,500 sq. ft. SW building) with 58 Underground Parking spaces and 59 Apartments
(91,300 sq. ft. NW building) with 63 Underground Parking spaces and 65 Apartments
(91,300 sq. ft. NE building) with 63 Underground Parking spaces and 65 Apartments
Studios: 9
1 BRs: 75
2 BRs: 105
Enclosed Parking: 184 spaces
Surface Parking: 157 spaces
The proposed apartments are a mix of studio’s, 1 & 2 Bedroom apartments and workout room sitting on
11.68 Acres with underground parking in each of the 3 Buildings. Each Building’s Exterior is a blend of
cement lap siding, cement shingle’s & panels with the lower portion of each building being stone as shown
in the elevation drawing.
The Apartment site also will have an Amenity Building that is centrally located to all 3 apartment buildings.
It will have bathrooms, changing rooms, large screen TV, kitchen area, lounging area and office for onsite
management. Contiguous to the Amenity Building is a swimming pool with a large patio area and outdoor
grilling patio.
Picnic Area is south of the Amenity Building and will have benches, picnic tables and an area for Swing Sets
and outdoor play equipment.
Recreational area: Will have basketball court, pickle ball and tennis courts with a large area for youth
activities such as soccer, baseball, touch football etc.
Urban Gardens: The Urban Garden area can be as large as 50,000 sq. ft. subject to demand.
All Apartments will have sidewalks that will connect to all recreational and amenity area’s which will feed
onto the trails and sidewalks on Julia Avenue and along Hudson Boulevard.
Description of Amenity Area’s & Amenity Points
Underground Parking under apartment buildings 184 stalls (requesting 10 points)
Amenity Building 25’ X 52’ 1,300 square feet
Patio Pool Area 57’ X 52’ 2,990 square feet
Grilling Plaza 35’ X 52’ 1,868 square feet (requesting 5 points)
Childrens Playground 3,750 square feet (requesting 10 points)
Picnic Area 2,911 square feet
Neighborhood Recreation/Urban Garden 30,808 square feet (requesting 10 points)
All Amenity areas are connected throughout the 12.85 Acre Project with 6’ concrete sidewalks
which connects to the 8’ Bituminous Hudson Blvd Trail (requesting 5 points)
The proposed land use is consistent with the 2040 Comprehensive Plan Future Land Use designation of
Mixed Use-Commercial (MU-C). The site will require rezoning from Rural Development Transitional (RT) to
Mixed Use Commercial (MU-C) PUD. The MU-C land use designation allows for up to 15 units per acre and
Goldridge is requesting a density of 16.17 units per acre by adding amenity features for amenity points as
described above.
As noted in the 2040 Lake Elmo Comprehensive Plan:
Housing Diversity
A community that has a diverse supply of housing is one that includes different tenures (rental and
ownership), types (single-family, townhome and apartment), price points, sizes and styles. This residential
mix can accommodate the needs of a wide variety of households at different life stages, incomes and family
types. Furthermore, it provides more options as resident housing needs vary over time due to changes in
age, income, housing preference, family structure, or abilities. In turn, this enables people to move into a
community and remain in it as they experience these life changes while staying close to their established
social support networks.
Goldridge Companies has designed this site with many amenities that complement the RIDGE Apartment
Community Project and Lifestyles in the Area.
PUD / CONCEPT PLAN REQUEST – August 12, 2020
The Proposed Site for the new Goddard School is located on the southwest corner of Julia Ave and
Hudson Blvd between Inwood & Keats exits on the north side of I 94.
Goddard School is a Premier Private Preschool/Child Care Center which currently licenses 525
schools in 38 states. This location will offer Safe & Healthy Childcare the same as it does in
Woodbury. The building will have a Zono Sanitizing Cabinet which kills 99.99% of common viruses
+ on non-porous surfaces and 99.99% of common bacteria on non-porous and semi-porous
surfaces, including body lice, bed bugs & Norovirus. The cabinet has an integrated mobile rack
system for sanitizing almost all items in the classroom such as Toys, Legos, dolls, wooden blocks,
cards, puzzles napping cots & mats. Every classroom is sanitized every day. This product was
approved for use in childcare facilities by the Washington County Department of Health.
Goddard Schools Play-Based Program Gives Children The Skills For Long-Term Success! Learn More
Now. Nurturing Environment. Highly-Trained Faculty. Nationally Accredited. Enrichment Programs.
STEAM Learning. (Science, technology, engineering, arts and mathematics).
Types: Pre-Kindergarten Program, Infant Program, Toddler Program, Preschool Program, Summer
Program and Summer Camp.
Site: 1.88 Acres Building: 11,500 sq. ft. Playgrounds: 23,000 sq. ft.
School Occupancy: Up to 188 children + Staff Ages: 6 weeks to 10 years of age
Future Parking: 52 more parking spaces to accommodate building expansion.
LAKE ELMO, MN / 09.29.2020 / 20-0018
Lake Elmo Apartments
1
EXISTING CONDITIONS
DAYCARE
BUILDING
DAYCARE
PLAYGROUND
FUTURE
PARKINGAMENITY BLDG21’-0”
8’-6”
18’-0”
9’-0”
32’-0”32’-0”24’-0”24’-0”STORMWATER
POND
STORMWATER
POND
URBAN
GARDEN
40’ STORMWATER EASEMENT
250’ CENTERLINE OF EXISTING DRIVEWAY TO CENTERLINE OF PROPOSED ROAD 745’ CENTERLINE OF PROPOSED ROAD TO CENTERLINE OF JULIA AVE N HUDSON BLVD N
108’-0”
49’-075’-8”PICNIC
AREA
42 42
41
33
52
U.P U.P U.P U.P U.P
U.P = UTILITY POLE
25’-0”
9’-5”
25’-0”47’-2”44’-6”52’-7”51’-10”87’-4”
NEIGHBORHOOD
RECREATION
AREA
CHILDREN’S
PLAYGROUND PRIVATE DRIVE8’-0” BITUMINOUS TRAIL
PROPOSED NE BLDGPROPOSED NW BLDG
PROPOSED SW BLDG
DEVELOPMENT SUMMARY
NOTES:
• All buildings within this development will have fire sprinkler systems
• All amenity areas will be lit to comply with cities photometric ordinances (5 pts)
• 6’ concrete sidewalks (5 pts)
• 8’ bituminous trail along Hudson
• Developer will improve Hudson Blvd to comply with cities requirement for improve-
ment on Hudson Blvd
AREA
GOLDRIDGE DEV.: 559,746 SF / 12.85 AC
GODDARD SCHOOL: 81,855 SF / 1.88 AC
RIDGE APTS: 477,891 SF / 10.97 AC
JULIA AVE: 31,200 / .72 AC
AMENITY POINTS: 45 POINTS
TOTAL SF OF JULIA + RIDGE APTS: 509,091 SF / 11.687 AC
DENSITY / ACRE: 16.17 UNITS / ACRE = 189 UNITS
IMPERMEABLE AREA: 251,288 SF / 5.77 AC
PERMEABLE AREA: 55%
PARKING
GODDARD SCHOOL: 52 STALLS
GOLDRIDGE DEV:
SURFACE PARKING: 158 STALLS
UNDERGROUND PARKING: 58 x 1 BLDG=58 STALLS
63 x 2 BLDG=126 STALLS (10 pts)
PATIO POOL AREA 2,990 SF
GRILLING PLAZA 1,868 SF (5 pts)
PICNIC AREA 2,911 SF
CHILDREN’S PLAYGROUND 3,750 SF (10 pts)
NEIGHBORHOOD RECREATION
/ URBAN GARDEN 27,976 SF (10 pts)
P
R
I
V
A
T
E
D
R
I
V
E
PRIVATE DRIVEPROPERTY LINE - 600’-0”PROPERTY LINE - 255’-0”PROPERTY LINE - 944’-0”
PROPERTY LINE - 944’-0”
6’-0”CONCRETE
SIDEWALK70’-0”349’-6”
116’-6”95’-8”JULIA AVE
RIGHT-OF-WAY
100’-0”PROPERTY LINE - 312’-0”70’-0”326’-0”
LAKE ELMO, MN / 09.29.2020 / 20-0018
Lake Elmo Apartments
2CONCEPT SITE PLAN
0’100’
SITE PLAN SITE PLAN
63 ENCLOSED PARKING STALLS / BLDGMECH.ELEC.LAKE ELMO, MN / 09.29.2020 / 20-0018
Lake Elmo Apartments
3CONCEPT PLAN
0’30’
SUB LEVEL - NE & NW BUILDINGS
LAKE ELMO, MN / 09.29.2020 / 20-0018
Lake Elmo Apartments
4CONCEPT PLAN
0’30’
LEVEL 1 - NE & NW BUILDINGS
LAKE ELMO, MN / 09.29.2020 / 20-0018
Lake Elmo Apartments
5CONCEPT PLAN
0’30’
LEVELS 2 & 3 - NE & NW BUILDINGS
DEVELOPMENT SUMMARY: Goldridge - Lake Elmo Apartment - NE & NW BUILDINGS Updated 2020-09-18
DESCRIPTION Parking GSF Structured
Parking
Surface
Parking
Total
Parking Amenity NLSF Efficiency Residential
Parking
Residential
Units
S1 Sublevel Parking 21,125 22,825 63 63 22,825 362 63
1 Lobby / Parking / Units 21,125 - - - 22,825 1,240 17,052 75%21
2 Units / Amenity 21,125 22,825 - 18,032 79%22
3 Units 21,125 22,825 18,032 79%22
84,500 22,825 63 0 63 0 91,300 1,240 53,116 58%63 65
Gross SF Parking GSF Structured
Parking
Surface
Parking
Total
Parking
Commercial GSF Residential GSF Amenity NLSF Efficiency Residential
Parking
Residential
Units
METRICS
Site SF 561,052 SF Unit Type Mix Qty Total Beds Avg Unit NLSF Total NLSF
Site Acreage 12.88 Acres Micro 0%- - 350 -
Dwelling Units 65 DU Studio 5%3 3 540 1,620
Dwelling Unit per Acre 5 DU/Acre 1 BR 42%27 27 700 16,496
2 BR 54%35 70 1,000 35,000
Residential Parking Ratio Per Unit 0.97 Stalls/Unit 3 BR 0%- - 1,200 -
Residential Parking Ratio Per Bedroom 0.63 Stalls/Bed
101%65 100 861 53,116
FAR 0.11
RESIDENTIAL MIX
TOTAL PARKING RESIDENTIAL
Gross SF Residential GSF
COMMERCIAL
Commercial GSF
LAKE ELMO, MN / 09.29.2020 / 20-0018
Lake Elmo Apartments
6CONCEPT PLAN
LAKE ELMO, MN / 09.29.2020 / 20-0018
Lake Elmo Apartments
7
-
-
-
-
58 ENCLOSED PARKING STALLS / BLDG
CONCEPT PLAN
SUB LEVEL - SW BUILDING
MECH.ELEC.0’30’
LAKE ELMO, MN / 09.29.2020 / 20-0018
Lake Elmo Apartments
8
-
-
-
-
1 BR 1 BR 1 BR
1 BR1 BR1 BR
2 BR 2 BR 2 BR 2 BR 2 BR
2 BR2 BR2 BR2 BR2 BR
2 BR
1 BR
Studio
Amenity
CONCEPT PLAN
LEVEL 1 - SW BUILDING
0’30’
LAKE ELMO, MN / 09.29.2020 / 20-0018
Lake Elmo Apartments
9
-
-
-
-
-
1 BR 1 BR 1 BR
1 BR1 BR1 BR
2 BR 2 BR 2 BR 2 BR 2 BR
2 BR2 BR2 BR2 BR2 BR
2 BR
1 BR
Studio
2 BR
CONCEPT PLAN
LEVELS 2 & 3 - SW BUILDING
0’30’
DEVELOPMENT SUMMARY: Goldridge - Lake Elmo Apartments - SW BUILDING Updated 2020-09-29
DESCRIPTION Parking GSF Structured
Parking
Surface
Parking
Total
Parking Amenity NLSF Efficiency Residential
Parking
Residential
Units
S1 Sublevel Parking 22,000 22,000 58 58 22,000 379 58
1 Lobby / Parking / Units 22,000 - - - 22,000 1,240 16,400 75%19
2 Units / Amenity 22,000 22,000 - 17,380 79%20
3 Units 22,000 22,000 17,380 79%20
88,000 22,000 58 0 58 0 88,000 1,240 51,160 58% 58 59
Gross SF Parking GSF Structured
Parking
Surface
Parking
Total
Parking
Commercial GSF Residential GSF Amenity NLSF Efficiency Residential
Parking
Residential
Units
METRICS
Site SF 561,052 SF Unit Type Mix Qty Total Beds Avg Unit NLSF Total NLSF
Site Acreage 12.88 Acres Micro 0%- - 350 -
Dwelling Units 59 DU Studio 5%3 3 540 1,620
Dwelling Unit per Acre 5 DU/Acre 1 BR 35%21 21 700 14,540
2 BR 60%35 70 1,000 35,000
Residential Parking Ratio Per Unit 0.98 Stalls/Unit 3 BR 0%- - 1,200 -
Residential Parking Ratio Per Bedroom 0.62 Stalls/Bed
100%59 94 872 51,160
FAR 0.12
RESIDENTIAL MIX
TOTAL PARKING RESIDENTIAL
Gross SF Residential GSF
COMMERCIAL
Commercial GSF
LAKE ELMO, MN / 09.29.2020 / 20-0018
Lake Elmo Apartments
10
3/16”=1’-0”
LAKE ELMO, MN / 09.29.2020 / 20-0018
Lake Elmo Apartments
11CONCEPT PLAN
STUDIO
3/16”=1’-0”
LAKE ELMO, MN / 09.29.2020 / 20-0018
Lake Elmo Apartments
12CONCEPT PLAN
ONE BEDROOM
3/16”=1’-0”
LAKE ELMO, MN / 09.29.2020 / 20-0018
Lake Elmo Apartments
13CONCEPT PLAN
TWO BEDROOM
3/16”=1’-0”
LAKE ELMO, MN / 09.29.2020 / 20-0018
Lake Elmo Apartments
14CONCEPT PLAN
TWO BEDROOM
Asphalt shingle roof
Fiber cement shingle siding
Fiber cement lap siding
Fiber cement panel siding
Manufactured stone
Fiberglass windows
45’-0”38’-8”LAKE ELMO, MN / 09.29.2020 / 20-0018
Lake Elmo Apartments
15CONCEPT PLAN
LEVEL 1 CONCEPTUAL IMAGE
9/3/2020 FOCUS Engineering, Inc. Mail - Lake Elmo Apartments (Goldridge Group) Concept Site Plan Review
https://mail.google.com/mail/u/0?ik=885060bd59&view=pt&search=all&permthid=thread-a%3Ar6403840559797302709%7Cmsg-a%3Ar-89066490357…1/1
Jack Griffin <jack.griffin@focusengineeringinc.com>
Lake Elmo Apartments (Goldridge Group) Concept Site Plan Review
1 message
Jack Griffin <Jack.Griffin@focusengineeringinc.com>Thu, Sep 3, 2020 at 11:37 AM
To: Ken Roberts <KRoberts@lakeelmo.org>
Cc: Chad Isakson <Chad.Isakson@focusengineeringinc.com>
Ken,
Please see the attached engineering review comments for the Lake Elmo Apartments (Goldridge Group) Concept Site
Plan review. Let me know if you have any questions or require any further reviews.
Thanks ~Jack
John (Jack) W. Griffin, P.E.
Principal / Sr. Municipal Engineer
FOCUS ENGINEERING, INC.
651.300.4264
jack.griffin@focusengineeringinc.com
2020-09-03 Lake Elmo Apartments Concept Plan Review.pdf
108K
PAGE 1 of 3
MEMORANDUM
Date: September 3, 2020
To: Ken Roberts, Planner Director Re: Lake Elmo Apartments (Goldridge Group)
Cc: Chad Isakson, Assistant City Engineer Concept Site Plan Review
From: Jack Griffin, P.E., City Engineer
We have reviewed the Lake Elmo Apartments Concept PUD Plans. The Concept Site Plans consisted of the
following documentation received on August 14, 2020:
Ridge Apartments Narrative dated August 12, 2020.
Goddard School Narrative dated August 12, 2020.
Concept Site Plan dated August 7, 2020.
Existing Conditions Plan dated August 7, 2020.
Engineering has the following review comments:
EXISTING CONDITIONS PLAN
The existing conditions plan is incomplete and does not provide the minimum information necessary to
facilitate a thorough review of the potential impacts by the development. Existing conditions information
is required throughout the proposed development site and extended for a minimum distance of 350 feet
from all property lines. Complete existing conditions information must be part of any preliminary plat
application for the application to be deemed complete.
Existing contours must be clearly labeled; power transmission poles and lines must be clearly shown;
existing buildings must be shown and labeled; all existing trees must be shown; and other significant
features shall also be shown.
The existing conditions along Hudson Boulevard and Julia Avenue must be fully detailed, including existing
right‐of‐way width; and pavement width, lane widths, and shoulder widths must be labeled.
Location, material type and size of existing sewers, water mains, culverts, and other underground utilities
within the tract and to a distance of 350 feet beyond the tract, the data as grades, invert elevations, and
locations of catch basins, and manholes shall also be shown.
STREETS AND TRANSPORTATION
Hudson Boulevard Improvements. Hudson Boulevard must be improved along the frontage of the
proposed development in accordance with the Hudson Boulevard Design Standards, with an Urban
section along the north boulevard and bituminous trail (see attached exhibit). A three‐lane roadway (per
the Hudson Boulevard typical sections) must be constructed along the west side of the plat to provide for
a left turn lane into the site, then transitioning to a two‐lane roadway with a dedicated left turn lane at
Julia Avenue. These improvements must be part of any preliminary plat application for the application to
be deemed complete.
Hudson Boulevard Right‐of‐Way Dedication. Additional right‐of‐way must be dedicated to the City along
Hudson Boulevard, as needed, to accommodate the Hudson Boulevard Improvements, including a 10‐foot
utility easement along the north side to be reserved for small utilities.
FOCUS ENGINEERING, inc.
Cara Geheren, P.E. 651.300.4261
Jack Griffin, P.E. 651.300.4264
Ryan Stempski, P.E. 651.300.4267
Chad Isakson, P.E. 651.300.4285
PAGE 2 of 3
Julia Avenue Right‐of‐Way Dedication. Additional right‐of‐way must be dedicated to the City to provide a
minimum 100‐foot right‐of‐way along the full length of Julia Avenue. In addition, a 10‐foot dedicated
utility easement must be provided directly adjacent to the 100‐foot Julia Avenue right‐of‐way. The
Concept plan appears to show the Daycare parking lot encroaching the Julia Avenue right‐of‐way. This
must be revised as part of any preliminary plat submittal.
Site Access. The concept plan proposes two new access locations for the development; one along Hudson
Boulevard and one along Julia Avenue.
The proposed Hudson Boulevard access is shown to be located approximately 250 feet east of the
existing Gatsby property, and approximately 750 feet west of the intersection with Julia Avenue.
This access location is consistent with the Hudson Boulevard design requirements. Intersection
and turning movement details must be provided with any preliminary plat submittal.
The proposed Julia Avenue access is shown to be located approximately 325 feet north of the
Hudson Boulevard intersection and generally aligned with the Springs development access
location to Julia Avenue. This access location is consistent with the requirements along Julia
Avenue. Intersection and turning movement details must be provided with any preliminary plat
submittal for further review.
Trail Connectivity. The City should review the site plan to determine trail connection requirements along
Hudson Boulevard and Julia Avenue.
Private Streets. The streets interior to the development are proposed to remain privately owned and
maintained. Interior street design may require revisions to provide adequate fire lanes and safety access.
The preliminary plat application must detail the private street typical sections, geometrics and proposed
uses (e.g. parking) for further city review.
MUNICIPAL SANITARY SEWER
The proposed site is guided in the City’s Comprehensive Plan for Phase I of the Regional Sewer Staging
Plan and would discharge to the MCES WONE Interceptor.
The concept plan does not include a sanitary sewer utility plan for review but is proposing 177 Apartment
units, an amenity facility with pool, and a school facility to accommodate 188 children plus staff. As part
of any preliminary plat application to be deemed complete, the applicant must provide a detailed
accounting of the proposed maximum sewer usage for the development, consistent with the Met Council
SAC manual methodology.
Sanitary sewer service is available to the site. The applicant will be responsible to connect to the City
sanitary sewer system, connecting to the existing 12‐inch sanitary sewer located along Hudson Boulevard,
and extend sanitary sewer into the development at applicant’s sole cost.
Existing Utility Easements. The existing sanitary sewer utility easements along Hudson Boulevard must be
shown with any preliminary plat submittal and plan revisions must be made to avoid
encroachments/conflicts with these easements.
Ongoing ownership and maintenance of the internal site sanitary sewer system will need to be
determined as part of the preliminary plat application. Any sanitary sewer main lines placed within the
development will require minimum 30‐foot easements centered over the pipe (or wider dependent upon
the sewer depths) dedicated to the City and in the form of the City’s Utility Easement Agreement.
MUNICIPAL WATER SUPPLY
The concept plan does not include a watermain utility plan for review but is proposing 177 Apartment
units, an amenity facility with pool, and a school facility to accommodate 188 children plus staff. As part
of any preliminary plat application to be deemed complete, the applicant must provide a detailed
accounting of the domestic and fire suppression demands for the development so that staff may verify
adequate water system capacity and pressures.
Municipal water service is available to the site. The applicant will be responsible to connect to the city
water system, connecting to the existing 12‐inch watermain located along Hudson Boulevard, and extend
minimum 8‐inch watermain into the development at applicant’s sole cost. The applicant will be required
PAGE 3 of 3
to construct a looped watermain network internal to the site with additional watermain connections to
the existing watermain along Julia Avenue, and to the watermain stub from the Union Park development
to the north.
No watermain pipe oversizing is anticipated at this time. Further review will be completed as the
application moves forward through the process.
The applicant will be responsible to place hydrants throughout the property at the direction of the Fire
Department. All fire hydrants shall be owned and maintained by the City.
Any watermain lines and hydrants placed within the development will require minimum 30‐foot
easements centered over the pipe. Easements must be dedicated to the city and be provided in the city’s
standard form of easement agreement.
STORMWATER MANAGEMENT
The concept plan shows potential stormwater pond locations for addressing stormwater management
requirements. However, no details are provided at this time to determine if stormwater management can
be adequately addressed as shown. The proposed development is subject to a storm water management
plan meeting State, Watershed District and City rules. A permit will be required from the Minnesota
Pollution Control Agency and applicable watershed district.
Storm water facilities proposed as part of the site plan to meet State and watershed permitting
requirements must be constructed in accordance with the City Engineering Design Standards Manual.
Permitting requirements will require rate control from all points of discharge from the site and will
require volume control (or infiltration). Overland emergency overflows or outlets are required as part of
the site plan for flood protection. The site plan will likely require additional storm water ponding or
infiltration to satisfy all storm water regulations.
If storm water ponds (detention) and infiltration basins are proposed, the 100‐year high water flood level
(HWL) for each basin must be fully contained within private property.
To the extent adjacent properties are impacted by storm water management discharges, written
permission from those properties must be submitted as part of the development applications.
The storm water facilities constructed for this development should remain privately owned and
maintained. The applicant will be required to execute and record a Stormwater Maintenance and
Easement Agreement in the City’s standard form of agreement.
Even as privately owned and maintain facilities, maintenance access roads meeting the City engineering
design standards must be provided for all storm water facilities.
1/30/20199:05:06 AMryansundberg 200
SCALE IN FEET
CITY OF LAKE ELMO
INWOOD AVE (CSAH 13) TO KEATS AVE (CSAH 19)
PRELIMINARY CONCEPT LAYOUT
HUDSON BOULEVARD
4
OF
3
SHEETE TRAIL) (JADINPLACE CONTINUOUS STREETINPLACE COMMERICAL ACCESSINPLACE COMMERICAL ACCESSINPLACE COMMERICAL ACCESSINPLACE COMMERICAL ACCESSCOMMERICAL DRIVEWAYCOMMERICAL DRIVEWAYTH 94 EB
TH 94 WB
10-FT UTILITY ESMT INP ROW (50' FROM {)
INP ROW (50' FROM {)
UTIL ESMT (60' FROM {)
1
6
1/30/20199:17:59 AMryansundberg 200
SCALE IN FEET
CITY OF LAKE ELMO
INWOOD AVE (CSAH 13) TO KEATS AVE (CSAH 19)
PRELIMINARY CONCEPT LAYOUT
HUDSON BOULEVARD
4
OF
4
SHEETCSAH 19 (KEATS AVE NB)CSAH 19 (KEATS AVE SB)I
NPL
ACE C
O
MMERIC
AL
AC
CESS
FUTURE CONTINUOUS STREET TO 5TH STREET N.
TH 94 EB
TH 94 WB ONLY ACCESSRIGHT OUTA
P
P
R
O
V
E
D
F
U
L
L
A
C
C
E
S
S
I
N
P
L
A
C
E
FI
E
L
D
A
C
C
E
S
S/
APP
R
O
VE
D F
ULL
AC
CESS
INP ROW (50' FROM {)
UTIL ESMT (60' FROM {)
INP ROW (50' FROM {)
UTIL ESMT (60' FROM {)
INP RTL
ACCESS
APPROVED
660' TO
ACCESS
APPROVED
660' TO
A
P
P
R
O
V
E
D
C
O
MME
RI
C
A
L
A
C
C
E
S
S
OF LTL & RTL FOR SU-PATH
ADDN'L ROW REQ'D WITH CONST.
ACCESS RANGE
POTENTIAL FULL
CONST. OF TURN LANES
ADDN'L ROW REQ'D WITH
FULL ACCESS)(ELIMINATED WITH POTENTIAL INPLACE RESIDENTIAL DRIVEWAY2
6
“Proudly Serving Neighbors & Friends”
Lake Elmo Fire Department
Memorandum
To: Ken Roberts, Planning Director
From: Dustin Kalis, Fire Chief
Date: 9/25/2020
Re: Preliminary Plan Review – Goldridge Lake Elmo Apartments
_______________________________________________________________________________________
The Lake Elmo Fire Department has completed a preliminary plan review of the Goldridge Lake Elmo
Apartments based on plans dated 8/27/2020 with the following comments:
1. All roads and drive lane shall meet the Lake Elmo Fire Department requirements for widths and turning
radiuses. Provide layout showing Lake Elmo Fire Apparatus turning radius overlay on drive lanes.
2. Dead-end fire apparatus access roads in excess of 150 feet shall be provided with width and
turnaround provision in accordance to the Fire Code. Currently all three parking areas create dead-end
fire apparatus access roads.
3. An approved signage and marking plan shall be determined for all No Parking and Fire Lane access
roads.
4. Fire hydrants shall be provided in approved locations following review by Engineering and Public
Works.
5. Building address numbers shall be plainly visible from the street fronting the property and shall
contrasting color from the background.
6. A Fire Department lock box is required for emergency access to building at an approved location(s) and
provide keys for emergency access into and throughout the occupancy as required.
7. The fire sprinkler system shall be installed compliant with provisions of 2016 NFPA Standard 13,
Installation of Sprinkler Systems. Class I standpipes are required in each stairwell. City permit required
prior to initiation of work.
8. Fire Department sprinkler connection location to be approved prior to installation.
9. The fire alarm system, shall be installed compliant with provisions of 2016 NFPA Standard 72, National
Fire Alarm Code. City permit required prior to initiation of work.
10. The sprinkler system shall be properly monitored by a qualified monitoring company.
11. Install emergency egress illumination in the means of egress including exit discharge compliant with
2020 MSFC.
“Proudly Serving Neighbors & Friends”
12. Install compliant exit signage as required by the 2020 MSFC.
13. Provide and install dry chemical fire extinguishers certified for service and tagged as required. Service
classification rating shall be a minimum 2A classification rating and maximum travel distance of 75 feet
to extinguishers. The minimum classification rating may be upgraded for special or extra hazard areas
within the occupancy.
14. Rooms containing controls for air-conditioning systems, roof access, elevator equipment, sprinkler
risers and valves, or other fire detection, suppression or control elements shall be identified for the use
of the fire department. Approved signs required to identify fire protection equipment and equipment
location, shall be constructed of durable materials, permanently installed and readily visible.
Codes and Standards Used for this Review
This review is based on the following codes and standards as adopted and in effect in the State of
Minnesota at the time of plan submittal.
o 2020 Minnesota State Fire Code
o NFPA 72, 2016 edition
o NFPA 13, 2016 edition
1
Resolution 2020-087
CITY OF LAKE ELMO
WASHINGTON COUNTY
STATE OF MINNESOTA
RESOLUTION NO. 2020 - 087
RESOLUTION APPROVING THE GOLDRIDGE GROUP MIXED USE DEVELOPMENT
(APARTMENTS AND CHILD CARE CENTER) CONCEPT PUD PLANS
WHEREAS, the City of Lake Elmo is a municipal corporation organized and existing under
the laws of the State of Minnesota; and
WHEREAS, Goldridge Group, LLP, c/o Brad Coats, 310 Pinnacle Way, Suite 300, Eau
Claire Wisconsin submitted an application to the City of Lake Elmo (City) for a Concept PUD Plan
for a 189 unit, attached housing (apartment) and child care center mixed use planned unit
development on a 14.15 acre site located at the intersection of Hudson Boulevard and Julia Avenue,
a copy of which is on file in the City of Lake Elmo Planning Department; and
WHEREAS, notice was published, mailed and posted pursuant to the Lake Elmo Zoning
Ordinance, Section 154.102; and
WHEREAS, the Lake Elmo Planning Commission held public hearing on September 14,
2020 to review and consider the Concept PUD approval request; and
WHEREAS, the Lake Elmo Planning Commission adopted a motion recommending to the
City Council approval of the Concept PUD subject to 17 conditions of approval; and
WHEREAS, the Lake Elmo Planning Director submitted a report and recommendation
regarding the Concept PUD as part of a memorandum to the City Council for the October 6, 2020
City C ouncil Meeting; and
WHEREAS, the City Council reviewed the Concept PUD application for the Goldridge
Group at its meeting held on October 6, 2020 and made the following findings of fact:
1. That the 2040 Lake Elmo Comprehensive Plan and Land Use Map shows the site of the
proposed planned development designated as MU-C (mixed use commercial); and that the
PUD Concept Plan would be consistent with the goals, objectives and intent of the 2040
Lake Elmo Comprehensive Plan and the 2040 Land Use Map for this area.
2. That the PUD Concept Plan complies with the general intent of the Mixed Use Commercial
zoning district with PUD modifications.
3. That the PUD Concept Plan generally complies with the City’s Subdivision regulations.
4. That the PUD Concept Plan is generally consistent with the City’s engineering standards
with exceptions as noted in the City Engineer’s memorandum dated September 3, 2020.
5. The PUD Concept Plan meets the minimum requirement for a PUD including minimum lot
area, open space and street layout.
2
Resolution 2020-087
6. The PUD Concept Plan meets more than one of the required PUD objectives identified in
Section 154.751 including providing: 1) Innovation in land development techniques that may
be more suitable for a given parcel than conventional approaches. 2) Promotion of integrated
land uses, allowing for a mixture of residential and commercial land uses. 3) More adequate,
usable, and suitably located open space and recreational amenities and other public facility
than would otherwise be provided under conventional development techniques. 4)
Accommodation of housing of all types with convenient access to employment opportunities
and/or commercial facilities. 5) Coordination of architectural styles and building forms to
achieve greater compatibility within the development and surrounding land uses. 6) Creation
of more efficient provision of public utilities and services, lessened demand on transportation
and the promotion of energy resource conservation and 7) Higher standards of site and
building design than would otherwise be provided under conventional land development
technique.
7. The PUD Concept Plan meets and could exceed the residential density requirements provided
in the 2040 Comprehensive Plan’s Land Use Map designation (mixed-use commercial) for
this site.
NOW, THEREFORE, BE IT RESOLVED THAT the City Council does hereby approve the
revised Concept PUD Plans for the proposed mixed use development to be located at Hudson
Boulevard and Julia Avenue (dated September 29, 2020) as prepared by Goldridge Group LLP
subject to the following conditions:
1. That the future preliminary plat and preliminary PUD Plans includes the parcel with the PID#
3402921340012.
2. That the applicant prepare any future preliminary plat and preliminary PUD plans showing all of the
site perimeter property lines - including any site plan revisions necessary for the right-of-way required
for Julia Avenue, for any additional right-of-way needed for Hudson Boulevard and all required
drainage and utility easements.
3. That before submitting an application and plans to the City for preliminary PUD plan/plat approval,
the developer revise the PUD concept plans to address the staff comments and recommended changes
and to allow for additional City review.
4. That the developer submit a PUD plan as part of any future preliminary development plans. The PUD
Plan shall include a detailed listing of all requested departures or modifications from City ordinances
and development standards including having reduce parking lot setbacks and having fewer off-street
parking spaces on the site than required by the City Code.
5. That all comments of the City Engineer’s Memorandum dated September 3, 2020 be addressed with
the future preliminary plat and preliminary PUD Plans submittal. In particular, the preliminary
development plans shall address all public utility designs, storm water management and Hudson
Boulevard and trail designs.
6. That all storm water retention and infiltration areas must be dedicated to the City and platted as
outlots on the preliminary plat unless otherwise directed by the City Engineer.
7. That all trails and sidewalks (public and private) be located outside of storm water ponding areas and
wetland buffer zones.
3
Resolution 2020-087
8. That an eight-foot-wide bituminous trail be installed along Hudson Boulevard and a six-foot-wide
concrete sidewalk along the Julia Avenue as part of this development.
9. That the Preliminary Plat and PUD Plans submittal include accurate open space and impervious
surface calculations.
10. That the Preliminary Plat and PUD Plans submittal include a complete tree inventory and tree
preservation/replanting and landscape plans to be reviewed and approved by the City’s Landscape
Architect.
11. That 6 foot-wide sidewalks be provided along Julia Avenue and along the private driveways/roads
within the site as shown on the project plans.
12. That the developer provide the City fees in lieu of park land dedication as recommended by the Parks
Commission and as required by Section 153.14 with the future final plat.
13. That the preliminary plat and preliminary PUD Plans submittal include a detailed subdivision phasing
plan.
14. That the preliminary plat and preliminary PUD Plans submittal include a detailed architectural plans
that clearly identifies the various architecture styles and exterior materials for all the proposed
buildings.
15. The applicant receive a permit from the South Washington Watershed District for the construction of
the proposed development.
16. That the developer shall prepare a plan for the ownership and management of the open space and
recreation areas as part of preliminary PUD plans.
17. That all comments of the Fire Chief be addressed with any future preliminary plat plans and
preliminary PUD plan submittal.
18. That all comments of the Building Official be addressed with any future preliminary plat plans and
preliminary PUD plan submittal.
19. That the developer verify the parking needs of the Goddard School as part of their preliminary plat
and PUD application and submittal.
Passed and duly adopted this 6th day of October, 2020 by the Lake Elmo Minnesota City Council.
____________________________________
Mike Pearson, Mayor
ATTEST:
____________________________________
Julie Johnson, City Clerk