HomeMy WebLinkAbout#11 - Legacy at North Star Final Plat, PUD and Easement VacationSTAFF REPORT DATE: 04/07/2020 TO: City Council FROM: Ken Roberts – Planning Director AGENDA ITEM: The Legacy at North Star Third Addition – Easement Vacation(s) and Final Plat and PUD Plans REVIEWED BY: Jack Griffin, City Engineer Sarah Sonsalla, City Attorney BACKGROUND: GWSA Land Development is requesting City approval of easement vacations and the Final PUD Plans to create lots for 64 single family detached homes located on 46.75 acres. This proposed final plat is the third phase of a 266 single family residential development on +/- 98.93 acres known as Legacy at North Star. The City approved the PUD Concept Plan on June 6, 2017 and approved the Preliminary Plat and PUD Plans on February 20, 2018 for the Legacy at North Star development. On August 8, 2018, the City Council approved the 1st addition of the Development (PUD) with 59 single family lots (Res. 2018-090), and approved the 2nd addition on April 16th, 2019 with 74 single family lots (Res. 2019-026). The third phase will consist of 64 single family lots primarily located in the southwest corner and the north east side of the development. On March 9, 2020, the Planning Commission held a public hearing about these latest requests. They reviewed the proposals and recommended approval of both the final plat and final PUD plans and the proposed easement vacation, subject to conditions of approval. ISSUE BEFORE THE CITY COUNCIL: The City Council is respectfully being requested to review and approve the developer’s requests for the proposed easement vacations and the final Plat and final PUD Plans for Legacy at North Star Third Addition. GENERAL INFORMATION: Applicant: GWSA Land Development Property Owner: GWSA Land Development, 10850 Old County Road 15, Suite 200, Plymouth, MN 55441 Location: Outlot B of 1st Addition, Legacy at North Star, Washington County, Minnesota. PID#s: 14.029.21.11.0037 Request: Easement Vacations, Final Plat and Development Stage PUD Plans Site Area: 46.75 acres Res. Dev. Area: 97.25 acres (overall) Land Use: Village Urban Low Density Current Zoning: V-LDR/PUD Proposed Zoning: V-LDR/PUD Surrounding: RR (north)/ LDR and VMX (east)/Agriculture (south)/ OP and RR (west). History: The City approved the PUD Concept Plan on June 6, 2017 and approved the Preliminary Plat and PUD Plans on February 20, 2018 for the Legacy at North Star development. Deadline: Application Complete – 1/29/2020 60 Day Deadline – 3/29/2020 Extension Letter Mailed – yes 120 Day Deadline – May 28, 2020 Applicable Code: Article 13 – Village Mixed Use District Page 2 Article 18 – Planned Unit Development Regulations Article 20 – Shoreland Code Subdivision Regulations PROPOSAL DETAILS/ANALYSIS: PUD Flexibility. The City approved this Village-Low Density Residential (V-LDR)/PUD development for the northern portion of the Schiltgen Farm at the northwest corner of CSAH 14 and CSAH 17. The developers requested to develop with a PUD because this process would afforded the developer a higher density than would normally be allowed if the development followed straight V-LDR zoning, furthermore, it also allowed flexibility within the Shoreland Code and other areas of the zoning code, such as lot dimensions. Changes since Preliminary Plat. The City had previously reviewed the discussed the preliminary plat for the Legacy at North Star which included higher number of units and had a different configuration than the one approved by the City Council in 2018. That approval came with revisions as directed by City Staff, Planning review, Engineering memo and Landscaping memo. The developer reduced the number of lots in the preliminary PUD from 276 to 269 (down from 279 from Concept Plan), and again to 262 units due to engineering comments during the detailed reviews of each phase of the development. Ultimately the density for the development will be at 2.68 units per acre with the all changes required by the City. Lot Sizes and Widths. The minimum allowed lot with in the shoreland of Sunfish Lake is 125 feet and 70 feet in the V-LDR District. The minimum lot size for lots in the shoreland of Sunfish Lake is 20,000 sq. ft. and in the V- LDR District, 9,000 sq. ft. The City allowed the developer to determine the area of buildable land and divide it by 20,000 sq. ft. This allows the developer the ability to have smaller lots but still maintain the total amount of land required for the code. In addition, there is open space in the PUD that is for park purposes and a City-owned outlot. Phases 1 and 2 the received approval for the lot sizes shown in red in the table below. The deviations are from setbacks, lot area, and width. In Phase 3, Lots 1-4 of Block 2, and Lot 1 of Block 5 take advantage of the amended lot dimensions. The proposed lot layout/dimensions are consistent with those approved by the City with the preliminary plat. Focusing on shoreland lots, only Lots 5-14 of Block 5 in this phase are in the shoreland district. Based off the standards on the shoreland code, the developer would be allowed to have 17 lots in the shoreland district and they are requesting 15 lots. Staff does not see that there are conflicts with the shoreland code. Shoreland Standard V-LDR Standard Villa Lots – Preliminary Approval Villa Lots - Proposed Interior Single Family – Preliminary Approval Interior Single Family - Proposed Exterior Single Family – Preliminary Approval Exterior Single Family - Proposed Minimum Lot Width 125 ft. 70 ft. 55 ft. 55 ft. 55 ft. 55 ft. 66 ft. 65 ft. Minimum Lot Area 40,000 sq. ft. 9,000 sq. ft. 7,900 sq. ft. 6,600 sq. ft. 6,900 sq. ft. 6,840 sq. ft. 8,500 sq. ft. 8,090 sq. ft. Minimum Front Yard Setback N/A 25 ft. 15 ft. 15 ft. 25 ft. 25 ft. 25 ft. 25 ft. Minimum Side Yard Setback N/A 10 ft./5 ft. or 7.5 ft./7.5 ft. 7 ft./8 ft. 7 ft./8 ft. 7 ft./8 ft. 7 ft./8 ft. 10 ft./5 ft. or 7.5 ft./7.5 ft. 10 ft./5 ft. or 7.5 ft./7.5 ft. Maximum Impervious Surface N/A 35% 50% 50% 40% 45% 45% 45% Page 3 Landscaping and Tree Preservation. Staff submitted the proposed project landscape plans to the City’s Landscape Architect for review. It is a recommended condition of approval that the landscape plans be approved by the Landscape Architect before recording of final plat. An issue that has arisen during the review of the plans for this phase of the development is that of required buffering along the northern and western edges of the site. Condition 11 of the preliminary PUD approval from February 20, 2018 required the “applicant provide a minimum 30-foot buffer from the northern edges and 50 foot buffer from the edges of the plat.” It is staff’s understanding that the City Council required this condition to have no-disturb areas to help ensure the adjacent properties to the north and west of the site would have some type of buffering and/or separation from the new development. With this phase of the development, there are areas along the northern side of the site that would have less than a 30-foot buffer. This includes 41st Street running west from County Road 17, where Kokanee Avenue will meet the northern property line and on Lots 3 and 4, Block 3. This street and lot layout are consistent with the preliminary plat as approved by the City Council. If the City requires a 30-foot-wide no-disturb buffer on the northern edge of Lots and 4, Block 3, it would greatly limit the buildable area on each of those lots. In my review of the City Council minutes from January 16, 2018 when the City was first discussing this plat, there was a motion made and approved by the City Council stating “that the applicant will provide a buffer deemed adequate by the City with sufficient landscaping or berming within the residential lots protected by a landscape easement and approved by the City.” This motion, however, did not get carried forward to the February 20, 2018 City Council meeting nor was included in the final conditions of approval for the PUD. To resolve this, staff is recommending the developer provide the City a detailed site, landscaping and/or berming plan for Lots 3 and 4, Block 3 that would be subject to City staff approval. These plans are to maximize the size of the buffer and no disturb (no build area) on each lot and is to show sufficient landscaping with trees and/or berming along the north property line to provide screening and would be subject to City staff approval. Much of what the rest of what developer needs to correct in the landscape plans are setback and spacing related which the developer has been addressing since the Planning Commission meeting. The applicant also provided a tree preservation plan for the overall PUD. For this phase of development there are no trees shown for removal. Outlots. Outlots B and C will eventually be owned by the HOA and have a Drainage and Utility easement applied to them while Outlot D and Outlot A will have a drainage and utility easement applied while also be retained by the Developer for future additions. See the Engineering section below for additional comments. Page 4 Parkland Dedication. The total required parkland dedication for the Legacy at North Star development is 10% of the total 98.93 acres - (9.893 acres). The applicant partially satisfied the park dedication requirement for the 1st and 2nd Addition with the dedication of Outlot D of the Northport addition, which consisted of 6.51 acres. The required park dedication is based on a 10% basis, either in the form of a cash payment or land dedication. The Developer applied 2.72 acres of the 6.51 acre dedication to the first addition. The developer applied an additional 2.28 acres from the 6.51 acre land dedication to the park dedication requirement for the 2nd addition. With the 3rd phase of development consisting of 21.45 acres, the applicant will be responsible for a park dedication of 2.145 acres of land. Since the Developer has 1.5 acres of credit remaining from the initial 6.51 acre land dedication, they will be responsible for an additional park dedication of 0.645 acres of land to meet the park dedication requirement for the 3rd Addition. They may satisfy this requirement by paying the City a cash contribution of $52,643 (.645 acres * 81,617.3 value per acre). The development also will provide an HOA-owned and maintained playfield in Outlot G on the west side of the project site that will part of this phase. There also is a playground, pool, pool house, and recreation area that the Developer established in the 1st Addition. Trails. It was a condition of preliminary plat approval that the applicant provide a trail connection to the Hamlet on Sunfish Lake trails plat, as shown below. This trail connection runs along 39th Street and will connect the Hamlet on Sunfish Lake trails to Lake Elmo Avenue. The trail connection will be a part of this phase, but will stop at the North Star property line. Private Trails. Private trails are shown below in red where blue represents areas where there are either public sidewalks, trails, or both. Subdivision Signs. Staff does not see that the developer is proposing to install any subdivision signs with this phase of the development. However, if the developer wants to install a sign, it will need to meet all the standards in the City Sign Code. 9.893 acres required to satisfy the City dedication requirements. 6.51 acres dedicate to the City via Outlot D of Northport 1st addition = 2.72 acres required 2nd addition = 2.28 acres required Total 5 3rd addition = 2.145 acres required 2.145 – 1.5 = .645 acres required for park dedication for 3rd Addition. 6.51 – 5 = 1.5 acres remaining for credit Dedicated Land Reid Park Page 5 Streets and Access. The development has a modified street grid with 60 foot wide public rights-of-ways with 28 foot wide streets (back to back), allowing parking on both sides of the street, except where there are center islands, such as at the entrance roads off of Lake Elmo Avenue. The proposed Third Addition street connections and designs are consistent with the approved overall preliminary plat. The developer provided right-of-way and street stubs from the First Addition to allow for vehicle connectivity to the north and south properties, should those ever develop. With the construction of this phase of the PUD, the development will have two street access points to the Schiltgen parcel to the south of the project site and one street access to the north. Staff expects these street connection points would be used to access the adjacent properties to the south and north in the event these properties develop. Such a future development to the south of this site also could provide street access to the land locked Chavez parcel lying on the eastern edge of Sunfish Lake. Village Parkway Design. When reviewing the Concept Plan the Council adopted a condition of approval that the developer carry the Village Parkway design through in the development with the southern road (39th Street) to at least to the first street stub providing access to the south. The developer met this design with the First Addition, with a trail on the north side and sidewalk on the south side to match up with existing configuration of 39th Street to the east. Street Names. The proposed street names are consistent with the City street naming policy. Fire Chief and Building Official Comments. Planning staff provided the Fire Chief and Building Official copies of the proposed Third Addition final plat. Comments were not provided. Washington County Review. The final plat and construction plans have been sent to Washington County for review. Staff did not receive comments from them for the 3rd addition. City Engineer Comments. The City Engineer memo dated February 17, 2020 is attached to this report. There are several comments in the report that will be impactful to the development. Staff views them as being positive. Engineering Memo Summary: • Outlot M, P, and O (As shown on the preliminary Plat, Attached) will need to be included in the 3rd phase for stormwater management. • Outlot I (Preliminary Plat – Outlot D of 3rd addition plat) must be an outlot as opposed to a drainage and utility easement. • The Trail through outlot E shall be completed, which was partially in the 2nd addition. Other Concerns. Watering Ban. The City is planning to construct another well in 2020 to help supply City water to the residents and users on the City water system. However, until the well is on-line, there may be water shortages – especially if there is a dry spring and summer. Due to the possible shortage of water, the City may need to implement watering restrictions in the City for this summer and into the future. This could include limiting or prohibiting the use water outside including for car washing and for watering grass. This could affect future home builders and buyers as there may be a limited supply of water available for outdoor uses. Conditions of Preliminary Plat and PUD Plan Approval. The following indicates how this phase of the development will meet the conditions of Preliminary Plat and PUD Plan Approval. 1. That PID# 11.029.21.44.0001 is subdivided to create Parcel 3 as indicated on the Preliminary Plat and that a Zoning Map Amendment is approved to rezone Parcels 1, 2, and 3 from Rural Development Transitional to Village Urban Low Density Residential. This condition has been met. 2. That the future preliminary plat and PUD Plans include parcels with PID# 14.029.21.11.0001, 11.029.21.43.0001, and a portion of 11.029.21.44.0001. Page 6 This condition has been met. 3. That the future preliminary plat and preliminary PUD Plans submittal identify all requests for flexibility from the V-LDR zoning district. The Applicant indicates in the narrative that PUD Flexibility is being requested on minimum lot width, lot area, front yard setback, side yard setback and maximum impervious coverage. 4. That all comments of the City Engineer’s Memorandum dated May 8, 2017 be addressed with the future preliminary plat and preliminary PUD Plans submittal. It is a recommended condition of approval for the Third Addition that the applicant address all items outlined in the City Engineer’s memo for the Final Plat and PUD Plans dated February 17, 2020. 5. That the Applicant submit additional details on the proposed stormwater reuse system and ongoing operations for City review and consideration. Ownership, maintenance and ongoing operational responsibilities must be clearly defined, and City acceptance of stormwater reuse must be contingent upon the City agreeing to the ongoing ownership, maintenance and operation plan, including the execution of a stormwater maintenance and easement agreement that addresses stormwater reuse. The Applicant has chosen to not pursue stormwater reuse on this time. While the Council did grant amenity points for this feature, there are still enough amenity points granted to reach the increased density. The applicant has indicated within the narrative that it was decided that this site would be better served with infiltration basins and that the stormwater reuse was not necessary due to the decrease in lot count and increase in open space. 6. That the Applicant provide a detailed phasing plan with the Final Plat 1st Addition application that clearly indicates the phasing of the construction for each public infrastructure component and addresses both construction access to the site and public access for new residents. Temporary cul-de-sacs should be part of the phasing plans and are required for any street with a platted lot with driveway access. The applicant provided this with the construction plans. 7. That the developer provide a trail connecting the trail in the middle of the development to Hamlet on Sunfish Lake trails along with a trail corridor of at least 30 feet in width. The developer shall not receive parkland dedication credit for the trail corridor nor cost of construction of the trail. The developer will provide this trail and will not receive parkland dedication credit for the construction of this trail. 8. That any approval be contingent on complying with Washington County’s requirements and requests pertaining to right-of-way, turn lanes and trail needs as noted in the Washington County Memo dated June 1, 2017. Washington County submitted preliminary plat comments to the City in a memo dated June 1, 2018. This memo indicated that sufficient right-of-way has been provided as per the Washington County Comprehensive Plan on the preliminary plat and that a sufficient right-of-way easement is provided to the south of the development. However, this memo also indicated that it would be preferable for there to be an additional 25 feet of right-of-way in order to accommodate a proposed route for the Central Greenway Trail, and because there is not 75 feet of right-of-way present on the on the east side of CSAH 17 centerline in order to accommodate a the 150 foot corridor required to expand to a four-lane divided highway. (Note: This condition has been met.) 9. Sufficient right-of-way along Lake Elmo Avenue N (CSAH-17) for both the Legacy at North Star Plat and PID# 14.02.921.11.0001 must be provided. Verification from Washington County that sufficient right-of- way along Lake Elmo Avenue N (CSAH-17) has been provided must be received by the City. It is a recommended condition of approval that the City receive written documentation from Washington County that sufficient right-of-way has been provided along CSAH 17/Lake Elmo Avenue along with a sufficient right-of-way easement on the property to the south. (Note: This condition has been met.) Page 7 10. The Applicant shall be solely responsible for all construction costs associated with the intersection improvements as recommended by Washington County. The developer started the construction of the First Addition in 2018 including the intersection of County Road 17 and 39th Street. The Developers Agreement(s) will further outline the Developer responsibility for the costs of the new intersection at 41st Street with County Road 17. 11. That the Applicant provide a minimum 30 foot buffer from the northern edges and 50 foot buffer from the western edges of the plat. This buffer shall average 170 feet on the western edge of the plat and 86 feet on the northern edge of the plat and include sufficient landscaping and/or berming as deemed adequate by the City. The applicant provided the City with the preliminary plat application an exhibit showing that the plans will meet this requirement. With the addition of the stub road to the north, however, it is not possible to have the 30-foot-buffer on two of the lots in this phase of the development. I outlined the status of this condition of approval and the current project plans in more detail on page 3 of this report. Staff is recommending a condition of approval that a 30 foot-wide no build buffer be applied to the northern development lot line and a 50 foot-wide no build buffer be incorporated on the western edge of the site and that the developer provide a detailed landscaping plan for Lot 4, Block 3 to meet the intent of this condition. 12. That the Landscape Plans receive approval from the City’s Landscape Architect and include revisions as mentioned in the Staff Report dated to the Planning Commission dated December 11, 2017. The overall landscape plans have been approved by the City’s Landscape Architect. It is a recommended condition of approval for Phase 3 that the landscape plans be updated to meet current City Standards and be approved by the City’s Landscape Architect. 13. That wetlands and wetland buffer areas be contained within outlots outside of lot areas and dedicated to the City. The preliminary plat shows that with buffer averaging this wetland buffer has been contained within Outlot N of the preliminary plat. This condition is not applicable to the Third Addition. 14. That the Applicant provide a detailed sanitary sewer phasing plan must be provided with Final Plat 1st Addition application to address timely connection to sewer for the wastewater treatment system that includes, at a minimum, dedicated right-of-way or utility easement extended to the westerly side of the plat. The applicant provided a drainage and utility easement over all of Outlot H, which may be used by the City as a permanent drainage and utility easement for the installation of a trunk sanitary sewer pipe to serve the Hamlet on Sunfish Lake development. The developer will be installing the sanitary sewer pipe with this phase of the development that the City can use to connect to the Hamlet on Sunfish Lake sewer system. Page 8 15. That the Final Plat and PUD Plans include a parking area for the HOA pool/playground recreation area that meets all applicable standards. This condition was addressed in Phase 1. 16. That the proposed 15 foot front yard setback for Villa Lots be approved provided the HOA documents include architectural requirements that require 4-sided architecture and garages facing the public right-of- ways to have windows and/or other architectural features. The applicant has indicated that they would prefer to have this requirement within the architectural guidelines, which is requested to be a separate document from the HOA documents. The applicant has indicated that this would provide greater control over the building designs. This change is a recommended condition of Final Plat and PUD Plans approval to have the applicant provide the City with this documentation for this phase of the development. 17. That the developer comply with any comments provided by the MnDNR. The applicant provided with the Preliminary Plat and PUD Plans application a shoreland tier analysis that shows the applicant’s plans provided sufficient open space within the shoreland area. 18. That the developer provide deed restrictions, covenants, permanent easements or other instruments for open space that prohibit future vegetative and topographic alterations other than routine maintenance, construction of buildings or storage of vehicles and other materials; and ensure preservation and maintenance of open space. It is a recommended condition of approval that the Applicant provide an open space or conservation easement with the City over homeowners’ association-owned outlots on the northern and western edges of the development. 19. That all Fire Chief and Building Official comments be addressed. Planning staff submitted the proposed Third Addition Final Plat and PUD Plans to the Building Official and Fire Chief. It is a recommended condition of approval of the Final Plat and PUD Plans that the developer address all these comments. 20. That street names comply with City’s Street Naming Policy. Page 9 The applicant changed the street names since preliminary plat approval to adhere to the City’s current street naming policy. The proposed street names in this Phase are consistent with those in the Preliminary Plat. 21. That the Applicant provide specific examples of proposed development signage, fencing, landscaping, lighting and site furnishings, including the clubhouse, that will adhere to the Lake Elmo Branding and Theming Study with the Final Plat and PUD Plans submittal. The applicant provided the City with this information with the Final Plat for the First Addition. 22. That the Applicant submit and the City approve updated Preliminary Plat and PUD Plans prior to submission of Final Plat and PUD Plans. The preliminary plat and PUD plans were approved before the applicant submitted the proposed Third Addition Final Plat and PUD application. 23. The proposed 7’/8’sideyard setbacks shall be approved by the City Engineer. The Engineer does not have issue with this side yard setback. 24. That the Applicant construct a bituminous trail extending south along the County right-of-way from 30th Way to the southerly plat limits (along the east side of Outlot C) and the future County right-of-way area along Lake Elmo Avenue of the parcel to the south of the plat should be graded for a future bituminous trail extension (grade ready trail) along the storm sewer outfall pipe location. This trail was shown on the construction plans for the First Addition and is covered by the developer’s agreement for that phase of the project. 25. That the Applicant pay a cash contribution in an amount equal to the fair market value of 3.383 acres of land to satisfy the development’s park land dedication requirement pursuant to Section 154.14 of the City Code. The applicant dedicated 6.51 physical acres of land for park purposes during preliminary PUD approval. The total required park contribution for the PUD was 9.893 acres, leaving 3.383 acres to either be dedicated by the developer or they are to provide a financial contribution for each phase of the PUD as they are developed. As noted in this report, the applicant will be responsible for a park dedication fee of $53,212.53 for Phase 3 of the PUD. Recommended Findings. Staff recommends approval of the Legacy at North Star Third Addition Final Plat and PUD Plans based on the following findings: 1. That all the requirements of City Code Section 153.10 related to the Final Plan and Final Plat have been met by the Applicant. 2. That the proposed Final Plat and PUD Plans for Legacy at North Star Third Addition will create 64 lots for single-family detached residential structures. 3. That the Legacy at North Star Third Addition Final Plat and PUD Plans are generally consistent with the Preliminary Plat and PUD Plans as approved by the City of Lake Elmo on February 20, 2018 by Resolution 2018-013. 4. That the Legacy at North Star Third Addition Final Plat and PUD Plans are consistent with the Lake Elmo Comprehensive Plan and the Future Land Use Map for this area with an allowed increase in density as a Planned Unit Development and with the exception of the Village Open Space Overlay District Greenbelt Corridor. 5. That the Legacy at North Star Third Addition Final Plat and PUD Plans comply with general intent of the City’s Village Low Density Residential zoning district regulations with PUD Modifications. Page 10 6. That the Legacy at North Star Third Addition Final Plat and PUD Plans comply with all other applicable zoning requirements, including the City’s landscaping, storm water, sediment and erosion control and other ordinances with the exception of issues identified in the Engineering memo dated February 17, 2020. 7. That the Legacy at North Star Third Addition Final Plat and PUD Plans comply with the City’s subdivision ordinance with PUD modifications. 8. That the Legacy at North Star Third Addition Final Plat and PUD Plans are generally consistent with the City’s engineering standards with the exception of necessary plan revisions outlined by the City Engineer in his review comments to the City about Legacy at North Star Third Addition Final Plat and PUD Plans dated December 12, 2019. 9. That the Legacy at North Star Third Addition Final Plat and PUD Plans meet the minimum requirement for a PUD including minimum lot area, open space and street layout. 10. That the Legacy at North Star Third Addition Final Plat and PUD Plans meet more than one of the required PUD objectives identified in Section 154.751 including providing: 1) more adequate, usable, and suitably located open space and recreational amenities and other public facility than would otherwise be provided under conventional development techniques, 2) Preservation and enhancement of important environmental features through careful and sensitive placement of buildings and facilities, and 3) Allowing the development to operate in concern with a redevelopment plan in certain areas of the City and to ensure the redevelopment goas and objective will be achieved. 11. That the Legacy at North Star Third Addition Final Plat and PUD Plans meet the allowed density requirements allowed with PUD flexibility. 12. That the Applicant is providing the following amenities, for which the City shall award amenity points: a. Pedestrian improvements including construction of a trail along the County right-of-way from 30th Way to the southerly plat limits; grading along the storm sewer outfall pipe location within the future right-of-way area along Lake Elmo Avenue of the property to the south of the proposed development along with dedication of County right-of-way to facilitate a future trail; and dedication of a 30-foot wide trail corridor along with construction of a trail connecting the trail within the development from Lak Elmo Avenue to the trail within the Hamlet on Sunfish Lake development (10 points). b. Theming elements from the Lake Elmo Theming Study (1 point). c. Additional open space above 20% (2 points). d. Connection of sewer to Hamlet on Sunfish Lake Development (5 points). e. Provision of private park amenities including a clubhouse, tot lot, and pool (5 points). 13. That the proposed PUD will allow a more flexible, creative, and efficient approach to the use of the land, and will specifically relate to existing zoning district standards in the following manner (with exceptions as noted): a. Lot Dimensions and Bulk Building Requirements Villa Lots Interior Single Family Exterior Single Family Minimum Lot Width 55 ft. 55 ft. 65 ft. Minimum Lot Area 6,600 sq. ft. 6,840 sq. ft. 8,090 sq. ft. Minimum Front Yard Setback 15 ft. 25 ft. 25 ft. Page 11 Minimum Side Yard Setback 7 ft./8 ft. 7 ft./8 ft. 10 ft./5 ft. or 7.5 ft./7.5 ft. Maximum Impervious Surface 50% 45% 45% Recommended Conditions of Approval. Staff and the Planning Commission are recommending approval of the requested Legacy at North Star Third Addition Final Plat and PUD Plans with the following conditions: 1. Final grading, drainage, and erosion control plans, sanitary and storm water management plans, landscape plans, and street and utility construction plans shall be reviewed and approved by the City Engineer and applicable Staff before the recording of the Final Plat. All changes and modifications to the plans requested by the City Engineer in the memorandums addressing Legacy at North Star Third Addition Final Plat and PUD Plans dated February 17, 2020 shall be incorporated into these documents and the project plans before the City gives them final approval. Such revisions shall include the required drainage and utility easements and temporary cul-de-sacs, if necessary. 2. All easements as requested by the City Engineer and Public Works Department shall be documented on the Final Plat before its execution by City Officials. 3. Final Plat approval is contingent upon the inclusion of temporary cul-de-sacs as may be determined as necessary by the City Engineer. Any temporary cul-de-sac cannot encroach on a lot proposed for platting. 4. If applicable, the Final Plat be contingent upon the City receiving separate drainage and utility easements in the City’s standard form of easement agreement for all off-site development improvements (beyond the plat limits). All off-site easements must be clearly shown on the street, grading and utility plans, with all dimensions labeled. The easements must be obtained before the start of construction. 5. Before the execution of the Final Plat by City officials, the Developer shall enter into a Development Agreement acceptable to the City Attorney and approved by the City Council that delineates who is responsible for the design, construction, and payment of the required improvements and shall include the payment of required park dedication fees for the Legacy at North Star Third Addition Final Plat with financial guarantees therefore. 6. A Landscape License Agreement shall be prepared for the maintenance of commonly held homeowners’ association-owned and City-owned outlots, right-of-ways, and medians before the release of the final plat by City Officials. 7. That the developer provide a trail connecting to the trails of Hamlet on Sunfish Lake. The Applicant shall not receive parkland dedication credit for the trail outlot or easement or construction of the trial. 8. That the developer provide the City written verification from Washington County that sufficient right-of- way has been provided on the plat along with a sufficient right-of-way easement along the property to the south of the development before plat recording. Prior to construction, the plan section detailing southbound right turn lanes and center left turn lanes at 39th Street must be submitted and approved by the county traffic engineer, applicable Washington County right-of-way permits must be obtained, drainage report and calculations must be submitted, and access control shall be dedicated to Washington County along CSAH 17/Lake Elmo Avenue frontage. The Applicant shall be solely responsible for all construction costs associated with the intersection improvements as recommended by Washington County. (Complete) 9. If still needed, that the applicant provide a Roadway, Drainage and Utility Easement in City standard form of roadway easement agreement, along Lake Elmo Avenue (CSAH 17) from the southern boundary to Page 12 Stillwater Boulevard North (CSAH 14), and consistent with the requirements of the preliminary plat approval. 10. That the Landscape Plans for this phase of the development be approved by the City’s Landscape Architect before recording of final plat. 11. That the applicant include in the Architectural Control guidelines for this phase of the development the requirements that villa lots utilize 4-sided architecture and garages facing the public right-of-ways to have windows and/or other architectural features. 12. That the applicant address all Fire Chief and Building Official comments in the final project plans. 13. That street names shall comply with City’s Street Naming Policy. 14. That the applicant pay the City the required parkland dedication fee applicable to this phase of the development, which is equivalent to a land dedication of 0.645 acres, before the City releases the final plat for recording. 15. That the applicant notify all home builders about possible City outdoor watering restrictions and that the home builders notify all home buyers that the City may impose limits on outdoor water use including no watering of grass or sod, unless the applicant is notifies by the city that this notice is no longer required. Said decision about whether or not this notice is no longer required shall be made at the sole discretion of the City. The applicant shall have the city approve the notification message before recording the final plat. 16. Except for along 41st Street north, at the required stub street (Kokanee Avenue North) and on Lots 3 and 4, Block 3, that the developer provide a 30 foot-wide open space buffer along to the northern development line as well as a 50 foot-wide open space buffer along the western line of the development. The City must approve the form of this buffer or easement before releasing the final plat for recording. For Lots 3 and 4, Block 3, the developer shall provide the City a detailed site, landscaping and/or berming plan for each lot that would be subject to City staff approval. This plan is to maximize the size of the buffer and no disturb (no build area) on each lot and is to show sufficient landscaping with trees and/or berming along the north property line of each lot to provide screening. These plans for each lot shall be subject to City staff approval and the no-disturb buffer area for each lot shall be included in the conservation easement or in another protective easement for the development. 17. That the development utilize Traditionaire LED Downlights from Xcel Energy for the development in lieu of the Street Light Type/Pole of Acorn with aluminum pole (all black) indicated in the City’s Engineering Standards and that streetlights be located only at intersections and at the ends of cul-de-sacs. 18. The developer record the approved final plat with Washington County within 180 days after City Council approval. Failure to record the final plat within 180 days of approval will cause the approval to become void. RECOMMENDATION: Staff and the Planning Commission recommend approval of the Legacy at North Star Third Addition Final Plat and PUD Plans with recommended findings and conditions of approval. “Move to adopt Resolution 2020-034 approving the Legacy at North Star Third Addition Final Plat and Final PUD Plans as recommended by the Planning Commission with the recommended findings and conditions of approval as listed in the staff report.” Page 13 EASEMENT VACATION: Easement Vacations. The applicant is requesting the City vacate part of the drainage and utility easement that resides over Outlot B, which was established in the First addition for the Third addition. The developer dedicated the easement with the Fist Addition final plat but it will no longer be required because new easements will be established with the Third Addition final plat. In addition, the developer could not record a new final plat (or replat) these existing Outlots into Lots and Blocks with the existing easements in place. Minnesota Statue outlines the provisions for vacating a public right-of-way or easement. It states in part that “Council may, by resolution, vacate any street, alley, public grounds, public way, or any part thereof, on its own motion or on petition of a majority of the owners of land abutting said property. Easement vacations require a public hearing and 4/5 vote by Council only if there has been no petition.” Recommended Findings: • The applicant has satisfied the City Platting Requirements. • The existing easement that resides over Outlot B of the 1st addition will no longer serve a functional purpose as it is over land that is area of the proposed 3rd addition. • That the recording of Legacy at North Star 3rd Addition will provide new easements that will provide the same function as the easement the City would be vacating. Recommended Conditions of Approval: • The final plat of the Legacy at North Star 3rd addition and the PUD Plans shall be approved by the City Council. • The dedication of new easements will be provided with the recording of Legacy at North Star 3rd Addition that will provide the same function as the easement(s) that the City is vacating. RECOMMENDATION: Staff and the Planning Commission recommend approval of the proposed vacation of the drainage and utility easements on Outlot B of Legacy at North Star First Addition as shown on the easement vacation Exhibit dated January 8, 2020. “Move to adopt Resolution 2020 – 035 approving the requested vacation of the drainage and utility easements on Outlot B of Legacy North Star First Addition for the purposes of final platting the Legacy at North Star Third Addition with the findings and conditions of approval as listed in the staff report.” ATTACHMENTS: 1. Proposed Final Plat 2. Approved Preliminary Plat 3. Construction Phasing Plan 4. Vacation Map (Outlot Map) 5. Site Maps 6. City Engineer Report dated February 17, 2020 7. Landscape Architect Review Memo February 19, 2020 8. Resolution 2020 – 034 Approving the final plat and final PUD plans 9. Resolution 2020 – 035 Approving easement vacation Page 14     PAGE 1 of 2  MEMORANDUM           Date:  February 17, 2020      To:  Ken Roberts, Planning Director  Re:  Legacy at Northstar 3rd Addition – Final Plat   Cc:  Chad Isakson, P.E., Assistant City Engineer    Engineering Review Comments  From:  Jack Griffin, P.E., City Engineer          An engineering review has been completed for the Legacy at Northstar 3rd Addition. Final Plat/Final Construction  Plans were received on January 31, 2020. The submittal consisted of the following documentation:     Legacy at Northstar 2nd Addition Final Plat, Sheets 1‐4, received January 31, 2020.   Legacy at Northstar 3rd Addition Construction Plans, Sheets 1‐32, dated December 19, 2019.   Legacy at Northstar 3rd Addition Specifications dated January 20, 2020.   Legacy at Northstar Phase 3 Landscape Plan, Sheets LP1‐LP6, dated January 27, 2020.      STATUS/FINDINGS:   Engineering review comments have been provided in two separate memos; one for Final Plat  approval, and one to assist with the completion of the final Construction Plans.  Please see the following review  comments relating to the Final Plat application.      FINAL PLAT/PLANS: LEGACY AT NORTHSTAR 3RD ADDITION   Final Plat approval must be contingent upon the Northstar 3rd Addition Plat including the dedication of city  owned Outlot M for storm water management, city owned Outlot P for storm water management, and  HOA  owned  Outlot  O  (Outlot  names  from  the  approved  preliminary plat).  The  Plat  must  include  the  required sanitary sewer and storm sewer easements on Outlot O.   Final Plat approval must be contingent upon the dedication of Outlot I (as shown on the preliminary plat)  rather  than  the  proposed  drainage  and  utility  easement  over  Lot  5,  Block  7.  Outlot  I  must  include  a  drainage and utility easement to the city over the entire Outlot.   The Legacy at North Star 3rd Addition Final Plat should include the dedication of HOA owned Outlot E  (preliminary plat) including the drainage and trail improvements to be completed adjacent to the 2nd  Addition and 3rd Addition platted lots. A drainage and utility easement must be provided over all Outlot E.   The  Final  Plat  should  be  revised  to  either  remove  Lot  1,  Block 8  (to  be  constructed  with  future  development phases) or to include the dedication of Outlot J (HOA owned) with a drainage and utility  easement to the city over the entire Outlot.   The Final Plat/construction plans must include a tempraory cul‐de‐sac on the west end of 41st Street in  order to include Lots 1 and 2, Block 3 as platted lots in the 3rd Addition.   Outlot A is shown as Shiltgen Family owned and is reserved for future development.    Outlot B is shown as HOA owned as required. The Final Plat must be revised to add a drainage and utility  easement over all of Outlot B.   Outlot C is shown as HOA owned as required. The Final Plat must be revised to add a drainage and utility  easement over all of Outlot C.  FOCUS ENGINEERING, inc.  Cara Geheren, P.E.   651.300.4261  Jack Griffin, P.E.                651.300.4264  Ryan Stempski, P.E.  651.300.4267  Chad Isakson, P.E.  651.300.4283      PAGE 2 of 2   Outlot D is shown as HOA owned. The Final Plat must be revised to add a drainage and utility easement  over all of Outlot D. The approved preliminary plat shows Outlot D as developer owned?   The Final Plat and Final Construction Plans must be revised so that Outlots and ownership are consistent  throughout the Final Plat and Final Construction Plans. There are significant discrepancies between the  proposed final plat and proposed plan documents.   All easements as requested by the City Engineer and Public Works department shall be documented on the  Final Plat prior to the release of the Final Plat for recording.    All off‐site easements must be clearly shown on the street, grading and utility plans, with all dimensions  labeled. The easements must be obtained and recorded prior to the start of construction (if not already  provided).   Permanent drainage and utility easements are required for the proposed water/sewer stubs on the  northerly property at the north end of Kokanee Avenue.   Permanent  drainage  and  utility  easements  are  required  for  the  proposed  storm  sewer  and  water/sewer stubs on the southerly property at the south end of 38th Street.   The  Final  Plat/Plans  show  access  to  Lake  Elmo  Avenue  at  41st  Street  North  as  required  to  provide  secondary access for the Legacy at North Star development.   The  sanitary  sewer  plan  includes  approximately  550  feet  of  10‐inch  diameter  sewer  pipe  oversizing,  extended  along  39th  Street  and  stubbed  across  Outlot  O  to  the  Hamlet  of  Sunfish  Lake  subdivision.  Oversize pipe costs should be addressed as part of the development agreement. No trunk watermain  oversizing is anticipated. All watermains should be 8‐inch diameter pipe.   Final Construction Plans and Specifications must be prepared in accordance with the City Engineering  Design Standards Manual dated April 2019, using City details, plan notes and specifications and meeting  City Engineering Design Guidelines.   Final  Construction  Plans  and  Specifications  must  be  revised  in accordance  with  the  Construction  Plan  engineering review memorandum dated February 17, 2020.    The Final Plat shall not be recorded until final construction plan approval is granted.   No construction for Legacy at Northstar 3rd Addition  may begin until  the applicant has received  City  Engineer approval for the Final Construction Plans; the applicant has obtained and submitted to the City all  applicable permits, easements and permissions needed for the project; and a preconstruction meeting has  been held by the City’s engineering department.  Wenck | Colorado | Georgia | Minnesota | North Dakota | Wyoming Toll Free 800-472-2232 Web wenck.com To: Ken Roberts, City of Lake Elmo Planning Director From: Lucius Jonett, Wenck Landscape Architect Date: February 19, 2020 Subject: City of Lake Elmo Landscape Plan Review Legacy at Northstar 3rd Addition, Review #1 Submittals  Tree Preservation Plan, dated July 5, 2018, received February 19, 2020.  Landscape Plans, dated January 27, 2020, received February 19, 2020. Location: East of Sunfish Lake and West of Lake Elmo Avenue North with entrances into the proposed development on 39th Street North and 41st Street Circle North. Land Use Category: Village Low Density Residential Surrounding Land Use Concerns: Screening from northern and western edges of the plat. Special landscape provisions in addition to the zoning code: The northern and western edges of the property require a greenbelt buffer consisting of a sufficiently wide buffer, berming and landscaping to screen the adjacent properties. Ken Roberts Planning Director City of Lake Elmo February 19, 2020 2 T:\6443 Lake Elmo\07 Legacy at North Star\04 3rd Addition\2020-01-27\2020-02-19 Legacy at Northstar 3rd Addition Landscape Plan Review.docx Tree Preservation: A. A tree preservation plan has been submitted that does meet all requirements. This tree preservation plan was submitted and approved with the preliminary plan. Master Plan Total Caliper Inches on-Site: 295.00 Cal Inches Significant Inches Removed On-Site 60.5 Cal Inches Common Trees 60.5 Conifer/Evergreen Trees 0 Hardwood Trees 0 Tree Removal Limits (30% Significant Inches Removed On-Site) 88.50 Cal Inches Subtract Common Tree Removals 60.5 Subtract Conifer/Evergreen Tree Removals 0 Subtract Hardwood Tree Removals 0 Removals in excess of 30% allowance 0.00 Cal Inches Removals in Excess of Allowance 0 Cal Inches Hardwood Tree Replacement (1/2 the dia inches removed) 0.00 Cal Inches Tree replacement needed 0.00 Cal Inches Tree Replacement Required @ 2.5" per Tree 0 # of Trees B. Tree replacement is not required because less than thirty (30) percent of the diameter inches of significant trees surveyed will be removed. C. Tree replacement calculations follow the required procedure and are correct. D. This project is residential development, any require mitigation replacement trees shall be in addition to landscape required tree counts. Ken Roberts Planning Director City of Lake Elmo February 19, 2020 3 T:\6443 Lake Elmo\07 Legacy at North Star\04 3rd Addition\2020-01-27\2020-02-19 Legacy at Northstar 3rd Addition Landscape Plan Review.docx Landscape Requirements: The proposed 3rd addition landscape plans are consistent with the previously approved preliminary plat landscape plans and meet the code required number of trees. Master Plan Preliminary Plan 1st Addition 1st Addition 2nd Addition 2nd Addition Required Approved Required Proposed Required Proposed Street frontage 26276 3185 3315 Lineal Feet Lake Shore 0 Lineal Feet Stream Frontage 0 Lineal Feet Total Linear Feet 26276 3185 3315 Lineal Feet /50 Feet = Required Frontage Trees 526 526* 64 66 Trees Development or Disturbed Area - SF Development or Disturbed Area 100 23 25 Acres *5 = Required Development Trees 500 500 115 125 Trees Required Mitigation Trees** 0 Required Number of Trees 1026 179 191 Total Trees to Date*** 1019 232 263 *It is noted on the plans, "Due to utility conflicts 44 of the boulevard trees shall be planted as buffer trees." **Ornamental Trees are not acceptable for use as replacement trees ***Proposed 12' evegreen trees shall count as 2 - 6' trees allowing 7 trees less than required. Master Plan Preliminary Plan 3rd Addition 3rd Addition Required Approved Required Proposed Street frontage 26276 3733 Lineal Feet Lake Shore 0 Lineal Feet Stream Frontage 0 Lineal Feet Total Linear Feet 26276 3733 Lineal Feet /50 Feet = Required Frontage Trees 526 526* 75 Trees Development or Disturbed Area - SF Development or Disturbed Area 100 28 Acres *5 = Required Development Trees 500 500 140 Trees Required Mitigation Trees** 0 Required Number of Trees 1026 215 Total Trees to Date*** 1019 316 Ken Roberts Planning Director City of Lake Elmo February 19, 2020 4 T:\6443 Lake Elmo\07 Legacy at North Star\04 3rd Addition\2020-01-27\2020-02-19 Legacy at Northstar 3rd Addition Landscape Plan Review.docx 1. A minimum one (1) tree is proposed for every fifty (50) feet of street frontage. 2. A minimum of five (5) trees are proposed to be planted for every one (1) acre of land that is developed or disturbed by development activity. The landscape plans do meet the minimum compositions of required trees: • At least 25% of the required number of trees shall be deciduous shade trees • At least 25% of the required number of trees shall be coniferous trees Preliminary Plan Qty Developer Deciduous Shade Trees 297 Developer Coniferous Trees 195 Developer Ornamental Trees 9 Builder Deciduous Shade Trees 342 Builder Coniferous Trees 176 Tree Count 1019 % Composition Total Deciduous Shade Trees 648 64% >25% required Total Coniferous Trees 371 36% >25% required Tree Count 1019 Phase 1 Qty Developer Deciduous Shade Trees 69 Developer Coniferous Trees 46 Developer Ornamental Trees 0 Builder Deciduous Shade Trees 80 Builder Coniferous Trees 37 Tree Count 232 % Composition Phase 1 Total Deciduous Shade Trees 149 64% >25% required Phase 1 Total Coniferous Trees 83 36% >25% required Tree Count 232 Phase 2 Qty Developer Deciduous Shade Trees 54 Developer Coniferous Trees 49 Developer Ornamental Trees 9 Builder Deciduous Shade Trees 92 Builder Coniferous Trees 59 Tree Count 263 % Composition Phase 2 Total Deciduous Shade Trees 155 59% >25% required Phase 2 Total Coniferous Trees 108 41% >25% required Tree Count 263 % Composition Phase 1 & 2 Total Deciduous Shade Trees 304 61% >25% required Phase 1 & 2 Total Coniferous Trees 191 39% >25% required Tree Count 495 Ken Roberts Planning Director City of Lake Elmo February 19, 2020 5 T:\6443 Lake Elmo\07 Legacy at North Star\04 3rd Addition\2020-01-27\2020-02-19 Legacy at Northstar 3rd Addition Landscape Plan Review.docx Phase 3 Qty Developer Deciduous Shade Trees 71 Developer Coniferous Trees 116 Developer Ornamental Trees 0 Builder Deciduous Shade Trees 86 Builder Coniferous Trees 43 Tree Count 316 % Composition Phase 3 Total Deciduous Shade Trees 157 50% >25% required Phase 3 Total Coniferous Trees 159 50% >25% required Tree Count 316 % Composition Phase 1-3 Total Deciduous Shade Trees 461 57% >25% required Phase 1-3 Total Coniferous Trees 350 43% >25% required Tree Count 811 A. A landscape plan has been submitted that does not include all requirements. 1. Driveway pavements are not shown on the landscape plan to review for tree placement conflicts. 2. Stormwater utilities are not shown on the landscape plan to review for tree placement conflicts. 3. Property lines and easements, including 10’ small utility setback/easement from all property lines, are not shown on the landscape plan to review for landscape placement conflicts. i. No deciduous tree trunks, evergreen tree mature driplines, or shrubs are allowed in the easement areas. B. The landscape plan does not meet the landscape layout requirements. 1. No utility conflicts; Prefer that the trunk of trees shall be 10 feet from the nearest utility, including water and sewer service stubs to each lot. C. Interior Parking Lot Landscaping – The development does not include interior parking lots. D. Perimeter Parking Lot Landscaping – The development does not include perimeter parking lots. E. Screening – A greenbelt with screening is required on the northern and western edges of the property and is shown on the proposed 3rd addition landscape plans. The screening design meets City requirements. Ken Roberts Planning Director City of Lake Elmo February 19, 2020 6 T:\6443 Lake Elmo\07 Legacy at North Star\04 3rd Addition\2020-01-27\2020-02-19 Legacy at Northstar 3rd Addition Landscape Plan Review.docx Findings: 1. Driveway pavements, stormwater utilities, and easement lines, including 10’ small utility setback/easement from all property lines, are not shown on the landscape plan to review for landscape placement conflicts. 2. With the 10’ small utility setback/easement from all property line requirement, it is expected that the applicant will have to shift the greenbelt screening buffer out of the easements as required. 3. There are several trees drawn within 10’ of the utility service lines to the properties. See attached figure showing conflicts. It is noted on the plans that trees are to be 10’ away from trunk to utility pipes in case symbols depict a location too close to utility services to homes on the plan. 4. Trees within residential lots that are intended to count toward the required number of landscape trees will need to be installed by the developer before the lot is built on and maintained. Proposed builder site trees will be difficult for City inspections since staff would possibly have to go on a homeowner’s lot to inspect. Builder street trees are okay, since they can be inspected from public property. However all builder trees will need to be installed and maintained for 2 years before the landscape financial security can be released. Recommendation: It is recommended that a condition of approval includes: 1. Submit a revised landscape plan including the missing driveway pavements, stormwater utilities, and easement lines for conflict review. And adjust the location of the greenbelt screening plantings to be outside of the 10’ small utility setback/easement from all property lines. Sincerely, Lucius Jonett, PLA (MN) Wenck Associates, Inc. City of Lake Elmo Municipal Landscape Architect SHORELAND - 1000'POND #7NWL - 942.0HWL - 945.5INFILTRATIONAREA #5NWL - 928.0HWL - 943.0POND #6NWL - 939.0HWL - 943.0PLAY FIELD150'X240'39TH STREET N38TH STREET NKIRKWOOD LN N 38TH TRAIL N38TH TRA IL NSURMSURMSURMSUR M B618B618B618 SURMPROPOSEDPROPOSEDSINGLE FAMILY70'x140' LOTSPROPOSEDSINGLE FAMILYInfiltration AreaNWL-942.0HWL-945.5Rock Overflow20' W x 0.5' HCL 2 RIP-RAP3" Composte MNDoTGrade 2 Tilled Into Top12" of Existing SandGRADING EASEMENTGRADING EASEMENT123456782312345678OUTLOT EDRAINAGE & UTILITY EASEMENTOVER ALL OF OUTLOTOUTLOT CDRAINAGE & UTILITY EASEMENTOVER ALL OF OUTLOTGRADING EASEMENTPROPOSEDPROPOSEDSINGLE FAMILY70'x140' LOTSPROPOSEDSINGLE FAMILYPROPOSEDPROPOSEDSINGLE FAMILY70'x140' LOTSPROPOSEDSINGLE FAMILYPROPOSEDPROPOSEDSINGLE FAMILY70'x140' LOTSPROPOSEDSINGLE FAMILYPROPOSEDPROPOSEDSINGLE FAMILY70'x140' LOTSPROPOSEDSINGLE FAMILYPROPOSEDPROPOSEDSINGLE FAMILY70'x140' LOTSPROPOSEDSINGLE FAMILYPROPOSEDPROPOSEDSINGLE FAMILY70'x140' LOTSPROPOSEDSINGLE FAMILYPROPOSEDPROPOSEDSINGLE FAMILY70'x140' LOTSPROPOSEDSINGLE FAMILYPROPOSEDPROPOSEDSINGLE FAMILY70'x140' LOTSPROPOSEDSINGLE FAMILYPROPOSEDPROPOSEDSINGLE FAMILY70'x140' LOTSPROPOSEDSINGLE FAMILYPROPOSEDPROPOSEDSINGLE FAMILY70'x140' LOTSPROPOSEDSINGLE FAMILYPROPOSEDPROPOSEDSINGLE FAMILY70'x140' LOTSPROPOSEDSINGLE FAMILYPROPOSEDPROPOSEDSINGLE FAMILY70'x140' LOTSPROPOSEDSINGLE FAMILYPROPOSEDPROPOSEDSINGLE FAMILY70'x140' LOTSPROPOSEDSINGLE FAMILYPROPOSEDPROPOSEDSINGLE FAMILY70'x140' LOTSPROPOSEDSINGLE FAMILYPROPOSEDPROPOSEDSINGLE FAMILY70'x140' LOTSPROPOSEDSINGLE FAMILYPROPOSEDPROPOSEDSINGLE FAMILY70'x140' LOTSPROPOSEDSINGLE FAMILYPROPOSEDPROPOSEDSINGLE FAMILY70'x140' LOTSPROPOSEDSINGLE FAMILYPROPOSEDPROPOSEDSINGLE FAMILY70'x140' LOTSPROPOSEDSINGLE FAMILYPROPOSEDPROPOSEDSINGLE FAMILY70'x140' LOTSPROPOSEDSINGLE FAMILYPROPOSEDPROPOSEDSINGLE FAMILY70'x140' LOTSPROPOSEDSINGLE FAMILYPROPOSEDPROPOSEDSINGLE FAMILY70'x140' LOTSPROPOSEDSINGLE FAMILYPROPOSEDPROPOSEDSINGLE FAMILY70'x140' LOTSPROPOSEDSINGLE FAMILYPROPOSEDPROPOSEDSINGLE FAMILY70'x140' LOTSPROPOSEDSINGLE FAMILYPROPOSEDPROPOSEDSINGLE FAMILY70'x140' LOTSPROPOSEDSINGLE FAMILY47OUTLOT B - PH1DRAINAGE & UTILITY EASEMENTOVER ALL OF OUTLOT8" DIP WM8" DIP WM8" DIP WM8" DIP WM8" DIP WM8" DIP WM8" DIP WM8" DIP WMDRIVE OVERCASTING11.25°11.25°11.25°22.5° &11.25°11.25°11.25°11.25°22.5°11.25°11.25°22.5°11.25°22.5° &11.25°11.25°11.25°4' sump8" PLUG WETLANDAREA:39370 SFNWL-960.0HWL-962.040TH ST N38TH TRA IL N40TH ST N39TH STREET NEdge ofWetland B618B618SURM40THST N75 FT WETLAND BUFFERBUFFER AVERAGING7070 SQ FT IMPACTWBWBWBWBWBWBWBSHORELAND - 1000'234123WBWB56OUTLOT DD&U OVER ALL OF OUTLOTOUTLOT B - PH1DRAINAGE & UTILITY EASEMENTOVER ALL OF OUTLOT8" D I P W M 8" DIP WM8" D IP WM 8" D I P W M8" DIP WM11.2 5 ° 11 . 2 5 ° 11 . 2 5 °11.25°22.5°22. 5 ° & 11. 2 5 ° 11. 2 5 ° 22.5°22.5°22.5° &11.25° POND #4NWL - 941.0HWL - 943.9POND #3NWL - 939.0HWL - 941.541ST STREET N41ST STREET N40TH ST NKOKANEE LANE NKOKANEE AVENUE NB618 B618SURM SURMSURMSURMSURMSURMSURMSURM40TH ST NPROPOSED FUTURE 75' RIGHT OF WAY (by others)PROPOSED 75' RIGHT OF WAY KOKANEE AVENUE NInfiltration AreaNWL-941.0HWL-943.9PROPOSED 75' RIGHT OF WAY Rock Overflow20' W x 0.5' HCL 2 RIP-RAP3" Composte MNDoTGrade 2 Tilled Into Top12" of Existing Sand15141312111098765432189101112131415166787GRASS PATH OUTLOT ADRAINAGE & UTILITY EASEMENTOVER ALL OF OUTLOTOUTLOT BDRAINAGE & UTILITY EASEMENTOVER ALL OF OUTLOT223OUTLOT B - PH1DRAINAGE & UTILITY EASEMENTOVER ALL OF OUTLOTOUTLOT D-PH1D&U OVER ALL OF OUTLOT8" DIP WM8" DIP WM8" DIP WM8" DIP WM8" D IP WM8" DIP WM8" DIP WM8" DIP WM11.25°11.25°11.25°11.25°11.25°11.25°22.5°11.25°11.25°11.25 ° 1 CITY OF LAKE ELMO WASHINGTON COUNTY STATE OF MINNESOTA RESOLUTION NO. 2020 - 034 RESOLUTION APPROVING THE LEGACY AT NORTH STAR 3RD ADDITION FINAL PLAT AND PLANNED UNIT DEVELOPMENT (PUD) PLANS WHEREAS, the City of Lake Elmo is a municipal corporation organized and existing under the laws of the State of Minnesota; and WHEREAS, GWSA Land Development, 10850 Old County Road 15, Suite 200 Plymouth, MN 55441 submitted an application to the City of Lake Elmo (City) for a Final Plat and Planned Unit Development Plan for 64 detached single family lots as the third phase of a 266 detached single family residential planned unit development on 98.93 acres, a copy of which is on file in the City of Lake Elmo Planning and Zoning Department; and WHEREAS, notice has been published, mailed and posted pursuant to the Lake Elmo Zoning Ordinance, Section 154.102; and WHEREAS, the Lake Elmo Planning Commission held public hearing on March 9, 2020 to consider the Final Plat and PUD Plans for the Third Addition; and WHEREAS, the Lake Elmo Planning Commission adopted a motion recommending approval of the Final Plat and PUD Plans for the Third Addition subject to conditions of approval; and WHEREAS, the Lake Elmo Planning Commission has submitted its report and recommendation concerning the Third Addition Final Plat and PUD Plans as part of a memorandum to the City Council from the Planning Director for the April 7, 2020 City Council Meeting; and WHEREAS, the City Council reviewed the Third Addition Final PUD Plan and Final Plat application at its meeting held on April 7, 2020 and made the following findings: 1. That the applicant has met all the requirements of City Code Section 153.10 related to the Final Plan and Final Plat. 2. That the proposed Final Plat and PUD Plans for Legacy at North Star 3rd Addition consist of the creation of 64 single-family detached residential structures. 3. That the Legacy at North Star 3rd Addition Final Plat and PUD Plans are generally consistent with the Preliminary Plat and PUD Plans as approved by the City of Lake Elmo on February 20, 2018 by Resolution 2018-013. 2 4. That the Legacy at North Star 3rd Addition Final Plat and PUD Plans are consistent with the Lake Elmo Comprehensive Plan and the Future Land Use Map for this area with an allowed increase in density as a Planned Unit Development and with the exception of the Village Open Space Overlay District Greenbelt Corridor. 5. That the Legacy at North Star 3rd Addition Final Plat and PUD Plans comply with general intent of the City’s Village Low Density Residential zoning district regulations with PUD Modifications. 6. That the Legacy at North Star 3rd Addition Final Plat and PUD Plans comply with all other applicable zoning requirements, including the City’s landscaping, storm water, sediment and erosion control and other ordinances with the exception of issues identified in the April 7, 2020 Staff report to the City Council. 7. That the Legacy at North Star 3rd Addition Final Plat and PUD Plans comply with the City’s subdivision ordinance with PUD modifications. 8. That the Legacy at North Star 3rd Addition Final Plat and PUD Plans are generally consistent with the City’s engineering standards with the exception of necessary plan revisions outlined by the City Engineer in his review comments to the City about the Legacy at North Star 3rd Addition Final Plat and PUD Plans dated February 17, 2020. 9. That the Legacy at North Star 3rd Addition Final Plat and PUD Plans meet the minimum requirements for a PUD including minimum lot area, open space and street layout. 10. That the Legacy at North Star 3rd Addition Final Plat and PUD Plans meet more than one of the required PUD objectives identified in Section 154.751 including providing: 1) more adequate, usable, and suitably located open space and recreational amenities and other public facility than would otherwise be provided under conventional development techniques, 2) Preservation and enhancement of important environmental features through careful and sensitive placement of buildings and facilities, and 3) Allowing the development to operate in concern with a redevelopment plan in certain areas of the City and to ensure the redevelopment goas and objective will be achieved. 11. That the Legacy at North Star 3rd Addition Final Plat and PUD Plans meet the allowed density requirements as allowed with PUD flexibility. 12. That the Applicant is providing the following amenities in the Legacy at North Star development, for which the City shall award amenity points: a. Pedestrian improvements including construction of a trail along the County right- of-way from 30th Way to the southerly plat limits; grading along the storm sewer outfall pipe location within the future right-of-way area along Lake Elmo Avenue of the property to the south of the proposed development along with dedication of County right-of-way to facilitate a future trail; and dedication of a 30-foot wide trail corridor along with construction of a trail connecting the trail within the development from Lak Elmo Avenue to the trail within the Hamlet on Sunfish Lake development (10 points). 3 b. Theming elements from the Lake Elmo Theming Study (1 point). c. Additional open space above 20% (2 points). d. Connection of sewer to Hamlet on Sunfish Lake Development (5 points). e. Provision of private park amenities including a clubhouse, tot lot, and pool (5 points). 13. That the proposed PUD will allow a more flexible, creative, and efficient approach to the use of the land, and will specifically relate to existing zoning district standards in the following manner (with exceptions as noted): a. Lot Dimensions and Bulk Building Requirements Villa Lots Interior Single Family Exterior Single Family Minimum Lot Width 55 ft. 55 ft. 65 ft. Minimum Lot Area 6,600 sq. ft. 6,840 sq. ft. 8,090 sq. ft. Minimum Front Yard Setback 15 ft. 25 ft. 25 ft. Minimum Side Yard Setback 7 ft./8 ft. 7 ft./8 ft. 10 ft./5 ft. or 7.5 ft./7.5 ft. Maximum Impervious Surface 50% 45% 45% NOW, THEREFORE, BE IT RESOLVED THAT the City Council does hereby approve the Legacy at North Star 3rd Addition Final Plat and PUD Plans subject to the following conditions: 1. Final grading, drainage, and erosion control plans, sanitary and storm water management plans, landscape plans, and street and utility construction plans shall be reviewed and approved by the City Engineer and applicable Staff before the recording of the Final Plat. All changes and modifications to the plans requested by the City Engineer in the memorandums addressing Legacy at North Star Third Addition Final Plat and PUD Plans dated February 17, 2020 shall be incorporated into these documents and the project plans before the City gives them final approval. Such revisions shall include the required drainage and utility easements and temporary cul-de- sacs, if necessary. 2. All easements as requested by the City Engineer and Public Works Department shall be documented on the Final Plat before its execution by City Officials. 3. Final Plat approval is contingent upon the inclusion of temporary cul-de-sacs as may be determined as necessary by the City Engineer. Any temporary cul-de-sac cannot encroach on a lot proposed for platting. 4 4. If applicable, the Final Plat be contingent upon the City receiving separate drainage and utility easements in the City’s standard form of easement agreement for all off-site development improvements (beyond the plat limits). All off-site easements must be clearly shown on the street, grading and utility plans, with all dimensions labeled. The easements must be obtained before the start of construction. 5. Before the execution of the Final Plat by City officials, the Developer shall enter into a Development Agreement acceptable to the City Attorney and approved by the City Council that delineates who is responsible for the design, construction, and payment of the required improvements and shall include the payment of required park dedication fees for the Legacy at North Star Third Addition Final Plat with financial guarantees therefore. 6. A Landscape License Agreement shall be prepared for the maintenance of commonly held homeowners’ association-owned and City-owned outlots, right-of-ways, and medians before the release of the final plat by City Officials. 7. That the developer provide a trail connecting to the trails of Hamlet on Sunfish Lake. The Applicant shall not receive parkland dedication credit for the trail outlot or easement or construction of the trial. 8. That the developer provide the City written verification from Washington County that sufficient right-of-way has been provided on the plat along with a sufficient right-of-way easement along the property to the south of the development before plat recording. Prior to construction, the plan section detailing southbound right turn lanes and center left turn lanes at 39th Street must be submitted and approved by the county traffic engineer, applicable Washington County right-of- way permits must be obtained, drainage report and calculations must be submitted, and access control shall be dedicated to Washington County along CSAH 17/Lake Elmo Avenue frontage. The Applicant shall be solely responsible for all construction costs associated with the intersection improvements as recommended by Washington County. (Complete) 9. If still needed, that the applicant provide a Roadway, Drainage and Utility Easement in City standard form of roadway easement agreement, along Lake Elmo Avenue (CSAH 17) from the southern boundary to Stillwater Boulevard North (CSAH 14), and consistent with the requirements of the preliminary plat approval. 10. That the Landscape Plans for this phase of the development be approved by the City’s Landscape Architect before recording of final plat. 11. That the applicant include in the Architectural Control guidelines for this phase of the development the requirements that villa lots utilize 4-sided architecture and garages facing the public right-of- ways to have windows and/or other architectural features. 12. That the applicant address all Fire Chief and Building Official comments in the final project plans. 13. That street names shall comply with City’s Street Naming Policy. 14. That the applicant pay the City the required parkland dedication fee applicable to this phase of the development, which is equivalent to a land dedication of 0.645 acres, before the City releases the final plat for recording. 5 15. That the applicant notify all home builders about possible City outdoor watering restrictions and that the home builders notify all home buyers that the City may impose limits on outdoor water use including no watering of grass or sod, unless the applicant is notifies by the city that this notice is no longer required. Said decision about whether or not this notice is no longer required shall be made at the sole discretion of the City. The applicant shall have the city approve the notification message before recording the final plat. 16. Except for along 41st Street north, at the required stub street (Kokanee Avenue North) and on Lots 3 and 4, Block 3, that the developer provide a 30 foot-wide open space buffer along to the northern development line as well as a 50 foot-wide open space buffer along the western line of the development. The City must approve the form of this buffer or easement before releasing the final plat for recording. For Lots 3 and 4, Block 3, the developer shall provide the City a detailed site, landscaping and/or berming plan for each lot that would be subject to City staff approval. This plan is to maximize the size of the buffer and no disturb (no build area) on each lot and is to show sufficient landscaping with trees and/or berming along the north property line of each lot to provide screening. These plans for each lot shall be subject to City staff approval and the no-disturb buffer area for each lot shall be included in the conservation easement or in another protective easement for the development. 17. That the development utilize Traditionaire LED Downlights from Xcel Energy for the development in lieu of the Street Light Type/Pole of Acorn with aluminum pole (all black) indicated in the City’s Engineering Standards and that streetlights be located only at intersections and at the ends of cul- de-sacs. 18. The developer record the approved final plat with Washington County within 180 days after City Council approval. Failure to record the final plat within 180 days of approval will cause the approval to become void. Passed and duly adopted this 7th day of April, 2020 by the City Council of Lake Elmo, Minnesota. ___________________________________ Mike Pearson, Mayor ATTEST: ____________________________________ Julie Johnson, City Clerk STATE OF MINNESOTA COUNTY OF WASHINGTON CITY OF LAKE ELMO RESOLUTION 2020 - 035 A RESOLUTION VACATING DRAINAGE AND UTILITY EASEMENT OVER OUTLOT B OF LEGACY AT NORTH STAR 1ST ADDITION WHEREAS, the City of Lake Elmo (City) is a municipal corporation organized and existing under the laws of the State of Minnesota; and WHEREAS, the City Council approved a Preliminary Plat and for the Legacy at North Star development in Lake Elmo on February 20, 2018 through adoption of Resolution 2018-013; and WHEREAS, the City Council approved the Legacy at North Star First Addition Final Plat on August 21, 2018 through adoption of Resolution 2018-090, which includes PID#s 14- 029-21-12-0013, 14-029-21-12-004 and PID# 14-029-21-11-0039; and WHEREAS, PID#s 14-029-21-12-0013, 14-029-21-12-004 and PID# 14-029-21-11- 0039 are owned by GWSA Land Development, LLC, Plymouth, MN 55441 (Owner); and WHEREAS, the City of Lake Elmo was granted a Drainage and Utility Easement over portions of PID#s 14-029-21-12-0013, 14-029-21-12-004, 14-029-21-11-0037 and PID# 14-029- 21-11-0039 and these easements were recorded with the Legacy at North Star First Addition Plat by the Office of the Registrar of Titles of Washington County on September 17, 2018; and WHEREAS, a request has been made to the City Council pursuant to Minnesota Statute §412.851 to vacate the Drainage and Utility Easements recorded with the Legacy at North Star First Addition by the Office of the Registrar of Titles of Washington County, Minnesota over PID# 14-029-21-11-0037, legally described as follows: All of the drainage and utility easements, as created and dedicated over, under, and across Outlot B, Legacy at North Star First Addition, according to the plat thereof, Washington County, Minnesota. WHEREAS, the City Clerk reviewed and examined the signatures on said request and determined the signatures constituted all of the landowners abutting upon the portion of easement to be vacated and rededicated; and WHEREAS, the Lake Elmo Planning Commission held a public hearing to consider the vacation of the Drainage and Utility Easements on the March 9, 2020 before the Planning Commission in the Lake Elmo City Hall located at 3800 Laverne Avenue North after due published and posted notice had been given and all interested and affected persons were given an opportunity to voice their concerns and be heard; and WHEREAS, the City Council in its discretion has determined that the vacation of the easements will benefit the public interest because: 1) The City has granted Final Plat Approval for Legacy at North Star 3rd Addition, which includes PID# 14-029-21-11-0037; which will grant the City more appropriate easements for similar purposes. WHEREAS, the City Council, at its meeting on April 7, 2020, considered the easement vacation request. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LAKE ELMO, COUNTY OF WASHINGTON MINNESOTA, that such request for vacation of an existing Drainage and Utility Easements is hereby granted in accordance with the property descriptions provided above, subject to the following condition of approval: 1) New easements as requested by the City Engineer and Public Works Director shall be recorded with the Legacy at North Star 3rd Addition Final Plat. BE IT FURTHER RESOLVED, that the Mayor and City Clerk are hereby authorized to sign all documents necessary to effectuate the intent of this resolution. Adopted by the Council this 7th day of April, 2020. Effective Date: ______________________ Approved: ________________________________ Mike Pearson, Mayor Attested by: ________________________________ Julie Johnson, City Clerk