HomeMy WebLinkAbout#14 - Northport 3rd AdditionSTAFF REPORT DATE: 3/4/2020 BUSINESS ITEM TO: City Council FROM: Ben Prchal, City Planner ITEM: Northport 3rd Addition Final Plat and Easement Vacation REVIEWED BY: Ken Roberts, Planning Director Planning Commission BACKGROUND: The Planning Commission had a chance to review an easement vacation request for the Northport 3rd addition on the 10th of February, 2020. The City Council will need to review the Easement Vacation 3rd Addition, Final Plat request from Pulte Homes of MN LLC, which is part of a planned 104 unit residential development. The 3rd Addition includes 41 single family lots that are located among 7.43 acre on the north eastern part of the subdivision. This request and final plat will be the last phase of the overall development. ISSUE BEFORE CITY COUNCIL: The City Council is being asked to review a Final Plat and Easement Vacation request for the Northport 3rd Addition. PROPOSAL DETAILS/ANALYSIS: General Information. Applicant: Pulte Homes of MN LLC, 7500 Flying Cloud Drive, Ste 670, Eden Prairie, MN 55344 (will act as both developer of the property and builder of homes) Location: PID# 13.029.21.44.0057 Request: Application for final plat approval of a 41 unit residential subdivision to be named Northport 3rd Addition and Easement Vacation Zoning: LDR – Low Density Residential Surrounding: North – Easton Village (LDR); West – Reid Park; South – Heritage Farms (OP-PUD); East – Lake Elmo Airport (Baytown Township). Comp. Plan: Village Urban Low Density Residential (1.5 - 2.49 units per acre) History: Property was included in Village Planning Area boundary and municipal sewer service area as defined in the 2013 Village Land Use Plan. A Comprehensive Plan Amendment was approved by Res. 2014-60, Preliminary Plat was approved by Res. 2014-74, 1st Addition (36 units) approved by Res. 2017-089, 2nd addition approved by Res. 2018-081 (29 units approved, 27 platted). Action Deadline: Application Complete – 1/16/2020 60 Day Deadline – 3/16/2020 Extension Letter Mailed – No Regulations: Chapter 153 – Subdivision Regulations Article 10 – Urban Residential Districts (LDR) §150.270 Storm Water, Erosion, and Sediment Control 2 Consistency with Preliminary Plat The proposed addition is consistent with the preliminary plat that was approved in 2014. However, engineering comments will need to be addressed before construction. Most lot sizes meet or exceed the minimum lot size requirement for the Urban Low Density Zoning District and those that do not are addressed in the conditions section. The development received approval to plat 36 units in the 1st addition, 29 units in the 2nd addition, and 41 units in the 3rd addition. This comes to a total of 106 units, however, only 104 were approved during preliminary approval. Although this is the case, only 27 lots were actually platted in the 2nd addition, which leaves the development in compliance with preliminary approval. Outlots. • During this phase of development the City will not be acquiring any outlots. All required outlots have been obtained during previous phases. Right-of-Way. There is 2.67 acres of right-of- way being dedicated to the City. Parkland. The developer met the City’s parkland dedication requirements through the deeding of Outlot C, which is now an extension of Reid Park. The developer is not responsible for additional park fees or improvements with this addition. Engineering Comments. The City Engineer comments can be found as an attachment as Northport 3rd Addition Final Plat review memos dated February 2, 2020. Staff is recommending, as a condition of approval that all of the comments outlined in the reports be followed. The construction plan memo holds the bulk of the comments. Metropolitan Airports Commission (MAC) Comments. Due to MAC’s review comments regarding the 1st Addition, it was a condition of approval that the applicant provide a disclosure statement to all first homeowners in the development advising of the airport and associated over-flights, and all builders shall be encouraged to incorporate interior noise reduction measures in to single family residential structures within the subdivision based on the Metropolitan Council’s Builder Guide. Staff recommended this be a condition in 2nd addition and again recommends it as a condition of 3rd addition. The MAC has not asked to change or add conditions. Building Official/Public Safety Review. Neither department had comments pertaining to the 3rd Addition. Access. There is a connection to Village Parkway, serving as the primary access and circulation route for the development. This phase of development will also connect Village Parkway to Easton Village. Landscape Plans. The City’s Landscape Architect reviewed the landscape plans, and the report is attached. The majority of the comments pertain to spacing issues with utilities, Village Parkway requirements, etc. 3rd Addition 2nd Addition 3 Fortunately there were only 4 findings, but a revised landscape plan and approval from the Landscape Architect will still be required. Buffering. Additional buffering beyond the landscape architects memo will not be required. Generally buffering is needed when a more intense use butts up to a less intense use. Regarding this phase the “use” butts up to an existing use of the same caliber, low density single family. Streets/Sidewalk. The street names proposed on the 3rd addition plat are not consistent with what was provided in the 2nd addition. However, the street naming does match the current ordinance. There are sidewalks shown in the 3rd addition which adhere to the Village Parkway Design standard(s). 153.09 12.) ii. - The names of deflecting streets shall not vary; names of continual streets shall not change, even if the street changes direction, unless an intersection exists. Final Plat Approval Process. The City’s subdivision ordinance establishes the procedure for obtaining final subdivision approval, in which case a final plat may only be reviewed after the City takes action on a preliminary plat. As long as the final plat is consistent with the preliminary approval, it can be approved by the City. Please note that the City’s approval of the Preliminary Plat did include a series of conditions that must be met by the applicant, which are addressed in the “Review and Analysis” section below. There are no public hearing requirements for a final plat. However, because there is an existing easement that needs to be vacated over Outlot A a public hearing was required, which the Planning Commission held. In order to provide the City Council with an update concerning the conditions associated with the preliminary plat for Northport (formerly known as Village Park Preserve), Staff has prepared the following: Preliminary Plat Conditions as designated by Resolution 2014-74 – With Staff Update Comments (updated information in bold italics): 1) The Metropolitan Council must approve the Comprehensive Plan Amendment for the Holliday parcel in advance of the City’s consideration of an application for Final Plat for the Village Park Preserve Subdivision. Comments: The Metropolitan Council approved the Comprehensive Plan Amendment for the Holliday parcel on September 23, 2014, i.e. not applicable. 4 2) In advance of Final Plat application, the applicant shall provide adequate title evidence satisfactory of the City Attorney. Comments: This condition is met. 3) All required modifications to the plans as requested by the City Engineer in a review memorandum dated September 4, 2014 shall be incorporated into the plans prior to consideration of a Final Plat. Comments: The conditions from 2014 were addressed in previous additions. The City Engineer has provided Staff comments for this phase of the development which are in line with the preliminary approval. 4) The Preliminary Plat approval is conditioned upon the applicant meeting all minimum City standards and design requirements. Comments: The City Engineer has approved the Preliminary Plans. 5) The developer shall follow all of the rules and regulations spelled out in the Wetland Conservation Act, and shall acquire the needed permits from Valley Branch Watershed District prior to the commencement of any grading or development activity on the site. Comments: The Applicant will need to obtain a Valley Branch Watershed District permit for the 3rd Addition. 6) Related to the proposed storm water discharge to the south, the Applicant must provide written permission from all property owners of the affected parcels located south of the proposed 30th Street culvert consenting to the discharge location, volume and rate(s) in advance of submitting Final Plat. Comments: The applicant has provided a Drainage and Utility Easement, Temporary Construction Easement, and Right-of-Way easement from the McLeod property, as well as a Temporary Construction Easement from the Krueger property with the 1st Addition. 7) The Applicant shall be responsible for the submission of final plans and the construction of all improvements within the 30th Street right-of-way as required by the City and further described in the review memorandum from the City Engineer dated September 4, 2014. Comments: This condition is met but also not applicable to this addition. 8) The Applicant shall observe all right-of-way and other requirements included in a review memorandum from Washington County dated September 3, 2014. Comment: This condition does not apply to this addition. 9) The Landscape Plan shall be updated per the recommendations of the City’s Landscape Consultant, described in a memo dated September 4, 2014. Tree protection measures for trees intended to be saved according to the submitted Tree Survey must be included in the Final Landscape Plan. Comments: The City Landscape Architect has reviewed the plans and addressed the 3rd addition as it relates to preliminary approval and the City Code. 10) The Applicant must enter into a separate grading agreement with the City prior to the commencement of any grading activity in advance of Final Plat and plan approval. The City Engineer shall review any grading plan that is submitted in advance of Final Plat, and said plan shall document extent of any proposed grading on the site. Comment: Grading for phase 3 will be addressed in the Development Agreement. 11) The Applicant shall install an additional row of trees in the rear of Lots 1-3, Block 1 to provide additional screening for the eastern boundary of the McLeod property to satisfy the condition of approval related to the requested Comprehensive Plan Amendment. Comments: This condition is not applicable to the 3rd Addition. 5 12) The developer shall obtain all required permits from Northern Natural Gas to perform construction work over the gas line that runs from north to south across the site. Comments: The need for a permit is essential for the entire development but is not as relevant for the 3rd addition. 13) The developer shall submit a letter from the Metropolitan Airports Commission agreeing to design of stormwater facilities acceptable to the City prior to submitting the Final Plat application. Comments. The MAC provided a letter dated December 5, 2014 to the City which indicates that while they do not advocate the construction of open-water retention ponds in close proximity to their airports, but they acknowledge both the engineering challenges on the development site that make the sole use of dry ponds or infiltration basins impractical and the efforts being made by the City to design and construct a regional stormwater retention system to reduce the volume and rate of unmitigated stormwater flowing to parcels in the immediate vicinity of the airport. There are no stormwater ponds created with this phase. Recommended Findings. Staff is recommending that the City council consider the following findings in regards to the proposed Northport 3rd Addition Final Plat: 1) That all the requirements of City Code Section 153.10 related to the Final Plan and Final Plat have been met by the Applicant. 2) That the proposed Final Plat for Northport 3rd Addition consists of the creation of 41 single-family detached residential structures. 3) That the Northport 3rd Addition Final Plat is generally consistent with the Preliminary Plat and Plans as approved by the City of Lake Elmo on September 16, 2014 and as amended on September 6, 2017. 4) That the Northport 3rd Addition Final Plat is consistent with the Lake Elmo Comprehensive Plan and the Future Land Use Map for this area. 5) That the Northport 3rd Addition Final Plat complies with the City’s Urban Low Density Residential zoning district regulations. 6) That the Northport 3rd Addition Final Plat complies with all other applicable zoning requirements, including the City’s landscaping, storm water, sediment and erosion control and other ordinances. 7) That the Northport 3rd Addition Final Plat complies with the City’s subdivision ordinance. 8) That the Northport 3rd Addition Final Plat is generally consistent with the City’s engineering standards with the exception of necessary plan revisions outlined by the City Engineer in his review comments to the City regarding Northport 3rd Addition Final Plat dated February 2, 2020. Recommended Conditions of Approval. Based off of input from other agencies and City departments Staff is recommending the following conditions. 1) Required modifications to final grading, drainage, and erosion control plans, sanitary and storm water management plans, landscape plans, street and utility, etc. shall be reviewed and approved by the City Engineer and applicable Staff prior to the recording of the Final Plat. All changes and modifications to the plans requested by the City Engineer in the memorandums (Final Plat Engineering Review & Final Construction Plans), dated February 10, 2020 addressing Northport 3rd Addition Final Plat shall be incorporated prior to the recording of the final plat. Final Plans and Specifications must be prepared in accordance with City Engineering Design Standards Manual dated April 2019 using City details, plan notes, and specifications. 6 2) All easements as required and approved by the City Engineer and Public Works Director shall be documented on the Final Plat prior to release of the Final Plat for recording. 3) Prior to the execution of the Final Plat by City officials, the Developer shall enter into a Developer’s Agreement acceptable to the City Attorney and approved by the City Council that delineates who is responsible for the design, construction, and payment of the required improvements for the Northport 3rd Addition Final Plat with financial guarantees. 4) The findings outlined in the City Landscape Architects review memo dated January 27, 2020 must be addressed and an updated plan must be approved by the City’s Landscape Architect. 5) A Landscape License Agreement shall be executed for the maintenance of right-of-ways prior to release of the final plat by City Officials. 6) The applicant shall provide a disclosure statement to all first homeowners in the development advising of the airport and associated over-flights, and all builders shall be encouraged to incorporate interior noise reduction measures into single family residential structures within the subdivision based on the Metropolitan Council’s Builder Guide. 7) The Applicant shall provide the City with a copy of the Northern Natural Gas permit and abide by any conditions of approval. 8) The developer shall follow all of the rules and regulations spelled out in the Wetland Conservation Act. 9) The approved plat shall be recorded with Washington County within 180 days after approval, failure to record will cause the approval to become void. RECOMMENDATION Staff recommends, due to consistency with the preliminary plat that the City council approve the Northport 3rd Addition Final Plat with conditions of approval as listed in the Staff report. Suggested motion: “Move to approve Resolution 2020-021 for the Northport 3rd Addition Final Plat with the listed conditions of approval” EASEMENT VACATION Due to an existing easement that resides over OutLot A, which was established during the 2nd Addition, the applicant needs to peruse an easement vacation. If the easement is not vacated the applicant will not be able to plat the property and convert it into single family lots. New easements will be appropriately established to accommodate the needs of the City for the 3rd Addition. Staff is recommending approval of the vacation with conditions. Recommended findings. - That the applicant has fulfilled the City application requirements. 2nd Addition 7 - That the existing easement that resides over Outlot A of the 2nd Addition will no longer serve a functional purpose after the approval and subsequent platting of the Northport 3rd Addition. - That the dedication of new easements will be provided with the recoding of North Port 3rd Addition to provide the same function as the easement that is being vacated. Which is not expected to have a negative impact to the public purpose. Recommended Conditions of Approval. - The final plat of Northport 3rd Addition must be approved by the City Council. - That the dedication of new easements will be provided with the recoding of Northport 3rd Addition to provide the same function as the easement(s) that is being vacated. RECOMMENDATION “Move to approve Resolution 2020-021 approving easement vacation for Outlot A of the Northport 2nd Addition with recommended conditions of approval.” Planning Commission and Staff Review Both the Planning Commission and City Staff recommend approval of the easement vacation. The Commission voted for vacation by a 7-0 vote. ATTACHMENTS: 1. Final Plat and Landscape Plans 2. City Engineer Review Memos dated February 10, 2020 3. Landscape Review Memo dated January 27, 2020 4. Resolution 2020-021 - Approving Phase 3 of the Northport Development 5. Resolution 2020-022 - approving the Easement Vacation 3rd Addition     PAGE 1 of 1  MEMORANDUM         Date:  February 10, 2020        To:  Ken Roberts, Planning Director  Re:  Northport 3rd Addition – Final Plat   Cc:  Chad Isakson, P.E., Assistant City Engineer    Engineering Review Comments  From:  Jack Griffin, P.E., City Engineer          An engineering review has been completed for Northport 3rd Addition. Final Plat/Construction Plans were received  on January 9, 2020. The submittal consisted of the following documentation prepared by Sathre‐Bergquist, Inc.,  unless noted otherwise:     Northport 3rd Addition Final Plat received January 9, 2020. No print/preparation date.   Northport 3rd Addition Construction Plans dated January 3, 2020.   Northport 3rd Addition Specifications dated January 3, 2020.   Northport 2nd Addition Landscape Plans dated January 7, 2020, prepared by Norby & Associates.      STATUS/FINDINGS:   Engineering review comments have been provided in two separate memos; one for Final Plat  approval, and one to assist with the completion of the final Construction Plans. Please see the following review  comments relating to the Final Plat application.      FINAL PLAT: NORTHPORT 3RD ADDITION   Final Construction Plans and Specifications must be prepared in accordance with the City Engineering Design  Standards  Manual  dated  April  2019,  using  City  details,  plan  notes  and  specifications  and  meeting  City  Engineering Design Guidelines.   Final  Construction  Plans  and  Specifications  must  be  revised  in accordance  with  the  Construction  Plan  engineering review memorandum dated February 10, 2020.    All easements as requested by the City Engineer and Public Works department shall be documented on the  Final Plat prior to the release of the Final Plat for recording.    The Final Plat shall not be recorded until final construction plan approval is granted.   No construction for Northport 3rd Addition may begin until the applicant has received City Engineer approval  for the Final Construction Plans; the applicant has obtained and submitted to the City all applicable permits,  easements and permissions needed for the project; and a preconstruction meeting has been held by the City’s  engineering department.  FOCUS ENGINEERING, inc.  Cara Geheren, P.E.   651.300.4261  Jack Griffin, P.E.                651.300.4264  Ryan Stempski, P.E.  651.300.4267  Chad Isakson, P.E.  651.300.4283      PAGE 1 of 2  MEMORANDUM         Date:  February 10, 2020      To:  Bob Molstad, Sathre‐Bergquist, Inc.  Re:  Northport 3rd Addition – Final Construction Plans   Cc:  Chad Onsgard, Pulte Homes    Engineering Review Comments    Ken Roberts, Planning Director        Chad Isakson, P.E., Assistant City Engineer      From:  Jack Griffin, P.E., City Engineer          An engineering review has been completed for the Northport 3rd Addition. Final Plat/Final Construction Plans were  received on January 9, 2020. The submittal consisted of the following documentation prepared by Sathre‐Bergquist,  Inc. or as noted:     Northport 3rd Addition Final Plat received January 9, 2020. No print/preparation date.   Northport 3rd Addition Construction Plans dated January 3, 2020.   Northport 3rd Addition Specifications dated January 3, 2020.   Northport 2nd Addition Landscape Plans dated January 7, 2020, prepared by Norby & Associates.      STATUS/FINDINGS:   Engineering review comments have been provided to assist with the completion of the final  Construction Plans and Northport 3rd Addition Final Plat. When submitting revised plans and specifications, please  provide a point by point response letter that details all changes made to the plans.      FINAL CONSTRUCTION PLANS   Sheet 1. Title Sheet. Add plan note to identify the standard of care guideline for the collection and depiction  of existing subsurface utility data per CI/ASCE 38‐02; in accordance with State Stature 216D.    Sheet 1. Title Sheet. Correct the sheet index table page numbering to match plan sheets.   Sheet 2. Revise plan sheet to show existing street light fixtures along Village Parkway up to 32nd Street  North. Revise street lighting plan as needed to meet Village Parkway design standards.   Sheet 2. Only one street sign is needed at the intersection of Village Parkway and Upper 31st. Remove the  proposed street sign on the northeast quadrant.   Sheet 2. Revise plan sheet to show existing no parking signs along Village Parkway up to 32nd Street North.  Revise no parking signage based on existing sign spacing.   Sheet 2. Add no parking signs to the island in the Upper 31st Street eyebrow similar to the proposed signage  in 2nd Addition.   Sheet 2. Revise plan notes and city sign details with April 2019 revisions.   Sheet 3. Revise Typical Section for Village Parkway to be consistent with approved preliminary plans and  proposed Northport 3rd Addition plans.   Sheet 4. Verify existing profile along Village Parkway. Plans must show existing conditions as field verified.      Sheet 4. Extend the proposed draintile out of CBMH C14 to STA 13+00 on Village Parkway.   Sheet 8. Add a mainline GV at the connection to the existing watermain in Easton Village.   Sheet 9. Show the proposed 36‐inch storm sewer pipe in profile view at the watermain offset (STA 14+75).  FOCUS ENGINEERING, inc.  Cara Geheren, P.E.   651.300.4261  Jack Griffin, P.E.                651.300.4264  Ryan Stempski, P.E.  651.300.4267  Chad Isakson, P.E.  651.300.4283      PAGE 2 of 2   Sheet 10. Revise casting type for structures C14 and C16, note calls for drive over casting (R‐3501 TB) but R‐ 3067‐V is shown.   Sheet 12. Add 4‐foot sump to CBMH A13. Label as sump manhole in both plan and profile view.   Sheet 12. Final Grading. Revise plan sheet to number 13.   Sheet 14. Add proposed missing rear lot corners for Lot 9, Block 1 (2x).   Sheet 14. Lots 10‐16, Block 1. Add spot elevations at all rear lot easement corners adjacent to the proposed  100‐year HWL. As‐built lot corners and easement corner elevations must be verified with as‐built grading to  maintain 100‐year HWL within drainage and utility easements.   Sheet 15. Correct legibility of rear lot corner between Lot 8‐9, Block 2.    Sheet 15. Lots 1‐9, Block 2. Add spot elevations at all rear lot easement corners adjacent to the proposed  100‐year HWL. As‐built lot corners and easement corner elevations must be verified with as‐built grading to  maintain 100‐year HWL within drainage and utility easements.   Landscaping  Plans.  Revise  plans  to  maintain  minimum  10‐foot  separation  from  all  utilities  including  water/sewer services.    SPECIFICATIONS   Revise Specifications to include updated Lake Elmo City Standard Specifications for Public Infrastructure  dated April, 2019.   Revise sheet SP‐1 note at the top of page to reference City Standard Specifications dated April, 2019.   Vi l l a g e P a r k w a y N LOWER 31ST STREET N Village Parkway N LOWER 31ST STREET NUPPER 31ST STREET NUPPER 31ST STR E E T NUPPER 30TH STREET NLI B E R T Y C O U R T N UPPER 31ST STREET NUPPER 31ST STREET N 6' SIDEWALK6' S I D E W A L K 6' SIDEWALK8' T R A I L 8' TRAIL 6' S I D E W A L K 8' TR A I L 8' TRAIL 6' SIDEWALK EXISTING 6' SIDEWALK EXISTING 8' TRAIL STREET NUPPER 30TH >>>>>>>>>> >> >>>>>>>>> >>>>>>>>>>>>>>>>>>>>>>>>>>>SERVICES TO BEEXTENDED 10' PASTROW (TYP.)SERVICES TO BEEXTENDED 10' PASTROW (TYP.)SERVICES TO BEEXTENDED 10' PASTROW (TYP.)SERVICES TO BEEXTENDED 10' PASTROW (TYP.)60 LF - 36"JACKING PIPEFES INV-912.5FES INV-912.5FES INV-912.5FES INV-912.5FES INV-912.5FES INV-912.5FES INV-913.0FES INV-912.0FES INV-912.0FES INV- 912.5FES INV-911.0FES INV-911.0FES INV-911.0FES INV-911.0FES INV-911.0FES INV-911.0FES INV-910.5FES INV-910.5FES INV-911.0>>>IRRIGATIONSERVICE> >>>>>>>>>>>>>>>>>>>>>>>>> >>>>>>>>>>>>>>>>>>>>> >>>>>AP P R O X . 9 1 6 . 6 EX. 1 0 0 Y R H W L AP P R O X . 9 1 5 . 8 PR O P . 1 0 0 Y R H W L 10%MAX679101112PONDACCESS10%MAXPONDACCES S 1 0%MAX PONDACCESS10%MAXPONDACCESS10%MAXPONDACCESSPONDACCESS10%MAXINF ILT .ACCESS10%MAX2134766655511122334488856123456789101112131415161514131211109876543211234567891011121314151612345678654321123458131412345678910111213141516177OUTLOT F(CITY OWNED)OUTLOT B(CITY OWNED)OUTLOT E(CITY OWNED)OUTLOT H(CITY OWNED)OUTLOT A(CITY OWNED)OUTLOT A(CITY OWNED)1617187OUTLOT G(DEVELOPER OWNED)181911122331234567891011121314151612345678654321OUTLOT F(CITY OWNED)OUTLOT B(CITY OWNED)OUTLOT E(CITY OWNED)OUTLOT H(CITY OWNED)OUTLOT A(CITY OWNED)OUTLOT A(CITY OWNED)OUTLOT G(DEVELOPER OWNED)BHBHBHNPNPSNSNSNSNSNSNNPRMHLDMDMWOPERMRMROROHA4AC5GD3SB7BC6BC2SBNP3CCNPBHBHTATAHAHAHA3"-6" RIVER ROCKVINYL EDGING35GR13LB5BC36MY42AJ40CMDMDMDMDMDMDMDMDMRMRMRMROROROWOWOWOWOHAHAALALALALALALROWOWOHAHAHADMDMDMDMDMDMDMDMALWOHAHAHLHLRMHLHLHAPE3PE3RO3RO3RO3RM3RM3HL3HL3RO3HADMALPE3ALALPE3HLDRAWN BYCHECKED BYISSUEDNO.BYDATEREVISIONSSIGNED:DATE:REG. #:I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WASPREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM DULYREGISTERED LANDSCAPE ARCHITECT UNDER THE LAWS OF THE STATE OFMINNESOTA20144CITY PROJECT NO.FILE NO.1MKKN01/07/202001MK200211UPDATE PER CITY COMMENTSLAKE ELMO,MNNORTHPORTPULTE GROUP-----42/25/2020--02MK200225UPDATE PER CITY COMMENTS--PLANTHIS PLAN SET AND THE CONCEPTS REPRESENTEDHEREIN ARE THE PROPERTY OF NORBY ANDAND ASSOCIATES LANDSCAPE ARCHITECTS.CHANGES TO OR USE OF THIS PLAN SHALL REQUIRE PRIOR WRITTEN APPROVAL BYCNORTHREQUIRED SITETREE DECIDUOUSSTREET FRONTAGE2.5" TREE DECIDUOUSREQUIRED SITETREE CONIFEROUSSODUPLAND DRYPRAIRIE MIX20050100050100SCALE IN FEETKEYWET MESICPRAIRIE MIXREQUIRED SITEORNAMENTAL TREELANDSCAPE ARCHITECT NOTES:ALL TREES SHALL HAVE A MINIMUM DEPTH OF 6" HARDWOOD BARK MULCH 6' DIAMETER RINGAROUND THE BASE OF THE TREE. KEEP MULCH OFF TREE TRUNK.ALL STREET FRONTAGE TREE PITS AND BACK FILL SHALL BE FREE OF CLASS V OR SIMILAR MATERIAL.TREES ARE TO BE BACKFILLED WITH MnDOT 3877 F SOIL.MINIMUM OF 2 ROWS OF SOD BEHIND CURB.AREAS WITH SIDEWALKS SHALL BE SODDED FROM BACK OF CURB TO SIDEWALK. SOD SHALL MEETMNDOT 3878 C SPECIFICATION FOR SALT TOLERANCE.ALL RESIDENTIAL LOTS SHALL BE TEMPORARILY SEEDED WITH UPLAND GRASS MIX.ALL OUTLOTS SHALL BE PERMENANTLY SEEDED WITH UPLAND DRY PRAIRIE MIX WITH EXCEPTION TOOUTLOTS TO BE SODDED AS SHOWN IN PLAN.ALL SOD INSTALLED ON VILLAGE PARKWAY N SHALL MEET MNDOT 3878 C SPECIFICATION FOR SALTTOLERANCE.STREET FRONTAGE3.0" TREE DECIDUOUSPH3 LANDSCAPE PLAN LOWER 31ST STREET N Village Parkway N LOWER 31ST STREET NUPPER 31ST STREET NUPPER 31ST ST R E E T N UPPER 31ST STREET N6' SIDEWALK6' SIDEWALK8' TRAIL8' TRAIL 6' SIDEWALK EXISTING 6' SIDEWALK EXISTING 8' TRAIL>>>>>>>>>>>>>>>>>>>>>>> > >>>>>>>>>>>>>>>>>>> >>>>>>>>> > >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>SERVICES TO BEEXTENDED 10' PASTSERVICES TO BEEXTENDED 10' PASTROW (TYP.)FES INV-912.5FES INV-912.5FES INV-912.5FES INV-912.5FES INV-912.5FES INV-912.5FES INV-913.0FES INV-911.0FES INV-911.0FES INV-911.0>>>>>>> > > > > >>>>>> >>>> >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>10%MAX679101112PONDACCESS10%MAXPONDACCESSPONDACCESS10%MAX6555448881234567816151413121110987654321612345813141234567891011121314151617OUTLOT F(CITY OWNED)OUTLOT B(CITY OWNED)OUTLOT A(CITY OWNED)OUTLOT G(DEVELOPER OWNED)18196OUTLOT F(CITY OWNED)OUTLOT B(CITY OWNED)OUTLOT A(CITY OWNED)OUTLOT G(DEVELOPER OWNED)BHBHBHNPNPSNSNSNSNSNSNNPRMHLDMDMWOPERMRMROROHA4AC5GD3SB7BC6BC2SBNP3CCNPBHBHTATAHAHAHADMDMDMDMDMDMDMDMRMRMRMROROROWOWOWOWOHAHAALALALALALALROWOWOHAHAHADMDMDMDMDMDMDMDMALWOHAHAHLHLRMHLHLHAPE3PE3RO3RO3RO3RM3RM3HL3HL3RO3HADMALPE3ALALPE3HLDRAWN BYCHECKED BYISSUEDNO.BYDATEREVISIONSSIGNED:DATE:REG. #:I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WASPREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM DULYREGISTERED LANDSCAPE ARCHITECT UNDER THE LAWS OF THE STATE OFMINNESOTA20144CITY PROJECT NO.FILE NO.2MKKN01/07/202001MK200211UPDATE PER CITY COMMENTSLAKE ELMO,MNNORTHPORTPULTE GROUP-----42/25/2020--02MK200225UPDATE PER CITY COMMENTS--PLANTHIS PLAN SET AND THE CONCEPTS REPRESENTEDHEREIN ARE THE PROPERTY OF NORBY ANDAND ASSOCIATES LANDSCAPE ARCHITECTS.CHANGES TO OR USE OF THIS PLAN SHALL REQUIRE PRIOR WRITTEN APPROVAL BYC100502502550SCALE IN FEETSCALE: 1" = 50'Tree and Shrub Plan21NORTHPH3 LANDSCAPE PLAN >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>3"-6" RIVER ROCKVINYL EDGING35GR13LB5BC36MY42AJ40CMHLDRAWN BYCHECKED BYISSUEDNO.BYDATEREVISIONSSIGNED:DATE:REG. #:I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WASPREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM DULYREGISTERED LANDSCAPE ARCHITECT UNDER THE LAWS OF THE STATE OFMINNESOTA20144CITY PROJECT NO.FILE NO.3MKKN01/07/202001MK200211UPDATE PER CITY COMMENTSLAKE ELMO,MNNORTHPORTPULTE GROUP-----42/25/2020--02MK200225UPDATE PER CITY COMMENTS--PLANTHIS PLAN SET AND THE CONCEPTS REPRESENTEDHEREIN ARE THE PROPERTY OF NORBY ANDAND ASSOCIATES LANDSCAPE ARCHITECTS.CHANGES TO OR USE OF THIS PLAN SHALL REQUIRE PRIOR WRITTEN APPROVAL BYC201050510SCALE IN FEETSCALE: 1" = 5'Median Plan31NORTHPH3 LANDSCAPE PLAN Wenck | Colorado | Georgia | Minnesota | North Dakota | Wyoming Toll Free 800-472-2232 Web wenck.com To: Ken Roberts, City of Lake Elmo Planning Director From: Lucius Jonett, Wenck Landscape Architect Date: January 27, 2020 Subject: City of Lake Elmo Landscape Plan Review Northport 3rd Addition, Review #1 Submittals  Landscape Plans, dated December 30, 2019, received January 20, 2020. Location: Northwest quadrant of the intersection of 30th Street North and Manning Avenue North, Lake Elmo, MN Land Use Category: Village Urban Low Density Surrounding Land Use Concerns: The area to the west on the northern portion of the plat is designated as parkland. Special landscape provisions in addition to the zoning code: Greenbelt buffer is required on the south and east sides of the plat. Ken Roberts Planning Director City of Lake Elmo January 27, 2020 2 T:\6443 Lake Elmo\01 Northport\04 3rd Addition\01 Plan Review\2020-01-22\2020-01-27 Northport Phase 3 Landscape Plan Review.docx Tree Preservation: A tree survey/preservation plan has been previously submitted, including a tree inventory showing individual trees that are exempt, removed and saved. The allowable tree removal limit is not exceeded; therefore, no mitigation plan or replacement trees are required. *Residential development - mitigation replacement trees are in addition to landscape required tree counts. A. Tree replacement calculations follow the required procedure and are correct. B. This project is residential development; therefore, mitigation replacement trees shall be in addition to landscape required tree counts. Entire Site Total Caliper Inches of Significant Trees On-Site: 467.5 Cal Inches Common Trees 367.5 Conifer/Evergreen Trees 0 Hardwood Trees 100 Significant Inches Removed On-Site 83 Cal Inches Common Trees 83 Conifer/Evergreen Trees 0 Hardwood Trees 0 Tree Removal Limits (30% Significant Inches Removed On-Site) 140.25 Cal Inches Subtract Common Tree Removals 83 Subtract Conifer/Evergreen Tree Removals 0 Subtract Hardwood Tree Removals 0 Removals in excess of 30% allowance 0.00 Cal Inches Removals in Excess of Allowance 0.0 Cal Inches Conifer Removals in Excess of 30% Allowance 0.0 Hardwood Removals in Excess of 30% Allowance 0.0 Confier Tree Replacement Needed (1/2 the dia inches removed) 0.0 Cal Inches Hardwood Tree Replacement Needed (1/2 the dia inches removed) 0.0 Cal Inches Conifer Tree Replacement Required @ 3" per 6' Tall Tree 0 # Trees Hardwood Tree Replacement Required @ 2.5" per Tree 0 # Trees Ken Roberts Planning Director City of Lake Elmo January 27, 2020 3 T:\6443 Lake Elmo\01 Northport\04 3rd Addition\01 Plan Review\2020-01-22\2020-01-27 Northport Phase 3 Landscape Plan Review.docx Landscape Requirements: The master plan and the landscape plan for all three phases meet the code required number of trees. After implementation of phase three, there will be more than the code required tree quantities. Master Plan Phase 1 Phase 2 Phase 3 (Code Required) Proposed Required Proposed Street frontage 13770 220 0 687 Lineal Feet Lake Shore 0 0 0 0 Lineal Feet Stream Frontage 0 0 0 0 Lineal Feet Total Linear Feet 13770 220 0 687 Lineal Feet /50 Feet = Required Frontage Trees 276 4.4 0 14 Trees Development or Disturbed Area - - - - SF Development or Disturbed Area 51.0 22.0 11.0 15.0 Acres x5 = Required Development Trees 255 110 55 75 Trees Required Mitigation Trees 0 0 0 0 Required Number of Trees 531 114.4 55 89 Total Trees to Date 346 102 121 569 The landscape plans for the 3rd phase on its own does not meet the minimum compositions of required trees, but the overall development total composition does meet the minimum requirement. Approved Master Plan Qty % Composition Deciduous Shade Trees 326 70% >25% required Coniferous Trees 143 30% >25% required Ornamental Trees* 39 Tree Count 508 1st Addition Qty % Composition Deciduous Shade Trees 230 71% >25% required Coniferous Trees 93 29% >25% required Ornamental Trees* 23 Tree Count 346 2nd Addition Qty % Composition Deciduous Shade Trees 79 81% >25% required Coniferous Trees 19 19% >25% required Ornamental Trees* 4 Tree Count** 102 *Ornamental Trees are not included in totals **as shown on plan, not in tables 3rd Addition Qty % Composition Deciduous Shade Trees 95 79% >25% required Coniferous Trees 18 15% >25% required Ornamental Trees* 8 <15% required Tree Count 121 Ken Roberts Planning Director City of Lake Elmo January 27, 2020 4 T:\6443 Lake Elmo\01 Northport\04 3rd Addition\01 Plan Review\2020-01-22\2020-01-27 Northport Phase 3 Landscape Plan Review.docx Development Total Qty % Composition Deciduous Shade Trees 404 76% >25% required Coniferous Trees 130 24% >25% required Ornamental Trees* 35 Tree Count 569 A. A landscape plan has been submitted that does include all requirements. B. The landscape plan does not meet the landscape layout requirements: Tree Spacing ............................................................................................................... • No driveway conflicts: Trunk of trees shall be 10 feet minimum from the nearest driveway edge. Please provide a paving plan to ensure that there are no driveway conflicts. • No utility conflicts: Trunk of trees shall be 10 feet from the nearest utility, including water and sewer service stubs to each lot. C. Interior Parking Lot Landscaping – The development does not include interior parking lots. D. Perimeter Parking Lot Landscaping – The development does not include perimeter parking lots. E. Screening – A greenbelt buffer with screening is required on the east side of the overall development and is shown on the landscape plans. The landscape plan is consistent with the approved preliminary plat plans and does meet screening requirements. Special Landscape Considerations: A. Village Parkway Collector – The development is along Village Parkway. a. Phase 3 does front Village Parkway and the landscape plan does not meet all requirements. Tree Location with Sidewalk or Trail........................................... 6‐feet back of curb The typical section for south of the railroad tracks on Village Parkway states that all trees should be 6’ from back of curb and 3’ from edge of sidewalk or trail. Tree Spacing ................................................................... Every 75’ on Both Sides All trees along Village Parkway must follow a 75’ spacing, like stated in previous additions of the Northport Development. Ken Roberts Planning Director City of Lake Elmo January 27, 2020 5 T:\6443 Lake Elmo\01 Northport\04 3rd Addition\01 Plan Review\2020-01-22\2020-01-27 Northport Phase 3 Landscape Plan Review.docx Findings: 1. There are several proposed trees that conflict with utilities. See attached figure with conflicting trees highlighted in red. All trees must be 10’ away from any utility line. In previous plan reviews the note, “All trees shall be planted outside of 10’ utility easement, measured from the tree trunk to pipe. The landscape contractor shall be responsible for the field verification of all existing utilities, by calling Gopher One State prior to beginning work. The landscape contractor shall be responsible for the protection and repair of all damaged utilities as a result of landscaping construction at no cost to the owner.” was added to ensure there were no utility conflicts at the time of construction. Please add to Phase 3 sheets to ensure the same guidelines are followed. If there are still conflicts with utilities, some trees may be omitted since more trees are being provided than required. Trees may also be moved to the back of lots, but not planted in an outlot or easement area. Please review and move trees to fit these guidelines accordingly. 2. All trees must be 10’ away from any driveway. The submitted landscape plan does not show proposed driveways, so any conflicts cannot be seen or corrected. A note similar to utility conflicts may be added to ensure there are no driveway conflicts. Trees may be moved to a different location or omitted since more trees are being provided than required. Trees may also be moved to the back of lots, but not planted in an outlot or easement area. Please revise the landscape plan to show proposed driveways and move trees to fit these guidelines accordingly. 3. Because this phase is along Village parkway, all boulevard trees must be 75’ apart. This was the case in previous development phase reviews and will need to be continued for phase three. Please revise the 50’ tree spacing along Village Parkway to 75’ in accordance with code. 4. Because this phase is along Village parkway, all boulevard trees must be 6’ off back of curb and 3’ from edge of sidewalk or trail. It appears that these trees are currently spaced evenly between the sidewalk or trail and back of curb but will need to be adjusted to fit the dimensions provided on the City detail: Village Parkway Collector Typical Sections – South of Railroad Tracks. Please revise the tree spacing to be within the Village Collector guidelines. Recommendation: It is recommended that a condition of approval include: 1. Submit a revised landscape plan. Sincerely, Lucius Jonett, PLA (MN) Wenck Associates, Inc. City of Lake Elmo Municipal Landscape Architect 10%MAX679101112PONDACCESS10%MAXPONDACCESSPONDACCESS10%MAX6555448881234567816151413121110987654321612345813141234567891011121314151617OUTLOT F(CITY OWNED)OUTLOT B(CITY OWNED)OUTLOT A(CITY OWNED)OUTLOT G(DEVELOPER OWNED)18196OUTLOT F(CITY OWNED)OUTLOT B(CITY OWNED)OUTLOT A(CITY OWNED)OUTLOT G(DEVELOPER OWNED)LOWER 31ST STREET N Village Parkway N LOWER 31ST STREET NUPPER 31ST STREET NUPPER 31ST ST R E E T N UPPER 31ST STREET N6' SIDEWALK6' SIDEWALK8' TRAIL8' TRAIL 6' SIDEWALK EXISTING 6' SIDEWALK EXISTING 8' TRAIL>>>>>>>>>>>>>>>>>>>>>>> > >>>>>>>>>>>>>>>>>>> >>>>>>>>> > >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>SERVICES TO BEEXTENDED 10' PASTSERVICES TO BEEXTENDED 10' PASTROW (TYP.)FES INV-912.5FES INV-912.5FES INV-912.5FES INV-912.5FES INV-912.5FES INV-912.5FES INV-913.0FES INV-911.0FES INV-911.0FES INV-911.0>>>>>>> > > > > >>>>>> >>>> >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>BHBHBHNPNPSNSNSNSNSNSNNPRMHLDMDMWOPERMRMROROHA4AC5GD3SB7BC6BC2SBNP3CCNPBHBHTATAHAHAHADMDMDMDMDMDMDMDMRMRMRMRMROROROWOWOWOWOHAHAHAHAHAHAALALALALALALALHAROWOWOALALHAHAHADMDMDMDMDMDMDMDMALWOWOHAHAHLHLRMRMHLHLHAPE3PE3RO3RO3RO3RM3RM3HL3HL3RO3HADMALALPE3ALALPE3DRAWN BYCHECKED BYISSUEDNO.BYDATEREVISIONSSIGNED:DATE:REG. #:I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WASPREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM DULYREGISTERED LANDSCAPE ARCHITECT UNDER THE LAWS OF THE STATE OFMINNESOTA20144CITY PROJECT NO.FILE NO.2MKKN12/30/19--------LAKE ELMO,MNNORTHPORTPULTE GROUP-----41/7/20--PLANTHIS PLAN SET AND THE CONCEPTS REPRESENTEDHEREIN ARE THE PROPERTY OF NORBY ANDAND ASSOCIATES LANDSCAPE ARCHITECTS.CHANGES TO OR USE OF THIS PLAN SHALL REQUIRE PRIOR WRITTEN APPROVAL BYC100502502550SCALE IN FEETSCALE: 1" = 50'Tree and Shrub Plan21NORTHPH3 LANDSCAPE PLAN 1 Resolution 2020- CITY OF LAKE ELMO WASHINGTON COUNTY STATE OF MINNESOTA RESOLUTION NO. 2020-021 A RESOLUTION APPROVING A FINAL PLAT FOR NORTHPORT 3RD ADDITION WHEREAS, the City of Lake Elmo is a municipal corporation organized and existing under the laws of the State of Minnesota; and WHEREAS, Pulte Homes of MN, LLC, 7500 Flying Cloud Drive, Ste 670, Eden Prairie, MN 55344, has submitted an application to the City of Lake Elmo (“City”) for a Final Plat for Northport 3rd Addition Final Plat, a copy of which is on file in the City of Lake Elmo Planning Department; and WHEREAS, on June 30, 2014, the Lake Elmo Planning Commission reviewed a General Sketch Plan of the property; and WHEREAS, on July 15, 2014, the Lake Elmo City Council approved a Comprehensive Plan Amendment to re-guide PID# 13.029.21.44.0002 from Rural Area Development to Urban Low Density Residential; and WHEREAS, on September 8, 2014, the Lake Elmo Planning Commission held a public hearing, reviewed and recommended approval of the Village Park Preserve Preliminary Plat; and WHEREAS, on September 16, 2014, the Lake Elmo City Council adopted Resolution 2014-74 approving the Preliminary Plat for a 104-unit single family subdivision, subject to 13 conditions; and WHEREAS, on September 5, 2017, the Lake Elmo City Council adopted Resolution 2017-089 approving the Final Plat for Northport 1st Addition; and WHEREAS, the Lake Elmo City Council approved resolution 2018-081 for Northport 2nd Addition Final plat at its July 17, 2018 meeting; and WHEREAS, the Lake Elmo Planning Commission has submitted its report and recommendation concerning the proposed Northport 3rd Addition Final Plat as part of a memorandum to the City Council for its March 4, 2020 meeting; and WHEREAS, the City Council reviewed the Northport 3rd Addition Final Plat at its meeting held on March 4th, 2020 and made the following findings: 1) That all the requirements of City Code Section 153.10 related to the Final Plan and Final Plat have been met by the Applicant. 2 Resolution 2020- 2) That the proposed Final Plat for Northport 3rd Addition will create 41 single-family lots. 3) That the Northport 3rd Addition Final Plat is generally consistent with the Preliminary Plat and Plans as approved by the City of Lake Elmo on September 16, 2014 and as amended on September 6, 2017. 4) That the Northport 3rd Addition Final Plat is consistent with the Lake Elmo Comprehensive Plan and the Future Land Use Map for this area. 5) That the Northport 3rd Addition Final Plat complies with the City’s Urban Low Density Residential zoning district regulations. 6) That the Northport 3rd Addition Final Plat complies with all other applicable zoning requirements, including the City’s landscaping, storm water, sediment and erosion control and other ordinances. 7) That the Northport 3rd Addition Final Plat complies with the City’s subdivision ordinance. 8) That the Northport 3rd Addition Final Plat is generally consistent with the City’s engineering standards with the exception of necessary plan revisions outlined by the City Engineer in his review comments to the City regarding Northport 3rd Addition Final Plat dated February 2, 2020. NOW, THEREFORE, BE IT RESOLVED THAT the City Council does hereby approve the Northport 3rd Addition Final Plat subject to the following conditions: 1. Required modifications to final grading, drainage, and erosion control plans, sanitary and storm water management plans, landscape plans, street and utility, etc. shall be reviewed and approved by the City Engineer and applicable Staff prior to the recording of the Final Plat. All changes and modifications to the plans requested by the City Engineer in the memorandums (Final Plat Engineering Review & Final Construction Plans), dated February 10, 2020 addressing Northport 3rd Addition Final Plat shall be incorporated prior to the recording of the final plat. Final Plans and Specifications must be prepared in accordance with City Engineering Design Standards Manual dated April 2019 using City details, plan notes, and specifications. 2. All easements as required and approved by the City Engineer and Public Works Director shall be documented on the Final Plat prior to release of the Final Plat for recording. 3. Prior to the execution of the Final Plat by City officials, the Developer shall enter into a Developer’s Agreement acceptable to the City Attorney and approved by the City Council that delineates who is responsible for the design, construction, and payment of the required improvements for the Northport 3rd Addition Final Plat with financial guarantees. 4. The findings outlined in the City Landscape Architects review memo dated January 27, 2020 must be addressed and an updated plan must be approved by the City’s Landscape Architect. 3 Resolution 2020- 5. A Landscape License Agreement shall be executed for the maintenance of right-of-ways prior to release of the final plat by City Officials. 6. The applicant shall provide a disclosure statement to all first homeowners in the development advising of the airport and associated over-flights, and all builders shall be encouraged to incorporate interior noise reduction measures into single family residential structures within the subdivision based on the Metropolitan Council’s Builder Guide. 7. The Applicant shall provide the City with a copy of the Northern Natural Gas permit and abide by any conditions of approval. 8. The developer shall follow all of the rules and regulations spelled out in the Wetland Conservation Act. 9. The approved plat shall be recorded with Washington County within 180 days after approval, failure to record will cause the approval to become void. Passed and duly adopted this 4th day of March, 2020 by the City Council of the City of Lake Elmo, Minnesota. ___________________________________ Mike Pearson, Mayor ATTEST: ____________________________________ Julie Johnson, City Clerk STATE OF MINNESOTA COUNTY OF WASHINGTON CITY OF LAKE ELMO RESOLUTION NO. 2020-022 A RESOLUTION VACATING DRAINAGE AND UTILITY EASEMENT OVER OUTLOT A IN THE NORTHPORT 2ND ADDITION WHEREAS, the City of Lake Elmo (City) is a municipal corporation organized and existing under the laws of the State of Minnesota; and WHEREAS, the City Council approved a Preliminary Plat the Northport development in Lake Elmo on September 16, 2014 through adoption of Resolution 2014-74; and WHEREAS, the City Council approved the Northport 2nd Addition Final Plat on July 17, 2018 through adoption of Resolution 2018-081; and WHEREAS, Outlot A of the Northport 2nd Addition, PID# 13.029.21.44.0057 has Drainage and Utility Easement(s) over the property and the easement(s) was recorded with the Northport 2nd Addition Plat by the Office of the Registrar of Titles of Washington County; and WHEREAS, the Lake Elmo Planning Commission held a public hearing to consider the vacation of the Drainage and Utility Easement(s) at the February 10, 2020 Planning Commission meeting in the Lake Elmo City Hall located at 3800 Laverne Avenue North after being published and posted notice had been given and all interested and affected persons were given an opportunity to voice their concerns and be heard; and WHEREAS, the City Council in its discretion has determined that the vacation of the easements will benefit the public interest because: 1. That the existing easement that resides over Outlot A of the Northport 2nd Addition will no longer serve a functional purpose after the approval and subsequent platting of the Northport 3rd Addition. 2. That the dedication of new easements will be provided with the recoding of Northport 3rd Addition to provide the same function as the easement that is being vacated. Which is not expected to have a negative impact to the public purpose. WHEREAS, the City Council, at its meeting on March 4, 2020, considered the easement vacation request. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LAKE ELMO, OF WASHINGTON COUNTY MINNESOTA, that such request for vacation of the existing Drainage and Utility Easement(s) is hereby granted in accordance with the property descriptions provided above, subject to the following condition of approval: 1. The final plat of Northport 3rd Addition must be approved by the City Council. 2. That the dedication of new easements will be provided with the recoding of Northport 3rd Addition to provide the same function as the easement that is being vacated. BE IT FURTHER RESOLVED, that the Mayor and City Clerk are hereby authorized to sign all documents necessary to effectuate the intent of this resolution. Adopted by the Council this 4th day of March, 2020. Effective Date: ______________________ Approved: ________________________________ Mike Pearson, Mayor Attested by: ________________________________ Julie Johnson, City Clerk