HomeMy WebLinkAbout#23 - Water Tower 3 Prelminary Design STAFF REPORT DATE: December 15, 2020 CONSENT AGENDA ITEM: Authorize Engineering Services for Water Tower No. 3 Preliminary Design and Water System Planning/Modeling SUBMITTED BY: Jack Griffin, City Engineer REVIEWED BY: Kristina Handt, City Administrator Marty Powers, Public Works Director Chad Isakson, Assistant City Engineer ISSUE BEFORE COUNCIL: Should the City Council authorize engineering services for Water Tower No. 3 Preliminary Design and Water System Planning/Modeling? BACKGROUND: In accordance with the City’s Capital Improvement Plan, a new water tower (Water Tower No. 3) is planned for construction in 2022, to be located in the low-pressure zone to support growth and development beyond the 400 REC unit limitation. Over the past year city staff have been in discussions with various property owners to identify properties that may be both a suitable location for the water tower and be available for timely acquisition by the city. Site acquisition is becoming critical and engineering design services are needed to continue preparing this project for 2022 construction. In addition, the State of Minnesota Co-Trustees for the 3M Settlement Funds has released its draft Clean Drinking Water Supply Plan (CDWSP) for City review and comment. While the City has completed its high -level overview comments, the planning process has revealed that the City’s water distribution system needs to be reviewed and evaluated in greater detail to fully understand the impacts to the distribution system, and necessary improvements that may be required by an alternative water source location. The City has requested the water system model files, in WaterCAD, from Wood LLC (the State’s consultant). Once received the City will require engineering support services from SEH to review and update with the water system changes over the past 2 years, and perform various modeling scenarios to review operational performance and identify system deficiencies. PROPOSAL DETAILS/ANALYSIS: At this time, the City Engineer is recommending that preliminary design services be initiated for Water Tower No. 3 to be located within the City’s water system low pressure zone. More specially, along Lake Elmo Avenue, between I94 and 14th Street North. The scope of work and associated fees has been developed with SEH as outlined in the attached Task Order No. 11. The preliminary design services shall aid the in determination of the water storage requirements and tower sizing, the water tower location for efficient hydraulic operations within the pressure zone, and site evaluation services to make recommendations regarding the site layout and other siting requirements. The services outlined in this task order are intended to assist the City to verify the selected water tower site as the preferred location prior to the city’s acquisition of the property. The City Engineer is also recommending that professional engineering support services be obtained to update and calibrate the city’s existing water distribution system hydraulic model, using the base WaterCAD file prepared by Wood LLC. Once the model has been obtained and verified to reflect updated existing conditions, water system modeling scenarios will be run to evaluate and make recommendations for expansion of the water supply system, as necessary, to responsibly and cost-effectively accommodate future growth, including an evaluation of alternative water supply source locations within the system. Over the next few years, the City will need to make important decisions related to the future of the City’s water supply sources, distribution system, and storage facilities. Development and utilization of the updated water system model will help to make informed decisions related to expected system operations. As part of the evaluation, the updated water model and corresponding evaluation will explore the viability of potential water supply options related to alternatives driven by the State’s Clean Drinking Water Supply Plan (CDWSP) related to 3M Settlement Funds. The scope and effort defined in the attached Task Order No. 12 will support the City in understanding the impacts and changes to the water system plan and will assist in supporting the City’s effort to advocate for the best alternative(s). FISCAL IMPACT: $19,000 to complete the Water Tower No. 3 Preliminary Design work, with services to be charged against the Water Towner No. 3 Improvements. Once completed a Task Order will be prepared for engineering services for final design and construction support services. $30,600 for Water System Planning/Modeling, with services to be charged against the Water Enterprise Fund. The City will be submitting a request to the State of Minnesota Co-Trustees for the 3M Settlement Funds to reimburse the City for the water planning services, however, no commitments for reimbursement have been made at this time. RECOMMENDATION: Staff is recommending that the City Council authorize, as part of the consent agenda, engineering services for Water Tower No. 3 Preliminary Design and Water System Planning/Modeling and as outlined in Task Order No. 11 and Task Order No. 12 respectively. If removed from the consent agenda, the recommended motion for this action is as follows: “Move to approve engineering services for Water Tower No. 3 Preliminary Design and Water System Planning/Modeling and as outlined in Task Order No. 11 and Task Order No. 12 respectively.” ATTACHMENTS: 1. Task Order No. 11 – Water Tower No. 3 Preliminary Design. 2. Task Order No. 12 – Water System Planning/Modeling.     TASK ORDER No. 11 – WATER TOWER NO. 3 PRELIMINARY DESIGN                    Page 1 of 3                                             TASK ORDER               No. 11  CITY OF LAKE ELMO, MINNESOTA – SHORT ELLIOTT HENDRICKSON, INC.  PROFESSIONAL ENGINEERING SERVICES AGREEMENT      In accordance with ARTICLE 1 of the Master AGREEMENT between the City of Lake Elmo (“CITY”) and  Short Elliott Hendrickson, Inc. (SEH) (“ENGINEER”), dated AUGUST 13, 2014 (“AGREEMENT”), the  ENGINEER agrees to provide Professional Engineering Support Services as follows:    WATER TOWER NO. 3 PRELIMINARY DESIGN    PROJECT  OVERVIEW: The  City  of  Lake  Elmo  requires  professional  engineering  services  for  the  preliminary design of Water Tower No. 3 to be located within the city’s water system low pressure  zone. The preliminary design services shall aid the in determination of the water storage requirements  and tower sizing, the water tower location for efficient hydraulic operations within the pressure zone,  and site evaluation services to make recommendations regarding the site layout and other siting  requirements. The City is currently searching for a suitable site to acquire for placement of the new  water tower. The services outlined in this task order are intended to assist the city to verify the selected  water tower site as the preferred location prior to the city’s acquisition of the property.     SERVICES TO BE PROVIDED BY ENGINEER: SEH,  Inc. shall  provide  the  following  Professional  Engineering Services:     Water Tower Sizing, Siting Evaluation & Preliminary Design. The tasks outlined below will verify and  secure the City’s plan to move forward with the prosed water tower site and verify the anticipated  water tower size and operation, so that final design and construction of the tower can proceed.  1. Project Management throughout the course of the work including submittal of a weekly  progress memo and job to date budget form.  2. Meeting: Conduct meeting to review potential water tower sites and size alternatives, Water  Tower Site visit.  3. Develop water tower size and height recommendations based on previous tasks.  4. Meet with city staff to develop site design criteria, miscellaneous project data for development  of schematic plan and cost estimates.  5. Hydraulic Modeling and Storage Determination.  6. Review Tank Operations and needs with City Engineering and Public Works staff.  7. Review  and  provide  recommendations  regarding  existing  PRV  station  and  SCADA  system  modifications.  8. Provide Architectural Rendering for one style of water tower located on the proposed site.  Additional renderings, if requested by the city, would be completed as additional services.  9. Preliminary Site Plan Layout.  10. Preliminary Cost/Benefit Estimates for selected Water Tower style and size. Cost estimates for  alternative style and sizes, if requested by the city, would be completed as additional services.      TASK ORDER No. 11 – WATER TOWER NO. 3 PRELIMINARY DESIGN                    Page 2 of 3                                             11. Prepare Preliminary Design Memorandum.  12. Private Utility Coordination and Design Locate.  13. Survey Site and other features.  14. Coordinate Soil Boring locations.  15. Review draft report with City and finalize the report.  16. Present the final report to the City.  TIMES FOR RENDERING SERVICES: ENGINEER shall perform its services and provide deliverables in  accordance with the following project schedule:  1. December 15, 2020 – Council approves Task Order to authorize work.  2. The Project schedule will vary and will be dependent upon the identification of various potential  water tower sites by the city that are available for acquisition, and receipt of the WaterCAD  model from the State of Minnesota.  3. Once information becomes available to the ENGINEER, services will proceed diligently through  completion.  CITY’S REPRESENTATIVE AND CONTRACT ADMINISTRATION:  The CITY’s representative with respect  to  services  rendered  by  ENGINEER  under  this  TASK  ORDER  shall  be the City Engineer.  Project  correspondence must be addressed to:  Jack Griffin, P.E., City Engineer   City of Lake Elmo   3800 Laverne Avenue North  Lake Elmo, MN 55042  651.300.4264  Email: Jack.griffin@focusengineeringinc.com    COMPENSATION:  Compensation to ENGINEER shall be based on the hourly billing rates for each staff  as assigned and provided in the ENGINEER’s Proposal for the work. Invoices shall be submitted once  each month and should be sent to the attention of the City Engineer.  Compensation to ENGINEER for Preliminary Design Services shall be on an hourly rate basis in a not to  exceed amount of $19,000.  ADDITIONAL SERVICES:  If authorized by the City, ENGINEER shall furnish or obtain from others  Additional Services which are not considered under this Task Order. Such services shall be compensated  for on an Hourly Rate basis in an amount approved by the City prior to any services being started or as  otherwise mutually agreed. The City is not obligated to compensate ENGINEER for services completed  outside the approved scope of work which are completed prior to ENGINEER submitting a written  request to the City, and receiving written approval of the City.      TASK ORDER No. 11 – WATER TOWER NO. 3 PRELIMINARY DESIGN                    Page 3 of 3                                             ATTACHMENTS:  This agreement supersedes and replaces all previous understandings, agreements or  contracts, written or verbal, between ENGINEER and City, regarding the Water Tower No. 3 Preliminary  Design. The following documents are attached for reference:    1. ENGINEER’s Proposal to the CITY dated December 8, 2020.    APPROVAL  AND  ACCEPTANCE:  Approval  and  Acceptance  of  this  Task  Order,  including  the  attachment(s) listed above, shall incorporate this document as part of the AGREEMENT. ENGINEER is  authorized to begin performance of services upon receipt of a copy of this Task Order signed by CITY.    The Effective Date of this Task Order is December 15, 2020.    SHORT ELLIOT HENDRICKSON, INC.   CITY OF LAKE ELMO, MINNESOTA      By _________________________________   By  _________________________________   (Authorized Principal of the Firm)  City Administrator      SHORT ELLIOTT HENDRICKSON: PROJECT WORK PLAN PROJECT NAME: Water Model Update and Source Water Modeling PROJECT NUMBER: LAKMO 123536 CLIENT: City of Lake Elmo, Minnesota PROJECT MANAGER: Chad T. Katzenberger, PE TOTAL HOURS 137 31 39 22 36 8 0 1 COST PER HOUR/UNIT (CHARGE-OUT RATE)$159.00 $114.00 $159.00 $141.00 $114.00 $141.00 $80.00 TOTAL LABOR COST $18,941 $4,929.00 $4,446.00 $3,498.00 $5,076.00 $912.00 $0.00 $80.00 % OF TOTAL COST 26.1%23.5%18.5%26.9%4.8%0.0%0.4% Task (Phase)Task Description Chad Katzenberger Lead Proj Engr and PM Heather Yelle Lead Water Modeler Scott Haupt Senior Civil Engineer Adam Bona Engineering Technician Ryan Hanson Project Engineer Mike Steuernagel GIS Melissa Blommel (Admin) 11 Task Order 11 - Water Tower Sizing, Siting Evaluation & Preliminary Desgin 11.01 MEETING: Conduct Meeting to review potential wate tower sites and size alternatives, Water Tower Site Visit 6 4 2 1 11.02 Develop water tower size and height recommendations based on previous tasks 4 4 11.03 Meet with City staff to develop site design critera, misc project data for development of schematic plan and cost estimates 4 4 11.04 Hydraulic Modeling & Storage Determination 1 4 11.05 Review Tank Operations and Needs with City Eng. & PW Staff 1 3 2 11.06 Review and provide recommendations regarding existing PRV station and SCADA system modifications 11.07 Provide Architectural Rendering for one style of water tower located on the proposed site 1 12 8 11.08 Preliminary Site Plan Layout 4 10 11.09 Preliminary Cost/Benefit Estimates for selected Water Tower style and size. Cost estimates for alternative style and sizes, if requested by the city, would be completed as additional services.2 4 11.1 Prepare Preliminary Design Report for Council Presentation 4 4 11.11 Private Utility Coord & Design Locate 4 8 11.12 Survey Site 4 16 11.13 Coordinate Soil Borings 1 1 2 11.14 QA/QC 1 2 11.15 Review draft report with City, and finalize the report.2 1 11.16 Present the report to the City staff and provide support 4 2 Task Hour Total 137 31 39 22 36 8 0 1 Total Task 11 $19,000 4,929$ 4,446$ 3,498$ 5,076$ 912$ -$ 80$ S:\KO\L\Lakmo\Common\RFPs\Water Modeling_2020\Lake Elmo Model Update and Source Modeling v2.xlsx 12/8/2020 8:22 AM Page 1 of 2     TASK ORDER No. 12 – WATER SYSTEM MODEL DEVELOPMENT AND EVALUATION                    Page 1 of 4                                             TASK ORDER               No. 12  CITY OF LAKE ELMO, MINNESOTA – SHORT ELLIOTT HENDRICKSON, INC.  PROFESSIONAL ENGINEERING SERVICES AGREEMENT      In accordance with ARTICLE 1 of the Master AGREEMENT between the City of Lake Elmo (“CITY”) and  Short Elliott Hendrickson, Inc. (SEH) (“ENGINEER”), dated AUGUST 13, 2014 (“AGREEMENT”), the  ENGINEER agrees to provide Professional Engineering Support Services as follows:    WATER SYSTEM PLANNING/MODELING    PROJECT OVERVIEW:  The City of Lake Elmo requires professional engineering services to update and  calibrate the city’s existing water distribution system hydraulic model, using WaterCAD. Once the  existing model has been developed, professional engineering services shall be provided to evaluate  and make recommendations for expansion of the water supply system, as necessary, to responsibly  and cost‐effectively accommodate future growth, including an evaluation of alternative water supply  source locations within the system.    Over the next few years, the city will need to make important decisions related to the future of the  city’s water supply sources, distribution system, and storage facilities. Development and utilization of  the updated water system model will help to make informed decisions related to expected system  operations. As part of the evaluation, the updated water model and corresponding evaluation will  explore the viability of potential water supply options related to alternatives driven by the State’s Clean  Drinking Water Supply Plan (CDWSP) related to 3M Settlement Funds. Since Lake Elmo is one of 14  different water systems being impacted by the final CDWSP, recommended improvements should be  carefully evaluated to make sure that selected alternatives are in the best interest of the City of Lake  Elmo. The scope and effort defined in this Task Order will support the city in understanding the impacts  and changes to the water system plan and will assist in supporting the city’s effort to advocate for the  best alternative(s).    SERVICES TO BE PROVIDED BY ENGINEER: SEH,  Inc. shall  provide  the  following  Professional  Engineering Services:     Task 1 – Water Model Review, Update, Development and Verification. The work outlined below will  develop an updated water system model, in WaterCAD, for the city so that advanced water system  questions related to water supply, water quality and future system operations can be addressed. The  model will become a central tool for the overall water system evaluation tasks related to supply,  treatment, and storage. It is the intention to build upon the WaterCAD model prepared by Wood LLC,  as the State’s consultant for the CDWSP.    1. Review existing model and available water system data. Develop a list of questions and data  needed to update the model.   2. Conduct a project kick‐off meeting with key representatives of the city and the SEH project  team. Review overall expectations and schedule for the project.  3. Update Water Model with latest system piping, elevation data, demand data, billing records.      TASK ORDER No. 12 – WATER SYSTEM MODEL DEVELOPMENT AND EVALUATION                    Page 2 of 4                                             4. Gather  historical  water  system  operational  data  (Average  Summer Week,  Average  Winter  Week), tabulate and analyze.  5. Develop diurnal demand curves for system pressure zones based on historical water use.  6. Review and verify existing water model operation with real extended period SCADA data (model  verification process).  7. Provide schematic map printouts and data tabulations for city staff review and revisions.  8. Finalize Water System Model Updates.  9. Develop documentation related to model update.  10. Develop standard current water system modeling results maps (Pressure, Fire Flow, EPS Flow  and Pressure).  11. Final Model Update Summary memo.  Task 2 – Future Water System Supply and Treatment Alternative Evaluation & on call water modeling  services. The work outlined below will utilize the updated water model to evaluate potential water  supply and distribution alternatives. In addition, long term water system expansion recommendations  will be provided.  1. Request  information  on  all  existing  water  system  facilities  and  proposed  5‐year  Capital  Improvement Plan (CIP) projects.  2. Prepare a schematic of the overall water system(s).  3. Perform a water supply analysis to determine the capacity of the groundwater wells to provide  current and future water needs and to identify any shortfalls.  4. Evaluate the capacities of the booster pumping facility to ensure that it has adequate capacities  to provide water to customers throughout the service area.  5. Using future land use map ‐ Develop Ultimate Water System model for future supply scenarios.  6. Using EPS Water Supply Simulation evaluate ability of Water System to Supply System Demands  through 2040 from Internal Groundwater sources.  7. Using EPS Water Supply Simulation evaluate ability of Water System to Supply System Demands  through 2040 from supply from Woodbury.  8. Meet with city staff to present the identified water system deficiencies and solicit input on  proposed improvement alternatives.  9. Identify improvements to the water distribution system to ensure that adequate water can be  transmitted to customers at required flows and pressures. This will include both the existing  water distribution system and expansion of the water distribution system to serve areas of new  development.  10. Prepare a map of water age and identify points or areas of oldest water under various seasonal  pumping scenarios.  11. Additional On‐Call Water Modeling Services and Modeling Support (as questions arise).  TIMES FOR RENDERING SERVICES: ENGINEER shall perform its services and provide deliverables in  accordance with the following project schedule:      TASK ORDER No. 12 – WATER SYSTEM MODEL DEVELOPMENT AND EVALUATION                    Page 3 of 4                                             1. December 15, 2020 – Council approves Task Order to authorize work.  2. The Project schedule will vary and will be dependent upon the identification of various potential  water tower sites by the city that are available for acquisition, and receipt of the WaterCAD  model from the State of Minnesota.  3. Once information becomes available to the ENGINEER, services will proceed diligently through  completion.  CITY’S REPRESENTATIVE AND CONTRACT ADMINISTRATION:  The CITY’s representative with respect  to  services  rendered  by  ENGINEER  under  this  TASK  ORDER  shall  be the City Engineer.  Project  correspondence must be addressed to:  Jack Griffin, P.E., City Engineer   City of Lake Elmo   3800 Laverne Avenue North  Lake Elmo, MN 55042  651.300.4264  Email: Jack.griffin@focusengineeringinc.com    COMPENSATION:  Compensation to ENGINEER shall be based on the hourly billing rates for each staff  as assigned and provided in the ENGINEER’s Proposal for the work. Invoices shall be submitted once  each month and should be sent to the attention of the City Engineer.  Compensation to ENGINEER for Preliminary Design Services shall be on an hourly rate basis in a not to  exceed amount of $30,600.  ADDITIONAL  SERVICES: If  authorized  by  the  City,  ENGINEER  shall  furnish  or  obtain  from  others  Additional Services which are not considered under this Task Order. Such services shall be compensated  for on an Hourly Rate basis in an amount approved by the City prior to any services being started or as  otherwise mutually agreed. The City is not obligated to compensate ENGINEER for services completed  outside the approved scope of work which are completed prior to ENGINEER submitting a written  request to the City, and receiving written approval of the City.    ATTACHMENTS:  This agreement supersedes and replaces all previous understandings, agreements or  contracts,  written  or  verbal,  between  ENGINEER  and  City,  regarding  the  Water  System  Model  Development and Evaluation. The following documents are attached for reference:    1. ENGINEER’s Proposal to the CITY dated December 8, 2020.                  TASK ORDER No. 12 – WATER SYSTEM MODEL DEVELOPMENT AND EVALUATION                    Page 4 of 4                                             APPROVAL  AND  ACCEPTANCE:  Approval  and  Acceptance  of  this  Task  Order,  including  the  attachment(s) listed above, shall incorporate this document as part of the AGREEMENT. ENGINEER is  authorized to begin performance of services upon receipt of a copy of this Task Order signed by CITY.    The Effective Date of this Task Order is December 15, 2020.    SHORT ELLIOT HENDRICKSON, INC.   CITY OF LAKE ELMO, MINNESOTA      By _________________________________   By  _________________________________   (Authorized Principal of the Firm)  City Administrator      SHORT ELLIOTT HENDRICKSON: PROJECT WORK PLAN PROJECT NAME: Water Model Update and Source Water Modeling PROJECT NUMBER: LAKMO 123536 CLIENT: City of Lake Elmo, Minnesota PROJECT MANAGER: Chad T. Katzenberger, PE TOTAL HOURS 244 41 165 12 0 8 15 3 COST PER HOUR/UNIT (CHARGE-OUT RATE)$159.00 $114.00 $159.00 $141.00 $114.00 $141.00 $80.00 TOTAL LABOR COST $30,504 $6,519.00 $18,810.00 $1,908.00 $0.00 $912.00 $2,115.00 $240.00 % OF TOTAL COST 21.4%61.7%6.3%0.0%3.0%6.9%0.8% Task (Phase)Task Description Chad Katzenberger Lead Proj Engr and PM Heather Yelle Lead Water Modeler Scott Haupt Senior Civil Engineer Adam Bona Engineering Technician Ryan Hanson Project Engineer Mike Steuernagel GIS Melissa Blommel (Admin) 12 Task 12.1 – Water Model Update and Preliminary Planning 12.01 Review existing model and available water system GIS data. Develop a list of questions and data needed to update the model 2 4 12 MEETING: Conduct a project kick-off meeting with key representatives of the City and the SEH project team. Review overall expectations and schedule for the project.8 8 2 2 1 12 Update Water Model with latest system piping, elevation data, demand data, billing records.8 4 12 Gather historical water system operational data - (Average Summer Week, Average Winter Week), Tabulate and analyze 1 8 12 Develop diurnal demand curves for system pressure zones based on historical water system data 2 16 12 Review and verify existing water model operation with real extended period SCADA data - Model verification Process 2 10 1 12 Finalize Water System Model Updates 1 8 12 Develop documentation related to model update 1 2 12 Develop standard current water system modeling results maps (Pressure, Fire Flow, EPS Flow and Pressure)8 2 12 Final Model Update Summary memo 1 4 1 Deliverables: Updated water model, memo, figures 4 4 1 Task Hour Total 116 22 80 4 0 2 6 2 Task Cost $14,500 3,498$ 9,120$ 636$ -$ 228$ 846$ 160$ 12 Task 12.2 – Future Water System Supply Source Evaluation & On Call Water Modeling Services 2.01 Request information on all existing water system facilities and proposed 5-year Capital Improvement Plan (CIP) projects thru the City Engineer.0.5 1 2.02 Prepare a schematic of the overall water system (s)4 2.03 Perform a water supply analysis to determine the capacity of the groundwater wells to provide current and future water needs and to identify any shortfalls.2 2 2 2.04 Evaluate the capacities of the booster pumping facility to ensure that it has adequate capacities to provide water to customers throughout the service area.0.5 1 2.05 Using future land use map - Develop Ultimate Water System model for future supply scenarios 6 2 2.06 Using EPS Water Supply Simulation valuate ability of Water System to Supply System Demands Through 2050 from Internal Groundwater sources 6 2 2.07 Using EPS Water Supply Simulation valuate ability of Water System to Supply System Demands Through 2050 from supply froom Woodbury 1 8 4 1 2.08 MEETING: Conduct a workshop with City staff to present the identified water system deficiencies, and solicit their input on proposed improvements.6 4 2 1 2.09 Identify improvements to the water distribution system to ensure that adequate water can be transmitted to customers at required flows and pressures. This will include both the existing water distribution system and expansion of the water distribution system in areas of new development. 1 6 1 2.10 Prepare a map of water age, and identify points or areas of oldest water under various seasonal pumping scenarios 8 2 2.11 Additional On Call Water Modeling Services and Modeling Support 8 40 4 2 Task Hour Total 128 19 85 8 0 6 9 1 Task Cost $16,000 3,021$ 9,690$ 1,272$ -$ 684$ 1,269$ 80$ Total Task 12 $30,600 $6,519 $18,810 $1,908 $0 $912 $2,115 $240 Existing Water System Facilities S:\KO\L\Lakmo\Common\RFPs\Water Modeling_2020\Lake Elmo Model Update and Source Modeling v2.xlsx 12/8/2020 8:22 AM Page 2 of 2