STAFF REPORT
DATE: March 4th, 2020
TO: City Council
FROM: Ben Prchal, City Planner
AGENDA ITEM: Septic System Code Amendment – Sizing Requirements
REVIEWED BY: Ken Roberts, Planning Director
Planning Commission
BACKGROUND:
The City Council had asked Staff to look into the sizing requirements for septic systems in the Rural Zoning Districts,
essentially the zoning districts which properties would not normally connect to City sewer. This was asked of Staff
because the City no longer permits septic systems but instead defers to Washington County as the permitting authority,
and there is less of a need for the existing standards in the City Code as it pertains to septic area.
ISSUE BEFORE THE CITY COUNCIL
Would the City Council like to approve the proposed ordinance amendments?
REVIEW AND ANALYSIS:
City Staff has gathered examples from other communities within Washington County to use as a baseline for review.
Based on the Cities that were used as references Lake Elmo is not the only City that has or would eliminate a defined
size limitation for septic systems.
City of Lake Elmo – 154.404 Site Design and Development Standards (Existing Language).
Septic Drainfield Regulation, A, RR, and RS Districts. All lots must have at least 20,000 square feet of land
suitable for septic drainfields and area sufficient for 2 separate and distinct drainfield sites. Placement of the
second required drainfield between the trenches of the first drainfield is prohibited.
Staff Comment – This standards of 20,000 sqft. is two things, slightly arbitrary and safe. There is
nothing inherently wrong with the 20,000 sqft. standard and in fact it is probably established because it is a
safe number due to its size. However, now that the City has deferred the permitting to Washington County
the number becomes less relevant. As a hypothetical, as long as Washington County has/will provided a
perspective home builder with an approved septic permit, Staff is inclined to believe that the property can
safely support the proposed build. City Staff is not suited to question the validity of a proposed septic
system, whether its 5,000 or 50,000 sqft. it is not known if either is more functional than the other.
Staff has spoken to Washington County regarding this code amendment and the concerns of not having a
minimum area and secondary system addressed in our code would be covered by the Washington County
standards. For example, Section 9.4 Minimum Size, Soil Treatment Area Says;
“For new subdivision testing, enough soil observations must be conducted to assure that at least 10,000 square feet of
suitable soil exists for each lot for long-term sewage treatment. On previously subdivided lots, enough area of suitable
soil must be identified for two soil treatment and dispersal areas. Percolation tests are not required for subdivision or
lot approval testing unless the permeability cannot be estimated or there is reason to believe the soil is not original or
has been disturbed.”
During most of the recent variance reviews the lots were previously subdivided (existing). This means the
criteria of two soil treatment areas would apply and newly developed lots in the rural districts would require
at least 10,000 sqft. of septic area (Half of the Existing City Expectation). Furthermore, other communities in
Washington County have already transitioned into the code language that Staff is recommending.
2
Example Communities
City of Forest Lake – Sec. 153.066 Individual Sewage Treatment Systems.
“All applicants for a use or building permit in any district not served by public sanitary sewer must demonstrate that an
on-site sewage treatment system can be installed in accordance with Washington County Subsurface Sewage
Treatment System regulations.”
Staff Comment – Staff likes the wording that they used for their standard. However, Staff is recommending a
slight modification that would hopefully improve the standard for the City. (See recommendation)
City of Hugo - Sec. 90-177. - Sewage treatment.
“No property shall be subdivided or platted in such manner as to create a new parcel or lot of record unless it is served
by municipal sanitary sewer service, or each lot or parcel created has been evaluated and found capable of holding an
individual septic system constructed in accordance with city standards.”
Staff Comment – The Lake Elmo City Code has similar language in the code. Searching the City website Hugo
also defers to Washington County regarding septic permitting.
City of Woodbury
Staff Comment – Based on what was found there was not a clear direction in the City Code of what was
expected in regards to permitting. However, the website states that permitting goes through Washington County.
City of Oakdale
Staff Comment - Staff could not find clear language in their code but their website also directs people to
Washington County for septic related questions.
FISCAL IMPACT:
Staff does not foresee a fiscal impact with the proposed code change.
PLANNING COMMISSION AND STAFF RECOMMENDATION
Planning Commission
The Planning Commission reviewed the proposed code amendment and were in favor of the change. During the review
Staff offered an additional amendment that would improve the recommendation for the City. The Commission voted in
favor to approve the amendment by a 7-0 vote.
City Staff
Staff believes that removing/amending the discussed section(s) of code will be beneficial to residents. Amending the
code is partially recommended because it is not a standard that Staff actively reviews for function and it eliminates one
less barrier for new construction. Some may believe that the standard should remain in place to help protect
residents/City from future circumstances that may become unfavorable. But again, if it is shown that 20,000 sqft. is
unreasonable and safe systems can be established on a lesser area, the standard could be reduced.
Staff recommends amending and replacing language in sections;
- 154.034 GB – General Business, C. 1.
- 154.404 B. and C.
Proposed Replacement Language
All applicants for a use or building permit in any district not served by public sanitary sewer must demonstrate that an
on-site sewage treatment system (Primary and/or Secondary Location) as approved by Washington County can be
installed in accordance with Washington County Subsurface Sewage Treatment System Regulations.
Recommendation:
“Motion to approve Ordinance 08-235 which will remove the required 20,000 sqft. septic area requirement for the
rural zoning districts.”
“Motion to approve Res. 2020-023 which is a summary publication of Ordinance 08 - 235”
ATTACHMENTS
City of Lake Elmo Code. City of Hugo Code. Ordinance XXX.
City of Forest Lake Code. Washington County Code Section. Summary Publication Resolution XXX.
III-9
1. The Old Village District shall be defined as the Old Village Sign District
described in § 151.117(S)(1)(a).
General Business
Lot Size 1-1/2 acres (except as required by Interstate Corridor Overlay
District, §§ 150.230 - 150.238)
Lot Width 150 Feet Minimum
Building Setback from property lines: (Also see § 154.082)
Front: 10 Feet Minimum
No setback required for properties located in the Old Village
District and south of Minnesota State Highway 5
Side (Interior): 20 Feet Minimum
No setback required for properties located in the Old Village
District and south of Minnesota State Highway 5
Side (Corner): 50 Feet Minimum
Rear: 50 Feet Minimum
Building Height (Also see
§ 154.083)
35 Feet Maximum
Maximum area to be covered by buildings, parking lots, driveways and other hard surfaces:
Up to 4 acres 40% of lot size
Larger than 4 acres to 8
acres
35% of lot size
Larger than 8 acres 25% of lot size
Lot Configuration Maximum lot depth to width dimension ratio shall be no more than
3:1
Lot Size Covered Area
Lot Configuration
Maximum Width of
Driveways
See § 93.26
Signage See §§ 154.212
Septic Drainage Regulation
(Also see §§ 51.002
through 51.008)
All newly subdivided lots shall have a minimum of 20,000 square
feet of land dedicated for septic system use and suitable for that
use. This land may comprise up to 2 separate areas, each of which
XI-5
i. Ground-mounted wind generators may exceed the allowable height restriction designated
in all rural districts and are subject to different setback requirements as identified in section
154.308.
(Ord. 2012-073, passed 3-19-2013; Am. Ord. No. 08-198, passed 2-7-2018; Am. Ord. 08-199,
passed 2-7-2018)
§ 154.403 DIMENSIONAL REQUIREMENTS AND PRESERVATION OF OPEN
SPACE.
A. Lot Configuration, RR District. All lots must be rectangular in shape and any 2 adjacent
sites must have an aspect ratio not exceeding 4:1.
(Ord. 2012-073, passed 3-19-2013)
§ 154.404 SITE DESIGN AND DEVELOPMENT STANDARDS.
Development of land within the rural districts shall follow established standards for traffic
circulation, landscape design, parking, signs and other considerations as specified in Articles 7,8
and 9. (Ord. 08-152, passed 10-01-2016) The following standards apply to specific uses, and are
organized by district.
A. Single-Family Detached Dwelling, All Rural Districts. All single-family dwellings shall
be at least twenty-four (24) feet in width, at least nine hundred sixty (960) square feet in
area, and be placed on a permanent foundation.
B. Septic Drainfield Regulation, A, RR, and RS Districts. All lots must have at least 20,000
square feet of land suitable for septic drainfields and area sufficient for 2 separate and
distinct drainfield sites. Placement of the second required drainfield between the trenches
of the first drainfield is prohibited.
C. Septic Drainfield Regulation, RE District. All new subdivided lots shall have a minimum
of 20,000 square feet of land to be dedicated for septic system use and suitable for that
use. This land may compromise up to 2 separate areas, each of which is contiguous to the
1.25-acre building site or contained within it, and each of which contains at least 10,000
contiguous square feet. Placement of the second required drainfield between the trenches
of the first drainfield is prohibited.
D. Secondary Dwelling, A District. One non-farm dwelling per each 40 acres, or part of a
dwelling on a prorated basis, not already containing a farm or non-farm dwelling, is
permitted provided:
1. The dwelling unit is located on a separate parcel of record in the office of the
County Recorder and/or County Auditor, which shall be at least 1-1/2 acres in
size;
2. The parcel on which the dwelling unit is located must have at least 125 feet of
frontage along a public street, be rectangular in shape and no dimension to be
greater than 3 times the other; and
Effective April 28, 2015 Chapter Four Subsurface Sewage Treatment System Regulations
34 Washington County Development Code
SECTION 9 SITE EVALUATION AND SOIL TESTING
9.1 Design Phase I; Site Evaluation.
Site evaluations consisting of preliminary and field evaluations according to parts this Section must be conducted
for all proposed sites for SSTS, including both ISTS and MSTS. The site evaluation is considered the first phase of
an SSTS design.
9.2 Preliminary Evaluation.
A preliminary evaluation for individual subsurface sewage treatment systems shall consist of determination,
location, or existence of the following :
(1) Design flow, anticipated effluent concentrations of biochemical oxygen demand, total suspended
solids, oil and grease, and anticipated presence of nondomestic waste from the dwelling, dwellings,
or other establishments.
(2) Proposed or existing:
(A) Water supply wells within 100 feet of the proposed SSTS;
(B) Existing and proposed buildings or improvements on the lot; and,
(C) Buried water supply pipes within 50 feet of the proposed system.
(3) Easements on the lot.
(4) The ordinary high water level of public waters, if adjacent to the lot.
(5) Floodplain designation and flooding elevation from published data or data that is acceptable to and
approved by the Department or local unit of government or the Minnesota Department of Natural
Resources, if applicable.
(6) Property lines.
(7) All required setbacks from the system.
(8) The soil characteristics at the proposed soil treatment and dispersal areas as obtained by the soil
survey report, including the soil map, map units, landscape position, parent material, flooding
potential, slope range, periodically saturated soil level, depth to bedrock, texture, color, depth to
redoximorphic features, and structure and consistence of soil horizons.
(9) A geocode or property identification number.
(10) Names of property owners.
(11) The inner wellhead management zone or wellhead protection area of a public water supply, if
applicable.
9.3 Field Evaluation.
A field evaluation for an individual subsurface sewage treatment system shall consist of the following items:
(1) Lot lines. Lot lines shall be confirmed in the field. .Lot improvements, required setbacks, and
easements must be identified.
(2) Surface features. The following surface features must be described:
(A) The percent and direction of the slope of the proposed system location.
(B) Vegetation types.
(C) Any evidence of cut or filled areas or disturbed or compacted soil.
(D) The flooding or run-on potential.
(E) A geomorphic description.
9.4 Minimum Size, Soil Treatment Area .
For new subdivision testing, enough soil observations must be conducted to assure that at least 10,000 square feet of
suitable soil exists for each lot for long-term sewage treatment. On previously subdivided lots, enough area of
suitable soil must be identified for two soil treatment and dispersal areas. Percolation tests are not required for
subdivision or lot approval testing unless the permeability cannot be estimated or there is reason to believe the soil
is not original or has been disturbed.
Forest La ke, MN Code of Ordinances
§ 153.066 INDIVIDUAL SEWAGE T REAT M ENT SYST EMS.
All applic ants for a use or building perm it in any dis trict not served by public sanitary sewer must dem onstrate that an
on-s ite sewage treatment s ystem can be ins talled in accordanc e with W ashington County Subsurface Sewage Treatm ent
System regulations .
(Ord. 537, pas s ed 11-8-2004; Am . Ord. 596, pas s ed 2-8-2010)
Sec. 90-177. - Sewage treatment.
(a) No property shall be subdivided or platted in such manner as to create a new parcel or lot of record
unless it is served by municipal sanitary sewer service, or each lot or parcel created has been
evaluated and found capable of holding an individual septic system constructed in accordance with
city standards.
(b) Municipal sanitary sewer service must be utilized where available. Where municipal sanitary sewer
service becomes available following the installation of an approved and functional septic system, the
property owner shall have 12 months to connect to the municipal system and abandon the septic
system. The 12-month period shall begin on the first day of the month following the city council's
approval of final payment to the contractor for the installation of the municipal service serving the
property.
(c) Land within the central business, general business, general industrial, and all residential districts
may not be subdivided or platted without being serviced by municipal sanitary sewer and public
water service.
(Prior Code, § 1175-115.1)
1
CITY OF LAKE ELMO
COUNTY OF WASHINGTON
STATE OF MINNESOTA
ORDINANCE NO. 08-235
AN ORDINANCE AMENDING THE LAKE ELMO CITY CODE OF ORDINANCES BY
AMENDING THE CITY’S SEPTIC STANDARDS
SECTION 1. The City Council of the City of Lake Elmo hereby ordains that Chapter 154
Zoning Code: Article III Zoning Distircts, Section 154.034 General Business, shall be
repealed and replaced it with the following language:
(C). Minimum district requiremnts.
Septic Drainage Regulation (Also see §§ 51.002 through 51.008);
All newly subdivided lots shall have a minimum of 20,000 square feet of land dedicated for septic
system use and suitable for that use. This land may comprise up to 2 separate areas, each of which is
contiguous to the 1.25-acre building site or contained within it, and each of which contains at least
10,000 contiguous square feet. Placement of the second required drainfield between the trenches of
the first drainfield is prohibited. All applicants for a use or building permit in any district not served
by public sanitary sewer must demonstrate that an on-site sewage treatment system (Primary and
Secondary Location) as approved by Washington County can be installed in accordance with
Washington County Subsurface Sewage Treatment System Regulations.
SECTION 2. The City Council of the City of Lake Elmo hereby ordains that Chapter 154
Zoning Code: Article XI Zoning Distircts, Section 154.404 Rural Districts, shall be repealed
and replaced it with the following language:
B. Septic Drainfield Regulation, A, RR, and RS Districts. All lots must have at least 20,000
square feet of land suitable for septic drainfields and area sufficient for 2 separate and distinct
drainfield sites. Placement of the second required drainfield between the trenches of the first
drainfield is prohibited. All applicants for a use or building permit in any district not served by
public sanitary sewer must demonstrate that an on-site sewage treatment system (Primary and
Secondary Location) as approved by Washington County can be installed in accordance with
Washington County Subsurface Sewage Treatment System Regulations.
C. Septic Drainfield Regulation, RE District. All new subdivided lots shall have a minimum of
20,000 square feet of land to be dedicated for septic system use and suitable for that use. This
land may compromise up to 2 separate areas, each of which is contiguous to the 1.25-acre
building site or contained within it, and each of which contains at least 10,000 contiguous square
feet. Placement of the second required drainfield between the trenches of the first drainfield is
prohibited. All applicants for a use or building permit in any district not served by public
sanitary sewer must demonstrate that an on-site sewage treatment system (Primary and
Secondary Location) as approved by Washington County can be installed in accordance with
Washington County Subsurface Sewage Treatment System Regulations.
SECTION 3. Effective Date. This ordinance shall become effective immediately upon
adoption and publication in the official newspaper of the City of Lake Elmo.
SECTION 3. Adoption Date. This Ordinance 08-235 was adopted on this ____ day of March
2020 by a vote of ___ Ayes and ___ Nays
2
LAKE ELMO CITY COUNCIL
_________________________________
Mike Pearson, Mayor
ATTEST:
_________________________________
Julie Johnson, City Clerk
This Ordinance 08-206 was published on the ____ day of ___________________, 2020.
CITY OF LAKE ELMO
COUNTY OF WASHINGTON
STATE OF MINNESOTA
RESOLUTION NO. 2020-023
RESOLUTION AUTHORIZING PUBLICATION OF ORDINANCE 08-235
WHEREAS, the Lake Elmo City Council has adopted Ordinance No. 08-235, an ordinance
amending the City’s Zoning Code as it pertains to Septic Area in Sections 154.034 and 154.404.
WHEREAS, the ordinance is lengthy; and
WHEREAS, Minnesota Statutes, section 412.191, subd. 4, allows publication by title and
summary in the case of lengthy ordinances or those containing charts or maps; and
WHEREAS, the City Council believes that the following summary would clearly inform
the public of the intent and effect of the ordinance.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Lake Elmo,
that the City Clerk shall cause the following summary of Ordinance No. 08-235 to be published in
the official newspaper in lieu of the entire ordinance:
Public Notice
The City Council of the City of Lake Elmo has adopted Ordinance No. 08-235, which amends the
City Zoning Code language for septic drainfield size requirements. The following is a summary
of the adopted ordinance language:
• Before a building permit could be released the City Code previously required a minimum
of 20,000 square feet of septic area (and approved permit from Washington County) for
rural single family lots. Since the City is not the reviewing authority for septic systems,
the Code now defers to the standards established by Washington County.
• The amendment is not considered to be reduction of expectations. Instead it is an
alignment of regulations between review authorities.
The full text of Ordinance No. 08-235 is available for inspection at Lake Elmo City Offices during
regular business hours.
BE IT FURTHER RESOLVED by the City Council of the City of Lake Elmo that the City
Administrator keep a copy of the ordinance at City Hall for public inspection and that a full copy of
the ordinance be placed in a public location within the City.
Dated: March 4th, 2020
___________________________________
Mayor Mike Pearson
ATTEST:
____________________________________
Julie Johnson, City Clerk
(SEAL)
The motion for the adoption of the foregoing resolution was duly seconded by member
_____________________ and upon vote being taken thereon, the following voted in favor thereof:
and the following voted against same:
Whereupon said resolution was declared duly passed and adopted.