HomeMy WebLinkAbout#09 - OV Phase 4 Change Order 3 STAFF REPORT DATE: February 4, 2020 CONSENT AGENDA ITEM: Old Village Phase 4 Street, Drainage, and Utility Improvements – Change Order No. 3 SUBMITTED BY: Chad Isakson, Project Engineer REVIEWED BY: Kristina Handt, City Administrator Jack Griffin, City Engineer ISSUE BEFORE COUNCIL: Should the City Council approve Change Order No. 3 for the Old Village Phase 4 Street, Drainage, and Utility Improvements? BACKGROUND: A-1 Excavating, Inc. was awarded a construction contract on June 5, 2018 to complete the Old Village Phase 4 Street, Drainage, and Utility Improvements project. Construction is complete. PROPOSAL DETAILS/ANALYSIS: A-1 Excavating, Inc., has submitted a change order to address additional work being requested by the City including: 1. Installation of two signs on 36th Street and Layton Avenue required concrete core drills not covered in the contract. 2. Installation of the storm sewer pipe through 11320 Upper 33rd Street required the removal of an existing wood staircase. The contractor removed and rebuilt the staircase to complete this work. 3. Change Storm Sewer Catch Basin 105B casting originally specified to a casting that would match into knock down curb that was installed. FISCAL IMPACT: This change order will increase the contract in the amount of $1,744.02 bringing the revised construction contract to $1,731,999.23. With this change order, the project remains within the authorized project budget and contingencies RECOMMENDATION: Staff is recommending that the City Council approve, as part of the Consent Agenda, Change Order No. 3 for the Old Village Phase 4 Street, Utility, and Drainage Improvements. If removed from the consent agenda, the recommended motion for the action is as follows: “Move to approve Change Order No. 3 for the Old Village Phase 4 Street, Drainage, and Utility Improvements, thereby increasing the contract amount by $1,744.02”. ATTACHMENTS: 1. Change Order No. 3. CONTRACT CHANGE ORDER FORM CHANGE ORDER NO.DATE: TO: UNIT EA LS LS Amount of Original Contract $ Sum of Additions/Deductions approved to date (CO Nos. 1, 2)$ Contract Amount to date $ Amount of this Change Order   (ADD)   (DEDUCT)   (NO CHANGE)$ Revised Contract Amount $ The Contract Period for Completion will be   (UNCHANGED)  (INCREASED)  (DECREASED)days APPROVED BY ENGINEER:  FOCUS ENGINEERING APPROVED BY CONTRACTOR DATE DATE APPROVED BY OWNER:  CITY OF LAKE ELMO, MINNESOTA DATE DATE $1,744.02 CITY OF LAKE ELMO, MINNESOTA BYBY CHANGE ORDER DESCRIPTION / JUSTIFICATION: This change order addresses additional work scope as requested by the City and as detailed below.  1) Installation of two signs on 36th Street / Layton Avenue required concrete core drills not originally included in the contract.  2) Installation of the storm sewer pipe through 11320 Upper 33rd Street required removal of an existing wood staircase. The  contractor removed and rebuilt the staircase to complete the work. 3) Change Catch Basin 105B casting to a R‐3209A casting to match knock down curb Attachments  (list documents supporting change):Itemization DESCRIPTION OF PAY ITEM QTY UNIT PRICE CO3‐1 Concrete Core Drill for Sign Installation NET CONTRACT CHANGE $303.00CO3‐3 Catch Basin Casting Type Change 1 $303.00 ITEM $300.00 $1,141.02CO3‐2 Replace Wood Staircase Removed for Storm Sewer  Installation 1 $1,141.02 2 $150.00 A‐1 Excavating, Inc, 408 26th Avenue PO Box 90, Bloomer, WI 54724 OLD VILLAGE PHASE 4 IMPROVEMENTS PROJECT NO. 2017.157 3 February 4, 2019 0 This Document will become a supplement to the Contract and all provisions will apply hereto. The Contract Documents are  modified as follows upon execution of this Change Order.  BYENGINEER 1,698,744.21 31,511.00 1,730,255.21 1,744.02 1,731,999.23 INCREASE/(DECREASE) 1/24/2020 FOCUS Engineering, inc.CHANGE ORDER FORM 1/24/2020 CHANGE ORDER NO. 3 OLD VILLAGE PHASE 4 IMPROVEMENTS CITY OF LAKE ELMO, MINNESOTA PROJECT NO. 2017.157 QUANTITY UNIT PRICE AMOUNT CO3‐1 EA 2.0 $150.00 $300.00 CO3‐2 LS 1.0 $1,141.02 $1,141.02 CO3‐3 LS 1.0 $303.00 $303.00 TOTALS ‐ CHANGE ORDER NO. 3 $1,744.02 ITEM DESCRIPTION OF PAY ITEM UNIT CHANGE ORDER Concrete Core Drill for Sign Installation DESCRIPTION / JUSTIFICATION Replace Wood Staircase Removed for Storm Sewer Installation Catch Basin Casting Type Change Installation of two signs on 36th Street / Layton Avenue required  concrete core drills not originally included in the contract. Installation of the storm sewer pipe through 11320 Upper 33rd Street  required removal of an existing wood staircase. The contractor  removed and rebuilt the staircase to complete the work. Change Catch Basin 105B casting to a R‐3209A casting to match knock  down curb