HomeMy WebLinkAbout#03 - February 2020 Monthly PW ReportMAYOR AND COUNCIL COMMUNICATION
DATE 3/17/2020
CONSENT
AGENDA ITEM: Public Works Director Report
SUBMITTED BY: Marty Powers, Public Works Director
REVIEWED BY: Kristina Handt, City Administrator
ISSUE BEFORE COUNCIL:
City Council is asked to review and accept, as part of Consent Agenda, a brief description of activities
that have taken place in the Public Works Department in the month of February, 2020.
PROPOSAL DETAILS/ANALYSIS:
STREETS
• Attended to streets, parking lots and city owned sidewalks after winter weather
events
• Wing back snow banks along road ways to increase storage area
• Wash trucks and equipment after snow events
• Continue tree trimming in ROWs
• Place radar trailer on Lake Elmo Ave for one week
• Work with engineering to backfill test bore holes in Heritage Farms project
• Annual League of MN Cities insurance facility review
• Clean up scrap metal pile at shop
• Compile Public Works asset photos and information for improving our records
along with the Insurance Company’s
• Applied for cost sharing of the new tandem plow truck’s pre-wet road salting
system
• Enforce winter sidewalk ordinance
• Replenish road salt supply
• Continue street sign replacement program
• Begin filling potholes on City streets
• Complete annual Fire extinguisher inspection and maintenance
• Complete and submit the 2019 hazardous material inventory reports for MPCA and
the annual MDPS tier II emergency report
• Continue ongoing maintenance on trucks and equipment
• Identified radiator coolant leak in Public Works shop generator. Collect pricing and
scheduled repair
• Set up and take down election booths
City Council Meeting Date Consent/Regular Agenda Item #__
Page 2
PARKS
• Weekly garbage collection continues
• Continue clearing snow and flooding skating rinks
• Continue to groom Sunfish Lake Park trails after snow events
• Award mowing contract
• Attempted to burn the buckthorn pile at Sunfish Lake Park. Will retry after the
wood dries out more
• Closed ice rinks and warming house for the season on 2/24/2020 due to ice
conditions
WATER
• PW staff continue meter replacement program
• Complete monthly bacteria and fluoride sampling
• Complete Monthly Generator and Safety Inspections of Equipment and Facilities
• Continue daily rounds, chlorine/fluoride sampling and locates
• Replace well 2 pre-lube solenoid
• Completed annual above ground well and booster pump inspections. No issues
identified
• Changed oil and grease well motors
• MDH annual inspection and sampling of wells and water
• Soft start component failure at 94 lift station cabinet, alarms and replacement
• Complete and submit 2019 ESPS water report and the DNR’s 2019 water
conservation report
• Replace well 2 fluoride chemical pump
SEWER
• Continue Weekly Proactive Pump downs of all Lift stations & Monthly Float
Cleaning
• TPC continued to resolve software update issues
• Assist with inspecting Hamlet sanitary sewer
• Replace damaged mix flush valve on a pump in the 94 lift station
• Spec out and present to MAC the Utility Van replacement
• Took delivery of new service truck, attached decals, began outfitting and staff
training
• Public Works staff attended OSHA monthly training
• Complete and submit 2019 Met Council sewer survey
• Continue to investigate pressure reducing valve inconsistencies and planning for
engineering
SURFACE WATER
• Continue MS4 bee hive software formatting and data entry
• Unthaw frozen culverts and storm sewers proactively to minimize spring thaw issues
using our new steamer/jetting unit
• Attended Washington County’s Flood meeting
• Met with Woodbury Public Works regarding their use of the asset management tool
Beehive, their MS4 program and street sign management
• Scheduled spring street sweeping for the first part of April, weather dependent
City Council Meeting Date Consent/Regular Agenda Item #__
Page 3
RECOMMENDATION:
Base on the activities listed above, City Council is respectfully asked to accept the February 2020 Public
Works Report.