Loading...
HomeMy WebLinkAbout#08 - Pay Req. 1 for 31st St-Stw Blvd STAFF REPORT DATE: November 17, 2020 CONSENT AGENDA ITEM: Approve Pay Request No. 1 for the 31st Street & Stillwater Boulevard Watermain Extension SUBMITTED BY: Mark Scholle, Project Engineer REVIEWED BY: Kristina Handt, City Administrator Marty Powers, Public Works Director Jack Griffin, City Engineer ISSUE BEFORE COUNCIL: Should the City Council approve Pay Request No. 1 for the 31st Street & Stillwater Boulevard Watermain Extension? BACKGROUND: Miller Excavating, Inc. was awarded a construction contract on May 5, 2020 to complete the 31st Street & Stillwater Boulevard Watermain Extension. On September 15, 2020 the City approved Change Order No. 1 to significantly revise the watermain alignment and scope of work in order to avoid the UPRR crossing and reduce the overall project costs roughly $80,000. The change in project scope delayed the start of the work until early October, 2020. At this time the work is substantially completed, except for restoration, with the watermain installed, tested and ready for operation. The six properties have been notified that they are able to connect to the public watermain and have 1-year to make the connection. The original project contract had a required substantial completion date of October 31st, 2020 and final completion date of November 13, 2020, however, a tie extension to June 17, 2021 and June 30, 20121 respectively are being recommended to address final restoration and turf establishment. PROPOSAL DETAILS/ANALYSIS: Miller Excavating, Inc. has submitted Partial Pay Request No. 1 in the amount of $253,515.50. The request has been reviewed and payment is recommended in the amount requested. In accordance with the contract documents, the City has retained 5% of the total work completed. The amount retained is $13,342.92. FISCAL IMPACT: None. Partial payment is proposed in accordance with the Contract for the project. Payment remains within the authorized scope and budget. RECOMMENDATION: Staff is recommending that the City Council approve, as part of the Consent Agenda, Pay Request No. 1 for the 31st Street & Stillwater Boulevard Watermain Extension. If removed from the consent agenda, the recommended motion for the action is as follows: “Move to approve Pay Request No. 1 to Miller Excavating, Inc. in the amount of $253,515.50 for the 31st Street & Stillwater Boulevard Watermain Extension”. ATTACHMENTS: 1. Partial Pay Estimate No. 1. 11-10-2020 PARTIAL PAY ESTIMATE NO. 1 31ST STREET - STILLWATER BLVD WATERMAIN EXTENSION CITY OF LAKE ELMO, MINNESOTA PROJECT NO. 2019.124 QUANTITY UNIT PRICE AMOUNT QUANTITY AMOUNT QUANTITY AMOUNT 1 LS 1 $16,052.79 $16,052.79 1.00 $16,052.79 1.00 $16,052.79 2 LS 1 $13,984.94 $13,984.94 0.97 $13,565.39 0.97 $13,565.39 3 EA 1 $276.37 $276.37 0.00 $0.00 0.00 $0.00 4 EA 1 $3,789.51 $3,789.51 1.00 $3,789.51 1.00 $3,789.51 5 EA 3 $4,938.27 $14,814.81 3.00 $14,814.81 3.00 $14,814.81 6 LF 2 $694.36 $1,388.72 0.00 $0.00 0.00 $0.00 7 EA 3 $1,823.25 $5,469.75 3.00 $5,469.75 3.00 $5,469.75 8 EA 2 $2,317.78 $4,635.56 2.00 $4,635.56 2.00 $4,635.56 9 LF 2 $388.54 $777.08 0.00 $0.00 0.00 $0.00 10 LF 160 $72.59 $11,614.40 161.00 $11,686.99 161.00 $11,686.99 11 EA 2 $905.51 $1,811.02 6.00 $5,433.06 6.00 $5,433.06 12 EA 4 $732.87 $2,931.48 0.00 $0.00 0.00 $0.00 13 EA 6 $535.92 $3,215.52 6.00 $3,215.52 6.00 $3,215.52 14 LF 15 $63.75 $956.25 10.00 $637.50 10.00 $637.50 15 LF 70 $72.74 $5,091.80 82.00 $5,964.68 82.00 $5,964.68 16 LF 20 $134.44 $2,688.80 0.00 $0.00 0.00 $0.00 17 LF 900 $55.36 $49,824.00 845.00 $46,779.20 845.00 $46,779.20 18 LS 1 $24,163.60 $24,163.60 0.00 $0.00 0.00 $0.00 19 LF 216 $36.81 $7,950.96 0.00 $0.00 0.00 $0.00 20 LF 216 $563.02 $121,612.32 0.00 $0.00 0.00 $0.00 21 EA 2 $2,931.17 $5,862.34 0.00 $0.00 0.00 $0.00 22 LB 520 $10.64 $5,532.80 520.00 $5,532.80 520.00 $5,532.80 23 EA 8 $342.16 $2,737.28 8.00 $2,737.28 8.00 $2,737.28 24 EA 1 $57.86 $57.86 0.00 $0.00 0.00 $0.00 25 EA 1 $198.61 $198.61 0.00 $0.00 0.00 $0.00 26 EA 7 $59.78 $418.46 0.00 $0.00 0.00 $0.00 27 SY 118 $15.23 $1,797.14 118.00 $1,797.14 118.00 $1,797.14 28 SY 20 $66.52 $1,330.40 0.00 $0.00 0.00 $0.00 29 TON 50 $35.77 $1,788.50 130.00 $4,650.10 130.00 $4,650.10 30 CY 112 $54.73 $6,129.76 122.00 $6,677.06 122.00 $6,677.06 31 SY 500 $3.52 $1,760.00 0.00 $0.00 0.00 $0.00 32 SY 500 $17.59 $8,795.00 0.00 $0.00 0.00 $0.00 33 LF 450 $4.69 $2,110.50 0.00 $0.00 0.00 $0.00 34 HR 5 $145.00 $725.00 2.00 $290.00 2.00 $290.00 $332,293.33 $153,729.14 $153,729.14 TOTALS - BASE CONTRACT $332,293.33 $153,729.14 $153,729.14 CO1-1 EA 1.0 $4,938.27 $4,938.27 1.00 $4,938.27 1.0 $4,938.27 CO1-2 EA 1.0 $1,823.25 $1,823.25 1.00 $1,823.25 1.0 $1,823.25 CO1-3 EA 1.0 $4,614.58 $4,614.58 1.00 $4,614.58 1.0 $4,614.58 CO1-4 EA 1.0 $388.54 $388.54 0.00 $0.00 0.0 $0.00 CO1-5 LF 13.0 $63.75 $828.75 13.00 $828.75 13.0 $828.75 CO1-6 LF -20.0 $134.44 -$2,688.80 0.00 $0.00 0.0 $0.00 CO1-7 LF 75.0 $134.44 $10,083.00 98.00 $13,175.12 98.0 $13,175.12 CO1-8 LF 930.0 $61.80 $57,474.00 879.00 $54,322.20 879.0 $54,322.20 CO1-9 LS -1.0 $24,163.60 -$24,163.60 0.00 $0.00 0.0 $0.00 CO1-10 LF -216.0 $36.81 -$7,950.96 0.00 $0.00 0.0 $0.00 CO1-11 LF -216.0 $563.02 -$121,612.32 0.00 $0.00 0.0 $0.00 CO1-12 LS 1.0 $9,105.00 $9,105.00 1.00 $9,105.00 1.0 $9,105.00 CO1-13 EA -2.0 $2,931.17 -$5,862.34 0.00 $0.00 0.0 $0.00 CO1-14 LBS 350.0 $10.64 $3,724.00 390.00 $4,149.60 390.0 $4,149.60 CO1-15 EA 2.0 $342.16 $684.32 2.00 $684.32 2.0 $684.32 CO1-16 EA -1.0 $198.61 -$198.61 0.00 $0.00 0.0 $0.00 CO1-17 SY 50.0 $15.23 $761.50 50.00 $761.50 50.0 $761.50 CO1-18 SY 120.0 $4.00 $480.00 234.00 $936.00 234.0 $936.00 CO1-19 CY 40.0 $16.75 $670.00 93.00 $1,557.75 93.0 $1,557.75 1" CURB STOP & BOX 6" DIP, CL. 52 WATER MAIN 8" DIP, CL. 52 WATER MAIN 12" DIP, CL. 52 WATER MAIN 10" HDPE WATER MAIN, DIRECTIONAL DRILL BASE BID MOBILIZATION 1" TYPE "K" COPPER WATER SERVICE 1" CORPORATION STOP W/ SADDLE 1" CORPORATION STOP TRAFFIC CONTROL GRUBBING CONNECT TO EXISTING 12" WATER MAIN HYDRANT HYDRANT EXTENSION 6" GATE VALVE AND BOX 8" GATE VALVE AND BOX VALVE BOX EXTENSION ITEM DESCRIPTION OF PAY ITEM UNIT CONTRACT THIS PERIOD TOTAL TO DATE 12" GATE VALVE & BOX VALVE BOX EXTENSION 8" DIP, CL. 52 WATERMAIN (IN CASING) 6" DIP, CL. 52 WATER MAIN 12" DIP, CL. 52 WATER MAIN 12" DIP, CL. 52 WATER MAIN 10" HDPE WATERMAIN, DIRECTIONAL DRILL 6" GATE VALVE & BOX HYDRANT BASE BID CHANGE ORDER NO. 1 SILT FENCE, MACHINE SLICED STREET SWEEPER WITH PICK UP BROOM BORING PITS 8" DIP, CL. 52 WATERMAIN (IN CASING) 30" MIN. STEEL CASING (TRENCHLESS) TUNNEL OBSTRUCTION DUCTILE IRON FITTINGS 10" HDPE TO 8" DIP TRANSITION FITTING OFF ROAD STRUCTURE MARKER SALVAGE AND REINSTALL MAILBOX TEMPORARY MAILBOX PATCH BITUMINOUS DRIVEWAY AGGREGATE BASE CLASS 2 TOPSOIL BORROW (CV) SEED & EROSION CONTROL BLANKET REMOVE AND REPLACE GRAVEL STREET SOD BORING PITS 30" MIN. STEEL CASING (TRENCHLESS) 30" STEEL CASING RESTOCKING FEE TUNNEL OBSTRUCTION DUCTILE IRON FITTINGS 10" HDPE TO 8" DIP TRANSITION FITTING SALVAGE AND REINSTALL MAILBOX REMOVE AND REPLACE GRAVEL STREET REMOVE BITUMINOUS PAVEMENT - STREET PATCH COMMON EXCAVATION (EV) - STREET PATCH QUANTITY UNIT PRICE AMOUNT QUANTITY AMOUNT QUANTITY AMOUNT ITEM DESCRIPTION OF PAY ITEM UNIT CONTRACT THIS PERIOD TOTAL TO DATE CO1-20 TN 80.0 $31.55 $2,524.00 172.42 $5,439.85 172.4 $5,439.85 CO1-21 TN 30.0 $208.20 $6,246.00 51.84 $10,793.09 51.8 $10,793.09 CO1-22 GAL 10.0 $2.00 $20.00 0.00 $0.00 0.0 $0.00 CO1-23 CY 10.0 $54.73 $547.30 0.00 $0.00 0.0 $0.00 CO1-24 SY 50.0 $3.52 $176.00 0.00 $0.00 0.0 $0.00 CO1-25 LF 100.0 $4.69 $469.00 0.00 $0.00 0.0 $0.00 -$56,919.12 $113,129.28 $113,129.28 TOTALS - REVISED CONTRACT $275,374.21 $266,858.42 $266,858.42 BITUMINOUS TACK COAT TOPSOIL BORROW (CV) SEED & EROSION CONTROL BLANKET SILT FENCE, MACHINE SLICED SUBTOTAL - CHANGE ORDER NO. 1 AGGREGATE BASE CLASS 6 - STREET PATCH BITUMINOUS PAVEMENT SPWEB340B - STREET PATCH