HomeMy WebLinkAbout#19 - Pay Request 4 for Well 5 Connecting WM STAFF REPORT DATE: December 15, 2020 CONSENT AGENDA ITEM: Accept Improvements and Approve Pay Request No. 4 (Final) for the Well No. 5 Connecting Watermain Improvements SUBMITTED BY: Chad Isakson, Project Engineer REVIEWED BY: Kristina Handt, City Administrator Marty Powers, Public Works Director Jack Griffin, City Engineer ISSUE BEFORE COUNCIL: Should the City Council accept the improvements and approve Pay Request No. 4 (Final) for the Well No. 5 Connecting Watermain Improvements? BACKGROUND: Miller Excavating, Inc. was awarded a construction contract on July 16, 2020 to complete the Well No. 5 Connecting Watermain Improvements. The contractor has completed the work in accordance with the contract, plans, and specifications, including all punch list items. PROPOSAL DETAILS/ANALYSIS: Miller Excavating, Inc., has submitted Partial Pay Request No. 4 (Final) in the amount of $28,393.60. The Project Engineer has prepared a Certificate of Completion indicating that all work is completed, including all punch list items, and is recommending the acceptance of the improvements and release of final retainage. Project acceptance will initiate the one-year warranty period for the improvements. The one-year warranty will begin on December 15, 2020 and will extend through December 15, 2021. FISCAL IMPACT: The final total construction cost is $519,469.60. This is 3.8% over the original contract amount of $500,000.33, but remains within the overall project budget. The total project cost was $601,000 which includes all engineering, geotechnical work, construction observation, and administration costs. This amount does include a contingency for outstanding engineering costs including record plans and warranty period review and follow up. The project is partially funded by the MPCA grant agreement for construction of Well No. 5. The grant agreement stipulates the cost split to be paid 90% by the MPCA ($540,900) and 10% by the City of Lake Elmo ($60,100). The total project costs for the Well No. 5 Connecting Watermain project is within the overall grant agreement budget amount. RECOMMENDATION: Staff is recommending that the City Council, as part of the Consent Agenda, accept the improvements and approve Pay Request No. 4 (Final) for the Well No. 5 Connecting Watermain Improvements. If removed from the consent agenda, the recommended motion for the action is as follows: “Move to accept the Well No. 5 Connecting Watermain Improvements and approve Pay Request No. 4 (Final) to Miller Excavating, Inc. in the amount of $28,393.60”. ATTACHMENTS: 1. Partial Pay Estimate No. 4 (Final). 2. Certificate of Completion. PARTIAL PAY ESTIMATE NO. 4 (FINAL) WELL NO. 5 CONNECTING WATERMAIN CITY OF LAKE ELMO, MINNESOTA PROJECT NO. 2019.128 QUANTITY UNIT PRICE AMOUNT QUANTITY AMOUNT QUANTITY AMOUNT 1 LS 1 $19,787.87 $19,787.87 0.00 $0.00 1.00 $19,787.87 2 LS 1 $58,165.81 $58,165.81 0.00 $0.00 1.00 $58,165.81 3 EA 10 $355.19 $3,551.90 0.00 $0.00 12.00 $4,262.28 4 EA 10 $581.66 $5,816.60 0.00 $0.00 13.00 $7,561.58 5 EA 10 $581.66 $5,816.60 0.00 $0.00 12.00 $6,979.92 6 EA 2 $1,275.62 $2,551.24 0.00 $0.00 2.00 $2,551.24 7 EA 1 $1,287.43 $1,287.43 0.00 $0.00 1.00 $1,287.43 8 LF 90 $77.08 $6,937.20 0.00 $0.00 60.00 $4,624.80 9 LF 160 $106.41 $17,025.60 0.00 $0.00 102.00 $10,853.82 10 LF 2325 $68.92 $160,239.00 0.00 $0.00 2,336.00 $160,997.12 11 EA 6 $1,778.31 $10,669.86 0.00 $0.00 6.00 $10,669.86 12 EA 5 $3,547.90 $17,739.50 0.00 $0.00 5.00 $17,739.50 13 EA 1 $281.23 $281.23 0.00 $0.00 0.00 $0.00 14 LF 5 $130.21 $651.05 0.00 $0.00 0.00 $0.00 15 EA 6 $4,793.00 $28,758.00 0.00 $0.00 6.00 $28,758.00 16 LF 3 $431.62 $1,294.86 0.00 $0.00 0.00 $0.00 17 LF 35 $71.82 $2,513.70 0.00 $0.00 32.00 $2,298.24 18 LF 130 $87.74 $11,406.20 0.00 $0.00 112.00 $9,826.88 19 LF 100 $74.04 $7,404.00 0.00 $0.00 92.00 $6,811.68 20 LF 85 $89.97 $7,647.45 0.00 $0.00 84.00 $7,557.48 21 EA 4 $891.79 $3,567.16 0.00 $0.00 4.00 $3,567.16 22 EA 6 $1,026.06 $6,156.36 0.00 $0.00 6.00 $6,156.36 23 EA 4 $527.14 $2,108.56 0.00 $0.00 4.00 $2,108.56 24 EA 6 $697.72 $4,186.32 0.00 $0.00 6.00 $4,186.32 25 EA 2 $55.95 $111.90 0.00 $0.00 3.00 $167.85 26 LB 1150 $6.03 $6,934.50 0.00 $0.00 1,775.00 $10,703.25 27 EA 16 $1,036.49 $16,583.84 0.00 $0.00 18.00 $18,656.82 28 SY 450 $75.30 $33,885.00 0.00 $0.00 698.00 $52,559.40 29 LF 320 $41.50 $13,280.00 0.00 $0.00 543.00 $22,534.50 30 LF 612 $0.47 $287.64 0.00 $0.00 624.00 $293.28 31 LF 2340 $0.47 $1,099.80 0.00 $0.00 470.00 $220.90 32 CY 300 $74.19 $22,257.00 0.00 $0.00 126.50 $9,385.04 33 SY 2000 $2.38 $4,760.00 0.00 $0.00 343.00 $816.34 34 SY 675 $17.51 $11,819.25 0.00 $0.00 1,233.00 $21,589.83 35 LF 940 $2.13 $2,002.20 0.00 $0.00 160.00 $340.80 36 HR 10 $141.57 $1,415.70 0.00 $0.00 20.50 $2,902.19 $500,000.33 $0.00 $516,922.10 TOTALS - BASE CONTRACT $500,000.33 $0.00 $516,922.10 CO1-1 SY 2,038.0 $1.25 $2,547.50 2,038.00 $2,547.50 2,038.0 $2,547.50 $2,547.50 $2,547.50 $2,547.50 CO2-1 LS 1.0 $16,921.77 $16,921.77 0.00 $0.00 0.0 $0.00 $16,921.77 $0.00 $0.00 TOTALS - REVISED CONTRACT $519,469.60 $2,547.50 $519,469.60 1" TYPE "K" COPPER WATER SERVICE, DIRECTIONAL DRILL 1.5" TYPE "K" COPPER WATER SERVICE 1.5" TYPE "K" COPPER WATER SERVICE, DIRECTIONAL DRILL 1" CORPORATION STOP W/ SADDLE 1.5" CORPORATION STOP W/ SADDLE 1" CURB STOP & BOX 1.5" CURB STOP & BOX OFF ROAD STRUCTURE MARKER DUCTILE IRON FITTINGS 14" HDPE 12" DIP TRANSITION FITTING REMOVE AND PATCH BITUMINOUS STREET REMOVE AND REPLACE CONCRETE CURB AND GUTTER 4" SOLID LINE YELLOW MULTI-COMP 4" BROKEN LINE YELLOW MULTI-COMP SUBTOTAL - CHANGE ORDER NO. 1 SEED AND HYDROMULCH BASE BID TOPSOIL BORROW (LV) SEED & EROSION CONTROL BLANKET SOD SILT FENCE, MACHINE SLICED STREET SWEEPER WITH PICK UP BROOM CHANGE ORDER NO. 1 CHANGE ORDER NO. 2 COMPENSATING CHANGE ORDER SUBTOTAL - CHANGE ORDER NO. 2 ITEM DESCRIPTION OF PAY ITEM UNIT CONTRACT THIS PERIOD TOTAL TO DATE BASE BID MOBILIZATION 14" HDPE WATERMAIN, DIRECTIONAL DRILL 6" GATE VALVE AND BOX 12" GATE VALVE AND BOX TRAFFIC CONTROL INLET PROTECTION CLEARING GRUBBING CONNECT TO EXISTING 12" WATERMAIN CUT TEE INTO EXISTING 12" WATERMAIN 6" DIP, CL. 52 WATERMAIN, INCL POLY WRAP 12" DIP, CL. 52 WATERMAIN, INCL POLY WRAP ADJUST EXISTING VALVE BOX VALVE BOX EXTENSION HYDRANT HYDRANT EXTENSION 1" TYPE "K" COPPER WATER SERVICE