HomeMy WebLinkAbout#10 - 2021-2025 Capital Improvement PlanSTAFF REPORT DATE: December 1, 2020 AGENDA ITEM: 2021-2025 CIP TO: Mayor and Council SUBMITTED BY: Kristina Handt, City Administrator BACKGROUND: In May staff developed recommendations for updates to the 2021-2025 Capital Improvement Plan (CIP) working in consultation with the Public Safety Committee, Maintenance Advisory Committee and the Parks Commission. In July, the Finance Committee reviewed the plan and made a recommendation to the Council in August. The Planning Commission held a public hearing on the 2021-2025 CIP at their November 9, 2020 meeting. There were no public comments at the meeting or written comments received prior. The Planning Commission voted 7-0 to find the CIP consistent with the 2040 Comprehensive Plan. ISSUE BEFORE COMMISSION: Should Council approve the 2021-2025 Capital Improvement Plan? PROPOSAL DETAILS/ANALYSIS: A copy of the 2021-2025 CIP is included in your packet. It includes projects that cost at least $25,000 and have a useful life span of five years or longer. Projects are prioritized and funding sources are identified. The 2021-2025 CIP includes 69 separate projects with a total estimated cost of about $72 million. These projects include street work, new facilities (city hall and fire station), equipment (fire, public works, parks and utilities), park and trail improvements, and utility infrastructure. FISCAL IMPACT: The total estimated costs of all the projects is $72 million. Funding sources are identified for each project with a summary included on page 13. OPTIONS: 1) Approve the 2021-2025 CIP 2) Amend and then Approve the 2020-2024 CIP RECOMMENDATION: “Motion to approve the 2021-2025 Capital Improvement Plan” ATTACHMENT: • Draft 2021-2025 Capital Improvement Plan City of Lake Elmo Capital Improvement Program 2021 – 2025 City Council Draft 12/1/20 TABLE OF CONTENTS Introduction What is a CIP? .................................................................................................................1 Scope of the Draft CIP .....................................................................................................1 Funding Sources...............................................................................................................2 Project Priorities...............................................................................................................3 2021-2025 CIP Overview Street Projects ..................................................................................................................4 Project Highlights by Department ...................................................................................4 CIP Reports (Appendix) Projects Listings………………………………………………………………………....7 Projects by Year & Priority ..…………………………………………………………..10 Funding Source Summary……………………………………………………………...14 Projects by Funding Source 2021-2025 ……………………………………………….15 Projects by Funding Source 2021-2030 ……………………………………………….18 Projects & Funding Sources by Department…………………………………………...23 Project Detail……………………………….…………………………………………..27 INTRODUCTION What is a CIP? A Capital Improvement Program, or CIP, is a multi-year (typically 5 years) capital expenditure plan for a city’s infrastructure (such as streets, parks and utility systems), vehicles, equipment and public buildings. It identifies the major projects needed and desired by the community, their potential costs and how they would be financed. Including a project in a CIP does not commit the city to that project. The City Council must specifically authorize each one, and the associated funding, before any project may proceed. When the CIP is reviewed (ideally annually, in conjunction with the budgeting process), projects may go forward as planned, advance ahead of schedule, be removed entirely, or new projects may be added, depending upon changes in circumstances and priorities. The Minnesota Land Planning Act requires that the implementation plan portion of the Comprehensive Plan include a CIP for major infrastructure needs (transportation, wastewater, water supply, parks and open space) for a five-year time period. Cities often expand the scope of their CIPs to include other capital needs (major equipment replacements, for example) and sometimes look beyond the five-year time period, up to 20 years in the future for some projects. Such projects represent more of a “wish-list” that can be evaluated each time the plan is updated. As a part of the Comprehensive Plan, the CIP has some legal standing. Minnesota Statutes Chapter 473.865 provides that “a local governmental unit shall not adopt any official control or fiscal device which is in conflict with its comprehensive plan.” A fiscal device includes a budget or bond issue; so it is important that the plan and CIP be kept-up-to date and in sync with city budgets. The primary benefit of a CIP is as a financial planning tool to help the city plan for the impact of capital needs on future budgets and property taxes, and to help forecast the need for borrowing to undertake major projects. The information developed as part of the capital planning process can help document the need for various projects and assist the City Council to sort out competing priorities. Scope of the CIP Lake Elmo’s CIP includes all capital projects that cost at least $25,000 and have a useful life span of five years or longer. Projects include all capital needs including major repairs to buildings and equipment purchases and replacements. Any projects not meeting these parameters would be reviewed as part of the annual operating budget, but would not be included in the CIP. 1 Funding Sources The CIP identifies a possible funding source(s) for each project listed. The various funding sources are as follows: Debt Service Fund Projects financed by borrowing, later to be repaid with property taxes, and potentially special assessments depending upon the characteristics of the project. General Fund Annual operating budget, primarily funded by property tax revenues. Park Improvement Fund Existing City fund, receipts from cash-in-lieu of land park dedication fees paid by developers and others who subdivide their land. Stormwater Fund Funds come from fees paid by users of the Stormwater system Wastewater Fund Funds come from fees paid by users of the Wastewater System Vehicle Replacement Fund Fund used to segregate funds set aside for planned replacements of existing vehicles. Funds are transferred from the operating budget (primarily property taxes) and the sale of equipment. Water Fund Municipal State Aid (MSA) Funds come from fees paid by users of the Water System State aid funds allocated to the City each year; annual allocation grows as the City grows. In addition to these sources, it is possible that future projects could be funded from donations, grants, user fees or other sources not listed. In 2019 the Vehicle Replacement Fund was revived. The fund balance at 12/31/19 was $1,261,463 (including bond proceeds of $698,984). The estimated balance on 12/31/2020 is $1,265,872. The updated proposed schedule of revenues and expenditures assumes the tax rate is flat in 2021 and then back to the 2% or greater increase in the tax rate each year after that. 2 Revenue from the sale of equipment is not included in the above table. Project Priorities Capital improvement projects should be prioritized in some way so that limited funding can be allocated to those which are most important. This is difficult because the varying nature of the projects and their benefits and objectives are so disparate as to be essentially not comparable. Some public agencies have developed elaborate rating and ranking systems to try to set priorities. Complicated scoring systems may have some disadvantages because they may give a false sense of objectivity or precision to the priority setting process. Others use simpler systems, or simply do not try to compare projects that are like “apples and oranges.” There is no accepted system or “industry standard” for prioritizing projects. The following system has been utilized by staff: 1 Critical or urgent, high-priority projects that should be done if at all possible; a special effort should be made to find sufficient funding for all of the projects in this group. 2 Very important, high-priority projects that should be done as funding becomes available. 3 Important and worthwhile projects to be considered if funding is available; may be deferred to a subsequent year. 4 Less important, low-priority projects; desirable but not essential. 5 Future Consideration 2021-2025 CIP OVERVIEW For 2021 through 2025, the draft CIP includes 69 separate projects (active, pending and new recommendations) with a total estimated cost of $72 million. All cost estimates are preliminary and based on current dollars. No assumptions have been made about inflation. It will be Year Revenue Expense Balance 2021 $260,746 $810,000 $716,618 2022 $150,000 $417,500 $449,118 2023 $175,000 $469,000 $155,118 2024 $200,000 $239,000 $116,118 2025 $200,000 $55,000 $261,118 2026 $200,000 $65,000 $396,118 2027 $366,000 $1,103,000 -$340,882 2028 $650,000 $0 $309,118 2029 $200,000 $295,000 $214,118 2030 $510,000 $55,000 $669,118 3 important to refine and update costs when the plan is reviewed, especially for projects in the first year or two of the plan. Some projects beyond the five-year planning period are also included in the CIP. Most of these projects are replacements for equipment and vehicles (such as fire trucks) which may have a life span of 10, 15 or 20 years and more. The plan may include “pending” projects for which timelines (and in most cases, cost estimates) have not yet been identified. As more information is developed about the need for, cost, and possible funding sources for these projects, they will be included in future CIP updates. Street Projects The update includes the following street projects in the CIP: • PW-027, Reconstruction of roads in Tamarack Farms, Heritage Farms, 38th St/39th St and Hamlet on Sunfish Lake and Old Village Phase 5 for $8,168,000 in 2021.Grant contributions are anticipated at $3,740,000. • PW-030, CSAH 15/30th St Signal for $250,000 in 2023. • PW-031, CSAH6/Inwood Street Signal for $250,000 in 2024. • PW-034, 15th St N (MSA Street) for $1,187,500 in 2022. • PW-035, UP RR Crossing-Village Parkway for $525,000 moved to 2022 from 2021. • PW-036, UP RR Crossing-Private Drive Closure for $105,000 moved to 2022 from 2021. • PW-037, UP RR Crossing-Klondike Ave for $262,500 moved to 2022 from 2021. • PW-038, Reclaim roads in Fields of St. Croix 1 and 2, Beaut Crest, Irish Ct, remaining OV 5 streets and Old Village Phase 6 streets, Parkview, Cardinal Ridge, Cardinal View, Whistling Valley, and Torres Pines for $11,554,280 in 2022. Grant contributions are anticipated at $6,825,000. • PW-039, Reclaim roads in Tana Ridge, Carriage Station, 59th St Ct/55th St/Julep Way and Old Village Phase 7, $2,577,246 in 2023. • PW-040, Reclaim roads to be determined for $2 million in 2024. • PW-041, Reclaim roads to be determined for $2 million in 2025. • PW-052, Ideal Ave (Phase 2) for $415,000 in 2022. • PW-053, Ideal Ave (CSAH 13) from CSAH 14 to CSAH 6, for $800,000 in 2024. • PW-057, Manning Phase 3 for $1,650,000 in 2023. • PW-058, TH 36/Manning Interchange for $265,000 in 2021. • PW-066, Manning Phase 4 (I-94 up to Oakland Middle School) for $50,000 (planning) in 2024 (new) May not see actual bill from county until construction sometime later. • PW-067, Manning/Hudson Stoplight for $250,000 in 2022 is covered by developer. (new) Project Highlights by Department Administration/Finance:  AF-001, New City Hall, Fire Station and Public Works Improvements, is the only request in this department. The project costs have been increased by 3% from the 2018 estimates 4 from Leo A Daly. The project activities would be split over three years 2020-2022 since the last tenant lease expires in June 2022. However, costs are shown as two separate bond issues. Building:  B-002, Replace 2015 Jeep used for inspections in 2021 for $30,000  B-003, Replace 2017 Equinox used for inspections in 2022 for $30,000  B-004, Replace 2019 Equinox used for inspections in 2024 for $30,000 Fire:  F-010, Replace B1 (brush rig) for $60,000 in 2021.  F-011, Engine E1 replacement for $650,000 moved up to 2021  F-012, Replace B 2 (brush rig) for $90,000 in 2024  F-017, Turnout Gear Replacements for $60,000 in 2022  F-018, Tahoe CV1 replacement for $55,000 in 2025  F-019, Tahoe CV2 replacement for $52,500 in 2022. Parks and Recreation:  PR-009, Central Greenway Regional Trail for $220,000 in 2023. The segments contemplated in 2023 include the area south of the Lake Elmo Park Preserve entrance along Keats Ave and a connecting segment on CSAH 14 in front of Hagberg’s Market.  PR-015, Dump Truck for $70,000 in 2021  PR-017, New or Refurbished Ballfields for $1 million in 2022.  PR-019, Dog Park for $25,000 in 2023  PR-020, Utility Vehicle/Trail Groomer for $37,000 in 2024  PR-021, Neighborhood Trail Connections for $200,000 in 2021 (could be pushed back to 2023) (new) Public Works:  Street Projects were mentioned above  The remaining projects are equipment purchases. Costs have been updated to reflect more recent pricing. No equipment purchases are proposed for 2021 as the asphalt hot box was moved back to 2022. Sewer System:  S-003, Hamlet on Sunfish Lake Sewer, for $775,000 in 2021. This is per an agreement with MPCA. Included in this cost is city oversizing of $155,000.  S-005, Old Village Phase 5, in 2021 to include sewer along 32nd St N for $2,300,000.  S-012, Section 36 Trunk Sewer Oversizing for $120,760 in 2021 and $32,922 in 2022.  S-013, Sewer Oversizing for $1,107,763 in 2021 includes city oversizing contribution of $1 million to the Old Village Phases and the remaining to developers. Oversizing in 2022 includes oversizing for OV 5 and payments to developers.  S-016, Old Village Phase 5 and 6, includes the remaining streets from OV 5 and OV 6 for $1,175,000 in 2022.  S-017, Old Village Sewer Extension Phase Seven for $548,625 in 2023 5  S-018, Heritage Farms Sewer Extension for $1,100,000 in 2021  S-019, Vac Truck for $250,000 in 2024. Costs to be split between sewer and stormwater funds (new).  S-020, Sewer Upgrades to provide service to 180 acres for $2 million ($1m each in 2021 and 2022) will allow the city to provide sewer to the northwest area, specifically section 16 which is the 180 acres obtained in the 2019 3M lawsuit settlement. (new) Storm Water System:  SW-001, Phase 2 Regional Drainage Improvements for $800,000 in 2023. The costs and dates are estimates and will depend upon development.  SW-002, Phase 3 Regional Drainage Improvements for $500,000 in 2024. The costs and dates are estimates and will depend upon development.  SW-003, Kramer Lake Floodplain Study for $60,000 in 2024 assumes a grant from the watershed district Water System:  W-005, Old Village Phase 5 (32nd St) watermain replacement for $480,000 in 2021.  W-006, Elevated Storage Tank #3, for revised estimated costs of $275,000 in 2021 and 3,200,000 in 2022  W-008, Village East Trunk Water main, for $132,000 in 2022 (moved back to coincide with railroad crossing project).  W-010, Paint Water Tower Tank #2 for $800,000 in 2023  W-012, Well #4 pump to be pulled and rebuilt for $35,000 in 2025.  W-013, Water main Oversizing for $326,844 in 2021 and $152,184 in 2022  W-018, Water Main extension to Hamlet on Sunfish Lake and 38th/39th St for $2,805,600 consistent with road work and includes $284,000 in water funds to accommodate oversizing. Also $150,000 for water upgrades associated with other road work areas (Heritage Farms, Tamarack).  W-023, Water Meter Change out for revised cost of $50,000 each year in 2021-2023  W-024, Automated Radio Read System for $300,000 in 2023  W-025, Old Village Phase 5 and 6 watermain component of $800,000 in 2022.  W-026, Old Village water extension Phase Seven for $265,650 in 2023.  W-027, Pressure Reduction Station-Connection to WT #3 for revised cost estimate of $132,000 in 2021  W-031, Water Main extension to Parkview Estates, Cardinal Ridge, Cardinal View, Torres Pines, Whistling Valley, and Irish Ct consistent with road work and assumes state grants for $4,231,000 in 2022. Additional $100,000 is for water system upgrades in Fields 2 and Beaut Crest.  W-032, water main upgrades in Tana Ridge and Carriage Station in conjunction with road work for $100,000 in 2023.  W-033, water main upgrades for $100,000 in conjunction with annual road work in 2024.  W-034, water main upgrades for $100,000 in conjunction with annual road work in 2025. 6 Capital Improvement Plan - 2021 - 2025 City of Lake Elmo, Minnesota PROJECT LISTING20212025thru Includes Projects from All Years Admin/Finance Department Status Project #Project Name New City Hall, Fire Station, PW ImprovementsActiveAF-001 Building Department Status Project #Project Name Replacement Inspection TruckActiveB-001 Inspection VehcileNew Recommendation B-002 Inspection VehcileNew Recommendation B-003 Inspection VehicleNew Recommendation B-004 Fire Department Status Project #Project Name Replacement of Parking Lot at Station #2PendingF-005 Rescue Engine E2ActiveF-001 Tender 1ActiveF-004 SCBA ReplacementsActiveF-007 B 1ActiveF-010 E1 EngineActiveF-011 B 2ActiveF-012 T2 Tender/EngineActiveF-013 Boat and TrailerActiveF-014 RangerActiveF-015 L1 Ladder TruckActiveF-016 Turnout Gear ReplacementsActiveF-017 CV 1 (Tahoe)Active F-018 CV 2 (Tahoe)Active F-019 Parks and Recreation Status Project #Project Name 50th Street TrailPendingPR-002 Demontreville Park ImprovementsPendingPR-003 Sunfish Lake Park ImprovementsPendingPR-007 Central Greenway Regional TrailActivePR-009 Dump TruckActivePR-015 New or Refurbished BallfieldsActivePR-017 Dog ParkActivePR-019 Utility Vehicile/Trail GroomerActivePR-020 Neighborhood Trail ConnectionsNew Recommendation PR-021 Public Works Department Status Project #Project Name 2019 Street ImprovementsPendingPW-013 Vac TrailerPendingPW-023 Keats Ave/TH 36 Acceleration LanePendingPW-059 LoaderActivePW-004 TractorActivePW-006 Lake Elmo Ave at 5th St Turn LaneActivePW-010 PickupTruck / plowActivePW-019 Monday, November 16, 2020Produced Using the Plan-It Capital Planning Software 7 2020 Street ImprovementsActivePW-026 2021 Street ImprovementsActivePW-027 CSAH19/Hudson Blvd Signal & Turn LaneActivePW-029 CSAH 15/30th Street SignalActivePW-030 CSAH 6/Inwood SignalActivePW-031 15th Street North (MSA Street)Active PW-034 UP RR Crossing - Village ParkwayActivePW-035 UP RR Crossing - Private Drive ClosureActivePW-036 UP RR Crossing: Klondike AveActivePW-037 2022 Street ImprovementsActivePW-038 2023 Street ImprovementsActivePW-039 2024 Street ImprovementsActivePW-040 2025 Street IrmprovementsActivePW-041 2026 Street ImprovementsActivePW-042 Service TruckActivePW-043 Back HoeActivePW-044 Tandem Plow TruckActivePW-045 Dump Truck w/PlowActivePW-047 Mini LoaderActivePW-048 Asphalt Hot BoxActivePW-049 Dump Truck with PlowActivePW-050 Ideal Ave (CSAH 13) Phase 2ActivePW-052 Ideal Ave (CSAH 13)-Phase 3- CSAH 14 to CSAH 6ActivePW-053 SkidloaderActivePW-054 2027 Street ImprovementsActivePW-055 2028 Street ImprovementsActivePW-056 Manning Ave Phase 3ActivePW-057 TH 36/Manning InterchangeActivePW-058 Pickup w/plowActivePW-060 PickupActivePW-061 DumpTruck w/plow, sander & underbodyActivePW-062 Pickup w/lift gate & plowActivePW-063 Pickup w/lift gate & plowActivePW-064 Dump Truck w/plow, sander & underbodyActivePW-065 Manning Phase 4ActivePW-066 Manning/Hudson StoplightActivePW-067 2029 Steet ImprovementsActivePW-068 5th St./Inwood Ave Signal LightActivePW-069 2030 Street ImprovementsNew Recommendation PW-070 Sewer Department Status Project #Project Name Hamlet on Sunfish Lake Sewer ExtensionActiveS-003 Old Village Sewer Extension Phase 5ActiveS-005 Section 36 Trunk Sewer Main OversizingActiveS-012 Sewer OversizingActiveS-013 Old Village Sewer Extension Phase 7ActiveS-017 Heritage Farms Sewer ExtensionActiveS-018 VAC TruckNew Recommendation S-019 Sewer to 180 AcresNew Recommendation S-020 Storm Water Department Status Project #Project Name Phase 2 Regional Drainage ImprovementsActiveSW-001 Phase 3 Regional Drainage ImprovementsActiveSW-002 Kramer Lake Floodplain StudyActiveSW-003 Monday, November 16, 2020Produced Using the Plan-It Capital Planning Software 8 Water Department Status Project #Project Name 2019 Street Improvement Project - water componentPendingW-001 OV Sewer Extension; Phase 5; water componentActiveW-005 Elevated Storage Tank #3ActiveW-006 Hammes Estates 12" bypassActiveW-007 Village East Trunk Watermain PRVActiveW-008 Paint Water Tank at PWActiveW-010 Well #4 Pump - Pull and RebuildActiveW-012 Watermain OversizingActiveW-013 Well & Pumphouse #5ActiveW-014 2020 Street & Utility Improvements-WaterActiveW-017 2021 Street & Utility Improvements-WaterActiveW-018 Utility TruckActiveW-022 Water Meter Change OutActiveW-023 Automated Radio Read SystemActiveW-024 OV sewer extension phase 6 & 5; water componentActiveW-025 OV sewer extension Phase 7; water componentActiveW-026 Pressure Reduction Station-Connection to WT #3ActiveW-027 31st St Area Water ExtensionActiveW-029 2022 Street Projects-water componentActiveW-031 2023 Street Projects-water componentActiveW-032 2024 Street Projects-water componentActiveW-033 2025 Street Projects-water componentActiveW-034 Monday, November 16, 2020Produced Using the Plan-It Capital Planning Software 9 Capital Improvement Plan - 2021 - 2025 City of Lake Elmo, Minnesota PROJECTS BY YEAR & PRIORITY 2021 2025thru Project Name Department Project #Priority Project Cost 2021 Priority 1 Critical F-011E1 Engine 1 650,000Fire Department W-006Elevated Storage Tank #3 1 275,000Water Department W-023Water Meter Change Out 1 50,000Water Department 975,000Total for: Priority 1 Priority 2 Very Important AF-001New City Hall, Fire Station, PW Improvements 2 5,896,750Admin/Finance Department B-002Inspection Vehcile 2 30,000Building Department PR-021Neighborhood Trail Connections 2 200,000Parks and Recreation PW-058TH 36/Manning Interchange 2 265,000Public Works Department 6,391,750Total for: Priority 2 Priority 3 Important F-010B 1 3 60,000Fire Department PR-015Dump Truck 3 70,000Parks and Recreation PW-0272021 Street Improvements 3 8,168,000Public Works Department S-003Hamlet on Sunfish Lake Sewer Extension 3 883,000Sewer Department S-005Old Village Sewer Extension Phase 5 3 2,298,100Sewer Department S-012Section 36 Trunk Sewer Main Oversizing 3 120,760Sewer Department S-013Sewer Oversizing 3 107,763Sewer Department S-018Heritage Farms Sewer Extension 3 1,100,000Sewer Department S-020Sewer to 180 Acres 3 1,000,000Sewer Department W-005OV Sewer Extension; Phase 5; water component 3 480,000Water Department W-013Watermain Oversizing 3 326,844Water Department W-0182021 Street & Utility Improvements-Water 3 2,805,600Water Department W-027Pressure Reduction Station-Connection to WT #3 3 132,000Water Department 17,552,067Total for: Priority 3 24,918,817Total for 2021 2022 Priority 1 Critical F-017Turnout Gear Replacements 1 60,000Fire Department PR-017New or Refurbished Ballfields 1 1,000,000Parks and Recreation PW-050Dump Truck with Plow 1 265,000Public Works Department W-006Elevated Storage Tank #3 1 3,200,000Water Department W-023Water Meter Change Out 1 50,000Water Department 4,575,000Total for: Priority 1 Priority 2 Very Important AF-001New City Hall, Fire Station, PW Improvements 2 5,381,750Admin/Finance Department PW-035UP RR Crossing - Village Parkway 2 525,000Public Works Department Monday, November 16, 2020Produced Using the Plan-It Capital Planning Software 10 Project Name Department Project #Priority Project Cost PW-036UP RR Crossing - Private Drive Closure 2 105,000Public Works Department PW-037UP RR Crossing: Klondike Ave 2 262,500Public Works Department PW-067Manning/Hudson Stoplight 2 250,000Public Works Department W-008Village East Trunk Watermain PRV 2 132,000Water Department 6,656,250Total for: Priority 2 Priority 3 Important B-003Inspection Vehcile 3 30,000Building Department F-019CV 2 (Tahoe)3 52,500Fire Department PW-03415th Street North (MSA Street)3 1,187,500Public Works Department PW-0382022 Street Improvements 3 11,554,280Public Works Department PW-052Ideal Ave (CSAH 13) Phase 2 3 415,000Public Works Department PW-054Skidloader 3 70,000Public Works Department S-005Old Village Sewer Extension Phase 5 3 1,400,400Sewer Department S-012Section 36 Trunk Sewer Main Oversizing 3 32,922Sewer Department S-020Sewer to 180 Acres 3 1,000,000Sewer Department W-013Watermain Oversizing 3 152,184Water Department W-025OV sewer extension phase 6 & 5; water component 3 800,000Water Department W-0312022 Street Projects-water component 3 4,331,000Water Department 21,025,786Total for: Priority 3 Priority 4 Less Important PW-049Asphalt Hot Box 4 50,000Public Works Department 50,000Total for: Priority 4 32,307,036Total for 2022 2023 Priority 1 Critical W-023Water Meter Change Out 1 50,000Water Department 50,000Total for: Priority 1 Priority 2 Very Important PW-004Loader 2 185,000Public Works Department PW-006Tractor 2 130,000Public Works Department PW-044Back Hoe 2 85,000Public Works Department PW-048Mini Loader 2 120,000Public Works Department 520,000Total for: Priority 2 Priority 3 Important PR-009Central Greenway Regional Trail 3 220,000Parks and Recreation PW-030CSAH 15/30th Street Signal 3 250,000Public Works Department PW-0392023 Street Improvements 3 2,577,246Public Works Department PW-057Manning Ave Phase 3 3 1,650,000Public Works Department S-017Old Village Sewer Extension Phase 7 3 548,625Sewer Department SW-001Phase 2 Regional Drainage Improvements 3 800,000Storm Water Department W-026OV sewer extension Phase 7; water component 3 265,650Water Department W-0322023 Street Projects-water component 3 100,000Water Department 6,411,521Total for: Priority 3 Priority 4 Less Important PR-019Dog Park 4 25,000Parks and Recreation W-010Paint Water Tank at PW 4 800,000Water Department 825,000Total for: Priority 4 Monday, November 16, 2020Produced Using the Plan-It Capital Planning Software 11 Project Name Department Project #Priority Project Cost 7,806,521Total for 2023 2024 Priority 2 Very Important S-019VAC Truck 2 250,000Sewer Department 250,000Total for: Priority 2 Priority 3 Important B-004Inspection Vehicle 3 30,000Building Department F-012B 2 3 90,000Fire Department PR-020Utility Vehicile/Trail Groomer 3 37,000Parks and Recreation PW-031CSAH 6/Inwood Signal 3 250,000Public Works Department PW-0402024 Street Improvements 3 2,000,000Public Works Department PW-053Ideal Ave (CSAH 13)-Phase 3- CSAH 14 to CSAH 6 3 800,000Public Works Department PW-060Pickup w/plow 3 41,000Public Works Department SW-002Phase 3 Regional Drainage Improvements 3 500,000Storm Water Department SW-003Kramer Lake Floodplain Study 3 60,000Storm Water Department W-024Automated Radio Read System 3 300,000Water Department W-0332024 Street Projects-water component 3 100,000Water Department 4,208,000Total for: Priority 3 Priority 4 Less Important PW-019PickupTruck / plow 4 41,000Public Works Department 41,000Total for: Priority 4 4,499,000Total for 2024 2025 Priority 1 Critical PW-066Manning Phase 4 1 50,000Public Works Department 50,000Total for: Priority 1 Priority 3 Important F-018CV 1 (Tahoe)3 55,000Fire Department PW-0412025 Street Irmprovements 3 2,000,000Public Works Department W-012Well #4 Pump - Pull and Rebuild 3 35,000Water Department W-0342025 Street Projects-water component 3 100,000Water Department 2,190,000Total for: Priority 3 2,240,000Total for 2025 GRAND TOTAL 71,771,374 Monday, November 16, 2020Produced Using the Plan-It Capital Planning Software 12 Capital Improvement Plan - 2021 - 2025 City of Lake Elmo, Minnesota FUNDING SOURCE SUMMARY 2021 thru 2025 TotalSource20212022202320242025 Debt Service 45,703,41415,733,613 18,293,930 6,375,871 3,300,000 2,000,000 General Fund 185,000135,000 50,000 Grants/Donation 18,977,6006,111,600 12,806,000 60,000 Municipal Sate Aid (MSA)1,687,5001,187,500 250,000 250,000 Park Dedication Fund 445,000200,000 245,000 Sewer Fund 345,682120,760 32,922 17,000 175,000 Storm Water Fund 92,00017,000 75,000 Vehicle Replacement Fund 1,990,500810,000 417,500 469,000 239,000 55,000 Water Fund 2,344,678942,844 434,184 432,650 400,000 135,000 23,918,817 33,307,036 7,806,521 4,499,000 2,240,000 71,771,374GRAND TOTAL Monday, November 16, 2020Produced Using the Plan-It Capital Planning Software 13 Capital Improvement Plan - 2021 - 2025 City of Lake Elmo, Minnesota PROJECTS BY FUNDING SOURCE 2021 2025thru TotalSourceProject #Priority 2021 2022 2023 2024 2025 Debt Service AF-001 11,278,5005,896,750 5,381,750New City Hall, Fire Station, PW Improvements 2 PW-027 4,428,0004,428,0002021 Street Improvements 3 PW-036 105,000105,000UP RR Crossing - Private Drive Closure 2 PW-037 262,500262,500UP RR Crossing: Klondike Ave 2 PW-038 4,729,2804,729,2802022 Street Improvements 3 PW-039 2,577,2462,577,2462023 Street Improvements 3 PW-040 2,000,0002,000,0002024 Street Improvements 3 PW-041 2,000,0002,000,0002025 Street Irmprovements 3 PW-052 415,000415,000Ideal Ave (CSAH 13) Phase 2 3 PW-053 800,000800,000Ideal Ave (CSAH 13)-Phase 3- CSAH 14 to CSAH 6 3 PW-057 1,650,0001,650,000Manning Ave Phase 3 3 PW-058 265,000265,000TH 36/Manning Interchange 2 S-003 883,000883,000Hamlet on Sunfish Lake Sewer Extension 3 S-005 3,698,5002,298,100 1,400,400Old Village Sewer Extension Phase 5 3 S-013 107,763107,763Sewer Oversizing 3 S-017 548,625548,625Old Village Sewer Extension Phase 7 3 S-018 1,100,0001,100,000Heritage Farms Sewer Extension 3 S-020 2,000,0002,000,000Sewer to 180 Acres 3 SW-001 800,000800,000Phase 2 Regional Drainage Improvements 3 SW-002 500,000500,000Phase 3 Regional Drainage Improvements 3 W-005 480,000480,000OV Sewer Extension; Phase 5; water component 3 W-006 3,475,000275,000 3,200,000Elevated Storage Tank #3 1 W-010 800,000800,000Paint Water Tank at PW 4 W-025 800,000800,000OV sewer extension phase 6 & 5; water component 3 45,703,41415,733,613 18,293,930 6,375,871 3,300,000 2,000,000Debt Service Total General Fund F-017 60,00060,000Turnout Gear Replacements 1 PW-035 25,00025,000UP RR Crossing - Village Parkway 2 PW-049 50,00050,000Asphalt Hot Box 4 PW-066 50,00050,000Manning Phase 4 1 185,000135,000 50,000General Fund Total Grants/Donation PR-017 1,000,0001,000,000New or Refurbished Ballfields 1 PW-027 3,740,0003,740,0002021 Street Improvements 3 PW-035 500,000500,000UP RR Crossing - Village Parkway 2 PW-038 6,825,0006,825,0002022 Street Improvements 3 PW-067 250,000250,000Manning/Hudson Stoplight 2 SW-003 60,00060,000Kramer Lake Floodplain Study 3 W-018 2,371,6002,371,6002021 Street & Utility Improvements-Water 3 W-031 4,231,0004,231,0002022 Street Projects-water component 3 Monday, November 16, 2020Produced Using the Plan-It Capital Planning Software 14 TotalSourceProject #Priority 2021 2022 2023 2024 2025 18,977,6006,111,600 12,806,000 60,000Grants/Donation Total Municipal Sate Aid (MSA) PW-030 250,000250,000CSAH 15/30th Street Signal 3 PW-031 250,000250,000CSAH 6/Inwood Signal 3 PW-034 1,187,5001,187,50015th Street North (MSA Street)3 1,687,5001,187,500 250,000 250,000Municipal Sate Aid (MSA) Total Park Dedication Fund PR-009 220,000220,000Central Greenway Regional Trail 3 PR-019 25,00025,000Dog Park 4 PR-021 200,000200,000Neighborhood Trail Connections 2 445,000200,000 245,000Park Dedication Fund Total Sewer Fund PW-044 17,00017,000Back Hoe 2 S-012 153,682120,760 32,922Section 36 Trunk Sewer Main Oversizing 3 S-019 175,000175,000VAC Truck 2 345,682120,760 32,922 17,000 175,000Sewer Fund Total Storm Water Fund PW-044 17,00017,000Back Hoe 2 S-019 75,00075,000VAC Truck 2 92,00017,000 75,000Storm Water Fund Total Vehicle Replacement Fund B-002 30,00030,000Inspection Vehcile 2 B-003 30,00030,000Inspection Vehcile 3 B-004 30,00030,000Inspection Vehicle 3 F-010 60,00060,000B 1 3 F-011 650,000650,000E1 Engine 1 F-012 90,00090,000B 2 3 F-018 55,00055,000CV 1 (Tahoe)3 F-019 52,50052,500CV 2 (Tahoe)3 PR-015 70,00070,000Dump Truck 3 PR-020 37,00037,000Utility Vehicile/Trail Groomer 3 PW-004 185,000185,000Loader2 PW-006 130,000130,000Tractor2 PW-019 41,00041,000PickupTruck / plow 4 PW-044 34,00034,000Back Hoe 2 PW-048 120,000120,000Mini Loader 2 PW-050 265,000265,000Dump Truck with Plow 1 PW-054 70,00070,000Skidloader3 PW-060 41,00041,000Pickup w/plow 3 1,990,500810,000 417,500 469,000 239,000 55,000Vehicle Replacement Fund Total Monday, November 16, 2020Produced Using the Plan-It Capital Planning Software 15 TotalSourceProject #Priority 2021 2022 2023 2024 2025 Water Fund PW-044 17,00017,000Back Hoe 2 W-008 132,000132,000Village East Trunk Watermain PRV 2 W-012 35,00035,000Well #4 Pump - Pull and Rebuild 3 W-013 479,028326,844 152,184Watermain Oversizing 3 W-018 434,000434,0002021 Street & Utility Improvements-Water 3 W-023 150,00050,000 50,000 50,000Water Meter Change Out 1 W-024 300,000300,000Automated Radio Read System 3 W-026 265,650265,650OV sewer extension Phase 7; water component 3 W-027 132,000132,000Pressure Reduction Station-Connection to WT #3 3 W-031 100,000100,0002022 Street Projects-water component 3 W-032 100,000100,0002023 Street Projects-water component 3 W-033 100,000100,0002024 Street Projects-water component 3 W-034 100,000100,0002025 Street Projects-water component 3 2,344,678942,844 434,184 432,650 400,000 135,000Water Fund Total 71,771,37423,918,817 33,307,036 7,806,521 4,499,000 2,240,000GRAND TOTAL Monday, November 16, 2020Produced Using the Plan-It Capital Planning Software 16 Capital Improvement Plan - 2021 - 2025 City of Lake Elmo, Minnesota PROJECTS BY FUNDING SOURCE 2021 2030thru Total20212022202320242025Source20262027202820292030 #Priority Debt Service 11,278,5005,896,750 5,381,750New City Hall, Fire Station, PW Improvements AF-001 2 4,428,0004,428,0002021 Street Improvements PW-027 3 105,000105,000UP RR Crossing - Private Drive Closure PW-036 2 262,500262,500UP RR Crossing: Klondike Ave PW-037 2 4,729,2804,729,2802022 Street Improvements PW-038 3 2,577,2462,577,2462023 Street Improvements PW-039 3 2,000,0002,000,0002024 Street Improvements PW-040 3 2,000,0002,000,0002025 Street Irmprovements PW-041 3 2,000,0002,000,0002026 Street Improvements PW-042 3 415,000415,000Ideal Ave (CSAH 13) Phase 2 PW-052 3 800,000800,000Ideal Ave (CSAH 13)-Phase 3- CSAH 14 to CSAH 6 PW-053 3 2,000,0002,000,0002027 Street Improvements PW-055 3 2,000,0002,000,0002028 Street Improvements PW-056 3 1,650,0001,650,000Manning Ave Phase 3 PW-057 3 265,000265,000TH 36/Manning Interchange PW-058 2 2,000,0002,000,0002029 Steet Improvements PW-068 3 2,000,0002,000,0002030 Street Improvements PW-070 3 883,000883,000Hamlet on Sunfish Lake Sewer Extension S-003 3 3,698,5002,298,100 1,400,400Old Village Sewer Extension Phase 5 S-005 3 107,763107,763Sewer Oversizing S-013 3 548,625548,625Old Village Sewer Extension Phase 7 S-017 3 1,100,0001,100,000Heritage Farms Sewer Extension S-018 3 2,000,0002,000,000Sewer to 180 Acres S-020 3 800,000800,000Phase 2 Regional Drainage Improvements SW-001 3 Monday, November 16, 2020Produced Using the Plan-It Capital Planning Software 17 Total20212022202320242025Source20262027202820292030 #Priority 500,000500,000Phase 3 Regional Drainage Improvements SW-002 3 480,000480,000OV Sewer Extension; Phase 5; water component W-005 3 3,475,000275,000 3,200,000Elevated Storage Tank #3 W-006 1 800,000800,000Paint Water Tank at PW W-010 4 800,000800,000OV sewer extension phase 6 & 5; water component W-025 3 Debt Service Total 55,703,41415,733,613 18,293,930 6,375,871 3,300,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 General Fund 60,00060,000Turnout Gear Replacements F-017 1 25,00025,000UP RR Crossing - Village Parkway PW-035 2 50,00050,000Asphalt Hot Box PW-049 4 50,00050,000Manning Phase 4 PW-066 1 General Fund Total 185,000135,000 50,000 Grants/Donation 16,00016,000RangerF-015 3 1,000,0001,000,000New or Refurbished Ballfields PR-017 1 3,740,0003,740,0002021 Street Improvements PW-027 3 500,000500,000UP RR Crossing - Village Parkway PW-035 2 6,825,0006,825,0002022 Street Improvements PW-038 3 250,000250,000Manning/Hudson Stoplight PW-067 2 60,00060,000Kramer Lake Floodplain Study SW-003 3 2,371,6002,371,6002021 Street & Utility Improvements- Water W-018 3 4,231,0004,231,0002022 Street Projects-water component W-031 3 Grants/Donation Total 18,993,6006,111,600 12,806,000 60,000 16,000 Municipal Sate Aid (MSA) 250,000250,000CSAH 15/30th Street Signal PW-030 3 250,000250,000CSAH 6/Inwood Signal PW-031 3 1,187,5001,187,50015th Street North (MSA Street)PW-034 3 Municipal Sate Aid (MSA) Total 1,687,5001,187,500 250,000 250,000 Monday, November 16, 2020Produced Using the Plan-It Capital Planning Software 18 Total20212022202320242025Source20262027202820292030 #Priority Park Dedication Fund 220,000220,000Central Greenway Regional Trail PR-009 3 25,00025,000Dog Park PR-019 4 200,000200,000Neighborhood Trail Connections PR-021 2 Park Dedication Fund Total 445,000200,000 245,000 Sewer Fund 17,00017,000Back Hoe PW-044 2 153,682120,760 32,922Section 36 Trunk Sewer Main Oversizing S-012 3 175,000175,000VAC Truck S-019 2 Sewer Fund Total 345,682120,760 32,922 17,000 175,000 Storm Water Fund 17,00017,000Back Hoe PW-044 2 75,00075,000VAC Truck S-019 2 Storm Water Fund Total 92,00017,000 75,000 Vehicle Replacement Fund 60,00030,000 30,000Inspection Vehcile B-002 2 60,00030,000 30,000Inspection Vehcile B-003 3 60,00030,000 30,000Inspection Vehicle B-004 3 60,00060,000B 1 F-010 3 650,000650,000E1 Engine F-011 1 90,00090,000B 2 F-012 3 650,000650,000T2 Tender/Engine F-013 4 20,00020,000Boat and Trailer F-014 3 110,00055,000 55,000CV 1 (Tahoe)F-018 3 115,50052,500 63,000CV 2 (Tahoe)F-019 3 70,00070,000Dump Truck PR-015 3 37,00037,000Utility Vehicile/Trail Groomer PR-020 3 185,000185,000LoaderPW-004 2 130,000130,000TractorPW-006 2 41,00041,000PickupTruck / plow PW-019 4 34,00034,000Back Hoe PW-044 2 120,000120,000Mini Loader PW-048 2 Monday, November 16, 2020Produced Using the Plan-It Capital Planning Software 19 Total20212022202320242025Source20262027202820292030 #Priority 265,000265,000Dump Truck with Plow PW-050 1 70,00070,000SkidloaderPW-054 3 41,00041,000Pickup w/plow PW-060 3 35,00035,000PickupPW-061 3 250,000250,000DumpTruck w/plow, sander & underbody PW-062 3 45,00045,000Pickup w/lift gate & plow PW-063 3 45,00045,000Pickup w/lift gate & plow PW-064 3 265,000265,000Dump Truck w/plow, sander & underbody PW-065 3 Vehicle Replacement Fund Total 3,508,500810,000 417,500 469,000 239,000 55,000 65,000 1,103,000 295,000 55,000 Water Fund 17,00017,000Back Hoe PW-044 2 132,000132,000Village East Trunk Watermain PRV W-008 2 35,00035,000Well #4 Pump - Pull and Rebuild W-012 3 479,028326,844 152,184Watermain Oversizing W-013 3 434,000434,0002021 Street & Utility Improvements- Water W-018 3 150,00050,000 50,000 50,000Water Meter Change Out W-023 1 300,000300,000Automated Radio Read System W-024 3 265,650265,650OV sewer extension Phase 7; water component W-026 3 132,000132,000Pressure Reduction Station- Connection to WT #3 W-027 3 100,000100,0002022 Street Projects-water component W-031 3 100,000100,0002023 Street Projects-water component W-032 3 100,000100,0002024 Street Projects-water component W-033 3 100,000100,0002025 Street Projects-water component W-034 3 Water Fund Total 2,344,678942,844 434,184 432,650 400,000 135,000 23,918,817 33,307,036 7,806,521 4,499,000 2,240,000 83,305,374GRAND TOTAL 2,065,000 3,103,000 2,000,000 2,311,000 2,055,000 Monday, November 16, 2020Produced Using the Plan-It Capital Planning Software 20 Capital Improvement Plan - 2021 - 2025 City of Lake Elmo, Minnesota PROJECTS & FUNDING SOURCES BY DEPARTMENT 2021 2025thru Total20212022202320242025DepartmentProject #Priority Admin/Finance Department AF-001 11,278,5005,896,750 5,381,750New City Hall, Fire Station, PW Improvements 2 Debt Service 5,896,750 5,381,750 11,278,500 11,278,5005,896,750 5,381,750Admin/Finance Department Total Building Department B-002 30,00030,000Inspection Vehcile 2 Vehicle Replacement Fund 30,000 30,000 B-003 30,00030,000Inspection Vehcile 3 Vehicle Replacement Fund 30,000 30,000 B-004 30,00030,000Inspection Vehicle 3 Vehicle Replacement Fund 30,000 30,000 90,00030,000 30,000 30,000Building Department Total Fire Department F-010 60,00060,000B 1 3 Vehicle Replacement Fund 60,000 60,000 F-011 650,000650,000E1 Engine 1 Vehicle Replacement Fund 650,000 650,000 F-012 90,00090,000B 2 3 Vehicle Replacement Fund 90,000 90,000 F-017 60,00060,000Turnout Gear Replacements 1 General Fund 60,000 60,000 F-018 55,00055,000CV 1 (Tahoe)3 Vehicle Replacement Fund 55,000 55,000 F-019 52,50052,500CV 2 (Tahoe)3 Vehicle Replacement Fund 52,500 52,500 967,500710,000 112,500 90,000 55,000Fire Department Total Parks and Recreation PR-009 220,000220,000Central Greenway Regional Trail 3 Park Dedication Fund 220,000 220,000 PR-015 70,00070,000Dump Truck 3 Vehicle Replacement Fund 70,000 70,000 PR-017 1,000,0001,000,000New or Refurbished Ballfields 1 Grants/Donation 1,000,000 1,000,000 PR-019 25,00025,000Dog Park 4 Park Dedication Fund 25,000 25,000 PR-020 37,00037,000Utility Vehicile/Trail Groomer 3 Vehicle Replacement Fund 37,000 37,000 PR-021 200,000200,000Neighborhood Trail Connections 2 Park Dedication Fund 200,000 200,000 Monday, November 16, 2020Produced Using the Plan-It Capital Planning Software 21 Total20212022202320242025DepartmentProject #Priority 1,552,000270,000 1,000,000 245,000 37,000Parks and Recreation Total Public Works Department PW-004 185,000185,000Loader2 Vehicle Replacement Fund 185,000 185,000 PW-006 130,000130,000Tractor2 Vehicle Replacement Fund 130,000 130,000 PW-019 41,00041,000PickupTruck / plow 4 Vehicle Replacement Fund 41,000 41,000 PW-027 8,168,0008,168,0002021 Street Improvements 3 Debt Service 4,428,000 4,428,000 Grants/Donation 3,740,000 3,740,000 PW-030 250,000250,000CSAH 15/30th Street Signal 3 Municipal Sate Aid (MSA)250,000 250,000 PW-031 250,000250,000CSAH 6/Inwood Signal 3 Municipal Sate Aid (MSA)250,000 250,000 PW-034 1,187,5001,187,50015th Street North (MSA Street)3 Municipal Sate Aid (MSA)1,187,500 1,187,500 PW-035 525,000525,000UP RR Crossing - Village Parkway 2 General Fund 25,000 25,000 Grants/Donation 500,000 500,000 PW-036 105,000105,000UP RR Crossing - Private Drive Closure 2 Debt Service 105,000 105,000 PW-037 262,500262,500UP RR Crossing: Klondike Ave 2 Debt Service 262,500 262,500 PW-038 11,554,28011,554,2802022 Street Improvements 3 Debt Service 4,729,280 4,729,280 Grants/Donation 6,825,000 6,825,000 PW-039 2,577,2462,577,2462023 Street Improvements 3 Debt Service 2,577,246 2,577,246 PW-040 2,000,0002,000,0002024 Street Improvements 3 Debt Service 2,000,000 2,000,000 PW-041 2,000,0002,000,0002025 Street Irmprovements 3 Debt Service 2,000,000 2,000,000 PW-044 85,00085,000Back Hoe 2 Sewer Fund 17,000 17,000 Storm Water Fund 17,000 17,000 Vehicle Replacement Fund 34,000 34,000 Water Fund 17,000 17,000 PW-048 120,000120,000Mini Loader 2 Vehicle Replacement Fund 120,000 120,000 PW-049 50,00050,000Asphalt Hot Box 4 General Fund 50,000 50,000 PW-050 265,000265,000Dump Truck with Plow 1 Vehicle Replacement Fund 265,000 265,000 PW-052 415,000415,000Ideal Ave (CSAH 13) Phase 2 3 Debt Service 415,000 415,000 PW-053 800,000800,000Ideal Ave (CSAH 13)-Phase 3- CSAH 14 to CSAH 6 3 Debt Service 800,000 800,000 PW-054 70,00070,000Skidloader3 Vehicle Replacement Fund 70,000 70,000 PW-057 1,650,0001,650,000Manning Ave Phase 3 3 Debt Service 1,650,000 1,650,000 PW-058 265,000265,000TH 36/Manning Interchange 2 Monday, November 16, 2020Produced Using the Plan-It Capital Planning Software 22 Total20212022202320242025DepartmentProject #Priority Debt Service 265,000 265,000 PW-060 41,00041,000Pickup w/plow 3 Vehicle Replacement Fund 41,000 41,000 PW-066 50,00050,000Manning Phase 4 1 General Fund 50,000 50,000 PW-067 250,000250,000Manning/Hudson Stoplight 2 Grants/Donation 250,000 250,000 33,296,5268,433,000 14,684,280 4,997,246 3,132,000 2,050,000Public Works Department Total Sewer Department S-003 883,000883,000Hamlet on Sunfish Lake Sewer Extension 3 Debt Service 883,000 883,000 S-005 3,698,5002,298,100 1,400,400Old Village Sewer Extension Phase 5 3 Debt Service 2,298,100 1,400,400 3,698,500 S-012 153,682120,760 32,922Section 36 Trunk Sewer Main Oversizing 3 Sewer Fund 120,760 32,922 153,682 S-013 107,763107,763Sewer Oversizing 3 Debt Service 107,763 107,763 S-017 548,625548,625Old Village Sewer Extension Phase 7 3 Debt Service 548,625 548,625 S-018 1,100,0001,100,000Heritage Farms Sewer Extension 3 Debt Service 1,100,000 1,100,000 S-019 250,000250,000VAC Truck 2 Sewer Fund 175,000 175,000 Storm Water Fund 75,000 75,000 S-020 2,000,0001,000,000 1,000,000Sewer to 180 Acres 3 Debt Service 2,000,000 2,000,000 8,741,5705,509,623 2,433,322 548,625 250,000Sewer Department Total Storm Water Department SW-001 800,000800,000Phase 2 Regional Drainage Improvements 3 Debt Service 800,000 800,000 SW-002 500,000500,000Phase 3 Regional Drainage Improvements 3 Debt Service 500,000 500,000 SW-003 60,00060,000Kramer Lake Floodplain Study 3 Grants/Donation 60,000 60,000 1,360,000800,000 560,000Storm Water Department Total Water Department W-005 480,000480,000OV Sewer Extension; Phase 5; water component 3 Debt Service 480,000 480,000 W-006 3,475,000275,000 3,200,000Elevated Storage Tank #3 1 Debt Service 275,000 3,200,000 3,475,000 W-008 132,000132,000Village East Trunk Watermain PRV 2 Water Fund 132,000 132,000 W-010 800,000800,000Paint Water Tank at PW 4 Debt Service 800,000 800,000 W-012 35,00035,000Well #4 Pump - Pull and Rebuild 3 Water Fund 35,000 35,000 W-013 479,028326,844 152,184Watermain Oversizing 3 Water Fund 326,844 152,184 479,028 W-018 2,805,6002,805,6002021 Street & Utility Improvements-Water 3 Monday, November 16, 2020Produced Using the Plan-It Capital Planning Software 23 Total20212022202320242025DepartmentProject #Priority Grants/Donation 2,371,600 2,371,600 Water Fund 434,000 434,000 W-023 150,00050,000 50,000 50,000Water Meter Change Out 1 Water Fund 50,000 50,000 50,000 150,000 W-024 300,000300,000Automated Radio Read System 3 Water Fund 300,000 300,000 W-025 800,000800,000OV sewer extension phase 6 & 5; water component 3 Debt Service 800,000 800,000 W-026 265,650265,650OV sewer extension Phase 7; water component 3 Water Fund 265,650 265,650 W-027 132,000132,000Pressure Reduction Station-Connection to WT #3 3 Water Fund 132,000 132,000 W-031 4,331,0004,331,0002022 Street Projects-water component 3 Grants/Donation 4,231,000 4,231,000 Water Fund 100,000 100,000 W-032 100,000100,0002023 Street Projects-water component 3 Water Fund 100,000 100,000 W-033 100,000100,0002024 Street Projects-water component 3 Water Fund 100,000 100,000 W-034 100,000100,0002025 Street Projects-water component 3 Water Fund 100,000 100,000 14,485,2784,069,444 8,665,184 1,215,650 400,000 135,000Water Department Total GRAND TOTAL 71,771,37424,918,817 32,307,036 7,806,521 4,499,000 2,240,000 Monday, November 16, 2020Produced Using the Plan-It Capital Planning Software 24 Capital Improvement Plan - 2021 - 2025 City of Lake Elmo, Minnesota Contact City Administrator 2021 2025thru Department Admin/Finance Department Description New City Facilities 1. Space Needs Study in 2017 including fire station and public works needs 2. cost estimates from BKV Space Needs Study dated November 21, 2017 for public works improvements 3. cost estimates for new fire station/city hall from Leo A Dlay study April 4, 2018 ($10.5m) increased for inflation 4. Public Works Improvements to existing facility $250,000 in 2018 for larger salt shed $515,000 in 2021 for office addition $257,500 in 2021 for yard improvements 5. New City Hall/Fire Station 2020-2022 Project #AF-001 Priority 2 Very Important Justification Would allow all staff (except public works) to be at one site, community meeting rooms, updated council chambers. Locate single fire station in more central location with better access to main roads. Brookfield lease was $33k per year and increasing. Brookfield office builiding and land purchased in 2018 Lease expirations: 3- month to month with 60-90 day notice 1-annual 12/31/2020 3-12/31/21 1-6/30/22 *relocation costs: personal property moving costs and reestablishment costs Budget Impact/Other Borrowing split over multiple years. 50% of funds borrowed must be spent within 12 months. Debt payments to be split amongst General Fund (80%), Water (10%) and Sewer (10%) 2021: degisn and preconstruction costs of new city hall/fire station ($772,500); public works office addition ($515,000) 2021: council chambers and fire apparatus bay additions ($4,351,750) and public works yard impr ($257,500) 2022: remodel of Brookfield and repurchase from EDA ($5,381,750) costs are based off of 2019 build estimates and include construction inflation of 3% Useful Life 40 years Project Name New City Hall, Fire Station, PW Improvements Category Buildings Type Improvement Status Active Total20212022202320242025Expenditures 772,500772,500Planning/Design 10,506,0005,124,250 5,381,750Construction/Maintenance 5,896,750 5,381,750 11,278,500Total Total20212022202320242025Funding Sources 11,278,5005,896,750 5,381,750Debt Service 5,896,750 5,381,750 11,278,500Total Monday, November 16, 2020Produced Using the Plan-It Capital Planning Software 25 Capital Improvement Plan - 2021 - 2025 City of Lake Elmo, Minnesota Contact Building Official 2021 2025thru Department Building Department Description Replace 2015 Jeep Project #B-002 Priority 2 Very Important Justification End of Useful Life, currently inoperable Budget Impact/Other Useful Life 5 years Project Name Inspection Vehcile Category Vehicles Type Equipment Status New Recommendation Total20212022202320242025Expenditures 30,00030,000Equip/Vehicles/Furnishings 30,000 30,000Total Total20212022202320242025Funding Sources 30,00030,000Vehicle Replacement Fund 30,000 30,000Total Monday, November 16, 2020Produced Using the Plan-It Capital Planning Software 26 Capital Improvement Plan - 2021 - 2025 City of Lake Elmo, Minnesota Contact Building Official 2021 2025thru Department Building Department Description Replace 2017 Equinox Project #B-003 Priority 3 Important Justification End of Useful Life, beginning to incur additonal maintenance costs Budget Impact/Other Useful Life 5 years Project Name Inspection Vehcile Category Vehicles Type Equipment Status New Recommendation Total20212022202320242025Expenditures 30,00030,000Equip/Vehicles/Furnishings 30,000 30,000Total Total20212022202320242025Funding Sources 30,00030,000Vehicle Replacement Fund 30,000 30,000Total Monday, November 16, 2020Produced Using the Plan-It Capital Planning Software 27 Capital Improvement Plan - 2021 - 2025 City of Lake Elmo, Minnesota Contact Building Official 2021 2025thru Department Building Department Description Replace 2019 Equinox Project #B-004 Priority 3 Important Justification End of Useful Life Budget Impact/Other Useful Life 5 years Project Name Inspection Vehicle Category Vehicles Type Equipment Status New Recommendation Total20212022202320242025Expenditures 30,00030,000Equip/Vehicles/Furnishings 30,000 30,000Total Total20212022202320242025Funding Sources 30,00030,000Vehicle Replacement Fund 30,000 30,000Total Monday, November 16, 2020Produced Using the Plan-It Capital Planning Software 28 Capital Improvement Plan - 2021 - 2025 City of Lake Elmo, Minnesota Contact Fire Chief 2021 2025thru Department Fire Department Description Replace 2001 B1 brush/grass rig=F350 w/markings and lighting Replace just the truck and lights reuse the skid unit Project #F-010 Priority 3 Important Justification End of Useful Life Replaces 2001 F-350 Budget Impact/Other Useful Life 15 years Project Name B 1 Category Vehicles Type Equipment Status Active Total20212022202320242025Expenditures 60,00060,000Equip/Vehicles/Furnishings 60,000 60,000Total Total20212022202320242025Funding Sources 60,00060,000Vehicle Replacement Fund 60,000 60,000Total Monday, November 16, 2020Produced Using the Plan-It Capital Planning Software 29 Capital Improvement Plan - 2021 - 2025 City of Lake Elmo, Minnesota Contact Fire Chief 2021 2025thru Department Fire Department Description Replacement of 1997 Engine that was refurbished in 2007 Project #F-011 Priority 1 Critical Justification End of Useful Life May not be needed if in one station, depending on staffing and pumping capacity Budget Impact/Other Useful Life 25 years Project Name E1 Engine Category Vehicles Type Equipment Status Active Total20212022202320242025Expenditures 650,000650,000Equip/Vehicles/Furnishings 650,000 650,000Total Total20212022202320242025Funding Sources 650,000650,000Vehicle Replacement Fund 650,000 650,000Total Monday, November 16, 2020Produced Using the Plan-It Capital Planning Software 30 Capital Improvement Plan - 2021 - 2025 City of Lake Elmo, Minnesota Contact Fire Chief 2021 2025thru Department Fire Department Description Replacement of 2004 B 2 Brush/grass rig Project #F-012 Priority 3 Important Justification Budget Impact/Other Useful Life 20 years Project Name B 2 Category Vehicles Type Equipment Status Active Total20212022202320242025Expenditures 90,00090,000Equip/Vehicles/Furnishings 90,000 90,000Total Total20212022202320242025Funding Sources 90,00090,000Vehicle Replacement Fund 90,000 90,000Total Monday, November 16, 2020Produced Using the Plan-It Capital Planning Software 31 Capital Improvement Plan - 2021 - 2025 City of Lake Elmo, Minnesota Contact Fire Chief 2021 2025thru Department Fire Department Description Replacement of 24 sets of turnout gear Project #F-017 Priority 1 Critical Justification End of useful life Budget Impact/Other Useful Life Project Name Turnout Gear Replacements Category Equipment: Fire Equip Type Maintenance Status Active Total20212022202320242025Expenditures 60,00060,000Equip/Vehicles/Furnishings 60,000 60,000Total Total20212022202320242025Funding Sources 60,00060,000General Fund 60,000 60,000Total Monday, November 16, 2020Produced Using the Plan-It Capital Planning Software 32 Capital Improvement Plan - 2021 - 2025 City of Lake Elmo, Minnesota Contact Fire Chief 2021 2025thru Department Fire Department Description Replace 2015 CV1, (Duty vehicle) w/emergency equipment, lighting and graphics. Project #F-018 Priority 3 Important Justification End of manufacturer’s warranty. Optimize resale value. Possible offset of up to $35,000.00 resale. Will sell as is, or remove emergency equipment for possible reuse and sell as passenger vehicle. Budget Impact/Other Less maintenance/repairs required to upkeep new vehicle Useful Life 0 Project Name CV 1 (Tahoe)Category Vehicles Type Equipment Status Active Total20212022202320242025Expenditures 55,00055,000Equip/Vehicles/Furnishings 55,000 55,000Total Total20212022202320242025Funding Sources 55,00055,000Vehicle Replacement Fund 55,000 55,000Total Monday, November 16, 2020Produced Using the Plan-It Capital Planning Software 33 Capital Improvement Plan - 2021 - 2025 City of Lake Elmo, Minnesota Contact Fire Chief 2021 2025thru Department Fire Department Description Replace 2017 CV2, (Duty vehicle) w/emergency equipment, lighting and graphics. Project #F-019 Priority 3 Important Justification End of manufacturer’s warranty. Optimize resale value. Possible offset of up to $38,000.00 resale. Will sell as is, or remove emergency equipment for possible reuse and sell as passenger vehicle. Budget Impact/Other Less maintenance/repairs required to upkeep new vehicle Useful Life 5 years Project Name CV 2 (Tahoe)Category Vehicles Type Equipment Status Active Total20212022202320242025Expenditures 52,50052,500Equip/Vehicles/Furnishings 52,500 52,500Total Total20212022202320242025Funding Sources 52,50052,500Vehicle Replacement Fund 52,500 52,500Total Monday, November 16, 2020Produced Using the Plan-It Capital Planning Software 34 Capital Improvement Plan - 2021 - 2025 City of Lake Elmo, Minnesota Contact City Administrator 2021 2025thru Department Parks and Recreation Description Central Greenway Regional Trail beginning at CSAH 19 and I-94, traveling through Lake Elmo Park Reserve, east along Stillwater Bvld to Manning Ave and then north to TH36. Project #PR-009 Priority 3 Important Justification Trail would address the following community needs: -Deliver students safely to school -Bring people to our downtown -Bring people to our parks -Provide safe recreation -Trail Diversity-Provide feel of Lake Elmo -Omit need to bike down Hwy 5/CSAH 14 -Compatibility with public grant opportunities -Compatibility with private funding opportunities Feasibility of land acquisition will be a consideration Trail likely to be built in segments in conjuction with county road projects and as funding allows through Met Council or other state grants Budget Impact/Other Additional trails to maintain-labor and materials for snow removal if desired by city Trail construction cost may be as high as $12 million. City would expect cost share with county as well as grants to offset costs. 2023 costs are for trail through new roundabout at CSAH 19 and CSAH 10 and trail extension abutting Hagebergs Future costs will be added as they are known Useful Life Project Name Central Greenway Regional Trail Category Park Improvements Type Improvement Status Active Total20212022202320242025Expenditures 220,000220,000Construction/Maintenance 220,000 220,000Total Total20212022202320242025Funding Sources 220,000220,000Park Dedication Fund 220,000 220,000Total Monday, November 16, 2020Produced Using the Plan-It Capital Planning Software 35 Capital Improvement Plan - 2021 - 2025 City of Lake Elmo, Minnesota Contact Public Works Director 2021 2025thru Department Parks and Recreation Description F550 pickup dump truck with chipper box and plow mount replaces 2009 vehicle. Project #PR-015 Priority 3 Important Justification End of Useful life Budget Impact/Other Useful Life Project Name Dump Truck Category Vehicles Type Equipment Status Active Total20212022202320242025Expenditures 70,00070,000Equip/Vehicles/Furnishings 70,000 70,000Total Total20212022202320242025Funding Sources 70,00070,000Vehicle Replacement Fund 70,000 70,000Total Monday, November 16, 2020Produced Using the Plan-It Capital Planning Software 36 Capital Improvement Plan - 2021 - 2025 City of Lake Elmo, Minnesota Contact City Administrator 2021 2025thru Department Parks and Recreation Description New ballfields to be constructed or refurbished after Tartan ball fields are no longer used by the public Project #PR-017 Priority 1 Critical Justification Replacement of some of the fields at Tartan Park lost to development of Royal Oaks Golf Course Community Budget Impact/Other Funding to be provided from developer in development agreement with Royal Golf. Funds to be used for acquisition of land, if necessary, and builidngor refurbishing of (a) new ballfield(s). Useful Life 40 years Project Name New or Refurbished Ballfields Category Park Improvements Type Improvement Status Active Total20212022202320242025Expenditures 1,000,0001,000,000Construction/Maintenance 1,000,000 1,000,000Total Total20212022202320242025Funding Sources 1,000,0001,000,000Grants/Donation 1,000,000 1,000,000Total Monday, November 16, 2020Produced Using the Plan-It Capital Planning Software 37 Capital Improvement Plan - 2021 - 2025 City of Lake Elmo, Minnesota Contact Public Works Director 2021 2025thru Department Parks and Recreation Description Parks commission recommended the search and planning for a dog park somewhere near the denser developments Improvements would be minimal such as fencing Project #PR-019 Priority 4 Less Important Justification Residents on small lots in denser developments need a place to take their dogs for exercise. By providing a dog park those who let their dogs run off leash in other parks can be redirected Budget Impact/Other Useful Life 25 years Project Name Dog Park Category Park Improvements Type Improvement Status Active Total20212022202320242025Expenditures 25,00025,000Construction/Maintenance 25,000 25,000Total Total20212022202320242025Funding Sources 25,00025,000Park Dedication Fund 25,000 25,000Total Monday, November 16, 2020Produced Using the Plan-It Capital Planning Software 38 Capital Improvement Plan - 2021 - 2025 City of Lake Elmo, Minnesota Contact Public Works Director 2021 2025thru Department Parks and Recreation Description Replaces 2014 Kubota Project #PR-020 Priority 3 Important Justification End of Useful Life Budget Impact/Other Useful Life 10 years Project Name Utility Vehicile/Trail Groomer Category Vehicles Type Equipment Status Active Total20212022202320242025Expenditures 37,00037,000Equip/Vehicles/Furnishings 37,000 37,000Total Total20212022202320242025Funding Sources 37,00037,000Vehicle Replacement Fund 37,000 37,000Total Monday, November 16, 2020Produced Using the Plan-It Capital Planning Software 39 Capital Improvement Plan - 2021 - 2025 City of Lake Elmo, Minnesota Contact Public Works Director 2021 2025thru Department Parks and Recreation Description Parks Commission request to develop trail connections between neighborhoods. May be spent over 2021-2023. Project #PR-021 Priority 2 Very Important Justification Budget Impact/Other Useful Life 40 years Project Name Neighborhood Trail Connections Category Park Improvements Type Improvement Status New Recommendation Total20212022202320242025Expenditures 20,00020,000Planning/Design 90,00090,000Land Acquisition 90,00090,000Construction/Maintenance 200,000 200,000Total Total20212022202320242025Funding Sources 200,000200,000Park Dedication Fund 200,000 200,000Total Monday, November 16, 2020Produced Using the Plan-It Capital Planning Software 40 Capital Improvement Plan - 2021 - 2025 City of Lake Elmo, Minnesota Contact Public Works Director 2021 2025thru Department Public Works Department Description Replace 1999 loader Project #PW-004 Priority 2 Very Important Justification End of Useful Life Budget Impact/Other Useful Life 15 years Project Name Loader Category Vehicles Type Equipment Status Active Total20212022202320242025Expenditures 185,000185,000Equip/Vehicles/Furnishings 185,000 185,000Total Total20212022202320242025Funding Sources 185,000185,000Vehicle Replacement Fund 185,000 185,000Total Monday, November 16, 2020Produced Using the Plan-It Capital Planning Software 41 Capital Improvement Plan - 2021 - 2025 City of Lake Elmo, Minnesota Contact Public Works Director 2021 2025thru Department Public Works Department Description Replace 2004 John Deere Tractor Cost include all ditch and mowing attachments Additional cost for snowblower ($30k included in total) Project #PW-006 Priority 2 Very Important Justification End of Useful Life Budget Impact/Other Useful Life 15 years Project Name Tractor Category Vehicles Type Equipment Status Active Total20212022202320242025Expenditures 130,000130,000Equip/Vehicles/Furnishings 130,000 130,000Total Total20212022202320242025Funding Sources 130,000130,000Vehicle Replacement Fund 130,000 130,000Total Monday, November 16, 2020Produced Using the Plan-It Capital Planning Software 42 Capital Improvement Plan - 2021 - 2025 City of Lake Elmo, Minnesota Contact Public Works Director 2021 2025thru Department Public Works Department Description Replacement for 2012 F250 End of usefull life (7 years) Project #PW-019 Priority 4 Less Important Justification Replacement for 2012 F250 End of useful life Budget Impact/Other Useful Life 10 years Project Name PickupTruck / plow Category Vehicles Type Equipment Status Active Total20212022202320242025Expenditures 41,00041,000Equip/Vehicles/Furnishings 41,000 41,000Total Total20212022202320242025Funding Sources 41,00041,000Vehicle Replacement Fund 41,000 41,000Total Monday, November 16, 2020Produced Using the Plan-It Capital Planning Software 43 Capital Improvement Plan - 2021 - 2025 City of Lake Elmo, Minnesota Contact Engineer 2021 2025thru Department Public Works Department Description $2,250,000 for Heritage Farms (30% assessed) $1,740,000 for Hamlet on Sunfish Lake (3M Grant) $528,000 for Tamarack Farms reconstruct (30% assessed) $2,000,000 for 38th/39th St (3M Grant) $1,650,000 for OV Phase 5 (32nd Street) (30% assessed) Project #PW-027 Priority 3 Important Justification Per pavement management plan reviewed by Engineer and Public Works Director Budget Impact/Other $675,000 in assessment revenue for Heritage Farms $$158,400 in assessment revenue for Tamarack Farms $495,000 in assessment revenue for OV 5 (32nd St) City share of debt would be $3,099,600 over 10 years Grant funds cash flowed by city would be $3,740,000 Useful Life 25 years Project Name 2021 Street Improvements Category Street Reconstruction Type Improvement Status Active Total20212022202320242025Expenditures 8,168,0008,168,000Construction/Maintenance 8,168,000 8,168,000Total Total20212022202320242025Funding Sources 4,428,0004,428,000Debt Service 3,740,0003,740,000Grants/Donation 8,168,000 8,168,000Total Monday, November 16, 2020Produced Using the Plan-It Capital Planning Software 44 Capital Improvement Plan - 2021 - 2025 City of Lake Elmo, Minnesota Contact Engineer 2021 2025thru Department Public Works Department Description CSAH 15/30th Street signal improvements. May be stand alone project or with CSAH 15 Phase 3 Project #PW-030 Priority 3 Important Justification Improvement needed due to increase of traffic Washington County study Budget Impact/Other Useful Life 25 years Project Name CSAH 15/30th Street Signal Category Street Construction Type Maintenance Status Active Total20212022202320242025Expenditures 250,000250,000Construction/Maintenance 250,000 250,000Total Total20212022202320242025Funding Sources 250,000250,000Municipal Sate Aid (MSA) 250,000 250,000Total Monday, November 16, 2020Produced Using the Plan-It Capital Planning Software 45 Capital Improvement Plan - 2021 - 2025 City of Lake Elmo, Minnesota Contact Engineer 2021 2025thru Department Public Works Department Description CSAH 6/ Inwood Signal Improvements - to replace 4-way stop. Project #PW-031 Priority 3 Important Justification Budget Impact/Other Useful Life 25 years Project Name CSAH 6/Inwood Signal Category Street Reconstruction Type Maintenance Status Active Total20212022202320242025Expenditures 250,000250,000Construction/Maintenance 250,000 250,000Total Total20212022202320242025Funding Sources 250,000250,000Municipal Sate Aid (MSA) 250,000 250,000Total Monday, November 16, 2020Produced Using the Plan-It Capital Planning Software 46 Capital Improvement Plan - 2021 - 2025 City of Lake Elmo, Minnesota Contact Engineer 2021 2025thru Department Public Works Department Description 15th Street reconstruction Project #PW-034 Priority 3 Important Justification Significant patching made in 2018 to extend road life a couple years. Recon needed per pavement management plan reviewed by Engineer and Public Works Director Budget Impact/Other Potential for some assessments Useful Life 25 years Project Name 15th Street North (MSA Street)Category Street Reconstruction Type Improvement Status Active Total20212022202320242025Expenditures 1,187,5001,187,500Construction/Maintenance 1,187,500 1,187,500Total Total20212022202320242025Funding Sources 1,187,5001,187,500Municipal Sate Aid (MSA) 1,187,500 1,187,500Total Monday, November 16, 2020Produced Using the Plan-It Capital Planning Software 47 Capital Improvement Plan - 2021 - 2025 City of Lake Elmo, Minnesota Contact Engineer 2021 2025thru Department Public Works Department Description UP RR Crossing - Village Parkway Project #PW-035 Priority 2 Very Important Justification To allow connectivity between developing neighborhoods north and south of the tracks Budget Impact/Other Useful Life 40 years Project Name UP RR Crossing - Village Parkway Category Street Construction Type Improvement Status Active Total20212022202320242025Expenditures 525,000525,000Construction/Maintenance 525,000 525,000Total Total20212022202320242025Funding Sources 25,00025,000General Fund 500,000500,000Grants/Donation 525,000 525,000Total Monday, November 16, 2020Produced Using the Plan-It Capital Planning Software 48 Capital Improvement Plan - 2021 - 2025 City of Lake Elmo, Minnesota Contact Engineer 2021 2025thru Department Public Works Department Description UP RR Crossing - Private driveway closure required for Village Parkway Crossing Project #PW-036 Priority 2 Very Important Justification Railroad requirement in order to get new crossing at Village Parkway Budget Impact/Other Useful Life 40 years Project Name UP RR Crossing - Private Drive Closure Category Unassigned Type Improvement Status Active Total20212022202320242025Expenditures 105,000105,000Construction/Maintenance 105,000 105,000Total Total20212022202320242025Funding Sources 105,000105,000Debt Service 105,000 105,000Total Monday, November 16, 2020Produced Using the Plan-It Capital Planning Software 49 Capital Improvement Plan - 2021 - 2025 City of Lake Elmo, Minnesota Contact Engineer 2021 2025thru Department Public Works Department Description UP RR Crossing - Klondike - upgraded crossing to inlcude light and gates Project #PW-037 Priority 2 Very Important Justification Railroad requirement in order to build new crossing at Village Parkway Budget Impact/Other Useful Life 40 years Project Name UP RR Crossing: Klondike Ave Category Street Construction Type Unassigned Status Active Total20212022202320242025Expenditures 262,500262,500Construction/Maintenance 262,500 262,500Total Total20212022202320242025Funding Sources 262,500262,500Debt Service 262,500 262,500Total Monday, November 16, 2020Produced Using the Plan-It Capital Planning Software 50 Capital Improvement Plan - 2021 - 2025 City of Lake Elmo, Minnesota Contact Engineer 2021 2025thru Department Public Works Department Description $3,800,000 for Parkview Estates, Cardinal Ridge and Cardinal View (3M Grant) $3,025,000 for Whistling Valley and Torres Pines (3M Grant) $2,579,280 for Fields of St. Croix 1 and 2, Beaut Crest, and Irish Court (30% assessed) $2,150,000 for remaining streets on OV 5 and 6 (30% assessed) Project #PW-038 Priority 3 Important Justification Annual street improvements per Engineering recommendation Budget Impact/Other $773,784 assessment revenue for Fields, Beaut Crest and Irish Court $645,000 assessment revenue for Ov 5&6 City share of debt would be $3,310,496 over 10 years Grant funds cash flowed by city would be $6,825,000 Useful Life 25 years Project Name 2022 Street Improvements Category Street Reconstruction Type Improvement Status Active Total20212022202320242025Expenditures 11,554,28011,554,280Construction/Maintenance 11,554,280 11,554,280Total Total20212022202320242025Funding Sources 4,729,2804,729,280Debt Service 6,825,0006,825,000Grants/Donation 11,554,280 11,554,280Total Monday, November 16, 2020Produced Using the Plan-It Capital Planning Software 51 Capital Improvement Plan - 2021 - 2025 City of Lake Elmo, Minnesota Contact Engineer 2021 2025thru Department Public Works Department Description $2,091,045 for Tana Ridge, Carriage Station, 59th St Ct/55th St/Julep Way (30% assessed) $486,201 for OV 7 (assessed 30%) Project #PW-039 Priority 3 Important Justification Annual street improvements per Engineering recommendation Budget Impact/Other $627,313 assessment revenue for neighborhoods $145,860 assessment revenue for OV 7 City share of debt service would be $1,804,073 Useful Life 25 years Project Name 2023 Street Improvements Category Street Reconstruction Type Improvement Status Active Total20212022202320242025Expenditures 2,577,2462,577,246Construction/Maintenance 2,577,246 2,577,246Total Total20212022202320242025Funding Sources 2,577,2462,577,246Debt Service 2,577,246 2,577,246Total Monday, November 16, 2020Produced Using the Plan-It Capital Planning Software 52 Capital Improvement Plan - 2021 - 2025 City of Lake Elmo, Minnesota Contact Engineer 2021 2025thru Department Public Works Department Description Annual Street Improvements Streets TBD Project #PW-040 Priority 3 Important Justification Annual street improvements per recommendation by City Engineer Budget Impact/Other TBD Useful Life 25 years Project Name 2024 Street Improvements Category Street Reconstruction Type Improvement Status Active Total20212022202320242025Expenditures 2,000,0002,000,000Construction/Maintenance 2,000,000 2,000,000Total Total20212022202320242025Funding Sources 2,000,0002,000,000Debt Service 2,000,000 2,000,000Total Monday, November 16, 2020Produced Using the Plan-It Capital Planning Software 53 Capital Improvement Plan - 2021 - 2025 City of Lake Elmo, Minnesota Contact Engineer 2021 2025thru Department Public Works Department Description Annual street improvements Project #PW-041 Priority 3 Important Justification Annual street improvements per recommendation from Engineering Budget Impact/Other TBD Useful Life 25 years Project Name 2025 Street Irmprovements Category Street Reconstruction Type Improvement Status Active Total20212022202320242025Expenditures 2,000,0002,000,000Construction/Maintenance 2,000,000 2,000,000Total Total20212022202320242025Funding Sources 2,000,0002,000,000Debt Service 2,000,000 2,000,000Total Monday, November 16, 2020Produced Using the Plan-It Capital Planning Software 54 Capital Improvement Plan - 2021 - 2025 City of Lake Elmo, Minnesota Contact Public Works Director 2021 2025thru Department Public Works Department Description Replace 2006 Case Backhoe with a more manuverable unit. Project #PW-044 Priority 2 Very Important Justification End of Useful Life Budget Impact/Other $85,000 total cost split amongst water, stormwater , streets, and parks sewer Useful Life Project Name Back Hoe Category Vehicles Type Equipment Status Active Total20212022202320242025Expenditures 85,00085,000Equip/Vehicles/Furnishings 85,000 85,000Total Total20212022202320242025Funding Sources 17,00017,000Sewer Fund 17,00017,000Storm Water Fund 34,00034,000Vehicle Replacement Fund 17,00017,000Water Fund 85,000 85,000Total Monday, November 16, 2020Produced Using the Plan-It Capital Planning Software 55 Capital Improvement Plan - 2021 - 2025 City of Lake Elmo, Minnesota Contact Public Works Director 2021 2025thru Department Public Works Department Description Mini loader will be outfitted with necessary snow removal equipment for cul de sacs, narrow streets and sidewalks/paths Project #PW-048 Priority 2 Very Important Justification End of Useful Life Budget Impact/Other Useful Life Project Name Mini Loader Category Vehicles Type Equipment Status Active Total20212022202320242025Expenditures 120,000120,000Equip/Vehicles/Furnishings 120,000 120,000Total Total20212022202320242025Funding Sources 120,000120,000Vehicle Replacement Fund 120,000 120,000Total Monday, November 16, 2020Produced Using the Plan-It Capital Planning Software 56 Capital Improvement Plan - 2021 - 2025 City of Lake Elmo, Minnesota Contact Public Works Director 2021 2025thru Department Public Works Department Description Replace trailer hot box unit with a dump style trailer unit Project #PW-049 Priority 4 Less Important Justification End of Useful Life Budget Impact/Other Useful Life Project Name Asphalt Hot Box Category Equipment: PW Equip Type Equipment Status Active Total20212022202320242025Expenditures 50,00050,000Equip/Vehicles/Furnishings 50,000 50,000Total Total20212022202320242025Funding Sources 50,00050,000General Fund 50,000 50,000Total Monday, November 16, 2020Produced Using the Plan-It Capital Planning Software 57 Capital Improvement Plan - 2021 - 2025 City of Lake Elmo, Minnesota Contact Public Works Director 2021 2025thru Department Public Works Department Description Replace 2006 model with a Tandem Project #PW-050 Priority 1 Critical Justification End of Useful Life The second tandem will be efficient all months of the year, not just efficient the four months of winter such as the single axles are. We have plans that would utilize both tandems all year- hauling snow out of cul de sacs, efficiently adding gravel or millings on shoulders and gravel roads, material from the pit to the shop for stock, moving street sweeping, fill and black dirt for park improvements and sewer water repairs. The addition of the tandem has allowed us to save on not only the fuel of running multiple small trucks but frees up the additional drivers aswell!! I am a HUGE fan of how efficient that truck is making things here. Jamie and I have already discussed changing up the plow routes so the tandems could plow in many of the new developments with wider roads not to mention they would not have to reload as often and the additional weight on the trucks add a ton of traction Budget Impact/Other Useful Life Project Name Dump Truck with Plow Category Vehicles Type Equipment Status Active Total20212022202320242025Expenditures 265,000265,000Equip/Vehicles/Furnishings 265,000 265,000Total Total20212022202320242025Funding Sources 265,000265,000Vehicle Replacement Fund 265,000 265,000Total Monday, November 16, 2020Produced Using the Plan-It Capital Planning Software 58 Capital Improvement Plan - 2021 - 2025 City of Lake Elmo, Minnesota Contact Engineer 2021 2025thru Department Public Works Department Description Cooperatvie project between Washington County, City of Oakdale and City of Lake Elmo Improvements to CSAH 13 from CSAH 14 to 44th St Project #PW-052 Priority 3 Important Justification Need determined by Washington County New development in Oakdale will increase traffic in area Budget Impact/Other all debt service agreement with Oakdale to split city costs 45/55 with Lake Elmo's cap at $400k additional $15k for city engineer Useful Life 20 years Project Name Ideal Ave (CSAH 13) Phase 2 Category Street Reconstruction Type Improvement Status Active Total20212022202320242025Expenditures 415,000415,000Construction/Maintenance 415,000 415,000Total Total20212022202320242025Funding Sources 415,000415,000Debt Service 415,000 415,000Total Monday, November 16, 2020Produced Using the Plan-It Capital Planning Software 59 Capital Improvement Plan - 2021 - 2025 City of Lake Elmo, Minnesota Contact Engineer 2021 2025thru Department Public Works Department Description Cooperative project between Washington County, City of Oakdale and City of Lake Elmo Per Washington County includes: Safety improvements including widening of shoulders Pavement imporvement Turn lane and intersection improvements Pedestrain and non-motorized upgrades Drainage Improvements Project #PW-053 Priority 3 Important Justification Need determined by Washington County Budget Impact/Other All Ag property owned by 3M on Lake Elmo side Useful Life 20 years Project Name Ideal Ave (CSAH 13)-Phase 3- CSAH 14 to CSAH 6 Category Street Reconstruction Type Improvement Status Active Total20212022202320242025Expenditures 800,000800,000Construction/Maintenance 800,000 800,000Total Total20212022202320242025Funding Sources 800,000800,000Debt Service 800,000 800,000Total Monday, November 16, 2020Produced Using the Plan-It Capital Planning Software 60 Capital Improvement Plan - 2021 - 2025 City of Lake Elmo, Minnesota Contact Public Works Director 2021 2025thru Department Public Works Department Description Additional skidloader to be used to mow park trails and asphalt in the summer. During the winter it can be used to aid in snow removal at city parking lots and possibly on park trails and sidewalks (w/blower) 2 speed highflow Project #PW-054 Priority 3 Important Justification additional skidloader needed due to growth in streets and parks Budget Impact/Other Useful Life Project Name Skidloader Category Vehicles Type Equipment Status Active Total20212022202320242025Expenditures 70,00070,000Equip/Vehicles/Furnishings 70,000 70,000Total Total20212022202320242025Funding Sources 70,00070,000Vehicle Replacement Fund 70,000 70,000Total Monday, November 16, 2020Produced Using the Plan-It Capital Planning Software 61 Capital Improvement Plan - 2021 - 2025 City of Lake Elmo, Minnesota Contact Engineer 2021 2025thru Department Public Works Department Description CSAH 15 from CSAH 14 to CSAH 10 Per Washington County includes: Expansion to four lane divided highway Access management Intersection control Separate multi-use trail Landscaping and Aesthetics Project #PW-057 Priority 3 Important Justification Need determined by Washington County Budget Impact/Other 30% assessment to residential properties Trail could come from park dedication funds County could delay project if not inlcuded as part of their BOND-2022 Useful Life 25 years Project Name Manning Ave Phase 3 Category Street Reconstruction Type Improvement Status Active Total20212022202320242025Expenditures 1,650,0001,650,000Construction/Maintenance 1,650,000 1,650,000Total Total20212022202320242025Funding Sources 1,650,0001,650,000Debt Service 1,650,000 1,650,000Total Monday, November 16, 2020Produced Using the Plan-It Capital Planning Software 62 Capital Improvement Plan - 2021 - 2025 City of Lake Elmo, Minnesota Contact Engineer 2021 2025thru Department Public Works Department Description New Interchange to replace stop lights at TH 36 and Manning Project #PW-058 Priority 2 Very Important Justification Cooperative project with MNDOT, Washington County, Stillwater, Grant, Oak Park Heights and Stillwater Township. Increased traffic on TH 36 Fatality at intersection in 2013 Budget Impact/Other Cost share between Wash Co, Mn DOT, Lake Elmo, and Stillwater. Interchange costs for Lake Elmo reduced to $253k after bonding bill. Useful Life 25 years Project Name TH 36/Manning Interchange Category Street Construction Type Improvement Status Active Total20212022202320242025Expenditures 265,000265,000Construction/Maintenance 265,000 265,000Total Total20212022202320242025Funding Sources 265,000265,000Debt Service 265,000 265,000Total Monday, November 16, 2020Produced Using the Plan-It Capital Planning Software 63 Capital Improvement Plan - 2021 - 2025 City of Lake Elmo, Minnesota Contact Public Works Director 2021 2025thru Department Public Works Department Description Pickup with plow to replace 2014 F250 Project #PW-060 Priority 3 Important Justification End of Useful Life Budget Impact/Other Useful Life 10 years Project Name Pickup w/plow Category Vehicles Type Equipment Status Active Total20212022202320242025Expenditures 41,00041,000Equip/Vehicles/Furnishings 41,000 41,000Total Total20212022202320242025Funding Sources 41,00041,000Vehicle Replacement Fund 41,000 41,000Total Monday, November 16, 2020Produced Using the Plan-It Capital Planning Software 64 Capital Improvement Plan - 2021 - 2025 City of Lake Elmo, Minnesota Contact Engineer 2021 2025thru Department Public Works Department Description Manning Ave from I-94 to 1300 feet south of CSAH 10 Per Washington County includes: Expansion to a four lane divided highway Access management Intersection control improvements Separate mulit use trail Project #PW-066 Priority 1 Critical Justification Need as determined by Washington County to ensure ongoing safe and efficient operation of this highway Budget Impact/Other Local contribution may not be required until construction phase, plannign begins in 2024 Useful Life 40 years Project Name Manning Phase 4 Category Street Reconstruction Type Improvement Status Active Total20212022202320242025Expenditures 50,00050,000Planning/Design 50,000 50,000Total Total20212022202320242025Funding Sources 50,00050,000General Fund 50,000 50,000Total Monday, November 16, 2020Produced Using the Plan-It Capital Planning Software 65 Capital Improvement Plan - 2021 - 2025 City of Lake Elmo, Minnesota Contact Engineer 2021 2025thru Department Public Works Department Description Stoploght at realigned Hudson Blvd and Manning Ave Project #PW-067 Priority 2 Very Important Justification per Washington County Budget Impact/Other Funding from Four Corners 1st Addition Useful Life 25 years Project Name Manning/Hudson Stoplight Category Street Construction Type Improvement Status Active Total20212022202320242025Expenditures 250,000250,000Construction/Maintenance 250,000 250,000Total Total20212022202320242025Funding Sources 250,000250,000Grants/Donation 250,000 250,000Total Monday, November 16, 2020Produced Using the Plan-It Capital Planning Software 66 Capital Improvement Plan - 2021 - 2025 City of Lake Elmo, Minnesota Contact Engineer 2021 2025thru Department Sewer Department Description Sewer Extension to Hamlet on Sunfish Lake 2020-sewer extension and connection 2021-repair and upgrades of sewer lines Project #S-003 Priority 3 Important Justification Per 2016 MPCA agreement Budget Impact/Other 2020 amounts paid by Hamlet HOA and Legacy developer 2021 $620,000 paid by Hamlet residents in assessments over 20 years 2021 $155,000 paid by sewer fund for oversizing Useful Life 40 years Project Name Hamlet on Sunfish Lake Sewer Extension Category Wastewater Type Improvement Status Active Total20212022202320242025Expenditures 883,000883,000Construction/Maintenance 883,000 883,000Total Total20212022202320242025Funding Sources 883,000883,000Debt Service 883,000 883,000Total Monday, November 16, 2020Produced Using the Plan-It Capital Planning Software 67 Capital Improvement Plan - 2021 - 2025 City of Lake Elmo, Minnesota Contact Engineer 2021 2025thru Department Sewer Department Description Sewer extension in the Old Village Phases 5 & 6 (over 2 years) OV 5: 33rd, Kraft , Lampert, 32nd, Langley OV 6: Upper 33rd, 34th, 35th, 36th, private drive south of UPRR 2021 will include work on 32nd St, then move to remaining areas in 2022 Project #S-005 Priority 3 Important Justification Met Coucnil requirement to extend sewer Failing septic systems 100% Assessed Budget Impact/Other $1,237,500 in sewer assessment income $2,461,000 city sewer fund contribution to pay debt Useful Life 40 years Project Name Old Village Sewer Extension Phase 5 Category Wastewater Type Improvement Status Active Total20212022202320242025Expenditures 1,400,4001,400,400Land Acquisition 2,298,1002,298,100Construction/Maintenance 2,298,100 1,400,400 3,698,500Total Total20212022202320242025Funding Sources 3,698,5002,298,100 1,400,400Debt Service 2,298,100 1,400,400 3,698,500Total Monday, November 16, 2020Produced Using the Plan-It Capital Planning Software 68 Capital Improvement Plan - 2021 - 2025 City of Lake Elmo, Minnesota Contact Engineer 2021 2025thru Department Sewer Department Description Section 36 Trunk Sewer Main Oversizing cost Project #S-012 Priority 3 Important Justification Section 36 Trunk Sewer Main Development driven from Hudson Blvd to the north Budget Impact/Other Developer paid except for oversizing costs Useful Life 40 years Project Name Section 36 Trunk Sewer Main Oversizing Category Wastewater Type Improvement Status Active Total20212022202320242025Expenditures 153,682120,760 32,922Other 120,760 32,922 153,682Total Total20212022202320242025Funding Sources 153,682120,760 32,922Sewer Fund 120,760 32,922 153,682Total Monday, November 16, 2020Produced Using the Plan-It Capital Planning Software 69 Capital Improvement Plan - 2021 - 2025 City of Lake Elmo, Minnesota Contact Engineer 2021 2025thru Department Sewer Department Description Sewer Oversizing Project #S-013 Priority 3 Important Justification Sewer oversizing based on developer pace and phasing Also $1 million of trunk sewer oversixing applied to OV sewer phases 1-7 in 2021 and $1,275,750 in 2022 Budget Impact/Other Useful Life 40 years Project Name Sewer Oversizing Category Wastewater Type Improvement Status Active Total20212022202320242025Expenditures 107,763107,763Other 107,763 107,763Total Total20212022202320242025Funding Sources 107,763107,763Debt Service 107,763 107,763Total Monday, November 16, 2020Produced Using the Plan-It Capital Planning Software 70 Capital Improvement Plan - 2021 - 2025 City of Lake Elmo, Minnesota Contact Engineer 2021 2025thru Department Sewer Department Description Legion Ave N Project #S-017 Priority 3 Important Justification Met Coucnil requirement to extend sewer Failing septic systems 100% Assessed Budget Impact/Other Useful Life Project Name Old Village Sewer Extension Phase 7 Category Wastewater Type Improvement Status Active Total20212022202320242025Expenditures 548,625548,625Construction/Maintenance 548,625 548,625Total Total20212022202320242025Funding Sources 548,625548,625Debt Service 548,625 548,625Total Monday, November 16, 2020Produced Using the Plan-It Capital Planning Software 71 Capital Improvement Plan - 2021 - 2025 City of Lake Elmo, Minnesota Contact Engineer 2021 2025thru Department Sewer Department Description Extension of municipal sewer to Heritage Farms neighborhood Project #S-018 Priority 3 Important Justification Petition submitted by homeonwers in 2018 Failing septics with limited options for replacement Coordinated with road work for efficiency Budget Impact/Other 100% assessed Useful Life 40 years Project Name Heritage Farms Sewer Extension Category Wastewater Type Improvement Status Active Total20212022202320242025Expenditures 1,100,0001,100,000Construction/Maintenance 1,100,000 1,100,000Total Total20212022202320242025Funding Sources 1,100,0001,100,000Debt Service 1,100,000 1,100,000Total Monday, November 16, 2020Produced Using the Plan-It Capital Planning Software 72 Capital Improvement Plan - 2021 - 2025 City of Lake Elmo, Minnesota Contact Public Works Director 2021 2025thru Department Sewer Department Description Used VAC Truck Project #S-019 Priority 2 Very Important Justification As the City’s water, sewer and storm sewer systems continue to expand at a fast rate we are seeing more and more of a need to maintain the utilities in a time sensitive manner. The addition of a VAC truck would benefit the city by improving the response time to sewer backups. It would allow more frequent cleaning of lift stations, reducing plugged pumps. We would Jet the required 1/3 of the cities sanitary mains as it fits our schedule. Currently we are not meeting the 1/3 rule due to the cost of contracting out the jetting. Water main gate valve boxes can be cleaned when full of sediment quickly to allow staff access to control valves to isolate main breaks. Plugged storm sewers and culverts can be cleaned quickly the same day issues are identified. The MPCA mandates we clean storm water sumps yearly. This piece of equipment would allow us to do the work in- house on our schedule instead of contracting it out. The Vac truck can safely and efficiently expose power, gas and communication lines. It reduces labor when excavating around curb stops, gate valves. This piece of equipment would replace the small VAC trailer unit we have now that cannot perform the majority of task provided above. Budget Impact/Other Useful Life 20 years Project Name VAC Truck Category Vehicles Type Equipment Status New Recommendation Total20212022202320242025Expenditures 250,000250,000Equip/Vehicles/Furnishings 250,000 250,000Total Total20212022202320242025Funding Sources 175,000175,000Sewer Fund 75,00075,000Storm Water Fund 250,000 250,000Total Monday, November 16, 2020Produced Using the Plan-It Capital Planning Software 73 Capital Improvement Plan - 2021 - 2025 City of Lake Elmo, Minnesota Contact Engineer 2021 2025thru Department Sewer Department Description Sewer trunk extension from lift station in Oakdale at Helmo Ave/Stillwater Blvd north on Idela Ave to city propoerty across from Target Includes contribution to Oakdale lift station upgrade and capacity improvements ($1.2M) Oversizing and lift station on 180 acres ($800,000) Project #S-020 Priority 3 Important Justification Serve 180 acres to allow for sewered development. Plan per the Section 16 Master Plan completed by Focus Engineering and HKGI in 2020 Budget Impact/Other Assumes 425 RECs Useful Life 40 years Project Name Sewer to 180 Acres Category Wastewater Type Improvement Status New Recommendation Total20212022202320242025Expenditures 2,000,0001,000,000 1,000,000Construction/Maintenance 1,000,000 1,000,000 2,000,000Total Total20212022202320242025Funding Sources 2,000,0002,000,000Debt Service 2,000,000 2,000,000Total Monday, November 16, 2020Produced Using the Plan-It Capital Planning Software 74 Capital Improvement Plan - 2021 - 2025 City of Lake Elmo, Minnesota Contact Engineer 2021 2025thru Department Storm Water Department Description Lake Elmo Ave and Stillwater Blvd Area Project #SW-001 Priority 3 Important Justification 2nd Phase to improving the regional drainage issues timing dependent upon development Budget Impact/Other Compensation for oversizing to developer Useful Life 40 years Project Name Phase 2 Regional Drainage Improvements Category Storm Sewer/Drainage Type Improvement Status Active Total20212022202320242025Expenditures 800,000800,000Construction/Maintenance 800,000 800,000Total Total20212022202320242025Funding Sources 800,000800,000Debt Service 800,000 800,000Total Monday, November 16, 2020Produced Using the Plan-It Capital Planning Software 75 Capital Improvement Plan - 2021 - 2025 City of Lake Elmo, Minnesota Contact Engineer 2021 2025thru Department Storm Water Department Description Phase 3 of Regional Drainage Improvements (VFW Park) Project #SW-002 Priority 3 Important Justification 3rd Phase of Regional Drainage Improvements (VFW Park) Budget Impact/Other Useful Life 40 years Project Name Phase 3 Regional Drainage Improvements Category Storm Sewer/Drainage Type Improvement Status Active Total20212022202320242025Expenditures 500,000500,000Construction/Maintenance 500,000 500,000Total Total20212022202320242025Funding Sources 500,000500,000Debt Service 500,000 500,000Total Monday, November 16, 2020Produced Using the Plan-It Capital Planning Software 76 Capital Improvement Plan - 2021 - 2025 City of Lake Elmo, Minnesota Contact 2021 2025thru Department Storm Water Department Description Kramer Lake Floodplain Study Project #SW-003 Priority 3 Important Justification Required for I94 Phase 3 area development Budget Impact/Other Funding to come from developer or included as watershed study Useful Life 40 years Project Name Kramer Lake Floodplain Study Category Unassigned Type Improvement Status Active Total20212022202320242025Expenditures 60,00060,000Planning/Design 60,000 60,000Total Total20212022202320242025Funding Sources 60,00060,000Grants/Donation 60,000 60,000Total Monday, November 16, 2020Produced Using the Plan-It Capital Planning Software 77 Capital Improvement Plan - 2021 - 2025 City of Lake Elmo, Minnesota Contact Engineer 2021 2025thru Department Water Department Description Replace waterman in Old Village phase 5: 32nd St OV Phase 5 and 6 done over 2 years, remaining roads done in second year Project #W-005 Priority 3 Important Justification Watermain past useful life Replace when street already dug up for sewer to be most efficient Budget Impact/Other 100% covered by water fund Useful Life 40 years Project Name OV Sewer Extension; Phase 5; water component Category Water Type Improvement Status Active Total20212022202320242025Expenditures 480,000480,000Construction/Maintenance 480,000 480,000Total Total20212022202320242025Funding Sources 480,000480,000Debt Service 480,000 480,000Total Monday, November 16, 2020Produced Using the Plan-It Capital Planning Software 78 Capital Improvement Plan - 2021 - 2025 City of Lake Elmo, Minnesota Contact Engineer 2021 2025thru Department Water Department Description Water Tower #3 Project #W-006 Priority 1 Critical Justification needed for development in Phase 2 400 RECs available before needed Can be located in either Phase 2 or 3, the closer to Lake Elmo Ave the better Budget Impact/Other Useful Life 40 years Project Name Elevated Storage Tank #3 Category Water Type Improvement Status Active Total20212022202320242025Expenditures 275,000275,000Land Acquisition 3,200,0003,200,000Construction/Maintenance 275,000 3,200,000 3,475,000Total Total20212022202320242025Funding Sources 3,475,000275,000 3,200,000Debt Service 275,000 3,200,000 3,475,000Total Monday, November 16, 2020Produced Using the Plan-It Capital Planning Software 79 Capital Improvement Plan - 2021 - 2025 City of Lake Elmo, Minnesota Contact Engineer 2021 2025thru Department Water Department Description 12" water main pressure reduction valve with bypass Project #W-008 Priority 2 Very Important Justification need to reduce pressure and accommodate water flows Budget Impact/Other Useful Life 40 years Project Name Village East Trunk Watermain PRV Category Water Type Improvement Status Active Total20212022202320242025Expenditures 132,000132,000Construction/Maintenance 132,000 132,000Total Total20212022202320242025Funding Sources 132,000132,000Water Fund 132,000 132,000Total Monday, November 16, 2020Produced Using the Plan-It Capital Planning Software 80 Capital Improvement Plan - 2021 - 2025 City of Lake Elmo, Minnesota Contact Public Works Director 2021 2025thru Department Water Department Description Project #W-010 Priority 4 Less Important Justification Recommended by TKDA Utility study in 2016 Regular maintenance of water tank Budget Impact/Other Useful Life 25 years Project Name Paint Water Tank at PW Category Water Type Maintenance Status Active Total20212022202320242025Expenditures 800,000800,000Equip/Vehicles/Furnishings 800,000 800,000Total Total20212022202320242025Funding Sources 800,000800,000Debt Service 800,000 800,000Total Monday, November 16, 2020Produced Using the Plan-It Capital Planning Software 81 Capital Improvement Plan - 2021 - 2025 City of Lake Elmo, Minnesota Contact Public Works Director 2021 2025thru Department Water Department Description Pull and Rebuild Well #4 pump Project #W-012 Priority 3 Important Justification Recommended by Bernie to be on a regular rotation Budget Impact/Other Useful Life 15 years Project Name Well #4 Pump - Pull and Rebuild Category Water Type Maintenance Status Active Total20212022202320242025Expenditures 35,00035,000Equip/Vehicles/Furnishings 35,000 35,000Total Total20212022202320242025Funding Sources 35,00035,000Water Fund 35,000 35,000Total Monday, November 16, 2020Produced Using the Plan-It Capital Planning Software 82 Capital Improvement Plan - 2021 - 2025 City of Lake Elmo, Minnesota Contact Engineer 2021 2025thru Department Water Department Description Oversizing cost of watermain pipe installed by developers. Project #W-013 Priority 3 Important Justification Ensures all pipe in the City will have flow capacity necessary for water system Budget Impact/Other Useful Life 40 years Project Name Watermain Oversizing Category Water Type Improvement Status Active Total20212022202320242025Expenditures 479,028326,844 152,184Other 326,844 152,184 479,028Total Total20212022202320242025Funding Sources 479,028326,844 152,184Water Fund 326,844 152,184 479,028Total Monday, November 16, 2020Produced Using the Plan-It Capital Planning Software 83 Capital Improvement Plan - 2021 - 2025 City of Lake Elmo, Minnesota Contact Engineer 2021 2025thru Department Water Department Description 2021 Street & Utility Improvements-water component (Hamlet on Sunfish Lake Heritage Farms and 38th/39th St) Project #W-018 Priority 3 Important Justification Bring water to neighborhoods in Special Well Construction Area with contaminated wells. Coordinate with road work for efficiency. Heritage Farms is valve updates to complete in conjunction with road work. Budget Impact/Other $1,455,600 for Hamlet on Sunfish Lake (3M Grant) $1,200,000 for 38th/39th St (3M Grant) $150,000 for Hertiage Farms from water fund for maintenance items Useful Life 40 years Project Name 2021 Street & Utility Improvements-Water Category Water Type Improvement Status Active Total20212022202320242025Expenditures 2,805,6002,805,600Construction/Maintenance 2,805,600 2,805,600Total Total20212022202320242025Funding Sources 2,371,6002,371,600Grants/Donation 434,000434,000Water Fund 2,805,600 2,805,600Total Monday, November 16, 2020Produced Using the Plan-It Capital Planning Software 84 Capital Improvement Plan - 2021 - 2025 City of Lake Elmo, Minnesota Contact Public Works Director 2021 2025thru Department Water Department Description Replace 200 obsolete Sensus and Neptune meters each year with new Sensus 1 pro meters Project #W-023 Priority 1 Critical Justification Old meters not working properly leads to the need to estimate usage therefore billing process takes more staff time Budget Impact/Other Useful Life 15 years Project Name Water Meter Change Out Category Water Type Improvement Status Active Total20212022202320242025Expenditures 150,00050,000 50,000 50,000Equip/Vehicles/Furnishings 50,000 50,000 50,000 150,000Total Total20212022202320242025Funding Sources 150,00050,000 50,000 50,000Water Fund 50,000 50,000 50,000 150,000Total Monday, November 16, 2020Produced Using the Plan-It Capital Planning Software 85 Capital Improvement Plan - 2021 - 2025 City of Lake Elmo, Minnesota Contact Public Works Director 2021 2025thru Department Water Department Description Automated radio read system for water meters. Project #W-024 Priority 3 Important Justification Eliminates the need to drive around and obtain reads. Improves billing and gives "real time" readings to help detect leaks. Budget Impact/Other Useful Life Project Name Automated Radio Read System Category Water Type Improvement Status Active Total20212022202320242025Expenditures 300,000300,000Equip/Vehicles/Furnishings 300,000 300,000Total Total20212022202320242025Funding Sources 300,000300,000Water Fund 300,000 300,000Total Monday, November 16, 2020Produced Using the Plan-It Capital Planning Software 86 Capital Improvement Plan - 2021 - 2025 City of Lake Elmo, Minnesota Contact Engineer 2021 2025thru Department Water Department Description Replacement of water mains in conjunction with sewer extension to Phase 6 and 5 done over 2 years Project #W-025 Priority 3 Important Justification Watermain past useful life Replace when street already dug up for sewer to be most efficient Budget Impact/Other Useful Life Project Name OV sewer extension phase 6 & 5; water component Category Water Type Improvement Status Active Total20212022202320242025Expenditures 800,000800,000Construction/Maintenance 800,000 800,000Total Total20212022202320242025Funding Sources 800,000800,000Debt Service 800,000 800,000Total Monday, November 16, 2020Produced Using the Plan-It Capital Planning Software 87 Capital Improvement Plan - 2021 - 2025 City of Lake Elmo, Minnesota Contact Engineer 2021 2025thru Department Water Department Description Old Village Phase 7 water main replacement on Legion Ave Project #W-026 Priority 3 Important Justification Watermain past useful life Replace when street already dug up for sewer to be most efficient Budget Impact/Other Useful Life Project Name OV sewer extension Phase 7; water component Category Water Type Improvement Status Active Total20212022202320242025Expenditures 265,650265,650Construction/Maintenance 265,650 265,650Total Total20212022202320242025Funding Sources 265,650265,650Water Fund 265,650 265,650Total Monday, November 16, 2020Produced Using the Plan-It Capital Planning Software 88 Capital Improvement Plan - 2021 - 2025 City of Lake Elmo, Minnesota Contact Engineer 2021 2025thru Department Water Department Description Pressure reduction station-12" Project #W-027 Priority 3 Important Justification nneded when water crosses Keats Ave Budget Impact/Other Useful Life 40 years Project Name Pressure Reduction Station-Connection to WT #3 Category Water Type Improvement Status Active Total20212022202320242025Expenditures 132,000132,000Construction/Maintenance 132,000 132,000Total Total20212022202320242025Funding Sources 132,000132,000Water Fund 132,000 132,000Total Monday, November 16, 2020Produced Using the Plan-It Capital Planning Software 89 Capital Improvement Plan - 2021 - 2025 City of Lake Elmo, Minnesota Contact Engineer 2021 2025thru Department Water Department Description Water main extensions to Parkview Estates, Cardinal Ridge, Cardinal View, Whistling Valley, Torres Pines and Irish Ct. Water maintenance items in Field fo St. Croix 2 and Beaut Crest in conjunction with road project Project #W-031 Priority 3 Important Justification Bring water to neighborhoods in Special Well Construction Area with contaminated wells. Coordinate with road work for efficiency. Exisitng water systems to be upgraded in conjuction with road work Budget Impact/Other $2,025,000 for Parkview Estates, Cardinal Ridge and Carinal View (3M Grant) $2,206,000 for Whistling Valley and Torres Pines (3M Grant) $100,000 for Fields and Beaut crest upgrades Useful Life 40 years Project Name 2022 Street Projects-water component Category Water Type Improvement Status Active Total20212022202320242025Expenditures 4,331,0004,331,000Construction/Maintenance 4,331,000 4,331,000Total Total20212022202320242025Funding Sources 4,231,0004,231,000Grants/Donation 100,000100,000Water Fund 4,331,000 4,331,000Total Monday, November 16, 2020Produced Using the Plan-It Capital Planning Software 90 Capital Improvement Plan - 2021 - 2025 City of Lake Elmo, Minnesota Contact Engineer 2021 2025thru Department Water Department Description Water system upgrades as road work is completed for efficiency in Tana Ridge and Carriage Station Project #W-032 Priority 3 Important Justification Budget Impact/Other Useful Life 40 years Project Name 2023 Street Projects-water component Category Water Type Improvement Status Active Total20212022202320242025Expenditures 100,000100,000Construction/Maintenance 100,000 100,000Total Total20212022202320242025Funding Sources 100,000100,000Water Fund 100,000 100,000Total Monday, November 16, 2020Produced Using the Plan-It Capital Planning Software 91 Capital Improvement Plan - 2021 - 2025 City of Lake Elmo, Minnesota Contact Engineer 2021 2025thru Department Water Department Description Water system upgrades as road work is completed for efficiency Project #W-033 Priority 3 Important Justification Budget Impact/Other Useful Life 40 years Project Name 2024 Street Projects-water component Category Water Type Improvement Status Active Total20212022202320242025Expenditures 100,000100,000Construction/Maintenance 100,000 100,000Total Total20212022202320242025Funding Sources 100,000100,000Water Fund 100,000 100,000Total Monday, November 16, 2020Produced Using the Plan-It Capital Planning Software 92 Capital Improvement Plan - 2021 - 2025 City of Lake Elmo, Minnesota Contact Engineer 2021 2025thru Department Water Department Description Water system upgrades as road work is completed for efficiency Project #W-034 Priority 3 Important Justification Budget Impact/Other Useful Life 40 years Project Name 2025 Street Projects-water component Category Water Type Improvement Status Active Total20212022202320242025Expenditures 100,000100,000Construction/Maintenance 100,000 100,000Total Total20212022202320242025Funding Sources 100,000100,000Water Fund 100,000 100,000Total Monday, November 16, 2020Produced Using the Plan-It Capital Planning Software 93